JP4749914B2 - Partition facility construction structure and partition facility construction method in the approach part of underpass tunnel - Google Patents

Partition facility construction structure and partition facility construction method in the approach part of underpass tunnel Download PDF

Info

Publication number
JP4749914B2
JP4749914B2 JP2006097006A JP2006097006A JP4749914B2 JP 4749914 B2 JP4749914 B2 JP 4749914B2 JP 2006097006 A JP2006097006 A JP 2006097006A JP 2006097006 A JP2006097006 A JP 2006097006A JP 4749914 B2 JP4749914 B2 JP 4749914B2
Authority
JP
Japan
Prior art keywords
partition
joint
segment
end surface
approach
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2006097006A
Other languages
Japanese (ja)
Other versions
JP2007270501A (en
Inventor
忠彦 辻
公宏 吉田
昌佳 井澤
洋志 古賀
博英 橋本
一博 小林
晃洋 峯▲崎▼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2006097006A priority Critical patent/JP4749914B2/en
Publication of JP2007270501A publication Critical patent/JP2007270501A/en
Application granted granted Critical
Publication of JP4749914B2 publication Critical patent/JP4749914B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

本発明は、アンダーパストンネルのアプローチ部における仕切り設備構築構造および仕切り設備構築方法に関する。   The present invention relates to a partition facility construction structure and a partition facility construction method in an approach portion of an underpass tunnel.

従来、立体交差などにおけるアンダーパストンネルは、トンネル部の両側に立坑を構築し、両立坑間を推進工法やシールド工法などによって施工され、アプローチ部が開削工法によって施工されている。一般的にアプローチ部は上部が開放され、側壁部と底部からなるコンクリート構造となっている。開削施工されるアプローチ部は、予め杭の打設などの土留め作業が必要であり、振動、騒音が発生するといった周辺環境に対する問題があるうえ、これらの掘削作業を行う際に重機の配置や開削及び立坑に必要な路上の施工占有面積が広範囲となるため、都市部などでは施工箇所における交通障害が生じるという問題があった。
このような問題を解消するため、シールド工法により地上からシールド掘削機を発進させてアンダーパストンネルの全線をシールドトンネルで連続施工する方法が採用されている(例えば特許文献1参照)。
ところで、このアプローチ部の側壁部の上端には、高欄や防音壁などの仕切り設備が取り付けられることがある。仕切り設備の設置面(基礎部)は、地上面に略平行に形成される。仕切り設備を設置する際の基礎部の施工は、例えば、アプローチ部を開削によって施工する場合には、仕切り設備の基礎部をアプローチ部の側壁と同時に施工するものであり、具体的には型枠を設けてその内部に鉄筋籠や鉄筋を配筋してからコンクリートを打設して基礎部を構築していた。
特開2005−248546号公報
Conventionally, underpass tunnels at three-dimensional intersections and the like have been constructed with vertical shafts on both sides of the tunnel portion, constructed between the compatible wells by a propulsion method, a shield method, and the like, and the approach portion is constructed by an open-cut method. In general, the approach portion is open at the top and has a concrete structure consisting of a side wall and a bottom. The approach section to be excavated requires earth retaining work such as driving piles in advance, and there are problems with the surrounding environment such as vibration and noise. Since the construction occupation area on the road required for excavation and shafts is wide, there is a problem that traffic troubles occur at construction sites in urban areas.
In order to solve such a problem, a method in which a shield excavator is started from the ground by a shield method and all the lines of the underpass tunnel are continuously constructed by the shield tunnel (see, for example, Patent Document 1).
By the way, partition equipment such as a railing or a soundproof wall may be attached to the upper end of the side wall portion of the approach portion. The installation surface (base part) of the partition facility is formed substantially parallel to the ground surface. For example, when the approach part is constructed by excavation, the foundation part is installed at the same time as the side wall of the approach part. The base was constructed by placing concrete rods after placing reinforcing rods and reinforcing bars in the interior.
JP 2005-248546 A

しかしながら、特許文献1は、アプローチ部がセグメントで構築されたものであり、仕切り設備を設ける場合にセグメントの上端面に直接或いはコンクリートを打設してなる基礎部を介して取り付ける好適な構築方法がないといった問題があった。
また、設置したセグメントの上端面に基礎部を設ける場合、その上端面に例えば円孔を削孔し、この円孔にインサートなどを取り付けて鉄筋やアンカーを接続してセグメントより上方に突出させて基礎部のコンクリートに埋め込むようにした作業を行う必要があった。このように、現場においてセグメント上端面を加工して鉄筋やアンカーを取り付ける作業が発生することから、時間と手間がかかり、効率よく構築作業ができないという欠点があった。
However, in Patent Document 1, the approach part is constructed by a segment, and there is a suitable construction method for attaching a partition facility directly or through a foundation part formed by placing concrete on the upper end surface of the segment. There was no problem.
Also, when a foundation is provided on the upper end surface of the installed segment, for example, a circular hole is drilled on the upper end surface, and an insert or the like is attached to the circular hole, and a reinforcing bar or anchor is connected to protrude above the segment. It was necessary to perform the work of embedding in the concrete of the foundation. As described above, since the work of attaching the reinforcing bars and anchors by processing the upper end surface of the segment occurs at the site, there is a drawback that it takes time and labor, and the construction work cannot be efficiently performed.

本発明は、上述する問題点に鑑みてなされたもので、簡易な構築構造としたことで構築作業を効率化させ、作業時間を短縮したアンダーパストンネルのアプローチ部における仕切り設備構築構造および仕切り設備構築方法を提供することを目的とする。   The present invention has been made in view of the above-described problems, and has a simple construction structure, which improves the efficiency of the construction work and shortens the work time. The purpose is to provide a construction method.

上記目的を達成するため、本発明に係るアンダーパストンネルのアプローチ部における仕切り設備構築構造は、アンダーパストンネルのアプローチ部に構築されるセグメントの上方に、アプローチ部の内側と外側とを仕切る仕切り設備を取り付けるアンダーパストンネルのアプローチ部における仕切り設備構築構造であって、セグメントの上端面に埋設された第1接合継手と、仕切り設備の下端面に備えられた第2接合継手とが設けられ、第1接合継手に第2接合継手が係合して構成されていることを特徴としている。
本発明によれば、セグメントの製造時に、予めセグメントの上端面に第1接合継手を埋設しておくことで、アプローチ部にセグメントを設置した後に、その第1接合継手に仕切り設備の第2接合継手を係合させてアプローチ部の上部に仕切り設備を設置することができる。現場においてセグメントに対する加工が不要となる簡易な接合構造であることから、仕切り設備の構築作業の効率を向上させることができる。
In order to achieve the above object, the partition facility construction structure in the approach portion of the underpass tunnel according to the present invention is a partition facility that partitions the inside and outside of the approach portion above the segment constructed in the approach portion of the underpass tunnel. A partition facility construction structure in an approach portion of an underpass tunnel to which the first joint joint embedded in the upper end surface of the segment and a second joint joint provided in the lower end surface of the partition facility are provided, It is characterized in that the second joint is engaged with the one joint.
According to the present invention, when the segment is manufactured, the first joint joint is embedded in the upper end surface of the segment in advance, so that after the segment is installed in the approach portion, the second joint of the partition facility is attached to the first joint joint. A partition facility can be installed on the upper part of the approach part by engaging the joint. Since it is a simple joining structure that eliminates the need for processing on the segment at the site, the efficiency of construction work of the partition equipment can be improved.

また、本発明に係るアンダーパストンネルのアプローチ部における仕切り設備構築構造では、アンダーパストンネルのアプローチ部に構築されるセグメントの上方に、アプローチ部の内側と外側とを仕切る仕切り設備を取り付けるアンダーパストンネルのアプローチ部における仕切り設備構築構造であって、上端面より上方に接続部材を突出させたセグメントと、仕切り設備の設置面をなし、突出してなる接続部材が埋め込まれるようにコンクリートを打設して形成させた基礎部と、基礎部の上面に取り付けられた仕切り設備とから構成されていることを特徴としている。
本発明によれば、アプローチ部にセグメントを設置した後に、セグメントの上端面より突出している接続部材を埋設させてコンクリートを打設した基礎部に仕切り設備を設置することができる。そして、セグメントとコンクリートとは、接続部材を介して強固に接続されている。現場においてセグメントに対する加工が不要となる簡易な接合構造であることから、仕切り設備の構築作業の効率を向上させることができる。
Moreover, in the partition equipment construction structure in the approach part of the underpass tunnel according to the present invention, an underpass tunnel for attaching the partition equipment for partitioning the inside and outside of the approach part above the segment constructed in the approach part of the underpass tunnel. The partition equipment construction structure in the approach part of the above, a segment in which the connecting member protrudes above the upper end surface, and an installation surface of the partition equipment, and the concrete is placed so that the protruding connecting member is embedded It is characterized by being comprised from the formed base part and the partition installation attached to the upper surface of the base part.
According to this invention, after installing a segment in an approach part, the partition equipment can be installed in the foundation part which embed | buried the connection member which protrudes from the upper end surface of a segment, and laid concrete. And the segment and concrete are firmly connected via the connection member. Since it is a simple joining structure that eliminates the need for processing on the segment at the site, the efficiency of construction work of the partition equipment can be improved.

また、本発明に係るアンダーパストンネルのアプローチ部における仕切り設備構築構造では、接続部材は、セグメントの上端面に埋設されてなる雌型継手に接続されていることが好ましい。
本発明によれば、予め上端面に雌型継手を備えたセグメントをアプローチ部に設置した後に、雌型継手に接続部材を接続し、この接続部材を埋設させてコンクリートを打設した基礎部に仕切り設備を設置することができる。
Moreover, in the partition equipment construction structure in the approach part of the underpass tunnel which concerns on this invention, it is preferable that the connection member is connected to the female coupling embed | buried under the upper end surface of a segment.
According to the present invention, after a segment having a female joint on the upper end surface is installed in the approach portion in advance, a connecting member is connected to the female joint, and the connecting member is embedded in the foundation portion on which concrete is placed. Partition facilities can be installed.

また、本発明に係るアンダーパストンネルのアプローチ部における仕切り設備構築構造では、アンダーパストンネルのアプローチ部に構築されるセグメントの上方に、アプローチ部の内側と外側とを仕切る仕切り設備を取り付けるアンダーパストンネルのアプローチ部における仕切り設備構築方法であって、上端面に雌型継手を埋設させてなるセグメントを設置し、雌型継手に接続部材を接続させて上端面より上方に突出させ、突出している接続部材が埋め込まれるようにコンクリートを打設し、仕切り設備の設置面をなす基礎部を形成し、基礎部の上面に仕切り設備を取り付けるようにしたことを特徴としている。
本発明によれば、アプローチ部にセグメントを設置した後に、接続部材をセグメントの上端面の雌型継手に接続させることで、接続部材を介してセグメントとコンクリートとが強固に接続される。現場においてセグメントに対する加工が不要となる簡易な接合構造であることから、仕切り設備の構築作業の効率を向上させることができる。
Moreover, in the partition equipment construction structure in the approach part of the underpass tunnel according to the present invention, an underpass tunnel for attaching the partition equipment for partitioning the inside and outside of the approach part above the segment constructed in the approach part of the underpass tunnel. A partition facility construction method in the approach part of the above, wherein a segment is formed by embedding a female joint on the upper end surface, a connecting member is connected to the female joint and protruded upward from the upper end surface, and the protruding connection Concrete is cast so that the members are embedded, a base part forming the installation surface of the partition equipment is formed, and the partition equipment is attached to the upper surface of the base part.
According to this invention, after installing a segment in an approach part, a segment and concrete are firmly connected via a connection member by connecting a connection member to the female joint of the upper end surface of a segment. Since it is a simple joining structure that eliminates the need for processing on the segment at the site, the efficiency of construction work of the partition equipment can be improved.

本発明のアンダーパストンネルのアプローチ部における仕切り設備構築構造および仕切り設備構築方法によれば、セグメントの製造時に予めセグメントの上端面に第1接合継手を埋設しておくことで、アプローチ部にセグメントを設置した後に、第1接合継手に仕切り設備の第2接合継手を係合させてアプローチ部の上部に仕切り設備を設置することができる。
また、アプローチ部にセグメントを設置した後に、セグメントの上端面より突出している接続部材を埋設させてコンクリートを打設した基礎部に仕切り設備を設置することができる。
このように、現場におけるセグメントに対する加工作業が不要となる簡易な接合構造を実現できる。したがって、構築作業において時間や手間がかからず効率化できるため、作業時間の短縮を図ることができる。
According to the partition facility construction structure and the partition facility construction method in the approach portion of the underpass tunnel of the present invention, the segment is placed in the approach portion by embedding the first joint joint in the upper end surface of the segment in advance when the segment is manufactured. After the installation, the partition equipment can be installed on the upper portion of the approach portion by engaging the second joint of the partition equipment with the first joint.
Moreover, after installing a segment in an approach part, the partition equipment can be installed in the foundation part which embed | buried the connection member which protrudes from the upper end surface of a segment and laid concrete.
In this way, a simple joining structure that eliminates the need for processing operations on the segment in the field can be realized. Therefore, the construction work can be performed efficiently without taking time and effort, and the work time can be shortened.

以下、本発明の第一の実施の形態によるアンダーパストンネルのアプローチ部における仕切り設備構築構造および仕切り設備構築方法について、図1乃至図3に基づいて説明する。
図1は本発明の第一の実施の形態による仕切り設備構築構造を示す破断斜視図、図2(a)はアンダーパストンネルの概略構成を示す側面図、(b)はアプローチ部における仕切り設備の設置状態を示す側面図、図3は仕切り設備構築構造の接合部を示す図であって、(a)はその要部側面図、(b)はその要部断面図である。
Hereinafter, the partition equipment construction structure and the partition equipment construction method in the approach part of the underpass tunnel according to the first embodiment of the present invention will be described with reference to FIGS. 1 to 3.
FIG. 1 is a cutaway perspective view showing a partition facility construction structure according to a first embodiment of the present invention, FIG. 2A is a side view showing a schematic configuration of an underpass tunnel, and FIG. 1B is a view of a partition facility in an approach section. FIG. 3 is a side view showing the installation state, FIG. 3 is a view showing the joint part of the partition facility construction structure, (a) is a side view of the main part, and (b) is a cross-sectional view of the main part.

図1に示すように、本第一の実施の形態によるアンダーパストンネルのアプローチ部における仕切り設備構築構造1は、シールド工法によって地山内に延設された矩形状のセグメントにより構築されたシールドトンネルからなる立体交差などのアンダーパストンネル2のアプローチ部2Aに適用される。そして、アプローチ部2Aに設置されるセグメント20の上端面20aには、接合部Sを介して例えば防音壁や高欄などの仕切り設備10が固定されている。   As shown in FIG. 1, the partition facility construction structure 1 in the approach portion of the underpass tunnel according to the first embodiment is a shield tunnel constructed by a rectangular segment extended in a natural ground by a shield method. This is applied to the approach portion 2A of the underpass tunnel 2 such as a three-dimensional intersection. A partition facility 10 such as a soundproof wall or a balustrade is fixed to the upper end surface 20a of the segment 20 installed in the approach portion 2A via a joint portion S.

先ず、本仕切り設備構築構造1が適用されるアンダーパストンネル2及びアプローチ部2Aについて説明する。
図2(a)及び(b)に示すように、アンダーパストンネル2は、側面視で略U字形に構築され、地中内に延設されているトンネル部2Bと、地上面Gからトンネル部2Bまでを連絡してなり上方が開放されたアプローチ部2Aとからなる。つまり、地上から地中に向けて徐々に深度を増していく傾斜路が形成され、所定の深さで略水平方向となり、さらに所定の位置で地上に向けた上り勾配の傾斜路が形成されている。
First, the underpass tunnel 2 and the approach part 2A to which the present partition facility construction structure 1 is applied will be described.
As shown in FIGS. 2A and 2B, the underpass tunnel 2 is constructed in a substantially U shape in a side view, and extends from the ground surface G to the tunnel portion 2B. It consists of an approach portion 2A that communicates up to 2B and is open at the top. In other words, a slope that gradually increases in depth from the ground toward the ground is formed, becomes a substantially horizontal direction at a predetermined depth, and further, an upward slope is formed at a predetermined position toward the ground. Yes.

図2(a)に示すように、本アンダーパストンネル2の施工に採用されるシールド工法は、周知の種々の工法を採用できるが、本第一の実施の形態では、断面の有効利用といった利点から矩形断面シールド機(図示省略)が使用され、この矩形シールド掘削機の後方でコンクリート製のセグメントが組み立てられている。
なお、本矩形シールド掘削機は、例えばカッタを複数に分割させることで各々の掘削断面を小さくして掘削できる。そして、下部カッタより上部カッタを先行させることで、土被りの小さなアプローチ部2Aでも地山を安定させて掘削できる。
As shown in FIG. 2A, the shield method employed in the construction of the underpass tunnel 2 can employ various well-known methods, but the first embodiment has the advantage of effective use of the cross section. A rectangular cross-section shield machine (not shown) is used, and a concrete segment is assembled behind this rectangular shield excavator.
In addition, this rectangular shield excavator can excavate by making each excavation cross section small, for example by dividing | segmenting a cutter into plurality. Then, by leading the upper cutter before the lower cutter, the approach portion 2A with a small earth covering can stably excavate the natural ground.

図1に示すように、アプローチ部2Aにトンネル軸方向に連続して構築されるセグメントリング20は、個々のセグメントピースを周方向に接続して構成され、上端を開放した断面視で略U型状をなしている。すなわち、セグメントリング20は、側部20b、20bと底部20cとからなる。そして、セグメントリング20の上端面20aが例えば地上面Gに略面一となるように構築されている。そのため、トンネルの深度が増加するにしたがって、セグメントリング20の側部20b(図2(b)参照)の高さ寸法が大きくなる。   As shown in FIG. 1, the segment ring 20 constructed continuously in the tunnel axis direction on the approach portion 2A is configured by connecting individual segment pieces in the circumferential direction, and is substantially U-shaped in a sectional view with the upper end opened. It has a shape. That is, the segment ring 20 includes side portions 20b and 20b and a bottom portion 20c. And the upper end surface 20a of the segment ring 20 is constructed so as to be substantially flush with the ground surface G, for example. Therefore, as the tunnel depth increases, the height dimension of the side portion 20b of the segment ring 20 (see FIG. 2B) increases.

図1に示す本第一の実施の形態による仕切り設備10では、防音壁を対象としている。この仕切り設備10、10は、その内側面10b、10b同士を対向させて配置され、セグメントリング20の上端面20aに沿ってトンネル軸方向に連続して設置されている。また、仕切り設備10は、トンネル軸方向に任意の長さに分割されている。   In the partition facility 10 according to the first embodiment shown in FIG. 1, a soundproof wall is targeted. The partitioning facilities 10 and 10 are arranged with their inner side surfaces 10b and 10b facing each other, and are continuously installed along the upper end surface 20a of the segment ring 20 in the tunnel axis direction. Moreover, the partition equipment 10 is divided | segmented into arbitrary lengths in the tunnel axial direction.

次に、接合部Sについて説明する。図3(a)及び(b)に示すように、セグメント20の上端面20aには、セグメント1ピース当たり二箇所の第1接合継手21、21が所定の位置に埋設されている。この第1接合継手21には、箱形状の凹陥部21a、21aが形成されており、凹陥部21aの開口部を上端面20aと同一面上で覆う係止板21bが設けられ、この係止板20bの略中央には貫通孔21cが形成されている。また、各第1接合継手21には埋込鉄筋22が設けられ、この埋込鉄筋22がセグメント20のコンクリートに埋め込まれている。
また、仕切り設備10における下端面10aには、第1接合継手21、21と対向する位置に第2接合継手11、11が埋設されて備えられている。この第2接合継手11は、第1接合継手21と同様の構成をなし、凹陥部11aが形成され、仕切り設備10の下端面10aに貫通孔11cが形成された係止板11bが設けられている。そして、第2接合継手11にもまた、埋込鉄筋12が仕切り設備10内に埋め込まれている。
Next, the joint part S will be described. As shown in FIGS. 3A and 3B, two first joints 21, 21 are embedded at predetermined positions on the upper end surface 20 a of the segment 20 per piece of the segment. The first joint 21 is formed with box-shaped recesses 21a and 21a, and is provided with a locking plate 21b that covers the opening of the recess 21a on the same plane as the upper end surface 20a. A through hole 21c is formed in the approximate center of the plate 20b. Each first joint 21 is provided with an embedded reinforcing bar 22, and the embedded reinforcing bar 22 is embedded in the concrete of the segment 20.
Moreover, the 2nd junction joints 11 and 11 are embed | buried and provided in the lower end surface 10a in the partition equipment 10 in the position facing the 1st junction joints 21 and 21. As shown in FIG. The second joint joint 11 has the same configuration as the first joint joint 21, has a recessed portion 11 a, and is provided with a locking plate 11 b in which a through hole 11 c is formed in the lower end surface 10 a of the partition facility 10. Yes. Further, the embedded reinforcing bars 12 are also embedded in the partition facility 10 in the second joint joint 11.

そして、図3(a)及び(b)に示すように、互いの貫通孔21c、11cを同軸上に配置させてセグメント20の上端面20aに仕切り設備10が設置された状態で、ボルト4を第2接合継手11の凹陥部11aから貫通孔11c、21cに挿通させ、第1接合継手21の凹陥部21aからナット5を挿入してボルト4の先端に螺合させる。この第1及び第2接合継手21、11の凹陥部21a、11aはセグメント20の内周側(内空側)に面して設けられているため、ボルト締結の作業はアプローチ部2Aの内側から行うことができる。
そして、セグメント20の上端面20aと仕切り設備10の下端面10aとを接合させることにより、アプローチ部2Aの上端部に仕切り設備10が取り付けられて仕切り設備構築構造1が構築されることになる。
Then, as shown in FIGS. 3A and 3B, the bolts 4 are attached in a state in which the through holes 21 c and 11 c are arranged coaxially and the partition equipment 10 is installed on the upper end surface 20 a of the segment 20. The through-holes 11 c and 21 c are inserted from the recessed portion 11 a of the second joint joint 11, and the nut 5 is inserted from the recessed portion 21 a of the first joint joint 21 and screwed to the tip of the bolt 4. Since the recessed portions 21a and 11a of the first and second joint joints 21 and 11 are provided facing the inner peripheral side (inner air side) of the segment 20, the bolt fastening operation is performed from the inside of the approach portion 2A. It can be carried out.
Then, by joining the upper end surface 20a of the segment 20 and the lower end surface 10a of the partition facility 10, the partition facility 10 is attached to the upper end portion of the approach portion 2A and the partition facility construction structure 1 is constructed.

上述したように実施の形態によるアンダーパストンネルのアプローチ部における仕切り設備構築構造および仕切り設備構築方法では、セグメント20の製造時に予めその上端面20aに第1接合継手21を埋設しておくことで仕切り設備10とセグメント20との仕切り設備構築構造1が簡易となり、現場におけるセグメントに対する加工作業が不要となる簡易な接合構造を実現できる。したがって、構築作業において時間や手間がかからず効率化できるため、作業時間の短縮を図ることができる。   As described above, in the partition facility construction structure and the partition facility construction method in the approach portion of the underpass tunnel according to the embodiment, the first joint joint 21 is embedded in the upper end surface 20a in advance when the segment 20 is manufactured. The partition facility construction structure 1 between the facility 10 and the segment 20 is simplified, and a simple joining structure that eliminates the need for processing work on the segment at the site can be realized. Therefore, the construction work can be performed efficiently without taking time and effort, and the work time can be shortened.

次に、本第一の実施の形態の変形例及び第二の実施の形態について、図4〜図6に基づいて説明するが、上述の第一の実施の形態と同一又は同様な部材、部分には同一の符号を用いて説明を省略し、第一の実施の形態と異なる構成について説明する。
図4は第一の実施の形態の変形例による仕切り設備接合構造の説明図であって、(a)はその接合工程を示す側面断面図、(b)は接合時の状態を示す断面図である。
図4(a)及び(b)に示すように、本変形例による仕切り設備構築構造1では、第一の実施の形態による第1及び第2接合継手(図3(a)及び(b)参照)に代えて、セグメント20に第3接合継手30を備え、この第3接合継手30に対して第4接合継手40を備えたものであり、第3接合継手30と第4接合継手40との接合は、仕切り設備10をトンネル軸方向(図4(a)に示すF方向、これを「スライド方向)とする)にスライドさせる構成となっている。
第3接合継手30は、セグメント20の上端面20aに埋設され、断面C型形状をなすC型金物31がその凹部31aの開口を上端面20a側に向けて配置されている。そして、凹部31aには、断面H型形状をなすH型金物32の一端が固着され、その他端(突出係合部32a)が上端面20aより上方に突出されている。
一方、第4接合継手40は、仕切り設備10の下端面10aに設けられ、断面C型状をなしていてスライド方向に所定の長さで形成された溝状のC型溝金物41と、C型金物41のスライド方向側に隣接して形成された受け穴42とからなる。C型溝金物41は、溝部41aの開口を下端面10aに向けて配置されている。そして、溝部41aは、スライド方向にテーパ面が形成されている。
仕切り設備10をセグメント20に固定する方法は、先ずセグメント20の第3接合継手30の突出係合部32aを受け穴42に挿入させるようにして仕切り設備10の下端面10aを矢印E方向に移動させてセグメント20の上端面20aに当接させる。次いで、仕切り設備10を上端面20aに沿って矢印F方向にスライドさせると、突出係合部32aが溝部41a内に挿入して係合される。このとき、溝部41aがテーパ状に形成されているため楔作用により突出係合部32aは容易に抜けることはない。
このように構成される変形例では、現場においてセグメント20に加工作業を行うことなくセグメント20と仕切り設備10とを接続することができるため、第一の実施の形態と同様の効果を奏する。
Next, a modification of the first embodiment and the second embodiment will be described with reference to FIGS. 4 to 6, but the same or similar members and parts as those of the first embodiment described above. The same reference numerals are used to omit the description, and a configuration different from that of the first embodiment will be described.
4A and 4B are explanatory views of a partition equipment joint structure according to a modification of the first embodiment, in which FIG. 4A is a side sectional view showing the joining process, and FIG. 4B is a sectional view showing a state at the time of joining. is there.
As shown to Fig.4 (a) and (b), in the partition installation construction structure 1 by this modification, the 1st and 2nd junction joint by 1st embodiment (refer Fig.3 (a) and (b)) ), The segment 20 is provided with a third joint joint 30, and the third joint joint 30 is provided with a fourth joint joint 40. The third joint joint 30 and the fourth joint joint 40 are The joining is configured such that the partition facility 10 is slid in the tunnel axis direction (the F direction shown in FIG. 4A, which is referred to as “sliding direction”).
The third joint joint 30 is embedded in the upper end surface 20a of the segment 20, and a C-shaped metal piece 31 having a C-shaped cross section is disposed with the opening of the recess 31a facing the upper end surface 20a. Then, one end of an H-shaped metal piece 32 having an H-shaped cross section is fixed to the recess 31a, and the other end (projecting engagement portion 32a) projects upward from the upper end surface 20a.
On the other hand, the fourth joint 40 is provided on the lower end surface 10a of the partition facility 10, and has a C-shaped grooved metal 41 having a C-shaped cross section and a predetermined length in the sliding direction, It consists of a receiving hole 42 formed adjacent to the slide direction side of the mold 41. The C-shaped grooved metal 41 is arranged with the opening of the groove 41a facing the lower end surface 10a. The groove 41a has a tapered surface in the sliding direction.
The method of fixing the partition facility 10 to the segment 20 is to move the lower end surface 10a of the partition facility 10 in the direction of arrow E by first inserting the protruding engagement portion 32a of the third joint joint 30 of the segment 20 into the receiving hole 42. To be brought into contact with the upper end surface 20a of the segment 20. Next, when the partition facility 10 is slid along the upper end surface 20a in the direction of arrow F, the projecting engagement portion 32a is inserted into the groove portion 41a and engaged. At this time, since the groove portion 41a is formed in a tapered shape, the protruding engagement portion 32a is not easily pulled out by the wedge action.
In the modified example configured as described above, the segment 20 and the partition facility 10 can be connected to the segment 20 without performing a machining operation at the site, so that the same effect as that of the first embodiment is achieved.

次に、図5は本発明の第二の実施の形態の仕切り設備構築構造を示す断面図、図6は第二の実施の形態の変形例による仕切り設備構築構造を示す断面図である。
図5に示すように、第二の実施の形態による仕切り設備構築構造1は、仕切り設備10がコンクリート50を介しセグメント20に固定される構造である。
アプローチ部2Aにおけるセグメント20には、円筒形状の第一カプラー61(雌型継手)が埋設されている。この第一カプラー61には孔61aが設けられ、その孔61aの内面にはメネジが形成されている。そして、第一カプラー61の下端側に鉄筋62を螺合させた状態で埋設されている。第一カプラー61の他端面はセグメント20の上端面20aと同一面に配置されている。
そして、セグメント20を所定位置に設置した後、第一カプラー61の孔61aの上端側に、両端に雄ネジが形成されている連結ボルト63の一端部63aを螺合させて他端部63bを上端面20aより所定の長さで突出させておく。そして、その他端部63bに第二カプラー64の一部を螺合させ、第二カプラー64に第二鉄筋65(本発明による接続部材に相当)の基端部65aを螺合接続する。さらに、第二鉄筋65を埋め込むようにして型枠6、6を設置し、その型枠6内にコンクリート50を打設する。コンクリート50の上面50aは、仕切り設備10の設置面となる。
なお、仕切り設備10とコンクリート50との接続方法は、例えば、コンクリート50に仕切り設備10を取り付けるための接続部材(図示省略)などを埋設したり、仕切り設備10の下端部をコンクリート50と共に固定したりする方法があるが、仕切り設備10の構造に対応した接続方法を適宜選択すればよいことは言うまでもない。
なお、図6に示すように、第二の実施の形態の第一カプラー61(図5参照)に代えてメネジが形成された略Y型形状の雌型インサート66(雌型継手)をセグメント20に埋め込ませる構成としてもよい(第二の実施の形態の変形例)。
本第二の実施の形態およびその変形例についても仕切り設備10の基礎部をなすコンクリート50とセグメント20との接続を現場において簡易に構築できることから、第一の実施の形態と同様の効果が得られる。
Next, FIG. 5 is a sectional view showing a partition facility construction structure according to the second embodiment of the present invention, and FIG. 6 is a sectional view showing a partition facility construction structure according to a modification of the second embodiment.
As shown in FIG. 5, the partition facility construction structure 1 according to the second embodiment is a structure in which the partition facility 10 is fixed to the segment 20 via the concrete 50.
A cylindrical first coupler 61 (female joint) is embedded in the segment 20 of the approach portion 2A. The first coupler 61 is provided with a hole 61a, and a female screw is formed on the inner surface of the hole 61a. And it is embed | buried in the state which made the rebar 62 screwed together in the lower end side of the 1st coupler 61. FIG. The other end surface of the first coupler 61 is disposed on the same plane as the upper end surface 20 a of the segment 20.
Then, after the segment 20 is installed at a predetermined position, one end portion 63a of a connecting bolt 63 having male screws formed at both ends is screwed to the upper end side of the hole 61a of the first coupler 61, and the other end portion 63b is connected. It protrudes from the upper end surface 20a by a predetermined length. Then, a part of the second coupler 64 is screwed to the other end 63b, and the base end 65a of the second reinforcing bar 65 (corresponding to the connecting member according to the present invention) is screwed to the second coupler 64. Further, the molds 6 and 6 are installed so as to embed the second reinforcing bars 65, and the concrete 50 is placed in the mold 6. The upper surface 50 a of the concrete 50 is an installation surface of the partition facility 10.
In addition, the connection method of the partition equipment 10 and the concrete 50 is, for example, embedded a connection member (not shown) for attaching the partition equipment 10 to the concrete 50, or fixing the lower end portion of the partition equipment 10 together with the concrete 50. However, it goes without saying that a connection method corresponding to the structure of the partition facility 10 may be selected as appropriate.
As shown in FIG. 6, instead of the first coupler 61 (see FIG. 5) of the second embodiment, a substantially Y-shaped female insert 66 (female joint) in which a female thread is formed is connected to a segment 20. It is good also as a structure embedded in (a modification of 2nd embodiment).
Since the connection between the concrete 50 and the segment 20 that form the foundation of the partition facility 10 can be easily constructed in the field for the second embodiment and its modifications, the same effects as those of the first embodiment can be obtained. It is done.

以上、本発明によるアンダーパストンネルのアプローチ部における仕切り設備構築構造および仕切り設備構築方法の第一及び第二の実施の形態について説明したが、本発明は上記の第一及び第二の実施の形態に限定されるものではなく、その趣旨を逸脱しない範囲で適宜変更可能である。
例えば、本発明による第一の実施の形態及び変形例では接合部Sをボルト締結やスライド移動させてなる接合構造としているが、これらの接合構造に限定されることはない。例えば、この他の接合継手として、セグメント20又は仕切り設備10のどちらか一方の接合面にピンボルトを内装させた雄型継手を備え、他方の接合面にそのピンボルトを挿入締結させる孔部を形成してなる雌型継手を備え、ピンボルトを孔部に挿入させることでセグメント20と仕切り設備10とを締結させる接合構造であってもよい。
また、第一及び第二の実施の形態では防音壁を対象にした仕切り設備10としているが、防音壁に限定されることはない。仕切り設備は、使用用途に応じた種類があり、夫々構造も異なることから、採用される仕切り設備に適した仕切り設備構築構造1とすればよい。
As described above, the first and second embodiments of the partition facility construction structure and the partition facility construction method in the approach portion of the underpass tunnel according to the present invention have been described, but the present invention is the first and second embodiments described above. The present invention is not limited to this, and can be appropriately changed without departing from the spirit of the invention.
For example, in the first embodiment and the modification according to the present invention, the joining portion S has a joining structure formed by bolt fastening or sliding movement, but the invention is not limited to these joining structures. For example, as this other joint joint, a male joint in which a pin bolt is housed in one of the joint surfaces of the segment 20 or the partition facility 10 is provided, and a hole for inserting and fastening the pin bolt is formed in the other joint surface. The joining structure which fastens the segment 20 and the partition equipment 10 by inserting the pin bolt into the hole portion may be provided.
In the first and second embodiments, the partition facility 10 is intended for a soundproof wall, but is not limited to the soundproof wall. There are various types of partition facilities depending on the intended use, and the structures are different from each other. Therefore, the partition facility construction structure 1 suitable for the partition facility employed may be used.

本発明の第一の実施の形態による仕切り設備構築構造を示す破断斜視図である。It is a fracture perspective view showing the partition equipment construction structure by a first embodiment of the present invention. (a)はアンダーパストンネルの概略構成を示す側面図、(b)はアプローチ部における仕切り設備の設置状態を示す側面図である。(A) is a side view which shows schematic structure of an underpass tunnel, (b) is a side view which shows the installation state of the partition installation in an approach part. 仕切り設備構築構造の接合部を示す図であって、(a)はその要部側面図、(b)はその要部断面図である。It is a figure which shows the junction part of a partition installation construction, Comprising: (a) is the principal part side view, (b) is the principal part sectional drawing. 第一の実施の形態の変形例による仕切り設備接合構造の説明図であって、(a)はその接合工程を示す側面断面図、(b)は接合時の状態を示す断面図である。It is explanatory drawing of the partition equipment joining structure by the modification of 1st embodiment, (a) is side sectional drawing which shows the joining process, (b) is sectional drawing which shows the state at the time of joining. 本発明の第二の実施の形態の仕切り設備構築構造を示す断面図である。It is sectional drawing which shows the partition installation construction structure of 2nd embodiment of this invention. 第二の実施の形態の変形例による仕切り設備構築構造を示す断面図である。It is sectional drawing which shows the partition installation construction structure by the modification of 2nd embodiment.

符号の説明Explanation of symbols

1 仕切り設備構築構造
2 アンダーパストンネル
2A アプローチ部
10 仕切り設備
10a 下端面
11 第2接合継手
20 セグメント
20a 上端面
21 第1接合継手
30 第3接合継手
40 第4接合継手
50 コンクリート
61 第一カプラー(雌型継手)
63 連結ボルト
65 第二鉄筋(接続部材)
66 雌型インサート(雌型継手)

DESCRIPTION OF SYMBOLS 1 Partitioning equipment construction structure 2 Underpass tunnel 2A Approach part 10 Partitioning equipment 10a Lower end surface 11 2nd joining joint 20 Segment 20a Upper end surface 21 1st joining joint 30 3rd joining joint 40 4th joining joint 50 Concrete 61 1st coupler ( Female fitting)
63 Connecting bolt 65 Second rebar (connecting member)
66 Female Insert (Female Joint)

Claims (4)

アンダーパストンネルのアプローチ部に構築されるセグメントの上方に、前記アプローチ部の内側と外側とを仕切る仕切り設備を取り付けるアンダーパストンネルのアプローチ部における仕切り設備構築構造であって、
前記セグメントの上端面に埋設された第1接合継手と、
前記仕切り設備の下端面に備えられた第2接合継手と、
が設けられ、
前記第1接合継手に前記第2接合継手が係合して構成されていることを特徴とするアンダーパストンネルのアプローチ部における仕切り設備構築構造。
A partition facility construction structure in the approach portion of the underpass tunnel, in which a partition facility for partitioning the inside and outside of the approach portion is installed above the segment constructed in the approach portion of the underpass tunnel,
A first joint joint embedded in the upper end surface of the segment;
A second joint joint provided on a lower end surface of the partition equipment;
Is provided,
A partition facility construction structure in an approach portion of an underpass tunnel, wherein the second joint is engaged with the first joint.
アンダーパストンネルのアプローチ部に構築されるセグメントの上方に、前記アプローチ部の内側と外側とを仕切る仕切り設備を取り付けるアンダーパストンネルのアプローチ部における仕切り設備構築構造であって、
上端面より上方に接続部材を突出させた前記セグメントと、
前記仕切り設備の設置面をなし、前記突出してなる前記接続部材が埋め込まれるようにコンクリートを打設して形成させた基礎部と、
前記基礎部の上面に取り付けられた前記仕切り設備と、
から構成されていることを特徴とするアンダーパストンネルのアプローチ部における仕切り設備構築構造。
A partition facility construction structure in the approach portion of the underpass tunnel, in which a partition facility for partitioning the inside and outside of the approach portion is installed above the segment constructed in the approach portion of the underpass tunnel,
The segment projecting the connecting member above the upper end surface;
None the installation surface of the partition facilities, a base portion which is formed by Da設concrete so that the connecting member formed by the projection is embedded,
The partition equipment attached to the upper surface of the foundation, and
A partition facility construction structure in the approach part of the underpass tunnel characterized by comprising
前記接続部材は、前記セグメントの前記上端面に埋設されてなる雌型継手に接続されていることを特徴とする請求項2に記載のアンダーパストンネルのアプローチ部における仕切り設備構築構造。 3. The partition facility construction structure for an approach portion of an underpass tunnel according to claim 2, wherein the connection member is connected to a female joint embedded in the upper end surface of the segment. アンダーパストンネルのアプローチ部に構築されるセグメントの上方に、前記アプローチ部の内側と外側とを仕切る仕切り設備を取り付けるアンダーパストンネルのアプローチ部における仕切り設備構築方法であって、
上端面に雌型継手を埋設させてなる前記セグメントを設置し、
前記雌型継手に接続部材を接続させて前記上端面より上方に突出させ、
前記突出している接続部材が埋め込まれるようにコンクリートを打設し、前記仕切り設備の設置面をなす基礎部を形成し、
前記基礎部の上面に前記仕切り設備を取り付けるようにしたことを特徴とするアンダーパストンネルのアプローチ部における仕切り設備構築方法。
A partition facility construction method in the approach portion of the underpass tunnel, in which a partition facility that partitions the inside and outside of the approach portion is installed above a segment constructed in the approach portion of the underpass tunnel,
Install the segment with the female joint embedded in the upper end surface,
Connecting a connecting member to the female joint and projecting upward from the upper end surface;
Placing concrete so that the protruding connection member is embedded, forming a base part that forms an installation surface of the partition equipment,
A partition facility construction method in an approach portion of an underpass tunnel, wherein the partition facility is attached to an upper surface of the foundation portion.
JP2006097006A 2006-03-31 2006-03-31 Partition facility construction structure and partition facility construction method in the approach part of underpass tunnel Expired - Fee Related JP4749914B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006097006A JP4749914B2 (en) 2006-03-31 2006-03-31 Partition facility construction structure and partition facility construction method in the approach part of underpass tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006097006A JP4749914B2 (en) 2006-03-31 2006-03-31 Partition facility construction structure and partition facility construction method in the approach part of underpass tunnel

Publications (2)

Publication Number Publication Date
JP2007270501A JP2007270501A (en) 2007-10-18
JP4749914B2 true JP4749914B2 (en) 2011-08-17

Family

ID=38673587

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006097006A Expired - Fee Related JP4749914B2 (en) 2006-03-31 2006-03-31 Partition facility construction structure and partition facility construction method in the approach part of underpass tunnel

Country Status (1)

Country Link
JP (1) JP4749914B2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4309219B2 (en) * 2003-09-30 2009-08-05 大成建設株式会社 Tunnel construction method

Also Published As

Publication number Publication date
JP2007270501A (en) 2007-10-18

Similar Documents

Publication Publication Date Title
KR101161332B1 (en) Construction method of the underground tunnel
KR100563272B1 (en) Earthworks for construction excavation
JP2015117545A (en) How to build an underground tunnel
KR20200145226A (en) Continuous Steel Material constituting Wall Connected to Plurality of Units and Underground Structure Construction Method Using the Same
JP6901889B2 (en) Outer shell leading tunnel construction method
JP2003193494A (en) Underground hollow structure constructing method and the underground hollow structure
JP4958044B2 (en) Installation structure and installation method for shield tunnel approach
JP4749914B2 (en) Partition facility construction structure and partition facility construction method in the approach part of underpass tunnel
JP2009287172A (en) Method for constructing base-isolated building by inverted construction method
JP2009263883A (en) Construction method for steel shell element
KR102570335B1 (en) Apparatus for guide biulding file using sheathing
JP6895740B2 (en) Horizontal force restraint structure
KR20070052109A (en) Simultaneous construction of slab and exterior wall and underground reverse casting using slim composite floor structure
JP6266411B2 (en) Ground excavation method
JP2005325556A (en) Concrete sheet pile
JP4833089B2 (en) Water stop device for underground penetrating body and construction method of underground penetrating body using the same
JP2009102804A (en) Earth retaining construction method
JP2017066836A (en) Core material for earth retaining wall and upper core material removing method
JP4440152B2 (en) Construction method of underground penetrating body and steel shell element therefor
KR20210098162A (en) Under ground structure using column steel pipe wall and construction method thereof
JP2010144469A (en) Construction method of intended underground outer wall, underground outer wall and earth retaining wall
JP4023532B2 (en) Underground continuous wall and its construction method
JP3681746B1 (en) Iron sheet pile and its insertion method
JP2008002154A (en) Segment unit
KR102184081B1 (en) Construction method for perforating goround bore using inverse casing

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090330

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20101203

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101214

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110210

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110510

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110518

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140527

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees