JP4584419B2 - Hollow structure having a plurality of hollow portions - Google Patents
Hollow structure having a plurality of hollow portions Download PDFInfo
- Publication number
- JP4584419B2 JP4584419B2 JP2000181784A JP2000181784A JP4584419B2 JP 4584419 B2 JP4584419 B2 JP 4584419B2 JP 2000181784 A JP2000181784 A JP 2000181784A JP 2000181784 A JP2000181784 A JP 2000181784A JP 4584419 B2 JP4584419 B2 JP 4584419B2
- Authority
- JP
- Japan
- Prior art keywords
- hollow
- wall member
- hollow structure
- embankment
- side wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Description
【0001】
【発明の属する技術分野】
この発明は、例えば、並列した複数のトンネル(中空部)を一体に形成してなる構造物などの、並列した状態の複数の中空部を有する中空構造物に関するものである。
【0002】
【従来の技術】
複数の中空部を有する中空構造物として、従来では、図2に示すように、各中空部20を構成している各上壁部材21と各底壁部材22とが同一レベルに位置しており、同一規模の空間で構成した各中空部20を同一面上に複数並列するような形態のものが一般に知られている。
【0003】
【発明が解決しようとする課題】
前述した従来の中空構造物は、上面が傾斜している盛土部分に設置するのには不向きなものであった。
【0004】
詳述すると、例えば、図2に示すように、河川に橋23を架ける場合その橋23の桁高Lを一定以上確保するためには、橋23に向かって上面が傾斜した盛土部分24を形成して、橋23への導入路25を作る必要がある。
【0005】
そして、この盛土部分はその周辺地域を分断してしまうこととなるので、従来から、盛土部分にトンネル(中空部)を形成して、盛土部分の中を通行できるようにすることが行われている。
【0006】
このトンネル(中空部)の形成は、盛土後に掘削するよりも、中空構造物の設置後その上に盛土した方が、簡単に短時間で行える。
【0007】
ところが、前述した従来の中空構造物を設置した後に盛土しようとすると、図に示すように、従来の中空構造物26の各上壁部材21は同一レベルに位置しているので、上壁部材21と盛土部分24の傾斜した上面24aとが干渉してしまい、傾斜した上面24aを形成することができなくなってしまう。
【0008】
なお、中空部が一つの中空構造物を盛土の最も高い部分一か所のみに設置すれば、傾斜した上面に関係なく、トンネル(中空部)を形成することはできる。しかし、例えば、二車線にすることや、車と人とを別けて通行させることができない等、盛土部分の有効利用ができなくなる。
【0009】
このように、前述した従来の中空構造物では、トンネル(中空部)の形成は簡単に短時間で行えるものの、その複数の中空部を有効に利用することが、即ち、盛土部分を有効利用できるようにすることができなかった。
【0010】
この発明は前述した事情に鑑みて創案されたもので、その目的は上面が傾斜している盛土部分に容易に対応することができて、その盛土部分を有効利用できるようにする複数の中空部を有する中空構造物を提供することにある。
【0011】
【課題を解決するための手段】
この発明での中空構造物は、幅方向に対向立設している両側壁部材と、この両側壁部材に幅方向に跨がるように接合している上壁部材と、両側壁部材の下端部間に設けている底壁部材とを長手方向に連結して、内部に長手方向へ指向する複数の中空部を形成していると共に、この中空部を並列した状態で複数形成してなるものとする。
【0012】
そして、この発明の中空構造物の各中空部を形成している各底壁部材は、同一面上の位置に設置している。また、中空構造物の各中空部を形成している各上壁部材は、各中空部毎にその並列方向へ徐々に底壁部材の方向へ移動する位置に設置されており、各中空部の仕切り壁となっている側壁部材は、その先端部分が断面略Y字状に枝分かれしており、一方が高い位置に延びていると共に、他方が低い位置に延びている。
【0013】
このようなこの発明の複数の中空部を有する中空構造物によれば、設置位置が、各中空部毎にその並列方向へ徐々に、底壁部材の方向へ移動している各上壁部材に沿って、盛土部分の傾斜した上面を形成できるようにしている。
【0014】
このことから、この発明の中空構造物を用いれば、盛土部分の傾斜した上面に対応して中空部を複数形成できるようになり、盛土部分を有効利用することができるようになる。
【0015】
【発明の実施の形態】
以下、この発明の複数の中空部を有する中空構造物を、図示する一実施形態によって説明する。
【0016】
中空構造物1(図1参照)は、幅方向に対向立設している両側壁部材2と、この両側壁部材2に幅方向に跨がるように接合している上壁部材3と、両側壁部材2の下端部間に設けている底壁部材4とを長手方向に連結して、内部に長手方向へ指向する複数の中空部5を形成していると共に、この中空部5を並列した状態で複数形成してなっている。
【0017】
そして、この中空構造物1の各中空部5を形成している各底壁部材4は、同一面上の位置に設置している。また、中空構造物1の各中空部5を形成している各上壁部材3は、各中空部5毎にその並列方向へ徐々に底壁部材4の方向へ移動する位置に設置している。
【0018】
なお、この実施形態での中空構造物1は、図1に示すように、河川6に橋7を架ける場合で、その橋7に向かって上面8aが傾斜するように形成した盛土部分8に設けている。
【0019】
また、この実施形態での中空構造物1は、その中空部5を四個形成しており、河川6側の中空部5が最も大きな規模になると共に、河川6から離れるにつれて小さな規模となるように構成している。
【0020】
即ち、中空構造物1は、その各中空部5を構成している各上壁部材3の設置位置が、各中空部5毎にその並列方向へ徐々に底壁部材4の方向へ移動して、各上壁部材3が、河川6から離れる方向へ下がる傾斜である盛土部分8の上面8aに沿って設置される状態となっている。
【0021】
さらに、この実施形態での中空構造物1は、両側壁部材2と上壁部材3とを別部材にして予め製作しておき、その各部材を施工現場にて組立てることで構成している。また、底壁部材4は、施工現場にてコンクリートを打設することで形成している。
【0022】
この中空構造物1は、その両側壁部材2と上壁部材3と底壁部材4とを一体に成形したものでもよい。
【0023】
この実施形態での各中空部5の仕切り壁となっている側壁部材2は、その先端部分が断面略Y字状に枝分かれしており、各中空部5毎にその並列方向へ徐々に底壁部材4の方向へ移動している各上壁部材3に対応して、一方が高い位置に延びていると共に、他方が低い位置に延びている。
【0024】
このような構成からなる複数の中空部5を有する中空構造物1を用いれば、その各上壁部材3の設置位置が、各中空部5毎にその並列方向へ徐々に、底壁部材4の方向へ移動していることにより、中空構造物1の上に盛土した場合、各上壁部材3に沿って、盛土部分8の傾斜した上面8aを形成することがてきる。
【0025】
このことから、この発明の中空構造物1を用いれば、盛土部分8上面8aの傾斜に対応して中空部5を複数形成できるようになって、盛土部分8を有効利用することができるようになる。
【0026】
【発明の効果】
この発明の複数の中空部を有する中空構造物では、中空構造物構成用である各上壁部材の設置位置が、各中空部毎にその並列方向へ徐々に、中空構造物構成用である底壁部材の方向へ移動している。
【0027】
そのため、この中空構造物の上に盛土した場合に、各上壁部材に沿って、盛土部分の傾斜した上面を形成することができる。
【0028】
このことから、この発明の中空構造物を用いれば、盛土部分上面の傾斜に対応して中空部を複数形成できるようになって、盛土部分を有効利用することができるようになる。
【図面の簡単な説明】
【図1】この発明の複数の中空部を有する中空構造物を上面が傾斜している盛土部分に設置した状態を示す概略図である。
【図2】従来の複数の中空部を有する中空構造物を上面が傾斜している盛土部分に設置した状態を示す概略図である。
【符号の説明】
1…中空構造物、2…側壁部材、3…上壁部材、4…底壁部材、5…中空部、6…河川、7…橋、8…盛土部分、8a…上面。[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a hollow structure having a plurality of parallel hollow portions, such as a structure formed by integrally forming a plurality of parallel tunnels (hollow portions).
[0002]
[Prior art]
As a hollow structure having a plurality of hollow portions, conventionally, as shown in FIG. 2, each
[0003]
[Problems to be solved by the invention]
The conventional hollow structure described above is unsuitable for installation on a banking portion whose upper surface is inclined.
[0004]
More specifically, for example, as shown in FIG. 2, when a
[0005]
And since this embankment part will divide the surrounding area, conventionally, a tunnel (hollow part) was formed in the embankment part, and it was made to pass through the embankment part. Yes.
[0006]
The tunnel (hollow part) can be formed more easily in a shorter time when the hollow structure is installed and then embanked on it than when excavating after embankment.
[0007]
However, when embankment is attempted after the above-described conventional hollow structure is installed, the
[0008]
In addition, if a hollow structure with one hollow part is installed only at the highest part of the embankment, a tunnel (hollow part) can be formed regardless of the inclined upper surface. However, effective use of the embankment part becomes impossible, for example, it is not possible to use two lanes or to separate cars and people.
[0009]
As described above, in the conventional hollow structure described above, the tunnel (hollow part) can be easily formed in a short time, but the plurality of hollow parts can be used effectively, that is, the embankment part can be used effectively. I couldn't do it.
[0010]
The present invention was devised in view of the above-mentioned circumstances, and its purpose is to easily cope with the embankment portion whose upper surface is inclined, and to make it possible to effectively use the embankment portion. It is in providing the hollow structure which has these.
[0011]
[Means for Solving the Problems]
The hollow structure according to the present invention includes both side wall members that are vertically opposed to each other, an upper wall member that is joined to the both side wall members so as to straddle the width direction, and lower ends of the both side wall members. The bottom wall member provided between the parts is connected in the longitudinal direction to form a plurality of hollow parts oriented in the longitudinal direction inside, and a plurality of these hollow parts are formed in parallel. And
[0012]
And each bottom wall member which forms each hollow part of the hollow structure of this invention is installed in the position on the same surface. Further, each upper wall member forming each hollow part of the hollow structure is installed at a position where each hollow part gradually moves in the direction of the bottom wall member in the parallel direction. As for the side wall member which is a partition wall, the front-end | tip part has branched in cross-sectional substantially Y shape, and while the other is extended to the high position, the other is extended to the low position .
[0013]
According to such a hollow structure having a plurality of hollow portions of the present invention, the installation position of each upper wall member that is gradually moving in the parallel direction for each hollow portion in the direction of the bottom wall member. Along the slope, an inclined upper surface of the embankment portion can be formed.
[0014]
From this, if the hollow structure of this invention is used, a plurality of hollow parts can be formed corresponding to the inclined upper surface of the embankment part, and the embankment part can be used effectively.
[0015]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, a hollow structure having a plurality of hollow portions according to the present invention will be described with reference to an illustrated embodiment.
[0016]
The hollow structure 1 (see FIG. 1) includes both
[0017]
And each bottom wall member 4 which forms each
[0018]
In addition, the hollow structure 1 in this embodiment is provided in the
[0019]
In addition, the hollow structure 1 in this embodiment has four
[0020]
That is, in the hollow structure 1, the installation position of each
[0021]
Furthermore, the hollow structure 1 in this embodiment is constructed by separately manufacturing the
[0022]
The hollow structure 1 may be formed by integrally forming both
[0023]
In this embodiment, the
[0024]
If the hollow structure 1 having a plurality of
[0025]
Therefore, if the hollow structure 1 of the present invention is used, a plurality of
[0026]
【The invention's effect】
In the hollow structure having a plurality of hollow portions according to the present invention, the installation position of each upper wall member for forming the hollow structure is gradually lowered in the parallel direction for each hollow portion. It is moving in the direction of the wall member.
[0027]
Therefore, when embankment is carried out on this hollow structure, the inclined upper surface of the embankment part can be formed along each upper wall member.
[0028]
From this, if the hollow structure of this invention is used, a plurality of hollow parts can be formed corresponding to the inclination of the upper surface of the embankment part, and the embankment part can be used effectively.
[Brief description of the drawings]
FIG. 1 is a schematic view showing a state in which a hollow structure having a plurality of hollow portions according to the present invention is installed on a banking portion whose upper surface is inclined.
FIG. 2 is a schematic view showing a state in which a conventional hollow structure having a plurality of hollow portions is installed on a bank portion whose upper surface is inclined.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 ... Hollow structure, 2 ... Side wall member, 3 ... Upper wall member, 4 ... Bottom wall member, 5 ... Hollow part, 6 ... River, 7 ... Bridge, 8 ... Embankment part, 8a ... Upper surface.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000181784A JP4584419B2 (en) | 2000-06-16 | 2000-06-16 | Hollow structure having a plurality of hollow portions |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000181784A JP4584419B2 (en) | 2000-06-16 | 2000-06-16 | Hollow structure having a plurality of hollow portions |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2002004305A JP2002004305A (en) | 2002-01-09 |
JP4584419B2 true JP4584419B2 (en) | 2010-11-24 |
Family
ID=18682659
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2000181784A Expired - Fee Related JP4584419B2 (en) | 2000-06-16 | 2000-06-16 | Hollow structure having a plurality of hollow portions |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4584419B2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100941277B1 (en) * | 2005-09-22 | 2010-02-11 | 파나소닉 전공 주식회사 | Organic light emitting element and its fabriction method |
WO2007104839A1 (en) * | 2006-03-10 | 2007-09-20 | Societe Civile De Brevets Matiere | Underground passageway |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07216970A (en) * | 1994-02-02 | 1995-08-15 | Takayuki Fukazawa | Concrete member for assembling two-row or more structure |
JPH0932486A (en) * | 1995-07-13 | 1997-02-04 | Honsyu Shikoku Renrakukiyou Kodan | Method for constructing arched tunnel |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2528374B2 (en) * | 1990-04-09 | 1996-08-28 | 株式会社フジタ | How to build a mountain road |
-
2000
- 2000-06-16 JP JP2000181784A patent/JP4584419B2/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07216970A (en) * | 1994-02-02 | 1995-08-15 | Takayuki Fukazawa | Concrete member for assembling two-row or more structure |
JPH0932486A (en) * | 1995-07-13 | 1997-02-04 | Honsyu Shikoku Renrakukiyou Kodan | Method for constructing arched tunnel |
Also Published As
Publication number | Publication date |
---|---|
JP2002004305A (en) | 2002-01-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107558494A (en) | A kind of Underground Station structure and its method of construction | |
JP4584419B2 (en) | Hollow structure having a plurality of hollow portions | |
KR101655073B1 (en) | Constructing method for 2arch tunnel with perforant-path in middle retaining wall | |
JP3096652B2 (en) | Construction method of widening tunnel and emergency parking zone | |
KR100878716B1 (en) | Coupling Block for Revetment Construction with Vegetation | |
CN209584881U (en) | A kind of light-duty shed hole structure quickly built | |
JP2002188398A (en) | Junction structure for segment for tunnel of large cross section | |
CN108330813B (en) | A kind of novel bridge | |
JP2005068861A (en) | Converging and branching structure of tunnel | |
JP2006249735A (en) | Construction method of crossing underground structure and crossing underground structure | |
CN207295774U (en) | A kind of Underground Station structure | |
KR200268141Y1 (en) | Arch Rahmen Bridges | |
JP2017057701A (en) | Concrete wall structure for reinforcing fill-integrated bridge, and construction method | |
JP5677813B2 (en) | Underground water storage structure | |
KR200235026Y1 (en) | Wing-wall for rahmen bridge in ground | |
RU2265105C1 (en) | Erosion protective device | |
JPH11131505A (en) | Retaining wall block and retaining wall | |
JPH03110293A (en) | Construction of sloped tunnel in city | |
JP2003138899A (en) | Tunnel and its construction method | |
CN110410083B (en) | Semi-bright and semi-dark tunnel entering method | |
JP6573948B2 (en) | Construction structure and construction method thereof | |
KR20020078543A (en) | Arch Rahmen Bridges | |
CN216809511U (en) | Assembled bridge face structure for hydraulic engineering | |
JP4037855B2 (en) | Road bridge erection method | |
JP2018021382A (en) | Foundation reinforcement structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20070316 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20090126 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20100608 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20100809 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20100831 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20100902 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130910 Year of fee payment: 3 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |