JP4188523B2 - Hook and hook removal method - Google Patents
Hook and hook removal method Download PDFInfo
- Publication number
- JP4188523B2 JP4188523B2 JP33660099A JP33660099A JP4188523B2 JP 4188523 B2 JP4188523 B2 JP 4188523B2 JP 33660099 A JP33660099 A JP 33660099A JP 33660099 A JP33660099 A JP 33660099A JP 4188523 B2 JP4188523 B2 JP 4188523B2
- Authority
- JP
- Japan
- Prior art keywords
- hook
- opening
- string member
- locking tool
- gondola
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Hooks, Suction Cups, And Attachment By Adhesive Means (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Description
【0001】
【発明の属する技術分野】
この発明は、例えば建物内へのエレベータ据付け工事において、昇降路内へのエレベータ組み込み作業に好適なフック(鉤)、及びそのフックの取外し方法に関する。
【0002】
【従来の技術】
エレベータの乗りかごやガイドレール等、いわゆるエレベータの主要部は、建物内を上下方向に複数階にわたって貫通して設けられた昇降路内に据付けられる。昇降路内には格別足場がないので、作業員は昇降路内天井から吊り下げられた作業用ゴンドラに乗って作業を行うこととなる。
【0003】
ゴンドラが昇降路内を昇降移動するためには、例えば、ゴンドラの台枠にロープ巻取機を搭載し、その巻取機により天井壁に吊下げたゴンドラ用ロープの巻取りあるいは巻き戻し操作により行なわれる。そのゴンドラ用ロープや命綱等の作業用補助ロープを昇降路天井壁から吊り下げるために、従来は、図5に示すように、ゴンドラ用ロープ1や補助ロープ2をシャクル(shacle)3を介してフック(鉤)4に接続し、そのフック4を、天井壁5のほぼ中央部に埋め込み固定されたU字状金具等からなる係止具51に掛けていた。
【0004】
フック4は、図6にその要部を拡大して示したように、ばねの付勢により本体の開口部4aを内側から閉鎖するように回動したピン状の閉鎖部41を有し、この閉鎖部41が外れ止めとなって、環部を形成した係止具51に掛けられて吊り下げられる。
【0005】
そこで、作業員がゴンドラ用ロープ1等を接続した重いフック4を係止具51に掛けるために、図5に示したように昇降路内に足場6が組み立てられた。
【0006】
このように、昇降路内でのエレベータの据付け工事では、作業員による実際の組み立て作業に先立ち、作業用ゴンドラの据付けが行われるが、作業員がゴンドラに乗り込んでの据付作業を終了して、エレベータ乗りかごを搬入して組み込むために、ゴンドラ及びゴンドラ用ロープ1等を取外し搬出する必要があり、そのため再び作業用足場6の搬入、組み立てを必要とした。
【0007】
もっとも、昇降路内のエレベータの構造によっては、フック4を取外してのゴンドラ用ロープ1や補助ロープ2の回収作業は、作業員がその後据え付けられたエレベータ乗りかごの上に乗って行うこともできる場合もある。
【0008】
【発明が解決しようとする課題】
上記のように、エレベータの据付け作業に際し、用済み後のフック(鉤)を天井壁の係止具から取り外して回収するのに、昇降路内に足場の搬入組み立てを行う必要があり、作業の安全確保とエレベータ据付け工事の効率化の点から改善が要望されていた。
【0009】
【課題を解決するための手段】
この発明は、上記従来の課題を解決するためになされたもので、請求項1に記載の発明は、回動する閉鎖部がばねの付勢により開口部を内側から閉鎖しつつ、壁面に固定され環部を形成した係止具に吊り下げられたフックにおいて、前記閉鎖部の回動先端部に一端が接続された第1の紐部材と、前記閉鎖部の回動軸側に一端が接続され、他端部が前記開口部側から前記環部を通して前記本体の前記開口部とは反対側に垂れ下げた第2の紐部材とを具備することを特徴とする。
【0010】
このように請求項1記載のフックは、第1の紐部材と第2の紐部材とを有し、第1の紐部材の他端部を引っ張ることによって、フック本体の開口部が開き、それに合わせて第2の紐部材を引っ張ることができるので、フック本体が回動し、開いた開口部から係止具を外すことができる。
【0011】
従って作業員は、ゴンドラ用ロープや補助ロープの取外し回収作業に、従来のように、格別昇降路内に足場を組上げてその上で作業することなく、たとえば最上階の乗り場ホールの躯体に立って、第1及び第2の紐を操作することにより、係止具からのフック取外しにより安全かつ容易に行うことができる。
【0012】
請求項2に記載の発明は、回動する閉鎖部がばねの付勢により本体開口部を内側から閉鎖しつつ、壁面に固定され環部を形成した係止具に吊り下げられたフックの取外し方法において、前記閉鎖部の回動先端部に一端が接続された第1の紐部材の他端部を引っ張り、前記開口部を開ける第1の操作と、この第1の操作を行いつつ、前記閉鎖部の前記回動軸側に一端が接続され、他端部が前記開口部側から前記係止具の環部を通して前記本体の開口部とは反対側に垂れ下げた第2の紐部材の他端部を引っ張り、前記開口部を介して、前記フック本体を前記係止具から取外す第2の操作とからなることを特徴とする。
【0013】
このように、請求項2に記載の発明では、第1の操作と第2の操作とにより、長く延ばした第1及び第2の紐を操作するだけで、フックを係止具から取外すことができるので、第1の発明と同様に、作業員は、格別昇降路内に足場を設けることなく、たとえば最上階の乗り場ホールに立って、フックを係止具から取外し、ゴンドラ用ロープや作業用補助ロープを安全かつ容易に回収することができる。
【0014】
【発明の実施の形態】
以下この発明によるフック(鉤)及びフック取外し方法の一実施の形態を図1ないし図4を参照して詳細に説明する。なお、図5及び図6に示した従来の構成と同一構成には同一符号を付して詳細な説明は省略する。
【0015】
図1は、本発明によるフックの一実施の形態を示した斜視図である。
【0016】
すなわち、図1に示したように、フック4は、回動するピン状の閉鎖部41が不図示のばねの付勢により開口部4aを内側から閉鎖しつつ、天井壁5に埋め込み固定されたU字状金具の係止具51に吊り下げられている。
【0017】
閉鎖部41の先端部には一端がビニールテープ等で固定された第1の紐部材7が接続され、この第1の紐部材7は、図示しないが、少なくとも他端部は最上階の乗り場ホールまで届く長さを有している。
【0018】
また、フック4の閉鎖部41の回動軸側は、ゴンドラ用ロープ1や補助ロープ2を連結したシャクル3がボルト42を介してフック4の本体部に連結されるように構成されていて、そのボルト42に第2の紐部材8の一端が接続され、他端部は、少なくとも最上階の乗り場ホールまでの距離を往復するだけの長さを有している。
【0019】
そして、その第2の紐部材8は、図示のようにフック4の開口部4a側から回して係止具51によって形成された環部を通して垂れ下げられる。
【0020】
上記第1及び第2の紐部材7,8を接続したフック4は、昇降路に組み立てられた足場6上から、作業員によって係止具51に掛けられる、さらに、フック4に接続されたゴンドラ用ロープ1にはゴンドラが吊り下げられ、そのゴンドラ内に作業員が乗り込み、昇降路内を昇降移動しつつエレベータの組み立て作業が行われる。
【0021】
なおここで、作業用補助ロープ2を除き、フック4に接続された第1及び第2の各紐部材7,8は、昇降路内に垂れ下がった状態では、エレベータの据付け作業上の邪魔になるので、巻き込んでシャクル3等に掛けておくのが良い。
【0022】
さて、作業員によるガイドレール等の組み立て作業が終了後は、作業員は、ゴンドラを昇降路底部のピットまで降ろし、ゴンドラ用ロープ1から解き降ろすとともに、不要となったゴンドラ用ロープ1や作業用補助ロープ2も、フック4ともども係止具51から取外し回収する必要がある。そこで、フック4を回収する手順を図1ないし図4を参照して説明する。
【0023】
なお、ゴンドラをゴンドラ用ロープ1から外される前に作業員は、フック4の第1及び第2の紐部材7,8を図1に示す状態に解きほぐし、各紐部材7,8の他端部は最上階のエレベータホールまで運ばれているものとする。
【0024】
そこで、最上階のエレベータホールやその躯体上で作業員は、第1及び第2の紐部材7,8の他端部を確保した状態で、図2に示すように第1の紐部材7を矢印方向に引っ張り、フック4の閉鎖部41を内側に倒し、開口部4aを開ける。
【0025】
開口部4aが開いた状態で作業員は、図3に示すように、第2の紐部材8を矢印方向に引っ張り、フック4を係止具51回りに持ち上げ、フック4を係止具51から引き離す。
【0026】
フック4が係止具51から離れたとき、図4に示すように、作業員は第2の紐部材8を緩めつつ、第1の紐部材7を手繰り寄せ、作業員の手元にフック4を回収する。
【0027】
このように、この実施の形態によれば、ゴンドラをゴンドラ用ロープ1から解き放した後、フック4を回収するのに、格別昇降路内に足場6を組み上げる必要がなく、昇降路天井に最も近い最上階のエレベータホール側に立って回収できるので、エレベータの据付け工事の作業効率の向上を図ることができ、工期を短縮することができる。
【0028】
なお、上記実施の形態において、第1及び第2の紐部材7,8は、ロープ状でも鎖状でも良い。
【0029】
また、第1の紐部材7と第2の紐部材8とは、上記のように、開口部4aを開口させた状態で、重いフック4を回転させるように操作してフックの取外しが行われる。フック4を回転させるためには、閉鎖部41の先端部に接続された一方の第1の紐部材7に対し、他方の第2の紐部材8は閉鎖部41の先端から離れた下方の軸側に接続されていれば良く、そのためには第2の紐部材8の接続位置は、必ずしもボルト42に限らず、ボルト42を通したフック4の穴あるいはフック4に連結されたシャクル3等に接続しても同様に作用させることができる。
【0030】
また、第1の紐部材7は閉鎖部41を開放させるものであるが、それと同時にフック4回収に際して重いフック4を吊下げることとなる。そこで、フック4の閉鎖部41が第1の紐部材7から万が一にも外れることがないように、図示しないが、第1の紐部材7の他端部を予めフック4の穴あるいはフック4に連結されたシャクル3等にしっかりと固定して置くのが良い。
【0031】
いずれにしても、本発明のフック及びフック取外し方法によれば、閉鎖部41の先端部に一端が接続された第1の紐部材7の他端部を引っ張ってフック開口部4aを開けるとともに、その先端部とは離れた下方の閉鎖部41の回動軸側に一端が接続され、かつ開口部4a側から係止具の環部を通した第2の紐部材8を引っ張るように構成することによって、作業員は遠隔操作により安全にフック4の取外し回収を行うことができる。
【0032】
【発明の効果】
この発明のフック及びフック取外し方法によれば、エレベータの据付け工事等において、ゴンドラ吊下げ用ロープを連結して、昇降路天井壁に係止したフックを簡単かつ安全に回収することができるとともに据付け工事の効率化が図られ、実用に際し顕著な効果を得ることができる。
【図面の簡単な説明】
【図1】この発明によるフックの一実施の形態を示す斜視図である。
【図2】図1に示すフックの取外しに際し、開口部を開ける状態を示した斜視図である。
【図3】図2に続き、フックの取外しに際し、フックが係止具から外れる状態を示した斜視図である。
【図4】図3に続き、フックの取外しに際し、フックが係止具から外れて回収される状態を示した斜視図である。
【図5】従来のフック取外し作業を説明する昇降路内の断面図である。
【図6】図5の要部拡大斜視図である。
【符号の説明】
1 ゴンドラ用ロープ
2 補助ロープ
3 シャクル
4 フック
4a 開口部
41 閉鎖部
42 ボルト
5 (昇降路)天井壁
51 係止具
6 足場
7 第1の紐部材
8 第2の紐部材[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a hook suitable for an elevator installation work in a hoistway, for example, in an elevator installation work in a building, and a method of removing the hook.
[0002]
[Prior art]
The main parts of the so-called elevator, such as an elevator car and a guide rail, are installed in a hoistway that penetrates the building in a vertical direction across a plurality of floors. Since there is no special scaffold in the hoistway, the worker will work on the work gondola suspended from the ceiling in the hoistway.
[0003]
In order for the gondola to move up and down in the hoistway, for example, a rope winder is mounted on the frame of the gondola, and the gondola rope is wound or unwound on the ceiling wall. Done. Conventionally, the
[0004]
The
[0005]
Therefore, as shown in FIG. 5, the scaffold 6 is assembled in the hoistway so that the worker can hang the
[0006]
In this way, in the elevator installation work in the hoistway, the work gondola is installed prior to the actual assembly work by the worker, but when the worker gets into the gondola and finishes the installation work, In order to carry in and incorporate the elevator car, it is necessary to remove and carry out the gondola and the
[0007]
However, depending on the structure of the elevator in the hoistway, the work of collecting the
[0008]
[Problems to be solved by the invention]
As described above, when the elevator is installed, it is necessary to carry out assembly of the scaffolding in the hoistway in order to remove the used hooks (claws) from the ceiling wall anchors and collect them. Improvements were demanded in terms of ensuring safety and improving the efficiency of elevator installation work.
[0009]
[Means for Solving the Problems]
The present invention has been made to solve the above-described conventional problems. In the invention according to
[0010]
Thus, the hook according to
[0011]
Therefore, the worker can, for example, stand in the chassis of the landing hall on the top floor without having to assemble a scaffold in the special hoistway and work on it, as in the past, for removing and collecting the gondola rope and auxiliary rope. By operating the first and second strings, the hook can be removed from the locking tool safely and easily.
[0012]
According to the second aspect of the present invention, the rotating closing part closes the main body opening from the inside by the bias of the spring, and the hook is suspended from the locking tool fixed to the wall surface and forming the ring part. In the method, a first operation of pulling the other end of the first string member having one end connected to the rotation tip of the closing portion to open the opening, and while performing the first operation, One end of the closing portion is connected to the rotating shaft side, and the other end portion of the second string member is hung from the opening side to the side opposite to the opening of the main body through the ring portion of the locking tool. It is characterized by comprising a second operation of pulling the other end and removing the hook body from the locking tool through the opening.
[0013]
Thus, in the invention according to
[0014]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, an embodiment of a hook and a hook removing method according to the present invention will be described in detail with reference to FIGS. In addition, the same code | symbol is attached | subjected to the same structure as the conventional structure shown in FIG.5 and FIG.6, and detailed description is abbreviate | omitted.
[0015]
FIG. 1 is a perspective view showing an embodiment of a hook according to the present invention.
[0016]
That is, as shown in FIG. 1, the
[0017]
A
[0018]
Further, the rotation shaft side of the
[0019]
And the
[0020]
The
[0021]
Here, except for the work
[0022]
Now, after the assembly work of the guide rails by the worker is completed, the worker lowers the gondola to the pit at the bottom of the hoistway, unloads it from the
[0023]
Before the gondola is detached from the
[0024]
Therefore, in the state where the other end portions of the first and
[0025]
With the
[0026]
When the
[0027]
Thus, according to this embodiment, after releasing the gondola from the
[0028]
In the above embodiment, the first and
[0029]
Further, as described above, the
[0030]
The
[0031]
In any case, according to the hook and the hook removing method of the present invention, the
[0032]
【The invention's effect】
According to the hook and the hook removing method of the present invention, it is possible to easily and safely recover the hook locked to the hoistway ceiling wall by connecting the gondola hanging rope in the elevator installation work or the like. Construction efficiency is improved, and a remarkable effect can be obtained in practical use.
[Brief description of the drawings]
FIG. 1 is a perspective view showing an embodiment of a hook according to the present invention.
2 is a perspective view showing a state in which an opening is opened when the hook shown in FIG. 1 is removed. FIG.
FIG. 3 is a perspective view showing a state in which the hook is detached from the locking tool when the hook is removed, following FIG. 2;
FIG. 4 is a perspective view showing a state in which the hook is removed from the locking tool and recovered when the hook is removed, following FIG. 3;
FIG. 5 is a cross-sectional view of a hoistway for explaining a conventional hook removing operation.
6 is an enlarged perspective view of a main part of FIG.
[Explanation of symbols]
DESCRIPTION OF
Claims (2)
前記閉鎖部の回動先端部に一端が接続された第1の紐部材と、
前記閉鎖部の回動軸側に一端が接続され、他端部が前記開口部側から前記環部を通して前記本体の前記開口部とは反対側に垂れ下げた第2の紐部材とを具備することを特徴とするフック。In the hook that is suspended from the locking tool that is fixed to the wall surface and formed the ring part while the rotating closing part closes the opening part from the inside by the bias of the spring,
A first string member having one end connected to the turning tip of the closing portion;
One end is connected to the rotating shaft side of the closing portion, and the other end portion is provided with a second string member that hangs down from the opening portion side through the ring portion to the side opposite to the opening portion of the main body. A hook characterized by that.
前記閉鎖部の回動先端部に一端が接続された第1の紐部材の他端部を引っ張り、前記開口部を開ける第1の操作と、
この第1の操作を行いつつ、前記閉鎖部の前記回動軸側に一端が接続され、他端部が前記開口部側から前記係止具の環部を通して前記本体の開口部とは反対側に垂れ下げた第2の紐部材の他端部を引っ張り、前記開口部を介して、前記フック本体を前記係止具から取外す第2の操作と
からなることを特徴とするフック取外し方法。In the removal method of the hook suspended from the locking tool which is fixed to the wall surface and formed the ring part while the rotating closing part closes the main body opening from the inside by the bias of the spring,
A first operation of pulling the other end of the first string member, one end of which is connected to the rotating tip of the closing portion, to open the opening;
While performing this first operation, one end is connected to the rotating shaft side of the closing portion, and the other end portion is opposite to the opening portion of the main body from the opening portion side through the ring portion of the locking tool. A hook removing method comprising: a second operation of pulling the other end portion of the second string member hanging down from the second string member and removing the hook body from the locking tool through the opening.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP33660099A JP4188523B2 (en) | 1999-11-26 | 1999-11-26 | Hook and hook removal method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP33660099A JP4188523B2 (en) | 1999-11-26 | 1999-11-26 | Hook and hook removal method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2001153125A JP2001153125A (en) | 2001-06-08 |
JP4188523B2 true JP4188523B2 (en) | 2008-11-26 |
Family
ID=18300841
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP33660099A Expired - Lifetime JP4188523B2 (en) | 1999-11-26 | 1999-11-26 | Hook and hook removal method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4188523B2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4865927B1 (en) * | 2010-07-30 | 2012-02-01 | 有限会社ユウキ製作所 | Hook locking system |
EP2527669A1 (en) * | 2011-05-26 | 2012-11-28 | Inventio AG | Device for assembling a lift in a lift shaft |
CN107313360B (en) * | 2017-07-18 | 2022-12-06 | 南昌大学 | Sliding cable type support-free support replacing operation platform |
-
1999
- 1999-11-26 JP JP33660099A patent/JP4188523B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JP2001153125A (en) | 2001-06-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6533641B2 (en) | Fall prevention method using wind-up fall prevention device and harness type safety belt used therefor | |
JPH11513965A (en) | Elevator installation method and apparatus | |
KR100701789B1 (en) | Drive system of life structure elevator of skyscraper | |
JP4188523B2 (en) | Hook and hook removal method | |
JP2004293182A (en) | Method and device for lifting and lowering working device to high place structure | |
JP4363726B2 (en) | Hook mounting device | |
KR20160030137A (en) | Safety system for bottom cage fix and disassemble of gang form | |
JPS62501891A (en) | rope car | |
JP2735477B2 (en) | Cableway passenger rescue device | |
JP2001097648A (en) | Passenger rescue method of elevator | |
JP6917048B2 (en) | Kaishakunin arm, and a crane arm with a kaishakunin arm | |
JPH08277086A (en) | Automatic hook | |
JP2860313B2 (en) | Escalator / truss lifting method | |
JPH10316375A (en) | High-lift fitting/removing device and method for chain block device | |
JP7033377B1 (en) | How to pull out the safety rope from the safety device of the elevator gondola and the safety rope release jig of the safety device | |
JP3544796B2 (en) | Lifting jig for elevator doorway device | |
JP3081641U (en) | Hanging hook | |
CN214456071U (en) | Elevator layer door lock unlocking structure and elevator | |
JPH10203751A (en) | Main rope replacing method of 2:1 roping elevator and device thereof | |
CN212671114U (en) | Mounting platform is used in building engineering construction | |
JP2551442Y2 (en) | Steel pipe suspension system | |
JPH0751432B2 (en) | Main rope replacement method for elevators | |
JPH0520756Y2 (en) | ||
JPH061577Y2 (en) | Pipe hanging | |
KR20190001146U (en) | Safety hook for fallen object guard net installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060406 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080215 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080826 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20080911 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 4188523 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110919 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120919 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130919 Year of fee payment: 5 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
EXPY | Cancellation because of completion of term |