JP3983974B2 - Power supply / demand adjustment method, power supply / demand adjustment system, and storage medium - Google Patents

Power supply / demand adjustment method, power supply / demand adjustment system, and storage medium Download PDF

Info

Publication number
JP3983974B2
JP3983974B2 JP2000393493A JP2000393493A JP3983974B2 JP 3983974 B2 JP3983974 B2 JP 3983974B2 JP 2000393493 A JP2000393493 A JP 2000393493A JP 2000393493 A JP2000393493 A JP 2000393493A JP 3983974 B2 JP3983974 B2 JP 3983974B2
Authority
JP
Japan
Prior art keywords
power
company
information
demand adjustment
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000393493A
Other languages
Japanese (ja)
Other versions
JP2002199584A (en
Inventor
政信 永杉
宣夫 福島
秀樹 林
幸雄 岸田
秀幸 宮路
修義 加藤
政一 加藤
康宏 野呂
雅彦 村井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2000393493A priority Critical patent/JP3983974B2/en
Publication of JP2002199584A publication Critical patent/JP2002199584A/en
Application granted granted Critical
Publication of JP3983974B2 publication Critical patent/JP3983974B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、電力需給調整事業者(以下、需給調整プロバイダーと略称する)が、電力会社および独立発電事業者(自家発電設備等を用いて発電を行い、他社に電力供給を行う電力会社以外の事業者および地域の一部に電力を供給する小規模の電力供給事業者の総称。以下、IPPと略称する)から電力を購入し、これらの電力を調整して電力需要家へ供給するようにした電力需給調整方法に関する。
【0002】
【従来の技術】
近年、電力業界において自由化により、現在の限られた数の電気事業者(電力会社)により構成されている電力供給体制が見直され、これまでの卸電気事業に係る参入規制を原則撤廃するとともに、新規参入者の間の競争を促進するための入札制度が導入されてきた。
【0003】
これにより、電力需要家への電力供給事業者として、電力会社、大規模な卸供給を行う卸電気事業者に加えてIPPが新規に参入することにより、電力需要家は競争原理にもとづいて、より低価格な電気を購入できるようになってきた。
【0004】
電力需要家は電力会社以外にもIPPと直接契約にもとづく料金設定で電力を購入することができるようになったため、電力会社のみならずIPPも、負荷の変動や天候等色々な要因にもとづいて需要家の電力購入量を予測し、発生電力、時間、価格について調整を行うことが必要になった。
【0005】
【発明が解決しようとする課題】
ところで、電力需要家にとっては、自家の日負荷や季節にもとづく負荷変動を考慮して電力会社およびIPPと直接契約することは煩わしいばかりでなく面倒である。
また、受電電圧が2万ボルト未満の電力需要家は、電力自由化の対象とはならないので、従前通りの料金で電力を購入せざるを得なかった。
そこで、電力会社、IPPおよび需要家の仲立ちをする第3者機関である需給調整プロバイダーを設立する構想が考えられている。
【0006】
しかし、現状では電力会社、IPPおよび需要家更には需給調整プロバイダーを含めた全者にとって利益をもたらすようなビジネスの仕組みについてはまだ考えられていない。
【0007】
本発明はこのような状況に鑑みなされたもので、需給調整プロバイダーが、電力供給側の電力会社およびIPPと電力需要家の間にあって、電力の需給調整を行いながらそれぞれに利益をもたらすようにした電力需給調整方法を提供することを目的とする。
【0008】
【課題を解決するための手段】
上記の目的を達成するために、請求項1に記載に電力需給調整方法に係わる発明は、ネットワークを利用して電力会社、独立発電事業者、電力需要家および電力需給調整事業者間で情報の授受を行い、前記電力需給調整事業者が前記独立発電事業者および前記電力会社の双方から電力を購入し、この購入電力を調整して前記電力需要家に販売する場合、
電力会社、独立発電事業者および電力需要家にそれぞれ入力装置、出力装置および電力測定装置を備えるとともに、電力需給調整事業者に入力装置、出力装置、制御装置および記憶装置を備えるようにし、電力需給調整事業者の当該制御装置が入力装置から入力された情報および記憶装置に記憶されている情報を用いて演算することにより、電力の販売および購入の募集情報を通知して応募を促す手段、電力会社損益計算手段、独立発電事業者損益計算手段、電力需要家損益計算および需給調整プロバイダー損益計算手段を実現し、
(1)電力需給調整事業者は電力販売・購入募集情報通知手段によって電力会社、独立発電事業者および電力需要家へ電力供給・購入を募集する情報を登録し、電力会社、独立発電事業者および電力需要家のそれぞれのメリットを判断するための条件式を登録したうえで送信し、
(2)電力会社は、電力需給調整事業者から送られてくる情報を入力装置で受信し、応募時に従来の電力販売量、電気料金、発電コスト、託送料金および事故時補給料金等に関する情報を出力装置から電力需給調整事業者へ送信し、
(3)独立発電事業者は、電力需給調整事業者から送られてくる情報を入力装置で受信し、応募時に従来の電力発電量、電力発電単価、電力発電コスト単価に関する情報を出力装置から電力需給調整事業者へ送信し、
(4)電力需要家は、電力需給調整事業者から送られてくる情報を入力装置で受信し、応募時に従来の電力購入量、支払い料金に関する情報を出力装置から電力需給調整事業者へ送信し、
(5)電力需給調整事業者は、電力会社から送られてくる従来の電力販売量、電気料金、発電コスト、託送料金および事故時補給料金等に関する情報、独立発電事業者から送られてくる従来の発電量、電気料金および発電コストに関する情報、および電力需要家から送られてくる従来の電力購入量、支払い料金に関する情報を、入力装置により入力してデータ保存装置に一旦格納し、この格納された応募情報をもとに、電力会社損益計算手段、独立発電事業者損益計算手段および電力需要家損益計算手段を実行し、電力会社、独立発電事業者および電力需要家のいずれにも従来を上回るメリットがあると判断できた場合、電力会社、独立発電事業者および電力需要家の端末装置にメリットありの情報を出力装置から通知して契約を成立させるようにしたことを特徴とする。
【0009】
ここで、損益とは、利益と損失の両方を含む概念であり、その単位は問わない。また、料金に対する情報、あるいはコストに関する情報とは、料金あるいはコストが算出可能であれば足りる趣旨である。例えば、電力需給調整業者において、電力単価が分っている場合は、電力需要家から電力購入量(消費量)の情報を得られれば、従来の電力需要家の支払い料金がわかる。このような場合、電力購入量も支払い料金に関する情報に含まれる。
【0011】
請求項に記載の電力需給調整方法に係わる発明は、請求項1に記載の電力需給調整方法おいて、電力会社および独立発電事業者購入量実績の情報と、電力需要家への電力販売量の実績とを受信する実績情報受信手段を設けたことを特徴とする。
【0013】
請求項に記載の電力需給調整方法に係わる発明は、請求項1に記載の電力需給調整方法において、電力需給調整事業者が、複数の電力需要家に対して、それぞれの電力の購入量、購入時間を調整することにより、需要家負荷パターンの平準化を行うことを特徴とする。
【0014】
請求項に記載の電力需給調整方法に係わる発明は、請求項1に記載の電力需給調整方法において、独立発電事業者からの購入量または電力需要家への販売量について契約内容と差異が発生した場合、契約違反者に対してペナルティ支払いの告知をすることを特徴とする。
【0015】
請求項に記載の電力需給調整方法に係わる発明は、請求項に記載の電力需給調整方法において、さらに、電力会社、独立発電事業者、電力需要家のペナルティ許容回数を保存すると共にペナルティ回数を履歴として保存することにより、このペナルティ回数がペナルティ許容回数よりも多い場合、修正契約案を電力会社、独立発電事業者および電力需要家に提示することを特徴とする。
【0016】
請求項に記載の電力需給調整システムに係わる発明は、電力会社、独立発電事業者および電力需要家にそれぞれ入力装置、出力装置および電力測定装置を備えるとともに、電力需給調整事業者に入力装置、出力装置、制御装置および記憶装置を備え、これら電力会社、独立発電事業者、電力需要家および電力需給調整事業者間でネットワークを利用して情報の授受を行うとともに、電力需給調整事業者が、独立発電事業者および前記電力会社の双方から電力を購入し、この購入電力を調整して前記電力需要家に販売するようにした電力需給調整システムにおいて、
電力需給調整事業者は、
電力会社、独立発電事業者および電力需要家へ電力供給・購入を募集する情報を登録し、電力会社、独立発電事業者および電力需要家のそれぞれのメリットを判断するための条件式を登録したうえで出力装置を介して電力会社、独立発電事業者および電力需要家に対し、電力の販売および購入の募集情報を通知し応募を促す、電力販売・購入募集情報通知手段と、
電力会社の出力装置から応募時に送られてくる従来の電力販売量、電気料金、発電コスト、託送料金および事故時補給料金等に関する情報をもとに、電力会社の販売利益の今回と従来との差額を計算し、利益が向上する場合、メリットがあると判断し通知する電力会社損益計算手段と、
独立発電事業者の出力装置から応募時に送られてくる従来の発電量、電気料金および発電コストに関する情報をもとに、独立発電事業者の利益を計算し、利益があればメリットがあると判断し通知する独立発電事業者損益計算手段と、
電力需要家の出力装置から応募時に送られてくる従来の電力購入量、支払い料金に関する情報をもとに、電力需要家の支払料金の従来との差額を計算し、支払料金が削減されている場合、メリットがあると判断し通知する電力需要家損益計算手段と、
を備えたことを特徴とする。
【0018】
請求項に記載の発明は、請求項1記載の電力需給調整方法において、前記独立発電事業者は電力負荷のベース分の電力を供給し、前記電力会社は電力負荷の変動分を含む電力を供給し、かつ、前記電力会社に対しては前記独立発電事業者よりも高い販売単価を設定し、当該各販売単価を記憶し、前記電力需要家の購入単価を記憶し、前記電力会社の電力販売量、前記独立発電事業者の電力販売量および電力需要家の電力購入量を入力し、前記入力した電力購入量と前記記憶している購入単価を用いて電力需要家から徴集する電気料金を演算し、前記入力した各電力販売量と前記記憶している各販売単価を用いて、前記徴集した電気料金の全部または一部を前記電力会社と前記独立発電事業者に配分することを特徴とする。
【0019】
「電力品質に対して責任を負う第一の電力供給事業者」とは、複数の電力供給事業者が同じ電力系統に電力を供給するとき、法律上あるいは社会通念上、電圧や周波数などの安定した電力を供給する最終責任があると考えられている電力供給事業者を意味し、いわゆる電力会社を含む趣旨である。
なお、「電力会社」とは、本出願日における電気事業法の一般電気事業者であって、いわゆる10電力会社をいうが、その承継会社も含む。
【0020】
「第二の電力供給事業者」は、電力品質に対して全く責任を負わなくても良いという意味ではなく、その責任の範囲あるいは度合いにおいて、第一の電力供給事業者ほどではないと法律上あるいは社会通念上考えられている電力供給事業者を意味し、いわゆる独立発電事業者を含む趣旨である。
【0021】
請求項に記載の発明は請求項記載の電力需給調整方法において、電力需要家が複数の場合、
前記電力会社の発電スケジュール、前記独立発電事業者の発電スケジュール、および、前記複数の電力需要家の各電力購入スケジュールを入力し
前記入力した各発電スケジュールをもとに全体の発電スケジュールを作成し
前記入力した各電力スケジュールをもとに全体の電力購入スケジュールを作成し
前記作成した全体の発電スケジュールと全体の電力購入スケジュールをもとに発電予定量と購入予定量の差を求め
この差が一定値を超えたとき、前記複数の電力需要家の全部または一部に電力購入量または購入時間について変更の依頼を送信し
前記依頼により、変更に応じた電力需要家に対しては、前記購入単価を下げて電気料金を演算することを特徴とする。
【0022】
【発明の実施の形態】
以下、本発明の実施形態について説明するが、詳細な説明に入る前に、概念について説明する。図1は、発明の概念構成図である。
(1)概念構成
図1において、需給調整プロバイダー100は、IPP300から一定出力の電力を安い電気料金で購入し、一方電力会社200から負荷変動分の電力を通常よりも高い電気料金で購入し、これらの2種類の購入電力を調整して従来の電力会社1社から購入する場合よりも安い電気料金で電力需要家400に販売することを業務としている。
【0023】
この業務を遂行するために、需給調整プロバイダー100は端末装置から電力会社200、IPP300および電力需要家400に対して電力販売・購入募集通知手段1iを通じて電力の販売、購入を募集するようにしている。この募集情報は、インターネット等の伝送回線2を通じて電力会社200、IPP300および電力需要家400に伝送され、それぞれに設置されているパソコン等端末装置の表示部に表示されるようになっている。
【0024】
電力会社200は、プロバイダー100からの募集に応募するため、端末装置から従来の電気料金、発電コストおよび販売量を入力する。
同様にしてIPP300もこの募集に応募するため、端末装置から従来の電気料金、発電コスト、販売量を入力する。また電力需要家400も募集に応募するため同様にして、端末装置から従来の支払料金、購入量を入力する。これらの従来情報は、データ保存装置1zに一旦格納する。
【0025】
電力会社損益計算手段1dは、このデータ保存装置1zに格納された応募情報をもとに、電力会社の販売利益の今回と従来との差額を計算し、利益が向上する場合、メリットがあると判断する。次に、IPP損益計算手段1eは、IPP300の利益を計算し、利益があればメリットがあると判断する。
【0026】
次に、電力需要家損益計算手段1fは、電力需要家400の支払料金の従来との差額を計算し、支払料金が削減されている場合、メリットがあると判断する。
需給調整プロバイダー・損益計算手段1gは、電力会社、IPPおよび電力需要家がそれぞれ得る利益の中から、需給調整プロバイダー100が得る利益を計算する。
【0027】
そして、電力会社200、IPP300および電力需要家400はそれぞれメリットがあると判断した場合、端末装置から伝送装置2を通じてメリット情報を募集者である需給調整プロバイダー100へ送信する。
【0028】
契約後、電気料金の計算と契約違反発生の有無を確認するため、需給調整プロバイダー100は、実績情報受信手段1hにより、電力会社200、IPP300から需要家400への送電量実績情報および需要家からの受電量実績情報を受信する。
また、契約違反が発生した場合、督促情報計算手段1jにより、ペナルティ料金を計算し、伝送回線を通じて、契約違反者へ通知する。
【0029】
(2)利益を生み出す仕組み
図2を参照して、利益を生み出す仕組みについて説明する。需給調整プロバイダー100は、電力需要家400に代わって、電力会社200から負荷変動分の電力を購入し、残りの一定出力分はIPP300から購入し、それぞれ電力会社200およびIPP300に電気料金を支払う。ここでいう負荷変動分とは、本図中に示しているように、時間の経過と共に変動する購入電力の内、一定出力分(ベース分)を差し引いた分である。
【0030】
電力会社200としては、負荷変動分しか販売できないとすれば、今までのように電力需要家に一括して販売していた状態に比べ、売上高および利益とも減少してしまうので、売上が減少しても、利益がでるように従来の一括販売よりも単価の高い電気料金で電力を販売することになる。例えば、電力需要家が従来使用している電力会社の提供する料金メニューの中で、より高い料金設定のメニューを使用する方法が考えられる。
【0031】
一方、IPP300にとっては、一定なベース分のみを販売するので、発電設備を効率的に運転でき、その結果負荷変動分を販売する電力会社200よりも低価格の電気料金で電力を販売することができる。
【0032】
換言すれば、IPPが一定出力(ベース)分を担うこととしたので、変動に追従する必要がなくなり、電力供給に伴う制御が容易となる。このため、過大な設備投資が不要となり、安い販売単価でも利益を出すことが可能となるのである。
【0033】
また、このIPP300の発電電力を電力需要家400に送電するためには、通常電力会社200の送電線を使用することになり、この場合設備使用料である託送料金(電力会社の送電線を借用して、電気を送る際の送電線の利用料金)を電力会社に支払う必要がある。
【0034】
更に、IPP300の発電設備の事故発生によって、一定出力分を供給することができなくなる場合には、電力需要家に契約電力量の供給を保証するために、一定出力分を電力会社に肩代わりしてもらわなければならない。
【0035】
本発明では、需給調整プロバイダー100が、IPP300から当該電力分の託送料金および一定出力分の補給に見合う事故時補給料金(※)をIPP300から受領し、電力会社へ支払う(※事故により送電できない電気を電力会社に補償してもらう際に支払う料金)。
【0036】
そして、需給調整プロバイダー100にとって重要なことは、電力需要家400が電力会社200から電力を一括購入していた場合よりも低価格の電気料金で販売するということと、需給調整処理を行って電力会社200、IPP300、電力需要家400それぞれにメリットを提供する見返りとして、電力会社200が得る利益向上額の一部、IPP300が得る利益の一部および電力需要家400が得る支払料金の削減額の一部を請求し、需給調整プロバイダー100としても利益を出すということである。
【0037】
図3は、従来の電力会社対電力需要家の契約形態を示す図であり、図2と比較するうえで提示したものである。図3からわかるように、従来では電力需要家400は電力会社200から一定出力分(ベース分)および負荷変動分の電力を一括して購入し、電気料金を支払っていた。この場合の電力会社200の利益は、電気料金から発電コストを差し引いた額である。
【0038】
図4は、本発明によるIPP300の利益、電力会社200の利益およびその向上額、電力需要家400の支払い料金およびその削減額、電力需給調整プロバイダー100の支払い料金の内訳を示している。
【0039】
図4からわかるように、電力会社200にとっての利益とは、需給調整プロバイダー100に販売した負荷変動分に係わる電気料金(新料金)から、発電コストを差し引き、託送料および事故時補給料金を加えた額(新規利益;3-1)である。そして、電力会社200にとっての利益向上額とは、この新規利益(3-1)から図3で示した従来の契約形態時での利益(2-1)を差し引いた額である。
【0040】
また、IPP300にとっての利益とは、需給調整プロバイダー100に販売したベース分に係わる電気料金から、発電コスト、託送料および事故時補給料金を差し引いた額(3-2)である。
【0041】
そして、需給調整プロバイダー100の総支払料金(3-3)とは、IPP300からのベース分購入料金(支払料金)および電力会社200からの負荷変動分の購入料金(支払料金)の合計値である。
【0042】
一方、電力需要家400は前記ベース分の電気料金および負荷変動分の電気料金を合算した電気料金を新規支払料金(3-4)として需給調整プロバイダー100へ支払うことになる。そして、図3で示した従来の契約形態での支払い料金(2-2)から新規支払料金(3-4)を差し引いた額が電力需要家400にとっての支払料金削減額即ちメリットとなる。
【0043】
(3)メリットを生み出す条件式
上述したように(2)の利益を生み出す仕組みでは、電力会社、IPP、需要家および電力需給調整プロバイダー全体としてのメリットを生み出す仕組みをマクロ的に説明したが、次にそれぞれのメリットの有無について詳しく説明する。
【0044】
図5(A)は電力会社としてメリットが出せる条件式を示し、新規の利益(3-1)の方が従来利益(2-1)よりも上回る場合メリットがあると判定する。
先ず、新規利益(3-1)の内訳から説明する。なお、丸数字は図7のパラメータを示す。電気料金とは、▲2▼販売単価×▲4▼販売量であり、発電コストとは、▲5▼発電コスト単価×▲4▼販売量であり、また、託送量料金+事故時補給料金とは、▲9▼(託送量料金単価+(10)*事故時補給料金単価)×▲7▼IPP発電量である。なお、(10)*は丸数字の10を意味するものとする。以下同じ。
【0045】
次に、従来方式における利益(2-1)について説明する。従来方式の利益は電気料金から発電コストを差し引いたものである。この場合、電気料金、発電コストとも式自体は(3-1)で説明したものと変らないが、各パラメータは図7の▲1▼〜(10)*で示すように従来技術と本発明とでは異なる。
【0046】
次に、図5(B)において、IPP300にとってメリットが出せる条件について説明する。この場合、メリットがあるのは、既に図4で説明したIPP300に利益がプラスになる場合である。つまり、電気量(▲6▼発電単価×▲7▼発電量)−発電コスト(▲8▼発電コスト単価×▲7▼発電量)−(託送量料金+事故時補給料金=(▲9▼託送量料金単価+事故時補給料金単価)×▲7▼発電量)がゼロよりも大きい場合にIPP300としてのメリットが出せる。
【0047】
図6(a)は需要家400にとってメリットを出せる条件、(b)需給調整プロバイダー100にとってメリットを出せる条件を示したものである。
需要家400にとってメリットを出せる条件は、従来の契約形態での電力会社200に対する支払料金よりも、新しい契約形態での需給調整プロバイダー100への支払料金の方が安い場合である。また、需給調整プロバイダー100にとってメリットを出せる条件は、図5(a)、(b)および図6(a)の各式が成立する場合である。
【0048】
(4)実施例
以上で本発明の概念説明を終えたので、次に具体的な実施例によって説明する。
(構成)
図8は、本実施例の構成を示す機能ブロック図であり、図1に対応する部分については同一符号を付けて説明する。
図8において、10は需給調整プロバイダー100に設置したサーバ計算機の機能ブロック図を示し、制御装置1aおよび各記憶装置1k〜1sが図1のデータ保存装置1zに対応している。
【0049】
このサーバ計算機10が伝送装置2を介して需給調整プロバイダー100、電力会社200、IPP300および電力需要家400のそれぞれに設けた端末装置101、201、301、401および電力測定装置202、302、402と接続されていることは発明の概要で述べた通りである。
【0050】
前記端末装置101、201、301は、それぞれキーボード、マウス等を含む入力装置と、CRTやLCD等の表示部およびプリンタ等を含む出力装置とから構成されている。
【0051】
なお、図8では、IPP300、電力需要家400はそれぞれ1つのみ示しているが、実際にはIPP300、電力需要家400とも複数存在する場合があり、また、需給調整プロバイダー100、電力会社200を含めて1箇所に複数の端末装置が存在する場合があるが、ここでは説明を簡単化するため、IPP300および電力需要家400は1箇所そして各箇所に端末装置を1台設置しているものとして説明する。
【0052】
次に、サーバ計算機10の詳細構成について説明する。1aはCPU等から構成された制御装置であり、各部、各手段の制御やデータの転送、種々の演算、データの一時的な格納等を行う。1bは入力制御装置、1cは出力制御装置であり、それぞれ伝送装置2を介して接続された前記各端末装置から入力されるデータ、出力されるデータを制御する。
【0053】
1d、1e、…1jは、既に図1で概要を説明したように、ソフトウェアにより達成される機能実現手段である。この機能実現手段の中で1dは電力会社200の損益を計算する手段、1eはIPP300の損益を計算する手段、1fは電力需要家400の損益を計算する手段そして1gは需給調整プロバイダー100の損益を計算する手段であり、それぞれ制御装置1aにおいて電力会社200、IPP300、電力需要家400および需給調整プロバイダー100に設置してある各端末装置201、301、401および101から入力された情報を基にそれぞれの損益計算等を行うものである。
【0054】
一方、1hは電力会社200、IPP300および電力需要家400の各電力測定装置202、302および402で測定された電力量を、伝送回線2を介して入力する実績情報受信手段であり、また、1iは電力会社200、IPP300、電力需要家400に対して電力販売および電力購入の募集情報を通知する電力販売・購入募集情報通知手段である。
【0055】
更に1jは、電力会社200、IPP300、電力需要家400へ契約違反発生時のペナルティ料金情報を通知する督促情報計算手段である。なお、これらの詳細については後述する。
【0056】
そして、1k、1l、1m、…1sはいずれも記憶装置であり、それぞれ以下のファイルが格納している。記憶装置1kには、電力会社200の「電力販売量」、「電力販売単価」、「電力発電コスト単価」、「託送料金単価」、「事故時補給料金単価」が記憶され、記憶装置1lには、IPP300の「電力発電量」、「電力発電単価」、「電力発電コスト単価」が記憶され、記憶装置1mには、電力需要家の「電力購入量」、「電力購入単価」が記憶されている。
【0057】
記憶装置1nには、需給調整プロバイダー100が電力の「供給・購入を募集する情報」と、電力会社200、IPP300、電力需要家400、需給調整プロバイダー100の利益を計算し、メリットの有無を判断する「条件式」が記憶されている。
【0058】
記憶装置1pには、電力会社200から需給調整プロバイダー100への「電力販売量」と「電力販売料金」とが履歴情報として記憶され、また記憶装置1qには、IPP300から需給調整プロバイダー100への「電力販売量」と「電力販売料金」更に「託送料金」、「事故時補給料金」が履歴情報として記憶されている。
【0059】
記憶装置1rには、電力需要家400が需給調整プロバイダー100から購入する「購入量」、「購入料金」が履歴情報として記憶され、そして記憶装置1sにはIPP300の「託送料金」、「事故時補給料金」、電力需要家400の「電力購入料金」が記憶されている。
【0060】
(動作)
次に、本実施例の動作について説明する。ここで、端末装置201,301、401および101、電力測定装置201、202および203は伝送装置2を介してそれぞれサーバ計算機10と接続されて通信を行うわけであるが、サーバ計算機10に端末装置201〜101または電力測定装置202〜402が接続されると、制御装置1aは伝送装置2および入力制御装置1bを介してこの接続情報を取り込むことにより接続状態を検知し、前記した各機能実現手段1d、1e、1f、1g、1h、1iおよび1jにしたがって端末装置101〜104または電力測定装置202〜402を制御する。図10ないし図13は、かかる手段の動作を説明するためのフローチャートである。
【0061】
(電力販売・購入募集情報、メリット判定条件式等の登録)
次に、電力販売・購入募集情報、メリット判定条件式等の登録について説明する。
先ず、図10に示したステップP−1において、制御装置1aは、図8の電力販売・購入募集手段1iを制御して、需給調整プロバイダー100の端末装置101の出力装置101bの表示部に対し、電力会社200およびIPP300の電力販売と、電力需要家400の電力購入を募集する情報の入力画面を表示する。
この入力画面の表示により、需給調整プロバイダー100の端末装置操作者に対して、電力の供給、購入を募集する情報を入力するように促す。端末装置操作者は、該当する情報を入力装置101aから入力すると、制御装置1aは、その入力情報をステップP−2で一旦需給調整プロバイダー情報ファイル1nに保存する。
【0062】
次に、制御装置1aはステップE−1で、電力会社損益計算手段1dを制御して、図14の「電力会社情報登録画面」を端末装置の出力装置201bの表示部に表示し、電力会社の端末装置操作者に対して各種情報を入力するように促す。
【0063】
この場合の入力すべき各種情報とは、1.「従来の電力販売量」、2.「電力発電コスト単価」、3.「電力販売単価」、4.「託送料金単価」、5.「事故時補給料金単価」である。なお、「電力販売単価」、「託送料金単価」、「事故時補給料金単価」が基本料金と従量料金から構成される場合、個別に入力するように促す。また、従量料金が季節や時間帯で異なる場合は、個別に入力するように促す。
【0064】
電力会社の端末装置操作者は、これら情報を入力装置201aから入力し、ステップE−2において、一旦、電力会社情報ファイル1kに保存する。
制御装置1aは同様にしてステップI−1において、IPP損益計算手段1eを制御して、図15の「IPP情報登録画面」を端末装置301の出力装置301bの表示部に表示し、IPPの端末装置操作者に対して各種情報の入力を促す。
【0065】
この場合の入力すべき各種情報とは、1.従来の「電力発電量」、2.「電力発電単価」、3.「電力発電コスト単価」である。IPPの端末装置操作者は、これら情報を入力し、ステップI−2において、一旦、IPP情報ファイル1lに保存する。
【0066】
更に、制御装置1aは、ステップC−1において、電力需要家損益計算手段1fを制御して、図16の「電力需要家情報登録画面」を端末装置401の表示部に表示させ、電力需要家400の端末装置操作者に対して、1.従来の「電力購入量」、2.「電力購入単価」の入力を促す。
【0067】
なお、「電力購入単価」が基本料金と従量料金より構成される場合、個別に入力するように促す。また、従量料金が季節や時間帯によって、変動する場合、個別に入力するように促す。
電力需要家400の端末装置操作者は、これら情報を入力装置401aから入力し、ステップC−2において、一旦、電力需要家情報ファイル1mに保存する。
【0068】
(メリット計算および計算結果の通知)
次に図9、図10および図11を参照して「メリット計算および計算結果の通知」について説明する。
先ず、図10において、需給調整プロバイダー100の端末操作者は、ステップP−3で、既に説明した登録情報をもとに端末装置101から電力会社200、IPP300および電力需要家400それぞれにメリットがあるか否か計算するように要求をかける。
【0069】
図9は損益計算における情報の流れを示す図であり、図示左側の列に、電力会社情報ファイル1k、IPP情報ファイル1l、電力需要家情報ファイル1m、電力需給調整プロバイダー情報ファイル1nからの入力情報を示す。真中の列は前記1d〜1gの損益計算手段を示す。そして右側の列に電力会社情報、IPP情報、電力需要家情報および電力需給調整プロバイダー情報に関する出力情報を示す。
【0070】
前記制御装置1aは、ステップP−5において、電力会社損益計算手段1dを制御し、記憶装置1k、1l、1m、1nをもとに「利益の差額」、「電力販売単価」、「電力販売量」を計算する。同様に、IPP損益計算手段1eを制御して、IPPのメリットである「利益」、「電力発電単価」、「電力発電量」を計算する。更に、電力需要家損益計算手段1fを制御して、電力需要家の「電力購入(支払)料金の差額」、「電力購入単価」、「電力購入量」を計算する。
なお、ステップP−5において、それぞれの計算結果は、一意ではないので、組合せ情報として端末装置101の出力装置101bの表示装置に表示する。
【0071】
次に、制御装置1aは、ステップP−6において、各損益計算手段1d,1e,1f,1gをそれぞれ制御して、図5、6に示す条件式が成立するか否か計算を行う。この条件式が1つでも成立しない場合は、制御装置1aはメリットがないと判定し、電力会社200、IPP300、電力需要家400毎にそれぞれステップE−4、I−4およびC−4で、それぞれの出力装置201b、301b、401bの表示部に「メリット無し」との表示を行う。
【0072】
ステップP−6において、条件式が全て成立する場合はメリットを出せるので、ステップE−5、I−5、C−5へ移行する。制御装置1aは、ステップE−5、I−5、C−5において、端末装置201、301、401それぞれの出力装置201b、301b、401bの表示部に「メリット有り」の情報を表示する。本発明では、この状態で契約が成立したものとする。
【0073】
なお、損益計算は、並行して行う必要はなく、1d、1e、1f,1gのそれぞれの手段によって、個別に行うことができる。また、需給調整プロバイダーが複数の計算結果から任意のメリットの組合せを選択することもできる。
【0074】
(負荷平準化施策)
需給調整プロバイダー100としては、需要負荷パターンが一定であれば、負荷変動がある場合に比べ、低価格に電力を提供できる。以下、需給調整プロバイダー100から電力需要家に提案する負荷平準化施策について説明する。
【0075】
先ず、制御装置1aは図10のステップP−3において電力需要家の利益、購入料金を計算後、図11のステップP−4で、電力需要家ファイル1mをもとに電力購入時間帯を変更した場合の電力購入料金を計算し、次のステップC−3で電力需要家の端末装置401の表示部に電力購入時間帯毎の購入料金および購入量を表示することにより、端末装置操作者に対して変更の登録を促す。
【0076】
これを受けて電力需要家200の端末装置操作者は、変更可能か否かを判断し、変更する場合は、端末装置の入力装置401aから変更後の電力購入量および電力購入時間帯を登録し、再度ステップP−3でメリットを計算する。このようにして、電力需要家400と需給調整プロバイダー100の間で負荷平準化の調整を行い、電力需要家としては、より低価格の電力を購入することができる。
【0077】
[契約後の運用]
次に契約締結後の運用について、料金の処理フロー、契約違反発生時の処理フローおよび外部要因による料金・コスト設定の変更について順を追って説明する。
【0078】
(料金の処理フロー)
契約締結後は、図12において、制御装置1aは、ステップE−6で、実績情報受信手段1hを制御して、電力会社200から需給調整プロバイダー100が購入した新料金での電力量を受信・登録する。登録された情報は、ステップE−7において、電力会社情報履歴ファイル1pに格納する。
【0079】
同様に、制御装置1aは、ステップI−6において実績情報受信手段1hを制御してIPP300から需給調整プロバイダー100が購入した電力量を受信・登録する。登録された情報は、ステップI−7において、IPP情報履歴ファイル1qに格納する。
【0080】
更に、制御装置11は、ステップC−6において実績情報受信手段1hを制御して、需給調整プロバイダー100から電力需要家400が購入した電力量を受信・登録する。登録された情報は、ステップC−7において、電力需要家情報履歴ファイル1rに格納する。
【0081】
次に、制御装置1aは、ステップP−7において督促情報計算手段1jを制御し、IPP情報履歴ファイル1q、電力需要家情報履歴ファイル1rを参照して、IPPの「託送料金」、「事故時補給料金」、電力需要家の「電力購入料金」を計算し、端末装置101の出力装置101bを介して情報を表示し、実績として需給調整プロバイダー督促情報ファイル1sに保存する。
【0082】
次に、ステップI−8,C−8において、端末装置301の出力装置301bにより、督促されたIPPの「託送料金」、「事故時補給料金」を表示する。同様に、端末装置401の出力装置401bにより、督促された電力需要家の「電力購入料金」を表示する。
【0083】
(契約違反発生時の処理)
次に、契約違反発生時の処理フローについて説明する。
図13において、制御装置1aは、先ずステップP−8で、督促情報計算手段1jを制御して、電力会社200、IPP300の電力販売量、電力需要家の電力購入量に契約上の違反が発生した場合、電力会社情報履歴ファイル1p、IPP情報履歴ファイル1q、電力需要家情報履歴ファイル1rに登録された情報をもとにペナルティ条項が発生した旨、督促情報を登録する。
【0084】
その後、ステップE−8,I−9,C−9において、電力会社の端末装置201、IPPの端末装置301、電力需要家の端末装置401の表示部にペナルティの督促情報を表示する。
【0085】
(料金・コスト設定の変更)
最後に、外部要因による料金・コスト設定の変更について説明する。
図10のステップE−3、I−3において、事業環境あるいは法的要因により、料金単価、コスト単価が変更になった場合、制御装置1aは、端末装置201、301の表示部に変更実施を促す画面を表示する。
【0086】
電力会社およびIPPの端末装置操作者は、端末装置201、301の入力装置201a,301aにより、料金単価またはコスト単価を変更し、この変更情報をもとに、ステップP−3で再度損益計算を行う。
なお、本発明は以上述べた実施例に限定されるものではなく、以下のように種々変更して実施できるものである。
【0087】
▲1▼ 事業環境や法規制により電気料金が変動する場合、その都度、電力会社、独立発電事業者の電気料金へ反映されるので、当該価格をもとにして、契約期間をベースに調整を行うようにしても良い。
【0088】
▲2▼ 独立発電事業者、電力需要家とも複数ある場合、それぞれの発電量、購入量を合計した上で、それぞれの電力会社、独立発電事業者、電力需要家がそれぞれメリットを出せる範囲内で運用するようにしても良い。
【0089】
▲3▼独立発電事業者が複数ある場合、独立発電事業者全体の利益を個々の独立発電事業者の販売電気量に応じて前記利益を分配するようにしても良い。
▲4▼ 需要家が複数ある場合、需要家の利益(従来方式との差額)を、個々の需要家における支払料金に応じて還元するようにしても良い。
【0090】
▲5▼ 電力会社、IPP、電力需要家のペナルティ回数を履歴として保存することにより、このペナルティ回数が多いときには、電力需給の品質を保つために、需給電力プロバイダーは契約内容の変更を各端末装置操作者に促すようにしても良い。
▲6▼電力会社、IPP、または電力需要家が電力需給調整事業者の役割を担っても良い。
【0091】
【発明の効果】
以上述べたように、本発明によれば電力会社に対して従来よりも売上は低下するが、適正な利益をもたらし、IPPに対しては、一定出力の電力販売に対する一定の利益を保証し、需要家に対しては、従来よりも低料金の電力を供給することができる。また、需給調整プロバイダー自身も電力会社、IPPおよび電力需要家が得る利益の一部を受け取り適正な利益を得ることができる。
【図面の簡単な説明】
【図1】本発明に係わる実施の形態の概念構成図。
【図2】本発明によりメリットを生み出す仕組みを説明する図。
【図3】従来の契約形態を示す図。
【図4】本発明による料金支払の例を示す図。
【図5】メリット条件式を示す図。
【図6】メリット条件式を示す図。
【図7】メリット条件式を示す図で使用するパラメータを示す図。
【図8】本発明の実施の形態を示す構成図。
【図9】メリット計算における情報の流れを示す図。
【図10】本発明に係わる実施の形態の作用を説明するためのフローチャート。
【図11】本発明に係わる実施の形態の作用を説明するためのフローチャート。
【図12】本発明に係わる実施の形態の作用を説明するためのフローチャート。
【図13】本発明に係わる実施の形態の作用を説明するためのフローチャート。
【図14】電力会社情報登録画面を示す図。
【図15】IPP情報登録画面を示す図。
【図16】電力需要家情報登録画面を示す図。
【符号の説明】
1a…制御装置、1b…入力制御装置、1c…出力制御装置、1d…電力会社損益計算手段、1e…IPP損益計算手段、1f…電力需要家損益計算手段、1g…電力需給調整事業者損益計算手段、1h…実績情報受信手段、1i…電力販売・購入募集通知手段、1j…督促情報計算手段、2…伝送装置、10…サーバ計算機、100…電力需給調整事業者、200…電力会社、300…独立発電事業者、400…電力需要家、101、201、301、401…端末装置、202、302、402…電力測定装置。
[0001]
BACKGROUND OF THE INVENTION
In the present invention, a power supply / demand adjustment operator (hereinafter abbreviated as a supply / demand adjustment provider) is an electric power company and an independent power generation company (other than an electric power company that generates power using private power generation facilities and supplies power to other companies. Purchasing power from small businesses that supply power to businesses and parts of the region (hereinafter abbreviated as IPP), adjusting these powers and supplying them to power consumers It relates to a method for adjusting power supply and demand.
[0002]
[Prior art]
In recent years, due to liberalization in the electric power industry, the current power supply system composed of a limited number of electric power companies (electric power companies) has been reviewed and the entry regulations related to the wholesale electric power business have been abolished in principle. Bidding systems have been introduced to promote competition among new entrants.
[0003]
In this way, as a power supplier to the power consumer, the IPP newly entered in addition to the power company and the wholesale electricity supplier that performs large-scale wholesale supply, the power consumer is based on the principle of competition, It has become possible to purchase cheaper electricity.
[0004]
In addition to power companies, power consumers can now purchase power with a price set based on a direct contract with IPP. Therefore, not only power companies but also IPPs are based on various factors such as load fluctuations and weather conditions. It became necessary to predict the amount of electricity purchased by consumers and adjust the generated power, time, and price.
[0005]
[Problems to be solved by the invention]
By the way, it is troublesome as well as troublesome for electric power consumers to directly contract with an electric power company and IPP in consideration of load fluctuations based on their daily load and season.
Moreover, since the electric power consumer whose receiving voltage is less than 20,000 volts is not the object of electric power liberalization, he had to purchase electric power as usual.
Therefore, a concept of establishing a supply and demand adjustment provider, which is a third party organization that mediates between electric power companies, IPPs, and consumers, has been considered.
[0006]
However, at present, there is still no idea about a business mechanism that can benefit all of us, including power companies, IPPs, customers, and even supply and demand providers.
[0007]
The present invention has been made in view of such a situation, and a supply and demand adjustment provider is provided between an electric power company on the power supply side and an IPP and an electric power consumer, and brings benefits to each while adjusting the supply and demand of electric power. It aims at providing the electric power supply-and-demand adjustment method.
[0008]
[Means for Solving the Problems]
  In order to achieve the above-mentioned object, the invention relating to the power supply and demand adjustment method according to claim 1 uses the network to transfer information between the power company, the independent power generation company, the power consumer and the power supply and demand adjustment company. The power supply and demand adjustment company purchases power from both the independent power generation company and the power company.Adjust this purchase powerSell to the electricity consumerIf
  Electric power companies, independent power generation companies and electric power consumers are equipped with input devices, output devices and electric power measurement devices, respectively, and electric power supply and demand adjustment operators are equipped with input devices, output devices, control devices and storage devices. Means for prompting the application by notifying the sales and purchase solicitation information by calculating the control device of the coordinator using the information input from the input device and the information stored in the storage device; Realize company profit and loss calculation means, independent generator profit and loss calculation means, power consumer profit and loss calculation and supply and demand adjustment provider profit and loss calculation means,
  (1) The power supply / demand adjustment business operator registers information for soliciting power supply / purchase from the power company, independent power generation company and power consumer by means of power sales / purchase recruitment information notification means. Register the conditional expression to judge the merits of each power consumer and send it,
  (2) The electric power company receives the information sent from the power supply and demand adjustment company with the input device, and at the time of applying for information on the conventional power sales volume, electricity charges, power generation costs, consignment charges and accident supply charges, etc. Send from the output device to the power supply and demand adjustment company,
  (3) The independent power generation company receives the information sent from the power supply and demand adjustment company by the input device, and when the application is made, information on the conventional power generation amount, power generation unit price, and power generation cost unit price is output from the output device. Send to the supply and demand adjustment company,
  (4) The power consumer receives the information sent from the power supply / demand adjustment company by the input device, and transmits the information on the conventional power purchase amount and payment fee from the output device to the power supply / demand adjustment business operator at the time of application. ,
  (5) The power supply / demand adjustment business operator has received information from the power company on the conventional electricity sales volume, electricity charges, power generation costs, consignment fees and accident replenishment fees, etc. The information on the amount of electricity generated, the electricity charge and the electricity generation cost, and the information on the conventional electricity purchase amount and the payment fee sent from the power consumer are input by the input device and temporarily stored in the data storage device. Based on the application information, the power company profit and loss calculation means, independent power generation company profit and loss calculation means and power consumer profit and loss calculation means are executed, surpassing all of the power companies, independent power generation companies and power consumers. If it can be determined that there is a merit, a contract is established by notifying the terminal device of the power company, independent power generation company, and power consumer of the merit information from the output device. Unishi wasIt is characterized by that.
[0009]
Here, the profit and loss is a concept including both profit and loss, and the unit is not limited. Further, the information on the fee or the information on the cost is sufficient if the fee or the cost can be calculated. For example, when the power unit price is known by a power supply and demand regulator, if the power purchase amount (consumption) information can be obtained from the power consumer, the conventional payment fee of the power consumer can be known. In such a case, the power purchase amount is also included in the information related to the payment fee.
[0011]
  Claim2The invention relating to the power supply and demand adjustment method according to claim 11The power supply and demand adjustment method described above is characterized in that performance information receiving means is provided for receiving information on the actual purchase amount of the electric power company and independent power generation company and the actual sales amount of electric power to the electric power consumer.
[0013]
  Claim3The invention relating to the power supply and demand adjustment method according to claim 11In the electric power supply and demand adjustment method described above, the electric power supply and demand adjustment company performs leveling of the customer load pattern by adjusting the purchase amount and purchase time of each electric power for a plurality of electric power consumers. Features.
[0014]
  Claim4The invention relating to the power supply and demand adjustment method according to claim 11In the power supply and demand adjustment method described, if there is a difference from the contract details regarding the amount purchased from an independent power generation company or the amount sold to an electric power consumer, a penalty payment is notified to the violator of the contract.RukoAnd features.
[0015]
  Claim5The invention relating to the power supply and demand adjustment method according to claim 14In the power supply and demand adjustment method described in, this penalty count is greater than the penalty allowance count by storing the penalty allowance counts of power companies, independent power producers, and power consumers, and saving the penalty counts as a history. Present amendment contract proposals to power companies, independent power producers and electricity consumersRukoAnd features.
[0016]
  Claim6Power supply and demand adjustment described insystemThe invention related toThe electric power company, independent power generation company and electric power consumer are each provided with an input device, an output device and an electric power measurement device, and the electric power supply and demand adjustment operator is provided with an input device, an output device, a control device and a storage device. Independent power generation companies, power consumers, and power supply and demand adjustment operators use the network to exchange information, and power supply and demand adjustment operators purchase power from both the independent power generation operators and the power companies. In the power supply and demand adjustment system in which the purchased power is adjusted and sold to the power consumer,
  Electricity supply and demand adjustment operators
Register information to solicit power supply / purchase from power companies, independent power generation companies, and power consumers, and register conditional expressions for judging the merits of each of the power companies, independent power generation companies, and power consumers. Power sales / purchase solicitation information notification means for notifying power companies, independent power producers and power consumers via the output device, and soliciting application for sales and purchase of power
Based on information on the conventional power sales volume, electricity charges, power generation costs, consignment charges, and accident replenishment charges, etc. sent from the power company's output device at the time of application, the current and previous sales profits of the power company If the difference is calculated and profits improve, the power company profit and loss calculation means to determine and notify that there is a merit,
Based on the information on the conventional power generation amount, electricity charges and power generation costs sent from the output device of the independent power generation company at the time of application, the profit of the independent power generation company is calculated, and if there is a profit, it is judged that there is merit. An independent power generation operator profit and loss calculation means to be notified,
Based on the information on the conventional power purchase amount and payment fee sent from the output device of the electric power customer at the time of application, the difference between the electric power customer payment fee and the conventional one is calculated, and the payment fee is reduced. Power consumer profit and loss calculation means to determine and notify that there is a merit,
It is provided with.
[0018]
  Claim7The invention described in2. The power supply and demand adjustment method according to claim 1, wherein the independent power generation company supplies power corresponding to a base of an electric power load, the electric power company supplies electric power including fluctuations of the electric power load, and the electric power company. For this, a unit sales price higher than that of the independent power generation company is set, each sales unit price is stored, a purchase unit price of the power consumer is stored, a power sales amount of the power company, Input the electricity sales amount and the electricity purchase amount of the electricity consumer, calculate the electricity bill collected from the electricity consumer using the inputted electricity purchase amount and the stored purchase unit price, and input each electricity sale All or part of the collected electricity bill is allocated to the electric power company and the independent power generation company by using the quantity and the stored sales unit price.It is characterized by that.
[0019]
"The first power supplier responsible for power quality" means that when multiple power suppliers supply power to the same power system, the voltage and frequency are stable due to legal or social conventions. It means an electric power supplier considered to have the final responsibility of supplying the electric power, and includes the so-called electric power company.
The “electric power company” is a general electric power company under the Electricity Business Law as of the filing date of the present application and refers to a so-called 10 electric power company, including its successor company.
[0020]
The “second power supplier” does not mean that it does not have to be responsible for the power quality at all, and it is legally not as much as the first power supplier in the scope or degree of responsibility. Or it means the electric power supply company considered by the social wisdom, and it is the meaning including a so-called independent power generation company.
[0021]
  Claim8The invention described in claim7In the power supply and demand adjustment method described above, when there are multiple power consumers,
  SaidPower companyPower generation schedule, the power generation schedule of the independent power generation company, and each power purchase schedule of the plurality of power consumers.Force,
  Create an overall power generation schedule based on the input power generation schedules.Completion,
  Create an overall power purchase schedule based on each input power schedule.Completion,
  Based on the overall power generation schedule created above and the overall power purchase schedule, the difference between the planned power generation amount and the planned purchase amount is calculated.Seeking,
  When this difference exceeds a certain value, a request for a change in power purchase amount or purchase time is sent to all or part of the plurality of power consumers.Belief,
  In response to the request, for electricity consumers according to the change, the electricity price is calculated by lowering the purchase unit price.To doFeatures.
[0022]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described. Prior to detailed description, the concept will be described. FIG. 1 is a conceptual configuration diagram of the invention.
(1) Conceptual configuration
In FIG. 1, the supply and demand adjustment provider 100 purchases a constant output power from the IPP 300 at a low electricity charge, while purchasing power for the load fluctuation from the power company 200 at a higher electricity charge than usual. The business is to sell purchased electricity customers 400 at a lower electricity rate than when purchasing power from a conventional power company after adjusting the purchased power.
[0023]
In order to carry out this work, the supply and demand adjustment provider 100 solicits the sale and purchase of power from the terminal device to the power company 200, the IPP 300 and the power consumer 400 through the power sales / purchase solicitation notification means 1i. . This recruitment information is transmitted to the electric power company 200, the IPP 300, and the electric power consumer 400 through the transmission line 2 such as the Internet, and is displayed on a display unit of a terminal device such as a personal computer installed therein.
[0024]
In order to apply for a recruitment from the provider 100, the electric power company 200 inputs the conventional electricity bill, power generation cost and sales volume from the terminal device.
Similarly, in order to apply for this recruitment, the IPP 300 also inputs the conventional electricity rate, power generation cost, and sales volume from the terminal device. Similarly, the electric power consumer 400 applies for the recruitment, and similarly inputs the conventional payment fee and purchase amount from the terminal device. Such conventional information is temporarily stored in the data storage device 1z.
[0025]
The power company profit / loss calculation means 1d calculates the difference between the current and previous sales profits of the power company based on the application information stored in the data storage device 1z. to decide. Next, the IPP profit / loss calculating means 1e calculates the profit of the IPP 300, and determines that there is a merit if there is a profit.
[0026]
Next, the power consumer profit / loss calculation means 1f calculates the difference between the payment charge of the power consumer 400 and the conventional payment charge, and determines that there is a merit when the payment charge is reduced.
The supply and demand adjustment provider / profit calculation means 1g calculates the profit that the supply and demand adjustment provider 100 obtains from the profits that the electric power company, IPP, and electric power consumer respectively obtain.
[0027]
When the power company 200, the IPP 300, and the power consumer 400 determine that there is a merit, the merit information is transmitted from the terminal device to the demand / supply adjustment provider 100 that is the recruiter through the transmission device 2.
[0028]
After the contract, in order to calculate the electricity bill and confirm whether or not the contract is violated, the supply and demand adjustment provider 100 uses the actual information receiving means 1h to transmit the actual power transmission information from the electric power company 200 and IPP 300 to the customer 400 and Received power reception result information.
Further, when a contract violation occurs, the penalty information calculation means 1j calculates a penalty fee and notifies the contract violator through the transmission line.
[0029]
(2) Mechanism for generating profits
With reference to FIG. 2, a mechanism for generating profit will be described. The supply and demand adjustment provider 100 purchases the power corresponding to the load fluctuation from the electric power company 200 on behalf of the electric power consumer 400, purchases the remaining constant output from the IPP 300, and pays the electric charges to the electric power company 200 and the IPP 300, respectively. As shown in the figure, the load fluctuation here is a part obtained by subtracting a certain output (base part) from the purchased power which fluctuates with the passage of time.
[0030]
If the power company 200 can sell only the amount of load fluctuations, sales and profits will decrease because both sales and profits will be reduced compared to the situation where it has been sold to electric power customers all at once. Even so, power will be sold at a higher electricity rate than conventional bulk sales so that profits can be obtained. For example, a method of using a higher price setting menu among the price menus provided by electric power companies that are conventionally used by electric power consumers can be considered.
[0031]
On the other hand, for IPP300, only a certain base is sold, so that the power generation facilities can be operated efficiently, and as a result, electric power can be sold at a lower price than the electric power company 200 that sells the load fluctuation. it can.
[0032]
In other words, since the IPP is responsible for a constant output (base), it is not necessary to follow fluctuations, and control accompanying power supply becomes easy. This eliminates the need for excessive capital investment and makes it possible to make a profit even at a low unit sales price.
[0033]
In addition, in order to transmit the power generated by the IPP 300 to the power consumer 400, the transmission line of the electric power company 200 is normally used. In this case, the consignment fee (the power company's transmission line is borrowed) which is a facility usage fee. Thus, it is necessary to pay the electric power company the usage fee of the transmission line when sending electricity.
[0034]
Furthermore, in the event that it becomes impossible to supply a constant output due to an accident at the power generation facility of IPP300, in order to guarantee the supply of contract power to power consumers, the constant output is taken over by the power company. I have to get it.
[0035]
In the present invention, the supply and demand adjustment provider 100 receives from the IPP 300 an accident replenishment charge (*) commensurate with the consignment charge for the power and the supply for a certain output from the IPP 300 and pays it to the power company (* electricity that cannot be transmitted due to the accident) To be paid by the power company for compensation).
[0036]
What is important for the supply and demand adjustment provider 100 is that the power consumer 400 sells electricity at a lower price than when the power customer 400 has purchased power from the power company 200 in a lump sum, and the power supply and demand adjustment process performs power supply adjustment. In return for providing benefits to each of the company 200, the IPP 300, and the power consumer 400, a part of the profit improvement obtained by the power company 200, a part of the profit obtained by the IPP 300, and the reduction of the payment fee obtained by the power consumer 400 This means that a part of the bill will be charged and profits will be made as a supply and demand adjustment provider 100.
[0037]
FIG. 3 is a diagram showing a conventional contract form between an electric power company and an electric power consumer, and is presented for comparison with FIG. As can be seen from FIG. 3, in the past, the electric power consumer 400 has purchased electricity from the electric power company 200 for a certain output (base) and load fluctuations in a lump, and paid for electricity. The profit of the electric power company 200 in this case is the amount obtained by subtracting the power generation cost from the electricity rate.
[0038]
FIG. 4 shows a breakdown of the profit of the IPP 300 according to the present invention, the profit of the electric power company 200 and the amount of improvement thereof, the payment fee of the electric power consumer 400 and the reduction amount thereof, and the payment fee of the electric power supply and demand adjustment provider 100.
[0039]
As can be seen from FIG. 4, the profit for the electric power company 200 is calculated by subtracting the power generation cost from the electricity charge (new charge) related to the load fluctuation sold to the supply and demand adjustment provider 100, and adding the contract shipping charge and the replenishment charge at the time of the accident. (New profit; 3-1). The profit improvement amount for the electric power company 200 is an amount obtained by subtracting the profit (2-1) in the conventional contract form shown in FIG. 3 from the new profit (3-1).
[0040]
Further, the profit for the IPP 300 is an amount (3-2) obtained by subtracting the power generation cost, the consignment shipping fee, and the accident supply fee from the electricity rate related to the base sold to the supply and demand adjustment provider 100.
[0041]
The total payment fee (3-3) of the supply and demand adjustment provider 100 is a total value of the base purchase fee (payment fee) from the IPP 300 and the purchase fee (payment fee) for the load fluctuation from the electric power company 200. .
[0042]
On the other hand, the power consumer 400 pays to the supply and demand adjustment provider 100 as a new payment fee (3-4), which is the total of the base rate and the load rate. The amount obtained by subtracting the new payment fee (3-4) from the payment fee (2-2) in the conventional contract form shown in FIG.
[0043]
(3) Conditional expressions that produce merits
As described above, in the mechanism for generating profits in (2), the mechanism for generating the merits of power companies, IPPs, customers, and the power supply / demand adjustment provider as a whole has been explained macroscopically. explain.
[0044]
FIG. 5 (A) shows a conditional expression that can give merit as an electric power company. When the new profit (3-1) exceeds the conventional profit (2-1), it is determined that there is merit.
First, the breakdown of new profit (3-1) will be explained. The circled numbers indicate the parameters in FIG. Electricity charges are (2) unit sales price x (4) sales volume, and power generation costs are (5) power generation cost unit price x (4) sales volume. Is (9) (consignment charge unit price + (10)*(Supply unit price at the time of accident) x 7) IPP power generation amount. (10)*Means the number 10 same as below.
[0045]
Next, the profit (2-1) in the conventional method will be described. The profit of the conventional method is the electricity price minus the power generation cost. In this case, both the electricity bill and the power generation cost are the same as those described in (3-1), but the parameters are shown in (1) to (10) in FIG.*As shown in the figure, the prior art and the present invention are different.
[0046]
Next, with reference to FIG. 5B, conditions that can provide merits for the IPP 300 will be described. In this case, there is a merit when the profit is positive to the IPP 300 already described in FIG. In other words, the amount of electricity ((6) power generation unit price x (7) power generation amount)-power generation cost ((8) power generation cost unit price x (7) power generation amount)-(consignment amount charge + accident supply fee = ((9) consignment) The advantage of IPP300 can be obtained when the unit price of unit charge + unit price of supply at the time of accident) x 7) power generation) is greater than zero.
[0047]
FIG. 6 (a) shows the conditions that can give merit to the consumer 400, and (b) the conditions that can give merit to the supply and demand adjustment provider 100.
The condition that can benefit the customer 400 is when the payment fee to the supply and demand adjustment provider 100 in the new contract form is lower than the payment charge to the power company 200 in the conventional contract form. In addition, the condition that can provide a merit for the supply and demand adjustment provider 100 is when the equations of FIGS. 5A, 5B, and 6A are satisfied.
[0048]
(4) Examples
Now that the concept of the present invention has been described, a specific embodiment will be described below.
(Constitution)
FIG. 8 is a functional block diagram showing the configuration of the present embodiment, and parts corresponding to those in FIG.
In FIG. 8, 10 shows a functional block diagram of a server computer installed in the supply and demand adjustment provider 100, and the control device 1a and the storage devices 1k to 1s correspond to the data storage device 1z in FIG.
[0049]
The server computer 10 has terminal devices 101, 201, 301, 401 and power measuring devices 202, 302, 402 provided in the supply / demand adjustment provider 100, the power company 200, the IPP 300, and the power consumer 400 via the transmission device 2, respectively. The connection is as described in the summary of the invention.
[0050]
Each of the terminal devices 101, 201, and 301 includes an input device including a keyboard, a mouse, and the like, and an output device including a display unit such as a CRT and an LCD, a printer, and the like.
[0051]
In FIG. 8, only one IPP 300 and one electric power consumer 400 are shown, but there may actually be a plurality of both IPP 300 and electric power consumer 400. In some cases, multiple terminal devices may exist in one location, but for simplicity of explanation, it is assumed here that IPP300 and power consumer 400 have one terminal device installed at one location and each location. explain.
[0052]
Next, a detailed configuration of the server computer 10 will be described. Reference numeral 1a denotes a control device composed of a CPU and the like, and performs control of each unit and means, data transfer, various calculations, temporary storage of data, and the like. Reference numeral 1b denotes an input control device, and 1c denotes an output control device, which controls data input and output from each of the terminal devices connected via the transmission device 2, respectively.
[0053]
1d, 1e,..., 1j are function realizing means achieved by software as already outlined in FIG. Among these function realizing means, 1d is a means for calculating the profit / loss of the electric power company 200, 1e is a means for calculating the profit / loss of the IPP 300, 1f is a means for calculating the profit / loss of the power consumer 400, and 1g is the profit / loss of the supply / demand adjustment provider 100 Based on information input from the terminal devices 201, 301, 401, and 101 installed in the power company 200, the IPP 300, the power consumer 400, and the supply and demand adjustment provider 100 in the control device 1a, respectively. It calculates the profit and loss of each.
[0054]
On the other hand, 1h is a record information receiving means for inputting the amount of power measured by the power measuring devices 202, 302 and 402 of the power company 200, the IPP 300 and the power consumer 400 through the transmission line 2, and 1i Is a power sales / purchase solicitation information notification means for notifying the power company 200, the IPP 300, and the power consumer 400 of power sales and power solicitation information.
[0055]
Furthermore, 1j is a dunning information calculation means for notifying the electric power company 200, the IPP 300, and the electric power customer 400 of penalty fee information when a contract violation occurs. Details of these will be described later.
[0056]
Each of 1k, 1l, 1m,... 1s is a storage device and stores the following files. The storage device 1k stores “electricity sales volume”, “electricity sales unit price”, “electric power generation cost unit price”, “consignment charge unit price”, and “accident supply unit price at accident” of the electric power company 200, and is stored in the storage device 1l. Stores the “electric power generation amount”, “electric power generation unit price”, and “electric power generation cost unit price” of the IPP300, and the storage device 1m stores “electricity purchase amount” and “electricity purchase unit price” of the electric power consumer. ing.
[0057]
In storage device 1n, supply / demand adjustment provider 100 calculates “information for recruiting / purchasing power” and the profits of electric power company 200, IPP300, electric power customer 400, and supply / demand adjustment provider 100, and determines whether there is any merit. A “conditional expression” is stored.
[0058]
The storage device 1p stores “power sales volume” and “power sales fee” from the power company 200 to the supply / demand adjustment provider 100 as history information, and the storage device 1q stores information from the IPP 300 to the supply / demand adjustment provider 100. “Electricity sales amount”, “Electricity sales fee”, “Consignment fee”, and “Accident supply fee” are stored as history information.
[0059]
The storage device 1r stores “purchase amount” and “purchase fee” purchased by the power consumer 400 from the supply and demand adjustment provider 100 as history information, and the storage device 1s stores “consignment fee” and “at the time of accident” of the IPP 300. The “replenishment fee” and the “electricity purchase fee” of the power consumer 400 are stored.
[0060]
(Operation)
Next, the operation of this embodiment will be described. Here, the terminal devices 201, 301, 401 and 101, and the power measuring devices 201, 202 and 203 are connected to the server computer 10 via the transmission device 2 for communication, respectively. When 201 to 101 or power measuring devices 202 to 402 are connected, the control device 1a detects the connection state by taking in this connection information via the transmission device 2 and the input control device 1b, and each of the function realizing means described above. The terminal devices 101 to 104 or the power measuring devices 202 to 402 are controlled according to 1d, 1e, 1f, 1g, 1h, 1i and 1j. 10 to 13 are flowcharts for explaining the operation of such means.
[0061]
(Registration of power sales / purchase recruitment information, merits judgment conditional expression, etc.)
Next, registration of power sales / purchase solicitation information, merit determination conditional expressions, etc. will be described.
First, in step P-1 shown in FIG. 10, the control device 1a controls the power sales / purchase soliciting means 1i in FIG. 8 to the display unit of the output device 101b of the terminal device 101 of the supply and demand adjustment provider 100. Then, an information input screen for recruiting electric power companies 200 and IPP 300 for electric power sales and electric power customers 400 is displayed.
By displaying this input screen, the terminal device operator of the supply and demand adjustment provider 100 is prompted to input information for recruiting and purchasing power. When the terminal device operator inputs corresponding information from the input device 101a, the control device 1a temporarily stores the input information in the supply and demand adjustment provider information file 1n in step P-2.
[0062]
Next, in step E-1, the control device 1a controls the power company profit / loss calculation means 1d to display the “power company information registration screen” of FIG. 14 on the display unit of the output device 201b of the terminal device. The terminal device operator is prompted to input various information.
[0063]
The various information to be entered in this case are: 1. “Conventional electricity sales volume”, 2. “Power generation cost unit price”, 3. “Electricity sales unit price”, 4. “Consignment charge unit price”, “5. Hourly replenishment unit price ”. In addition, when the “electricity sales unit price”, “consignment charge unit price”, and “accident supply unit price” are composed of a basic charge and a pay-as-you-go charge, the user is prompted to enter them individually. In addition, if the pay-as-you-go charges differ according to the season or time zone, it is urged to input them individually.
[0064]
The operator of the power company terminal device inputs the information from the input device 201a, and temporarily stores it in the power company information file 1k in step E-2.
Similarly, in step I-1, the control device 1a controls the IPP profit / loss calculation means 1e to display the “IPP information registration screen” of FIG. 15 on the display unit of the output device 301b of the terminal device 301, and the IPP terminal It prompts the device operator to input various information.
[0065]
The various information to be input in this case are 1. conventional “electric power generation amount”, 2. “electric power generation unit price”, and 3. “electric power generation cost unit price”. The IPP terminal device operator inputs these information and temporarily stores them in the IPP information file 11 in step I-2.
[0066]
Further, in step C-1, the control device 1a controls the power consumer profit / loss calculation means 1f to display the “power consumer information registration screen” of FIG. Encourage 400 terminal device operators to enter 1. “Purchase power” and 2. “Purchase unit price”.
[0067]
In addition, when the “power purchase unit price” is composed of a basic charge and a pay-as-you-go charge, it is urged to input separately. Also, if the pay-as-you-go fee varies depending on the season or time zone, the user is prompted to enter it individually.
The terminal device operator of the power consumer 400 inputs this information from the input device 401a, and temporarily stores it in the power consumer information file 1m in Step C-2.
[0068]
(Merit calculation and calculation result notification)
Next, “merit calculation and notification of calculation result” will be described with reference to FIG. 9, FIG. 10, and FIG.
First, in FIG. 10, the terminal operator of the supply and demand adjustment provider 100 has merits from the terminal device 101 to the electric power company 200, the IPP 300, and the electric power consumer 400 based on the registration information already described in Step P-3. Make a request to calculate whether or not.
[0069]
FIG. 9 is a diagram showing the flow of information in the profit and loss calculation. In the left column of the figure, the input information from the electric power company information file 1k, the IPP information file 11, the electric power customer information file 1m, and the electric power supply / demand adjustment provider information file 1n is shown. Indicates. The middle column shows the profit / loss calculation means 1d to 1g. And the output information regarding electric power company information, IPP information, electric power consumer information, and electric power supply and demand adjustment provider information is shown in the right column.
[0070]
In step P-5, the control device 1a controls the power company profit / loss calculation means 1d, and based on the storage devices 1k, 1l, 1m, 1n, the "profit difference", "power sales unit price", "power sales" Calculate "amount". Similarly, the IPP profit / loss calculation means 1e is controlled to calculate “profit”, “unit price of electric power generation”, and “amount of electric power generation” which are the merits of IPP. Further, the power consumer profit / loss calculation means 1 f is controlled to calculate the “difference in power purchase (payment) charges”, “unit price of power purchase”, and “amount of power purchase” of the power consumer.
In step P-5, since the respective calculation results are not unique, they are displayed on the display device of the output device 101b of the terminal device 101 as combination information.
[0071]
Next, in step P-6, the control device 1a controls each profit / loss calculation means 1d, 1e, 1f, 1g to calculate whether or not the conditional expressions shown in FIGS. When even one of the conditional expressions is not satisfied, the control device 1a determines that there is no merit, and for each of the electric power company 200, the IPP 300, and the electric power consumer 400, in steps E-4, I-4, and C-4, “No merit” is displayed on the display section of each output device 201b, 301b, 401b.
[0072]
In step P-6, if all the conditional expressions are satisfied, a merit can be obtained, and the process proceeds to steps E-5, I-5, and C-5. In Steps E-5, I-5, and C-5, the control device 1a displays “Merits” information on the display units of the output devices 201b, 301b, and 401b of the terminal devices 201, 301, and 401, respectively. In the present invention, it is assumed that the contract is established in this state.
[0073]
In addition, it is not necessary to calculate profit / loss in parallel, and it can be individually performed by means of 1d, 1e, 1f, and 1g. In addition, the supply and demand adjustment provider can select any combination of merits from a plurality of calculation results.
[0074]
(Load leveling measures)
The supply and demand adjustment provider 100 can provide electric power at a lower price as long as the demand load pattern is constant than when there is a load fluctuation. Hereinafter, the load leveling measure proposed by the supply and demand adjustment provider 100 to the power consumer will be described.
[0075]
First, the control device 1a calculates the power consumer's profit and purchase fee in step P-3 in FIG. 10, and then changes the power purchase time zone based on the power consumer file 1m in step P-4 in FIG. In the next step C-3, the purchase fee and the purchase amount for each power purchase time zone are displayed on the display unit of the power consumer terminal device 401 in the next step C-3. Encourage registration of changes.
[0076]
In response to this, the terminal device operator of the power consumer 200 determines whether or not the change can be made, and when changing, registers the changed power purchase amount and the power purchase time zone from the input device 401a of the terminal device. Then, the merit is calculated again in Step P-3. In this way, the load leveling is adjusted between the power consumer 400 and the supply and demand adjustment provider 100, and the power consumer can purchase lower priced power.
[0077]
[Operation after contract]
Next, the operation after the contract is concluded will be described in order with respect to the charge processing flow, the processing flow when the contract is violated, and the change in charge / cost setting due to external factors.
[0078]
(Price processing flow)
After the contract is concluded, in FIG. 12, the control device 1a controls the record information receiving means 1h in step E-6 to receive the power amount at the new rate purchased by the supply / demand adjustment provider 100 from the power company 200. sign up. In step E-7, the registered information is stored in the power company information history file 1p.
[0079]
Similarly, the control device 1a controls and records the amount of power purchased by the demand / supply adjustment provider 100 from the IPP 300 by controlling the record information receiving means 1h in step I-6. In step I-7, the registered information is stored in the IPP information history file 1q.
[0080]
Further, in step C-6, the control device 11 controls the record information receiving means 1h to receive and register the amount of power purchased by the power consumer 400 from the supply and demand adjustment provider 100. In step C-7, the registered information is stored in the power consumer information history file 1r.
[0081]
Next, the control device 1a controls the dunning information calculation means 1j in step P-7, refers to the IPP information history file 1q and the power consumer information history file 1r, and determines the IPP “consignment fee”, “at the time of accident” The “replenishment fee” and the “electricity purchase fee” of the electric power consumer are calculated, information is displayed via the output device 101b of the terminal device 101, and is stored in the demand / supply adjustment provider prompting information file 1s as the actual result.
[0082]
Next, in steps I-8 and C-8, the IPP “consignment fee” and “accident supply fee” are displayed by the output device 301b of the terminal device 301. Similarly, the output device 401b of the terminal device 401 displays the “power purchase fee” of the urged power consumer.
[0083]
(Processing when contract violation occurs)
Next, the processing flow when contract violation occurs will be described.
In FIG. 13, the control device 1a first controls the dunning information calculation means 1j in Step P-8, and a contract violation occurs in the power sales amount of the power company 200 and the IPP 300 and the power purchase amount of the power consumer. In this case, the dunning information is registered to the effect that the penalty clause has occurred based on the information registered in the power company information history file 1p, the IPP information history file 1q, and the power customer information history file 1r.
[0084]
Thereafter, in steps E-8, I-9, and C-9, penalty reminding information is displayed on the display units of the power company terminal device 201, the IPP terminal device 301, and the power consumer terminal device 401.
[0085]
(Change of charge / cost setting)
Lastly, the change in charge / cost settings due to external factors will be described.
In Steps E-3 and I-3 in FIG. 10, when the unit price and the unit cost are changed due to the business environment or legal factors, the control device 1a changes the display units of the terminal devices 201 and 301. Display a prompt screen.
[0086]
The operator of the electric power company and the IPP terminal device change the unit price or the cost unit price by using the input devices 201a and 301a of the terminal devices 201 and 301, and calculate profit / loss again in step P-3 based on the change information. Do.
In addition, this invention is not limited to the Example described above, It can implement variously as follows.
[0087]
(1) When electricity charges fluctuate due to the business environment and laws and regulations, they are reflected in the electricity charges of electric power companies and independent power generation companies each time. Therefore, adjustments are made based on the contract period based on the prices. You may make it do.
[0088]
(2) If there are multiple independent power producers and power consumers, the total amount of power generated and purchased must be combined, and within the range that each power company, independent power producer, and power customer can benefit. You may make it operate.
[0089]
(3) When there are a plurality of independent power generation companies, the profits of the entire independent power generation companies may be distributed according to the amount of electricity sold by each independent power generation company.
{Circle around (4)} When there are a plurality of consumers, the profits of the consumers (difference from the conventional method) may be returned according to the payment fee of each consumer.
[0090]
(5) By storing the penalty counts of power companies, IPPs, and power consumers as a history, when this penalty count is high, the power supply / demand provider changes the contract details to each terminal device in order to maintain the power supply / demand quality. The operator may be prompted.
(6) An electric power company, IPP, or an electric power consumer may play the role of an electric power supply and demand adjustment operator.
[0091]
【The invention's effect】
As described above, according to the present invention, sales to electric power companies will be lower than before, but it will bring about an appropriate profit, and IPP will guarantee a certain profit for electric power sales with a constant output, The consumer can be supplied with electric power at a lower charge than before. In addition, the supply and demand adjustment provider itself can receive a part of the profits obtained by the electric power company, the IPP, and the electric power consumer, and obtain appropriate profits.
[Brief description of the drawings]
FIG. 1 is a conceptual configuration diagram of an embodiment according to the present invention.
FIG. 2 is a diagram for explaining a mechanism for generating a merit according to the present invention;
FIG. 3 is a diagram showing a conventional contract form.
FIG. 4 is a diagram showing an example of fee payment according to the present invention.
FIG. 5 is a diagram showing a merit conditional expression.
FIG. 6 is a diagram showing a merit conditional expression.
FIG. 7 is a diagram showing parameters used in a diagram showing merit conditional expressions;
FIG. 8 is a configuration diagram showing an embodiment of the present invention.
FIG. 9 is a diagram showing a flow of information in merit calculation.
FIG. 10 is a flowchart for explaining the operation of the embodiment according to the present invention.
FIG. 11 is a flowchart for explaining the operation of the embodiment according to the present invention.
FIG. 12 is a flowchart for explaining the operation of the embodiment according to the present invention.
FIG. 13 is a flowchart for explaining the operation of the embodiment according to the present invention.
FIG. 14 is a diagram showing a power company information registration screen.
FIG. 15 is a diagram showing an IPP information registration screen.
FIG. 16 is a diagram showing a power consumer information registration screen.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1a ... Control apparatus, 1b ... Input control apparatus, 1c ... Output control apparatus, 1d ... Electric power company profit / loss calculation means, 1e ... IPP profit / loss calculation means, 1f ... Electric power consumer profit / loss calculation means, 1g ... Electric power supply / demand adjustment business profit / loss calculation Means: 1h: Performance information receiving means, 1i: Electricity sales / purchase notification means, 1j: Dunning information calculation means, 2: Transmission device, 10: Server computer, 100: Electric power supply / demand adjustment company, 200: Electric power company, 300 ... an independent power generation company, 400 ... a power consumer, 101, 201, 301, 401 ... a terminal device, 202, 302, 402 ... a power measuring device.

Claims (8)

ネットワークを利用して電力会社、独立発電事業者、電力需要家および電力需給調整事業者間で情報の授受を行い、前記電力需給調整事業者が前記独立発電事業者および前記電力会社の双方から電力を購入し、この購入電力を調整して前記電力需要家に販売する場合、
電力会社、独立発電事業者および電力需要家にそれぞれ入力装置、出力装置および電力測定装置を備えるとともに、電力需給調整事業者に入力装置、出力装置、制御装置および記憶装置を備えるようにし、電力需給調整事業者の当該制御装置が入力装置から入力された情報および記憶装置に記憶されている情報を用いて演算することにより、電力の販売および購入の募集情報を通知して応募を促す手段、電力会社損益計算手段、独立発電事業者損益計算手段、電力需要家損益計算および需給調整プロバイダー損益計算手段を実現し、
(1)電力需給調整事業者は電力販売・購入募集情報通知手段によって電力会社、独立発電事業者および電力需要家へ電力供給・購入を募集する情報を登録し、電力会社、独立発電事業者および電力需要家のそれぞれのメリットを判断するための条件式を登録したうえで送信し、
(2)電力会社は、電力需給調整事業者から送られてくる情報を入力装置で受信し、応募時に従来の電力販売量、電気料金、発電コスト、託送料金および事故時補給料金等に関する情報を出力装置から電力需給調整事業者へ送信し、
(3)独立発電事業者は、電力需給調整事業者から送られてくる情報を入力装置で受信し、応募時に従来の電力発電量、電力発電単価、電力発電コスト単価に関する情報を出力装置から電力需給調整事業者へ送信し、
(4)電力需要家は、電力需給調整事業者から送られてくる情報を入力装置で受信し、応募時に従来の電力購入量、支払い料金に関する情報を出力装置から電力需給調整事業者へ送信し、
(5)電力需給調整事業者は、電力会社から送られてくる従来の電力販売量、電気料金、発電コスト、託送料金および事故時補給料金等に関する情報、独立発電事業者から送られてくる従来の発電量、電気料金および発電コストに関する情報、および電力需要家から送られてくる従来の電力購入量、支払い料金に関する情報を、入力装置により入力してデータ保存装置に一旦格納し、この格納された応募情報をもとに、電力会社損益計算手段、独立発電事業者損益計算手段および電力需要家損益計算手段を実行し、電力会社、独立発電事業者および電力需要家のいずれにも従来を上回るメリットがあると判断できた場合、電力会社、独立発電事業者および電力需要家の端末装置にメリットありの情報を出力装置から通知して契約を成立させるようにしたことを特徴とする電力需給調整方法。
Information is exchanged between the power company, the independent power generation company, the power customer and the power supply and demand adjustment company using the network, and the power supply and demand adjustment company receives power from both the independent power generation company and the power company. And adjusting the purchased power to sell to the power consumer ,
Electric power companies, independent power generation companies and electric power consumers are equipped with input devices, output devices and electric power measurement devices, respectively, and electric power supply and demand adjustment operators are equipped with input devices, output devices, control devices and storage devices. Means for prompting the application by notifying the sales and purchase solicitation information by calculating the control device of the coordinator using the information input from the input device and the information stored in the storage device; Realize company profit and loss calculation means, independent generator profit and loss calculation means, power consumer profit and loss calculation and supply and demand adjustment provider profit and loss calculation means,
(1) The power supply / demand adjustment business operator registers information for soliciting power supply / purchase from the power company, independent power generation company and power consumer by means of power sales / purchase recruitment information notification means. Register the conditional expression to judge the merits of each power consumer and send it,
(2) The electric power company receives the information sent from the power supply and demand adjustment company with the input device, and at the time of applying for information on the conventional power sales volume, electricity charges, power generation costs, consignment charges and accident supply charges, etc. Send from the output device to the power supply and demand adjustment company,
(3) The independent power generation company receives the information sent from the power supply and demand adjustment company by the input device, and when the application is made, information on the conventional power generation amount, power generation unit price, and power generation cost unit price is output from the output device. Send to the supply and demand adjustment company,
(4) The power consumer receives the information sent from the power supply / demand adjustment company by the input device, and transmits the information on the conventional power purchase amount and payment fee from the output device to the power supply / demand adjustment business operator at the time of application. ,
(5) The power supply / demand adjustment business operator has received information from the power company on the conventional electricity sales volume, electricity charges, power generation costs, consignment fees and accident replenishment fees, etc. The information on the amount of electricity generated, the electricity charge and the electricity generation cost, and the information on the conventional electricity purchase amount and the payment fee sent from the power consumer are input by the input device and temporarily stored in the data storage device. Based on the application information, the power company profit and loss calculation means, independent power generation company profit and loss calculation means and power consumer profit and loss calculation means are executed, surpassing all of the power companies, independent power generation companies and power consumers. If it can be determined that there is a merit, a contract is established by notifying the terminal device of the power company, independent power generation company, and power consumer of the merit information from the output device. Electric power supply and demand control method, characterized in that had Unishi.
請求項1に記載の電力需給調整方法おいて、電力需給調整事業者は、電力会社および独立発電事業者購入量実績の情報と、電力需要家への電力販売量の実績とを受信することを特徴とする電力需給調整方法。Keep power supply and demand adjustment method according to claim 1, power supply and demand adjustment operators, and the information of the power companies and independent power producers buy the actual amount, to receive and track record of electricity sales amount to the power consumers A method for adjusting power supply and demand. 請求項1に記載の電力需給調整方法において、電力需給調整事業者、複数の電力需要家に対して、それぞれの電力の購入量、購入時間を調整することにより、需要家負荷パターンの平準化を行うことを特徴とする電力需給調整方法。In power supply and demand control method according to claim 1, the power supply adjustment operators for a plurality of electric power consumer, purchases of respective power, by adjusting the purchase time, leveling customer load pattern A power supply and demand adjustment method characterized by: 請求項1に記載の電力需給調整方法において、電力需給調整事業者は、独立発電事業者からの購入量または電力需要家への販売量について契約内容と差異が発生した場合、契約違反者に対してペナルティ支払いの告知をすることを特徴とする電力需給調整方法。In the electric power supply and demand adjustment method according to claim 1, the electric power supply and demand adjustment company, when there is a difference between the contract contents and the purchase amount from the independent power generation company or the sales quantity to the electric power consumer, electric power supply and demand control method according to claim and to Turkey announcements penalty payments Te. 請求項に記載の電力需給調整方法において、さらに電力会社、独立発電事業者、電力需要家のペナルティ許容回数を保存すると共にペナルティ回数を履歴として保存することにより、このペナルティ回数がペナルティ許容回数よりも多い場合、修正契約案を電力会社、独立発電事業者および電力需要家に提示することを特徴とする電力需給調整方法。5. The power supply and demand adjustment method according to claim 4 , wherein the penalty number of the electric power company, the independent power generation company, and the power consumer is further saved and the penalty number is saved as a history so that the penalty number is more than the penalty allowance number. in many cases, modify the draft contract of the power company, power supply and demand adjustment method according to claim and Turkey be presented to the independent power producers and power demand alike. 電力会社、独立発電事業者および電力需要家にそれぞれ入力装置、出力装置および電力測定装置を備えるとともに、電力需給調整事業者に入力装置、出力装置Power companies, independent power generation companies, and power consumers have input devices, output devices, and power measurement devices, respectively. 、制御装置および記憶装置を備え、これら電力会社、独立発電事業者、電力需要家および電力需給調整事業者間でネットワークを利用して情報の授受を行うとともに、電力需給調整事業者が、独立発電事業者および前記電力会社の双方から電力を購入し、この購入電力を調整して前記電力需要家に販売するようにした電力需給調整システムにおいて、And control devices and storage devices. These power companies, independent power producers, power consumers, and power supply and demand regulators use the network to exchange information, and the power supply and demand regulators In an electric power supply and demand adjustment system that purchases electric power from both an operator and the electric power company, adjusts the purchased electric power and sells it to the electric power consumer,
電力需給調整事業者は、Electricity supply and demand adjustment operators
電力会社、独立発電事業者および電力需要家へ電力供給・購入を募集する情報を登録し、電力会社、独立発電事業者および電力需要家のそれぞれのメリットを判断するための条件式を登録したうえで出力装置を介して電力会社、独立発電事業者および電力需要家に対し、電力の販売および購入の募集情報を通知し応募を促す、電力販売・購入募集情報通知手段と、  Register information to solicit power supply / purchase from power companies, independent power generation companies, and power consumers, and register conditional expressions for judging the merits of each of the power companies, independent power generation companies, and power consumers. Power sales / purchase solicitation information notification means for notifying power companies, independent power producers, and power consumers via the output device in order to notify the sales and purchase solicitation information and encourage application
電力会社の出力装置から応募時に送られてくる従来の電力販売量、電気料金、発電コスト、託送料金および事故時補給料金等に関する情報をもとに、電力会社の販売利益の今回と従来との差額を計算し、利益が向上する場合、メリットがあると判断し通知する電力会社損益計算手段と、  Based on information on the conventional power sales volume, electricity charges, power generation costs, consignment charges, and accident replenishment charges, etc. sent from the power company's output device at the time of application, the current and previous sales profits of the power company If the difference is calculated and profits improve, the power company profit and loss calculation means to determine and notify that there is a merit,
独立発電事業者の出力装置から応募時に送られてくる従来の発電量、電気料金および発電コストに関する情報をもとに、独立発電事業者の利益を計算し、利益があればメリットがあると判断し通知する独立発電事業者損益計算手段と、  Based on information on the conventional power generation amount, electricity charges and power generation costs sent from the output device of the independent power generation company at the time of application, the profit of the independent power generation company is calculated, and if there is a profit, it is judged that there is merit An independent power generation operator profit and loss calculation means to be notified,
電力需要家の出力装置から応募時に送られてくる従来の電力購入量、支払い料金に関する情報をもとに、電力需要家の支払料金の従来との差額を計算し、支払料金が削減されている場合、メリットがあると判断し通知する電力需要家損益計算手段と、  Based on the information on the conventional power purchase amount and payment fee sent from the output device of the electric power customer at the time of application, the difference between the electric power customer payment fee and the conventional one is calculated, and the payment fee is reduced. Power consumer profit and loss calculation means to determine and notify that there is a merit,
を備えたことを特徴とする電力需給調整システム。A power supply and demand adjustment system characterized by comprising:
前記独立発電事業者は電力負荷のベース分の電力を供給し、前記電力会社は電力負荷の変動分を含む電力を供給し、かつ、前記電力会社に対しては前記独立発電事業者よりも高い販売単価を設定し、当該各販売単価を記憶し、前記電力需要家の購入単価を記憶し、前記電力会社の電力販売量、前記独立発電事業者の電力販売量および電力需要家の電力購入量を入力し、前記入力した電力購入量と前記記憶している購入単価を用いて電力需要家から徴集する電気料金を演算し、前記入力した各電力販売量と前記記憶している各販売単価を用いて、前記徴集した電気料金の全部または一部を前記電力会社と前記独立発電事業者に配分することを特徴とする請求項1記載の電力需給調整方法 The independent power generation company supplies power for the base of the power load, the power company supplies power including fluctuations in the power load, and is higher for the power company than the independent power generation company Set sales unit price, store each sales unit price, store the purchase price of the electric power consumer, store the electric power sales amount of the electric power company, the electric power sales amount of the independent power generation company, and the electric power purchase amount of the electric power consumer To calculate an electricity charge collected from a power consumer using the input power purchase amount and the stored purchase unit price, and the input power sales amount and the stored sales unit price. The power supply and demand adjustment method according to claim 1, wherein all or part of the collected electricity bill is distributed to the electric power company and the independent power generation company . 力需要家が複数の場合、
前記電力会社の発電スケジュール、前記独立発電事業者の発電スケジュール、および、前記複数の電力需要家の各電力購入スケジュールを入力し
前記入力した各発電スケジュールをもとに全体の発電スケジュールを作成し
前記入力した各電力スケジュールをもとに全体の電力購入スケジュールを作成し
前記作成した全体の発電スケジュールと全体の電力購入スケジュールをもとに発電予定量と購入予定量の差を求め
この差が一定値を超えたとき、前記複数の電力需要家の全部または一部に電力購入量または購入時間について変更の依頼を送信し
前記依頼により、変更に応じた電力需要家に対しては、前記購入単価を下げて電気料金を演算することを特徴とする請求項7記載の電力需給調整方法。
If power consumers there are a plurality of,
The power company of the power generation schedule, the independent power producer of power generation schedule, and enter the respective power purchase schedule of the plurality of electric power consumers,
Create a whole generation schedule based on each of the power generation schedule that was the input,
Create a whole of power purchase schedule based on each power schedule that is the input,
I asked the difference between the power generation schedule amount and purchase a predetermined amount based on the power generation schedule and overall power purchase schedule for the whole of the created,
When this difference exceeds a predetermined value, it sends a request for changing the amount of power purchased or purchased time to all or part of the plurality of electric power consumers,
The power supply and demand adjustment method according to claim 7 , wherein an electric charge is calculated by reducing the purchase unit price for an electric power consumer in response to the change by the request.
JP2000393493A 2000-12-25 2000-12-25 Power supply / demand adjustment method, power supply / demand adjustment system, and storage medium Expired - Fee Related JP3983974B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000393493A JP3983974B2 (en) 2000-12-25 2000-12-25 Power supply / demand adjustment method, power supply / demand adjustment system, and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000393493A JP3983974B2 (en) 2000-12-25 2000-12-25 Power supply / demand adjustment method, power supply / demand adjustment system, and storage medium

Publications (2)

Publication Number Publication Date
JP2002199584A JP2002199584A (en) 2002-07-12
JP3983974B2 true JP3983974B2 (en) 2007-09-26

Family

ID=18859285

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000393493A Expired - Fee Related JP3983974B2 (en) 2000-12-25 2000-12-25 Power supply / demand adjustment method, power supply / demand adjustment system, and storage medium

Country Status (1)

Country Link
JP (1) JP3983974B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3730614B2 (en) * 2002-11-26 2006-01-05 株式会社東芝 Power control method and power management system for electronic equipment
JP5004158B2 (en) * 2006-06-13 2012-08-22 独立行政法人産業技術総合研究所 Energy supply and demand adjustment system
WO2013179876A1 (en) 2012-05-28 2013-12-05 三菱電機株式会社 Demand and supply adjustment system
JP5768097B2 (en) * 2013-08-01 2015-08-26 日本電信電話株式会社 Information processing apparatus and service providing method
CN105139111A (en) * 2015-08-11 2015-12-09 江苏天源招标有限公司 Agreement inventory material order allocation method based on greedy algorithm
JP6845091B2 (en) * 2017-06-02 2021-03-17 株式会社東芝 Electric power retail business evaluation device and electric power retail business evaluation method

Also Published As

Publication number Publication date
JP2002199584A (en) 2002-07-12

Similar Documents

Publication Publication Date Title
US8156022B2 (en) Method and system for providing price protection for commodity purchasing through price protection contracts
JP3631967B2 (en) Surplus power management system and control method thereof
US7945501B2 (en) System and method for constraining depletion amount in a defined time frame
JP2004526245A5 (en)
US20070050230A1 (en) Computer facilitated ordering, tracking, and reporting system
Carmona The regulatory function in public-private partnerships for the provision of transport infrastructure
Rashidizadeh‐Kermani et al. Stochastic risk‐constrained decision‐making approach for a retailer in a competitive environment with flexible demand side resources
JP3983974B2 (en) Power supply / demand adjustment method, power supply / demand adjustment system, and storage medium
JP2021086312A (en) Power trading assisting system, power trading assisting device, and program
KR20200129844A (en) Integrated support system for car sales
EP1321875A1 (en) Commodity order acceptance and transportation system, method and recording medium
JP4050021B2 (en) Power consignment control system and power transaction method
JP2004062805A (en) Electric power metering service system, metering service center and metering method
Rubio et al. CERTS customer adoption model
JP2001352676A (en) System and method for proposing energy saving
Abdala Transmission pricing in privately-owned electricity grids: An illustration from the Argentine electricity pool
KR102152259B1 (en) Method for providing mileage using cryptocurrency
WO2017035571A1 (en) Analysing smart meter data for solar or storage recommendation
JP2001256380A (en) Calculation system for elevator maintenance charge
JP2007043819A (en) Apparatus and method for intervening power transaction
Oppen et al. A proposal for prosumer electricity trading
Cao et al. Business outcome-based pricing models for IT services
US20220108272A1 (en) Parcel Margin Optimization (PMO) System for and Methods of Generating and Optimizing Discounted Parcel Shipping Prices
JP6845091B2 (en) Electric power retail business evaluation device and electric power retail business evaluation method
Hochstetler et al. In search of a tariff fit for the grid's edge revolution: Reflections from Brazil

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20040116

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20050720

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050818

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20050720

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050901

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070220

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20070219

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070227

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070426

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070703

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070705

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100713

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100713

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110713

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120713

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130713

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees