JP3881306B2 - How to install the fall prevention net - Google Patents

How to install the fall prevention net Download PDF

Info

Publication number
JP3881306B2
JP3881306B2 JP2002366394A JP2002366394A JP3881306B2 JP 3881306 B2 JP3881306 B2 JP 3881306B2 JP 2002366394 A JP2002366394 A JP 2002366394A JP 2002366394 A JP2002366394 A JP 2002366394A JP 3881306 B2 JP3881306 B2 JP 3881306B2
Authority
JP
Japan
Prior art keywords
fall prevention
vertical
prevention net
rope
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2002366394A
Other languages
Japanese (ja)
Other versions
JP2004194867A (en
Inventor
正樹 上野
圭一 中西
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Telegraph and Telephone Corp
Original Assignee
Nippon Telegraph and Telephone Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Telegraph and Telephone Corp filed Critical Nippon Telegraph and Telephone Corp
Priority to JP2002366394A priority Critical patent/JP3881306B2/en
Publication of JP2004194867A publication Critical patent/JP2004194867A/en
Application granted granted Critical
Publication of JP3881306B2 publication Critical patent/JP3881306B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
本発明は、電気設備及び電気通信設備における鋼材を主とするトラス構造等の鉄塔上で、垂直に近い角度で連続的に配置された梯子状の電線等配線固定用構造物(以下、「垂直ラダー」という)に沿って、鉄塔の上部から鉄塔の基礎部に電線やケーブル等の布設及び固定作業を行う場合や、鉄塔中間箇所で設備増設用の支持金具等の設置を行う場合において、作業者の墜落又は作業時の材料若しくは工具の落下を防止するための墜落防止網を取り付ける方法に関するものである。
【0002】
【従来の技術】
近年、インターネット接続サービスや携帯電話等の移動体通信に対応すべく、高速かつ大容量の情報通信ネットワークの構築が急務となっている。そのため、無線系電気通信設備やそれに関わる装置の電源線、電力線等の電気設備を鉄塔に設置する工事が進められている。この工事は、鉄塔上部にアンテナ等の装置を増設するとともに、この装置の電源線や電力線等のケーブルを鉄塔上部から電力制御棟まで引き込むため、ケーブルを鉄塔上部から鉄塔に設置されている作業者昇降用の垂直ラダー(Ladder)や昇降用階段に沿って垂直に近い角度で地上の基礎部へ降ろし、そこから電力制御棟まで延長している。また、ケーブルを垂直ラダー等に沿って基礎部にまで降ろす場合には、ケーブルを垂直ラダー等に沿って50cm間隔で鉄塔上部から基礎部まで垂直ラダー等に打ち止めして布設する。
【0003】
また、ケーブルを布設する前には、作業者の墜落又は材料若しくは工具の落下を防止するために、鉄塔上部より基礎部へ通常5m間隔程度で墜落防止網を作業範囲全てに取り付ける必要がある。このように、墜落防止網の設置間隔を5mと定めているのは、高低差を広く空けすぎると墜落時の落下速度が速くなりすぎるため、墜落防止網で受け止めても人体の荷重で延ばされ、人体が鉄塔構造物に接触する可能性が高く、作業者へのダメージが大きく致命傷となり得るからである。
【0004】
また、墜落防止網の取付作業は、一般的に垂直ラダー等を利用して作業者が鉄塔の最上部に登り、最上部の作業位置から順に5m程度の間隔をおいて基礎部まで取り付けることにより行う。この墜落防止網は、通常、ナイロン製繊維等の網を3m四方から5m四方程度まで編むことにより形成され、各頂点(四角)には同じくナイロン製繊維等の接続紐を設けたものが一般的である。作業者は、地上の基礎部から墜落防止網の取り付けを行う箇所まで一つずつ墜落防止網を引き上げ、又は一括して鉄塔上部の作業台等に引き上げた後に引き下ろしを行い、接続紐を1箇所ずつ鉄塔構造物の梁や柱に結び付ける。この結付作業は、通常、鉄塔の内側(垂直ラダー等のケーブルが配線される側)に墜落防止網の1辺を横方向に広げ、両端(2頂点)の接続紐を鉄塔構造物の適当な位置に結び付けることにより行う。そして、墜落防止網を作業者の昇降又は材料若しくは工具の上げ下ろしを行う際に、墜落又は落下が予想される範囲より広い範囲に広げ、墜落時又は落下時に作業者の身体又は材料若しくは工具に適度な衝撃吸収が得られる程度に墜落防止網の弛みを調整し、残りの2頂点の接続紐を鉄塔構造物に結び付けて全体を固定する。
【0005】
尚、垂直ロープを4本用意して地上で5m間隔に全ての墜落防止網を予め取り付けておき、まとめて吊り上げて取り付けることをせず、鉄塔上で墜落防止網を一つずつ取り付ける理由は、鉄塔の各所に存在する構造物の梁や筋交いが支障となり墜落防止網を付けた状態での引き上げが不可能であることと、複数の墜落防止網全体の重量が重く人力で引き上げることが困難だからである。
【0006】
【特許文献1】
特開平1−249073号公報
【0007】
【特許文献2】
特開2002−339594号公報
【0008】
【発明が解決しようとする課題】
しかしながら、上記墜落防止網の取付作業を行う場合には、作業者自信が接続紐の先に結んである通い綱等を持ち、垂直ラダー等から梁や筋交い及び柱等の間をくぐって歩き垂直ラダー等の反対側部分まで横移動し、この反対側の鉄塔構造物に適当な弛みを持たせて、残りの2頂点の接続紐を取り付ける必要がある。この墜落防止網の取付作業は、鉄塔上の高所で行うことから、作業者の墜落を防止するための三重の安全を確保している。そのうちの一つ目は、親網(α)の一端を鉄塔最上部に取り付け、他端を作業者に取り付けるものである。二つ目は、作業者が横移動する前に安全帯に付属する親ロープ(β)を腰に取り付けるものである。この親ロープ(β)は、横移動可能な長さを有している。また、三つ目は、横移動後に残りの2点の接続紐を取り付ける前に取付場所を固定して両手を使えるようにすべく、取付場所で補助ロープ(γ)を腰に巻くものである。但し、この補助ロープ(γ)は、横移動場所に前もって設置する必要がある。
【0009】
以上のように、電源線や電力線等のケーブルを布設する際に安全を確保すべく、墜落防止網を取り付ける必要があり、従来は、この墜落防止網を取り付けるため、更に、親網(α)、親ロープ(β)及び補助ロープ(γ)を使用して安全を確保しなければならず、非常に時間の掛かる効率の悪い作業であった。
【0010】
本発明は上述した事情を鑑みてなされたものであり、墜落防止網を短時間で取り付けることができる墜落防止網の取付方法を提供することを目的としたものである。
【0011】
【課題を解決するための手段】
上記目的を達成するため、請求項1に係る発明は、鉄塔の上部から地上の基礎部に梯子又は昇降用階段に沿ってケーブルの布設等を行う前に作業者の墜落又は材料若しくは工具の落下を防止する墜落防止網を取り付ける墜落防止網の取付方法において、前記鉄塔の上部から通線ロープを前記基礎部へ懸垂するステップと、事前にフック金具を昇降調整金具によって取り付けてある2本の垂直ロープの上端に前記通線ロープを取り付けて、前記通線ロープを引き上げることにより前記2本の垂直ロープを基礎部から上部へ引き上げるステップと、前記墜落防止網を前記鉄塔の取付場所付近まで引き上げ、当該引き上げた墜落防止網の2頂点の接続紐を前記鉄塔の梯子側の鉄塔構造物に取り付けるステップと、前記2本の垂直ロープを操作竿で前記梯子側に引き寄せて、まだ取り付けを行っていない2頂点の接続紐をそれぞれ前記引き寄せた垂直ロープの各フック金具に接続するステップと、前記2本の垂直ロープの最下端の近傍で引線固定を行う引線器を使用して、前記2本の垂直ロープを引っ張って固定するステップと、を実行することを特徴とする墜落防止網の取付方法である。
【0012】
ここで、本発明の「通線ロープ」は、2本の垂直ロープを引き上げることができれば、1本のみ使用しても2本以上使用してもよい(以下、同様)。
【0013】
請求項2に係る発明は、鉄塔の上部から地上の基礎部に梯子又は昇降用階段に沿ってケーブルの布設等を行う前に作業者の墜落又は材料若しくは工具の落下を防止する墜落防止網を取り付ける墜落防止網の取付方法において、前記鉄塔の上部から通線ロープを前記基礎部へ2本懸垂するステップと、事前に留金具をかしめ加工した2本の垂直ロープの上端に前記通線ロープを取り付けて、前記通線ロープを引き上げることにより前記2本の垂直ロープを基礎部から上部へ引き上げるステップと、前記墜落防止網を前記鉄塔の取付場所付近まで引き上げ、当該引き上げた墜落防止網の2頂点の接続紐を前記鉄塔の梯子側の鉄塔構造物に取り付けるステップと、前記2本の垂直ロープを操作竿で前記梯子側に引き寄せて、まだ取り付けを行っていない2頂点の接続紐をそれぞれ前記引き寄せた垂直ロープの各留金具の上部側に接続するステップと、前記2本の垂直ロープの最下端の近傍で引線固定を行う引線器を使用して、前記2本の垂直ロープを引っ張って固定するステップと、を実行することを特徴とする墜落防止網の取付方法である。
【0014】
請求項3に係る発明は、前記垂直ロープは、高所作業での墜落防止に使用される親ロープであることを特徴とする請求項1又は2に記載の墜落防止網の取付方法である。
【0015】
請求項4に係る発明は、前記操作竿は、多段式に伸縮可能であることを特徴とする請求項1又は2に記載の墜落防止網の取付方法である。
【0016】
請求項5に係る発明は、前記操作竿は、先端に前記垂直ロープを引っ掛ける鈎型形状の先端金具が設けられていることを特徴とする請求項4に記載の墜落防止網の取付方法である。
【0017】
請求項6に係る発明は、前記昇降調整金具は、前記垂直ロープ上の任意の間隔で自由に取付位置を移動可能に取り付けることが可能であることを特徴とする請求項1に記載の墜落防止網の取付方法である。
【0018】
請求項7に係る発明は、前記留金具は、金属環からなり前記垂直ロープにかしめ加工されていることを特徴とする請求項2に記載の墜落防止網の取付方法である。
【0019】
【発明の実施の形態】
以下、図1乃至図4を用いて本発明に係る第1の実施形態を説明する。尚、図1乃至図4は、本実施形態に係る墜落防止網の取付方法及び取付器具を示した図である。
【0020】
図1に示すように、鉄塔100には、一般に、作業者昇降用の垂直ラダー(Ladder)Aが設置されている。この垂直ラダーAは、アンテナ等の装置の電源線や電力線等のケーブルを鉄塔100上部から地上の基礎部へ降ろす際に、作業者が昇降に使用するための梯子である。また、ケーブルを垂直ラダーAに沿って基礎部まで降ろす場合には、ケーブルを垂直ラダーAに沿って50cm間隔で鉄塔上部から基礎部まで打ち止めして布設する。また、鉄塔100には、鉄塔100の強度を確保するために、上部から基礎部に渡って複数の梁Bが設けられている。更に、鉄塔の上部には、作業者用の作業場所Cが設けられている。このような構造からなる鉄塔100において、以下に、墜落防止網4の取付方法及び取付器具を説明する。
【0021】
まず、図1に示すように、最上段の作業場所Cから墜落防止網4の取付範囲を考慮しながら各梁Bの間を通すルート選定を行い、作業場所Cから通線ロープ10を地上の基礎部へ(矢印a方向へ)2本懸垂する(ステップS1)。この通線ロープ10は、後述の垂直ロープ1より外径の細いロープであり、先端には垂直ロープ1を取り付けて引き上げるための取付フック11が設けられている。
【0022】
次に、図2に示すように、作業者は、作業場所Cから基礎部までの高さに合わせて事前に5m間隔で複数の昇降調整金具2及びフック金具5の取り付けを行った垂直ロープ1の先端(上端)を、通線ロープ10の取付フック11に取り付けて、基礎部から上部へ(矢印b方向へ)引き上げる(ステップS2)。この垂直ロープ2は2本あり、上記2本の通線ロープ10にそれぞれ取り付けられて引き上げられる。垂直ロープ2としては、作業者墜落時の荷重に耐えうる必要があることから一般に高所作業での墜落防止に使用される親ロープを使用し、垂直ロープ2の両端にも荷重見合いの安全性の確認された連結フックが設けられている。
【0023】
更に、垂直ロープ2には、垂直ロープ2上の任意の間隔で自由に取付位置を移動可能な昇降調整金具2が複数取り付けられている。この昇降調整金具2としては、垂直ロープ1の外径に適合した墜落防止用の昇降器等の親ロープ把持器具等を使用し、垂直ロープ1の途中から容易に取付が可能で作業者墜落時の衝撃荷重に充分耐えられるロープ把持能力を保有し、把持機能の操作により容易に把持位置を移動できる機能があるものが適している。
【0024】
更に、各昇降調整金具2には紐等によりフック金具5が取り付けられ、墜落防止網4の4角の頂点に設けてある後述の接続紐6が容易に取り付けられるように工夫されている。
【0025】
尚、昇降調整金具2は、墜落防止網4の取り付けとともに鉄塔100の形状が基礎部へ下がるほど広がっている形状の場合には、垂直ロープ1自体を垂直に垂らすだけでなく鉄塔100の形状に合わせて斜めに延線する際に、垂直ロープ1の把持器具としても使用する。また、垂直ロープ1の先端(下端)は、作業者が昇降する垂直ラダーAに近い位置に容易に引き上げ可能な状態に巻いて集積しておくことで、後述の操作竿3による垂直ロープ1の引き寄せ作業時の負荷を軽減することができる。
【0026】
次に、作業者は上部方向から順に墜落防止網4を取付場所近傍に引き上げ、図3に示すように、垂直ラダーA側の鉄塔構造物Dに墜落防止網4の2頂点の接続紐6,6を結び付ける(ステップS3)。この墜落防止網4は、ケーブル布設等の作業を行う範囲に合わせて、ナイロン製繊維等の網を3m四方から5m四方程度まで編むことにより形成され、各頂点(四角)には同じくナイロン製繊維等の接続紐6が設けられている。また、接続紐6,6を結び付ける際には、垂直ラダーAのケーブル布設等を行う作業側に沿って作業者も昇降移動することから、作業者の身体が通過できる程度の空間Eを確保すべく、弛みを持たせて結び付ける。更に、作業者の通過後には、垂直ラダーAで墜落防止網4を別途仮捕縛する等の処置を必要により行う。
【0027】
次に、図3に示すように、作業者は、垂直ラダーAで親綱式安全帯を取り付けて自己の墜落防止をした状態で、先端に鈎型の先端金具7が付いた操作竿3を延伸し、垂直ロープ1を自己側(垂直ラダーA側)に引き寄せて、昇降調整金具2に連結したフック金具5にまだ取り付けを行っていない接続紐6,6を接続する(ステップS4)。この操作竿3は、作業者が垂直ラダーAの昇降時の支障とならないよう容易に持ち運べるように多段式に伸縮可能であり、先端には垂直ロープ1を容易に引っ掛けることができる大きめの鈎型形状の先端金具7が設けられている。
【0028】
以上によって墜落防止網4を1つ取り付ける作業が終了し、この作業を繰り返すことによって、全ての墜落防止網4の取付が完了する。
【0029】
最後に、全ての墜落防止網4の取付が完了した時点で、垂直ロープ1の最下端に近い位置で垂直ロープ1の張線固定を行う張線器12を使用し、垂直ラダーA側から垂直ロープ1が離れる方向(矢印d方向)に適度に荷重をかけて垂直ロープ1を引っ張り、墜落防止網4に適度な弛みを持たせた状態で固定する(ステップS5)。
【0030】
尚、墜落防止網4の4箇所の接続紐6の取付を実現する際、墜落防止網4の設置高さが鉄塔構造物に接触する等の支障があると判断した時点で、操作竿3による垂直ロープ1の引き寄せと昇降調整金具2の位置移動による設置高さの微調整を行ってもよい。
【0031】
また、垂直ロープ1の2本の引き上げ作業の際、鉄塔100の構造によって一部の高さまでの墜落防止網4が先に接続された状態でも引き上げ可能な状況である場合は、一部の墜落防止網4と垂直ロープ1を同時に引き上げて効率良く設置することは可能である。
【0032】
以上説明したように、本実施形態によれば、墜落防止網4の2頂点の接続紐6,6を取り付けることができる垂直ロープ1を鉄塔100の上部まで引き上げ、その後に墜落防止網4の他の2頂点の接続紐6,6を鉄塔100の鉄塔構造物Dに取り付け、その後に操作竿で垂直ロープ1を垂直ラダーA側(矢印c側)に引き寄せ、その後に接続紐6,6を垂直ロープ1に取り付けられている昇降調整金具2のフック金具5に取り付ける。これにより、従来のように、作業者は、親網(α)、親ロープ(β)及び補助ロープ(γ)を使用して安全を確保してから、垂直ラダーから梁や筋交い及び柱等の間をくぐって歩き垂直ラダーの反対側部分まで横移動する必要がないため、墜落防止網の取付を短時間で行うことができるという効果を奏する。
【0033】
〔第2の実施形態〕
以下、図5を用いて本発明に係る第2の実施形態を説明する。尚、図5は、本実施形態に係る墜落防止網の取付方法及び取付器具を示した図である。
【0034】
本実施形態は、基本的に上記第1の実施形態と同様の作業手順で墜落防止網4を取り付けるが、使用する器具が異なる。即ち、金属環からなる留金具8を5m毎若しくは更に細かい間隔でかしめ加工した垂直ロープ1’を使用する。この留金具8によって、垂直ロープ1’自体の鉄塔運搬や引き上げ時に支障とならない程度のかしめ加工による外径差を持たせることで、墜落防止網4の4角頂点から接続されている接続紐6’,6’の先端に付けた連結用フック9を垂直ロープ1’に取り付けた際、留金具8の上端より下部へずり落ちることを防止する。この連結フック9は、垂直ロープ1’を中心に自由に回動することができるとともに、垂直ロープ1’の外径は容易に挿通するが留金具8の外径で通過できない内径が形成されたフックやカラビナ等の連結器具であり、墜落防止網4’の2頂点の接続紐6’,6’の各先端に取り付けられている。これ以外は同じ構成であるため、同一符号を付して説明を省略する。
【0035】
また、本実施形態における墜落防止網4’の取付作業は、上記ステップS4がのみが相違するため、この相違するステップのみを説明する。即ち、図5に示すように、作業者は、垂直ラダーAで親綱式安全帯を取り付けて自己の墜落防止をした状態で、先端に鈎型の先端金具7が付いた操作竿3を延伸し、垂直ロープ1を自己側(垂直ラダーA側)に引き寄せて、留金具8の上部側の垂直ロープ1’部分に連結フック9を取り付けて、取り付けを行っていない接続紐6’,6’を接続する(ステップS4’)。これにより、墜落防止網4’を1つ取り付ける作業が終了し、この作業を繰り返すことによって、全ての墜落防止網4’の取付が完了する。
【0036】
以上説明したように、本実施形態によれば、上記第1の実施形態における昇降調整金具2とフック金具5に代えて、垂直ロープ1’に留金具8のみを取り付けているため、上記第1の実施形態の効果に加えて、垂直ロープ1’を引き上げる際に、鉄塔100の梁や筋交い等に引っ掛かることがないという効果を奏する。
【0037】
尚、連結用フック9を省略して直接接続紐6で垂直ロープ1に接続してもよい。この場合には若干取り付けに時間を要するが、留金具8があることで墜落時の衝撃荷重が加わっても容易に下方にずれ落ちない墜落防止網4’の取り付けを実施することができる。
【0038】
また、上記第1及び第2の実施形態における手順(ステップ)で鉄塔100の垂直に連続する作業範囲で、墜落防止網4(4’)の設置が実施できるが、この取付方法は、垂直ロープ1(1’)の通過させるルートや鉄塔100の形状により傾斜した構造物の連続した作業範囲での墜落防止網の取付等に応用が可能である。
【0039】
更に、上記各実施形態では、垂直ダラーAを利用して作業者が昇降する場合について説明したが、これに限るものではなく、昇降用階段を利用して昇降する場合であってもよい。
【0040】
【発明の効果】
以上説明したように、本発明によれば、墜落防止網の2頂点の接続紐(6,6)を取り付けることができる垂直ロープを鉄塔の上部まで引き上げ、その後に墜落防止網の他の2頂点の接続紐(6,6)を鉄塔の鉄塔構造物に取り付け、その後に操作竿で垂直ロープを垂直ラダー等の梯子側に引き寄せ、その後に接続紐(6,6)を垂直ロープに取り付けられている昇降調整金具のフック金具に取り付ける。これにより、作業者は梯子から梁や筋交い及び柱等の間をくぐって歩き梯子の反対側部分まで横移動する必要がないため、墜落防止網の取付を短時間で行うことができるという効果を奏する。
【図面の簡単な説明】
【図1】本発明の第1の実施形態に係る墜落防止網の取付方法及び取付器具を示した図。
【図2】本発明の第1の実施形態に係る墜落防止網の取付方法及び取付器具を示した図。
【図3】本発明の第1の実施形態に係る墜落防止網の取付方法及び取付器具を示した図。
【図4】本発明の第1の実施形態に係る墜落防止網の取付方法及び取付器具を示した図。
【図5】本発明の第2の実施形態に係る墜落防止網の取付方法及び取付器具を示した図。
【符号の説明】
1(1’) 垂直ロープ
2 昇降調整金具
3 操作竿
4(4’)墜落防止網
5 フック金具
6 接続紐
7 先端金具
8 留金具
9 連結フック
10 通線ロープ
11 取付フック
12 張線器
100 鉄塔
A 垂直ラダー
B 梁
C 作業場所
D 空間
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a ladder-like electric wire fixing structure (hereinafter referred to as “vertical”) continuously arranged at an angle close to vertical on a steel tower mainly made of steel materials in electrical equipment and telecommunications equipment. If the installation and fixing work of electric wires and cables from the upper part of the tower to the foundation part of the tower is performed along with the ladder) It is related with the method of attaching the fall prevention net | network for preventing a person's fall or the fall of the material or tool at the time of work.
[0002]
[Prior art]
In recent years, there is an urgent need to construct a high-speed and large-capacity information communication network in order to cope with mobile communication such as Internet connection services and mobile phones. For this reason, work is underway to install electrical facilities such as power lines and power lines for wireless telecommunications facilities and related equipment on steel towers. This work involves adding equipment such as antennas to the upper part of the tower and drawing cables such as power lines and power lines from the upper part of the tower to the power control building. Along a vertical ladder (Ladder) for lifting and lowering and a stair for lifting and lowering to a foundation on the ground at an angle close to the vertical, it extends to the power control building. When the cable is lowered to the foundation along the vertical ladder or the like, the cable is laid by striking the vertical ladder or the like from the upper part of the tower to the foundation at intervals of 50 cm along the vertical ladder or the like.
[0003]
Moreover, before laying the cable, it is necessary to attach a fall prevention net to the entire work area at intervals of about 5 m from the upper part of the steel tower to the base part in order to prevent the worker from falling or the material or tool from falling. In this way, the installation interval of the fall prevention net is set to 5 m because the fall speed at the fall will be too fast if the height difference is wide enough, so even if it is received by the fall prevention net, it will be extended by the load of the human body. This is because there is a high possibility that the human body will come into contact with the steel tower structure, and the damage to the worker can be serious and fatal.
[0004]
In addition, the fall prevention net is generally installed by using a vertical ladder, etc., where an operator climbs to the top of the steel tower and attaches it to the foundation at an interval of about 5 m in order from the work position on the top. Do. This fall prevention net is usually formed by knitting a net made of nylon fiber or the like from about 3 m square to about 5 m square, and each apex (square) is similarly provided with a connection string of nylon fiber etc. It is. The worker pulls up the fall prevention net one by one from the ground base to the place where the fall prevention net is installed, or pulls it down to the work table above the tower, etc. Connect to the beams and pillars of the tower structure one by one. This is usually done by spreading one side of the fall prevention net laterally inside the tower (the side where cables such as vertical ladders are routed) and connecting the connecting strings at both ends (two vertices) to the appropriate structure of the tower structure. This is done by tying them to different positions. When the fall prevention net is raised or lowered by the worker or the material or tool is raised or lowered, the fall prevention net is expanded to a range wider than the range where the fall or fall is expected. The slack of the fall prevention net is adjusted to such an extent that sufficient shock absorption is obtained, and the remaining two apex connecting strings are tied to the steel tower structure and fixed as a whole.
[0005]
The reason why we prepared four vertical ropes and installed all the fall prevention nets on the ground at intervals of 5 m in advance, and then installed them one by one on the tower without lifting them all together. Because the beams and braces of the structures that exist in various places of the tower are obstructed, it is impossible to lift with the fall prevention net attached, and the weight of the entire fall prevention net is heavy, and it is difficult to pull it up manually. It is.
[0006]
[Patent Document 1]
Japanese Patent Laid-Open No. 1-249073
[Patent Document 2]
JP 2002-339594 A
[Problems to be solved by the invention]
However, when performing the above-described fall prevention net installation work, the worker himself has a knitting rope attached to the tip of the connecting string, and walks through the vertical ladder etc. through the beams, braces and columns etc. It is necessary to move laterally to the opposite side of the ladder, etc., and to attach the remaining two apex connecting cords with an appropriate slack in the steel tower structure on the opposite side. Since the installation work of the fall prevention net is performed at a high place on the steel tower, triple safety is secured to prevent the fall of the worker. The first of them is to attach one end of the parent net (α) to the top of the steel tower and the other end to the worker. The second is to attach the parent rope (β) attached to the safety belt to the waist before the worker moves sideways. The parent rope (β) has a length that allows lateral movement. The third is to wrap the auxiliary rope (γ) around the waist at the mounting location so that the mounting location is fixed and both hands can be used before attaching the remaining two connection strings after lateral movement. . However, this auxiliary rope (γ) needs to be installed in advance in the lateral movement place.
[0009]
As described above, in order to ensure safety when laying cables such as a power line and a power line, it is necessary to attach a fall prevention net, and conventionally, in order to attach this fall prevention net, further, a parent network (α) It was a very time-consuming and inefficient work because it was necessary to ensure safety using the parent rope (β) and the auxiliary rope (γ).
[0010]
The present invention has been made in view of the above-described circumstances, and an object of the present invention is to provide a method for attaching a fall prevention net capable of attaching the fall prevention net in a short time.
[0011]
[Means for Solving the Problems]
In order to achieve the above-mentioned object, the invention according to claim 1 is a method in which an operator falls or a material or a tool falls before a cable is laid along a ladder or an ascending / descending stairs from an upper part of a steel tower to a foundation part on the ground. In the method of attaching a fall prevention net, the step of suspending a wire rope from the upper part of the steel tower to the foundation part, and two vertical fittings in which the hook fitting is attached in advance by a lifting adjustment fitting Attaching the wire rope to the upper end of the rope, and pulling up the two vertical ropes from the base by lifting the wire rope; and pulling up the fall prevention net to the vicinity of the installation location of the tower, A step of attaching a connection string at the two apexes of the raised fall prevention net to the tower structure on the ladder side of the tower, and the two vertical ropes in front Pulling to the ladder side, connecting the connection cords at the two vertices that have not yet been attached to each hook metal fitting of the pulled-up vertical rope, and fixing the drawing line in the vicinity of the lowermost ends of the two vertical ropes And a step of pulling and fixing the two vertical ropes by using a wire drawing device.
[0012]
Here, as long as two vertical ropes can be pulled up, only one or two or more may be used as the “wire rope” of the present invention (the same applies hereinafter).
[0013]
The invention according to claim 2 is provided with a fall prevention net for preventing a worker from falling or dropping a material or a tool before laying a cable along a ladder or an ascending / descending stairs from an upper part of a steel tower to a foundation part on the ground. In the method of attaching the fall prevention net to be attached, a step of suspending two wire ropes from the upper part of the tower to the foundation part, and the wire ropes at the upper ends of two vertical ropes that have been previously crimped with fasteners. Attaching and pulling up the two vertical ropes from the base to the upper part by pulling up the wire rope, and pulling up the fall prevention net to the vicinity of the installation position of the tower, and two apexes of the raised fall prevention net Attaching the connecting string to the tower structure on the ladder side of the tower, and pulling the two vertical ropes to the ladder side with an operating rod, and it is still attached Connecting each of the two apex connecting strings to the upper side of each fastener of the drawn vertical rope, and using a wire drawing device for fixing the drawing wire in the vicinity of the lowermost ends of the two vertical ropes, And a step of pulling and fixing two vertical ropes.
[0014]
The invention according to claim 3 is the method of attaching a fall prevention net according to claim 1 or 2, wherein the vertical rope is a parent rope used for fall prevention in high-altitude work.
[0015]
The invention according to claim 4 is the method of attaching the fall prevention net according to claim 1 or 2, characterized in that the operation rod can be expanded and contracted in a multistage manner.
[0016]
The invention according to claim 5 is the fall prevention net mounting method according to claim 4, wherein the operation rod is provided with a hook-shaped tip metal fitting for hooking the vertical rope to the tip. .
[0017]
The invention according to claim 6 is characterized in that the lifting adjustment fitting can be attached so as to be freely movable at an arbitrary interval on the vertical rope. This is a method of attaching the net.
[0018]
The invention according to claim 7 is the method of attaching the fall prevention net according to claim 2, wherein the clasp is made of a metal ring and caulked to the vertical rope.
[0019]
DETAILED DESCRIPTION OF THE INVENTION
A first embodiment according to the present invention will be described below with reference to FIGS. 1 to 4 are views showing a method for attaching a fall prevention net and an attachment device according to the present embodiment.
[0020]
As shown in FIG. 1, the steel tower 100 is generally provided with a vertical ladder (A) for raising and lowering workers. The vertical ladder A is a ladder that is used by an operator to move up and down when a cable such as a power line or a power line of a device such as an antenna is dropped from the upper part of the tower 100 to the foundation on the ground. When the cable is lowered to the foundation along the vertical ladder A, the cable is laid by striking the cable from the top of the tower to the foundation along the vertical ladder A at intervals of 50 cm. Moreover, in order to ensure the strength of the steel tower 100, the steel tower 100 is provided with a plurality of beams B from the upper part to the foundation part. Furthermore, the work place C for workers is provided in the upper part of the steel tower. In the steel tower 100 having such a structure, a method for mounting the fall prevention net 4 and a mounting tool will be described below.
[0021]
First, as shown in FIG. 1, a route is selected to pass between each beam B from the work place C on the uppermost stage while considering the installation range of the fall prevention net 4, and the line rope 10 is connected to the ground from the work place C. Two pieces are suspended to the base (in the direction of arrow a) (step S1). The wire rope 10 is a rope having a smaller outer diameter than a vertical rope 1 described later, and an attachment hook 11 for attaching and pulling the vertical rope 1 is provided at the tip.
[0022]
Next, as shown in FIG. 2, the operator attaches a plurality of lifting adjustment fittings 2 and hook fittings 5 at an interval of 5 m in advance according to the height from the work place C to the base portion. Is attached to the attachment hook 11 of the wire rope 10 and pulled up from the base to the top (in the direction of arrow b) (step S2). The two vertical ropes 2 are attached to the two passing ropes 10 and pulled up. As the vertical rope 2, it is necessary to be able to withstand the load at the time of the operator's crash, so the parent rope generally used for preventing the crash at high-altitude work is used. The confirmed connecting hook is provided.
[0023]
Furthermore, the vertical rope 2 is provided with a plurality of lifting adjustment fittings 2 that can be freely moved at arbitrary intervals on the vertical rope 2. As this lifting adjustment fitting 2, a parent rope gripping device such as a fall prevention elevator adapted to the outer diameter of the vertical rope 1 is used, and can be easily attached from the middle of the vertical rope 1 so that the operator can fall. It is suitable to have a rope gripping ability that can sufficiently withstand the impact load of the above and to have a function of easily moving the gripping position by operating the gripping function.
[0024]
Further, each lifting adjustment fitting 2 is attached with a hook fitting 5 by a string or the like, and is devised so that a connection string 6 described later provided at the four corners of the fall prevention net 4 can be easily attached.
[0025]
In addition, when the shape of the tower 100 is expanded so that it falls to the base with the attachment of the fall prevention net 4, the lifting / lowering adjustment fitting 2 not only hangs the vertical rope 1 itself but also the shape of the tower 100. It is also used as a gripping tool for the vertical rope 1 when it is obliquely extended. Further, the tip (lower end) of the vertical rope 1 is wound and accumulated in a state where it can be easily pulled up to a position close to the vertical ladder A where the operator ascends and descends. The load at the time of drawing work can be reduced.
[0026]
Next, the operator pulling the upper direction fall protection network 4 in order to near the mounting location, as shown in FIG. 3, the connection of the two vertices of the vertical ladder A side of the steel tower structure D in fall protection network 4 straps 6 1 ties 6 2 (step S3). This fall prevention net 4 is formed by knitting a net of nylon fiber or the like from about 3 m square to about 5 m square in accordance with the range of work such as cable laying, and each apex (square) is also made of nylon fiber. A connecting string 6 is provided. Further, when connecting the connection strings 6 1 , 6 2 , since the worker also moves up and down along the work side for laying the cable of the vertical ladder A, the space E that allows the operator's body to pass therethrough. To secure it, tie it with a slack. Furthermore, after the operator passes, a measure such as temporarily trapping the fall prevention net 4 with the vertical ladder A is performed as necessary.
[0027]
Next, as shown in FIG. 3, the operator attaches the master rope type safety belt with the vertical ladder A to prevent the self-falling, and puts the operation rod 3 with the hook-shaped tip metal fitting 7 at the tip. Extending, pulling the vertical rope 1 toward the self side (vertical ladder A side), and connecting the connection strings 6 3 and 6 4 not yet attached to the hook metal fitting 5 connected to the lifting adjustment metal fitting 2 (step S4). . The operation rod 3 can be expanded and contracted in a multi-stage manner so that an operator can easily carry the vertical ladder A so as not to be hindered when the vertical ladder A is moved up and down, and the large rod shape on which the vertical rope 1 can be easily hooked. A shaped end fitting 7 is provided.
[0028]
The operation for attaching one fall prevention net 4 is completed as described above, and the installation of all the fall prevention nets 4 is completed by repeating this work.
[0029]
Finally, when all the fall prevention nets 4 have been attached, a tensioner 12 is used to fix the vertical rope 1 at a position close to the lowermost end of the vertical rope 1, and the vertical ladder A side is The vertical rope 1 is pulled in an appropriate load in the direction in which the rope 1 is separated (arrow d direction), and is fixed in a state in which the fall prevention net 4 has an appropriate slack (step S5).
[0030]
When it is determined that the installation height of the fall prevention net 4 has a problem such as contact with the steel tower structure when the attachment of the four connection strings 6 of the fall prevention net 4 is realized, the operation rod 3 is used. Fine adjustment of the installation height may be performed by pulling the vertical rope 1 and moving the position of the lifting adjustment fitting 2.
[0031]
Further, when two vertical ropes 1 are pulled up, if the fall prevention net 4 up to a certain height is connected to the height of the tower 100 due to the structure of the steel tower 100, it is possible to pull it up. It is possible to efficiently pull up the prevention net 4 and the vertical rope 1 at the same time.
[0032]
As described above, according to the present embodiment, the vertical rope 1 to which the connection cords 6 3 , 6 4 at the two vertices of the fall prevention net 4 can be attached is pulled up to the upper part of the steel tower 100, and then the fall prevention net 4 The other two apex connecting cords 6 1 , 6 2 are attached to the tower structure D of the tower 100, and then the vertical rope 1 is pulled to the vertical ladder A side (arrow c side) with an operating rod, and then the connecting string 6 3, attached 6 4 to hook fitting 5 on the installed lift adjustment bracket 2 perpendicularly rope 1. As a result, as in the prior art, the worker secures safety using the parent net (α), the parent rope (β), and the auxiliary rope (γ), and then, from the vertical ladder, the beam, bracing, pillars, etc. Since there is no need to walk through and move laterally to the opposite side of the vertical ladder, the fall prevention net can be attached in a short time.
[0033]
[Second Embodiment]
The second embodiment according to the present invention will be described below with reference to FIG. In addition, FIG. 5 is the figure which showed the attachment method and attachment fixture of the fall prevention net | network concerning this embodiment.
[0034]
In the present embodiment, the fall prevention net 4 is basically attached by the same operation procedure as that of the first embodiment, but the instruments used are different. That is, the vertical rope 1 ′ obtained by caulking the clasp 8 made of a metal ring every 5 m or at a finer interval is used. With this clasp 8, the connecting rope 6 connected from the four corners of the fall prevention net 4 by giving the outer diameter difference by caulking so as not to hinder the transportation and pulling of the vertical rope 1 ′ itself. When the connecting hook 9 attached to the tip of 3 ', 6 4 ' is attached to the vertical rope 1 ', it is prevented from sliding down from the upper end of the clasp 8 to the lower part. The connecting hook 9 can freely rotate about the vertical rope 1 ′, and an inner diameter that allows the outer diameter of the vertical rope 1 ′ to be easily inserted but cannot pass through the outer diameter of the clasp 8 is formed. It is a connecting device such as a hook or a carabiner, and is attached to each end of the connecting cords 6 3 ′ and 6 4 ′ at the two apexes of the fall prevention net 4 ′. Since it is the same structure except this, the same code | symbol is attached | subjected and description is abbreviate | omitted.
[0035]
In addition, the installation work of the fall prevention net 4 ′ in the present embodiment is different only in the above step S4, and therefore, only the different steps will be described. That is, as shown in FIG. 5, the operator extends the operation rod 3 with the hook-shaped tip metal fitting 7 at the tip in a state in which the master rope type safety belt is attached with the vertical ladder A and the self-falling is prevented. Then, the vertical rope 1 is pulled toward the self side (vertical ladder A side), and the connecting hook 9 is attached to the vertical rope 1 'portion on the upper side of the clasp 8, and the connecting cords 6 3 ', 6 that are not attached are attached. 4 'is connected (step S4'). Thereby, the work of attaching one fall prevention net 4 ′ is completed, and by repeating this work, the attachment of all the fall prevention nets 4 ′ is completed.
[0036]
As described above, according to the present embodiment, instead of the lifting adjustment fitting 2 and the hook fitting 5 in the first embodiment, only the clasp 8 is attached to the vertical rope 1 ′. In addition to the effect of the embodiment, when pulling up the vertical rope 1 ′, there is an effect that the vertical rope 1 ′ is not caught by a beam or a brace of the steel tower 100.
[0037]
The connecting hook 9 may be omitted and the connecting rope 6 may be directly connected to the vertical rope 1. In this case, although a little time is required for attachment, the presence of the clasp 8 makes it possible to attach the fall prevention net 4 ′ that does not easily fall down even when an impact load is applied during the fall.
[0038]
Moreover, although the fall prevention net | network 4 (4 ') can be implemented in the work range which continues in the vertical direction of the steel tower 100 in the procedure (step) in the said 1st and 2nd embodiment, this attachment method is a vertical rope. The present invention can be applied to installation of a fall prevention net in a continuous work range of a structure inclined by the route of 1 (1 ′) and the shape of the steel tower 100.
[0039]
Furthermore, although each said embodiment demonstrated the case where an operator raises / lowers using the vertical dollar A, it is not restricted to this, The case where it raises / lowers using the raising / lowering stairs may be sufficient.
[0040]
【The invention's effect】
As described above, according to the present invention, the vertical rope to which the two connecting cords (6 3 , 6 4 ) of the fall prevention net can be attached is raised to the upper part of the steel tower, and then the other fall prevention net Attach the connection cord (6 1 , 6 2 ) at the top of the tower to the tower structure of the tower, then pull the vertical rope toward the ladder such as the vertical ladder with the operating rod, and then connect the connection cord (6 3 , 6 4 ) Attach it to the hook fitting of the lifting adjustment fitting attached to the vertical rope. This eliminates the need for the worker to walk from the ladder through beams, braces, and pillars to the opposite side of the ladder, so that the fall prevention net can be installed in a short time. Play.
[Brief description of the drawings]
FIG. 1 is a view showing a method for attaching a fall prevention net and a fixture according to a first embodiment of the present invention.
FIG. 2 is a view showing a method for attaching a fall prevention net and an attachment device according to the first embodiment of the present invention.
FIG. 3 is a view showing a method for attaching a fall prevention net and an attachment device according to the first embodiment of the present invention.
FIG. 4 is a view showing a method for attaching a fall prevention net and an attachment device according to the first embodiment of the present invention.
FIG. 5 is a view showing a method for attaching a fall prevention net and an attachment device according to a second embodiment of the present invention.
[Explanation of symbols]
1 (1 ') Vertical rope 2 Lifting adjustment fitting 3 Operation rod 4 (4') Fall prevention net 5 Hook fitting 6 Connection string 7 Tip fitting 8 Fastening fitting 9 Connection hook 10 Wire rope 11 Mounting hook 12 Tension wire 100 Steel tower A Vertical ladder B Beam C Work place D Space

Claims (7)

鉄塔の上部から地上の基礎部に梯子又は昇降用階段に沿ってケーブルの布設等を行う前に作業者の墜落又は材料若しくは工具の落下を防止する墜落防止網を取り付ける墜落防止網の取付方法において、
前記鉄塔の上部から通線ロープを前記基礎部へ2本懸垂するステップと、
事前にフック金具を昇降調整金具によって取り付けてある2本の垂直ロープの上端に前記通線ロープを取り付けて、前記通線ロープを引き上げることにより前記2本の垂直ロープを基礎部から上部へ引き上げるステップと、
前記墜落防止網を前記鉄塔の取付場所付近まで引き上げ、当該引き上げた墜落防止網の2頂点の接続紐を前記鉄塔の梯子側の鉄塔構造物に取り付けるステップと、
前記2本の垂直ロープを操作竿で前記梯子側に引き寄せて、まだ取り付けを行っていない2頂点の接続紐をそれぞれ前記引き寄せた垂直ロープの各フック金具に接続するステップと、
前記2本の垂直ロープの最下端の近傍で引線固定を行う引線器を使用して、前記2本の垂直ロープを引っ張って固定するステップと、
を実行することを特徴とする墜落防止網の取付方法。
In the installation method of the fall prevention net which attaches the fall prevention net which prevents the fall of the worker or the material or the tool before laying the cable along the ladder or the stairs for raising and lowering from the upper part of the steel tower to the ground base ,
Suspending two wire ropes from the top of the tower to the foundation;
Step of pulling up the two vertical ropes from the base to the upper part by attaching the wire rope to the upper ends of the two vertical ropes to which the hook metal fitting is previously attached by the lifting adjustment metal fitting and pulling up the wire rope When,
The step of pulling up the fall prevention net to the vicinity of the installation location of the tower, and attaching the connection cord at the two apexes of the raised fall prevention net to the tower structure on the ladder side of the tower;
Pulling the two vertical ropes to the ladder side with an operating rod, and connecting each of the two apex connecting strings not yet attached to each hook metal fitting of the pulled vertical rope;
Pulling and fixing the two vertical ropes using a wire drawing device that fixes the drawing wire in the vicinity of the lowermost ends of the two vertical ropes;
A method of mounting a fall prevention net, characterized in that
鉄塔の上部から地上の基礎部に梯子又は昇降用階段に沿ってケーブルの布設等を行う前に作業者の墜落又は材料若しくは工具の落下を防止する墜落防止網を取り付ける墜落防止網の取付方法において、
前記鉄塔の上部から通線ロープを前記基礎部へ2本懸垂するステップと、
事前に留金具をかしめ加工した2本の垂直ロープの上端に前記通線ロープを取り付けて、前記通線ロープを引き上げることにより前記2本の垂直ロープを基礎部から上部へ引き上げるステップと、
前記墜落防止網を前記鉄塔の取付場所付近まで引き上げ、当該引き上げた墜落防止網の2頂点の接続紐を前記鉄塔の梯子側の鉄塔構造物に取り付けるステップと、
前記2本の垂直ロープを操作竿で前記梯子側に引き寄せて、まだ取り付けを行っていない2頂点の接続紐をそれぞれ前記引き寄せた垂直ロープの各留金具の上部側に接続するステップと、
前記2本の垂直ロープの最下端の近傍で引線固定を行う引線器を使用して、前記2本の垂直ロープを引っ張って固定するステップと、
を実行することを特徴とする墜落防止網の取付方法。
In the installation method of the fall prevention net which attaches the fall prevention net which prevents the fall of the worker or the material or the tool before laying the cable along the ladder or the stairs for raising and lowering from the upper part of the steel tower to the ground base ,
Suspending two wire ropes from the top of the tower to the foundation;
Attaching the wire rope to the upper ends of two vertical ropes that have been previously crimped with fasteners, and pulling the two vertical ropes upward from the base by pulling up the wire rope;
The step of pulling up the fall prevention net to the vicinity of the installation location of the tower, and attaching the connection cord at the two apexes of the raised fall prevention net to the tower structure on the ladder side of the tower;
Pulling the two vertical ropes to the ladder side with an operating rod, and connecting the connection vertices of two vertices that have not yet been attached to the upper side of each fastener of the pulled vertical ropes;
Pulling and fixing the two vertical ropes using a wire drawing device that fixes the drawing wire in the vicinity of the lowermost ends of the two vertical ropes;
A method of mounting a fall prevention net, characterized in that
前記垂直ロープは、高所作業での墜落防止に使用される親ロープであることを特徴とする請求項1又は2に記載の墜落防止網の取付方法。The method for attaching a fall prevention net according to claim 1 or 2, wherein the vertical rope is a parent rope used for fall prevention in high-altitude work. 前記操作竿は、多段式に伸縮可能であることを特徴とする請求項1又は2に記載の墜落防止網の取付方法。The method for attaching a fall prevention net according to claim 1 or 2, wherein the operation rod is extendable and retractable in a multistage manner. 前記操作竿は、先端に前記垂直ロープを引っ掛ける鈎型形状の先端金具が設けられていることを特徴とする請求項4に記載の墜落防止網の取付方法。The method of claim 4, wherein the operation rod is provided with a hook-shaped tip metal fitting for hooking the vertical rope to the tip. 前記昇降調整金具は、前記垂直ロープ上の任意の間隔で自由に取付位置を移動可能に取り付けることが可能であることを特徴とする請求項1に記載の墜落防止網の取付方法。The method for attaching a fall prevention net according to claim 1, wherein the elevating metal fitting can be attached so as to be freely movable at an arbitrary interval on the vertical rope. 前記留金具は、金属環からなり前記垂直ロープにかしめ加工されていることを特徴とする請求項2に記載の墜落防止網の取付方法。The method according to claim 2, wherein the clasp is made of a metal ring and caulked to the vertical rope.
JP2002366394A 2002-12-18 2002-12-18 How to install the fall prevention net Expired - Lifetime JP3881306B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002366394A JP3881306B2 (en) 2002-12-18 2002-12-18 How to install the fall prevention net

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002366394A JP3881306B2 (en) 2002-12-18 2002-12-18 How to install the fall prevention net

Publications (2)

Publication Number Publication Date
JP2004194867A JP2004194867A (en) 2004-07-15
JP3881306B2 true JP3881306B2 (en) 2007-02-14

Family

ID=32763609

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002366394A Expired - Lifetime JP3881306B2 (en) 2002-12-18 2002-12-18 How to install the fall prevention net

Country Status (1)

Country Link
JP (1) JP3881306B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2427741T3 (en) 2009-11-02 2013-10-31 Vestas Wind Systems A/S A safety cover for a tower of a wind power installation

Also Published As

Publication number Publication date
JP2004194867A (en) 2004-07-15

Similar Documents

Publication Publication Date Title
US9988842B2 (en) Ladders including rope and pulley system and fall protection device
AU2018200896B2 (en) Ladder securing apparatuses, ladders incorporating same and related methods
JP4102372B2 (en) Attaching the protective net to the steel tower
CN106088565A (en) The method of tiltedly climbing of attachment type raise scaffold and attachment type raise scaffold
JP6533641B2 (en) Fall prevention method using wind-up fall prevention device and harness type safety belt used therefor
KR102172332B1 (en) Safety device for electric pole work
JP5651514B2 (en) Tree lift assisting tool equipped with a two-point locking fall prevention rope and a belt with a choke stand, and a tree lifting method using the same
KR20100132673A (en) Gang form comprising safe net
JP3881306B2 (en) How to install the fall prevention net
KR101068229B1 (en) Dismantled tower crane cargo handling system and cargo handling method using thereof
EP1232315B1 (en) Mast structure
JP3181831U (en) Fall prevention device
JP2005139813A (en) Rooftop work method and apparatus used for rooftop work
JP2021031870A (en) Lifting facility
KR101853009B1 (en) Greenhouse safety ladder for high place
KR102642247B1 (en) Safety device for electric pole work
JP2002070017A (en) Slope face working method and slope face-work safety belt used for it
FI105410B (en) Mast construction and associated process
KR200445361Y1 (en) Lower support of the safety netting device
EP3816083A1 (en) Procedure for a descending assembly of elevation systems and a pre-tensioned mast
CN217417885U (en) Safety protection device for well bucket in vertical shaft
CN215592428U (en) Hoisting device of curtain wall
JP7153823B1 (en) Underslung crane gondola
KR102264843B1 (en) Material lifting system for stack repair
JP3132479U (en) Manhole lifting tool

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050222

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20061020

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061031

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061109

R150 Certificate of patent or registration of utility model

Ref document number: 3881306

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101117

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101117

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111117

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111117

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121117

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121117

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131117

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131117

Year of fee payment: 7

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131117

Year of fee payment: 7

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term