JP3738050B2 - CAD system for unit building - Google Patents

CAD system for unit building Download PDF

Info

Publication number
JP3738050B2
JP3738050B2 JP08112095A JP8112095A JP3738050B2 JP 3738050 B2 JP3738050 B2 JP 3738050B2 JP 08112095 A JP08112095 A JP 08112095A JP 8112095 A JP8112095 A JP 8112095A JP 3738050 B2 JP3738050 B2 JP 3738050B2
Authority
JP
Japan
Prior art keywords
production
design
unit
building
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP08112095A
Other languages
Japanese (ja)
Other versions
JPH08278995A (en
Inventor
孝美 向山
潔 萩平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP08112095A priority Critical patent/JP3738050B2/en
Publication of JPH08278995A publication Critical patent/JPH08278995A/en
Application granted granted Critical
Publication of JP3738050B2 publication Critical patent/JP3738050B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Description

【0001】
【産業上の利用分野】
本発明はユニット建物用CADシステムに関し、複数の箱形建物ユニットを組み立てて建築されるプレハブ式建物の設計に利用される。
【0002】
【背景技術】
プレハブ式建物は、工業化によるコスト低減および品質安定化等のメリットから、近年急速に普及するに至っている。
プレハブ式建物のうち、軸組みカーテンウォール工法は在来工法に近いものであり、工場生産された柱梁および壁用面材を組み立てて建築される。また、木質パネル工法は工場で生産されたパネルを現場で組み立てて建築される。
これらの各プレハブ工法の建物は、それぞれ軸材や面材等の単純な部材の集合体として構成される。
一方、プレハブ化建物のうち、ユニット工法は工場で箱形の建物ユニットを生産し、現場で組み立てるものであり、生産、輸送、現場施工が基本的にユニット単位である。
【0003】
これらのプレハブ式建物は、企画建築として提供されることが一般的であった。企画建築とは、建物の間取りや外観形状等の概略から、組み込み設備の種類や内外装の仕様等の細部までを建物メーカーが設計したものである。
但し、企画建築であっても、顧客の要望に応じて、間取り、設備、仕様に関して幾つかのオプションを選択できる場合が多い。
【0004】
しかし、近年では施主の要望が多様化しており、画一的な企画建物ないしオプション選択では十分な顧客満足が得られないようになっており、プレハブ建物においても多様な個別設計の注文建築への対応が要望されている。
ここで、注文建築への対応にあたっては、各建物毎に最初から設計しなおす必要があり、従来の企画住宅に比べて建物メーカーの設計作業が膨大化する。
このため、プレハブ式建物の注文対応には、作業を効率化するためにCAD(コンピュータ支援設計)システムの導入が必要となる。
【0005】
【発明が解決しようとする課題】
ところで、前述したプレハブ式建物の中でも、ユニット建物は他のプレハブ工法に比べて注文建築への対応およびCAD化が難しいという問題があった。
すなわち、軸組み式建物やパネル式建物で注文建築に対応する場合には、施主注文に応じて間取り等の概略をまとめ、それを具体化する詳細構造や仕様部品をまとめて設計図面を作成し、施主の確認を経て設計が完了し、部品生産ないし建築施工に至ることになる。
つまり、この種の建物では、建物全体が単純に部品の集合体として捉えられるため、間取りプランニング等の概略から使用部材や構造等の詳細の設計までが一体不可分で連続的である。
このため、CAD化にあたっては一連の設計内容を追うことで比較的簡単に行えるとともに、注文対応にあたっても設計作業をやり直すだけで特段の困難はない。
【0006】
しかし、ユニット建物においては、前述のように取り扱いがユニット単位であるため、その設計には単純な部材レベルと建物全体のレベルとの間に、ユニット単体に関する中間的な設計レベルが必要である。
特に、各ユニットのフレームには、建物に組み込まれた状態での構造強度を確保するとともに、輸送等の取り扱いを考慮してユニット単体での自立強度を確保する必要があり、ユニット単体レベルの設計作業が煩雑なものとなる。
【0007】
このようなことから、ユニット建物での概略設計の大幅な変更には、建物全体レベルでの再設計に加え、その内容に応じて各ユニットの再設計等が必要となり、作業およびコストが膨大となる。
さらに、膨大な処理が必要になることから、CAD化にあたっては処理を実行するコンピュータ装置の速度低下が生じ、あるいは処理装置の高速化に伴うコスト上昇等が生じ、CAD化が困難になるという問題がある。
そして、CAD化の遅れに伴って、ユニット建物の注文建築への対応も遅れていた。
本発明の目的は、大幅な設計変更にも柔軟迅速に対応できるユニット建物の設計方法およびユニット建物用CADシステムを提供することにある。
【0008】
【課題を解決するための手段】
本発明は、CADシステム全体を基本設計と生産設計とに二分し、基本設計では建物の基本的なユニット配置までの概要(施主に見える部分の形状や仕様、施主が要望する機能等)を設計し、注文に応じた建物を表す必要最小限の事項をまとめ、施主打ち合わせにより設計変更が繰り返される部分の作業負荷を軽減するとともに、生産設計では基本設計で決まった内容に対応した詳細(施主の見えない部分の構造や部品構成)を設計することにより、ユニット単体レベルの複雑な生産設計をも効率的に処理できるようにする。そして、生産設計においては躯体、屋根、その他の部品の区分毎に生産設計を行い、生産図面の作成および積算、発注を行えるようにする。これらにより前記目的を達成するものである。
【0009】
具体的に、本発明は、複数の建物ユニットを組み立てて建設されるユニット建物の設計を行うためのユニット建物用CADシステムであって、前記建物の形状および前記建物内におけるユニット配置を指定する基本設計情報を作成する基本設計システムと、前記基本設計情報に基づいて前記建物および各建物ユニット毎の構造および部品構成を含む生産設計情報を作成する生産準備システムとで構成され、前記基本設計システムは、標準に設定された屋根種別を設定するために必要な設定モジュールを画面表示ないし入力操作受付する標準プログラムと、この標準プログラムの一部を差し替えることで前記標準に設定された屋根種別とは異なる屋根種別を設定するための動作プログラムを生成する差し替えプログラムと、外部入力された屋根種別の指定に基づいて前記標準プログラムおよび前記差し替えプログラムから実行プログラムを生成するプログラム編集部と、前記実行プログラムを実行して前記指定された種別の屋根の設計情報を設定するプログラム実行部と、で構成された屋根形状設定モジュールを含み、前記生産準備システムは、前記基本設計情報に基づいて各建物ユニットの細部構造および部品構成を設計しかつ躯体、屋根、その他の部品の区分毎に当該各建物ユニットないしその構成部品の生産図面を作成する生産設計部と、前記生産図面に基づいて各建物ユニットおよび各部品の積算リストを作成しかつ当該積算リストおよび前記生産図面に基づいて各建物ユニットおよび各部品の生産および受発注を管理する受発注積算部とで構成されていることを特徴とする。
【0010】
前記生産設計部は、前記建物の躯体部分の生産図面を作成する躯体生産設計セクションと、前記建物の屋根部分の生産図面を作成する屋根生産設計セクションと、前記建物のその他の部品の生産図面を作成する部品生産設計セクションとを含んでいることが望ましい。
前記生産設計部は、生産図面とともに当該図面に使用する部品の積算情報を含む積算データを作成するものとされ、前記受発注積算部は、前記生産設計部で作成された積算データに基づいて積算リストを作成する積算セクションと、この積算リストに基づいて資材および部品の発注を行う受発注セクションとを含んでいることが望ましい。
【0011】
さらに、前記生産準備システムにより作成されかつ前記基本設計システムにより参照される設計要素データベースを有し、この設計要素データベースは建物の設計にあたって遵守すべき設計ルールおよび選択可能な構造や形状等の要素リストを含むことが望ましい。
前記生産準備システムは、前記各建物ユニットないし各部品の生産設計情報とともに当該各建物ユニットないし各部品の生産マニュアルおよび/または施工マニュアルを出力することが望ましい。
前記生産図面は、使用する個々の部品の生産に必要な詳細情報を示す部品図と、前記部品図に示された各部品の組み立て状態や関連を示す組立図と、前記部品の生産および組み立てに関するマニュアルを含む工程図とを含むことが望ましい。
【0012】
【作用】
このような本発明においては、基本設計で建物の基本的なユニット配置までの概要(施主に見える部分の形状や仕様、施主が要望する機能等)を設計し、施主との打ち合わせを行って注文に応じた建物を表す必要最小限の事項をまとめる。次に、生産設計では、基本設計で決まった内容に対応した詳細(施主の見えない部分の構造や部品構成)を設計し、工場生産に必要な図面や情報をまとめる。
【0013】
従って、施主打ち合わせにより設計変更が繰り返される部分は簡略でよくなり、繰り返し行われる部分の作業負荷が軽減されるとともに、ユニット単体レベル等の複雑な生産設計は基本設計がまとまった後に一度だけ行えばよくなり、個々に設計が必要な注文住宅への対応が可能になる。
また、基本設計では概要の設計が主であるため、繰り返し作業があっても負荷が軽く、かつ負荷の重い生産設計は繰り返しを避けられるため、各々を個別にCAD化することで実用的なCADシステムを構成することが可能となる。
【0014】
更に、生産準備システムを生産設計部と受発注積算部とで構成することで、生産に向けた詳細設計ないし積算発注等の業務を効率よく行えるようになり、生産設計については躯体、屋根、その他の部品という区分毎に処理することで効率化が図られる。これらにより前記目的が達成される。
【0015】
特に、生産設計部において、躯体生産設計、屋根生産設計、部品生産設計の各セクションを独立させることで、各々が並列的な処理も可能となり、一層の効率化が図られる。
また、各生産図面の作成の際に積算用データを作成し、積算セクションでの積算に利用することで、積算工程を効率よくかつ正確化できる。
【0016】
さらに、基本設計と生産設計とが、それぞれ共通の設計要素データベースを参照し、共通の設計基準に基づいて各々の設計を行うことにより、基本設計で設定したが生産設計で対応できない等の不都合を回避できるとともに、部品や構造等のコード化、パッケージ化による情報量や処理負荷の軽減を図ることが可能となる。
さらに、生産準備システムにおいて、生産図面や積算リストとともに、該当する部品等に関する生産マニュアルを作成することにより、施工作業の効率化あるいはマニュアル供給の確実化を図ることが可能となる。
【0017】
【実施例】
以下、本発明の一実施例を図面に基づいて説明する。
(全体構成)
本実施例は、施主の注文に応じて多様なユニット建物を設計しかつ生産施工を支援するCADシステムである。
図1には本実施例の概略が示され、図2には本実施例で行われる処理流れの概略が示されている。
【0018】
ユニット建物用CADシステムS10は、基本設計およびその段階の周辺支援を行う基本設計システムS20と、生産設計およびその周辺支援を行う生産準備システムS30とで構成されている。
各システムS20、S30は、それぞれが既存のコンピュータシステムにより構成され、設定された処理プログラムに基づいて対話式の入力操作により所定の設計作業を実行するものである。
【0019】
各システムS20、S30は、それぞれ操作入力を行うための画像表示装置(ビットマップ式ディスプレイ等)および入力装置(文字やコマンド入力用のキーボード、位置指定用のマウス、ライトペン、タブレット、デジタイザ等)を備えるとともに、作成した図面や積算リスト等の設計情報を出力するための印刷装置(プリンタ、プロッタ等)および記憶装置(磁気ディスク等)ないしは他のコンピュータシステムに接続する通信装置を備えている。これらは何れも既存の機器から適宜選択されたものである。
【0020】
(基本設計システムS20の概要)
基本設計システムS20は、建物メーカーの営業所等に設置され、営業担当者S11が操作して施主S12の注文に応じた基本設計を行うものである。
このために、基本設計システムS20は、意匠設計サブシステムS21、積算サブシステムS22、業務サブシステムS23、設計要素データベースS24を備えている。
【0021】
意匠設計サブシステムS21は、営業担当者S11が操作して基本設計の内容を示す平面図F21、基礎伏図F22、屋根伏図F23、配線図F24(それぞれ生産設計の際に参照される図であり、部品の指定情報等も含む)を作成するとともに、これらの基本設計内容から立面図F25、パース図F26(生産設計に必要ではないが、施主S12に提示する図)を作成するためのものである。
【0022】
積算サブシステムS22は、意匠設計サブシステムS21で作成された各図F21〜F24の内容に基づいて、使用される部品一覧等を示す積算リストL21を作成するものである。
業務サブシステムS23は、意匠設計サブシステムS21で作成された各図F21〜F24の内容、および積算サブシステム22で作成された積算リストL21の内容に基づいて、現場施工(主に基礎施工)およびその部品の発注、建物の生産設計の発注等を手配するための発注書L22、更には建物建設の価格見積書L23を作成するものである。
【0023】
設計要素データベースS24は、意匠設計サブシステムS21での設計および積算サブシステムS22での積算処理の際に参照されるものである。
図11にも示すように、設計要素データベースS24は、生産準備システムS30の設計要素データベースS33の内容が転送されるものであり、その内容として基本設計で使用できる部品情報S1010、各部品の積算情報、設計ルールS1020等が蓄積されている。
【0024】
部品情報S1010は、建物の基本構造となるユニットの情報(寸法、種別等の概略;但し柱梁等の詳細は生産設計で設計する)を始めとする各種部品の情報であり、各部品を構成する最も基本的なレベルの部品を示す単品部品図S1011と、各部品の積算情報S1012(各子部品に必要なねじ等の品番や必要本数、単価等)とを含んでいる。
これらの部品情報S1010は親部品、子部品等の形で階層化、パッケージ化されており、例えば親部品「A型の窓」と指定すれば、子部品として「サッシ」、「取付枠」等が自動的に選択されるようになっている。
【0025】
設計ルールS1020には、特定の構造や部品の設置の際の取り扱い等が含まれており、例えば「ユニット内に階段を設けた場合には階段室に面する梁に補強を入れること」等の情報が含まれている。
【0026】
さらに、設計要素データベースS24には、設計に必要な情報のみならず、各部品の施工作業手順を示す生産マニュアルS1030が含まれている。
生産マニュアルS1030には、工程図面やマニュアルが各部品と一セットで記録されており、各部品が使用される際には該当する工程図面やマニュアルが選択され、設計情報と一緒に出力されるようになっている。
【0027】
(基本設計システムS20での作業の流れ)
営業担当者S11は、施主S12の注文を受け(手順P21;図2参照、以下同じ)、この注文に基づいて基本設計システムS20を操作し、基本設計を行って各図F21〜F26および各リストL21〜L23を作成する(手順P22)。
そして、作成した平面図F21、立面図F25、パース図F26、見積書L23を設計案として施主S12に提示し、その設計内容で良いか確認をとる(手順P23)。
ここで、施主S12から設計内容の変更や追加等を受けた場合には、基本設計を修正し(手順P24)、再び施主S12に提示し、これらを確認が得られるまで繰り返す。
【0028】
施主S12の確認が得られたら、その基本設計の内容で生産準備に入る。
具体的には、基礎伏図F22と発注書L22を基礎施工者S13に送り、建設現場S14に基礎W21を施工させるとともに(手順P25)、基本設計情報W22である平面図F21、屋根伏図F23、配線図F24、積算リストL21とともに、発注書L22を生産準備システムS30に送り、ユニットを含む建物部分の生産設計を実行させる(手順P26)。
以上が基本設計システムS20の概要である。
【0029】
(生産準備システムS30の概要)
生産準備システムS30は、建物メーカーの設計部門等に設置され、メーカー設計者S15が前述の基本設計情報W22に基づいて建物の生産設計を行うものである。
このために、生産準備システムS30は、生産設計サブシステムS31、受発注積算サブシステムS32、設計要素データベースS33を備えている。
【0030】
生産設計サブシステムS31は、メーカー設計者S15が操作して基本設計情報W22の内容を具体的に展開し、工場生産等に必要な個々の部品の詳細な部品図F31、その組み立てを示す組立図F32、生産および施工に関する工程図(作業の指示や作業途中の状態の図示等を含むマニュアル)F33を作成するものである。
ここで、工場生産等に必要な部品情報としては、指定された各部品の構成部品(親部品に対する子部品)の情報(例えば種別、寸法、使用数、加工箇所等)である。そして、構成部品とは、例えばユニットであればそのフレームの柱梁や内外装材、内部に組み込まれる設備等であり、窓サッシであればその枠材や窓ガラス等である。
【0031】
受発注積算サブシステムS32は、生産設計サブシステムS31で作成された各図F31〜F33の内容に基づいて、使用される部品一覧等を示す積算リストL31、および必要な資材を外部発注するための発注書L32を作成するものである。
なお、前述した部品図F31、組立図F32、工程図F33が生産図面F30であり、これらの各図F31〜F33と積算リストL31とを合せたものが生産設計情報W31となる。
【0032】
設計要素データベースS33は、生産設計サブシステムS31での設計および受発注積算サブシステムS32での積算処理の際に参照されるものであり、基本設計で指定された各部品に関する詳細な情報および設計ルール等が蓄積されている(図11参照)。
ここで、設計要素データベースS33は、前述した基本設計システムS20の設計要素データベースS24の内容(部品情報S1010、設計ルールS1020、生産マニュアルS1030)を有し、かつ各々に設計要素データベースS24に設定された各部品等の記録項目に対して工場生産を行うための具体的かつ詳細な情報を適宜付加したものとなっている。なお、設計要素データベースS24には付加された内容以外の基本設計に必要な情報のみが識別され、転送されるようになっている。
【0033】
なお、設計要素データベースS33は、生産設計サブシステムS31および受発注積算サブシステムS32により適宜、情報の追加や訂正が行われるようになっており、更新された内容は基本設計システムS20の設計要素データベースS24にも反映され、相互の連携が確保されるようになっている。
【0034】
(生産準備システムS30での作業の流れ)
基本設計情報W22を受け取ったメーカー設計者S15は生産準備システムS30を操作し、生産設計サブシステムS31により基本設計情報W22の内容に応じた生産設計(手順P31;図2参照、以下同じ)、積算(手順P32)、および部品発注(手順P33)を行い、これにより資材調達(手順P34)、工場生産(手順P35)、現場組み立て(手順P36)が行われる。
【0035】
具体的には、生産準備システムS30から資材業者S16へ、積算リストL31および発注書L32が送られ、これに応じた資材W32が工場S17および現場S14に送られる。
また、生産準備システムS30から工場S17へ、部品図F31、組立図F32、工程図F33、積算リストL31が送られ、これらに基づいて資材W32から部品W33が生産され、建物ユニットおよび現場施工部品として現場S14に送られる。
さらに、生産準備システムS30から組立施工者S18へ、組立図F32、工程図F33が送られ、現場組み立てが行われる。
これらにより、現場S14には、施主S12の注文に応じた建物W34が建築されることになる。
以上が生産準備システムS30の概要である。
【0036】
(基本設計システムS20の詳細)
図3には基本設計システムS20がより詳細に示されている。
基本設計システムS20は、前述したように、各図F21〜F26を作成する意匠設計サブシステムS21、積算リストL21を作成する積算サブシステムS22、発注書L22および見積書L23を作成する業務サブシステムS23、および設計要素情報を記憶する設計要素データベースS24を備えている。
【0037】
このうち、意匠設計サブシステムS21は、各図F21〜F26を作成するために、平面図セクションS211、基礎伏図セクションS212、屋根伏図セクションS213、配線図セクションS214、立面図セクションS215、パース図セクションS216を備えている。
【0038】
各セクションS211〜S214は、それぞれ既存のCADシステムと同様に外部操作により画面表示される画像を見ながら部品選択や位置指定を行うことで各図を作成するものである。
このうち、平面図以外の各セクションS212〜S214には外部操作とともに、先に作成した平面図F21の情報が参照されるようになっている。例えば、基礎伏図F22において、全体の概略形状は平面図F21で指定したユニット配置に準じて自動設定され、これにより重複した入力操作を省略できる等となっている。
【0039】
(平面図セクションS211)
平面図セクションS211は、建物W34の基本的な間取り配置等から一階ないし上階、地下等の各階層の平面形状および仕様等を平面図F21に設定してゆくものである。
図4に示すように、平面図セクションS211は躯体サブセクションS211Aおよび内外装サブセクションS211Bで構成されている。
【0040】
躯体サブセクションS211Aは、ユニット設定モジュールS2111、玄関設定モジュールS2112、バルコニー設定モジュールS2113を備えて構成されている。
内外装サブセクションS211Bは、グリッド設定モジュールS2114、外壁設定モジュールS2115、建具設定モジュールS2116を備えて構成されている。
【0041】
ユニット設定モジュールS2111は、操作画面に表示された空白の平面図画像V2110に対し、使用するユニットの種類や寸法等を選択し、そのユニットを示す矩形を配列してゆくことで、建物の基本となるユニット構成V2111を設定するものである。
使用するユニットは設計要素データベースS24から選択される。種類としては標準ユニット、階高ユニットの別、バルコニーユニット等がある。寸法としては4、5、6モジュールサイズ等の呼び寸法が用いられる。
これにより、平面図F21には使用するユニットの設計情報(種類、寸法、位置等)が埋め込まれることになる。
【0042】
玄関設定モジュールS2112は、設定されたユニット構成V2111の一部に、玄関となる領域V2112を指定するものである。これにより、平面図F21の指定された玄関領域V2112には土間コンクリート施工等の玄関用の設計情報(領域、種別等)が埋め込まれる。
バルコニー周辺設定モジュールS2113は、バルコニーとして設定された部分に手摺や支柱等の付属部材V2113の設計情報(種別、寸法、位置等)を指定するものである。これにより、指定された情報は平面図F21の各部に埋め込まれる。
【0043】
グリッド設定モジュールS2114は、ユニット配置V2111の内部および外部に内外装を設定する位置の基準となるグリッド(仮想的な格子状枠)V2114の設計情報(種別、位置等)を設定するものである。
外壁設定モジュールS2115は、ユニット構成V2111の外周に沿いかつグリッドV2114に従って外壁V2115を設定するものである。この際、外壁の表面模様等も仕様として設定される。この設定はユニット配置の外周を自動的に追跡する自動モードと、逐次操作指定してゆく手動モードとを選択できるようになっている。
建具設定モジュールS2116は、ユニット構成V2111の内部にグリッドV2114に従って窓や扉、あるいはキッチン、トイレやバスユニット等の設備類V2116に関する設計情報(種別、仕様、寸法、位置等)を設定するものである。
【0044】
なお、各設定にあたって、設計情報のうち使用できる部品や構造の種別や仕様等あるいは設置ルール等は、それぞれ設計要素データベースS24を参照することにより適宜選択される。例えば、画面上でユニットを配置する際にはユニットの一覧が別ウインドウ表示され、玄関を設定する際には建物の角隅の場合には角隅用の構造のみが提示される等となっている。
そして、平面図F21には、各設定により埋め込まれたユニットないし設備類の指定等により、設計要素データベースS24に記憶された各々に関するより詳細な情報がリンクされ、これらにより建物の基本的な設計情報が作成されるようになっている。
【0045】
(基礎伏図セクションS212)
基礎伏図セクションS212は、建物W34の基礎の設計情報を基礎伏図F22に設定してゆくものである。
図5に示すように、基礎伏図セクションS212は、基本設定モジュールS2121、玄関設定モジュールS2122、天端設定モジュールS2123、特殊天端設定モジュールS2124、独立基礎設定モジュールS2125、補助設定モジュールS2126を備えて構成されている。
【0046】
基本設定モジュールS2121は、操作画面に表示された空白の基礎伏図画像V2120に対し、平面図F21を参照して基本的な基礎V2121を設定するものである。
基本的な基礎形状の設定とは、例えば平面図F21のユニット構成V2111の外周に対応した位置に連続した布基礎を設定することである。また、必要に応じて指定した領域に土間コンクリートが設定される。
【0047】
玄関設定モジュールS2122は、平面図F21に指定された玄関領域V2112に従って、玄関土間コンクリートV2122を指定するものである。
天端設定モジュールS2123は、先に設定された基礎V2121の基本的な布基礎上端高さを指定するものである。
基礎形状V2121の高さは全体が同じ高さである場合が多いが、一部領域が異なる高さに設定される場合もあり、このような場合には領域と高さを指定することになる。
特殊天端設定モジュールS2124は、先に設定された基礎V2121の基本的な布基礎上端高さと異なる領域V2124を指定し、その高さを指定するものである。
【0048】
独立基礎設定モジュールS2125は、基礎V2121の内部あるいは外部に独立基礎V2125を設定するものである。独立基礎V2125は、比較的大型のユニットの長辺下梁を支持するために適宜設置されるものであり、基礎形状V2121の内側部分のユニット長辺に沿った位置に適宜指定される。
補助設定モジュールS2126は、基礎V2121の各部にユニットのアンカーボルト接合用のシース缶、基礎V2121の布基礎部分を貫通する点検口等の補助的な部品や構造V2126の設定を行うものである。
【0049】
これらの各設定にあたっても、平面図作成時と同様に、設計情報のうち使用できる部品や構造の種別や仕様等あるいは設置ルール等は、それぞれ設計要素データベースS24を参照することにより適宜選択される。
そして、基礎伏図F22には、各設定により埋め込まれた基礎構成の指定等により、設計要素データベースS24に記憶された各々に関するより詳細な情報がリンクされ、これらにより建物の基礎に関する設計情報が作成されるようになっている。
【0050】
(屋根伏図セクションS213)
屋根伏図セクションS213は、建物W34の屋根の設計情報を屋根伏図F23に設定してゆくものである。
図6に示すように、屋根伏図セクションS213は、屋根形状設定モジュールS2131と樋設定モジュールS2132とで構成される。
【0051】
屋根形状設定モジュールS2131は、標準プログラムS2133、差し替えプログラムS2134、プログラム編集部S2135、実行プログラムS2136、プログラム実行部S2137を備えている。
標準プログラムS2133は、標準に指定された屋根種別(例えば寄棟型)の各部形状、寸法、仕様を設定するために必要な設定モジュールを画面表示ないし入力操作受付する一連の動作(例えば、平面図F21から建物外形を読み込んで画面表示し、その輪郭に応じた補助線を表示し、棟線の位置入力を受け付ける等の各種動作)を処理するプログラムである。
【0052】
差し替えプログラムS2134は、標準(寄棟型)の標準プログラムS2133に対し、その一部を差し替えることで異なる屋根種別(軒先カット式寄棟型、台形ユニット式寄棟型、切妻型等)を設定するための動作プログラムを生成する差分プログラムであり、例えば標準プログラムS2133の差し替え対象部分を示す対象情報と差し替えられるプログラム内容を示す差し替え情報との組合せを屋根種別の名称等の識別情報とともにまとめて構成されている。
【0053】
プログラム編集部S2135は、外部入力された屋根種別の指定に基づいて標準プログラムS2133および差し替えプログラムS2134から実行プログラムS2136を生成するものである。具体的には、指定された屋根種別が標準の寄棟型ならば、標準プログラムS2133をそのまま実行プログラムS2136とする。一方、指定された屋根種別が標準以外の形式ならば、差し替えプログラムS2134から指定された形式に該当する識別情報を検索し、この識別情報が附された差し替え情報および対象情報を取り出し、標準プログラムS2133の対象情報で指定される部分を差し替え情報に入れ換えることで編集を行い、実行プログラムS2136とする。
【0054】
プログラム実行部S2137は、編集された実行プログラムS2136を実行することにより、操作画面に所定の表示を行い、操作入力を受け付けることにより、先に指定された種別の屋根V2131の設計情報を設定するものである。
【0055】
樋設定モジュールS2132は、操作画面に屋根V2131の画像を表示するとともに、樋の種別(外樋や内樋等)の指定を受け、指定された形式の軒樋V2132を屋根V2131の外周を巡るように自動設定する。さらに、外部入力により縦樋位置を指定し、建物外壁に沿った縦樋の情報を設定可能である。
【0056】
配線図セクションS214は、平面図F21の各階層に対し、平面図F21で指定された設備類のうち、給排水が必要なもの(バス、トイレ、キッチン、エアコン等)、電気配線が必要なもの(照明、固定式の電気器具、壁面等のスイッチ、コンセント等)について、それぞれ必要な配管や配線を建物躯体内に指定するものである。指定方式等は既存のCADシステムに準じたものが利用される。
【0057】
立面図セクションS215は、平面図F21および屋根伏図F23の設計情報に基づいて、建物の立面図F25を自動生成する。具体的には、平面図F21および屋根伏図F23から外形を取り出し、指定された外装(窓サッシや縦樋等)の位置や仕様等を読み出し、外壁の仕様から模様等を読み出し、これらにより建物各方向の立面を作成する。これらの一連の処理は既存のCADシステムに準じたものが利用される。
【0058】
パース図セクションS216は、立面図セクションS215と同様に、平面図F21および屋根伏図F23の設計情報に基づいて、建物のパース図F26を自動生成する。このパース図作成処理も既存のCADシステムに準じたものが利用される。
【0059】
以上に述べた各セクションS211〜S216により、平面図F21ないしパース図F26が作成される。このうち、立面図F25とパース図F26を除く各図F21〜F24は積算サブシステムS22および業務サブシステムS23に送られ、積算リストL21、発注書L22、見積書L23の作成が行われる。
【0060】
積算サブシステムS22は、平面図F21、基礎伏図F22、屋根伏図F23、配線図F24に設定された設計情報に基づいて、必要な部品(例えば、指定された外壁の仕様の外壁パネルが何枚必要か、あるいは指定されたエアコン等の設置に付随して必要となる部品は何か等)をリストアップして積算リストL21とするとともに、価格の小計ないし合計を計算する。この際、使用する部品の選択ないしは付随する部品の選択等にあたっては設計要素データベースS24が参照される。
【0061】
業務サブシステムS23は、平面図F21〜配線図F24および積算リストL21の情報に基づいて、必要な発注等の業務をまとめ、基礎施工者S13および生産準備システムS30向けの発注書L22を作成するとともに、施主S12に提示するための見積書L23を作成し、発注等を行う。
すなわち、基礎伏図S212と発注書L22を基礎施工者S13に送り、平面図F21、立面図F25、パース図F26、見積書L23を営業担当者S11を介して施主S12に送り、平面図F21、屋根伏図F23、配線図F24、積算リストL21、発注書L22を生産準備システムS30に送る。
なお、生産準備システムS30に送られる平面図F21、屋根伏図F23、配線図F24、積算リストL21が基本設計情報W22となる。
【0062】
(生産準備システムS30の詳細)
図7には生産準備システムS30がより詳細に示されている。
生産準備システムS30は、前述したように、基本設計情報W22から生産図面F30(部品図F31、組立図F32、工程図F33)を作成する生産設計サブシステムS31と、生産図面F30から積算リストL31、発注書L32を作成する受発注積算サブシステムS32と、各々での処理の際に参照される設計要素情報を記憶する設計要素データベースS33とを備えている。
なお、部品図F31は単品の部品に関する図面であり、他部材への取付け指示を示す図も含む。組立図F32は複数の単品から組み立てられる部品に関する図面であり、各単品の組み合わせ状態や組立手順の説明等も含む。工程図F33は全体の組立てに関する図面であり、工場施工や現場施工でのマニュアル等に類する内容を含む。
【0063】
(生産設計サブシステムS31)
生産設計サブシステムS31は、建物躯体部分の生産図面F30を作成する躯体生産設計セクションS311、屋根部分の生産図面F30を作成する屋根生産設計セクションS312、建物各部に設置される部品や設備に関する生産図面F30を作成する部品生産設計セクションS313を備えている。
各セクションS311〜S313は、それぞれ既存のCADシステムと同様に外部操作により画面表示される画像を見ながら部品選択や位置指定を行うことで各図を作成するものである。
【0064】
(躯体生産設計セクションS311)
躯体生産設計セクションS311は、設計要素データベースS33を参照しつつ、基本設計情報W22から建物W34の各階層の建物ユニット、各ユニットを構成するフレームや外壁パネル、サッシ、内外装等の部品、各部品を構成する子部品へと順次細部へ展開し、各々を詳細に設計して生産図面F30(部品図F31、組立図F32、工程図F33)を作成するものである。
【0065】
図8に示すように、躯体生産設計セクションS311は、外壁パネル展開モジュールS3111、標準ユニット展開モジュールS3112、特殊ユニット展開モジュールS3113、玄関ユニット展開モジュールS3114、躯体艤装部材展開モジュールS3115、躯体出荷部材展開モジュールS3116を備えるとともに、積算用データ作成モジュールS3117、部品データ登録モジュールS3118を備えている。
【0066】
外壁パネル展開モジュールS3111は、図9のように、基本設計情報W22から各建物ユニットの配置V3101を読み出し、外壁V3102が装着されるユニットV3103を選別するとともに、選別された各ユニットV3103の外壁部分に基本設計情報W22が指定する仕様の外壁パネルV3104を割り付けてゆく。この際、基本設計情報W22に基づき、窓サッシ等が配置される場合には、当該窓サッシを避けてその周囲に小形外壁パネルを配列する等の処理を行う。これらにより、各ユニット毎に使用する外壁パネルおよび付随する取付金具等の部品コードを決定し、各部品の部品図F31、その組み立て状態を示す組立図F32、部品の生産ないし組み立ての手順等を示す工程図F33として生産図面F30に設定してゆく。
【0067】
標準ユニット展開モジュールS3112は、基本設計情報W22から各ユニットの仕様を読み出し、標準ユニットと指定されたものについての部品展開を行う。ここで、標準ユニットとは、標準高さ、階高、階低の直方体ユニットであり、台形ユニット、セットバックユニット等を除く。但し、標準ユニットであっても玄関が指定されるユニットも除く。
部品展開は、図9のように、順次選択したユニットV3103に対し、基本設計情報W22からそのフレームV3105の外形寸法および必要強度等を割り出し、このフレームV3105を妻パネル、天井パネル、床パネル等の親部品V3106に展開し、さらに前記寸法および強度の条件を満たす鋼材等の子部品V3107に展開する。そして、各ユニット毎に親部品、子部品レベルの部品図F31、組立図F32、工程図F33をまとめて生産図面F30に設定してゆく。
【0068】
特殊ユニット展開モジュールS3113は、台形ユニット、セットバックユニット等の特殊な構造および設定が必要なユニットに関する部品展開を行うものである。このモジュールでは、各特殊ユニット毎に異なる設定が付加されるが、基本的には前述した標準ユニットの部品展開と同様な手順で生産図面F30の設定が行われる。
【0069】
玄関ユニット展開モジュールS3114は、玄関に関する特殊な構造および設定が必要なユニットに関する部品展開を行うものである。このモジュールでは、玄関の仕様毎に異なる設定が付加されるが、基本的には前述した標準ユニットの部品展開と同様な手順で生産図面F30の設定が行われる。
【0070】
躯体艤装部材展開モジュールS3115は、基本設計情報W22から建物内に設置される部品情報を読み出し、工場施工段階で各ユニット内に艤装される部品についての詳細を展開するとともに、その組み付けに必要な補助部品の展開を行い、各々の部品図F31、組立図F32、工程図F33をまとめるものである。ここで、躯体艤装部材とは、例えばキッチンユニット、バスユニット、照明器具、収納建具、エアコン等、各々がユニット内に収まるもの(例えば図9の部品V3108)等である。
【0071】
躯体出荷部材展開モジュールS3116は、基本設計情報W22から建物内に設置される部品情報を読み出し、工場施工段階で各ユニット内に艤装しない部品についての詳細を展開するとともに、その組み付けに必要な補助部品の展開を行い、各々の部品図F31、組立図F32、工程図F33をまとめるものである。ここで、躯体出荷部材とは、例えばユニットジョイント材、シール材、配管パイプ等の各ユニット間に跨る部品(例えば図9の部品V3109)、あるいは壁紙、仕上げ材等の現場施工が適したもの等である。これらの躯体出荷部材は、ユニットとともに現場へ出荷され、現場組み立て時に施工されることになる。
【0072】
積算用データ作成モジュールS3117は、各展開モジュールS3111〜S3116で作成された生産図面F30に設定された各部品の部品コードおよび数等をまとめて積算用データを作成するものである。この積算用データは受発注積算サブシステムS321での積算作業に用いられる。
【0073】
部品データ登録モジュールS3118は、各展開モジュールS3111〜S3116で生産図面F30を作成する間に、設計要素データベースS33に登録されていないが使用頻度の高い子部品の組合せを新たな親部品の組合せとして設計要素データベースS33に自動的に追加登録するものである。
【0074】
(屋根生産設計セクションS312)
屋根生産設計セクションS312は、設計要素データベースS33を参照しつつ、基本設計情報W22から建物W34の屋根を構成する屋根パネルや支持構造等の親部品、各部品を構成する子部品へと順次細部へ展開し、各々を詳細に設計して生産図面F30(部品図F31、組立図F32、工程図F33)を作成するものである。
【0075】
図10に示すように、屋根生産設計セクションS312は、屋根情報入力モジュールS3121、屋根形状図作成モジュールS3122、屋根パネル割り実行モジュールS3123、特殊形状情報入力モジュールS3124を備えるとともに、屋根パネル展開モジュールS3125、接合金物展開モジュールS3126、垂直部品展開モジュールS3127、小屋パネル展開モジュールS3128、補助部品展開モジュールS3129を備えている。
【0076】
屋根情報入力モジュールS3121は、基本設計情報W22から建物の屋根に関する基本的な設計情報を読み出すものである。この際、参照する情報は主に屋根伏図F23であるが、屋根を支持する躯体構造(主にユニット配置)を得るために平面図F21も参照される。
屋根形状図作成モジュールS3122は、屋根情報入力モジュールS3121で読み出された屋根の設計情報に基づき、操作画面に表示された空白の平面図画像V3120に屋根形状V3122を自動的に描画するものである。
【0077】
屋根パネル割り実行モジュールS3123は、屋根情報入力モジュールS3121で読み出された屋根の設計情報から外周輪郭形状や登り棟線等を識別し、設計要素データベースS33に登録された屋根パネル割り付けルールに基づいて、基本設計情報W22で指定された屋根を構成するのに適切な屋根パネルの割り付けV3123の設定を自動的に行うものである。
特殊形状情報入力モジュールS3124は、基本設計情報W22に指定されたドーマーや天窓等の特殊形状V3124を画面上で指定するものである。
【0078】
屋根パネル展開モジュールS3125は、屋根パネル割り実行モジュールS3123で設定された割り付けV3123および基本設計情報W22が指定する仕様に基づいて各屋根パネル毎に構造および部品の展開を行い、使用する部品の部品コードを決定し、各部品の部品図F31、その組み立て状態を示す組立図F32、部品の生産ないし組み立ての手順等を示す工程図F33として生産図面F30に設定してゆく。
【0079】
接合金物展開モジュールS3126は、屋根パネル展開モジュールS3125で設定された屋根パネルの構造および屋根パネル割り実行モジュールS3123で設定された割り付けV3123に基づいて、各屋根パネルの接合に必要な接合部品の展開を行い、屋根パネルと同様に生産図面F30に設定してゆく。
ここで、接合部品とは、屋根パネル同士を接合するパネル接合金物、屋根パネルと小屋パネルとの接合を行う外周接合金物、屋根架構面のユニット同士の接合を行う柱頭接合金物等である。
【0080】
垂直部品展開モジュールS3127は、屋根パネル展開モジュールS3125で設定された屋根パネルの構造および屋根パネル割り実行モジュールS3123で設定された割り付けV3123に基づいて、各屋根パネルの支持に必要な垂直部品の展開を行い、屋根パネルと同様に生産図面F30に設定してゆく。
ここで、垂直部品とは、屋根パネルを支持あるいは補強する束、ブレース、谷木等である。
【0081】
小屋パネル展開モジュールS3128は、屋根パネル展開モジュールS3125で設定された屋根パネルの構造、屋根パネル割り実行モジュールS3123で設定された割り付けV3123、および基本設計情報W22に基づいて、屋根の底部(躯体最上階部分の上面)に配置されて屋根構造のベースとなる小屋パネルの構造および部品の展開を行い、屋根パネルと同様に生産図面F30に設定してゆく。この際、小屋パネルの割り付けは躯体最上階部分のユニット割りに準拠され、割り付けられた小屋パネル毎に子部品に展開される。
【0082】
補助部品展開モジュールS3129は、屋根パネル展開モジュールS3125で設定された屋根パネルの構造、屋根パネル割り実行モジュールS3123で設定された割り付けV3123、および基本設計情報W22に基づいて、樋や鼻隠し等の軒先部品、軒天材等の軒天部品、仕上げ材その他の屋根副資材等の補助部品の展開を行い、屋根パネルと同様に生産図面F30に設定してゆく。
なお、屋根生産設計セクションS312には、図示しないが躯体生産設計セクションS311と同様な積算用データ作成モジュールおよび部品データ登録モジュールが設けられ、積算用データL31が出力される。
【0083】
(部品生産設計セクションS313)
部品生産設計セクションS313は、躯体生産設計セクションS311および屋根生産設計セクションS312で1セットとして取り扱われる部品についての詳細な生産設計を行うものである。このような部品としては、インテリア、内装部品、間仕切り、設備機器など、室内で目につきやすい部品、あるいは機能として居住者に関係が大きい部品が主である。
設計の際には、指定された部品について、取付け部位の位置や形態等や、施主注文に応じた仕様を参照して種別を決定し、部品図F31および組立図F32を作成する。
【0084】
また、部品生産設計セクションS313は、躯体生産設計セクションS311および屋根生産設計セクションS312で設計を行う際に、基本設計情報W22には該当する仕様等の部品が設計要素データベースS33に無い場合、必要に応じて該当する仕様等の部品を詳細に設計し、設計要素データベースS33に追加登録する処理を行うものである。
但し、通常の部品でこのような処理は少なく、専ら種類が多岐に渡る間仕切りに対して行われる。
【0085】
(受発注積算サブシステムS32)
受発注積算サブシステムS32は、生産設計サブシステムS31で設定された積算用データ等を参照して積算リストL31を作成する積算セクションS321と、積算セクションS321で作成された積算リストL31等を参照して発注書L32を作成する営業受発注セクションS322および工場受発注セクションS323を備えている。
各セクションS311〜S313は、それぞれ既存のコンピュータを用いた積算システムあるいは受発注管理システムと同様なものである。
【0086】
積算セクションS321は、生産設計サブシステムS31の各セクションS311〜S313から送られる積算用データに基づいて、各セクションによる生産図面F30に示された各部品を生産するにあたって必要な子部品や資材等のリストをまとめ、価格等の情報とともに積算リストL31を作成する。
営業受発注セクションS322は、積算セクションS321で作成された積算リストL31に基づいて、部品生産用の資材を供給する業者(子部品を生産する外部業者を含む)向けの発注書L32を作成し、該当する資材の情報を記載した積算リストL31とともに資材業者に送るものである。
工場受発注セクションS323は、積算セクションS321で作成された積算リストL31に基づいて、部品の生産を実行する工場向けの発注書L32を作成し、該当する部品の情報を記載した積算リストL31とともに工場に送るものである。
【0087】
以下、本実施例の効果を説明する。
(全体構成の効果)
本実施例のユニット建物用CADシステムS10においては、先ず基本設計システムS20により建物の概要に関する基本設計を行い、続く生産準備システムS30により生産に必要な詳細な生産設計を行うことができる。
つまり、基本設計システムS20により、建物の基本的なユニット配置までの概要(施主S12に見える部分の形状や仕様、施主が要望する機能等)を設計し、施主との打ち合わせを行って注文に応じた建物を表す必要最小限の事項を基本設計情報W22としてまとめることができる。
また、生産準備システムS30により、基本設計で決まった内容に対応した詳細(施主の見えない部分の構造や部品構成)を設計し、工場生産に必要な生産図面F30や積算リストL31等の情報にまとめることができる。
【0088】
従って、施主打ち合わせにより設計変更が繰り返される部分は簡略でよくなり、繰り返し行われる部分の作業負荷が軽減されるとともに、ユニット単体レベル等の複雑な生産設計は基本設計がまとまった後に一度だけ行えばよくなり、個々に設計が必要な注文住宅への対応ができる。
また、基本設計では概要の設計が主であるため、繰り返し作業があっても負荷が軽く、かつ負荷の重い生産設計は繰り返しを避けられるため、各々を個別にCAD化することで実用的なCADシステムを構成することができる。
【0089】
(設計要素データベースS24、S33の効果)
基本設計システムS20ないし生産準備システムS30においては、それぞれ共通の設計要素情報を登録した設計要素データベースS24、S33を参照し、共通の設計基準に基づいて各々の設計を行うことにより、基本設計で設定したが生産設計で対応できない等の不都合を回避できるとともに、部品や構造のコード化、パッケージ化による情報量や処理負荷の軽減を図ることができる。
また、設計要素データベースS24、S33の登録は、生産準備システムS30側で行い、基本設計システムS20に転送するようにしたため、登録内容に生産上の困難部分を回避するルール等を予め盛り込むことができ、基本設計と生産設計を分割しても設計ないし生産を確実に行うことができる。
【0090】
さらに、設計要素データベースS24、S33には「ルールとして登録されている」ものの「具体的な部品が規定されていない」場合など、生産設計サブシステムS31によって順次追加登録できるようにしたため、予め使用可能性の低い部品等は部品登録を省略しておき、必要性や使用頻度に応じて追加することができ、設計要素データベースS24、S33のコンパクト化を図ることができる。そして、これにより記憶装置等の機材の簡略化、低コスト化が図れるとともに、登録内容のメンテナンス性をも向上することができる。
【0091】
(基本設計システムS20の全体的な効果)
基本設計システムS20では、意匠設計サブシステムS21、積算サブシステムS22、業務サブシステムS23で構成することで、図情報や積算情報を含む基本設計情報W22の作成とともに進行管理等の業務を効率よく行うことができる。
すなわち、意匠設計サブシステムS21により、平面図F21、基礎伏図F22、屋根伏図F23、配線図F24の設計を行うことで、施主S12との打ち合わせに必要な立面図F25やパース図F26を自動作成することができる。
【0092】
特に、意匠設計サブシステムS21では、基礎伏図F22、屋根伏図F23、配線図F24の基本的な設定(ユニット配置や外形、間取りや設備類の配置等)の際に、平面図F21の設計情報が自動的に参照されるため、同様な設定についての重複した操作を省力化できるとともに、設計情報の一貫性、整合性を容易に確保することができる。
そして、積算サブシステムS22では、平面図F21ないし配線図F24の設計情報を参照して積算リストL21を自動作成できるとともに、業務サブシステムS23では、施主S12向けの見積書L23および基礎施工者S13や生産準備システムS30向けの発注書L22をも自動作成することができる。
【0093】
(基本設計システムS20の平面図セクションS211の効果)
基本設計システムS20の平面図セクションS211では、ユニット設定、玄関設定、バルコニー周辺設定を順次処理することで躯体に関する設定を行い、グリッド設定、外壁設定、建具設定を順次処理することで内外装に関する設定を行うことができる。
【0094】
特に、躯体サブセクションS211Aでは、基本的なユニット設定モジュールS2111の後で玄関設定モジュールS2112を実行することで、土間や上がり框等の特殊な処理が必要な玄関部分の設定をユニット設定とは別に処理することができる。
このため、玄関となるべき部位であっても当該部位のユニットに関する設定を他の部分と同様に前段のユニット設定モジュールS2111で処理することができ、あるいは玄関専用ユニットの設定等を行うために前段のユニット設定モジュールS2111が複雑化する等の不都合を回避できる。
【0095】
また、内外装サブセクションS211Bでは、グリッド設定モジュールS2114により、先に設定されたユニット配置上に基準位置を示すグリッドを設定することができる。そして、このグリッドに基づいて内外装を設定するようにしたので、詳細な位置寸法等の指定を行うことなくグリッドに基づく正確な位置設定を行うことができる。
さらに、建具の設定を行う建具設定モジュールS2116とは別に、外壁設定モジュールS2115を設けることで、他の内外装とは処理の相違が大きい外壁パネルの設定を確実かつ容易に行うことができる。
【0096】
(基本設計システムS20の基礎伏図セクションS212の効果)
基本設計システムS20の基礎伏図セクションS212では、基礎の基本設定、玄関設定で領域を確定し、通常および特殊な天端を設定するとともに、独立基礎および補助的な設定を行うことで、基礎の設計を行うことができる。
【0097】
特に、基本設定モジュールS2121で全体的な布基礎の設定を行った後、玄関設定モジュールS2122を実行することで、土間や上がり框等の特殊な処理が必要な玄関部分の設定を基本設定とは別に処理することができる。
また、基本設定モジュールS2121で全体的な布基礎の設定を行った後、独立基礎設定モジュールS2125を実行することで、布基礎とは異なり設置の有無がある独立基礎の設定を適宜行うことができる。
このため、基本設定モジュールS2121では玄関や独立基礎を考慮することなく、包括的かつ連続的な基礎の基本設定を行うことができ、処理の単純化により自動化を容易に促進することができる。
【0098】
さらに、天端設定モジュールS2123で基本的な天端高さの設定を行ったのち、特殊天端設定モジュールS2124で特殊な部分の天端高さを設定することで、天端設定モジュールS2123の処理の単純化が図れるとともに、特殊天端をも確実に設定することができる。
【0099】
(基本設計システムS20の屋根伏図セクションS213の効果)
基本設計システムS20の屋根伏図セクションS213では、屋根形状設定モジュールS2131で屋根の基本形状を設定し、続く樋設定モジュールS2132で軒樋および縦樋の設定を行うことができる。
【0100】
特に、屋根形状設定モジュールS2131では、標準プログラムS2133および差替えプログラムS2134を準備しておき、屋根形状に応じて標準プログラムの一部を差替えプログラムで置換することで標準以外の各種屋根形状に対応できるとともに、各種屋根形状毎にそれぞれ完全な実行プログラムを用意する場合に比べてプログラムサイズをコンパクト化でき、共通部分を共用化することでメンテナンス性をも向上することができる。
【0101】
(生産準備システムS30の全体的な効果)
生産準備システムS30では、生産設計サブシステムS31と受発注積算サブシステムS32とで構成することで、生産に向けた詳細設計ないし積算発注等の業務を効率よく行うことができる。
特に、生産設計サブシステムS31により、基本設計情報W22に設定された内容を詳細に設計することで、工場S17での生産や資材業者S16への発注に必要な生産図面F30(部品図F31、組立図F32、工程図F33)を自動作成することができる。
この際、生産設計サブシステムS31では、躯体生産設計セクションS311、屋根生産設計セクションS312、部品生産設計セクションS313で構成することにより、処理内容が大幅に異なる躯体と屋根とを別個に処理できるとともに、各々で用いる部品等をさらに別個に処理することができる。
そして、受発注積算サブシステムS32では、生産図面F30を参照して積算リストL31を自動作成できるとともに、資材業者S16および工場S17向けの発注書L32をも自動作成することができる。
【0102】
(生産準備システムS30のマニュアル添付に関する効果)
生産準備システムS30では、生産設計サブシステムS31において部品図F31、組立図F32とともに、該当する部品等に関する生産マニュアル(工程図F33)を作成することにより、工場や現場での施工作業を容易かつ確実にすることができる。
特に、生産設計サブシステムS31では、建物に使用する部品に対応したマニュアルを選択して工場や現場に配布するため、使用する部品に対応しないマニュアルが配布される等の誤りや、全ての部品に対応したマニュアルを用いるような冗長性を排除することができ、必要なマニュアルを確実に供給することで、作業を容易かつ効率よく行うことができる。
【0103】
(生産準備システムS30の躯体生産設計セクションS311の効果)
生産準備システムS30の躯体生産設計セクションS311では、外壁パネル展開、標準ユニット展開、特殊ユニット展開、玄関ユニット展開を順次処理することによりユニット部分の詳細を設計することができ、躯体艤装部品展開および躯体出荷部品展開によりユニットに艤装あるいは添付出荷される部品までの詳細設計を行うことができる。
【0104】
特に、一般的な標準ユニットを処理する標準ユニット展開モジュールS3112と、それ以外の特殊ユニットを処理する特殊ユニット展開モジュールS3113とを分けることで、数が多い標準ユニットについては当該ユニットに最適化された処理を行うことで全体としての処理効率を高めることができる。一方で、特殊ユニット展開モジュールS3113では特殊ユニットに必要な多数のパラメータ設定等に確実に対応することができる。
【0105】
また、各ユニット展開モジュールS3112、S3113とは別に、玄関ユニット展開モジュールS3114を設けることで、土間や上がり框等の特殊な処理が必要な玄関部分の設定を標準および特殊のユニット設定とは別に処理することができ、玄関が形成されるユニットが標準であっても特殊であっても確実な対応を行うことができる。
さらに、各ユニット展開モジュールS3112〜S3114の処理に先だって、外壁パネル展開モジュールS3111で各ユニットに適宜装着される外壁パネルの展開を行うことで、各ユニット展開の際に具体的な外壁支持構造まで含めた詳細設計を行うことができる。
【0106】
そして、躯体生産設計セクションS311では、前述したユニット展開の後、躯体艤装部品展開モジュールS3115により工場S17で艤装施工する部品を展開するとともに、躯体出荷部材展開モジュールS3116により艤装施工せずにユニットとともに出荷する部材を展開することができる。
これらの艤装部品と出荷部材とを分けたことにより、躯体艤装部品展開モジュールS3115ではユニット単位の処理を行うとともに、躯体出荷部材展開モジュールS3116ではユニット間の部材等を建物単位で処理することができ、確実な処理を行うことができる。
【0107】
また、躯体生産設計セクションS311では、前述した各モジュールS3111〜S3116で展開された生産図面F30に基づいて、積算用データ作成モジュールS3117で積算用データL31を作成することで、次の受発注積算サブシステムS312での処理を容易にすることができる。
さらに、部品データ登録モジュールS3118により、生産図面F30および積算用データL31を含む生産設計情報W31に基き、必要に応じて前述した設計要素データベースS33への追加登録等を行うことができる。
【0108】
(生産準備システムS30の屋根生産設計セクションS312の効果)
生産準備システムS30の屋根生産設計セクションS312では、屋根の基本形状を設計した後、当該屋根形状を構成する細部の部品展開を行うことにより、屋根の詳細設計を行うことができる。
このうち、屋根の基本形状の設計においては、屋根情報入力モジュールS3121で入力した基本設計情報W22に基づいて屋根形状図作成モジュールS3122で作図することで屋根の基本形状を得ることができる。
【0109】
また、屋根パネル割り実行モジュールS3123により、設計要素データベースS33に登録されたルールに基づいて、屋根の基本形状を構成する屋根パネルを適切に割り付けることができる。
このため、屋根の形状が様々であっても、割り付けられた屋根パネルをそれぞれ生産や輸送が容易な部品とすることができる。
【0110】
これらの屋根情報入力ないし屋根パネル割り実行の処理は、新たな設計情報の入力等が必要ないため、一連の処理として自動実行することができる。
そして、特殊形状情報入力モジュールS3124により、自動化できない特殊な処理あるいは特殊な部品の設定等をも確実に行うことができる。
【0111】
一方、細部の部品展開にあたっては、屋根パネル展開モジュールS3125、接合金物展開モジュールS3126、垂直部品展開モジュールS3127、小屋パネル展開モジュールS3128、補助部品展開モジュールS3129により分担して行うため、各々を順次あるいは並行して処理することができる。
【0112】
なお、本発明は前記実施例に限定されるものではなく、本発明の目的を達成できる範囲内での変形等は本発明に含まれるものである。
すなわち、前述したシステムの構成にあたり、使用するコンピュータシステムの形式や規模等は実施にあたって適宜選択すればよく、入出力装置の形式や種類等も同様である。
【0113】
また、コンピュータシステム上で前述したシステムを実現することは、既存のコンピュータ技術を利用しつつ前述した実施例で明らかにされた機能に基づいて行えばよく、具体的アルゴリズム、操作画面あるいは出力情報のデザイン等も適宜選択すればよい。
さらに、前述したシステムで入出力される基本設計情報W22や生産設計情報W31の具体的な形式や内容も実施にあたって適宜選択すればよく、設計要素データベースS24、S33についても同様である。
【0114】
そして、ユニット建物の設計という点では、設計に必要な図面および部品リスト等が出力できればよく、見積書L23、発注書L32等の作成機能は適宜省略してもよい。
さらに、前記実施例では基礎を現場施工するために、基本設計システムS20で作成した基礎伏図F23を現場に送ったが、プレキャストコンクリートブロックを配列するプレハブ基礎等を用いる場合には、基礎伏図F23をも生産設計システムS30に送り、プレハブ基礎部品の詳細設計を行うようにしてもよい。
【0115】
【発明の効果】
以上に述べたように、本発明によれば、施主に見える部分の形状や仕様、施主が要望する機能等について、建物の基本的なユニット配置までの概要をまとめて基本設計を行い、施主との打ち合わせを行って注文に応じた建物を表す必要最小限の事項をまとめるとともに、基本設計で決まった内容に対応した詳細、つまり施主の見えない部分の構造や部品構成等に関する生産設計を行い、工場生産に必要な図面や情報をまとめることができる。
従って、施主打ち合わせにより設計変更が繰り返される部分は簡略でよくなり、繰り返し行われる部分の作業負荷が軽減されるとともに、ユニット単体レベル等の複雑な生産設計は基本設計がまとまった後に一度だけ行えばよくなり、個々に設計が必要な注文住宅にも対応することができる。
【0116】
また、基本設計では概要の設計が主であるため、繰り返し作業があっても負荷が軽く、かつ負荷の重い生産設計は繰り返しを避けられるため、各々を個別にCAD化することで実用的なCADシステムを構成することができる。
更に、生産準備システムを生産設計部と受発注積算部とで構成することで、生産に向けた詳細設計ないし積算発注等の業務を効率よく行えるようになり、生産設計については躯体、屋根、その他の部品という区分毎に処理することで効率化を図ることができる。
【0117】
特に、生産設計部において、躯体生産設計、屋根生産設計、部品生産設計の各セクションを独立させることで、各々が並列的な処理も可能となり、一層の効率化が図られる。
また、各生産図面の作成の際に積算用データを作成し、積算セクションでの積算に利用することで、積算工程を効率よくかつ正確化できる。
【0118】
さらに、基本設計と生産設計とが、それぞれ共通の設計要素データベースを参照し、共通の設計基準に基づいて各々の設計を行うことにより、基本設計で設定したが生産設計で対応できない等の不都合を回避できるとともに、部品や構造のコード化、パッケージ化による情報量や処理負荷の軽減を図ることができる。
さらに、生産準備システムにおいて、生産図面や積算リストとともに、該当する部品等に関する生産マニュアルを作成することにより、施工作業の効率化あるいはマニュアル供給の確実化を図ることが可能となる。
【図面の簡単な説明】
【図1】本発明の一実施例の全体を示す模式図。
【図2】前記実施例の設計手順概要を示すフローチャート。
【図3】前記実施例の基本設計システムの構成を示すブロック図。
【図4】前記実施例の平面図セクションの構成を示すブロック図。
【図5】前記実施例の基礎伏図セクションの構成を示すブロック図。
【図6】前記実施例の屋根伏図セクションの構成を示すブロック図。
【図7】前記実施例の生産準備システムの構成を示すブロック図。
【図8】前記実施例の躯体生産設計セクションの構成を示すブロック図。
【図9】前記実施例の生産準備システムの処理を示す模式図。
【図10】前記実施例の屋根生産設計セクションの構成を示すブロック図。
【図11】前記実施例の設計要素データベースの構成を示すブロック図。
【符号の説明】
S10 ユニット建物用CADシステム
S12 施主
S14 現場
S17 工場
S20 基本設計システム
S21 意匠設計サブシステム
S211 平面図セクション
S212 基礎伏図セクション
S213 屋根伏図セクション
S214 配線図セクション
S215 立面図セクション
S216 パース図セクション
S22 積算サブシステム
S23 業務サブシステム
S24 設計要素データベース
S30 生産準備システム
S31 生産設計サブシステム
S311 躯体生産設計セクション
S312 屋根生産設計セクション
S313 部品生産設計セクション
S32 受発注積算サブシステム
S321 積算セクション
S322 営業受発注セクション
S323 工場受発注セクション
S33 設計要素データベース
F21 平面図
F22 基礎伏図
F23 屋根伏図
F24 配線図
F25 立面図
F26 パース図
F30 生産図面
F31 部品図
F32 組立図
F33 マニュアルである施工図
L21 積算リスト
L22 発注書
L23 見積書
L31 積算リスト
L32 発注書
W21 基礎
W22 基本設計情報
W31 生産設計情報
W33 部品
W34 建物
[0001]
[Industrial application fields]
The present invention relates to a unit building CAD system and is used for designing a prefabricated building constructed by assembling a plurality of box-shaped building units.
[0002]
[Background]
Prefabricated buildings have been rapidly spreading in recent years due to advantages such as cost reduction and quality stabilization due to industrialization.
Among prefabricated buildings, the frame curtain wall method is close to the conventional method, and is built by assembling factory-produced column beams and wall face materials. In addition, the wooden panel method is constructed by assembling panels produced at the factory on site.
Each of these prefabricated buildings is configured as a collection of simple members such as shaft members and face members.
On the other hand, among prefabricated buildings, the unit construction method is to produce box-shaped building units at the factory and assemble them at the site. Production, transportation, and construction at the site are basically unit units.
[0003]
These prefabricated buildings were generally offered as planned buildings. Planned architecture is designed by the building maker from the outline of the building layout and exterior shape to details such as the types of built-in equipment and interior and exterior specifications.
However, even in the case of planned construction, there are many cases where several options can be selected regarding the floor plan, equipment, and specifications in accordance with the customer's request.
[0004]
However, in recent years, client demands have diversified, and it has become impossible to obtain sufficient customer satisfaction with uniform planning buildings or option selection. Response is required.
Here, in order to deal with the custom-built construction, it is necessary to redesign each building from the beginning, and the design work of the building maker becomes enormous as compared with the conventional planned house.
For this reason, when ordering prefabricated buildings, it is necessary to introduce a CAD (Computer Aided Design) system in order to improve work efficiency.
[0005]
[Problems to be solved by the invention]
By the way, among the prefabricated buildings described above, the unit building has a problem that it is difficult to deal with custom construction and to make CAD compared to other prefabricated methods.
In other words, when building a custom-built building with a framed building or a panel building, outline the floor plan etc. according to the owner's order, and create a design drawing with the detailed structure and specification parts that embody it. After the confirmation of the owner, the design is completed, leading to parts production or building construction.
That is, in this type of building, since the entire building is simply regarded as an assembly of parts, the outline from the floor plan planning to the detailed design of the members and structures used are inseparable and continuous.
For this reason, CAD can be performed relatively easily by following a series of design contents, and there is no particular difficulty in redoing the design work for ordering.
[0006]
However, since unit buildings are handled in units as described above, an intermediate design level for a single unit is required between the simple member level and the entire building level for the design.
In particular, it is necessary to secure the structural strength of each unit frame when assembled in a building, as well as to ensure the self-supporting strength of the unit alone in consideration of handling such as transportation. The work becomes complicated.
[0007]
For this reason, in order to make a substantial change in the general design of a unit building, it is necessary to redesign each unit according to the contents in addition to the redesign at the entire building level, which requires enormous work and costs. Become.
Furthermore, since enormous processing is required, the speed of the computer device that executes the processing is reduced in CAD processing, or the cost increases due to the speeding up of the processing device, which makes it difficult to perform CAD processing. There is.
And with the delay of CAD, the response to the custom building of unit buildings was also delayed.
An object of the present invention is to provide a unit building design method and a unit building CAD system that can flexibly and quickly cope with a large design change.
[0008]
[Means for Solving the Problems]
The present invention divides the entire CAD system into basic design and production design, and in the basic design, outlines the basic unit layout of the building (shape and specifications of the parts visible to the client, functions requested by the client, etc.) In addition, the minimum necessary items representing the building according to the order are summarized, the work load of the part where the design change is repeated by the owner meeting is reduced, and the details corresponding to the contents determined in the basic design in the production design (the owner's details) By designing the invisible part structure and component structure), it is possible to efficiently handle complex production design at the unit level. In the production design, the production design is performed for each category of the frame, the roof, and other parts so that production drawings can be created, integrated, and ordered. These achieve the above object.
[0009]
Specifically, the present invention is a CAD system for a unit building for designing a unit building constructed by assembling a plurality of building units, Shape and unit layout in the building A basic design system for creating basic design information for designating, and based on the basic design information Structure and component configuration for each building and each building unit And production preparation system to create production design information including The basic design system is set to the standard by replacing a part of this standard program with a standard program for displaying a screen or accepting an input operation for a setting module necessary for setting a roof type set as a standard. A replacement program for generating an operation program for setting a roof type different from the roof type, and a program editing unit for generating an execution program from the standard program and the replacement program based on the designation of the roof type inputted externally, A program execution unit configured to execute the execution program and set the design information of the designated type of roof, and a roof shape setting module configured by: The production preparation system designs the detailed structure and component configuration of each building unit based on the basic design information, and creates a production drawing of each building unit or its component for each category of frame, roof, and other components. A production design department that creates an integrated list of each building unit and each part based on the production drawing, and manages production and ordering of each building unit and each part based on the integrated list and the production drawing. It is characterized by comprising an order integrating unit.
[0010]
The production design section includes a production production design section for producing a production drawing of a building body part of the building, a roof production design section for producing a production drawing of a roof part of the building, and production drawings of other parts of the building. It is desirable to include a part production design section to be created.
The production design unit is to create integration data including integration information of parts used in the drawing together with the production drawing, and the ordering and integration unit is integrated based on the integration data created by the production design unit. It is desirable to include a totaling section for creating a list and a receiving / ordering section for ordering materials and parts based on this totaling list.
[0011]
Furthermore, it has a design element database created by the production preparation system and referred to by the basic design system, and this design element database is a list of elements such as design rules and selectable structures and shapes to be observed in building design. It is desirable to include.
It is desirable that the production preparation system outputs a production manual and / or a construction manual for each building unit or part together with production design information for each building unit or part.
The production drawing relates to a part diagram showing detailed information necessary for production of individual parts to be used, an assembly drawing showing an assembly state and relation of each part shown in the part drawing, and production and assembly of the parts. It is desirable to include a process diagram including a manual.
[0012]
[Action]
In the present invention, an outline (basic shape and specifications of the part that can be seen by the client, the functions required by the client, etc.) is designed, arranged in consultation with the client, and ordered in the basic design. Summarize the minimum necessary items that represent buildings according to Next, in production design, details corresponding to the contents determined in the basic design (structure and parts configuration of the part that the client cannot see) are designed, and drawings and information necessary for factory production are compiled.
[0013]
Therefore, the part where the design change is repeated by the client meeting can be simplified, the work load of the repeated part can be reduced, and complicated production design such as the unit level can be performed only once after the basic design is compiled. It will be better and will be able to accommodate custom homes that require individual design.
In addition, the basic design is mainly an outline design, so even if there is a repetitive work, the load is light and the heavy load design can be avoided. A system can be configured.
[0014]
Furthermore, by configuring the production preparation system with the production design department and the order placement and integration part, it will be possible to efficiently carry out operations such as detailed design for production or cumulative ordering. The efficiency is improved by processing for each category of parts. The above-mentioned purpose is achieved by these.
[0015]
In particular, in the production design department, the sections of the housing production design, the roof production design, and the part production design are made independent, so that each of them can be processed in parallel, and further efficiency is achieved.
In addition, the integration process can be efficiently and accurately performed by creating integration data when creating each production drawing and using it for integration in the integration section.
[0016]
In addition, the basic design and production design each refer to the common design element database and perform each design based on the common design criteria. In addition to avoidance, it is possible to reduce the amount of information and processing load by coding and packaging parts and structures.
Furthermore, in the production preparation system, it is possible to improve the efficiency of construction work or ensure the supply of manuals by creating a production manual for the relevant parts together with production drawings and integration lists.
[0017]
【Example】
Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
(overall structure)
The present embodiment is a CAD system that designs various unit buildings and supports production and construction in accordance with orders from clients.
FIG. 1 shows an outline of this embodiment, and FIG. 2 shows an outline of a processing flow performed in this embodiment.
[0018]
The unit building CAD system S10 includes a basic design system S20 that performs basic design and peripheral support at that stage, and a production preparation system S30 that performs production design and peripheral support.
Each of the systems S20 and S30 is configured by an existing computer system, and executes a predetermined design work by an interactive input operation based on a set processing program.
[0019]
Each system S20, S30 has an image display device (bitmap type display, etc.) and an input device (keyboard for character and command input, mouse for position designation, light pen, tablet, digitizer, etc.) for performing operation input, respectively. And a communication device connected to a printing device (printer, plotter, etc.) and a storage device (magnetic disk, etc.) or other computer system for outputting design information such as the created drawing and integration list. These are all appropriately selected from existing devices.
[0020]
(Outline of basic design system S20)
The basic design system S20 is installed in a building manufacturer's sales office or the like, and is operated by the sales representative S11 to perform basic design according to the order of the client S12.
For this purpose, the basic design system S20 includes a design design subsystem S21, an integration subsystem S22, a business subsystem S23, and a design element database S24.
[0021]
The design design subsystem S21 is a plan view F21, a basic plan view F22, a roof plan view F23, and a wiring diagram F24 that are operated by the sales representative S11 to show the contents of the basic design (each of which is referred to in production design). Yes, including part designation information etc.), and creating an elevation F25 and a perspective F26 (not shown for production design but presented to the client S12) from these basic design contents Is.
[0022]
The integration subsystem S22 generates an integration list L21 indicating a list of parts to be used based on the contents of the drawings F21 to F24 created by the design design subsystem S21.
The business subsystem S23 is based on the contents of the drawings F21 to F24 created by the design design subsystem S21 and the contents of the totalization list L21 created by the totalization subsystem 22, and performs on-site construction (mainly basic construction) and A purchase order L22 for arranging the order of the parts, the production design order of the building, and the price estimate L23 for building construction are created.
[0023]
The design element database S24 is referred to during design in the design design subsystem S21 and integration processing in the integration subsystem S22.
As shown also in FIG. 11, the design element database S24 is transferred with the contents of the design element database S33 of the production preparation system S30. As the contents, the part information S1010 that can be used in the basic design, the integrated information of each part Design rule S1020 and the like are accumulated.
[0024]
The part information S1010 is information on various parts including information on a unit that is a basic structure of a building (an outline of dimensions, types, etc .; details of column beams are designed by production design). A single product part diagram S1011 showing the most basic level parts to be performed, and integrated information S1012 of each part (part number, required number, unit price, etc. of screws necessary for each child part) are included.
These parts information S1010 is hierarchized and packaged in the form of a parent part, a child part, etc. For example, if a parent part “A-type window” is designated, “sash”, “mounting frame”, etc. as child parts Is automatically selected.
[0025]
The design rule S1020 includes handling when installing a specific structure or part. For example, “If a staircase is provided in the unit, reinforce the beam facing the staircase”. Contains information.
[0026]
Further, the design element database S24 includes not only information necessary for the design but also a production manual S1030 indicating the construction work procedure of each part.
In the production manual S1030, process drawings and manuals are recorded as a set with each part. When each part is used, the corresponding process drawings and manuals are selected and output together with design information. It has become.
[0027]
(Work flow in the basic design system S20)
The sales representative S11 receives the order from the client S12 (procedure P21; see FIG. 2, the same applies hereinafter), operates the basic design system S20 based on this order, performs the basic design, and performs the drawings F21 to F26 and the lists. L21 to L23 are created (procedure P22).
Then, the created plan view F21, elevation view F25, perspective view F26, and estimate sheet L23 are presented to the client S12 as a design plan, and it is confirmed whether the design contents are acceptable (procedure P23).
Here, when a change or addition of the design contents is received from the owner S12, the basic design is corrected (procedure P24), presented again to the owner S12, and this is repeated until confirmation is obtained.
[0028]
When the confirmation of the owner S12 is obtained, production preparation is started with the contents of the basic design.
Specifically, the foundation plan F22 and the purchase order L22 are sent to the foundation builder S13 to cause the construction site S14 to construct the foundation W21 (procedure P25). Then, the purchase order L22 is sent to the production preparation system S30 together with the wiring diagram F24 and the integration list L21, and the production design of the building portion including the unit is executed (procedure P26).
The above is the outline of the basic design system S20.
[0029]
(Outline of production preparation system S30)
The production preparation system S30 is installed in a design department or the like of a building manufacturer, and the manufacturer designer S15 performs production design of the building based on the basic design information W22 described above.
For this purpose, the production preparation system S30 includes a production design subsystem S31, an order integration subsystem S32, and a design element database S33.
[0030]
The production design subsystem S31 is operated by the manufacturer designer S15 to specifically develop the contents of the basic design information W22, and a detailed part drawing F31 of individual parts necessary for factory production and the like, and an assembly drawing showing its assembly F32, a process diagram relating to production and construction (manual including instructions for work and illustration of a state during work) F33 is created.
Here, the part information necessary for factory production or the like is information (for example, type, size, number of used parts, processing location, etc.) of component parts (child parts with respect to the parent part) of each designated part. The component is, for example, a column beam or interior / exterior material of the frame if it is a unit, equipment installed in the interior, or the frame material or window glass if it is a window sash.
[0031]
The ordering / accumulating subsystem S32 is based on the contents of the drawings F31 to F33 created by the production design subsystem S31, and an integrating list L31 indicating a list of parts to be used, and for ordering necessary materials externally. The purchase order L32 is created.
The parts drawing F31, assembly drawing F32, and process drawing F33 described above are the production drawing F30, and the combination of these drawings F31 to F33 and the integration list L31 is the production design information W31.
[0032]
The design element database S33 is referred to during the design in the production design subsystem S31 and the integration process in the order integration subsystem S32, and includes detailed information and design rules for each part specified in the basic design. Etc. are accumulated (see FIG. 11).
Here, the design element database S33 has the contents (part information S1010, design rule S1020, production manual S1030) of the design element database S24 of the basic design system S20 described above, and each is set in the design element database S24. Specific and detailed information for factory production is appropriately added to record items such as each part. Only information necessary for basic design other than the added contents is identified and transferred to the design element database S24.
[0033]
Note that the design element database S33 is such that information is added or corrected as appropriate by the production design subsystem S31 and the ordering / accumulating subsystem S32, and the updated contents are the design element database of the basic design system S20. Reflected in S24, mutual cooperation is ensured.
[0034]
(Work flow in production preparation system S30)
Receiving the basic design information W22, the manufacturer designer S15 operates the production preparation system S30, and the production design subsystem S31 performs the production design according to the contents of the basic design information W22 (procedure P31; see FIG. 2, the same applies hereinafter), integration (Procedure P32) and parts ordering (procedure P33) are performed, whereby material procurement (procedure P34), factory production (procedure P35), and on-site assembly (procedure P36) are performed.
[0035]
Specifically, the integration list L31 and the purchase order L32 are sent from the production preparation system S30 to the material supplier S16, and the material W32 corresponding to this is sent to the factory S17 and the site S14.
Further, the parts drawing F31, the assembly drawing F32, the process drawing F33, and the integration list L31 are sent from the production preparation system S30 to the factory S17, and based on these, the part W33 is produced from the material W32, and is used as a building unit and a site construction part. Sent to the site S14.
Furthermore, the assembly drawing F32 and the process drawing F33 are sent from the production preparation system S30 to the assembly worker S18, and on-site assembly is performed.
As a result, a building W34 corresponding to the order of the owner S12 is constructed at the site S14.
The above is the outline of the production preparation system S30.
[0036]
(Details of basic design system S20)
FIG. 3 shows the basic design system S20 in more detail.
As described above, the basic design system S20 includes the design design subsystem S21 that creates the drawings F21 to F26, the integration subsystem S22 that generates the integration list L21, the business order subsystem S23 that generates the purchase order L22 and the estimate L23. And a design element database S24 for storing design element information.
[0037]
Among them, the design design subsystem S21 generates a plan view section S211, a basic plan view section S212, a roof plan view section S213, a wiring diagram section S214, an elevation view section S215, and a perspective view in order to create the drawings F21 to F26. Figure section S216 is provided.
[0038]
Each section S211 to S214 creates each figure by selecting a part and specifying a position while viewing an image displayed on the screen by an external operation, as in the existing CAD system.
Among these, the sections S212 to S214 other than the plan view are referred to the information of the plan view F21 created earlier together with the external operation. For example, in the basic plan F22, the overall schematic shape is automatically set in accordance with the unit arrangement specified in the plan view F21, so that redundant input operations can be omitted.
[0039]
(Plan view section S211)
The plan view section S211 sets the plan shape and specifications of each level such as the first floor to the upper floor and the basement in the plan view F21 from the basic floor plan layout of the building W34.
As shown in FIG. 4, the plan view section S211 includes a housing subsection S211A and an interior / exterior subsection S211B.
[0040]
The housing subsection S211A includes a unit setting module S2111, an entrance setting module S2112, and a balcony setting module S2113.
The interior / exterior subsection S211B includes a grid setting module S2114, an outer wall setting module S2115, and a joinery setting module S2116.
[0041]
The unit setting module S2111 selects the type and size of the unit to be used for the blank plan view image V2110 displayed on the operation screen, and arranges the rectangles indicating the units, thereby determining the basic of the building. The unit configuration V2111 is set.
The unit to be used is selected from the design element database S24. There are standard units, floor height units, and balcony units. As dimensions, nominal dimensions such as 4, 5, and 6 module sizes are used.
As a result, design information (type, size, position, etc.) of the unit to be used is embedded in the plan view F21.
[0042]
The entrance setting module S2112 designates a region V2112 to be an entrance as part of the set unit configuration V2111. Thereby, the design information (area, type, etc.) for the entrance such as soil concrete construction is embedded in the designated entrance area V2112 of the plan view F21.
The balcony periphery setting module S2113 designates design information (type, size, position, etc.) of the accessory member V2113 such as a handrail or a support column in a portion set as a balcony. Thereby, the designated information is embedded in each part of the plan view F21.
[0043]
The grid setting module S2114 sets design information (type, position, etc.) of a grid (virtual lattice-like frame) V2114 that serves as a reference for positions where the interior and exterior are set inside and outside the unit arrangement V2111.
The outer wall setting module S2115 sets the outer wall V2115 along the outer periphery of the unit configuration V2111 and according to the grid V2114. At this time, the surface pattern of the outer wall is also set as a specification. In this setting, it is possible to select an automatic mode in which the outer periphery of the unit arrangement is automatically tracked and a manual mode in which operation is designated sequentially.
The joinery setting module S2116 sets design information (types, specifications, dimensions, positions, etc.) related to equipment V2116 such as windows, doors, kitchens, toilets, and bath units in the unit configuration V2111 according to the grid V2114. .
[0044]
In each setting, the types and specifications of the parts and structures that can be used in the design information, installation rules, and the like are appropriately selected by referring to the design element database S24. For example, when placing units on the screen, a list of units is displayed in a separate window, and when setting the entrance, only the structure for the corner is presented in the case of the corner of the building. Yes.
The floor plan F21 is linked with more detailed information about each stored in the design element database S24 according to the designation of the unit or equipment embedded in each setting, and thereby the basic design information of the building Is to be created.
[0045]
(Foundation plan section S212)
The foundation plan section S212 sets the foundation design information of the building W34 in the foundation plan F22.
As shown in FIG. 5, the basic plan section S212 includes a basic setting module S2121, an entrance setting module S2122, a top setting module S2123, a special top setting module S2124, an independent basic setting module S2125, and an auxiliary setting module S2126. It is configured.
[0046]
The basic setting module S2121 sets the basic foundation V2121 with reference to the plan view F21 for the blank basic sketch image V2120 displayed on the operation screen.
The basic foundation shape setting is, for example, setting a continuous fabric foundation at a position corresponding to the outer periphery of the unit configuration V2111 in the plan view F21. Also, soil concrete is set in the designated area as needed.
[0047]
The entrance setting module S2122 designates the inter-soil concrete V2122 according to the entrance area V2112 designated in the plan view F21.
The top edge setting module S2123 designates the basic cloth foundation upper end height of the foundation V2121 set in advance.
The height of the basic shape V2121 is often the same height as a whole, but some areas may be set to different heights. In such a case, the area and height are designated. .
The special top edge setting module S2124 designates a region V2124 different from the basic cloth foundation upper end height of the foundation V2121 set in advance, and designates the height thereof.
[0048]
The independent foundation setting module S2125 sets the independent foundation V2125 inside or outside the foundation V2121. The independent foundation V2125 is appropriately installed in order to support the long side lower beam of the relatively large unit, and is appropriately designated at a position along the unit long side of the inner portion of the foundation shape V2121.
The auxiliary setting module S2126 performs setting of auxiliary parts such as a sheath can for joining an anchor bolt of the unit to each part of the foundation V2121 and an inspection port penetrating the cloth foundation portion of the foundation V2121 and the structure V2126.
[0049]
In each of these settings, as in the plan view creation, the usable parts, structure types, specifications, installation rules, and the like in the design information are appropriately selected by referring to the design element database S24.
The basic plan F22 is linked with more detailed information about each of the elements stored in the design element database S24 by designating the foundation structure embedded by each setting, etc., thereby creating design information about the foundation of the building. It has come to be.
[0050]
(Roof plan section S213)
The roof plan section S213 sets the design information of the roof of the building W34 in the roof plan F23.
As shown in FIG. 6, the roof plan section S213 includes a roof shape setting module S2131 and a fence setting module S2132.
[0051]
The roof shape setting module S2131 includes a standard program S2133, a replacement program S2134, a program editing unit S2135, an execution program S2136, and a program execution unit S2137.
The standard program S2133 is a series of operations (for example, a plan view) for displaying a setting module necessary for setting the shape, dimensions, and specifications of each part of the roof type (for example, a dormitory type) designated as a standard (for example, a plan view) This is a program that reads the building outline from F21, displays it on the screen, displays an auxiliary line corresponding to the outline, and processes various operations such as accepting a building line position input.
[0052]
The replacement program S2134 sets a different roof type (eave edge cut type dormitory type, trapezoid unit type dormitory type, gable type, etc.) by replacing a part of the standard program (partnership type) standard program S2133. For example, a combination of target information indicating a replacement target portion of the standard program S2133 and replacement information indicating program content to be replaced together with identification information such as a roof type name. ing.
[0053]
The program editing unit S2135 generates an execution program S2136 from the standard program S2133 and the replacement program S2134 based on the designation of the roof type input from the outside. Specifically, if the designated roof type is a standard dormitory type, the standard program S2133 is directly used as the execution program S2136. On the other hand, if the designated roof type is a format other than the standard, the identification information corresponding to the designated format is retrieved from the replacement program S2134, the replacement information and the target information to which this identification information is attached is extracted, and the standard program S2133 is retrieved. Editing is performed by replacing the part specified by the target information with the replacement information, and the execution program S2136 is obtained.
[0054]
The program execution unit S2137 executes the edited execution program S2136, thereby performing a predetermined display on the operation screen and accepting an operation input, thereby setting design information of the roof V2131 of the previously specified type. It is.
[0055]
The fence setting module S2132 displays the image of the roof V2131 on the operation screen, receives designation of the type of fence (outer fence, inner fence, etc.), and goes around the outer periphery of the roof V2131 with the designated type of eaves V2132. Automatically set to Furthermore, it is possible to specify a downspout position by external input and set up information on downspout along the outer wall of the building.
[0056]
In the wiring diagram section S214, for each level of the plan view F21, among the facilities specified in the plan view F21, those that require water supply / drainage (bathrooms, toilets, kitchens, air conditioners, etc.) and those that require electrical wiring ( For lighting, stationary electrical appliances, wall switches, outlets, etc.), the necessary piping and wiring are designated in the building housing. A designation method or the like conforming to an existing CAD system is used.
[0057]
The elevation section S215 automatically generates an elevation F25 of the building based on the design information of the plan view F21 and the roof plan F23. Specifically, the external shape is taken out from the plan view F21 and the roof plan F23, the position and specifications of the specified exterior (window sash, vertical shaft, etc.) are read out, the pattern etc. are read out from the specifications of the outer wall, and the building Create elevations in each direction. For these series of processes, the one conforming to the existing CAD system is used.
[0058]
The perspective view section S216 automatically generates a perspective view F26 of the building based on the design information of the plan view F21 and the roof plan F23 as in the elevation view section S215. This perspective diagram creation process is also based on an existing CAD system.
[0059]
The plan view F21 to the perspective view F26 are created by the sections S211 to S216 described above. Of these, the drawings F21 to F24 except for the elevation F25 and the perspective F26 are sent to the accumulation subsystem S22 and the business subsystem S23, and the accumulation list L21, the purchase order L22, and the estimate L23 are created.
[0060]
Based on the design information set in the plan view F21, the basic plan view F22, the roof plan view F23, and the wiring diagram F24, the integration subsystem S22 determines the necessary parts (for example, what the outer wall panel of the specified outer wall specification is. The number of necessary parts or the parts necessary for the installation of the designated air conditioner, etc.) is listed to make an integration list L21, and the subtotal or total of the price is calculated. At this time, the design element database S24 is referred to when selecting a part to be used or selecting an accompanying part.
[0061]
The business subsystem S23 collects necessary orders and the like based on the information in the plan view F21 to the wiring diagram F24 and the integration list L21, and creates a purchase order L22 for the basic builder S13 and the production preparation system S30. Then, an estimate L23 to be presented to the client S12 is created and an order is placed.
That is, the foundation plan S212 and the purchase order L22 are sent to the foundation builder S13, the plan view F21, the elevation F25, the perspective view F26, and the estimate L23 are sent to the client S12 via the sales staff S11, and the plan view F21. The roof plan F23, the wiring diagram F24, the integration list L21, and the purchase order L22 are sent to the production preparation system S30.
The plan view F21, roof plan F23, wiring diagram F24, and integration list L21 sent to the production preparation system S30 are the basic design information W22.
[0062]
(Details of production preparation system S30)
FIG. 7 shows the production preparation system S30 in more detail.
As described above, the production preparation system S30 includes the production design subsystem S31 that creates the production drawing F30 (part drawing F31, assembly drawing F32, and process drawing F33) from the basic design information W22, and the integration list L31 from the production drawing F30. The system includes a purchase / order integration subsystem S32 for creating a purchase order L32, and a design element database S33 for storing design element information referred to in each processing.
The component drawing F31 is a drawing related to a single component, and includes a diagram showing an instruction to attach to another member. The assembly drawing F32 is a drawing related to a part assembled from a plurality of single items, and includes a combination state of each single item, an explanation of an assembly procedure, and the like. The process diagram F33 is a drawing related to the entire assembly, and includes contents similar to manuals for factory construction and on-site construction.
[0063]
(Production design subsystem S31)
The production design subsystem S31 includes a building production design section S311 for creating a production drawing F30 for a building frame part, a roof production design section S312 for creating a production drawing F30 for a roof part, and production drawings relating to parts and equipment installed in each part of the building. A part production design section S313 for creating F30 is provided.
Each section S311 to S313 creates each figure by selecting a part and specifying a position while viewing an image displayed on the screen by an external operation as in the existing CAD system.
[0064]
(Body production design section S311)
The frame production design section S311 refers to the design element database S33, and includes building units at each level of the building W34 from the basic design information W22, parts such as frames and outer wall panels, sashes, and interior / exterior components constituting each unit, and parts. The sub-components are sequentially developed in detail, and each is designed in detail to produce a production drawing F30 (component drawing F31, assembly drawing F32, process drawing F33).
[0065]
As shown in FIG. 8, the chassis production design section S311 includes an outer wall panel deployment module S3111, a standard unit deployment module S3112, a special unit deployment module S3113, a front door unit deployment module S3114, a chassis packaging member deployment module S3115, and a chassis shipping member deployment module. In addition to S3116, an integration data creation module S3117 and a component data registration module S3118 are provided.
[0066]
As shown in FIG. 9, the outer wall panel expansion module S3111 reads out the layout V3101 of each building unit from the basic design information W22, sorts out the unit V3103 to which the outer wall V3102 is mounted, and puts it on the outer wall portion of each sorted unit V3103. The outer wall panel V3104 having the specification designated by the basic design information W22 is assigned. At this time, when a window sash or the like is arranged based on the basic design information W22, processing such as arranging a small outer wall panel around the window sash is performed. Thus, the part code of the outer wall panel and the accompanying mounting bracket used for each unit is determined, and the part drawing F31 of each part, the assembly drawing F32 showing the assembly state, the production or assembly procedure of the part, etc. are shown. The production drawing F30 is set as the process drawing F33.
[0067]
The standard unit expansion module S3112 reads the specifications of each unit from the basic design information W22, and performs component expansion for those designated as standard units. Here, the standard unit is a rectangular parallelepiped unit having a standard height, floor height, and floor height, and excludes trapezoidal units, setback units, and the like. However, even if it is a standard unit, the unit where the entrance is specified is also excluded.
As shown in FIG. 9, for the component development, the external dimensions and required strength of the frame V3105 are determined from the basic design information W22 for the sequentially selected unit V3103, and this frame V3105 is used for the wife panel, ceiling panel, floor panel, etc. It expands to a parent part V3106, and further expands to a child part V3107 such as a steel material that satisfies the above-mentioned dimensions and strength conditions. Then, for each unit, the part drawing F31, assembly drawing F32, and process drawing F33 at the parent part and child part level are collectively set in the production drawing F30.
[0068]
The special unit expansion module S3113 performs component expansion related to a unit that requires a special structure and setting, such as a trapezoidal unit and a setback unit. In this module, different settings are added for each special unit. Basically, the production drawing F30 is set in the same procedure as the parts development of the standard unit described above.
[0069]
The entrance unit expansion module S3114 performs component expansion related to a unit that requires a special structure and setting regarding the entrance. In this module, different settings are added depending on the specifications of the entrance, but basically, the production drawing F30 is set in the same procedure as the parts development of the standard unit described above.
[0070]
The frame outfitting member deployment module S3115 reads out the component information installed in the building from the basic design information W22, develops details about the components installed in each unit at the factory construction stage, and assists necessary for the assembly The parts are developed, and each part drawing F31, assembly drawing F32, and process drawing F33 are collected. Here, the housing equipment member is, for example, a kitchen unit, a bath unit, a lighting fixture, a storage fixture, an air conditioner, or the like (for example, component V3108 in FIG. 9) that can be accommodated in the unit.
[0071]
The chassis shipping member expansion module S3116 reads out information on the parts installed in the building from the basic design information W22, develops details about parts not installed in each unit at the factory construction stage, and auxiliary parts necessary for the assembly. The parts diagram F31, the assembly diagram F32, and the process diagram F33 are collected. Here, the chassis shipping member is a component (for example, the component V3109 in FIG. 9) straddling between the units such as a unit joint material, a sealing material, and a piping pipe, or a material suitable for on-site construction such as wallpaper and finishing material. It is. These chassis shipping members are shipped to the site together with the unit, and are constructed at the time of on-site assembly.
[0072]
The integration data creation module S3117 creates integration data by collecting the part codes and the number of each component set in the production drawing F30 created by each development module S3111 to S3116. This integration data is used for the integration work in the ordering / acquisition integration subsystem S321.
[0073]
The part data registration module S3118 designs a combination of child parts that are not registered in the design element database S33 but are frequently used as a new parent part combination while the production drawing F30 is created by each of the development modules S3111 to S3116. This is automatically added to the element database S33.
[0074]
(Roof production design section S312)
The roof production design section S312 is sequentially referred to the design element database S33, and the basic design information W22 to the parent parts such as the roof panel and the support structure that constitute the roof of the building W34 and the child parts that constitute each part in order. It develops and designs each in detail to produce a production drawing F30 (parts drawing F31, assembly drawing F32, process drawing F33).
[0075]
As shown in FIG. 10, the roof production design section S312 includes a roof information input module S3121, a roof shape drawing creation module S3122, a roof panel allocation execution module S3123, and a special shape information input module S3124, and a roof panel deployment module S3125, A joint hardware development module S3126, a vertical parts development module S3127, a cabin panel development module S3128, and an auxiliary parts development module S3129 are provided.
[0076]
The roof information input module S3121 reads basic design information related to the roof of the building from the basic design information W22. At this time, the information to be referred to is mainly the roof plan F23, but the plan view F21 is also referred to in order to obtain a frame structure (mainly unit arrangement) that supports the roof.
The roof shape drawing creation module S3122 automatically draws the roof shape V3122 on the blank plan view image V3120 displayed on the operation screen based on the roof design information read out by the roof information input module S3121. .
[0077]
The roof panel allocation execution module S3123 identifies the outer peripheral contour shape, the climbing ridge line, and the like from the roof design information read out by the roof information input module S3121, and based on the roof panel allocation rule registered in the design element database S33. The setting of the roof panel allocation V3123 suitable for configuring the roof specified by the basic design information W22 is automatically performed.
The special shape information input module S3124 designates the special shape V3124 such as a dormer or skylight designated in the basic design information W22 on the screen.
[0078]
The roof panel expansion module S3125 expands the structure and parts for each roof panel based on the specification specified by the layout V3123 and the basic design information W22 set in the roof panel allocation execution module S3123, and the part code of the part to be used Are set in the production drawing F30 as a part drawing F31 of each part, an assembly drawing F32 showing the assembly state, and a process drawing F33 showing a production or assembly procedure of the part.
[0079]
The joint hardware development module S3126 develops joint components necessary for joining the roof panels based on the structure of the roof panel set in the roof panel development module S3125 and the assignment V3123 set in the roof panel assignment execution module S3123. And set the production drawing F30 in the same manner as the roof panel.
Here, the joining component is a panel joining hardware that joins roof panels, an outer periphery joining hardware that joins the roof panel and the cabin panel, a stigma joining hardware that joins the units of the roof frame, and the like.
[0080]
The vertical component deployment module S3127 deploys the vertical components necessary for supporting each roof panel based on the structure of the roof panel set in the roof panel deployment module S3125 and the allocation V3123 set in the roof panel allocation execution module S3123. And set the production drawing F30 in the same manner as the roof panel.
Here, the vertical part is a bundle, brace, valley or the like that supports or reinforces the roof panel.
[0081]
The hut panel development module S3128 is based on the structure of the roof panel set in the roof panel development module S3125, the layout V3123 set in the roof panel allocation execution module S3123, and the basic design information W22. The structure and parts of the hut panel which is arranged on the upper surface of the part and becomes the base of the roof structure are developed and set in the production drawing F30 in the same manner as the roof panel. At this time, the allocation of the hut panel conforms to the unit allocation of the uppermost floor portion of the frame, and is deployed to the child parts for each allocated hut panel.
[0082]
The auxiliary part deployment module S3129 is based on the structure of the roof panel set in the roof panel deployment module S3125, the layout V3123 set in the roof panel allocation execution module S3123, and the basic design information W22, and the eaves such as a bag and a nose cover Auxiliary parts such as parts, eaves parts such as eave parts, finishing materials and other roof auxiliary materials are developed and set in the production drawing F30 like the roof panel.
Although not shown, the roof production design section S312 is provided with an accumulation data creation module and a part data registration module similar to the housing production design section S311 and outputs the accumulation data L31.
[0083]
(Parts production design section S313)
The parts production design section S313 performs detailed production design for parts handled as one set in the housing production design section S311 and the roof production design section S312. Such parts are mainly parts that are easily noticed indoors, such as interiors, interior parts, partitions, and equipment, or parts that are largely related to residents as a function.
At the time of designing, the type of the designated part is determined with reference to the position and form of the attachment site and the specification according to the client order, and the part drawing F31 and the assembly drawing F32 are created.
[0084]
In addition, the parts production design section S313 is necessary if the basic design information W22 does not have a part with a corresponding specification or the like in the design element database S33 when designing in the housing production design section S311 and the roof production design section S312. In response to this, a part having a detailed specification is designed in detail, and a process of additionally registering it in the design element database S33 is performed.
However, such processing is rare with normal parts, and is performed exclusively for partitions with a wide variety of types.
[0085]
(Ordering / Accumulating Subsystem S32)
The order integration subsystem S32 refers to the integration section S321 that creates the integration list L31 by referring to the integration data set in the production design subsystem S31, the integration list L31 that is generated in the integration section S321, and the like. The business order section S322 and the factory order section S323 for creating the purchase order L32 are provided.
Each of the sections S311 to S313 is the same as an integration system using an existing computer or an order management system.
[0086]
The integration section S321 includes subparts and materials necessary for producing each part shown in the production drawing F30 by each section based on the integration data sent from each section S311 to S313 of the production design subsystem S31. The list is compiled and an integration list L31 is created together with information such as prices.
The sales order section S322 creates a purchase order L32 for a supplier (including an external supplier that produces child parts) that supplies materials for parts production based on the integration list L31 created in the integration section S321. This information is sent to the material supplier together with the integration list L31 in which information on the corresponding material is described.
The factory ordering / ordering section S323 creates a purchase order L32 for a factory that executes parts production based on the integration list L31 created in the integration section S321, and the factory together with the integration list L31 that describes the information of the corresponding parts. To send to.
[0087]
Hereinafter, the effect of the present embodiment will be described.
(Effect of overall structure)
In the unit building CAD system S10 of the present embodiment, basic design related to the outline of the building can be first performed by the basic design system S20, and detailed production design necessary for production can be performed by the subsequent production preparation system S30.
In other words, the basic design system S20 is used to design the outline of the basic unit layout of the building (the shape and specifications of the parts visible to the client S12, the functions requested by the client, etc.), meet with the client, and accept the order. Necessary minimum items representing a building can be collected as basic design information W22.
In addition, details corresponding to the contents determined in the basic design (structure and parts configuration invisible to the owner) are designed by the production preparation system S30, and the information such as the production drawing F30 and the integration list L31 necessary for factory production is designed. Can be summarized.
[0088]
Therefore, the part where the design change is repeated by the client meeting can be simplified, the work load of the repeated part can be reduced, and complicated production design such as the unit level can be performed only once after the basic design is compiled. It becomes better and can handle custom homes that need to be individually designed.
In addition, the basic design is mainly an outline design, so even if there is a repetitive work, the load is light and the heavy load design can be avoided. The system can be configured.
[0089]
(Effects of design element databases S24 and S33)
In the basic design system S20 to the production preparation system S30, reference is made to the design element databases S24 and S33 in which common design element information is registered, and each design is performed based on a common design standard, thereby setting the basic design. However, it is possible to avoid inconveniences such as inability to cope with production design, and to reduce the amount of information and processing load by coding and packaging parts and structures.
In addition, since the design element databases S24 and S33 are registered on the production preparation system S30 side and transferred to the basic design system S20, rules and the like for avoiding difficult production parts can be incorporated in the registered contents in advance. Even if the basic design and the production design are divided, the design or production can be performed reliably.
[0090]
In addition, in the design element databases S24 and S33, it can be used in advance because it can be added and registered sequentially by the production design subsystem S31 when “specific parts are not specified” although “registered as rules”. Registration of parts having low characteristics can be omitted, and can be added according to necessity and usage frequency, and the design element databases S24 and S33 can be made compact. As a result, the equipment such as the storage device can be simplified and the cost can be reduced, and the maintainability of the registered contents can be improved.
[0091]
(Overall effect of basic design system S20)
The basic design system S20 is composed of the design design subsystem S21, the integration subsystem S22, and the business subsystem S23, thereby efficiently performing operations such as progress management as well as the creation of basic design information W22 including diagram information and integration information. be able to.
That is, by designing the plan view F21, the basic plan view F22, the roof plan view F23, and the wiring diagram F24 by the design design subsystem S21, the elevation view F25 and the perspective view F26 necessary for the meeting with the client S12 can be obtained. Can be created automatically.
[0092]
In particular, in the design design subsystem S21, the basic plan F22, the roof plan F23, and the wiring diagram F24 are basically designed (unit layout, outer shape, floor plan, layout of equipment, etc.). Since the information is automatically referred to, it is possible to save the duplication of operations for the same setting and to easily ensure the consistency and consistency of the design information.
The integration subsystem S22 can automatically create the integration list L21 with reference to the design information of the plan view F21 to the wiring diagram F24, and the work subsystem S23 can estimate the estimate L23 for the client S12, the basic builder S13, and the like. A purchase order L22 for the production preparation system S30 can also be automatically created.
[0093]
(Effect of the plan view section S211 of the basic design system S20)
In the plan view section S211 of the basic design system S20, the unit setting, the entrance setting, and the balcony peripheral setting are sequentially processed to set the frame, and the grid setting, the outer wall setting, and the fitting setting are sequentially processed to set the interior and exterior settings. It can be performed.
[0094]
In particular, in the housing subsection S211A, the entrance setting module S2112 is executed after the basic unit setting module S2111, thereby processing the setting of the entrance part that requires special processing such as dirt and rising walls separately from the unit setting. can do.
For this reason, even if it is a part that should be the entrance, the setting related to the unit of the part can be processed by the unit setting module S2111 of the previous stage in the same way as other parts, or the previous stage for setting the entrance dedicated unit, etc. Inconveniences such as complication of the unit setting module S2111 can be avoided.
[0095]
In the interior / exterior subsection S211B, the grid setting module S2114 can set a grid indicating the reference position on the previously set unit arrangement. Since the interior and exterior are set based on this grid, accurate position setting based on the grid can be performed without specifying detailed position dimensions or the like.
Furthermore, by providing the outer wall setting module S2115 separately from the fitting setting module S2116 for setting the fitting, it is possible to reliably and easily set the outer wall panel having a large processing difference from the other interior and exterior.
[0096]
(Effects of basic plan section S212 of basic design system S20)
In the basic plan section S212 of the basic design system S20, the area is determined by the basic setting of the foundation and the entrance setting, the normal and special top ends are set, the independent foundation and the auxiliary setting are performed, and the foundation Design can be done.
[0097]
In particular, after the overall cloth foundation is set in the basic setting module S2121, the entrance setting module S2122 is executed, so that the setting of the entrance part that requires special processing such as a dirt floor and a rising fence is separated from the basic setting. Can be processed.
In addition, by setting the overall cloth foundation in the basic setting module S2121 and then executing the independent foundation setting module S2125, it is possible to appropriately set an independent foundation that has presence / absence of installation unlike the cloth foundation. .
For this reason, in the basic setting module S2121, comprehensive and continuous basic setting can be performed without considering the entrance and independent foundation, and automation can be easily promoted by simplifying the processing.
[0098]
Further, after the basic top edge height is set by the top edge setting module S2123, the special top edge setting module S2124 is used to set the top height of a special portion, so that the processing of the top edge setting module S2123 is performed. The special top can also be set reliably.
[0099]
(Effect of roof plan map section S213 of basic design system S20)
In the roof plan section S213 of the basic design system S20, the basic shape of the roof can be set by the roof shape setting module S2131 and the eaves setting and the vertical setting can be set by the subsequent setting setting module S2132.
[0100]
In particular, in the roof shape setting module S2131, a standard program S2133 and a replacement program S2134 are prepared, and by replacing a part of the standard program with a replacement program according to the roof shape, various roof shapes other than the standard can be supported. Compared with the case where a complete execution program is prepared for each roof shape, the program size can be made compact, and maintenance can be improved by sharing a common part.
[0101]
(Overall effect of production preparation system S30)
The production preparation system S30 is configured by the production design subsystem S31 and the order placement / acquisition integration subsystem S32, so that it is possible to efficiently perform operations such as detailed design or production ordering for production.
In particular, by designing in detail the contents set in the basic design information W22 by the production design subsystem S31, the production drawing F30 (parts drawing F31, assembly) required for production at the factory S17 and ordering to the material supplier S16. FIG. F32 and process diagram F33) can be automatically created.
At this time, in the production design subsystem S31, it is possible to separately process the frame and the roof, which are significantly different in processing contents, by configuring the frame production design section S311, the roof production design section S312 and the part production design section S313. Parts used in each can be further processed separately.
The ordering / subtracting integration subsystem S32 can automatically create an integration list L31 with reference to the production drawing F30, and can also automatically create an order sheet L32 for the material supplier S16 and the factory S17.
[0102]
(Effects of manual preparation for production preparation system S30)
In the production preparation system S30, the production design subsystem S31 produces a production manual (process diagram F33) for the relevant parts together with the parts drawing F31 and the assembly drawing F32, thereby making it easy and reliable for the construction work in the factory or on-site. Can be.
In particular, in the production design subsystem S31, manuals corresponding to the parts used in the building are selected and distributed to the factory or the site. Redundancy such as using corresponding manuals can be eliminated, and work can be performed easily and efficiently by reliably supplying the necessary manuals.
[0103]
(Effect of chassis production design section S311 of production preparation system S30)
In the housing production design section S311 of the production preparation system S30, the details of the unit part can be designed by sequentially processing the outer wall panel expansion, standard unit expansion, special unit expansion, and entrance unit expansion. It is possible to carry out detailed design up to the parts that are fitted to the unit or shipped together with the unit by deploying the shipped parts.
[0104]
In particular, by dividing the standard unit expansion module S3112 for processing general standard units from the special unit expansion module S3113 for processing other special units, a large number of standard units are optimized for the unit. By performing the processing, the overall processing efficiency can be increased. On the other hand, the special unit expansion module S3113 can reliably cope with a large number of parameter settings required for the special unit.
[0105]
Further, by providing the entrance unit expansion module S3114 separately from the unit expansion modules S3112 and S3113, the setting of the entrance portion that requires special processing such as the dirt and the rising wall is processed separately from the standard and special unit settings. It is possible to provide a reliable response regardless of whether the unit on which the entrance is formed is standard or special.
Further, prior to the processing of each unit expansion module S3112 to S3114, the outer wall panel expansion module S3111 performs expansion of the outer wall panel that is appropriately attached to each unit, so that a specific outer wall support structure is included in each unit expansion. Detailed design can be done.
[0106]
In the chassis production design section S311, after the unit development described above, the parts to be outfitted in the factory S17 are developed by the body outfitting part development module S3115, and the parts are shipped together with the unit without the outfitting construction by the body shipping member development module S3116. The member to be developed can be developed.
By separating these outfitting parts and shipping members, the main body outfitting parts deployment module S3115 can perform processing in units, and the outfitting shipping parts deployment module S3116 can process members between units in units of buildings. , Reliable processing can be performed.
[0107]
Also, in the chassis production design section S311, the next ordering / subtracting integration sub is created by creating the integration data L31 in the integration data creation module S3117 based on the production drawing F30 developed in each of the modules S3111 to S3116 described above. Processing in the system S312 can be facilitated.
Further, the parts data registration module S3118 can be additionally registered in the above-described design element database S33 as necessary based on the production design information W31 including the production drawing F30 and the integration data L31.
[0108]
(Effect of roof production design section S312 of production preparation system S30)
In the roof production design section S312 of the production preparation system S30, after designing the basic shape of the roof, the detailed design of the roof can be performed by developing the parts of the details constituting the roof shape.
Among these, in the design of the basic shape of the roof, the basic shape of the roof can be obtained by drawing in the roof shape drawing creation module S3122 based on the basic design information W22 input in the roof information input module S3121.
[0109]
Further, the roof panel allocation execution module S3123 can appropriately allocate the roof panels constituting the basic shape of the roof based on the rules registered in the design element database S33.
For this reason, even if the shape of a roof is various, the allocated roof panel can be made into parts which are easy to produce and transport, respectively.
[0110]
These roof information input and roof panel allocation execution processes do not require input of new design information, and can be automatically executed as a series of processes.
The special shape information input module S3124 can reliably perform special processing that cannot be automated or setting of special parts.
[0111]
On the other hand, in the detailed parts development, since the roof panel development module S3125, the joint hardware development module S3126, the vertical part development module S3127, the hut panel development module S3128, and the auxiliary part development module S3129 are shared, they are sequentially or in parallel. Can be processed.
[0112]
In addition, this invention is not limited to the said Example, The deformation | transformation etc. in the range which can achieve the objective of this invention are included in this invention.
That is, in the configuration of the system described above, the format and scale of the computer system to be used may be selected as appropriate in the implementation, and the format and type of the input / output device are the same.
[0113]
In addition, the above-described system on the computer system may be realized based on the functions disclosed in the above-described embodiments using existing computer technology, and a specific algorithm, operation screen, or output information What is necessary is just to select a design etc. suitably.
Further, the specific format and contents of the basic design information W22 and the production design information W31 input / output by the system described above may be selected as appropriate in the implementation, and the same applies to the design element databases S24 and S33.
[0114]
In terms of designing the unit building, it is only necessary to output a drawing, a parts list, and the like necessary for the design, and functions for creating the estimate sheet L23, the order sheet L32, and the like may be omitted as appropriate.
Furthermore, in the said Example, in order to construct a foundation in the field, the foundation plan F23 created by basic design system S20 was sent to the field, but when using a prefabricated foundation etc. which arranges a precast concrete block, a foundation plan is used. F23 may also be sent to the production design system S30 to perform detailed design of the prefabricated foundation parts.
[0115]
【The invention's effect】
As described above, according to the present invention, the basic design for the shape and specifications of the portion that can be seen by the client, the functions requested by the client, etc. In addition to collecting the minimum necessary items that represent the building according to the order, we will produce the production design related to the details and the structure of the parts that the client cannot see, such as the details that correspond to the contents decided in the basic design, Drawings and information necessary for factory production can be compiled.
Therefore, the part where the design change is repeated by the client meeting can be simplified, the work load of the repeated part can be reduced, and complicated production design such as the unit level can be performed only once after the basic design is compiled. It becomes better and can accommodate custom homes that need to be individually designed.
[0116]
In addition, the basic design is mainly an outline design, so even if there is a repetitive work, the load is light and the heavy load design can be avoided. The system can be configured.
Furthermore, by configuring the production preparation system with the production design department and the order placement and integration part, it will be possible to efficiently carry out operations such as detailed design for production or cumulative ordering. It is possible to improve efficiency by processing each category of parts.
[0117]
In particular, in the production design department, the sections of the housing production design, the roof production design, and the part production design are made independent, so that each of them can be processed in parallel, and further efficiency is achieved.
In addition, the integration process can be efficiently and accurately performed by creating integration data when creating each production drawing and using it for integration in the integration section.
[0118]
In addition, the basic design and production design each refer to the common design element database and perform each design based on the common design criteria. This can be avoided, and the amount of information and processing load can be reduced by coding and packaging parts and structures.
Furthermore, in the production preparation system, it is possible to improve the efficiency of construction work or ensure the supply of manuals by creating a production manual for the relevant parts together with production drawings and integration lists.
[Brief description of the drawings]
FIG. 1 is a schematic view showing the whole of an embodiment of the present invention.
FIG. 2 is a flowchart showing an outline of a design procedure of the embodiment.
FIG. 3 is a block diagram showing a configuration of a basic design system of the embodiment.
FIG. 4 is a block diagram showing a configuration of a plan view section of the embodiment.
FIG. 5 is a block diagram showing a configuration of a basic plan view section of the embodiment.
6 is a block diagram showing a configuration of a roof plan section of the embodiment. FIG.
FIG. 7 is a block diagram showing the configuration of the production preparation system of the embodiment.
FIG. 8 is a block diagram showing a configuration of a housing production design section of the embodiment.
FIG. 9 is a schematic diagram showing processing of the production preparation system of the embodiment.
FIG. 10 is a block diagram showing a configuration of a roof production design section of the embodiment.
FIG. 11 is a block diagram showing a configuration of a design element database according to the embodiment.
[Explanation of symbols]
S10 CAD system for unit building
S12 Client
S14 site
S17 factory
S20 Basic design system
S21 Design design subsystem
S211 Plan view section
S212 Basic plan section
S213 roof plan section
S214 Wiring diagram section
S215 Elevation section
S216 Perspective section
S22 Integration subsystem
S23 Business subsystem
S24 Design element database
S30 Production preparation system
S31 Production design subsystem
S311 Housing Production Design Section
S312 Roof production design section
S313 Parts production design section
S32 Order Accumulation Subsystem
S321 Integration section
S322 Sales order section
S323 Factory order section
S33 Design element database
F21 Plan view
F22 Foundation plan
F23 roof plan
F24 Wiring diagram
F25 elevation
F26 Perth diagram
F30 production drawings
F31 Parts drawing
F32 assembly drawing
Construction drawing that is F33 manual
L21 Integration list
L22 Purchase order
L23 estimate
L31 totalization list
L32 purchase order
W21 basics
W22 Basic design information
W31 production design information
W33 parts
W34 Building

Claims (6)

複数の建物ユニットを組み立てて建設されるユニット建物の設計を行うためのユニット建物用CADシステムであって、
前記建物の形状および前記建物内におけるユニット配置を指定する基本設計情報を作成する基本設計システムと、前記基本設計情報に基づいて前記建物および各建物ユニット毎の構造および部品構成を含む生産設計情報を作成する生産準備システムとで構成され、
前記基本設計システムは、標準に設定された屋根種別を設定するために必要な設定モジュールを画面表示ないし入力操作受付する標準プログラムと、この標準プログラムの一部を差し替えることで前記標準に設定された屋根種別とは異なる屋根種別を設定するための動作プログラムを生成する差し替えプログラムと、外部入力された屋根種別の指定に基づいて前記標準プログラムおよび前記差し替えプログラムから実行プログラムを生成するプログラム編集部と、前記実行プログラムを実行して前記指定された種別の屋根の設計情報を設定するプログラム実行部と、で構成された屋根形状設定モジュールを含み、
前記生産準備システムは、前記基本設計情報に基づいて各建物ユニットの細部構造および部品構成を設計しかつ躯体、屋根、その他の部品の区分毎に当該各建物ユニットないしその構成部品の生産図面を作成する生産設計部と、前記生産図面に基づいて各建物ユニットおよび各部品の積算リストを作成しかつ当該積算リストおよび前記生産図面に基づいて各建物ユニットおよび各部品の生産および受発注を管理する受発注積算部とで構成されていることを特徴とするユニット建物用CADシステム。
A unit building CAD system for designing a unit building constructed by assembling a plurality of building units,
Basic design system for creating basic design information for designating the shape of the building and unit arrangement in the building, and production design information including structure and component configuration for each building and each building unit based on the basic design information With production preparation system to create,
The basic design system is set to the standard by replacing a part of this standard program with a standard program for displaying a screen or accepting an input operation for a setting module necessary for setting a roof type set as a standard. A replacement program for generating an operation program for setting a roof type different from the roof type, and a program editing unit for generating an execution program from the standard program and the replacement program based on the designation of the roof type inputted externally, A program execution unit configured to execute the execution program and set the design information of the designated type of roof, and a roof shape setting module configured by:
The production preparation system designs the detailed structure and component configuration of each building unit based on the basic design information, and creates a production drawing of each building unit or its component for each category of frame, roof, and other components. A production design department that creates an integrated list of each building unit and each part based on the production drawing, and manages production and ordering of each building unit and each part based on the integrated list and the production drawing. A unit building CAD system characterized by comprising an order integrating unit.
請求項1に記載したユニット建物用CADシステムにおいて、前記生産設計部は、前記建物の躯体部分の生産図面を作成する躯体生産設計セクションと、前記建物の屋根部分の生産図面を作成する屋根生産設計セクションと、前記建物のその他の部品の生産図面を作成する部品生産設計セクションとを含んでいることを特徴とするユニット建物用CADシステム。2. The CAD system for unit buildings according to claim 1, wherein the production design unit includes a cabinet production design section for creating a production drawing of the building frame portion of the building, and a roof production design for creating a production drawing of the roof portion of the building. A CAD system for unit buildings comprising a section and a parts production design section for creating production drawings of other parts of the building. 請求項1または請求項2に記載したユニット建物用CADシステムにおいて、前記生産設計部は、前記生産図面とともに当該図面に使用する部品の積算情報を含む積算データを作成するものとされ、前記受発注積算部は、前記生産設計部で作成された積算データに基づいて積算リストを作成する積算セクションと、この積算リストに基づいて資材および部品の発注を行う受発注セクションとを含んでいることを特徴とするユニット建物用CADシステム。3. The unit building CAD system according to claim 1 or 2, wherein the production design unit creates integrated data including integrated information of parts used for the drawing together with the production drawing, The integration unit includes an integration section that creates an integration list based on the integration data created by the production design unit, and a receiving / ordering section that orders materials and parts based on the integration list. A CAD system for unit buildings. 請求項1から請求項3までの何れかに記載したユニット建物用CADシステムにおいて、前記生産準備システムにより作成されかつ前記基本設計システムにより参照される設計要素データベースを有し、この設計要素データベースは建物の設計にあたって遵守すべき設計ルールおよび選択可能な構造や形状等の要素リストを含むことを特徴とするユニット建物用CADシステム。4. The unit building CAD system according to claim 1, further comprising a design element database created by the production preparation system and referred to by the basic design system, wherein the design element database is a building. A CAD system for unit buildings, which includes a design rule to be observed in designing and a list of elements such as selectable structures and shapes. 請求項1から請求項4までの何れかに記載したユニット建物用CADシステムにおいて、前記生産準備システムは、前記各建物ユニットないし各部品の生産設計情報とともに当該各建物ユニットないし各部品の生産マニュアルおよび/または施工マニュアルを出力することを特徴とするユニット建物用CADシステム。The CAD system for unit buildings according to any one of claims 1 to 4, wherein the production preparation system includes a production manual for each building unit or each part together with production design information for each building unit or each part. A CAD system for unit buildings characterized by outputting a construction manual. 請求項1から請求項5までの何れかに記載したユニット建物用CADシステムにおいて、前記生産図面は、使用する個々の部品の生産に必要な詳細情報を示す部品図と、前記部品図に示された各部品の組み立て状態や関連を示す組立図と、前記部品の生産および組み立てに関するマニュアルを含む工程図とを含むことを特徴とするユニット建物用CADシステム。The CAD system for unit buildings according to any one of claims 1 to 5, wherein the production drawing is shown in a component diagram showing detailed information necessary for production of individual parts to be used, and the component diagram. A CAD system for unit buildings, comprising an assembly drawing showing an assembly state and relation of each component, and a process diagram including a manual regarding production and assembly of the component.
JP08112095A 1995-04-06 1995-04-06 CAD system for unit building Expired - Fee Related JP3738050B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP08112095A JP3738050B2 (en) 1995-04-06 1995-04-06 CAD system for unit building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP08112095A JP3738050B2 (en) 1995-04-06 1995-04-06 CAD system for unit building

Publications (2)

Publication Number Publication Date
JPH08278995A JPH08278995A (en) 1996-10-22
JP3738050B2 true JP3738050B2 (en) 2006-01-25

Family

ID=13737529

Family Applications (1)

Application Number Title Priority Date Filing Date
JP08112095A Expired - Fee Related JP3738050B2 (en) 1995-04-06 1995-04-06 CAD system for unit building

Country Status (1)

Country Link
JP (1) JP3738050B2 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001282862A (en) * 2000-03-28 2001-10-12 Daiwa House Ind Co Ltd Building design support system
JP2001282880A (en) * 2000-03-30 2001-10-12 Misawa Homes Co Ltd Virtual construction method for house, virtual construction system and recording medium
JP2003058732A (en) * 2001-08-14 2003-02-28 Nec Corp Product selling support system
JP2004288105A (en) * 2003-03-25 2004-10-14 Daiwa House Ind Co Ltd Detail determining device of member component
JP4605431B2 (en) * 2004-01-26 2011-01-05 積水ハウス株式会社 Information linkage system between drawing creation CAD and member development CAD
JP4750464B2 (en) * 2005-05-11 2011-08-17 株式会社竹中工務店 Building design support device and building design support program
US8620708B2 (en) 2007-11-09 2013-12-31 Hitachi-Ge Nuclear Energy, Ltd. Progress status management method, program, and progress status management device
JP4926923B2 (en) * 2007-11-20 2012-05-09 ミサワホーム株式会社 CAD system
JP4919180B2 (en) * 2010-06-11 2012-04-18 積水ハウス株式会社 Information linkage system between drawing creation CAD and member development CAD
JP6395091B2 (en) * 2014-09-12 2018-09-26 パナソニックIpマネジメント株式会社 Allocation device, program
JP7307846B1 (en) * 2022-09-29 2023-07-12 三晃金属工業株式会社 Roof integration support device and computer program

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0573626A (en) * 1991-06-12 1993-03-26 Misawa Homes Co Ltd Retrieval method for house design plan
JPH0652267A (en) * 1992-07-31 1994-02-25 Sekisui Chem Co Ltd Parts allocation system in unit building
JPH06195424A (en) * 1992-12-24 1994-07-15 O Ee Haujingu Sekkei:Kk Building plan selection plate and building drawing output device
JPH06337910A (en) * 1993-05-28 1994-12-06 Haseko Corp Drawing/information generating system in design, estimation and execution for interior finish work of multiple dwelling house

Also Published As

Publication number Publication date
JPH08278995A (en) 1996-10-22

Similar Documents

Publication Publication Date Title
JP3738050B2 (en) CAD system for unit building
US20210383033A1 (en) Structural construction system employing architectural modeling
CN110709848A (en) Intelligent planning
KR20150121699A (en) Method and system using standardized structural components
US20020066256A1 (en) Construction system for building housing and other shelters
JP3663222B2 (en) Unit building design method and unit building CAD system
JP7200459B2 (en) Design support device
Sacks et al. A project model for an automated building system: design and planning phases
JP3663225B2 (en) Unit building design method and unit building CAD system
JPH08190581A (en) Unit building design method and cad system for unit building
JPH10162050A (en) Building designing device and method therefor
JPH0822479A (en) Design supporting device for building
JPH08147339A (en) Cad system for roof of unit building
JPH08137931A (en) Method for designing base of unit building and cad system for base of unit building
JPH08147340A (en) Method and cad system for drawing foundation of unit buiding
JP2001147946A (en) Building designing device
JP3164950B2 (en) Member determination device
JP2004086788A (en) Construction drawing-less design method and building production method using the design method
JP3124894B2 (en) Building renovation support system
Johnson et al. Experimental building information models
JP2003242203A (en) Support system for building exterior member selection, and construction layout drawing and order preparation
JPH09170330A (en) Building reform cad cost estimation system
JP4037180B2 (en) Housing reform support device and support method
JP2003271675A (en) Wooden house structural member production data generating system
JPH06337910A (en) Drawing/information generating system in design, estimation and execution for interior finish work of multiple dwelling house

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050726

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050912

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20051025

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20051031

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091104

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091104

Year of fee payment: 4

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091104

Year of fee payment: 4

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091104

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101104

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101104

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111104

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121104

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131104

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees