JP3191635U - Rotating device for installed pile - Google Patents
Rotating device for installed pile Download PDFInfo
- Publication number
- JP3191635U JP3191635U JP2014002065U JP2014002065U JP3191635U JP 3191635 U JP3191635 U JP 3191635U JP 2014002065 U JP2014002065 U JP 2014002065U JP 2014002065 U JP2014002065 U JP 2014002065U JP 3191635 U JP3191635 U JP 3191635U
- Authority
- JP
- Japan
- Prior art keywords
- pile
- rod
- discharge
- connecting rod
- rotating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 claims abstract description 14
- 230000002093 peripheral effect Effects 0.000 claims description 11
- 238000003756 stirring Methods 0.000 claims description 7
- 230000015572 biosynthetic process Effects 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 abstract 1
- 239000007788 liquid Substances 0.000 description 30
- 238000009412 basement excavation Methods 0.000 description 26
- 238000000034 method Methods 0.000 description 12
- 239000003795 chemical substances by application Substances 0.000 description 11
- 238000010276 construction Methods 0.000 description 8
- 239000004568 cement Substances 0.000 description 7
- 239000008267 milk Substances 0.000 description 6
- 210000004080 milk Anatomy 0.000 description 6
- 235000013336 milk Nutrition 0.000 description 6
- 238000007596 consolidation process Methods 0.000 description 5
- 238000007599 discharging Methods 0.000 description 3
- 239000002689 soil Substances 0.000 description 3
- 239000013049 sediment Substances 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000009430 construction management Methods 0.000 description 1
- 238000010790 dilution Methods 0.000 description 1
- 239000012895 dilution Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Piles And Underground Anchors (AREA)
Abstract
【課題】設置した杭との接触もなく、杭頭上部(ヤットコ部)での固結体発生を防止するための設置杭の回転装置を提供する。【解決手段】オーガ駆動装置に接続する接続ロッド1と、設置する杭4に回転力と押込み力とを伝達するため杭頭部に被着される回転キャップ3と、前記接続ロッドと前記回転キャップとを連結する吐出ロッド2とからなる設置杭の回転装置であって、前記接続ロッドの中空部1Aと連続する前記吐出ロッドの中空部2Aの下端が、前記回転キャップ内の天版部5中央に開口する逆止弁7を備えた吐出口6としたことを特徴とする。【選択図】図1PROBLEM TO BE SOLVED: To provide a rotating device for an installed pile for preventing the formation of a consolidated body at an upper portion (yatco portion) of the pile head without contact with the installed pile. SOLUTION: A connecting rod 1 connected to an auger drive device, a rotating cap 3 attached to a pile head in order to transmit a rotational force and a pushing force to a pile 4 to be installed, the connecting rod and the rotating cap. A rotating device for an installation pile composed of a discharge rod 2 for connecting the above, and a lower end of the hollow portion 2A of the discharge rod continuous with the hollow portion 1A of the connection rod is the center of the top plate portion 5 in the rotary cap. The discharge port 6 is provided with a check valve 7 that opens to the outside. [Selection diagram] Fig. 1
Description
本考案は、プレボーリング埋込杭工法において、ヤットコ長が長い場合など、杭頭部上方にセメントミルク柱状固化体が形成されるのを防止できる設置杭の回転装置に関する。 The present invention relates to a rotating device for an installed pile that can prevent the formation of a cement milk columnar solidified body above a pile head, such as when the length of a Yatco is long in the pre-boring embedded pile method.
プレボーリング埋込杭工法は、オーガまたはロッド等の掘削装置で地盤を所定の深度まで掘削した後、この掘削孔に杭を建込み挿入する工法である。そして、地盤と建込んだ杭との一体性を確保するために、杭先端部には根固液が、杭体と掘削孔の間には杭周固定液がそれぞれ充填されている。 The pre-boring embedding pile method is a method of constructing and inserting a pile into this excavation hole after excavating the ground to a predetermined depth with an excavator such as an auger or a rod. And in order to ensure the integrity of the ground and the built pile, the root of the pile is filled with root solid liquid, and between the pile body and the excavation hole is filled with pile periphery fixing liquid.
これら根固液や杭周固定液としては、強度管理されたセメントミルク等が使用されており、掘削孔容積と孔内の掘削土砂量および杭体体積等によって充填量を算出している。しかし、土質や伏流水等の地盤条件は場所によって異なることから、目標とする充填液の固結強度も大きくばらつくことが知られている。 For these root solids and pile circumference fixing liquid, strength-controlled cement milk or the like is used, and the filling amount is calculated from the excavation hole volume, the amount of excavated sediment in the hole, the pile body volume, and the like. However, since ground conditions such as soil quality and underground water vary depending on the location, it is known that the consolidation strength of the target filling liquid varies greatly.
近年、高支持力杭工法の実績が増えるなか、充填液の固結強度に対する信頼性への要求も高くなっており、工法によっては充填液量を一定量増やして施工することが行われるようになった。しかし、充填液の量を増やすことで、逸水や希釈による充填液固結強度の低下は避けられるものの、杭頭部でのオーバーフローによる充填液の杭頭上方部の固結による残土処理量の増加が懸念される。 In recent years, as the results of the high bearing capacity pile method have increased, the demand for reliability of the consolidation strength of the filling liquid has also increased, and depending on the construction method, it is possible to perform construction with a certain amount of filling liquid. became. However, by increasing the amount of filling liquid, a decrease in filling liquid consolidation strength due to water loss or dilution can be avoided, but the amount of residual soil treatment due to consolidation of the filling liquid above the pile head due to overflow at the pile head can be reduced. There is concern about the increase.
また、杭頭部の中空部内にフーチングとの結合を目的とした鉄筋の挿入空間を確保するため、従来は杭頭部の中空部内にスペーサを挿入したり、或いは杭頭部の中空部に高吸水性ポリマーを塗布することによって杭内面との付着を防止したり、固化物防止装置を装着する等の提案がなされてきる。 In addition, in order to secure an insertion space for reinforcing bars in the hollow part of the pile head, conventionally, a spacer is inserted into the hollow part of the pile head or a high space is provided in the hollow part of the pile head. Proposals have been made to prevent adhesion to the inner surface of the pile by applying a water-absorbing polymer, or to install a solidification prevention device.
しかし、上記従来の提案は、杭頭部の中空部内での充填液固結体の除去に効果的でも、杭頭部の上方部(ヤットコ部)における充填液の固結体発生には効果がない。また、地盤面から一定長下方に杭頭部がセットされる場合、特に杭長が短い場合には、杭頭上方部の掘削孔に上がってきたセメントミルク(杭周固定液)が固結し、杭頭部の接合処理ができなくなる畏れがある。 However, the above-mentioned conventional proposal is effective for removing the filling liquid solidified body in the hollow part of the pile head, but is effective for generating the solidified body of the filling liquid in the upper part (Yatco part) of the pile head. Absent. In addition, when the pile head is set down a certain length from the ground surface, especially when the pile length is short, cement milk (pile circumference fixing liquid) that has risen in the excavation hole above the pile head is consolidated. The pile head may not be able to be joined.
一方、杭頭部の上方部での充填液固結体発生に対処する方法としては、施工直後に杭頭上部の土砂を撹拌したり除去する方法、施工翌日など一定の時間を経て杭頭上部を再掘削することが考えられるが、こうした作業は工程を長引かせるとともに、設置した杭との損傷が懸念されることから施工管理上好ましい方法とはいえない。 On the other hand, as a method to cope with the filling liquid consolidation at the upper part of the pile head, the method is to stir or remove the sediment at the upper part of the pile head immediately after construction, the upper part of the pile head after a certain time such as the next day of construction. However, this work is not a preferable method in terms of construction management because it prolongs the process and concerns about damage to the installed pile.
本考案は、施工工程を長引かせることなく且つ設置した杭との接触もなく、杭頭上部での充填液による固結体の発生を防止することのができる既製杭の回転装置を提供する。 This invention provides the rotation apparatus of the ready-made pile which can prevent generation | occurence | production of the solidified body by the filling liquid in a pile head upper part, without making a construction process protracted and contact with the installed pile.
上記の目的を達成するため、本願の請求項1に係る考案は、オーガ駆動装置に接続する接続ロッドと、設置する杭に回転力と押込み力とを伝達するため杭頭部に被着される回転キャップと、前記接続ロッドと前記回転キャップとを連結する吐出ロッドとからなる設置杭の回転装置であって、前記接続ロッドの中空部と連続する前記吐出ロッドの中空部の下端が、前記回転キャップ内の天版部中央に開口する逆止弁を備えた吐出口としたことを特徴とする設置杭の回転装置である。
In order to achieve the above object, the device according to
また、本願の請求項2に係る考案は、オーガ駆動装置に接続する接続ロッドと、既成杭に回転力と押込み力とを伝達するために杭頭部に被着される回転キャップと、前記接続ロッドと前記回転キャップとを連結する吐出ロッドとからなる既製杭の回転装置であって、前記接続ロッドの中空部と連続する前記吐出ロッドの中空部が、該吐出ロッドの外周面に開口する逆止弁を備えた吐出口としたことを特徴とする設置杭の回転装置である。
Further, the invention according to
そして、本願の請求項3に係る考案は、前記吐出ロッドの外周面に開口する前記吐出口を、周方向に所定間隔で複数個備えたことを特徴とする設置杭の回転装置であり、本願の請求項4に係る考案は、前記接続ロッド又は吐出ロッドに、直径方向外方に延びる攪拌ブレードを一個以上装着したことを特徴とする設置杭の回転装置である。
And the invention which concerns on
本考案に係る設置杭の回転装置は、前記回転キャップ内の天版部中央に開口する前記吐出ロッドの吐出口から、又は、前記吐出ロッドの外周面に開口する一個又は複数個の前記吐出口から、前記接続ロッドの中空部を通して固結防止剤がそれぞれ吐出する構造としているので、杭頭部における充填液のオーバーフローによる杭頭上方部(ヤットコ部)での固結体発生を防止できる。 The rotation device of the installation pile according to the present invention includes one or a plurality of the discharge ports that open from the discharge port of the discharge rod that opens to the center of the top plate portion in the rotation cap or the outer peripheral surface of the discharge rod. From the above, since the anti-caking agent is discharged through the hollow portion of the connecting rod, it is possible to prevent the occurrence of a solidified body in the upper part of the pile head (Yatco part) due to the overflow of the filling liquid in the pile head.
さらに、本考案は、上記の構成に加え、前記接続ロッド又は吐出ロッドに、直径方向外方に延びる攪拌ブレードを一個以上装着したことから、吐出口から吐出した固結防止剤と杭頭上方部(ヤットコ部)のソイルセメントが十分攪拌され、セメントミルク固結体の形成をより一層確実に防止できるとゝもに、設置した埋設杭との接触がないので杭頭部の損傷をも防止することができる。 Furthermore, in addition to the above-described configuration, the present invention is provided with one or more stirring blades extending outward in the diameter direction on the connecting rod or the discharge rod, so that the anti-caking agent discharged from the discharge port and the upper portion of the pile head (Yatco) soil cement is sufficiently agitated to further prevent the formation of cement milk consolidated body, and also prevents damage to the pile head because there is no contact with the installed buried pile. be able to.
以下、本考案を図面に示す実施例に従って説明する。図1及び図5において、1はオーガ駆動装置Aに接続する内部が中空の接続ロッドで、2は前記接続ロッド1の下端部に連結した内部が中空の吐出ロッドであり、該吐出ロッド2の中空部2Aと前記接続ロッド1の中空部1Aは連通している。
Hereinafter, the present invention will be described with reference to embodiments shown in the drawings. 1 and 5,
3は前記吐出ロッド2の下方部に設置した回転キャップで、オーガ又はロッド等の掘削装置によって予め地盤に掘削した掘削孔H内に既成杭4を建て込む際、前記回転キャップ3を既成杭4の前記杭頭4Aに被着させるものであり、その杭頭4Aに設けた突起部4Bを前記回転キャップ3の係止溝3Aに係止させて被着させることで、前記オーガ駆動装置Aで前記既成杭4に前記回転キャップ3を介して回転力と押込み力とが伝達される。
5は前記回転キャップ3の天版部で、前記接続ロッド1に連結した前記吐出ロッド2の下方部は、前記回転キャップ3の天壁を形成している上下一対の天版部5,5に固定されており、該両天版部5,5の中央部を上下方向に貫通する前記吐出ロッド2の下端には吐出口6が形成されている。なお、図中、7は前記吐出口6に設置した逆止弁である。
上記構成の既成杭回転装置による設置杭の施工手順を、図1、図4および図5によって説明すると、前記オーガ駆動装置Aに装着した図示しないオーガ又はロッド等の掘削装置で、地盤Gに既成杭4を建て込むための掘削孔Hを所定の深度まで掘削する。つぎに、この掘削孔Hから掘削装置を引き上げながら根固め液,杭周固定液を順次注入充填し、根固め液,杭周固定液等の充填液Bを所定量充填したのち前記掘削装置を掘削孔Hより引き抜き、この掘削孔H内に既成杭回転装置により既成杭4を建て込む。
The construction procedure of the installed pile by the built-up pile rotating device having the above-described configuration will be described with reference to FIGS. 1, 4 and 5. The excavation device such as an auger or a rod (not shown) attached to the auger drive device A is formed on the ground G. The excavation hole H for building the
根固め液,杭周固定液等の充填液Bを充填した前記掘削孔H内に既成杭4を建て込む場合には、図5に示すように、オーガ駆動装置Aに接続した接続ロッド1、該接続ロッド1の下端部に連結した吐出ロッド2、該吐出ロッド2の下方部に設置した回転キャップ3からなる既成杭回転装置を使用する。すなわち、図1に示すように、既成杭4の杭頭4Aに回転キャップ3を被せ、杭頭4Aに設けた突起部4Bを前記回転キャップ3の係止溝3Aと係止させ、この状態で、上記オーガ駆動装置Aによって埋設する既成杭4を吊り上げる。
When the
つぎに、図5(イ)に示すように、掘削孔Hの上方に吊り上げた前記既成杭4の先端部を前記掘削孔H内に挿入し、前記オーガ駆動装置Aによって前記回転キャップ3を介して前記既成杭4に回転力と押込み力とを付与しながら下降させ、図5(ロ)に示すように、前記掘削孔H内に前記既成杭4を埋設する。前記掘削孔H内に前記既成杭4を所定深度まで埋設するが、設置された前記既成杭4の杭頭4Aは地盤G面から一定長(ヤットコ部の長さ)下方にセットされる場合が通常である。この場合には、既成杭4の杭頭上方部の掘削孔Ha内は前記充填液Bによって充満されている。
Next, as shown in FIG. 5 (b), the tip of the
前記既成杭4を前記掘削孔Hの所定の深度位置まで埋設せしめたのち前記回転キャップ3を逆回転させ、該回転キャップ3を前記既成杭4の杭頭4Aから外す。そして、前記既成杭4の杭頭4Aと接触しない位置まで前記回転キャップ3を上昇させた後、前記オーガ駆動装置Aに固結防止剤CをポンプPによって圧送する。前記オーガ駆動装置A内に圧送された前記固結防止剤Cは、前記接続ロッド1および吐出ロッド2の中空部1Aおよび2Aを通って前記回転キャップ3内に開口する前記吐出ロッド2の吐出口6に至り、該吐出口6に設置した逆止弁7を押し開いて吐出させる。
After the
そして、前記回転キャップ3内に開口する前記吐出口6から固結防止剤Cを吐出させながら、前記オーガ駆動装置Aによって前記接続ロッド1,吐出ロッド2,回転キャップ3をそれぞれ正回転させ、これらを回転させながら杭頭上方部の掘削孔Ha内を上昇させ、既成杭回転装置を前記掘削孔Hの上端開口部から引き上げる。
Then, while discharging the anti-caking agent C from the
つぎに、杭頭上方部の掘削孔Ha内を上昇させながら回転キャップ3を回転させ、該回転キャップ3内に開口する吐出口6から固結防止剤Cを吐出させることで、前記充填液Bによって充満されていた杭頭上方部の掘削孔Ha内は吐出口6から吐出された固結防止剤Cと攪拌され、図5の(ハ)に示すように、セメントミルク固結体(充填液Bによる固結体)の形成が妨げられる混合液Dで満たされた掘削孔Haとなる。
Next, the filling liquid B is obtained by rotating the
図2及び図3に示すものは、本考案に係る既成杭回転装置の第2実施例で、前記第1の実施例と異なる部分は、前記吐出口6の開口を前記回転キャップ3内にではなく前記吐出ロッド2の外周壁に形成した構成とした点であり、その他の構成において両実施例に大きな相違点はない。
2 and 3 show a second embodiment of the prefabricated pile rotating device according to the present invention. The difference from the first embodiment is that the opening of the
すなわち、図2及び図3に示す第2実施例の既成杭回転装置は、オーガ駆動装置Aに接続する接続ロッド1と、既成杭4に回転力と押込み力とを伝達するために杭頭4Aに被着される回転キャップ3と、前記接続ロッド1と前記回転キャップ3とを連結する吐出ロッド2とからなる既製杭の回転装置であって、前記接続ロッド1の中空部1Aと連続する前記吐出ロッド2の中空部2Aは、該吐出ロッド2の外周壁に形成した吐出口6と連通しており、外周面に開口する前記吐出口6は所定の間隔をおいて複数個形成されている。
That is, the prefabricated pile rotating device of the second embodiment shown in FIGS. 2 and 3 has a connecting
したがって、前記オーガ駆動装置Aから前記接続ロッド1および吐出ロッド2の中空部1Aおよび2Aを通って圧送されてたきた固結防止剤Cは、前記吐出ロッド2の外周面に開口する複数個の吐出口6,6から逆止弁7を押し開いて吐出することとなり、前記充填液Bによって充満されていた杭頭上方部の掘削孔Ha内は効率よく前記固結防止剤Cと攪拌されることになり、セメントミルク固結体の形成が妨げられた掘削孔となる。
Accordingly, the anti-caking agent C that has been pumped from the auger drive device A through the
なお、図3に示す既製杭の回転装置は、前記第1及び第2実施例のものに更なる部材を設置した第3の実施例である。すなわち、図において、8は前記接続ロッド1の外周面に突設した複数本の攪拌ブレードで、直径方向外方に放射状に延びており、前記接続ロッド1の外周面に沿って所定の間隔で装着した既製杭の回転装置である。
In addition, the rotation apparatus of the ready-made pile shown in FIG. 3 is the 3rd Example which installed the additional member in the thing of the said 1st and 2nd Example. That is, in the figure, 8 is a plurality of stirring blades projecting on the outer peripheral surface of the connecting
このような構成とすることで、前記充填液Bによって充満されていた杭頭上方部の掘削孔Ha内は、前記複数本の攪拌ブレード8の回転によってより一層前記固結防止剤Cと前記充填液Bとが攪拌されることになり、セメントミルク固結体の形成がより効果的に妨げられた掘削孔となる。
By adopting such a configuration, the inside of the excavation hole Ha in the upper portion of the pile head filled with the filling liquid B is further filled with the anti-caking agent C and the filling by the rotation of the plurality of stirring
A オーガ駆動装置
1 接続ロッド
2 吐出ロッド
1A・2A 中空部
3 回転キャップ
3A 係止溝
4 既成杭
4A 杭頭
4B 突起部
5 天版部
6 吐出口
6A 開口部
7 逆止弁
8 攪拌ブレード
G 地盤
H 掘削孔
Ha 杭頭上方部の掘削孔
B 充填液
C 固結防止剤
DESCRIPTION OF SYMBOLS A
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2014002065U JP3191635U (en) | 2014-04-21 | 2014-04-21 | Rotating device for installed pile |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2014002065U JP3191635U (en) | 2014-04-21 | 2014-04-21 | Rotating device for installed pile |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JP3191635U true JP3191635U (en) | 2014-07-03 |
Family
ID=78224452
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2014002065U Expired - Fee Related JP3191635U (en) | 2014-04-21 | 2014-04-21 | Rotating device for installed pile |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3191635U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2017106187A (en) * | 2015-12-08 | 2017-06-15 | 株式会社トーヨーアサノ | Rotating cap, ready-made pile burying device, pile foundation construction method |
| JP2019218787A (en) * | 2018-06-21 | 2019-12-26 | 株式会社ワイビーエム | Steel pipe pile rotational press-in device |
-
2014
- 2014-04-21 JP JP2014002065U patent/JP3191635U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2017106187A (en) * | 2015-12-08 | 2017-06-15 | 株式会社トーヨーアサノ | Rotating cap, ready-made pile burying device, pile foundation construction method |
| JP2019218787A (en) * | 2018-06-21 | 2019-12-26 | 株式会社ワイビーエム | Steel pipe pile rotational press-in device |
| JP7025758B2 (en) | 2018-06-21 | 2022-02-25 | 株式会社ワイビーエム | Steel pipe pile rotary press-fitting device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6044351B2 (en) | Solidified body construction method, steel pipe pile embedding method using the same, and steel pipe pile embedding structure | |
| JP5986429B2 (en) | Caisson and manufacturing method thereof | |
| CN104603366B (en) | The building method of nodiform in situ concrete pile and be equipped with the steel pipe excavating sword | |
| JP2002155530A (en) | Method of burying ready-made piles and metal fittings | |
| JPH11200363A (en) | Cast-in-place pile, construction method thereof, and winged steel pipe member used therefor | |
| JP6246599B2 (en) | Ground reinforcement method using small-diameter concrete cast-in-place pile. | |
| JP4863120B2 (en) | Foundation pile | |
| JP5948068B2 (en) | Pile construction method with anchors | |
| JP5698316B2 (en) | Construction method of foundation pile | |
| AU2015349623A1 (en) | Construction screw pile | |
| AU2013351554B2 (en) | Method for manufacturing a pile | |
| JP5885512B2 (en) | Construction method of heat collection tube | |
| JP6249440B2 (en) | Manhole levitation prevention method | |
| JP7732778B2 (en) | Hollow steel pipe and method for extracting existing structure using the same | |
| JP7073326B2 (en) | How to remove buried objects | |
| AU2016100944B4 (en) | Construction Screw Pile | |
| JP4872561B2 (en) | Construction method of ready-made piles | |
| JP4476230B2 (en) | Steel pipe pile rooting method | |
| JP5230553B2 (en) | Yatco lots and Yatcos, methods for reducing the strength of Yatco pillars using these, and methods for burying ready-made piles | |
| JP2015183374A (en) | Pile construction method | |
| JP6403652B2 (en) | Drilling rig | |
| JP3545723B2 (en) | Shaft construction machine, shaft construction method and deep foundation method | |
| JP2008031772A (en) | Construction method of ready-made piles and lid used for the construction method | |
| JP5777424B2 (en) | Ground excavation method | |
| JP5607944B2 (en) | Drilling head |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 3191635 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |