JP3145165B2 - Roof unit suspension structure - Google Patents

Roof unit suspension structure

Info

Publication number
JP3145165B2
JP3145165B2 JP02399692A JP2399692A JP3145165B2 JP 3145165 B2 JP3145165 B2 JP 3145165B2 JP 02399692 A JP02399692 A JP 02399692A JP 2399692 A JP2399692 A JP 2399692A JP 3145165 B2 JP3145165 B2 JP 3145165B2
Authority
JP
Japan
Prior art keywords
roof
unit
roof unit
finishing material
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP02399692A
Other languages
Japanese (ja)
Other versions
JPH05222774A (en
Inventor
雅明 茂木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP02399692A priority Critical patent/JP3145165B2/en
Publication of JPH05222774A publication Critical patent/JPH05222774A/en
Application granted granted Critical
Publication of JP3145165B2 publication Critical patent/JP3145165B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、屋根ユニットの吊り部
構造に係り、特にルーフサッシ等を備えた屋根ユニット
に隣接配置される屋根ユニットの前記屋根ユニット側の
吊り部構造に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure for hanging a roof unit, and more particularly to a structure for hanging a roof unit adjacent to a roof unit having a roof sash or the like.

【0002】[0002]

【背景技術】ユニット式建物は、複数の建物ユニットお
よび屋根ユニットを工場から建設現場に輸送し、クレー
ン等を用いて設置することで建てられている。この際、
屋根ユニットは、通常屋根仕上材を貼っていない状態で
輸送され、建設現場においてクレーンで建物ユニット上
に設置された後に屋根仕上材を貼ることで仕上げられて
いた。
2. Description of the Related Art A unit building is constructed by transporting a plurality of building units and roof units from a factory to a construction site, and installing the units using a crane or the like. On this occasion,
A roof unit is usually transported without a roof finishing material, and is finished by attaching a roof finishing material after being installed on a building unit by a crane at a construction site.

【0003】しかしながら、このような従来の屋根ユニ
ットでは屋根仕上材を建設現場で施工しなければならな
いため、現場作業が煩雑となり、作業性が悪いという問
題があった。このため、工場で屋根仕上材を予め貼って
おき、現場作業を少なくすることが行われるようになっ
た。しかしながら、予め屋根仕上材を貼っておいた場
合、屋根ユニットの吊り部の部分にはアイボルト等の吊
り具を取り付けるための挿通孔を屋根仕上材に形成し、
屋根ユニットの設置後に挿通孔を塞いで防水処理を行わ
なければならず作業が煩雑であるという問題があった。
However, in such a conventional roof unit, since a roof finishing material must be constructed at a construction site, there has been a problem that on-site work is complicated and workability is poor. For this reason, a roof finishing material has been pasted in a factory in advance to reduce the on-site work. However, if the roof finishing material has been pasted in advance, an insertion hole for attaching a hanging tool such as an eyebolt is formed in the hanging portion of the roof unit in the roof finishing material,
After installing the roof unit, the insertion hole must be closed and waterproof treatment must be performed, which causes a problem that the operation is complicated.

【0004】[0004]

【発明が解決しようとする課題】このため、本出願人は
屋根ユニットのジョイント部分は建設現場で防水処理し
なければならない点に着目し、隣接する屋根ユニット側
の各端部に屋根仕上材を貼らず、この部分に吊り具を取
り付けることで屋根仕上材の挿通孔を無くすとともに、
屋根ユニットのその他の部分に工場で予め屋根仕上げ材
を貼っておき、現場では隣接する屋根ユニットの各端部
に跨るジョイント用の屋根仕上材を貼り付ける作業のみ
を行うようにし、現場での施工作業の軽減を図る屋根ユ
ニットを創作した。
For this reason, the present applicant has paid attention to the point that the joint portion of the roof unit must be waterproofed at the construction site, and a roof finishing material is attached to each end of the adjacent roof unit. Attaching a hanging tool to this part without attaching, eliminating the insertion hole of the roof finishing material,
Apply the roof finishing material to the other parts of the roof unit in advance at the factory, and only perform the work of attaching the roof finishing material for the joint that straddles each end of the adjacent roof unit at the site. A roof unit designed to reduce work has been created.

【0005】しかしながら、サンルーフ等を設けるため
などでルーフサッシを有する屋根ユニットを設置する場
合には、屋根の仕上げが通常の屋根ユニットと異なるた
め、このルーフサッシを有する屋根ユニットと通常の屋
根ユニットとのジョイント部分は、ジョイント用の屋根
仕上材を取付けて防水処理することができなかった。こ
のため、ルーフサッシを有する屋根ユニットに隣接配置
される屋根ユニットは、従来と同様に屋根仕上材を貼ら
ずに輸送して設置し、現場において屋根仕上材を貼って
いたため、現場作業が煩雑であった。
However, when a roof unit having a roof sash is installed to provide a sunroof or the like, the finish of the roof is different from that of a normal roof unit. Cannot be waterproofed by installing a roofing material for the joint. For this reason, the roof unit placed adjacent to the roof unit having a roof sash was transported and installed without pasting the roof finishing material as in the past, and the roof finishing material was pasted on the site, so the on-site work was complicated. there were.

【0006】本発明の目的は、ルーフサッシ等を備える
屋根ユニットに隣接配置される屋根ユニットでも作業性
良く設置できる屋根ユニットの吊り部構造を提供するこ
とにある。
An object of the present invention is to provide a hanging unit structure of a roof unit which can be installed with good workability even with a roof unit arranged adjacent to a roof unit having a roof sash or the like.

【0007】[0007]

【課題を解決するための手段】本発明の屋根ユニットの
吊り部構造は、屋根ユニットの構造材には下地材を介し
て屋根仕上材が取り付けられ、前記下地材は切欠き部を
除き端縁が構造材の側面よりも突出するように設けられ
るとともに、前記構造材の外側の側面には、前記下地材
の切欠き部分に配置されかつ上端が屋根仕上材の上面と
略同じ高さとされた吊りナットが固定されていることを
特徴とするものである。
According to the present invention, there is provided a suspension unit structure for a roof unit, wherein a structural member of the roof unit is provided with a base material interposed therebetween.
The roof finishing material is attached to the base material, and the base material
Except edge is provided so that it protrudes from the side of the structural material
And the base material is provided on the outer side surface of the structural material.
, And a suspension nut having an upper end substantially at the same height as the upper surface of the roof finishing material is fixed.

【0008】[0008]

【作用】本発明では、屋根ユニットの構造材の外側の側
面に吊り具固着具である吊りナットを固定しているの
で、工場において屋根ユニットの構造材の上面端部まで
屋根仕上材を貼っておくことが可能となる。このため、
建設現場において屋根仕上材を貼って仕上作業を行った
り、屋根仕上材に吊り具が挿通される挿通孔を形成し、
その孔を現場で塞ぐ作業を行ったりする必要がなく、現
場作業が軽減されて作業性が向上する。
According to the present invention, the hanging nut , which is a hanging fixture, is fixed to the outer side surface of the structural material of the roof unit. Can be stored. For this reason,
At the construction site, apply a roof finishing material to perform finishing work, or form an insertion hole through which a hanging tool is inserted into the roof finishing material,
There is no need to perform the work of closing the hole at the site, and the on-site work is reduced, and the workability is improved.

【0009】[0009]

【実施例】以下、本発明の一実施例を図面に基づいて説
明する。本実施例は、図1に示すように、ボックス状の
建物ユニット1の上に設置される複数の屋根ユニットの
うち、ルーフサッシ2が設けられた屋根ユニット3の棟
方向に隣接して配置される屋根ユニット4に適用される
吊り部構造である。
An embodiment of the present invention will be described below with reference to the drawings. In the present embodiment, as shown in FIG. 1, among a plurality of roof units installed on a box-shaped building unit 1, a roof unit 3 provided with a roof sash 2 is disposed adjacent to a ridge direction. This is a hanging structure applied to the roof unit 4.

【0010】屋根ユニット3は、断面略五角形状に形成
され、図2,3に示すように、屋根面を構成する構造材
である溝型鋼11に下地材12を介してルーフサッシ2
が取付けられている。ルーフサッシ2は、サッシ枠13
およびガラス押え枠14によって合せガラス15を挟持
して構成され、各隙間にはシリコンシール16が充填さ
れている。また、サッシ枠13の内周面には結露防止用
の発泡材17が固定され、サッシ枠13および下地材1
2間には防水シート18が貼られている。防水シート1
8の端部は屋根ユニット4側に延長され、この延長部分
には離型紙19が貼られている。
The roof unit 3 is formed to have a substantially pentagonal cross section. As shown in FIGS. 2 and 3, a roof sash 2 is interposed between a grooved steel 11 which is a structural material constituting a roof surface and a base material 12.
Is installed. The roof sash 2 has a sash frame 13
In addition, a laminated glass 15 is sandwiched by a glass holding frame 14 and each gap is filled with a silicon seal 16. A foam material 17 for preventing dew condensation is fixed to the inner peripheral surface of the sash frame 13, and the sash frame 13 and the base material 1 are fixed.
A waterproof sheet 18 is stuck between the two. Waterproof sheet 1
8 is extended toward the roof unit 4 side, and a release paper 19 is affixed to this extended portion.

【0011】一方、屋根ユニット4は、屋根ユニット3
と同様に断面略五角形状に形成され、屋根面を構成する
構造材である溝型鋼21に下地材22を介して屋根仕上
材23が取付けられている。下地材22は、図4にも示
すように溝型鋼21の側面よりも突出するように設けら
れ、一方、屋根仕上材23は溝型鋼21の側面に突出し
ないように設けられている。屋根仕上材23および下地
材22間には、図示しない防水シートが介装されるとと
もに、その端縁部分には水返し24が取付けられてい
る。
On the other hand, the roof unit 4 is
A roof finishing material 23 is attached via a base material 22 to a channel steel 21 which is formed in a substantially pentagonal cross section in the same manner as described above and is a structural material constituting a roof surface. The base material 22 is provided so as to protrude from the side surface of the channel steel 21 as shown in FIG. 4, while the roof finishing material 23 is provided so as not to protrude from the side surface of the channel steel 21. A waterproof sheet (not shown) is interposed between the roof finishing material 23 and the base material 22, and a water return 24 is attached to an edge portion thereof.

【0012】溝型鋼21の側面には、下地材22の切欠
き部分を通して屋根仕上材23および水返し24の上面
と略同じ高さまで延長されたアングル状のナット支持材
25が溶接等で固定され、このナット支持材25には上
端が屋根仕上材23および水返し24の上面と略同じ高
さとされた吊り具固着具としての吊ナット26が溶接等
で固定されている。この吊ナット26には、吊り具であ
るアイボルト27が螺合される。なお、屋根ユニット4
の屋根ユニット3に隣接しない側の吊り部の構造は、本
実施例と同じものでもよいし、その部分の納まり等に応
じた構造を適宜採用してもよい。
On the side surface of the channel steel 21, an angle-shaped nut support member 25 extended to approximately the same height as the upper surfaces of the roof finishing material 23 and the water return 24 through a cutout portion of the base material 22 is fixed by welding or the like. To the nut support member 25, a suspension nut 26 as a suspension fixture fixing member whose upper end is substantially the same height as the top surfaces of the roof finishing material 23 and the water return 24 is fixed by welding or the like. An eyebolt 27 as a hanging tool is screwed into the hanging nut 26. The roof unit 4
The structure of the hanging portion on the side not adjacent to the roof unit 3 may be the same as that of the present embodiment, or a structure corresponding to the accommodation of the portion may be appropriately adopted.

【0013】このような構成の本実施例では、工場にお
いて屋根ユニット3,4を組立た後、トラック等で建設
現場に輸送する。この際、屋根ユニット4は、予め工場
において屋根仕上材23を貼って屋根面を仕上げた状態
で建設現場に輸送する。建設現場では、屋根ユニット3
を建物ユニット1上にクレーンで吊り上げて設置した
後、吊ナット26に螺合されたアイボルト27を介して
屋根ユニット4を吊り上げて屋根ユニット3に隣接して
建物ユニット1上に設置する。この際、屋根ユニット4
は屋根ユニット3側に突出する部分がなくて干渉しない
ため、所定の位置に直接設置できる。
In this embodiment having such a configuration, after assembling the roof units 3 and 4 at the factory, the roof units 3 and 4 are transported to the construction site by trucks or the like. At this time, the roof unit 4 is transported to the construction site in a state where the roof finishing material 23 is pasted on the factory and the roof surface is finished. At the construction site, the roof unit 3
Is lifted on the building unit 1 by a crane, and then the roof unit 4 is lifted via the eyebolts 27 screwed to the hanging nuts 26 and installed on the building unit 1 adjacent to the roof unit 3. At this time, the roof unit 4
Has no protruding portion on the side of the roof unit 3 and does not interfere with it, and can be directly installed at a predetermined position.

【0014】屋根ユニット4を図2に示すように設置し
た後、アイボルト27を取り外し、屋根ユニット3の防
水シート18をその離型紙19をはがして図3に示すよ
うに屋根ユニット4の下地材22および水返し24に貼
りつける。そして、屋根ユニット3,4のジョイント部
分にジョイントカバー28を取付けて屋根を仕上げる。
このジョイントカバー28は、カバー28の一端縁を屋
根ユニット4の水返し24および屋根仕上材23間の隙
間に差し込み、他端縁をサッシ枠13にビス止めし、充
填材29でシールすることで取付けられる。
After installing the roof unit 4 as shown in FIG. 2, the eyebolts 27 are removed, the waterproof sheet 18 of the roof unit 3 is peeled off its release paper 19, and the base material 22 of the roof unit 4 is removed as shown in FIG. And stick it on the water return 24. Then, the joint covers 28 are attached to the joint portions of the roof units 3 and 4 to finish the roof.
This joint cover 28 is formed by inserting one edge of the cover 28 into a gap between the water return 24 and the roof finishing material 23 of the roof unit 4, screwing the other edge to the sash frame 13, and sealing with the filler 29. Mounted.

【0015】このような本実施例によれば、アイボルト
27が螺合される吊ナット26を溝型鋼21の外側の側
面にナット支持材25を介して固定しているので、工場
において屋根仕上材23を溝型鋼21の上面端部まで貼
った状態で屋根ユニット4を仕上げることができる。こ
のため、屋根仕上材23にアイボルト27の挿通孔を形
成する必要がなく、かつ屋根ユニット4の端部まで屋根
仕上材23を取付けることができるので、建設現場では
屋根ユニット4に屋根仕上材23を取付けたり、挿通孔
を防水処理するなどの作業が不要となり、現場作業を軽
減できて作業性を向上できる。
According to this embodiment, since the suspension nut 26 to which the eyebolt 27 is screwed is fixed to the outer side surface of the channel steel 21 via the nut support member 25, the roof finishing material is used in the factory. The roof unit 4 can be finished in a state in which 23 is stuck to the upper surface end of the channel steel 21. Therefore, it is not necessary to form an insertion hole for the eyebolt 27 in the roof finishing material 23 and the roof finishing material 23 can be attached to the end of the roof unit 4. This eliminates the need for installation work or waterproofing the insertion hole, thereby reducing on-site work and improving workability.

【0016】また、屋根ユニット4と屋根ユニット3と
が水平方向に重ならず干渉しないので、屋根ユニット3
が設置されていても屋根ユニット4を所定の位置に直接
設置することができる。このため、屋根ユニット4をい
ったん仮置きしてから位置をずらしたりする必要がな
く、屋根ユニット4の吊り込み作業を容易にかつ安全に
行うことができる。
The roof unit 4 and the roof unit 3 do not overlap with each other in the horizontal direction and do not interfere with each other.
Is installed, the roof unit 4 can be directly installed at a predetermined position. For this reason, it is not necessary to temporarily shift the position after temporarily placing the roof unit 4, and the work of hanging the roof unit 4 can be performed easily and safely.

【0017】さらに、屋根ユニット3,4のジョイント
部分は、屋根ユニット3,4を設置した後、離型紙19
を剥がして防水シート18を屋根ユニット4に貼りつ
け、ジョイントカバー28を取付けるだけでよいので、
現場におけるジョイント部分の防水処理も容易に行うこ
とができる。
Further, after the roof units 3 and 4 are installed, the joint portions of the roof units 3 and 4
, The waterproof sheet 18 is attached to the roof unit 4 and the joint cover 28 is simply attached.
The joint can be easily waterproofed at the site.

【0018】また、吊り具固着具である吊ナット26を
その上端が屋根仕上材23や水返し24の上面と略同じ
高さとなるように設けたので、アイボルト27のように
フランジ部分を有する吊り具であってもそのねじ部全部
を吊ナット26に螺合でき、アイボルト27を確実にか
つ強固に取付けることができる。
Further, since the suspension nut 26 serving as a suspension fixture is provided so that its upper end is substantially the same height as the upper surface of the roof finishing material 23 or the water return 24, a suspension having a flange portion like an eyebolt 27 is provided. Even if it is a tool, the entire screw portion can be screwed to the suspension nut 26, and the eye bolt 27 can be securely and firmly attached.

【0019】なお、本発明は前述の実施例に限定される
ものではなく、本発明の目的を達成できる範囲での変
形、改良等は本発明に含まれるものである。例えば、本
発明の吊り部の構造は、ルーフサッシ2を有する屋根ユ
ニット3に隣接して設置される屋根ユニット4に適用さ
れるものに限らず、他の屋根ユニットに適用してもよ
い。特に前記実施例のように、屋根仕上面が異なり、隣
接する屋根ユニット間で連続するように屋根仕上材を設
ける必要がない屋根ユニットの吊り部構造に最適であ
る。
It should be noted that the present invention is not limited to the above-described embodiment, but includes modifications and improvements as long as the object of the present invention can be achieved. For example, the structure of the suspension unit of the present invention is not limited to the structure applied to the roof unit 4 installed adjacent to the roof unit 3 having the roof sash 2 and may be applied to other roof units. Particularly, as in the above-described embodiment, the present invention is most suitable for a hanging unit structure of a roof unit in which a roof finishing surface is different and a roof finishing material does not need to be provided so as to be continuous between adjacent roof units.

【0020】また、吊り具固着具の取付方法としては、
前記実施例のように溝型鋼21の側面にナット支持材2
5を介して取付けられるものに限らず、吊ナット26を
直接溝型鋼21の側面に溶接固定するなど、他の方法や
構造でもよい。要するに吊り具固着具が構造材の外側の
側面に設けられかつその上面が屋根仕上材と略同じ高さ
位置に設けられていればよい。
Further, as a method of attaching the hanging fixture,
The nut supporting member 2 is provided on the side surface of the channel steel 21 as in the above embodiment.
The method is not limited to the method in which the suspension nut is attached via the hook 5, and another method or structure such as directly fixing the suspension nut 26 to the side surface of the channel steel 21 by welding may be used. In short, it suffices that the hanging fixture is provided on the outer side surface of the structural material and the upper surface thereof is provided at substantially the same height as the roof finishing material.

【0021】さらに、屋根ユニット3,4の設置順序
は、前記実施例のように屋根ユニット3の後に屋根ユニ
ット4を設置するものに限らず、屋根ユニット4を先に
設置してもよい。すなわち、前記実施例のように屋根ユ
ニット3,4が水平方向に重ならず干渉しない場合に
は、屋根ユニット3,4の設置順序は実施にあたって適
宜設定することができる。
Further, the order of installation of the roof units 3 and 4 is not limited to the installation of the roof unit 4 after the roof unit 3 as in the above embodiment, and the roof unit 4 may be installed first. That is, when the roof units 3 and 4 do not overlap and do not interfere with each other in the horizontal direction as in the above-described embodiment, the installation order of the roof units 3 and 4 can be appropriately set in the implementation.

【0022】また、本発明の吊り部構造は、前記実施例
のように断面略五角形状に形成されて切り妻屋根を構成
する屋根ユニット4に限らず、寄棟屋根、入り母屋屋
根、陸屋根等を構成する種々の形状の屋根ユニットに適
用することができる。
Further, the suspension structure of the present invention is not limited to the roof unit 4 which is formed to have a substantially pentagonal cross section and constitutes a gable roof, as in the above-described embodiment, but also includes a ridge roof, a purlin roof, a land roof, and the like. Can be applied to various shapes of roof units.

【0023】[0023]

【発明の効果】このような本発明によれば、ルーフサッ
シ等を備える屋根ユニットに隣接配置される屋根ユニッ
トであっても作業性良く設置することができるという効
果がある。
According to the present invention, there is an effect that even a roof unit arranged adjacent to a roof unit having a roof sash or the like can be installed with good workability.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例を用いたユニット式建物の全
体構成を示す概略斜視図である。
FIG. 1 is a schematic perspective view showing the overall configuration of a unit building using one embodiment of the present invention.

【図2】本実施例の吊り部構造を示す断面図である。FIG. 2 is a cross-sectional view illustrating a hanging portion structure according to the present embodiment.

【図3】屋根ユニット間のジョイント部の防水処理後の
吊り部構造を示す断面図である。
FIG. 3 is a cross-sectional view showing a suspension structure after waterproofing a joint between roof units.

【図4】本実施例の吊り部構造を示す斜視図である。FIG. 4 is a perspective view showing a hanging portion structure of the present embodiment.

【符号の説明】[Explanation of symbols]

2 ルーフサッシ 3,4 屋根ユニット 11,21 溝型鋼 12,22 下地材 13 サッシ枠 23 屋根仕上材 25 ナット支持材 26 吊ナット 27 アイボルト 28 ジョイントカバー 2 Roof sash 3,4 Roof unit 11,21 Channel steel 12,22 Base material 13 Sash frame 23 Roof finishing material 25 Nut support material 26 Hanging nut 27 Eye bolt 28 Joint cover

フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E04B 1/348 E04B 7/02 511 E04G 21/14 - 21/22 E04D 3/00 - 3/40 Continued on the front page (58) Fields surveyed (Int.Cl. 7 , DB name) E04B 1/348 E04B 7/02 511 E04G 21/14-21/22 E04D 3/00-3/40

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 屋根ユニットの構造材には下地材を介し
て屋根仕上材が取り付けられ、前記下地材は切欠き部を
除き端縁が構造材の側面よりも突出するように設けられ
るとともに、前記構造材の外側の側面には、前記下地材
の切欠き部分に配置されかつ上端が屋根仕上材の上面と
略同じ高さとされた吊りナットが固定されていることを
特徴とする屋根ユニットの吊り部構造。
1. The structural material of the roof unit is provided with a base material
The roof finishing material is attached to the base material, and the base material
Except edge is provided so that it protrudes from the side of the structural material
And the base material is provided on the outer side surface of the structural material.
A hanging nut, which is disposed in a notch portion of the roof unit and whose upper end has substantially the same height as the upper surface of the roof finishing material, is fixed.
JP02399692A 1992-02-10 1992-02-10 Roof unit suspension structure Expired - Fee Related JP3145165B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP02399692A JP3145165B2 (en) 1992-02-10 1992-02-10 Roof unit suspension structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP02399692A JP3145165B2 (en) 1992-02-10 1992-02-10 Roof unit suspension structure

Publications (2)

Publication Number Publication Date
JPH05222774A JPH05222774A (en) 1993-08-31
JP3145165B2 true JP3145165B2 (en) 2001-03-12

Family

ID=12126193

Family Applications (1)

Application Number Title Priority Date Filing Date
JP02399692A Expired - Fee Related JP3145165B2 (en) 1992-02-10 1992-02-10 Roof unit suspension structure

Country Status (1)

Country Link
JP (1) JP3145165B2 (en)

Also Published As

Publication number Publication date
JPH05222774A (en) 1993-08-31

Similar Documents

Publication Publication Date Title
JP4588482B2 (en) The gantry device in the waterproof layer, the gantry device mounting structure and the gantry device mounting method in the waterproof layer.
JPH05263506A (en) Fixing device for object on roof or floor
JP3145165B2 (en) Roof unit suspension structure
JP2617646B2 (en) Roof unit and joint structure of roof unit
JPS6055659B2 (en) Installation structure of lighting components for folded plate roofs
JP3244670B2 (en) Waterproof structure between the outer wall pillar cover and veranda shade
JP2510366B2 (en) Building decoration structure
JPS5862236A (en) Apparatus for fixing building on roof or floor
JP2564345Y2 (en) Roof panel unit
JPS6335942A (en) Wall under-treatment structure of outer wall panel
JP2536183Y2 (en) Balcony mounting structure
JPS5810933Y2 (en) Frame mounting structure
JPS6116335Y2 (en)
JP2509844B2 (en) Scaffold mounting method for outer wall panels
JP2023088744A (en) Upper surface rain prevention structure for building unit
JP2023088743A (en) Upper surface rain prevention structure for building unit, and upper surface rain prevention method
JPS6113617Y2 (en)
JP2869743B2 (en) Curved roof panel
JPS6326503Y2 (en)
JP2552845B2 (en) Waterproof corridor repair method
JPS5834162Y2 (en) Connection device between girder and purlin
JP2517185B2 (en) Roof for building unit
JPS631682Y2 (en)
JP2515898Y2 (en) Roof panel
JPH06146610A (en) Temporary flashing tool of building unit

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20001205

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090105

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100105

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100105

Year of fee payment: 9

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100105

Year of fee payment: 9

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110105

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110105

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120105

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees