JP2999732B2 - Building erection equipment and construction method - Google Patents

Building erection equipment and construction method

Info

Publication number
JP2999732B2
JP2999732B2 JP35644796A JP35644796A JP2999732B2 JP 2999732 B2 JP2999732 B2 JP 2999732B2 JP 35644796 A JP35644796 A JP 35644796A JP 35644796 A JP35644796 A JP 35644796A JP 2999732 B2 JP2999732 B2 JP 2999732B2
Authority
JP
Japan
Prior art keywords
steel column
post
frame
main body
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP35644796A
Other languages
Japanese (ja)
Other versions
JPH10184017A (en
Inventor
康孝 山崎
敏文 小堀
功一 大塚
敏夫 寺倉
裕二 浦辺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kawada Industries Inc
Original Assignee
Kawada Industries Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawada Industries Inc filed Critical Kawada Industries Inc
Priority to JP35644796A priority Critical patent/JP2999732B2/en
Publication of JPH10184017A publication Critical patent/JPH10184017A/en
Application granted granted Critical
Publication of JP2999732B2 publication Critical patent/JP2999732B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、鉄骨に沿わせた支
柱の上部に大屋根を備え、支柱をリフトアップすること
で大屋根を上昇しつつ建物の鉄骨順次階層毎に構築して
いく建築物の架設装置およびこの装置を使用した構築法
に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction in which a large roof is provided at the top of a pillar along a steel frame, and the pillar is lifted up to ascend the large roof while building the building in order of steel frames of a building in order. The present invention relates to a device for erection of objects and a construction method using the device.

【0002】[0002]

【従来の技術】この種の建築物の構築法は、支柱をリフ
トアップすることで大屋根を上昇させながら既設鉄骨組
み階層の上に作業空間を作れること、この大屋根に取り
付けたクレーン装置により架設部材を吊り上げて順次鉄
骨組み階層を構築できるので施工が簡単であること、等
の理由により最近では広範囲に利用されるようになって
いる。
2. Description of the Related Art The construction method of this kind of building is that a work space can be created on an existing steel frame hierarchy while raising a large roof by lifting up a pillar, and a crane device attached to the large roof. Recently, it has been widely used because the construction members can be constructed sequentially by lifting the erection members, thereby simplifying the construction.

【0003】このような理由から、従来では、この種の
建築物の構築法もしくは装置として、既に特開平4−9
3469号,特開平5−133016号,特開平6−1
73458号,特開平7−42242号,特開平7−1
27260号,特開平7−139716号等に示された
技術が知られている。
[0003] For such a reason, heretofore, as a construction method or an apparatus of this type of building, Japanese Patent Application Laid-Open No.
3469, JP-A-5-133016, JP-A-6-1
73458, JP-A-7-42242, JP-A 7-1
No. 27260 and Japanese Patent Application Laid-Open No. 7-139716 are known.

【0004】[0004]

【発明が解決すべき課題】従来のこの種の構築法のう
ち、特開平4−93469号に示された工法は、上端に
大屋根を固定した仮設柱を、その下端に設けた上下一対
の着脱可能なガイドにより既設鉄骨柱に固定することで
鉄骨柱に沿って立設配置し、既設鉄骨柱の上端に新設鉄
骨柱を設置した後に、仮設柱の上部に設けた昇降装置か
ら突出するアームを新設鉄骨柱の上端に係止した状態
で、上下一対のガイドを、既設鉄骨柱から離しながら昇
降装置によって仮設柱を上昇させて、今度は新設鉄骨柱
に固定するという手順を繰り返すことで、大屋根の上昇
と既設鉄骨柱の上端に対する新設鉄骨柱の組み立てを行
う。
Among the conventional construction methods of this type, the construction method disclosed in Japanese Patent Application Laid-Open No. Hei 4-93469 is based on a temporary column having a large roof fixed at the upper end and a pair of upper and lower columns provided at the lower end. An arm protruding from the elevating device provided above the temporary pillar after the new steel pillar is installed at the upper end of the existing steel pillar by fixing it to the existing steel pillar by a detachable guide and arranging it vertically along the steel pillar. By locking the upper and lower guides with the upper end of the new steel column with the upper and lower guides separated from the existing steel column by raising and lowering the temporary column with the lifting device, this time repeating the procedure of fixing to the new steel column, Raise the large roof and assemble a new steel column to the upper end of the existing steel column.

【0005】また、特開平5−133016号の工法
は、上端に大屋根を固定した外構の下端にシリンダを介
して上下動可能な一対のアームを設けて、上方のアーム
の先端を鉄骨柱に係止し、下方のアームを鉄骨柱から外
した状態でシリンダロッドを縮長することで外構を上昇
し、所定の上昇位置で、今度は下方のアームを鉄骨柱に
係止し、上方のアームを鉄骨柱から外した状態でシリン
ダロッドを伸長することで外構を上昇させて、上方アー
ムを鉄骨柱に係止するという手順を繰り返すことにより
大屋根を上昇させる。
In the method disclosed in Japanese Unexamined Patent Publication No. Hei 5-133016, a pair of arms that can move up and down via a cylinder is provided at the lower end of an outer structure having a large roof fixed at the upper end, and the tip of the upper arm is connected to a steel column. The lower arm is removed from the steel column, and the outer structure is raised by shortening the cylinder rod.The lower arm is then locked to the steel column at the predetermined raised position. The outer roof is raised by extending the cylinder rod while the arm is removed from the steel column, and the procedure of locking the upper arm to the steel column is repeated to raise the large roof.

【0006】上記特開平6−173458号,特開平7
−42242号,特開平7−127260号,特開平7
−139716号も夫々部分的な違いはあるものの、基
本的には、いずれも上端に大屋根を固定した仮設柱を、
その下端に設けた上下一対のガイドなりアームにより既
設鉄骨柱に固定した状態で、既設鉄骨柱の上端に新設鉄
骨柱を設置し、その後仮設柱に設けた上方のガイドなり
アームを新設鉄骨柱に係止した状態で、下方のガイドな
りアームを既設鉄骨柱から離しながらリフトアップ装置
により仮設柱と大屋根を上昇させて、下方のガイドなり
アームを新設鉄骨柱に係止するという盛り替え作業を繰
り返すことで共通している。
The above-mentioned JP-A-6-173458 and JP-A-7-173458
-42242, JP-A-7-127260, JP-A-7-127260
-139716 also has a partial difference, but basically, all of them have temporary pillars with a large roof fixed at the upper end,
A new steel column is installed at the upper end of the existing steel column while being fixed to the existing steel column by a pair of upper and lower guide arms provided at its lower end, and then the upper guide arm provided on the temporary column is attached to the new steel column. In the locked state, lift the temporary pillar and large roof with the lift-up device while separating the lower guide arm from the existing steel column, and lock the lower guide arm to the new steel column. It is common to repeat.

【0007】ところで、これらの各従来工法は、上記の
共通事項から明らかなように、いずれも一つのリフトア
ップ装置が大屋根と、この大屋根を支えている仮設柱と
を上昇させるための機能を兼用しているので、上下一対
のガイドなりアームを鉄骨柱に固定したり離したりしな
がら仮設柱をリフトアップさせる時に、この仮設柱に大
屋根の全荷重が加わっていることになる。そのため、リ
フトアップ装置の能力をかなり強力な大掛かりものと
し、かつ、鉄骨柱に対する上下一対のガイドなりアーム
の固着力を強力なものにする必要があり、大屋根の全荷
重が加わっている仮設柱をリフトアップさせながら、ガ
イドなりアームを鉄骨柱に固定するための操作が細心の
注意を必要とするので、作業が煩雑で危険性を含んでい
るという問題がある。
[0007] In each of these conventional methods, as is apparent from the above-mentioned common matter, in each case, one lift-up device raises a large roof and a temporary column supporting the large roof. When the temporary pillar is lifted up while fixing and separating the pair of upper and lower guide arms from and to the steel pillar, the full load of the large roof is applied to the temporary pillar. Therefore, it is necessary to make the capacity of the lift-up device very large and large, and also to make the pair of upper and lower guides and the arm that are fixed to the steel column strong. The operation for fixing the guide or arm to the steel column while lifting up the robot requires careful attention, so that there is a problem that the operation is complicated and involves risks.

【0008】[0008]

【課題を解決するための手段】本発明は、上記のような
従来におけるこの種の構築法における問題点に鑑み、大
屋根を支えている仮設柱を上昇させるためのリフトアッ
プ機構を、仮設柱だけを上昇させるリフトアップ装置
と、全ての仮設柱が所定の高さに上昇した時点で、夫々
の仮設柱を支点として利用しながら大屋根だけを上昇さ
せるリフトアップ装置とに分け、仮設柱の上昇と大屋根
の上昇とが夫々安定して行えるようにした構築装置とそ
の装置による構築法の提供を目的としたものである。
SUMMARY OF THE INVENTION The present invention has been made in consideration of the above-described problems in this type of conventional construction method, and a lift-up mechanism for raising a temporary pillar supporting a large roof is provided by a temporary pillar. And the lift-up device, which raises only the large roof while using each temporary pillar as a fulcrum, when all the temporary pillars have risen to a predetermined height. It is an object of the present invention to provide a construction apparatus and a construction method using the apparatus, in which the ascent and the roof can be stably performed, respectively.

【0009】本発明における建築物の架設装置として
は、建築中の構造物における既設本体鉄骨柱の側面に取
付けられて、前記構造物の上方を覆う組立作業用大屋根
ステージの架構を支持するための建築物の架設装置であ
って、外ポストとこれに摺動自在に挿通された内ポスト
の下端に夫々本体鉄骨柱に対して着脱可能な掴み装置を
設けると共に、これら上下の掴み装置の間を特殊ジャッ
キにより連結したポスト上昇機構と、前記外ポストの上
方には該外ポストに夫々摺動自在に挿通された、該外ポ
ストに対して水平方向に着脱可能なピンロック手段を有
する上下一対の架構受け具を設けると共に、これら上下
の受け具の間を特殊ジャッキにより連結し、かつ、上方
の架構受け具を架構に固定した架構上昇機構とからなっ
ていることを特徴する。
The erection apparatus for a building according to the present invention is provided to support a frame of a large roof stage for an assembly work, which is attached to a side surface of an existing main body steel column of a structure under construction and covers an upper part of the structure. A erection device for a building, wherein grippers are provided at the lower ends of the outer post and the inner post slidably inserted thereinto so as to be attachable to and detachable from the main body steel column, and between the upper and lower grippers. A pair of upper and lower pins having a post lifting mechanism connected by a special jack, and pin lock means above the outer post, which are slidably inserted into the outer post, respectively, and which can be horizontally attached to and detached from the outer post. And a frame lifting mechanism in which the upper and lower receivers are connected by a special jack, and the upper frame receiver is fixed to the frame. .

【0010】上記の外ポストと内ポストの下端に設けら
れる本体鉄骨柱への掴み装置としては、ジャッキにより
鉄骨柱の両側方向へ延びる左右一対のアームと、これら
のアームの先端を本体鉄骨柱の両側面に圧着する掴みジ
ャッキと、前記アームの先端を本体鉄骨柱の内側面に抱
え込むためのホールディング装置とにより構成すること
が好ましい。
As a gripping device for the main body steel column provided at the lower end of the outer post and the inner post, a pair of left and right arms extending in both directions of the steel column by jacks, and the ends of these arms are connected to the main body steel column. It is preferable to comprise a gripping jack crimped on both side surfaces and a holding device for holding the tip of the arm on the inner side surface of the main body steel column.

【0011】また、ホールディング装置としては、左右
の掴みジャッキに対して夫々係脱自在に取付けられた左
右一対の固定子と、両固定子の間を締めたり緩めたりす
るネジ状の連結金物により構成することが好ましい。
The holding device comprises a pair of left and right stators which are respectively removably attached to the left and right gripping jacks, and a screw-shaped connecting hardware for tightening or loosening between the two stators. Is preferred.

【0012】一方、前記の架設装置を使用する構築方法
としては、建築中の構造物における既設本体鉄骨柱の側
面に取付けられて、前記構造物の上方を覆う組立作業用
大屋根ステージの架構を支持するための構築手段により
建築物を構築する工法において、外ポストとこれに摺動
自在に挿通された内ポストを夫々の下端に設けたポスト
上昇機構の掴み装置により本体鉄骨柱に固定した状態で
既設本体鉄骨柱の上端に新設鉄骨柱を立設し、前記上下
の掴み装置の着脱と特殊ジャッキの伸縮により外ポスト
と内ポストを新設鉄骨柱に沿って上昇させ、順次同様の
操作により全ての外ポストと内ポストを上昇させたの
ち、外ポスト上方における架構上昇機構の上下架構受け
具を、全て同時にピンロック手段の着脱と特殊ジャッキ
の伸縮により上昇させて、上部架構受け具を押し上げる
ことで架構を上昇すること特徴とする。
On the other hand, as a construction method using the above-described erection apparatus, a structure of a large-roof stage for assembling work, which is attached to a side surface of an existing main body steel column in a structure under construction and covers an upper part of the structure, is provided. In a construction method of constructing a building by a construction means for supporting, a state in which an outer post and an inner post slidably inserted therein are fixed to a main body steel column by a gripping device of a post lifting mechanism provided at each lower end. A new steel column is erected on the upper end of the existing main body steel column, and the outer and inner posts are raised along the new steel column by attaching and detaching the upper and lower gripping devices and expanding and contracting the special jack. After raising the outer post and the inner post, the upper and lower frame supports of the frame raising mechanism above the outer post are all raised at the same time by attaching / detaching the pin lock means and expanding / contracting the special jack. Te, and wherein raising the Frames by pushing up the upper rack 構受 only ingredients.

【0013】[0013]

【発明の実施の形態】BEST MODE FOR CARRYING OUT THE INVENTION

【実施例】次に本発明に係る構築法を構築装置の構成と
共に、図面に示す実施例について説明すると、この構築
法に使用する構築装置は、図1に示すように、本体鉄骨
柱1に沿って立設されるポスト2と、このポスト2の下
部に設けられるポスト上昇機構3と、前記ポスト2の上
部に設けられる大屋根(図示せず)の架構5を上昇する
ための架構上昇機構4とから基本的に構成される。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, the construction method according to the present invention will be described with reference to the embodiment shown in the drawings together with the construction of the construction apparatus. The construction apparatus used in this construction method is, as shown in FIG. A post 2 erected along the same, a post elevating mechanism 3 provided below the post 2, and a frame elevating mechanism for elevating a frame 5 of a large roof (not shown) provided above the post 2. 4 basically.

【0014】前記ポスト2は、主体となる外ポスト6
と、この外ポスト6内に摺動自在に挿通される内ポスト
7とからなっている。また、ポスト2の下部に設けられ
る前記ポスト上昇機構3は、前記外ポスト6の下端を梁
材8の上の本体鉄骨柱1に固定するための、該外ポスト
6の下端に設けられた上部固定アーム装置9と、前記内
ポスト7の下端を梁材8の上の本体鉄骨柱1に固定する
ための、該内ポスト7の下端に設けられた下部固定アー
ム装置10と、これらの上下の固定アーム装置9,10
の間を連結する左右一対の縦向きの多段式特殊ジャッキ
11とからなっている。
The post 2 includes an outer post 6 serving as a main body.
And an inner post 7 slidably inserted into the outer post 6. The post raising mechanism 3 provided at the lower part of the post 2 is provided at the lower end of the outer post 6 for fixing the lower end of the outer post 6 to the main body steel column 1 on the beam 8. A fixed arm device 9; a lower fixed arm device 10 provided at the lower end of the inner post 7 for fixing the lower end of the inner post 7 to the main body steel column 1 on the beam member 8; Fixed arm devices 9, 10
And a pair of left and right vertical multi-stage special jacks 11 for connecting between them.

【0015】前記上部固定アーム装置9は、図2に示す
ように、外ポスト6の下端左右両側に横向きに固定され
たアームガイド12と、このアームガイド12に摺動自
在に挿通されたアーム13と、該アーム13を梁材8の
上における本体鉄骨柱1の両側面に沿って伸縮移動させ
るためのアームジャッキ14とを備えている。また、前
記アーム13の先端には、該アーム13の先端が本体鉄
骨柱1の両側面位置まで伸びた時に、このアーム13の
先端を本体鉄骨柱1の両側面に圧着するための掴みジャ
ッキ15が設けられている。
As shown in FIG. 2, the upper fixed arm device 9 comprises an arm guide 12 fixed laterally to the lower left and right sides of the outer post 6, and an arm 13 slidably inserted through the arm guide 12. And an arm jack 14 for extending and contracting the arm 13 along both side surfaces of the main body steel column 1 on the beam member 8. The tip of the arm 13 has a gripping jack 15 for crimping the tip of the arm 13 to both sides of the main body steel column 1 when the tip of the arm 13 extends to both side surfaces of the main body steel column 1. Is provided.

【0016】更に、前記掴みジャッキ15の先端には、
前記アーム13の先端を掴みジャッキ15によって梁材
8の上における本体鉄骨柱1の両側面に圧着した状態の
時に、アーム13の先端を本体鉄骨柱1の内側面に抱え
込むためのホールディング装置16が取付けられてい
る。
Further, at the tip of the gripping jack 15,
A holding device 16 for holding the tip of the arm 13 on the inner side surface of the main body steel column 1 when the front end of the arm 13 is gripped by the jack 15 and pressed against both side surfaces of the main body steel column 1 on the beam 8. Installed.

【0017】このホールディング装置16は、図5aに
示すように、左右の掴みジャッキ15に対して夫々係脱
もしくは回動自在に取付けられた左右一対の固定子17
と、両固定子17の間を締めたり緩めたりするターンバ
ックルのようなネジ式連結金物18とからなっていて、
上部固定アーム装置9を本体鉄骨柱1に固定するために
アーム13の先端を本体鉄骨柱1の両側面方向に伸ばし
た時には、前記ホールディング装置16が掴みジャッキ
15の先端に取付けられ、また、後に述べるように、上
部固定アーム装置9を上昇すべくアーム13の先端を本
体鉄骨柱1の両側面から引き離す時には、連結金物18
を緩めることで該ホールディング装置16が掴みジャッ
キ15の先端から外せるようになっている。
As shown in FIG. 5A, the holding device 16 comprises a pair of left and right stators 17 which are respectively attached to the left and right gripping jacks 15 so as to be detachable or rotatable.
And a screw-type connecting hardware 18 such as a turnbuckle for tightening or loosening between the two stators 17,
When the tip of the arm 13 is extended toward both sides of the main body steel column 1 to fix the upper fixed arm device 9 to the main body steel column 1, the holding device 16 is gripped and attached to the front end of the jack 15, and As described above, when the tip of the arm 13 is pulled away from both side surfaces of the main body steel column 1 to raise the upper fixed arm device 9, the connecting hardware 18
By loosening the holding device 16, the holding device 16 can be grasped and removed from the tip of the jack 15.

【0018】また、図3に示すように、前記内ポスト7
の下端に設けられる前記下部固定アーム装置10も、前
記上部固定アーム装置9と同様に、内ポスト7の下端左
右両側に横向きに固定されたアームガイド19と、この
アームガイド19に摺動自在に挿通されたアーム20
と、該アーム20を梁材8の上における本体鉄骨柱1の
両側面に沿って伸縮移動させるためのアームジャッキ2
1とを備えている。また、前記アーム20の先端には、
該アーム20の先端が梁材8の上における本体鉄骨柱1
の両側面位置まで伸びた時に、このアーム20の先端を
本体鉄骨柱1の両側面に圧着するための掴みジャッキ2
2が設けられている。
Further, as shown in FIG.
Similarly to the upper fixed arm device 9, the lower fixed arm device 10 provided at the lower end of the inner post 7 also has an arm guide 19 fixed laterally on the left and right sides of the lower end of the inner post 7, and the arm guide 19 is slidable on the arm guide 19. Arm 20 inserted
And an arm jack 2 for extending and retracting the arm 20 along both side surfaces of the main body steel column 1 on the beam member 8.
1 is provided. Also, at the tip of the arm 20,
The main body steel column 1 with the tip of the arm 20 on the beam 8
Gripping jack 2 for crimping the tip of the arm 20 to both sides of the main body steel column 1 when the arm 20 is extended to both side positions.
2 are provided.

【0019】更に、前記掴みジャッキ22の先端には、
前記アーム20の先端を掴みジャッキ22によって梁材
8の上における本体鉄骨柱1の両側面に圧着した状態の
時に、アーム20の先端を本体鉄骨柱1の内側面に抱え
込むための着脱可能な左右一対の固定子24と、両固定
子24の間を連結する連結金物25とを備えた前記ホー
ルディング装置16と同様なホールディング装置23が
取付けられている。
Further, at the tip of the gripping jack 22,
Removable left and right for holding the tip of the arm 20 on the inner side surface of the main body steel column 1 when the end of the arm 20 is gripped by the jack 22 and pressed against both side surfaces of the main body steel column 1 on the beam 8. A holding device 23 similar to the holding device 16 having a pair of stators 24 and a connecting hardware 25 for connecting the two stators 24 is attached.

【0020】一方、外ポスト6の上方に設けられる前記
架構上昇機構4は、図1に示すように、外ポスト6の上
方に沿って摺動する一対の上部ピンロック装置26と、
下部ピンロック装置27と、これらの上下のピンロック
装置26,27の間を連結する左右一対の縦向きのスト
ロークセンサーを内蔵した特殊ジャッキ28とからなっ
ている。そして前記上部ピンロック装置26は、外ポス
ト6に摺動自在に挿通した受け枠29と、この受け枠2
9の左右両側面にブラケット30を介して設けられた、
前記外ポスト6の両側面に等間隔で開設した透孔31へ
ピン32を係脱するためのピンロックジャッキ33とか
らなっており、前記受け枠29に大屋根(図示せず)を
構成する前記架構5が一体に固定保持されている。
On the other hand, as shown in FIG. 1, the frame lifting mechanism 4 provided above the outer post 6 includes a pair of upper pin lock devices 26 sliding along the upper side of the outer post 6,
It comprises a lower pin lock device 27 and a special jack 28 having a pair of left and right vertical stroke sensors for connecting between the upper and lower pin lock devices 26 and 27. The upper pin lock device 26 includes a receiving frame 29 slidably inserted into the outer post 6 and a receiving frame 2.
9, provided on both left and right sides via a bracket 30;
It comprises a pin lock jack 33 for engaging and disengaging a pin 32 with a through hole 31 formed at both sides of the outer post 6 at regular intervals. The receiving frame 29 forms a large roof (not shown). The frame 5 is integrally fixed and held.

【0021】また、前記架構上昇機構4の下部ピンロッ
ク装置27も、前記上部ピンロック装置26と同様に、
外ポスト6に摺動自在に挿通した受け枠34と、この受
け枠34の左右両側面にブラケット35を介して設けら
れた、前記外ポスト6の両側面に等間隔で開設した透孔
31へピン36を係脱するためのピンロックジャッキ3
7とからなっている。
The lower pin lock device 27 of the frame lifting mechanism 4 is also similar to the upper pin lock device 26,
A receiving frame 34 slidably inserted through the outer post 6 and through holes 31 provided at both left and right sides of the receiving frame 34 via brackets 35 and provided at equal intervals on both sides of the outer post 6. Pin lock jack 3 for disengaging pin 36
It consists of seven.

【0022】次に、前記の構築装置を使用した建築物の
構築方法を説明すると、図4aに示すように、既設鉄骨
柱1aにおける梁材8aの上に、並列する複数本のポス
ト2(図4ではそのうちの一本を示す)を、夫々ポスト
上昇機構3の縦向き特殊ジャッキ11を縮長した状態
で、夫々の外ポスト6の下端の上部固定アーム装置9と
内ポスト7の下端の下部固定アーム装置10とを夫々し
っかりと固定する。その固定に際しては、図5aに示す
ように、アームジャッキ14,21を伸ばしてアーム1
3,20を鉄骨柱1aの両側面に延出し、該アーム1
3,20の先端の掴みジャッキ15,22を鉄骨柱1a
の両側面に圧着すると共に、アーム13,20の先端に
ホールディング装置16,23を取り付けてしっかりと
鉄骨柱1aを抱え込む。
Next, a method of building a building using the above-described building apparatus will be described. As shown in FIG. 4A, a plurality of posts 2 (see FIG. 4) arranged in parallel on a beam 8a of an existing steel column 1a. 4 shows one of them), the upper fixed arm device 9 at the lower end of the outer post 6 and the lower portion of the lower end of the inner post 7 in a state where the vertical special jack 11 of the post lifting mechanism 3 is contracted. Each of the fixed arm devices 10 is firmly fixed. In fixing, as shown in FIG. 5A, the arm jacks 14 and 21 are extended to
3 and 20 are extended to both side surfaces of the steel column 1a.
The gripping jacks 15, 22 at the tips of 3, 20 are connected to the steel column 1a.
And the holding devices 16 and 23 are attached to the ends of the arms 13 and 20 to securely hold the steel column 1a.

【0023】その時、外ポスト6の上方の架構上昇機構
4における上部ピンロック装置26の受け枠29と下部
ピンロック装置27の受け枠34とは、図6aに示すよ
うに、縦向き特殊ジャッキ28を縮長した状態で、夫々
のロックピン32,36が外ポスト6の透孔31へ嵌入
することで所定位置にロックされ、外ポスト6に固定支
持されている。
At this time, the receiving frame 29 of the upper pin lock device 26 and the receiving frame 34 of the lower pin lock device 27 in the frame lifting mechanism 4 above the outer post 6 are, as shown in FIG. In a state where the length is reduced, the lock pins 32 and 36 are fitted into the through holes 31 of the outer post 6 to be locked at a predetermined position, and are fixed and supported by the outer post 6.

【0024】この状態で図4bに示すように、既設鉄骨
柱1aの上に、梁材8bを有する新設鉄骨柱1bを取付
け接続した後、ポスト上昇機構3の下部固定アーム装置
10はそのままの状態として、図5bに示すように、上
部固定アーム装置9のホールディング装置16を外ずす
と共に、掴みジャッキ15も鉄骨柱1aへの圧着状態を
解き、図5cのように、アームジャッキ14を縮めてア
ーム13を鉄骨柱1aの両側面から引き離し、上部固定
アーム装置9を上方へ移動するための準備を整える。
In this state, as shown in FIG. 4B, after the new steel column 1b having the beam member 8b is attached and connected to the existing steel column 1a, the lower fixed arm device 10 of the post lifting mechanism 3 is left as it is. As shown in FIG. 5B, the holding device 16 of the upper fixed arm device 9 is disengaged, and the gripping jack 15 also releases the crimped state to the steel column 1a, and the arm jack 14 is contracted as shown in FIG. 5C. The arm 13 is separated from both side surfaces of the steel column 1a, and preparations for moving the upper fixed arm device 9 upward are prepared.

【0025】図4では、既設鉄骨柱1aに取付けられる
複数本のポスト2のうち、一本のポスト2を示している
が、既設鉄骨柱1aの上に梁材8bを有する新設鉄骨柱
1bを接続する工程は順次時間差があるので、全数の鉄
骨柱1bその他の鉄骨組立てなどを終えたポスト2から
順に上記のような上部固定アーム装置9の上方移動への
準備に入る。
FIG. 4 shows one post 2 among a plurality of posts 2 attached to the existing steel column 1a. A new steel column 1b having a beam 8b on the existing steel column 1a is shown. Since there is a time lag in the connecting process, preparations for the upward movement of the upper fixed arm device 9 as described above are started in order from the post 2 which has finished assembling all the steel columns 1b and other steel frames.

【0026】このように、上部固定アーム装置9の上方
移動への準備を終えたポスト2から順に、図4cに示す
ように、上下両固定アーム装置9,10間の縦向き特殊
ジャッキ11を伸長して外ポスト6を上昇させ、上部固
定アーム装置9を新設鉄骨柱1bの梁材8bの上に固定
するが、この上部固定アーム装置9の上方移動を行う前
に、このポスト2だけは上方の架構上昇機構4における
上部ピンロック装置26の受け枠29と、下部ピンロッ
ク装置27の受け枠34のロックピン32,36を、夫
々外ポスト6の透孔31から引き抜いて、受け枠29,
34と外ポスト6とのロック状態を予め解除しておく。
As shown in FIG. 4c, the vertical special jack 11 between the upper and lower fixed arm devices 9 and 10 is extended in order from the post 2 where the preparation for the upward movement of the upper fixed arm device 9 is completed. Then, the outer post 6 is raised to fix the upper fixed arm device 9 on the beam 8b of the new steel column 1b. Before the upper fixed arm device 9 is moved upward, only the post 2 is moved upward. The receiving frame 29 of the upper pin lock device 26 and the lock pins 32, 36 of the receiving frame 34 of the lower pin lock device 27 in the frame lifting mechanism 4 are pulled out from the through holes 31 of the outer post 6, respectively.
The locked state between the outer post 34 and the outer post 6 is released in advance.

【0027】このように、複数本のポスト2のうち、特
定のポスト2の架構上昇機構4の受け枠29,34と外
ポスト6とのロック状態を解除すると、この特定のポス
ト2の架構上昇機構4だけは大屋根の架構5の支持力を
失うことになるが、並列する別のポスト2の架構上昇機
構4が外ポスト6とのロック状態を維持して、大屋根の
架構5を支えているので、全体としてポスト2による大
屋根架構5の支持に問題は生じない。
As described above, when the locked state between the receiving frames 29 and 34 of the frame lifting mechanism 4 of the specific post 2 and the outer post 6 among the plurality of posts 2 is released, the frame lifting of the specific post 2 is performed. Only the mechanism 4 loses the supporting capacity of the large roof frame 5, but the frame lifting mechanism 4 of another post 2 in parallel maintains the locked state with the outer post 6 to support the large roof frame 5. Therefore, there is no problem in supporting the large roof frame 5 by the post 2 as a whole.

【0028】従って、図4cに示すように、特定のポス
ト2における上下両固定アーム装置9,10間の縦向き
特殊シリンダ11を伸長して外ポスト6を上昇させる
と、そのポスト2の架構上昇機構4は外ポスト6とのロ
ック状態が解除されているので、外ポスト6の上端が受
け枠29,34を通り抜けて上昇する。
Therefore, as shown in FIG. 4c, when the vertical special cylinder 11 between the upper and lower fixed arm devices 9 and 10 in the specific post 2 is extended to raise the outer post 6, the frame of the post 2 is raised. Since the lock state of the mechanism 4 with the outer post 6 has been released, the upper end of the outer post 6 passes through the receiving frames 29 and 34 and rises.

【0029】このようにして外ポスト6の上端が受け枠
29,34を通り抜けて上昇した後、再び、図6aのよ
うに、そのポスト2の架構上昇機構4の上下両ピンロッ
ク装置26,27のロックピン32,36を外ポスト6
の透孔31に嵌入して、受け枠29,34を外ポスト6
とロック状態とし、今度は、図4dに示すように、下部
固定アーム装置10を、前記と同様の操作によって鉄骨
柱1aから外して、縦向き特殊ジャッキ11を縮長し、
一段上方の鉄骨柱1aの梁材8aの上に固定する。
After the upper end of the outer post 6 ascends through the receiving frames 29 and 34 in this manner, as shown in FIG. 6A, the upper and lower pin lock devices 26 and 27 of the frame lifting mechanism 4 of the post 2 again. Lock pins 32 and 36 of outer post 6
And the receiving frames 29 and 34 are attached to the outer posts 6.
Then, as shown in FIG. 4D, the lower fixed arm device 10 is detached from the steel column 1a by the same operation as described above, and the vertical special jack 11 is shortened.
It is fixed on the beam 8a of the steel column 1a one step above.

【0030】このような作業を順次全てのポスト2に繰
り返して、全てのポスト2の上昇が完了したならば、今
度は、図4e乃至hに示すように、大屋根架構5の上昇
に移る。
This operation is sequentially repeated for all the posts 2, and when the ascent of all the posts 2 is completed, the process proceeds to the ascending of the large roof frame 5, as shown in FIGS.

【0031】この作業では、まず、図6aのように、全
てのポスト2の架構上昇機構4における上下両ピンロッ
ク装置26,27の受け枠29,34が、ロックピン3
2,36により外ポスト6にロックされた状態から、図
6bのように、上部ピンロック装置26の受け枠29の
ロックピン32を、夫々外ポスト6の透孔31から引き
抜いて受け枠29と外ポスト6とのロック状態を解除
し、大屋根架構5の荷重を下部ピンロック装置27の受
け枠34により受け持たせ、その状態で図6cのよう
に、全てのポスト2の架構上昇機構4における縦向き特
殊ジャッキ28を同時に伸長して、上部ピンロック装置
26の受け枠29を上昇させ、大屋根架構5の全体を押
し上げる。
In this operation, first, as shown in FIG. 6A, the receiving frames 29, 34 of the upper and lower pin locking devices 26, 27 in the frame lifting mechanism 4 of all the posts 2 are fixed to the lock pins 3
6B, the lock pins 32 of the receiving frame 29 of the upper pin locking device 26 are pulled out from the through holes 31 of the outer post 6 and the receiving frame 29 is locked with the receiving frame 29, as shown in FIG. The locked state with the outer post 6 is released, and the load of the large roof frame 5 is received by the receiving frame 34 of the lower pin lock device 27, and in this state, as shown in FIG. At the same time, the receiving frame 29 of the upper pin lock device 26 is raised, and the entire large roof frame 5 is pushed up.

【0032】大屋根架構5の押し上げはこれで終了した
わけではなく、前記縦向き特殊ジャッキ28の伸長によ
り、上部ピンロック装置26の受け枠29を上昇した状
態で、今度は図6dに示すように、上部ピンロック装置
26の受け枠29をロックピン32により外ポスト2に
ロックして、大屋根架構5の荷重を上部ピンロック装置
26に受け持たせてから、その状態で下部ピンロック装
置27のロックピン36を引き抜き、次に、図6eのよ
うに、縦向き特殊ジャッキ28を縮長して下部ピンロッ
ク装置27を所定の高さまで引き上げる。
The lifting of the large roof frame 5 is not completed at this point, but the extension of the vertical special jack 28 raises the receiving frame 29 of the upper pin lock device 26, as shown in FIG. Then, the receiving frame 29 of the upper pin lock device 26 is locked to the outer post 2 by the lock pin 32 so that the upper pin lock device 26 bears the load of the large roof frame 5, and then the lower pin lock device Then, as shown in FIG. 6e, the vertical special jack 28 is contracted and the lower pin lock device 27 is pulled up to a predetermined height.

【0033】縦向き特殊ジャッキ28の縮長により下部
ピンロック装置27が所定の高さまで引き上げられた後
は、図6fのように、下部ピンロック装置27の受け枠
34をロックピン36により外ポスト2にロックして、
上部ピンロック装置26のピン32を引き抜き、再び、
図6gのように、全てのポスト2の架構上昇機構4にお
ける縦向き特殊ジャッキ28の同時伸長により、各上部
ピンロック装置26の受け枠29を上昇し、大屋根架構
5を所定の高さまで押し上げる。
After the lower pin lock device 27 is pulled up to a predetermined height by the contraction of the vertical special jack 28, the receiving frame 34 of the lower pin lock device 27 is fixed to the outer post by the lock pin 36 as shown in FIG. Lock to 2,
Pull out the pin 32 of the upper pin lock device 26, and again,
As shown in FIG. 6g, by simultaneously extending the vertical special jacks 28 in the frame raising mechanisms 4 of all the posts 2, the receiving frames 29 of the respective upper pin lock devices 26 are raised, and the large roof frame 5 is pushed up to a predetermined height. .

【0034】[0034]

【発明の効果】以上に述べたように、本発明の構築方法
に使用する架設装置では、ポスト2に対して、該ポスト
2を上昇させるためのポスト上昇機構3と、このポスト
2の上方の架構5を上昇させるための架構上昇機構4と
を別個に設けて、ポスト上昇機構3の上部固定アーム装
置9と下部固定アーム装置10を、夫々鉄骨柱1に沿っ
て上昇させる時には、架構上昇機構4における上下両ピ
ンロック装置26,27の受け枠29,34は、外ポス
ト6とのロック状態が解除されているので、ポスト上昇
機構3は全く架構5の荷重を受けることなく上昇させる
ことができ、従って、ポスト上昇機構3としてはあまり
大掛かりでないコンパクトな機構によりポスト2の上昇
をコンピュータ制御により円滑、迅速にしてかつ安全に
行うことができる。
As described above, in the erection apparatus used in the construction method of the present invention, the post 2 has a post elevating mechanism 3 for elevating the post 2, and a post elevating mechanism 3 above the post 2. When the frame raising mechanism 4 for raising the frame 5 is separately provided, and the upper fixed arm device 9 and the lower fixed arm device 10 of the post raising mechanism 3 are respectively raised along the steel column 1, the frame raising mechanism is used. Since the lock state of the receiving frames 29, 34 of the upper and lower pin lock devices 26, 27 in 4 with the outer post 6 is released, the post lifting mechanism 3 can be raised without receiving the load of the frame 5 at all. Therefore, the post 2 can be raised smoothly, quickly and safely by computer control by a compact mechanism that is not so large as the post raising mechanism 3.

【0035】また、大屋根架構5を上昇させる時には、
既に上昇移動を完了し、安定した状態にあるポスト2を
支点として、大荷重の架構5のみを押し上げるので、架
構水平度およびジャッキの同調精度を検知しながら上昇
作業を行うことで、従来のこの種の工法に比較して大屋
根の上昇移動をコンピュータ制御により安定かつ安全に
行うことができる。
When raising the large roof frame 5,
Only the frame 5 with a large load is pushed up using the post 2 which has already completed the ascending movement and the post 2 in a stable state as a fulcrum. Compared with the various construction methods, the upward movement of the large roof can be performed more stably and safely by computer control.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本体鉄骨柱に沿って立設されるポストの構成を
示す一部欠切斜視図。
FIG. 1 is a partially cutaway perspective view showing a configuration of a post standing upright along a main body steel column.

【図2】ポスト上昇機構における上部固定アーム装置の
構成を示す斜視図。
FIG. 2 is a perspective view showing a configuration of an upper fixed arm device in the post lifting mechanism.

【図3】同じくポスト上昇機構における下部固定アーム
装置の構成を示す斜視図。
FIG. 3 is a perspective view showing a configuration of a lower fixed arm device in the post elevating mechanism.

【図4】構築方法の順序を示す工程図。FIG. 4 is a process chart showing the order of the construction method.

【図5】ポスト上昇機構の動作を示す断面図。FIG. 5 is a cross-sectional view showing the operation of the post lifting mechanism.

【図6】架構上昇機構の作業工程を示す側面図。FIG. 6 is a side view showing an operation process of the frame lifting mechanism.

【符号の説明】[Explanation of symbols]

1:本体鉄骨柱 2:ポスト 3:ポスト上昇機構 4:架構上昇機構 5:架構 6:外ポスト 7:内ポスト 8:梁材 9:上部固定アーム 10:下部固定アーム 11:特殊ジャッキ 12:アームガイド 13:アーム 14:アームジャッキ 15:掴みジャッキ 16:ホールディング装置 17:固定子 18:連結金具 19:アームガイド 20:アーム 21:アームジャッキ 22:掴みジャッキ 23:ホールディング装置 24:固定子 25:連結金具 26:上部ピンロック装置 27:下部ピンロック装置 28:特殊ジャッキ 29:受け枠 30:ブラケット 31:透孔 32:ロックピン 33:ピンロックジャッキ 34:受け枠 35:ブラケット 36:ロックピン 37:ピンロックジャッキ 1: Main body steel column 2: Post 3: Post raising mechanism 4: Frame raising mechanism 5: Frame 6: Outer post 7: Inner post 8: Beam 9: Upper fixed arm 10: Lower fixed arm 11: Special jack 12: Arm Guide 13: Arm 14: Arm jack 15: Gripping jack 16: Holding device 17: Stator 18: Connection fitting 19: Arm guide 20: Arm 21: Arm jack 22: Grabbing jack 23: Holding device 24: Stator 25: Connection Metal fitting 26: Upper pin lock device 27: Lower pin lock device 28: Special jack 29: Receiving frame 30: Bracket 31: Through hole 32: Lock pin 33: Pin lock jack 34: Receiving frame 35: Bracket 36: Lock pin 37: Pin lock jack

───────────────────────────────────────────────────── フロントページの続き (72)発明者 寺倉 敏夫 東京都北区滝野川1丁目3番11号 川田 工業株式会社内 (72)発明者 浦辺 裕二 東京都北区滝野川1丁目3番11号 川田 工業株式会社内 (58)調査した分野(Int.Cl.7,DB名) E04G 21/14 E04G 21/16 E04B 1/35 E04G 21/28 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Toshio Terakura 1-3-11 Takinogawa, Kita-ku, Tokyo Kawada Kogyo Co., Ltd. (72) Inventor Yuji 1-33-111 Takinogawa, Kita-ku, Tokyo Kawada Kogyo Incorporated (58) Fields surveyed (Int. Cl. 7 , DB name) E04G 21/14 E04G 21/16 E04B 1/35 E04G 21/28

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 建築中の構造物における既設本体鉄骨柱
の側面に取付けられて、前記構造物の上方を覆う組立作
業用大屋根ステージの架構を支持するための建築物の架
設装置であって、外ポストとこれに摺動自在に挿通され
た内ポストの下端に夫々本体鉄骨柱に対して着脱可能な
掴み装置を設けると共に、これら上下の掴み装置の間を
特殊ジャッキにより連結したポスト上昇機構と、前記外
ポストの上方には該外ポストに夫々摺動自在に挿通され
た、該外ポストに対して水平方向に着脱可能なピンロッ
ク手段を有する上下一対の架構受け具を設けると共に、
これら上下の受け具の間を特殊ジャッキにより連結し、
かつ、上方の架構受け具を架構に固定した架構上昇機構
とからなる建築物の架設装置。
1. A building erection apparatus for supporting a frame of an assembling large roof stage attached to a side surface of an existing main body steel column of a structure under construction to cover an upper part of the structure. A post lifting mechanism in which a gripping device is provided at the lower end of the outer post and the inner post slidably inserted therein and detachable from the main body steel column, and the upper and lower gripping devices are connected by a special jack. A pair of upper and lower frame receivers having pin lock means which are slidably inserted into the outer posts and which can be horizontally attached to and detached from the outer posts are provided above the outer posts,
Connect these upper and lower receivers with a special jack,
In addition, a construction apparatus for a building, comprising a frame lifting mechanism in which an upper frame receiving member is fixed to the frame.
【請求項2】 外ポストと内ポストの下端に設けられる
本体鉄骨柱への掴み装置が、ジャッキにより鉄骨柱の両
側方向へ延びる左右一対のアームと、これらのアームの
先端を本体鉄骨柱の両側面に圧着する掴みジャッキと、
前記アームの先端を本体鉄骨柱の内側面に抱え込むため
のホールディング装置とからなっている請求項1の建築
物の架設装置。
2. A device for gripping a main body steel column provided at a lower end of an outer post and an inner post, comprising: a pair of left and right arms extending in both directions of the steel column by jacks; A grip jack that crimps to the surface,
2. The building erection apparatus according to claim 1, further comprising a holding device for holding a tip of said arm on an inner surface of a main body steel column.
【請求項3】 ホールディング装置が、左右の掴みジャ
ッキに対して夫々係脱自在に取付けられた左右一対の固
定子と、両固定子の間を締めたり緩めたりするネジ状の
連結金物からなっている請求項2の建築物の架設装置。
3. A holding device comprising a pair of left and right stators which are respectively removably attached to left and right gripping jacks, and a screw-like connection hardware for tightening and loosening between the two stators. The building erection device according to claim 2.
【請求項4】 建築中の構造物における既設本体鉄骨柱
の側面に取付けられて、前記構造物の上方を覆う組立作
業用大屋根ステージの架構を支持するための構築手段に
より建築物を構築する工法において、外ポストとこれに
摺動自在に挿通された内ポストを夫々の下端に設けたポ
スト上昇機構の掴み装置により本体鉄骨柱に固定した状
態で既設本体鉄骨柱の上端に新設鉄骨柱を立設し、前記
上下の掴み装置の着脱と特殊ジャッキの伸縮により外ポ
ストと内ポストを新設鉄骨柱に沿って上昇させ、順次同
様の操作により全ての外ポストと内ポストを上昇させた
のち、外ポスト上方における架構上昇機構の上下架構受
け具を、全て同時にピンロック手段の着脱と特殊ジャッ
キの伸縮により上昇させて、上部架構受け具を押し上げ
ることで架構を上昇することを特徴する建築物の構築工
法。
4. A building is constructed by construction means for supporting a frame of a large roof stage for assembly work, which is attached to a side surface of an existing main body steel column in a structure under construction and covers an upper part of the structure. In the construction method, the outer post and the inner post slidably inserted into this are fixed to the main body steel column by the gripping device of the post lifting mechanism provided at each lower end, and the new steel column is mounted on the upper end of the existing main body steel column. After standing, raising and lowering the upper and lower posts along the new steel column by attaching and detaching the upper and lower gripping devices and expanding and contracting the special jack, and sequentially raising all the outer and inner posts by the same operation, The upper and lower frame supports of the frame raising mechanism above the outer post are all raised at the same time by attaching and detaching the pin lock means and expanding and contracting the special jack, and the upper frame receiving device is raised to raise the frame. Building construction method characterized by doing.
JP35644796A 1996-12-26 1996-12-26 Building erection equipment and construction method Expired - Fee Related JP2999732B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP35644796A JP2999732B2 (en) 1996-12-26 1996-12-26 Building erection equipment and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP35644796A JP2999732B2 (en) 1996-12-26 1996-12-26 Building erection equipment and construction method

Publications (2)

Publication Number Publication Date
JPH10184017A JPH10184017A (en) 1998-07-14
JP2999732B2 true JP2999732B2 (en) 2000-01-17

Family

ID=18449059

Family Applications (1)

Application Number Title Priority Date Filing Date
JP35644796A Expired - Fee Related JP2999732B2 (en) 1996-12-26 1996-12-26 Building erection equipment and construction method

Country Status (1)

Country Link
JP (1) JP2999732B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5059357B2 (en) * 2006-08-03 2012-10-24 株式会社日立プラントテクノロジー Construction method of boiler cage section floor
CN112081390B (en) * 2020-09-16 2021-12-14 中国建筑第二工程局有限公司 Steel structure lifting, limiting and locking device and construction method thereof

Also Published As

Publication number Publication date
JPH10184017A (en) 1998-07-14

Similar Documents

Publication Publication Date Title
JP2999732B2 (en) Building erection equipment and construction method
CN112376435A (en) Rapid construction device and method for arch rib of arch bridge
JP3049583B2 (en) Composite jack device for lifting and lifting
JP2618171B2 (en) Telescopic strut
JP2001055834A (en) Push-up construction method and its device
JP3230104B2 (en) Tower crane
JP2890341B2 (en) Method and apparatus for lifting up top-level frame for structure construction
JP3185016B2 (en) How to raise and lower structures
JP2872886B2 (en) Construction lift equipment
JPH0246594Y2 (en)
JP2592980B2 (en) Construction method of steel frame material for high-rise structure
JP3247954B2 (en) Structure lifting method and apparatus
JPH0791904B2 (en) Push-up device
JPH1037478A (en) Automatic roof lifting equipment and method for constructing building by lifting roof
JPH0431412Y2 (en)
JP2767365B2 (en) Construction method of roof structure
JP3179814B2 (en) Column and beam construction method and apparatus
JP3119982B2 (en) Self-elevating construction equipment
JP2914162B2 (en) How to dismantle a water gas tank
JP2776128B2 (en) Lifting device for building frame
JP3225385B2 (en) Jacking device of the driving floor advance type construction method
JP2572642B2 (en) Scaffolding disassembly method
JPH083577Y2 (en) Frame for scaffolding
JP3028265B2 (en) Driven floor advance lifting method
JP2842034B2 (en) Lifting device for building frame

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees