JP2958880B1 - Seismic reinforcement method - Google Patents

Seismic reinforcement method

Info

Publication number
JP2958880B1
JP2958880B1 JP12733098A JP12733098A JP2958880B1 JP 2958880 B1 JP2958880 B1 JP 2958880B1 JP 12733098 A JP12733098 A JP 12733098A JP 12733098 A JP12733098 A JP 12733098A JP 2958880 B1 JP2958880 B1 JP 2958880B1
Authority
JP
Japan
Prior art keywords
reinforced concrete
steel
steel plate
seismic
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP12733098A
Other languages
Japanese (ja)
Other versions
JPH11324337A (en
Inventor
良夫 川元
幸和 武田
一義 内田
勇三 鈴木
Original Assignee
株式会社シーク研究所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社シーク研究所 filed Critical 株式会社シーク研究所
Priority to JP12733098A priority Critical patent/JP2958880B1/en
Application granted granted Critical
Publication of JP2958880B1 publication Critical patent/JP2958880B1/en
Publication of JPH11324337A publication Critical patent/JPH11324337A/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

【要約】 【課題】 既存建物をむやみに解体せず、外部からの補
強工事ですむので、建物内部はそのままで居ながらにし
て工事ができ、しかも大きく嵩張らないような補強を簡
単かつ安価に施すことができる。 【解決手段】 既存の鉄筋コンクリート造または鉄骨鉄
筋コンクリート造で、鉄筋コンクリート造の場合は鉄筋
コンクリート柱1と鉄筋コンクリート梁2での架構面に
外側から耐震補強用の鋼板4を配設し、接着系アンカー
6等でアンカー止めする鋼材5でこの鋼板4を外側から
押さえる。
[Summary] [Problem] Since existing buildings are not dismantled unnecessarily and only external reinforcement work is required, construction can be performed while keeping the inside of the building as it is, and reinforcement that is not large and bulky is easily and inexpensively provided. be able to. SOLUTION: An existing reinforced concrete structure or a steel reinforced concrete structure. In the case of a reinforced concrete structure, a steel plate 4 for seismic reinforcement is arranged from the outside on a frame surface of a reinforced concrete column 1 and a reinforced concrete beam 2, and an adhesive anchor 6 or the like. This steel plate 4 is pressed from the outside by a steel material 5 to be anchored.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、既存建物の耐震性
能を高める改修をおこなう耐震補強構法に関するもので
ある。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a seismic retrofitting method for improving an existing building to improve its seismic performance.

【0002】[0002]

【従来の技術】1995年1月17日の阪神・淡路大震
災を契機とし、1981年以前の旧耐震基準によって建
てられた建物の安全性の問題が指摘され、1995年1
2月に既存建物に関する「耐震改修促進法」が施行され
た。この法律の骨子は、旧基準による学校、病院、デパ
ート、事務所など特定建築物の所有者は耐震診断および
耐震改修を行う努力義務があるとするものである。
2. Description of the Related Art Following the Great Hanshin-Awaji Earthquake on January 17, 1995, the safety of buildings built under the old seismic standards before 1981 was pointed out.
In February, the “Act on Promotion of Seismic Retrofitting” for existing buildings was enacted. The essence of the law is that owners of certain buildings, such as schools, hospitals, department stores, and offices, have an obligation to make seismic assessments and upgrades under the old standards.

【0003】旧基準による建物は全国で約2400万棟
もあり、そのうち既存不適格建物は約1400万棟にの
ぼると推定されている。このうち既に耐震診断された建
物は全体的に微々たるものと思われ、次のステップであ
る施工に関しては更に多くの困難を伴うため思うように
進まないのが実状のようである。しかしながら、官民に
より耐震診断規準や耐震改修構法の整備も着実に進み、
構法に関しては最近は色々なものが提案され実施に移さ
れている。
[0003] There are about 24 million buildings in the country based on the old standard, of which it is estimated that about 14 million are non-existent buildings. Of these buildings, the buildings that have already been diagnosed with earthquake resistance are considered to be insignificant overall, and it seems that the actual situation is that the building, which is the next step, does not proceed as expected because it involves more difficulties. However, the government and the private sector are steadily developing seismic diagnosis standards and seismic retrofitting construction methods.
Recently, various construction methods have been proposed and put into practice.

【0004】耐震補強構法の一般的な方策は、強度を高
めることと靭性を増すことであり、現在のところ構法の
多くは建物内部補強である。
[0004] The general measures of seismic retrofitting are to increase the strength and increase the toughness, and at present most of the constructions are reinforcement inside buildings.

【0005】内部補強は構造部材の断面積の増加、耐震
要素の追加設置による強度の増加、および柱・壁のせん
断補強などによる靭性能の向上が主な対策である。その
方法は、耐震壁の増設、ブレースの増設、そで壁の付
加、柱の補強等で、さらに、耐震壁の壁厚を増す、ブレ
ースの断面を大きくする、柱断面を大きくするなどの方
法や特殊な例として建物全体を免震装置の上に載せるこ
とも考えられる。
The main measures for internal reinforcement are to increase the cross-sectional area of structural members, increase the strength by additionally installing seismic elements, and improve the toughness by shear reinforcement of columns and walls. The method is to increase the wall thickness of the earthquake-resistant wall, increase the cross-section of the brace, increase the cross-section of the column, etc. Or as a special case, it is conceivable to put the whole building on the seismic isolation device.

【0006】これらを更に詳細に説明すると、増設する
耐震壁としては場所打ち壁、PCa板壁、鉄板壁、コン
クリートブロック壁などから選択でき、柱・梁にアンカ
ーボルト等を介して固定するが、これは耐力の向上もし
くは耐力・靱性の向上を目的としたものである。ブレー
スの増設は、ブレースとしてX型ブレース、K型ブレー
ス、V型ブレース、その他の形状のブレースが選択で
き、これも耐力の向上もしくは耐力・靱性の向上を目的
としたものである。
To explain these in more detail, the additional earthquake-resistant wall can be selected from a cast-in-place wall, a PCa plate wall, an iron plate wall, a concrete block wall, and the like, and is fixed to columns and beams via anchor bolts. Is intended to improve proof stress or proof stress and toughness. When the brace is added, an X-shaped brace, a K-shaped brace, a V-shaped brace, or any other brace can be selected as the brace, and this is also for the purpose of improving the yield strength or the yield strength / toughness.

【0007】そで壁の付加は、このそで壁としては場所
打ちそで壁やPCa板そで壁であり、耐力の向上を期す
る。柱の補強による場合は、既存柱の周囲に鋼板を巻
き、隙間に無収縮モルタルを充填する方法、既存柱の周
囲に帯筋を巻き、後打ちコンクリートまたはモルタルで
補強する方法、その他溶接金網、FRPを周囲に配設
し、無収縮モルタルを充填したり、もしくは後打ちコン
クリートまたはモルタルを施す方法、腰壁の縁切りを行
う方法などが選択でき、耐力の向上もしくは靱性の向上
を目的とする。
[0007] The addition of a sleeve wall is a place-in-place wall or a PCa-plate-sleeve wall, which is intended to improve the proof stress. In the case of column reinforcement, a method of winding steel plates around existing columns and filling non-shrink mortar in gaps, winding a stirrup around existing columns, reinforcing with post-cast concrete or mortar, other welding wire mesh, A method of arranging FRP around, filling with non-shrink mortar, or applying post-cast concrete or mortar, a method of trimming a lumbar wall, and the like can be selected, and the purpose is to improve proof stress or toughness.

【0008】[0008]

【発明が解決しようとする課題】前記従来の耐震補強工
法のうち、耐震壁やブレースやそで壁の増設の場合は、
この増設により建物のレイアウトを変更したりする必要
が生じ、建物の機能上必要な所に増設できないこともあ
る。また、工事期間中は少なくとも工事フロアーは使用
できない。
Among the conventional seismic retrofitting methods described above, in the case of adding an earthquake-resistant wall, a brace or a sleeve wall,
Due to this addition, it is necessary to change the layout of the building, and it may not be possible to add the building to a necessary place for its function. Also, at least the construction floor cannot be used during the construction period.

【0009】耐震壁の厚みを増す、ブレースの断面を大
きくする、柱断面を大きくするなどの方法では、建物の
有効面積が減るおそれがあり、また、前記と同じく工事
期間中は少なくとも工事フロアーは使用できない。
The method of increasing the thickness of the earthquake-resistant wall, enlarging the cross section of the brace, or enlarging the cross section of the column may reduce the effective area of the building. I can not use it.

【0010】柱の補強で、柱に鋼板、繊維等を巻く・貼
る等の方法は、柱の剪断耐力、曲げ耐力、剛性にさほど
の向上とはならず、剛性率、編心率の改善もできない。
さらに、このような前記すべての補強は工事場所は室内
全般となり、資材の搬出入はエレベーター、階段に頼る
ことになり、建物使用者の利便性に大きく影響を与える
こととなる。
[0010] The method of winding or pasting a steel plate, fiber, or the like to the column for reinforcing the column does not significantly improve the shear strength, bending strength, and rigidity of the column, and cannot improve the rigidity and knitting ratio. .
In addition, all of the above-mentioned reinforcements require a construction site in the entire room, and the loading and unloading of materials depends on elevators and stairs, which greatly affects the convenience of building users.

【0011】一方、建物全体を免震装置の上に載せる方
法では、工事自体が大がかりとなり、工事期間中の使用
制限がある。さらに建物高さが高くなったり、使用でき
ないフロアーができたりする。また、免震装置を設ける
には建物外周部にドライエリアを取る必要があるが、敷
地上や施工上これがなかなか取れない。
On the other hand, in the method of mounting the whole building on the seismic isolation device, the construction itself becomes large and there is a restriction on use during the construction period. In addition, the height of the building becomes higher and floors that cannot be used are created. In addition, to install a seismic isolation device, it is necessary to provide a dry area on the outer periphery of the building, but this cannot be easily achieved on the site and construction.

【0012】一方、梁、スラブ、水平ブレースなどを既
存建物から張り出し、外部に新しい架構を心棒のように
構築する外部補強構法があり、これは建物内部はそのま
まで、居ながらにして工事ができるという大きな利点が
ある。又、同時に外壁をリニューアルでき、さらにその
空間を既存建物の省エネ化やインテリジェント化にも利
用できる。
On the other hand, there is an external reinforcement method in which beams, slabs, horizontal braces, and the like are extended from an existing building, and a new frame is constructed outside like a mandrel. There is a great advantage that. At the same time, the outer wall can be renewed, and that space can be used for energy saving and intelligentization of existing buildings.

【0013】特開平10-61204号公報に示す既存建物に耐
震改修工法も前記外部補強構法の一例で、既存建物は鉄
筋コンクリート造または鉄骨鉄筋コンクリート造の架構
であり、既存建物の外周部にウエブにスタッドボルトを
植設した鉄骨柱、鉄骨梁の鉄骨架構を設け、既存建物の
鉄筋コンクリート柱、鉄筋コンクリート梁からもこのス
タッドボルトに対向するように接着系アンカーを植設
し、既存建物の鉄筋コンクリート柱や鉄筋コンクリート
梁の外面と鉄骨柱、鉄骨梁のフランジで囲まれた空間に
配筋し、かつ、高強度無収縮コンクリートを充填して一
体化を図るようにした。
The seismic retrofitting method for an existing building disclosed in Japanese Patent Application Laid-Open No. 10-61204 is also an example of the above-mentioned external reinforcement construction method. A steel frame with steel bolts and steel beams with bolts will be installed.Adhesive anchors will also be installed from the reinforced concrete columns and reinforced concrete beams of the existing building so as to face the stud bolts. Are arranged in a space surrounded by the outer surface of the steel frame, the flange of the steel column, and the flange of the steel beam, and are filled with high-strength non-shrinkable concrete for integration.

【0014】しかし、前記のごとく外部に新しい架構を
心棒のように構築するのでは大掛かりな工事となり、工
期も長く、建設コストも高騰し、さらに、架構を付加す
る分だけ躯体の嵩が増加し、建物周囲に一定の空間を必
要とする。
However, constructing a new frame outside like a mandrel as described above requires a large amount of work, requires a long construction period, increases construction costs, and further increases the bulk of the frame by adding the frame. Requires a certain space around the building.

【0015】本発明の目的は前記従来例の不都合を解消
し、既存建物をむやみに解体せず、外部からの補強工事
ですむので、建物内部はそのままで居ながらにして工事
ができ、しかも大きく嵩張らないような補強を簡単かつ
安価に施すことができる耐震補強構法を提供することに
ある。
The object of the present invention is to eliminate the disadvantages of the prior art, to dismantle the existing building and to reinforce it from the outside. It is an object of the present invention to provide a seismic retrofitting method that can easily and inexpensively provide reinforcement without bulkiness.

【0016】[0016]

【課題を解決するための手段】本発明は前記目的を達成
するため、第1に、既存の鉄筋コンクリート造または鉄
骨鉄筋コンクリート造の柱、梁での架構面に外側から耐
震補強用の鋼板を配設し、アンカー止めする鋼材でこの
鋼板を外側から押さえ、このアンカー止めする鋼材には
予め透孔を適宜に穿設しておき、この透孔を介して鋼材
に耐震補強用の鋼板を溶接すること、第2に、架構面に
は鉄筋コンクリート壁があり、耐震補強用の鋼板はこの
鉄筋コンクリート壁面に重合するとともに隙間に充填材
を注入すること、第3に、耐震補強用の鋼板は鉄筋コン
クリート壁にアンカー止めすること、第4に、充填材
は、白セメントと珪砂と添加物からなるエマルジョンと
ポリアクリル酸ポリマーセメントモルタルからなる複合
高分子エマルジョンを調合してなるポリマーセメント系
材料であることを要旨とするものである。
In order to achieve the above object, the present invention firstly disposes a steel plate for seismic reinforcement from the outside on an existing reinforced concrete or steel reinforced concrete column or beam frame. The steel plate to be anchored is pressed against the steel plate from the outside, and the steel plate to be anchored is appropriately drilled with a through hole in advance, and a steel plate for seismic reinforcement is welded to the steel material through the through hole. Secondly, there is a reinforced concrete wall on the frame surface. The steel plate for seismic reinforcement is superimposed on this reinforced concrete wall and filler is injected into the gap. Third, the steel plate for seismic reinforcement is anchored to the reinforced concrete wall. Fourth, the filler is a composite polymer emulsion consisting of an emulsion composed of white cement, silica sand and additives, and a polyacrylic acid polymer cement mortar. It is an summarized in that a polymer cement material formed by compounding.

【0017】請求項1記載の本発明によれば、既存の鉄
筋コンクリート(RC)ラーメンの柱・梁間に耐震補強
用の鋼板が配設され、この鋼板により耐震性の増大が図
れ、可能な限り既存建物の耐震性を引き出すことができ
る。また、この耐震補強用の鋼板はアンカー止めする鋼
材で外側から押さえられるので、座屈が防止され、鋼板
の強度を終局強度付近まで発揮させることができる。さ
らに、鋼板による補強なので架構を増設する場合に比べ
て大きく張り出すこともなく、コスト的にも安価です
む。
According to the first aspect of the present invention, a steel plate for seismic reinforcement is arranged between columns and beams of the existing reinforced concrete (RC) frame, and the steel plate can increase the earthquake resistance. It can bring out the earthquake resistance of the building. Further, since the steel plate for seismic reinforcement is pressed from the outside by a steel material to be anchored, buckling is prevented, and the strength of the steel plate can be brought to near the ultimate strength. Furthermore, since it is reinforced with steel plates, it does not overhang as compared with the case where a frame is added, and the cost is low.

【0018】しかも、耐震補強用の鋼板を外側から押さ
える鋼材とこの鋼板とは鋼材には予め透孔を適宜に穿設
しておき、この透孔を介して鋼材に耐震補強用の鋼板を
溶接することで簡単に一体化できる。
In addition, a steel material for holding the steel plate for seismic reinforcement from the outside and the steel plate are provided with through holes in the steel material in advance, and the steel plate for the seismic reinforcement is welded to the steel material through the through holes. Can be easily integrated.

【0019】請求項2記載の本発明によれば、前記作用
に加えて、既存の鉄筋コンクリート壁である場合で、鋼
板を張り付けることで既存の鉄筋コンクリート壁の耐力
の増強を図り、耐震性を増すようにした。特に隙間に充
填材を注入することで、単独では座屈を生じて耐力を発
揮し難い鋼板を鉄筋コンクリート壁と一体化させること
で鉄筋コンクリート壁を鋼板の座屈防止の保剛材とし、
座屈防止を図ることができる。
According to the second aspect of the present invention, in addition to the above-mentioned functions, in the case of an existing reinforced concrete wall, the steel plate is attached to increase the strength of the existing reinforced concrete wall, thereby increasing the earthquake resistance. I did it. In particular, by injecting fillers into the gaps, the steel plate that buckles alone and hardly exerts proof strength is integrated with the reinforced concrete wall by itself, making the reinforced concrete wall a stiffener to prevent buckling of the steel plate,
Buckling can be prevented.

【0020】請求項3記載の本発明によれば、耐震補強
用の鋼板は鉄筋コンクリート壁にアンカー止めすること
でより鉄筋コンクリート壁との一体化が達成でき、請求
項4記載の本発明によれば、充填材をポリマーセメント
系材料とすることで、耐火性能を上げ、火災に強いもの
とすることができる。
According to the third aspect of the present invention, the steel plate for seismic reinforcement can be integrated with the reinforced concrete wall by anchoring to the reinforced concrete wall, and according to the fourth aspect of the present invention, By making the filler a polymer cement-based material, fire resistance can be increased and fire resistance can be increased.

【0021】[0021]

【発明の実施の形態】以下、本発明の実施の形態を詳細
に説明する。図1は本発明の耐震補強構法の第1実施形
態を示す横断平面図、図2は同上要部の横断平面図、図
3は同上縦断側面図、図4は同上正面図で、図中1は既
存建物の既存の鉄筋コンクリート柱、2は既存の鉄筋コ
ンクリート梁で、既存の鉄筋コンクリート造(RC造)
のラーメン(架構)を形成している。なお、既存建物が
鉄骨鉄筋コンクリート造(SRC造)の場合もあり、そ
の場合は鉄骨鉄筋コンクリート柱と鉄骨鉄筋コンクリー
ト梁での架構となる。
Embodiments of the present invention will be described below in detail. FIG. 1 is a cross-sectional plan view showing a first embodiment of the seismic retrofitting construction method of the present invention, FIG. 2 is a cross-sectional plan view of essential parts of the same, FIG. 3 is a vertical sectional side view of the same, FIG. Is the existing reinforced concrete column of the existing building, 2 is the existing reinforced concrete beam, and the existing reinforced concrete structure (RC structure)
Form a ramen (frame). In some cases, the existing building is made of steel reinforced concrete (SRC), and in that case, the frame is made up of steel reinforced concrete columns and steel reinforced concrete beams.

【0022】また、本実施形態では、鉄筋コンクリート
柱1と鉄筋コンクリート梁2での架構には既存の鉄筋コ
ンクリート壁3が設けられている。
Further, in the present embodiment, an existing reinforced concrete wall 3 is provided on a frame composed of the reinforced concrete columns 1 and the reinforced concrete beams 2.

【0023】本発明は前記鉄筋コンクリート壁3の壁面
に外側から重合するようにして耐震補強用の鋼板4を前
記鉄筋コンクリート柱1と鉄筋コンクリート梁2での架
構面に配設した。
In the present invention, a steel plate 4 for seismic reinforcement is disposed on the frame surface of the reinforced concrete column 1 and the reinforced concrete beam 2 so as to be superposed on the wall surface of the reinforced concrete wall 3 from the outside.

【0024】そして、鉄筋コンクリート柱1と鉄筋コン
クリート梁2に沿うようにチャンネル型鋼による鋼材5
を外側から取付け、この鋼材5で鋼板4を外側から押さ
えるようにした。
A steel material 5 made of channel-type steel is provided along the reinforced concrete column 1 and the reinforced concrete beam 2.
Was attached from the outside, and the steel sheet 5 was pressed from the outside by the steel material 5.

【0025】前記鋼材5は、既存建物の鉄筋コンクリー
ト柱1や鉄筋コンクリート梁2からは削孔内に接着剤を
充填してスタッドボルトを固定してなる接着系アンカー
(商品名ケミカルアンカー)6を植設し、この接着系ア
ンカー6で固定する。
The steel material 5 is provided with an adhesive anchor (trade name: chemical anchor) 6 from the reinforced concrete column 1 or the reinforced concrete beam 2 of the existing building, in which a hole is filled with an adhesive and a stud bolt is fixed. Then, it is fixed with the adhesive anchor 6.

【0026】さらに、鋼材5には楕円形の透孔7を予め
適宜に穿設しておき、この透孔7を介して鋼材5に耐震
補強用の鋼板4を溶接するようにしてもよい。鋼材5と
鋼板4とは透孔7以外の溶接も可能である。
Further, an elliptical through hole 7 may be appropriately formed in the steel material 5 in advance, and the steel plate 4 for seismic reinforcement may be welded to the steel material 5 through the through hole 7. The welding of the steel material 5 and the steel plate 4 other than the through hole 7 is also possible.

【0027】また、鉄筋コンクリート壁3の壁面にも接
着系アンカー6を植設し、この接着系アンカー6で鋼板
4を鉄筋コンクリート壁3に固定する。
An adhesive anchor 6 is also planted on the wall surface of the reinforced concrete wall 3, and the steel plate 4 is fixed to the reinforced concrete wall 3 with the adhesive anchor 6.

【0028】このようにして耐震補強用の鋼板4を鉄筋
コンクリート壁3の壁面に重ねるように配設した場合、
両者間には隙間が生じるが、図2に示すようにこの隙間
に充填材を注入した。
When the steel plate 4 for seismic reinforcement is arranged so as to overlap with the wall surface of the reinforced concrete wall 3 in this manner,
A gap is formed between the two, and a filler is injected into this gap as shown in FIG.

【0029】この充填材8としてはエポキシ樹脂でもよ
いが、耐熱性を考慮して、白セメントと珪砂と添加物か
らなるエマルジョンとポリアクリル酸ポリマーセメント
モルタルからなる複合高分子エマルジョンを調合してな
るポリマーセメント系材料を用いた。
The filler 8 may be an epoxy resin, but in consideration of heat resistance, is prepared by blending an emulsion composed of white cement, silica sand and additives and a composite polymer emulsion composed of polyacrylic acid polymer cement mortar. A polymer cement-based material was used.

【0030】図中9は鉄筋コンクリート柱1や鉄筋コン
クリート梁2の施す斫出し部分9であり、前記充填材8
を充填し易いように予め斫出し部分9で空間を確保す
る。
In the figure, reference numeral 9 denotes a cutout portion 9 to be provided on the reinforced concrete column 1 or the reinforced concrete beam 2, and the filler 8
A space is previously secured in the shaving portion 9 so that the material can be easily filled.

【0031】前記のごとく、本発明は既存のRC壁に外
部から鋼板を張り付け、またはRCラーメンの柱梁間に
設置して耐震性の増大を図ろうとするもので、耐震補強
用の鋼板4は不足する地震力を負担するものとなり、計
算によって鋼板材の許容応力度、並びに不足地震力から
鋼板厚さを決定し、必要強度を満足させる。
As described above, in the present invention, the steel plate is stuck on the existing RC wall from the outside or installed between the columns and beams of the RC frame to increase the seismic resistance. The steel plate thickness is determined from the allowable stress of the steel plate material and the insufficient seismic force by calculation, and the required strength is satisfied.

【0032】なお、接着系アンカー6に代えて機械式の
アンカー、いわゆる埋込み式のアンカーボルトを使用し
てもよい。
Note that, instead of the adhesive anchor 6, a mechanical anchor, that is, a so-called embedded anchor bolt may be used.

【0033】図5、図6は本発明の第2実施形態として
鉄筋コンクリート壁3がない場合であるが、その場合で
も耐震補強用の鋼板4をRCラーメンの柱梁間に配設す
ることで耐震性の増大を図ることが可能である。
FIGS. 5 and 6 show a second embodiment of the present invention in which the reinforced concrete wall 3 is not provided. Even in such a case, the steel plate 4 for seismic reinforcement is disposed between the columns and beams of the RC frame. Can be increased.

【0034】また、耐震補強用の鋼板4を外側から押さ
える鋼材5の設置は、図7に示すようにブレース状、格
子状など種々の形態を選択できる。この鋼材5の配置は
前記第1実施形態の鉄筋コンクリート壁3がある場合に
も応用できる。
The steel material 5 for holding the steel plate 4 for seismic reinforcement from the outside can be selected from various forms such as a brace shape and a lattice shape as shown in FIG. This arrangement of the steel material 5 can be applied to the case where the reinforced concrete wall 3 of the first embodiment is provided.

【0035】[0035]

【発明の効果】以上述べたように本発明の耐震補強構法
は、既存建物をむやみに解体せず、外部からの補強工事
ですむので、建物内部はそのままで居ながらにして工事
ができ、しかも大きく嵩張らないような補強を簡単かつ
安価に施すことができるものである。
[Effect of the Invention] As described above, the seismic retrofitting construction method of the present invention does not needlessly dismantle an existing building, but requires only external reinforcement work. It is possible to easily and inexpensively reinforce it so as not to be bulky.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の耐震補強構法の第1実施形態を示す横
断平面図である。
FIG. 1 is a cross-sectional plan view showing a first embodiment of a seismic retrofitting method according to the present invention.

【図2】本発明の耐震補強構法の第1実施形態を示す要
部の横断平面図である。
FIG. 2 is a cross-sectional plan view of a main part showing the first embodiment of the seismic retrofitting construction method of the present invention.

【図3】本発明の耐震補強構法の第1実施形態を示す縦
断側面図である。
FIG. 3 is a longitudinal sectional side view showing the first embodiment of the earthquake-resistant reinforcement method of the present invention.

【図4】本発明の耐震補強構法の第1実施形態を示す正
面図である。
FIG. 4 is a front view showing a first embodiment of the seismic retrofitting construction method of the present invention.

【図5】本発明の耐震補強構法の第2実施形態を示す横
断平面図である。
FIG. 5 is a cross-sectional plan view showing a second embodiment of the seismic retrofitting construction method of the present invention.

【図6】本発明の耐震補強構法の第2実施形態を示す縦
断側面図である。
FIG. 6 is a longitudinal sectional side view showing a second embodiment of the seismic retrofitting construction method of the present invention.

【図7】本発明の耐震補強構法の第3実施形態を示す正
面図である。
FIG. 7 is a front view showing a third embodiment of the earthquake-resistant reinforcing method of the present invention.

【図8】本発明の耐震補強構法の第4実施形態を示す正
面図である。
FIG. 8 is a front view showing a fourth embodiment of the earthquake-resistant reinforcement method of the present invention.

【符号の説明】[Explanation of symbols]

1…鉄筋コンクリート柱 2…鉄筋コンクリー
ト梁 3…鉄筋コンクリート壁 4…鋼板 5…鋼材 6…接着系アンカー 7…透孔 8…充填材 9…斫出し部分
DESCRIPTION OF SYMBOLS 1 ... Reinforced concrete column 2 ... Reinforced concrete beam 3 ... Reinforced concrete wall 4 ... Steel plate 5 ... Steel material 6 ... Adhesive anchor 7 ... Through-hole 8 ... Filler 9 ... Cut-out part

フロントページの続き (72)発明者 鈴木 勇三 東京都中央区銀座8−14−14 株式会社 シーク研究所内 (56)参考文献 特開 平4−85461(JP,A) 特開 平9−273316(JP,A) 特開 平9−158490(JP,A) 特開 平9−221918(JP,A) 特開 平8−284194(JP,A) 特開 平4−118475(JP,A) 特開 昭57−137076(JP,A) (58)調査した分野(Int.Cl.6,DB名) E04G 23/02 Continuation of front page (72) Inventor Yuzo Suzuki 8-14-14 Ginza, Chuo-ku, Tokyo Inside Seek Research Laboratories Co., Ltd. (56) References JP-A-4-85461 (JP, A) JP-A-9-273316 (JP) JP-A-9-158490 (JP, A) JP-A-9-221918 (JP, A) JP-A-8-284194 (JP, A) JP-A-4-118475 (JP, A) JP 57-137076 (JP, A) (58) Field surveyed (Int. Cl. 6 , DB name) E04G 23/02

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 既存の鉄筋コンクリート造または鉄骨鉄
筋コンクリート造の柱、梁での架構面に外側から耐震補
強用の鋼板を配設し、アンカー止めする鋼材でこの鋼板
を外側から押さえ、このアンカー止めする鋼材には予め
透孔を適宜に穿設しておき、この透孔を介して鋼材に耐
震補強用の鋼板を溶接することを特徴とする耐震補強構
法。
1. A steel plate for seismic reinforcement is arranged from the outside on the existing reinforced concrete or steel reinforced concrete column or beam frame, and the steel plate to be anchored is pressed down from outside and the anchored. A seismic retrofitting method characterized in that a through hole is appropriately drilled in a steel material in advance, and a steel plate for seismic reinforcement is welded to the steel material through the through hole.
【請求項2】 架構面には鉄筋コンクリート壁があり、
耐震補強用の鋼板はこの鉄筋コンクリート壁面に重合す
るとともに隙間に充填材を注入する請求項1記載の耐震
補強構法。
2. The frame surface has a reinforced concrete wall,
2. The method according to claim 1, wherein a steel plate for seismic reinforcement is superposed on the reinforced concrete wall surface and a filler is injected into the gap.
【請求項3】 耐震補強用の鋼板は鉄筋コンクリート壁
にアンカー止めする請求項2記載の耐震補強構法。
3. The method of claim 2, wherein the steel plate for seismic reinforcement is anchored to a reinforced concrete wall.
【請求項4】 充填材は、白セメントと珪砂と添加物か
らなるエマルジョンとポリアクリル酸ポリマーセメント
モルタルからなる複合高分子エマルジョンを調合してな
るポリマーセメント系材料である請求項2または請求項
3記載の耐震補強構法。
4. The filler material is a polymer cement-based material prepared by blending an emulsion composed of white cement, silica sand and additives and a composite polymer emulsion composed of polyacrylic acid polymer cement mortar. The described seismic reinforcement method.
JP12733098A 1998-05-11 1998-05-11 Seismic reinforcement method Expired - Fee Related JP2958880B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12733098A JP2958880B1 (en) 1998-05-11 1998-05-11 Seismic reinforcement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12733098A JP2958880B1 (en) 1998-05-11 1998-05-11 Seismic reinforcement method

Publications (2)

Publication Number Publication Date
JP2958880B1 true JP2958880B1 (en) 1999-10-06
JPH11324337A JPH11324337A (en) 1999-11-26

Family

ID=14957264

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12733098A Expired - Fee Related JP2958880B1 (en) 1998-05-11 1998-05-11 Seismic reinforcement method

Country Status (1)

Country Link
JP (1) JP2958880B1 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030070337A (en) * 2002-02-25 2003-08-30 한국건설기술연구원 structure strengthening method by fiber reinforced sheet(or laminate) and embedded anchoring plate
JP4759301B2 (en) * 2005-04-01 2011-08-31 大成建設株式会社 Seismic reinforcement method for buildings
JP4951285B2 (en) * 2006-07-20 2012-06-13 ショーボンド建設株式会社 Method for forming a concrete structure bending reinforcement structure.
JP5113376B2 (en) * 2006-12-14 2013-01-09 大成建設株式会社 Reinforcement structure of the frame
JP2010053676A (en) * 2008-08-26 2010-03-11 Eco Easel:Kk Maeda model ii
JP2012012065A (en) * 2010-06-30 2012-01-19 Morimatsu Research Institution Co Ltd Reinforcing structure of liquid storage tank made of concrete
JP6265676B2 (en) * 2013-10-09 2018-01-24 株式会社竹中工務店 Steel shear wall

Also Published As

Publication number Publication date
JPH11324337A (en) 1999-11-26

Similar Documents

Publication Publication Date Title
JP3799036B2 (en) Building basic structure and construction method
KR101670553B1 (en) Seismic reinforcement using precast concrete wall outside of building
JP2958880B1 (en) Seismic reinforcement method
JP3690437B2 (en) Seismic reinforcement structure for existing buildings
JP3992401B2 (en) Seismic reinforcement method for existing buildings with RC seismic walls
JP4227557B2 (en) Reinforced wall construction method and existing wall structure of existing concrete wall
JP3226492B2 (en) Seismic isolation structure of high-rise building
Teran et al. Reinforced concrete jacketing of existing structures
JP2001303584A (en) Structure for connecting head of foundation pile with footing
JP2001329699A (en) Reinforcing construction for concrete wall
JP3235716B2 (en) Seismic retrofitting method for existing buildings
JP2002357009A (en) Vibration-control beam and method for building it
JP2843204B2 (en) Earthquake-resistant wall
JP3929006B2 (en) Construction method for expanded seismic walls
KR100628537B1 (en) Pc structure wall system with high earthquake resistance capacity
KR102321433B1 (en) Seismic Reinforcement Structure Of Being Mounted On Exterior
JPH0932311A (en) Reinforcement structure of existing building
JP6388738B1 (en) Seismic reinforcement structure for concrete structures
JP3306226B2 (en) Attached column base structure of multi-story shear wall
JP3418681B2 (en) Installation method of ultra mild steel panel damper in precast RC building structure
JP3909488B2 (en) Seismic reinforcement structure of existing building and its construction method
JP2004060245A (en) Framework reinforcing structure
JP3677689B2 (en) Seismic reinforcement method and structure for existing buildings
JP2000303701A (en) Aseismatic reinforcing structure
JP3002740B2 (en) Seismic reinforcement structure of columnar structure

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees