JP2597998Y2 - Jig for positioning PC floorboard - Google Patents

Jig for positioning PC floorboard

Info

Publication number
JP2597998Y2
JP2597998Y2 JP1993042292U JP4229293U JP2597998Y2 JP 2597998 Y2 JP2597998 Y2 JP 2597998Y2 JP 1993042292 U JP1993042292 U JP 1993042292U JP 4229293 U JP4229293 U JP 4229293U JP 2597998 Y2 JP2597998 Y2 JP 2597998Y2
Authority
JP
Japan
Prior art keywords
beard
main frame
floorboard
positioning
oblique guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1993042292U
Other languages
Japanese (ja)
Other versions
JPH0710252U (en
Inventor
明博 安永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP1993042292U priority Critical patent/JP2597998Y2/en
Publication of JPH0710252U publication Critical patent/JPH0710252U/en
Application granted granted Critical
Publication of JP2597998Y2 publication Critical patent/JP2597998Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【産業上の利用分野】本考案は、梁上へのヒゲ筋付きP
C床板の据付を容易にするとともに据付精度を高めるP
C床板の位置決め用治具に関するものである。
[Industrial application] The present invention relates to a P with a whisker on a beam.
CP that facilitates installation of floorboards and increases installation accuracy
The present invention relates to a jig for positioning a C floor plate.

【0002】[0002]

【従来の技術】最近、各種のRC造建物において、その
施工の合理化、工期の短縮、品質の向上等の観点から、
工場等で予め製造してプレキャスト化した柱、梁、床
板、耐力壁等が汎用されている。例えば、図1に示すよ
うにPC(プレキャスト)床板11aは、そのRC造床
板の端面部に凹凸コツター12を形成するとともに、ヒ
ゲ筋13aを適宜の間隔を置き突設したヒゲ筋付き構造
とし、クレーン等で揚重してその端面部を梁(大梁、小
梁)10上に掛けそのヒゲ筋13aを梁10上に配置し
て架設するとともに、その梁10の逆側に他のPC床板
の端面部、そのヒゲ筋を同様に配置して架設し、梁10
上で隣り合う先行のヒゲ筋13aと後行のヒゲ筋を重合
状に配置して相互に溶接し、PC床板の端面部間にコン
クリートを打設し一体的に接合して接合耐力を高めた構
造になつている。
2. Description of the Related Art Recently, in various RC buildings, from the viewpoint of rationalization of construction, shortening of construction period, improvement of quality, etc.,
Pillars, beams, floorboards, load-bearing walls, etc., pre-manufactured and manufactured in factories and the like are widely used. For example, as shown in FIG. 1, the PC (precast) floorboard 11 a has a structure with a whisker which has an uneven cotter 12 formed on the end face of the RC floor slab and has a whisker 13 a protruding at appropriate intervals. Lift it with a crane or the like, place the end face on the beam (large beam, small beam) 10, place the beard 13 a on the beam 10 and erection, and place another PC floor plate on the opposite side of the beam 10. The end face and its beard line are similarly arranged and erected, and the beam 10
The preceding adjacent beard 13a and the succeeding beard are arranged in a superposed manner and welded to each other, and concrete is cast between the end faces of the PC floorboard and integrally joined to increase the joint strength. It has a structure.

【0003】[0003]

【考案が解決しようとする課題】従来のヒゲ筋付きPC
床板は、上記のように梁上に先に据え付けたPC床板の
先行ヒゲ筋に対し、後に据え付けるPC床板の後行ヒゲ
筋を重合状に精度良く据え付けるのに多くの手数、手間
を要し、配筋のバラツキが生じ易いなど、その施工性と
ともに接合耐力、信頼性等に課題がある。
[Problem to be Solved by the Invention] Conventional PC with Mustache
The floorboard requires a lot of trouble and effort to accurately install the trailing beard muscle of the PC floorboard to be installed later in a superimposed manner with respect to the preceding beard muscle of the PC floorboard installed earlier on the beam as described above, There is a problem in the joint strength, reliability, etc., as well as the workability, such as the variation in the arrangement of the reinforcing bars.

【0004】本考案は、上記のような課題に対処するた
めに開発されたものであつて、その目的とする処は、ヒ
ゲ筋付きPC床板の据付を容易としその据付精度を高め
て、施工性とともに接合耐力、信頼性を向上したPC床
板の位置決め用治具を提供するにある。
The present invention has been developed in order to solve the above-mentioned problems. The purpose of the present invention is to make it easier to install a PC floor panel with a whisker and to improve the installation accuracy, An object of the present invention is to provide a jig for positioning a PC floorboard, which has improved joint strength and reliability, as well as reliability.

【0005】[0005]

【考案が解決しようとする課題】本考案は、先に据え付
けたPC床板の先行ヒゲ筋の側部に配置して梁上にセツ
トする位置決め用の主枠と、その主枠上に斜設され後に
据え付けるPC床板の後行ヒゲ筋を滑りガイドして梁上
に位置決めする斜設ガイド部と、その斜設ガイド部の下
端部と主枠の側部との間に形成した先行ヒゲ筋の係止部
を具備し、梁上のPC床板の先行ヒゲ筋の側部に斜設ガ
イド付き主枠を配置し、斜設ガイド部の下端部と主枠の
側部との間の係止部に先行ヒゲ筋を係止して梁上にセツ
トすることにより、後に据え付ける床PC板の後行ヒゲ
筋を斜設ガイド部で滑りガイドして位置決めし、PC床
板の据付を容易とし据付精度、信頼性を高めている。
SUMMARY OF THE INVENTION The present invention is directed to a main frame for positioning, which is arranged on the side of a preceding beard line of a PC floor panel previously set and set on a beam, and which is inclined on the main frame. An inclined guide portion that slides and guides a trailing beard line of a PC floor board to be installed later and is positioned on a beam, and a preceding beard line formed between a lower end portion of the inclined guide portion and a side portion of the main frame. The main frame with the oblique guide is arranged on the side of the preceding beard of the PC floor board on the beam, and the stop between the lower end of the oblique guide and the side of the main frame is provided. By locking the leading beard and setting it on the beam, the trailing beard of the floor PC board to be installed later is slid and guided by the oblique guide section and positioned, facilitating the installation of the PC floor board and ensuring installation accuracy and reliability. Is increasing the character.

【0006】[0006]

【作用】先に据え付けたPC床板の先行ヒゲ筋の側部に
斜設ガイド部付き主枠を配置すると、その斜設ガイド部
の下端部と主枠の側部との間の係止部に先行ヒゲ筋が係
止されて、その主枠が梁上の定位置に容易に固定セツト
され、後に据え付けるPC床板の後行ヒゲ筋が、その斜
設ガイド部で滑りガイドされて先行ヒゲ筋の側部に容易
に精度良く重合状に配置され、その斜設ガイド部付き主
枠を上方に取り外し、ヒゲ筋相互を溶接しコンクリート
を打設して、PC床板の据付施工性とともに接合耐力、
信頼性等が効果的に高められている。
When the main frame with the oblique guide portion is arranged on the side of the preceding beard of the PC floorboard previously installed, the main frame with the oblique guide portion is provided at the locking portion between the lower end portion of the oblique guide portion and the side of the main frame. The leading beard is locked, the main frame is easily fixed at a fixed position on the beam, and the trailing beard of the PC floor board to be installed later is slid and guided by the oblique guide portion to prevent the leading beard. It is easily and accurately arranged on the side in a superimposed state, the main frame with the oblique guide part is removed upward, the beard streaks are welded together and concrete is cast, and the joint strength and installation workability of the PC floorboard are achieved.
Reliability has been effectively improved.

【0007】[0007]

【実施例】図1及び図2に本考案の一実施例を示す。図
中1は本考案のPC床板の位置決め用治具、2は位置決
め用治具1の主枠、2aは主枠2の側部、3は主枠2の
上部に斜設した斜設ガイド部、3aは斜設ガイド部3の
下端部と主枠2の側部2aの上部との間に形成した先行
ヒゲ筋13aの係止部、5は主枠2の中央部上に突設し
た取手、10は梁(大梁又は小梁)、11a,11bは
PC床板、12はPC床板11a,11bの端面部に形
成した凹凸コツター、13a,13bはPC床板11
a,11bの端面に適宜の間隔で突設したヒゲ筋(先行
ヒゲ筋,後行ヒゲ筋)であり、図示の実施例は、先に据
え付けたPC床板11aの先行ヒゲ筋13aの側部に配
置して梁10上にセツトする位置決め用の主枠2と、そ
の主枠2上に斜設され後に据え付ける床PC板11bの
後行ヒゲ筋13bを滑りガイドして梁10上に位置決め
する斜設ガイド部3と、その斜設ガイド部3の下端部と
主枠2の側部2aとの間に形成した先行ヒゲ筋13aの
係止部3aを具備したPC床板の位置決め用治具1にな
つている。
1 and 2 show an embodiment of the present invention. In the drawing, 1 is a jig for positioning the PC floorboard of the present invention, 2 is a main frame of the jig 1 for positioning, 2a is a side portion of the main frame 2, and 3 is an oblique guide portion obliquely provided on an upper portion of the main frame 2. Reference numeral 3a denotes a locking portion of the preceding bar 13a formed between the lower end of the oblique guide portion 3 and the upper portion of the side portion 2a of the main frame 2. Reference numeral 5 denotes a handle protruding above the central portion of the main frame 2. Numeral 10 is a beam (large beam or small beam), 11a and 11b are PC floor plates, 12 is an uneven cotter formed on an end face of PC floor plates 11a and 11b, and 13a and 13b are PC floor plates 11.
a and 11b are provided with beards (leading beards, trailing beards) protruding from the end faces of the PC floorboard 11a at an appropriate interval. A positioning main frame 2 that is arranged and set on the beam 10 and a slanting guide that slides and guides a trailing whisker 13b on the floor PC board 11b that is installed on the main frame 2 and that is to be installed later. The positioning jig 1 for positioning the PC floorboard, which is provided with the mounting guide portion 3 and the locking portion 3a of the leading beard 13a formed between the lower end portion of the inclined guide portion 3 and the side portion 2a of the main frame 2. I'm sorry.

【0008】さらに詳述すると、前記の位置決め用治具
1において、図1に示すように主枠2は、適宜の間隔を
置き平行に対設した一対の板材等で形成して、梁10上
に立設したスタッドボルト(図2参照)15に妨げられ
ないで梁10上に容易にセツト可能とし、その上部をP
C床板11a,11bの板部上に突出するように側視山
型状に形成して、その一方の側面2aを先に据え付けた
PC床板11aの先行ヒゲ筋13aの側部に配置する構
造になつている。また、斜設ガイド部3は、主枠2の上
部に形成した側視山型状部に溶接して斜設し、その下端
部を主枠2の側部2aに対し適宜の間隔を置き下方に突
出して、主枠2の側部2aとの間に先行ヒゲ筋13aの
係止部3aを形成した構造とし、斜設ガイド部3付き主
体2に構成されている。主枠2の上部中央には取手5を
突設されている。
More specifically, in the positioning jig 1, as shown in FIG. 1, the main frame 2 is formed of a pair of plate members or the like arranged in parallel at an appropriate interval. It can be easily set on the beam 10 without being hindered by stud bolts 15 (see FIG. 2) erected at
The C floorboards 11a, 11b are formed in a mountain shape so as to protrude above the plate portions, and the one side surface 2a is arranged on the side of the preceding beard line 13a of the PC floorboard 11a previously installed. I'm sorry. The oblique guide portion 3 is welded to the mountain-shaped portion viewed from the side formed on the upper portion of the main frame 2 and is obliquely installed. And the main frame 2 has a structure in which a locking portion 3a of the preceding bar 13a is formed between the main frame 2 and the side portion 2a. A handle 5 protrudes from the upper center of the main frame 2.

【0009】前記のPC床板11aは、図1に示すよう
にクレーン等により吊持してH形鋼やRC造等の梁(大
梁や小梁等)10の間に架設され、そのPC床板11a
の端面部の凹凸コツター12部分が梁10の側部上への
かかり代となり、その端面部から突出した先行ヒゲ筋1
3aが梁10上に配置されて据え付けられる。次に、位
置決め用治具1の斜設ガイド部3付き主体2を梁10上
の先行ヒゲ筋13aの側部に当接させるように配置する
と、斜設ガイド部3の下端部と主枠2の側部2aとの間
の係止部5aに先行ヒゲ筋13aの上部が係止されて、
先行ヒゲ筋13aの側部に位置決め用治具1が容易に精
度良く固定セツトされ、さらに、他のPC床板11bを
クレーン等により吊持してその端部を隣り合うようにし
て梁10上に据え付けると、そのPC床板11bの端面
部の後行ヒゲ筋13bが斜設ガイド部3に滑りガイドさ
れて下降し、先に据付けらているPC床板11aの先行
ヒゲ筋13aの側部に後行ヒゲ筋13bが容易に精度良
く重合状に配置され(図1B,図2A参照)、取手5に
よりその位置決め用治具1を上方に取り外すと、例え
ば、図2に示すように梁(大梁や小梁等)10上にPC
床板11a,11bの端面部が精度良く隣り合つた配置
となり、各先行ヒゲ筋13aと各後行ヒゲ筋13bが相
互に小間隔(例えば斜設ガイド部3の厚さ,10mm以
下)を置き重合状に配設されて、ヒゲ筋相互の逃げ寸法
が小さくその相互溶接が容易に行われ、PC床板11a
と11bの端面部間にコンクリートCを打設すると、両
端面部に形成した凹凸コツター12、先行ヒゲ筋13a
と後行ヒゲ筋13b、及び梁10上のスタツドボルト1
5等により、PC床板11a,11bの両端部間、さら
に梁10が強力に一体的に接合されれる。
As shown in FIG. 1, the PC floor panel 11a is suspended between beams (large beams, small beams, etc.) 10 such as H-beams and RC structures by being suspended by a crane or the like.
The concave and convex cotter 12 at the end face portion serves as an allowance on the side portion of the beam 10, and the leading mustache muscle 1 protruding from the end face portion.
3a is arranged and installed on the beam 10. Next, when the main body 2 with the oblique guide portion 3 of the positioning jig 1 is arranged so as to be in contact with the side portion of the preceding beard 13a on the beam 10, the lower end portion of the oblique guide portion 3 and the main frame 2 are arranged. The upper portion of the preceding beard muscle 13a is locked to the locking portion 5a between the side portion 2a and
The positioning jig 1 is easily and accurately fixed to the side of the preceding beard 13a, and the other PC floor plate 11b is suspended by a crane or the like on the beam 10 so that its ends are adjacent to each other. When installed, the trailing beard 13b of the end face of the PC floor plate 11b is slid and guided by the oblique guide portion 3 and descends, and the trailing beard 13b is trailed by the side of the preceding beard 13a of the previously installed PC floor plate 11a. The beard line 13b is easily and accurately arranged in a superimposed state (see FIGS. 1B and 2A), and when the positioning jig 1 is removed upward by the handle 5, for example, as shown in FIG. PC on beam 10)
The end faces of the floorboards 11a and 11b are arranged adjacent to each other with high accuracy, and the leading and trailing whiskers 13a and the trailing whiskers 13b are overlapped at a small interval (for example, the thickness of the oblique guide 3 and 10 mm or less). Are arranged in a shape such that the relief size between the beard streaks is small and the mutual welding is easily performed.
When the concrete C is cast between the end faces of the bosses 11b and 11b, the uneven cotter 12 formed on both end faces and the leading hair 13a
And stud bolt 1 on beam 10 and trailing beard 13b
5 and the like, the beam 10 is strongly and integrally joined between both ends of the PC floor boards 11a and 11b.

【0010】なお、図示例では、H形鋼の梁上にPC床
板を据え付ける場合について例示しているが、各種の形
鋼の梁やRC造梁上に据え付ける場合についても同様に
適用され、また、PC床板の構造は図示例に限られるも
のではない。
In the illustrated example, the case where the PC floor plate is installed on the beam of the H-section steel is illustrated. However, the same applies to the case where the PC floor plate is installed on the beam of various shaped steels or the RC beam. The structure of the PC floorboard is not limited to the illustrated example.

【0011】[0011]

【考案の効果】本考案は、前述のように先に据え付けた
PC床板の先行ヒゲ筋の側部に位置決め用の斜設ガイド
部付き主枠を配置すると、その斜設ガイド部の下端部と
主枠の側部との間の係止部にその先行ヒゲ筋が係止され
て、その斜設ガイド部付き主枠は梁上の定位置に固定セ
ツトされ、後に据え付けるPC床板の後行ヒゲ筋が、そ
の斜設ガイド部で滑りガイドされて先行ヒゲ筋の側部に
精度良く重合状に配置され、その斜設ガイド部付き主枠
を上方に取り外し、ヒゲ筋相互を溶接しコンクリートを
打設することにより、ヒゲ筋付きPC床板の据付を容易
とし据付精度を高めて、施工性とともに接合耐力、信頼
性を著しく向上している。
[Effects of the Invention] As described above, the present invention is to dispose a main frame with an oblique guide portion for positioning on the side of the preceding beard line of the PC floorboard previously installed, and to dispose the lower end portion of the oblique guide portion. The leading beard is locked at the locking portion between the side of the main frame and the main frame with the oblique guide portion is fixedly set at a fixed position on the beam, and the trailing beard of the PC floor board to be installed later. The streaks are slid and guided by the oblique guide portions, and are accurately arranged in an overlapping manner on the side portions of the preceding beard streaks, the main frame with the oblique guide portions is removed upward, the beard streaks are welded to each other, and concrete is struck. The installation facilitates the installation of the PC floor panel with a whisker and enhances the installation accuracy, and significantly improves the joint proof strength and reliability as well as the workability.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本考案の一実施例及びその使用態様を示す斜視
図(A)と本考案のPC床板の位置決め用治具の側面図
(B)及びその平面図(C)
FIG. 1 is a perspective view showing an embodiment of the present invention and its use mode (A), and a side view (B) and a plan view (C) of a jig for positioning a PC floorboard of the present invention.

【図2】PC床板の位置決め据付状態を示す梁上部分の
平面図(A)とそのX−X断面図(B)である。
FIG. 2 is a plan view (A) of an upper part of a beam and a cross-sectional view taken along line XX (B) of the beam, showing a positioning and installation state of a PC floor panel.

【符号の説明】[Explanation of symbols]

2 主枠 2a 側部(主枠) 3 斜設ガイド部 3a 係止部 10 梁(大梁,小梁) 11a PC床板 11b PC床板 13a ヒゲ筋(先行ヒゲ筋) 13b ヒゲ筋(後行ヒゲ筋) 2 Main frame 2a Side part (main frame) 3 Slanting guide part 3a Locking part 10 Beam (large beam, small beam) 11a PC floor board 11b PC floor board 13a Mustache muscle (preceding mustache muscle) 13b Mustache muscle (following mustache muscle)

Claims (1)

(57)【実用新案登録請求の範囲】(57) [Scope of request for utility model registration] 【請求項1】 先に据え付けたPC床板の先行ヒゲ筋の
側部に配置して梁上にセツトする位置決め用の主枠と、
同主枠上に斜設され後に据え付けるPC床板の後行ヒゲ
筋を滑りガイドして梁上に位置決めする斜設ガイド部
と、同斜設ガイド部の下端部と主枠の側部との間に形成
した先行ヒゲ筋の係止部を具備したことを特徴とするP
C床板の位置決め用治具。
1. A main frame for positioning, which is disposed on a side of a preceding beard muscle of a PC floorboard previously set and set on a beam,
An oblique guide section that slides and guides a trailing beard line of a PC floor board that is obliquely mounted on the main frame and then installed on the beam, and between a lower end of the oblique guide section and a side of the main frame. Characterized in that it is provided with an engaging portion for the preceding beard muscle formed in
Jig for positioning C floorboard.
JP1993042292U 1993-07-05 1993-07-05 Jig for positioning PC floorboard Expired - Lifetime JP2597998Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1993042292U JP2597998Y2 (en) 1993-07-05 1993-07-05 Jig for positioning PC floorboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1993042292U JP2597998Y2 (en) 1993-07-05 1993-07-05 Jig for positioning PC floorboard

Publications (2)

Publication Number Publication Date
JPH0710252U JPH0710252U (en) 1995-02-14
JP2597998Y2 true JP2597998Y2 (en) 1999-07-26

Family

ID=12631972

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1993042292U Expired - Lifetime JP2597998Y2 (en) 1993-07-05 1993-07-05 Jig for positioning PC floorboard

Country Status (1)

Country Link
JP (1) JP2597998Y2 (en)

Also Published As

Publication number Publication date
JPH0710252U (en) 1995-02-14

Similar Documents

Publication Publication Date Title
JP4347500B2 (en) Bridge girder
JP2597998Y2 (en) Jig for positioning PC floorboard
JP3466961B2 (en) Reinforcement method for existing load-bearing walls with openings
JPH11166292A (en) Steel frame beam and floor execution using the beam
JPH01223247A (en) Joint structure between steel-concrete composed board and steel girder
JP3828641B2 (en) Column and beam connection structure
JP2600411Y2 (en) Column-beam joint structure
JP2523891Y2 (en) Connection structure between girders and steel beams
JP2575887Y2 (en) Precast concrete beam members
JP2582870Y2 (en) Structure of the connection between girder and girder
JPS5910246Y2 (en) architectural framework structure
JPH0450724Y2 (en)
JP2003055916A (en) Form for concrete floor slab of corrugated steel plate
JPH0427948Y2 (en)
JP2510454Y2 (en) Joint structure of steel rebar concrete girder and half precast concrete girder
JP2972955B2 (en) Column and beam joining method and its structure
JPH0967940A (en) Reinforcement structure of existing building
JPH0220322Y2 (en)
JPS5925931Y2 (en) Composite girder using π-shaped steel
JP2763308B2 (en) Steel reinforced concrete column base
JPH0711164B2 (en) Steel frame
JP2569618Y2 (en) Work stage for steel structure
JPH0633598A (en) Buried formwork for pillar/beam connecting part
JP2000234390A (en) Reinforcing structure of unit building and building unit
JP3749935B2 (en) Column and beam construction method and enclosure