JP2020094447A - Method for installing rectangular propulsion pipe and method for manufacturing underground structure equipped with rectangular propulsion pipe - Google Patents

Method for installing rectangular propulsion pipe and method for manufacturing underground structure equipped with rectangular propulsion pipe Download PDF

Info

Publication number
JP2020094447A
JP2020094447A JP2018234215A JP2018234215A JP2020094447A JP 2020094447 A JP2020094447 A JP 2020094447A JP 2018234215 A JP2018234215 A JP 2018234215A JP 2018234215 A JP2018234215 A JP 2018234215A JP 2020094447 A JP2020094447 A JP 2020094447A
Authority
JP
Japan
Prior art keywords
rectangular
propulsion pipe
excavation
rectangular propulsion
excavator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2018234215A
Other languages
Japanese (ja)
Inventor
均 浅野
Hitoshi Asano
均 浅野
請川 誠
Makoto Ukekawa
誠 請川
小林 修
Osamu Kobayashi
修 小林
卓人 中山
Takuto Nakayama
卓人 中山
市川 政美
Masami Ichikawa
政美 市川
陽介 水澤
Yosuke Mizusawa
陽介 水澤
和田 洋一
Yoichi Wada
洋一 和田
Original Assignee
戸田建設株式会社
Toda Constr Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 戸田建設株式会社, Toda Constr Co Ltd filed Critical 戸田建設株式会社
Priority to JP2018234215A priority Critical patent/JP2020094447A/en
Publication of JP2020094447A publication Critical patent/JP2020094447A/en
Pending legal-status Critical Current

Links

Abstract

To provide a method of installing a rectangular propulsion pipe that suppresses the cost of an excavator when installing the rectangular propulsion pipe and also suppresses a deterioration of a construction accuracy of the rectangular propulsion pipe due to rolling of the excavator.SOLUTION: A method of excavating a rectangular propulsion pipe 10 having a rectangular cross-sectional outer shape with an excavator 1 provided in a front and installing the same in the ground comprises: a main excavation step of excavating the excavator 1 having a skin plate 2 having a circular cross-section in front of the rectangular propulsion pipe 10 so that the corners of the rectangular propulsion pipe 10 do not overlap with the external shape of the skin plate 2 in front view; prior to the main excavation step, a preceding excavation step of excavating the rectangular propulsion pipe 10 in the main excavation step including a portion that does not overlap the outer shape of the excavator 1; and after the preceding excavation step and before the main excavation step, a preceding filling step of filling a filler material 21 in the portion excavated in the preceding excavation step.SELECTED DRAWING: Figure 3

Description

本発明は、アンダーパスの本体構造やパイプルーフなどに用いるために、推進工法で設置される矩形推進管の設置方法及び矩形推進管を備える地中構造物の製造方法に関する。 TECHNICAL FIELD The present invention relates to a method for installing a rectangular propulsion pipe installed by a propulsion method and a method for manufacturing an underground structure including the rectangular propulsion pipe, for use in a main structure of an underpass, a pipe roof, and the like.
推進工法で設置される推進管には、正面視において断面の外形が円形状のものだけでなく、矩形形状のもの(以下、矩形推進管という。)も使用される。
矩形推進管を地中に設け、アンダーパスの本体構造やパイプルーフなどの地中構造物を構築(製造)するには、矩形推進管の前方に掘削機を設けて、矩形推進管を後方から押圧装置によって押圧しながら、掘削機により掘削を行う、いわゆる推進工法が良く採用される。
As the propulsion pipe installed by the propulsion method, not only one having a circular cross section in a front view but also a rectangular one (hereinafter referred to as a rectangular propulsion pipe) is used.
In order to construct (manufacture) an underpass main body structure and underground structure such as a pipe roof by installing a rectangular propulsion pipe in the ground, an excavator is installed in front of the rectangular propulsion pipe and the rectangular propulsion pipe is installed from the rear. A so-called propulsion method is often employed in which excavation is performed by an excavator while pressing with a pressing device.
推進工法において矩形推進管の前方に設けられる掘削機には、当該矩形の形状を掘削するものが用いられる。このようなものには、正面視において外形が矩形推進管に合わせた矩形のスキンプレートを有し、矩形のスキンプレートに内接するように配置された円形に掘削する回転カッタを備えたものがある。
このような掘削機において、回転カッタで掘削することができない矩形の隅部は、別途に打撃ハンマ、掘削バケット、回転カッタを掘削機に設けて矩形の断面を掘削する(特許文献1)。また、矩形のスキンプレートに内接するように配置された回転カッタに、遊星カッタを設けて矩形の隅部も掘削する掘削機もある(特許文献2)。
The excavator provided in front of the rectangular propulsion pipe in the propulsion method is one that excavates the rectangular shape. Some of these include a rectangular skin plate whose outer shape matches a rectangular propulsion tube when viewed from the front, and a circular cutter that is arranged so as to be inscribed in the rectangular skin plate and has a circular cutter. ..
In such an excavator, a rectangular corner that cannot be excavated by the rotary cutter is separately provided with a hammer, an excavation bucket, and a rotary cutter to excavate a rectangular cross section (Patent Document 1). Also, there is an excavator that excavates a rectangular corner by providing a planetary cutter on a rotary cutter that is inscribed in a rectangular skin plate (Patent Document 2).
特開2008−144368号公報JP, 2008-144368, A 特開2009−263883号公報JP, 2009-263883, A
特許文献1のような掘削機は、別途に隅部に設ける打撃ハンマ、掘削バケット、回転カッタのため、その構造も複雑になり、掘削機のコストが増加してしまう。特許文献2のような掘削機においても、回転カッタに遊星カッタを設けるため、同様に構造も複雑になり、掘削機のコストが増加してしまう。 The excavator as disclosed in Patent Document 1 has a striking hammer, an excavation bucket, and a rotary cutter that are separately provided at the corners, so that the structure thereof becomes complicated and the cost of the excavator increases. Even in the excavator disclosed in Patent Document 2, since the planetary cutter is provided on the rotary cutter, the structure is similarly complicated and the cost of the excavator increases.
また、正面視において外形が矩形のスキンプレートを備えた掘削機は、円形のスキンプレートの掘削機に比較して、掘削機のコストが高くなるとともに、掘削時のローリング自体の制御や修正も比較的難しくなり、ローリングした際には、後続する矩形推進管もそのローリング形状に従って配置されることになり、施工精度が低下してしまう。 In addition, an excavator equipped with a skin plate with a rectangular outer shape when viewed from the front is more expensive than a excavator with a circular skin plate, and the control and modification of the rolling itself during excavation are also compared. When it rolls, the subsequent rectangular propulsion pipes are also arranged according to the rolling shape, which reduces the construction accuracy.
さらに、アンダーパスの本体構造部やパイプルーフなどのような構造物では、矩形推進管を並設して連結させる場合があり、このような場合には、矩形推進管の隅部には並設させる矩形推進管と連結する継手部が設けられており、上記のようにローリングによって矩形推進管の施工精度が低下すると、継手部が適切に配置されず連結に支障が生じることになってしまう。
そして、上記継手部を掘削するために、さらに別の掘削手段が必要となり、掘削機のコストも増加することになる。
Furthermore, in structures such as the underpass body structure and pipe roof, rectangular propulsion pipes may be installed side by side.In such a case, the rectangular propulsion pipes may be installed side by side at the corners. A joint portion that is connected to the rectangular propulsion pipe is provided. If the construction accuracy of the rectangular propulsion pipe is reduced by rolling as described above, the joint portion is not properly arranged, and the connection is hindered.
Further, in order to excavate the joint portion, another excavating means is required, which increases the cost of the excavator.
そこで、本発明の目的は、矩形推進管を設置する際に、掘削機のコストを抑えるとともに、掘削機のローリングによる矩形推進管の施工精度の低下を抑える矩形推進管の設置方法を提供すること及び矩形推進管を備える地中構造物の製造方法を提供することである。 Therefore, an object of the present invention is to provide a method for installing a rectangular propulsion pipe that suppresses the cost of the excavator when installing the rectangular propulsion pipe and suppresses the deterioration of the construction accuracy of the rectangular propulsion pipe due to rolling of the excavator. And a method of manufacturing an underground structure including a rectangular propulsion pipe.
本願請求項1に係る発明は、断面の外形が矩形形状を有する矩形推進管を、前記矩形推進管の前方に設けた掘削機で掘削して地中に設置する方法であって、正面視において、断面の外形が円形状のスキンプレートを有する前記掘削機を、前記矩形推進管の隅部が前記スキンプレートの外形に重ならないようにして前記矩形推進管の前方に設けて掘削する本掘削工程と、前記本掘削工程より前であって、前記本掘削工程における前記矩形推進管が前記掘削機の外形に重ならない部分を含んで掘削する先行掘削工程と、前記先行掘削工程の後であって前記本掘削工程より前に、前記先行掘削工程で掘削した箇所に充填材を充填する先行充填工程と、を備えることを特徴とする矩形推進管の設置方法である。 The invention according to claim 1 of the present application is a method of excavating a rectangular propulsion pipe having a rectangular cross-sectional outer shape with an excavator provided in front of the rectangular propulsion pipe and installing the same in the ground. A main excavation step of excavating the excavator having a skin plate with a circular cross-section in the front of the rectangular propulsion pipe so that corners of the rectangular propulsion pipe do not overlap with the external shape of the skin plate. And a preceding excavation step of excavating before the main excavation step, in which the rectangular propulsion pipe in the main excavation step includes a portion that does not overlap the outer shape of the excavator, and after the preceding excavation step, Prior to the main excavation step, a pre-filling step of filling a filler material in a portion excavated in the pre-excavation step is provided.
本願請求項2に係る発明は、前記矩形推進管の隅部には、並設される矩形推進管と連結する継手部が設けられており、前記先行掘削工程では、前記継手部が配置される部分も掘削しておくことを特徴とする請求項1に記載の矩形推進管の設置方法である。 In the invention according to claim 2 of the present application, a joint portion that is connected to the rectangular propulsion pipes arranged in parallel is provided at a corner portion of the rectangular propulsion pipe, and the joint portion is arranged in the preceding excavation step. The method for installing a rectangular propulsion pipe according to claim 1, wherein the portion is also excavated.
本願請求項3に係る発明は、前記本掘削工程を掘削する掘削機を利用して、前記先行掘削工程における掘削を行うことを特徴とする請求項1又は請求項2に記載の矩形推進管の設置方法である。 The invention according to claim 3 of the present application uses the excavator for excavating the main excavation step to perform excavation in the preceding excavation step, wherein the rectangular propulsion pipe according to claim 1 or 2 is used. This is the installation method.
本願請求項4に係る発明は、断面の外形が矩形形状の矩形推進管を備える地中構造物の製造方法であって、前記矩形推進管を、前記矩形推進管の前方に設けた掘削機で掘削して地中に前記矩形推進管を設置する際に、正面視において、断面の外形が円形状のスキンプレートを有する前記掘削機を、前記矩形推進管の隅部が前記スキンプレートの外形に重ならないようにして前記矩形推進管の前方に設けて掘削する本掘削工程と、前記本掘削工程より前に、前記本掘削工程における前記矩形推進管が前記掘削機の外形に重ならない部分を含んで掘削する先行掘削工程と、前記先行掘削工程の後であって前記本掘削工程より前に、前記先行掘削工程で掘削した箇所に充填材を充填する先行充填工程と、を備えることを特徴とする矩形推進管を備える地中構造物の製造方法である。 The invention according to claim 4 of the present application is a method of manufacturing an underground structure including a rectangular propulsion pipe having a rectangular cross-section, wherein the rectangular propulsion pipe is an excavator provided in front of the rectangular propulsion pipe. When excavating and installing the rectangular propulsion pipe in the ground, in front view, the excavator having a skin plate having a circular cross-sectional outer shape, the corner portion of the rectangular propulsion pipe to the outer shape of the skin plate. A main excavation step of excavating by providing in front of the rectangular propulsion pipe so as not to overlap, and before the main excavation step, including a portion in which the rectangular propulsion pipe in the main excavation step does not overlap the outer shape of the excavator. And a pre-filling step of filling a filler material at a location excavated in the pre-drilling step after the pre-drilling step and before the main excavating step. Is a method of manufacturing an underground structure including a rectangular propulsion pipe.
本願請求項5に係る発明は、前記矩形推進管の隅部には、並設される矩形推進管と連結する継手部が設けられており、前記先行掘削工程では、前記継手部が配置される部分も掘削しておくことを特徴とする請求項4に記載の矩形推進管を備える地中構造物の製造方法である。 In the invention according to claim 5 of the present application, a joint portion that is connected to the rectangular propulsion pipes arranged in parallel is provided at a corner portion of the rectangular propulsion pipe, and the joint portion is arranged in the preceding excavation step. The method for manufacturing an underground structure provided with a rectangular propulsion pipe according to claim 4, wherein the portion is also excavated.
本願請求項6に係る発明は、前記本掘削工程を掘削する掘削機を利用して、前記先行掘削工程における掘削を行うことを特徴とする請求項4又は請求項5に記載の矩形推進管を備える地中構造物の製造方法である。 The invention according to claim 6 of the present application utilizes the excavator for excavating the main excavation step to perform excavation in the preceding excavation step, and the rectangular propulsion pipe according to claim 4 or claim 5. It is a method of manufacturing an underground structure provided.
請求項1に係る構成により、矩形推進管を設置する際に、円形の回転カッタ及び円形のスキンプレートの掘削機を使用できるようになり、掘削機のコストを抑えるとともに、掘削機のローリングによる矩形推進管の施工精度の低下を抑える矩形推進管の設置方法を提供することができる。請求項3に係る構成により、矩形推進管を設置する際に、掘削機のコストを抑えるとともに、掘削機のローリングによる矩形推進管の施工精度の低下を抑えた矩形推進管を備える地中構造物の製造方法を提供することができる。 With the configuration according to claim 1, when the rectangular propulsion pipe is installed, it becomes possible to use an excavator having a circular rotary cutter and a circular skin plate, which reduces the cost of the excavator and makes the rectangle by rolling the excavator. It is possible to provide a method for installing a rectangular propulsion pipe that suppresses a decrease in the construction accuracy of the propulsion pipe. With the configuration according to claim 3, an underground structure provided with a rectangular propulsion pipe that suppresses the cost of the excavator when installing the rectangular propulsion pipe and also suppresses the deterioration of the construction accuracy of the rectangular propulsion pipe due to rolling of the excavator. Can be provided.
加えて、矩形推進管の隅部に並設させる矩形推進管と連結する継手部が設けられるアンダーパスの本体構造部やパイプルーフのような構造物において、継手部の施工精度の低下を押さえ、継手部が適切に配置されず連結に支障が生じないようにすることができる。 In addition, in a structure such as the main structure of the underpass or a pipe roof in which a joint portion that is connected to the rectangular propulsion pipes that are provided in parallel at the corners of the rectangular propulsion pipes is provided, it is possible to suppress a decrease in the construction accuracy of the joint portion, It is possible to prevent the joint portion from being not properly arranged and hindering the connection.
加えて、先行掘削工程での掘削機と本掘削工程での掘削機とを共用することで、掘削機のコストを低減することができる。 In addition, the cost of the excavator can be reduced by sharing the excavator in the preceding excavation process with the excavator in the main excavation process.
本発明で使用する掘削機及び矩形推進管の斜視図である。1 is a perspective view of an excavator and a rectangular propulsion pipe used in the present invention. 本発明の施工順序を説明する断面図である。It is sectional drawing explaining the construction order of this invention. 本発明の施工順序を説明する断面図である。It is sectional drawing explaining the construction order of this invention. 本発明の施工順序を説明する断面図である。It is sectional drawing explaining the construction order of this invention. 本発明の施工順序を説明する断面図である。It is sectional drawing explaining the construction order of this invention. 本発明の施工順序を説明する断面図である。It is sectional drawing explaining the construction order of this invention. 本発明の施工順序を説明する断面図である。It is sectional drawing explaining the construction order of this invention. 本発明の施工順序を説明する断面図である。It is sectional drawing explaining the construction order of this invention.
以下、本発明の実施の形態につき図面を参照する等して説明する。なお、本発明は、実施形態に限定されないことはいうまでもない。
本実施形態は、矩形推進管を推進工法で発進基地から到達基地までの施工長にわたって施工して、矩形推進管を水平方向に連結してアンダーパスの本体構造部の地中構造物を構築(製造)する例である。
図1は、本発明で使用する掘削機1及び矩形推進管10の斜視図である。
Hereinafter, embodiments of the present invention will be described with reference to the drawings. Needless to say, the present invention is not limited to the embodiment.
In this embodiment, a rectangular propulsion pipe is constructed by a propulsion method over a construction length from a starting base to a reaching base, and the rectangular propulsion pipes are horizontally connected to construct an underground structure of the main structure portion of the underpass ( Manufacturing).
FIG. 1 is a perspective view of an excavator 1 and a rectangular propulsion pipe 10 used in the present invention.
掘削機1は、矩形推進管10の前方に設けられる。掘削機1は、スキンプレート2及び回転カッタ3を備えている。スキンプレート2は、正面視において、外形が円形のものであって、回転カッタ3も回転軸を中心に円形に回転するもので、汎用的に推進工法に用いられるものである。
回転カッタ3が回転することで、正面視においてスキンプレートの円形の外形に相当する断面を掘削する。
The excavator 1 is provided in front of the rectangular propulsion pipe 10. The excavator 1 includes a skin plate 2 and a rotary cutter 3. The skin plate 2 has a circular outer shape when viewed from the front, and the rotary cutter 3 also rotates in a circular shape around a rotation axis, which is generally used for a propulsion method.
As the rotary cutter 3 rotates, a cross section corresponding to the circular outer shape of the skin plate is excavated in a front view.
矩形推進管10は、掘削機1の後方に設けられる。矩形推進管10の後方の図示しない発進基地には、押圧装置が設けられ、押圧装置によって、掘削機1と矩形推進管10が押し出される。矩形推進管10は順次継ぎ足されて、押圧装置によって押し出されながら、掘削機1によって掘削が行われると同時に矩形推進管10が地中に設置されていく、いわゆる推進工法が行われる。矩形推進管10は、発進基地から到達基地までの施工長にわたって設置される。 The rectangular propulsion pipe 10 is provided behind the excavator 1. A pressing device is provided at a start base (not shown) behind the rectangular propulsion pipe 10, and the excavator 1 and the rectangular propulsion pipe 10 are pushed out by the pressing device. The so-called propulsion method is performed in which the rectangular propulsion pipes 10 are successively added and pushed out by the pressing device while the excavator 1 excavates and at the same time the rectangular propulsion pipes 10 are installed in the ground. The rectangular propulsion pipe 10 is installed over the construction length from the starting base to the reaching base.
矩形推進管10は、正面視において上下壁及び左右壁を備えた略正方形の矩形であって、四つの隅部11の左右一方側に雌継手12及び左右他方側に雄継手13を備えている。矩形推進管10が並設される際に、隣合う矩形推進管10同士の雌継手12と雄継手13が係合して連結される。 The rectangular propulsion pipe 10 is a substantially square rectangle having upper and lower walls and left and right walls in a front view, and has a female joint 12 on one of the left and right sides of the four corners 11 and a male joint 13 on the other side of the four corners 11. . When the rectangular propulsion pipes 10 are arranged side by side, the female joints 12 and the male joints 13 of the adjacent rectangular propulsion pipes 10 are engaged and connected.
掘削機1は、正面視において、その円形状のスキンプレート2が、矩形推進管10の4つの隅部11がスキンプレート2の外形に重ならないようにして矩形推進管10の前方に設けられる。具体的には、矩形推進管10の上下左右壁にスキンプレート2の後端が内接するように配置され、固定される。 When the excavator 1 is viewed from the front, the circular skin plate 2 is provided in front of the rectangular propulsion pipe 10 so that the four corners 11 of the rectangular propulsion pipe 10 do not overlap the outer shape of the skin plate 2. Specifically, the rear end of the skin plate 2 is arranged and fixed to the upper, lower, left and right walls of the rectangular propulsion pipe 10 so as to be inscribed.
なお、図示はしないが、正面視においてスキンプレート2の外形が矩形推進管10の4つの隅部11に重ならない部分は開口となるが、当該部分に後述する充填材などが入らないようにカバーが設けられている。
本実施形態では、矩形推進管10の前方に掘削機1のスキンプレート2を設けたように記載されているが、これに限らず、掘削機1と別に連結部材を介在させても良い。その際、連結部材の形状を、矩形推進管10の4つの隅部11の重ならない部分の開口に後述する充填材などが流入しないような形状にしても良い。
Although not shown, a portion where the outer shape of the skin plate 2 does not overlap with the four corners 11 of the rectangular propulsion tube 10 when viewed from the front is an opening, but a cover is provided to prevent the filler or the like described later from entering the portion. Is provided.
In the present embodiment, it is described that the skin plate 2 of the excavator 1 is provided in front of the rectangular propulsion pipe 10, but the present invention is not limited to this, and a connecting member may be interposed separately from the excavator 1. At this time, the shape of the connecting member may be such that a filler, which will be described later, does not flow into the openings of the non-overlapping portions of the four corners 11 of the rectangular propulsion pipe 10.
図2乃至図6と共に、上記の掘削機1を用いて矩形推進管10を設置する方法を説明する。図2乃至図6において、設置されたものは実線で表され、これから設置されるものは破線で表されている。 A method of installing the rectangular propulsion pipe 10 using the excavator 1 will be described with reference to FIGS. 2 to 6. 2 to 6, the installed ones are shown by solid lines, and the ones to be installed are shown by broken lines.
図2に示すように、既設の矩形推進管10の右側に矩形推進管10を並設する。並設される矩形推進管10は、その雄継手13を既設の矩形推進管10の雌継手12に係合することで連結されて設置される。
既設の矩形推進管10の隅部11及び雌継手12は、当該既設の矩形推進管10が設置される前に予め形成された先行掘削孔20の内部に位置している。当該先行掘削孔20には、後述する充填材21が充填されている。
As shown in FIG. 2, the rectangular propulsion pipes 10 are arranged side by side on the right side of the existing rectangular propulsion pipes 10. The rectangular propulsion pipes 10 arranged side by side are connected and installed by engaging the male joint 13 thereof with the female joint 12 of the existing rectangular propulsion pipe 10.
The corner portion 11 and the female joint 12 of the existing rectangular propulsion pipe 10 are located inside the preceding excavation hole 20 formed in advance before the existing rectangular propulsion pipe 10 is installed. The preceding excavation hole 20 is filled with a filling material 21 described later.
図3に示すように、並設する矩形推進管10の隅部11及び雌継手12が含まれ、正面視において掘削機1(スキンプレート2)が重ならない矩形推進管10の部分を含むように、先行掘削孔20を発進基地から到達基地までの施工長にわたって施工する。先行掘削孔20は、並設する矩形推進管10の雌継手12が配置される側の下側の隅部11に施工される。
この先行掘削孔20を掘削する工程は、本発明の先行掘削工程に相当する。
As shown in FIG. 3, the corner portions 11 and the female joints 12 of the rectangular propulsion pipes 10 arranged side by side are included so that the excavator 1 (skin plate 2) does not overlap the rectangular propulsion pipe 10 in a front view. The preceding excavation hole 20 is constructed over the construction length from the starting base to the reaching base. The preceding excavation hole 20 is formed in the lower corner portion 11 of the side-by-side arrangement of the female joints 12 of the rectangular propulsion pipes 10.
The step of excavating the preceding excavation hole 20 corresponds to the preceding excavation step of the present invention.
先行掘削孔20は、水平ボーリングなどどのような方法で掘削しても良いが、並設する矩形推進管10の前方に設ける掘削機1を用いても良い。この場合、先行掘削孔20を掘削する掘削機と並設する矩形推進管10の前方に設ける掘削機1を共用することで、掘削機のコストを抑えることができる。この場合には、先行掘削孔20の外径と並設する矩形推進管10の前方に設けた掘削機1による掘削孔の外径とが同一になる。 The preceding excavation hole 20 may be excavated by any method such as horizontal boring, but the excavator 1 provided in front of the juxtaposed rectangular propulsion pipes 10 may be used. In this case, the cost of the excavator can be suppressed by sharing the excavator 1 provided in front of the rectangular propulsion pipe 10 arranged in parallel with the excavator that excavates the preceding excavation hole 20. In this case, the outer diameter of the preceding excavation hole 20 and the outer diameter of the excavation hole by the excavator 1 provided in front of the rectangular propulsion pipe 10 arranged in parallel are the same.
図4に示すように、下側の隅部11の先行掘削孔20を掘削した後、掘削した先行掘削孔20の内部に充填材21を充填する。この先行掘削孔20に充填材を充填する工程は、本発明の先行充填工程に相当する。
充填材21は、充填後に先行掘削孔20の地山部分が崩壊せず、しかもこの後に上側の隅部11の先行掘削孔20の掘削が可能であるとともに、並設する矩形推進管10の前方に設ける掘削機1が掘削でき、矩形推進管10の隅部11、雌継手12及び雄継手13が貫入できる程度のものを充填する。
As shown in FIG. 4, after excavating the preceding excavation hole 20 in the lower corner portion 11, the filler 21 is filled inside the excavated preceding excavation hole 20. The step of filling the preceding drill hole 20 with the filler corresponds to the preceding filling step of the present invention.
The filling material 21 does not collapse the ground portion of the preceding excavation hole 20 after the filling, and after that, it is possible to excavate the preceding excavation hole 20 in the upper corner portion 11, and in front of the juxtaposed rectangular propulsion pipes 10. The excavator 1 provided in FIG. 2 can be excavated and the corner portion 11, the female joint 12, and the male joint 13 of the rectangular propulsion pipe 10 can be penetrated.
充填材21の一例として、一液性で水中不分離性を有し、短期で地山の安定が保持できる強度(例えば、一軸圧縮強度80kN/m2程度(第三種建設発生土程度))が発現するとともに、長期にわたって低強度(例えば、一軸圧縮強度100kN/m2程度以下)を保持できるものであれば良い。 As an example of the filler 21, a strength that is one-liquid and non-separable in water and that can maintain the stability of the ground in a short time (for example, uniaxial compressive strength of about 80 kN/m2 (third-class construction soil)) Any material that develops and retains low strength (for example, uniaxial compressive strength of 100 kN/m 2 or less) for a long period of time may be used.
充填材21の充填は、どのような方法で充填しても良いが、先行掘削孔20を掘削機1で掘削する場合には、例えば以下の方法で充填する。
到達基地に到達した掘削機を回収して、当該掘削機の後方の推進管を引き抜きながら先行掘削孔20に充填材21を充填する。
The filling with the filling material 21 may be performed by any method, but when the preceding excavation hole 20 is excavated by the excavator 1, for example, the following method is used.
The excavator that has reached the arrival base is collected, and the preceding excavation hole 20 is filled with the filler 21 while pulling out the propulsion pipe behind the excavator.
なお、到達基地を設けないで発進基地から施工長を施工するような場合には、例えば、前面に充填材の排出口を設けた掘削機の後方に推進管を設けて先行掘削孔を掘削する。その後、推進管を掘削機とともに引き戻しながら、前面の排出口から充填材を排出して、先行掘削孔に充填材を充填するようにして対応する。 In addition, when constructing the construction length from the starting base without providing the reaching base, for example, a propulsion pipe is provided at the rear of the excavator having a filler discharge port at the front to excavate the preceding excavation hole. . Thereafter, while pulling back the propulsion pipe together with the excavator, the filler is discharged from the front discharge port to fill the preceding excavation hole with the filler.
図5に示すように、並設する矩形推進管10の隅部11及び雌継手12が含まれ、正面視において掘削機1(スキンプレート2)が重ならない矩形推進管10の部分を含むように、先行掘削孔20を発進基地から到達基地までの施工長にわたって施工する。先行掘削孔20は、並設する矩形推進管10の雌継手12が配置される側の上側の隅部11に施工される。
この先行掘削孔20を掘削する工程は、本発明の先行掘削工程に相当する。
As shown in FIG. 5, the corner portions 11 and the female joints 12 of the rectangular propulsion pipes 10 arranged side by side are included, so that the excavator 1 (skin plate 2) does not overlap the rectangular propulsion pipe 10 in a front view. The preceding excavation hole 20 is constructed over the construction length from the starting base to the reaching base. The preceding excavation hole 20 is formed in the upper corner portion 11 of the side-by-side arrangement of the female joints 12 of the rectangular propulsion pipes 10.
The step of excavating the preceding excavation hole 20 corresponds to the preceding excavation step of the present invention.
先行掘削孔20を施工する際には、下側の先行掘削孔20に充填された充填材21を一部掘削するが、このような重なり部を設けずに、上下の先行掘削孔を離間させても良い。 When constructing the preceding excavation hole 20, a part of the filling material 21 filled in the lower preceding excavation hole 20 is excavated, but the upper and lower preceding excavation holes are separated without providing such an overlapping portion. May be.
図6に示すように、上側の隅部11の先行掘削孔20を掘削した後、掘削した先行掘削孔20の内部に充填材21を充填する。この先行掘削孔20に充填材を充填する工程は、本発明の先行充填工程に相当する。
先行掘削孔20は、並設する矩形推進管10の雌継手12が配置側の隅部11の上下に二段に施工され、充填材21が充填される。
As shown in FIG. 6, after excavating the preceding excavation hole 20 in the upper corner portion 11, the filler 21 is filled inside the excavated preceding excavation hole 20. The step of filling the preceding drill hole 20 with the filler corresponds to the preceding filling step of the present invention.
The preceding excavation hole 20 is filled with the filling material 21 in two steps above and below the corner 11 on the side where the female joints 12 of the rectangular propulsion pipes 10 arranged in parallel are arranged.
図7に示すように、並設する矩形推進管10の前方に設けた掘削機1によって掘削を行う。この掘削では、掘削機1の回転カッタ3により先行充填工程で充填された充填材21とそれらに囲まれた地山部が掘削され、正面視において断面が円形の掘削孔となる。この掘削工程で、並設される矩形推進管10の中心の大部分に相当する断面の地山が掘削されることになる。この掘削工程は、本発明の本掘削工程に相当する。 As shown in FIG. 7, excavation is performed by the excavator 1 provided in front of the rectangular propulsion pipes 10 arranged in parallel. In this excavation, the rotary cutter 3 of the excavator 1 excavates the filler material 21 filled in the preceding filling step and the natural ground portion surrounded by the filler material 21 to form an excavation hole having a circular cross section in a front view. In this excavation step, the ground having a cross section corresponding to most of the center of the rectangular propulsion pipes 10 arranged in parallel is excavated. This excavation step corresponds to the main excavation step of the present invention.
図8に示すように、掘削機1の後方の矩形推進管10が推進され並設される。
並設される矩形推進管10の隅部11、雌継手12、雄継手13は、先行掘削孔20に充填された充填材21を横に除きながら配置されることになる。このとき、地山に対して推進とは異なり、充填材での推進であるので、推進の抵抗は低い。
並設される矩形推進管10は、雄継手13が既設の矩形推進管10の雌継手12に係合しながら設置される。
As shown in FIG. 8, the rectangular propulsion pipe 10 behind the excavator 1 is propelled and arranged in parallel.
The corner portion 11, the female joint 12, and the male joint 13 of the rectangular propulsion pipes 10 arranged in parallel are arranged while laterally removing the filler 21 filled in the preceding excavation hole 20. At this time, unlike the propulsion with respect to the natural ground, the propulsion resistance is low because the propulsion is performed with the filler.
The rectangular propulsion pipes 10 arranged in parallel are installed while the male joint 13 is engaged with the female joint 12 of the existing rectangular propulsion pipe 10.
以降、図2乃至図8によって説明した工程を繰り返して、アンダーパスの本体構造部を構築していく。 Thereafter, the steps described with reference to FIGS. 2 to 8 are repeated to construct the underpass body structure portion.
〔その他の変形例〕
本発明は上記の実施の形態に限定されるものではない。例えば以下のようなものも含まれる。
[Other modifications]
The present invention is not limited to the above embodiment. For example, the following items are also included.
本実施形態では、矩形推進管を連結してアンダーパスの本体構造部を構築する例であったが、これに限られず、パイプルーフのような構造物であっても良い。
また、本実施形態では、矩形推進管を連結して並設するものであったが、連結せずに矩形推進管を並設するような地中構造物であっても良い。
さらに、矩形推進管を並設するような地中構造物でなく、矩形推進管単体を設置するものでも適用可能である。
In the present embodiment, the example in which the rectangular propelling pipes are connected to construct the underpass main body structure portion is not limited to this, and a structure such as a pipe roof may be used.
Further, in the present embodiment, the rectangular propulsion pipes are connected and arranged in parallel, but an underground structure in which the rectangular propulsion pipes are arranged in parallel without being connected may be used.
Further, it is also possible to apply a rectangular propulsion pipe alone instead of an underground structure in which rectangular propulsion pipes are installed in parallel.
本実施形態では、先行掘削孔を掘削する掘削機と並設する矩形推進管の前方に設ける掘削機を共用する例を示したが、これに限られず、異なる掘削機としても良い。この場合には、異なる掘削機の掘削外径が異なるものであっても良い。 In the present embodiment, an example is shown in which an excavator provided in front of a rectangular propulsion pipe provided in parallel with an excavator that excavates a preceding excavation hole is shared, but the present invention is not limited to this, and different excavators may be used. In this case, different excavators may have different excavation outer diameters.
1 掘削機
2 スキンプレート
3 回転カッタ
10 矩形推進管
11 隅部
12 雌継手
13 雄継手
20 先行掘削孔
21 充填材
DESCRIPTION OF SYMBOLS 1 Excavator 2 Skin plate 3 Rotating cutter 10 Rectangular propulsion pipe 11 Corner 12 Female joint 13 Male joint 20 Preceding excavation hole 21 Filler

Claims (6)

  1. 断面の外形が矩形形状を有する矩形推進管を、前記矩形推進管の前方に設けた掘削機で掘削して地中に設置する方法であって、
    正面視において、断面の外形が円形状のスキンプレートを有する前記掘削機を、前記矩形推進管の隅部が前記スキンプレートの外形に重ならないようにして前記矩形推進管の前方に設けて掘削する本掘削工程と、
    前記本掘削工程より前であって、前記本掘削工程における前記矩形推進管が前記掘削機の外形に重ならない部分を含んで掘削する先行掘削工程と、
    前記先行掘削工程の後であって前記本掘削工程より前に、前記先行掘削工程で掘削した箇所に充填材を充填する先行充填工程と、
    を備えることを特徴とする矩形推進管の設置方法。
    A method for installing a rectangular propulsion pipe having a rectangular cross-sectional outer shape in the ground by excavating with a excavator provided in front of the rectangular propulsion pipe,
    In a front view, the excavator having a skin plate having a circular cross-section is provided in front of the rectangular propulsion pipe so that a corner portion of the rectangular propulsion pipe does not overlap the external shape of the skin plate for excavation. Main excavation process,
    Prior to the main excavation step, the preceding excavation step of excavating the rectangular propulsion pipe in the main excavation step including a portion that does not overlap the outer shape of the excavator,
    After the preceding excavation step and before the main excavation step, a preceding filling step of filling a filler material in a portion excavated in the preceding excavation step,
    A method for installing a rectangular propulsion pipe, comprising:
  2. 前記矩形推進管の隅部には、並設される矩形推進管と連結する継手部が設けられており、
    前記先行掘削工程では、前記継手部が配置される部分も掘削しておくことを特徴とする請求項1に記載の矩形推進管の設置方法。
    A corner portion of the rectangular propulsion pipe is provided with a joint portion that is connected to the rectangular propulsion pipes arranged in parallel.
    The method for installing a rectangular propulsion pipe according to claim 1, wherein in the preceding excavation step, a portion where the joint portion is arranged is also excavated.
  3. 前記本掘削工程を掘削する掘削機を利用して、前記先行掘削工程における掘削を行うことを特徴とする請求項1又は請求項2に記載の矩形推進管の設置方法。 The method of installing a rectangular propulsion pipe according to claim 1 or 2, wherein the excavation machine for excavating the main excavation step is used to perform excavation in the preceding excavation step.
  4. 断面の外形が矩形形状の矩形推進管を備える地中構造物の製造方法であって、
    前記矩形推進管を、前記矩形推進管の前方に設けた掘削機で掘削して地中に前記矩形推進管を設置する際に、
    正面視において、断面の外形が円形状のスキンプレートを有する前記掘削機を、前記矩形推進管の隅部が前記スキンプレートの外形に重ならないようにして前記矩形推進管の前方に設けて掘削する本掘削工程と、
    前記本掘削工程より前に、前記本掘削工程における前記矩形推進管が前記掘削機の外形に重ならない部分を含んで掘削する先行掘削工程と、
    前記先行掘削工程の後であって前記本掘削工程より前に、前記先行掘削工程で掘削した箇所に充填材を充填する先行充填工程と、
    を備えることを特徴とする矩形推進管を備える地中構造物の製造方法。
    A method of manufacturing an underground structure comprising a rectangular propulsion pipe having a rectangular cross section,
    When installing the rectangular propulsion pipe in the ground by excavating the rectangular propulsion pipe with an excavator provided in front of the rectangular propulsion pipe,
    In a front view, the excavator having a skin plate having a circular cross-section is provided in front of the rectangular propulsion pipe so that a corner portion of the rectangular propulsion pipe does not overlap the external shape of the skin plate for excavation. Main excavation process,
    Prior to the main excavation step, a preceding excavation step of excavating the rectangular propulsion pipe in the main excavation step including a portion that does not overlap the outer shape of the excavator,
    After the preceding excavation step and before the main excavation step, a preceding filling step of filling a filler material in a portion excavated in the preceding excavation step,
    A method for manufacturing an underground structure including a rectangular propulsion pipe, comprising:
  5. 前記矩形推進管の隅部には、並設される矩形推進管と連結する継手部が設けられており、
    前記先行掘削工程では、前記継手部が配置される部分も掘削しておくことを特徴とする請求項4に記載の矩形推進管を備える地中構造物の製造方法。
    A corner portion of the rectangular propulsion pipe is provided with a joint portion that is connected to the rectangular propulsion pipes arranged in parallel.
    The method for manufacturing an underground structure having a rectangular propulsion pipe according to claim 4, wherein in the preceding excavation step, a portion where the joint portion is arranged is also excavated.
  6. 前記本掘削工程を掘削する掘削機を利用して、前記先行掘削工程における掘削を行うことを特徴とする請求項4又は請求項5に記載の矩形推進管を備える地中構造物の製造方法。 The method for manufacturing an underground structure provided with a rectangular propulsion pipe according to claim 4 or 5, wherein an excavator for excavating the main excavation step is used to perform excavation in the preceding excavation step.
JP2018234215A 2018-12-14 2018-12-14 Method for installing rectangular propulsion pipe and method for manufacturing underground structure equipped with rectangular propulsion pipe Pending JP2020094447A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018234215A JP2020094447A (en) 2018-12-14 2018-12-14 Method for installing rectangular propulsion pipe and method for manufacturing underground structure equipped with rectangular propulsion pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018234215A JP2020094447A (en) 2018-12-14 2018-12-14 Method for installing rectangular propulsion pipe and method for manufacturing underground structure equipped with rectangular propulsion pipe

Publications (1)

Publication Number Publication Date
JP2020094447A true JP2020094447A (en) 2020-06-18

Family

ID=71084696

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018234215A Pending JP2020094447A (en) 2018-12-14 2018-12-14 Method for installing rectangular propulsion pipe and method for manufacturing underground structure equipped with rectangular propulsion pipe

Country Status (1)

Country Link
JP (1) JP2020094447A (en)

Similar Documents

Publication Publication Date Title
KR101691139B1 (en) Construction method using soil retaining wall
KR100847352B1 (en) Supporting tube assembly for tunnel supporting method with grouted steel pipe in the borehole and supporting method of using thereof
JP3860143B2 (en) Excavator for pipe roof and pipe roof construction method using them
JP2020094447A (en) Method for installing rectangular propulsion pipe and method for manufacturing underground structure equipped with rectangular propulsion pipe
JP5399292B2 (en) Element propulsion method and blade element used for element propulsion method
JP2004316126A (en) Work execution method for large section tunnel and deformed section shield boring machine
JP2009174179A (en) Construction method for shield machine receiving opening, and arrival method for shield machine
JP2010112037A (en) Method for removing and restoring underground installation
JP2013231277A (en) Sealed type excavator adaptive to underground space in a horseshoe or hood sectional shape
JP2000290994A (en) Method for drilling columnar continuous hole and inner casing
JP2000234493A (en) Method for constructing face part earth retaining wall of shield starting shaft
JP6857097B2 (en) How to build a tunnel
JP2008014000A (en) Construction method of cast-in-place concrete pile
JP6615465B2 (en) Yamadome wall
JP5246426B2 (en) Construction method of underground structure
JP4322688B2 (en) Construction method of large section tunnel
JP2018071287A (en) Construction method of pipe roof
JP2001073674A (en) Joining method for shield tunnel
JP5865445B2 (en) Concrete box used for open shield method
JP2003027469A (en) Steel pipe pile, foundation pile producing method using the same and device of the method
JP2020165287A (en) Combination structure of steel material, construction method of earth retaining wall, and removal method of upper pile for earth retaining wall
JP2009035968A (en) Rectangular boring machine
KR20200037581A (en) Method of press-fitting steel pipe to form working pipe
JP2006226036A (en) Shield boring machine and execution method of underground structure
JP2004162256A (en) Removable buried pipe

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210827