JP2020084447A - Installation method of land slide prevention pile for high place work platform - Google Patents

Installation method of land slide prevention pile for high place work platform Download PDF

Info

Publication number
JP2020084447A
JP2020084447A JP2018216447A JP2018216447A JP2020084447A JP 2020084447 A JP2020084447 A JP 2020084447A JP 2018216447 A JP2018216447 A JP 2018216447A JP 2018216447 A JP2018216447 A JP 2018216447A JP 2020084447 A JP2020084447 A JP 2020084447A
Authority
JP
Japan
Prior art keywords
crane
work
gate
landslide
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2018216447A
Other languages
Japanese (ja)
Other versions
JP6506878B1 (en
Inventor
裕輔 樫本
Yusuke Kashimoto
裕輔 樫本
孝彦 樫本
Takahiko Kashimoto
孝彦 樫本
Original Assignee
株式会社オーク
Oak:Kk
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社オーク, Oak:Kk filed Critical 株式会社オーク
Priority to JP2018216447A priority Critical patent/JP6506878B1/en
Application granted granted Critical
Publication of JP6506878B1 publication Critical patent/JP6506878B1/en
Publication of JP2020084447A publication Critical patent/JP2020084447A/en
Active legal-status Critical Current

Links

Images

Abstract

To provide an installation method of a land slide prevention pile for efficiently installing a land slide prevention pile T in a high mountain place A by arranging a high place work platform and installing a gate type crane 2 thereon without using a large heavy machine in a high mountain place where it is difficult to introduce a heavy machine for drilling a large drilling hole.SOLUTION: An installation method comprises the steps of: disposing self-travel transportation means 1 capable of self-traveling from a lower work place D of a foot of the high mountain place A toward a high place work platform B; separating the gate type crane 2 to a plurality of component members 2-2n of the gate type crane to those weights transportable by the self-travel transportation means 1 at the lower work place D before installing the gate type crane 2 at the high working platform B; transporting the plurality of component members 2-2n of the gate type crane from the lower work place D to the high place work platform B by the self-travel transportation means 1; and travelably assembling the plurality of component members 2-2n of the gate type crane into the gate type crane 2 at the high place work platform B.SELECTED DRAWING: Figure 1

Description

本発明は、大型クレーンや大型杭打機等の大型重機を運搬困難な高所山間部において、山間部地盤の地滑り抑止用の鋼杭を埋設するための地滑り抑止杭埋設施工方法に関する。 TECHNICAL FIELD The present invention relates to a landslide prevention pile burying construction method for burying steel piles for landslide prevention in mountain ground in a high mountain area where it is difficult to carry large heavy equipment such as large cranes and large pile driving machines.
従来のこの種の高所山間部における地滑り抑止杭埋設孔を形成するための掘削孔形成方法に関する特許公報等を挙げることはできないが、本件出願人は、過去に図15に示すように高所山間部Aに仮設した高所作業足場Bに杭打ちやぐらYを設置して、この杭打ちやぐらYに設けた繰り出しリールLから繰り出される吊りロープRにダウンザホールハンマー1を吊持し、該ダウンザホールハンマー1を高所作業足場Bから高所山間部Aの傾斜地盤に打設することによって山間部地盤Gに地滑り抑止杭埋設孔Cを形成し、且つ該地滑り抑止杭埋設孔Cに地滑り抑止杭Tを埋設施工するようにしていた。 Although it is not possible to name a patent publication or the like regarding a conventional method for forming a hole for landslide prevention pile burial in a mountainous area of this type of high place, the applicant of the present application has shown that, as shown in FIG. The pile-driving tower Y is installed on the work platform B at a high place temporarily installed in the mountain area A, and the down-the-hole hammer 1 is hung on the suspension rope R fed from the feeding reel L provided on the pile-driving tower Y. By laying 1 from the work platform B at a high place to the sloping ground in the mountainous region A at a high place, a landslide suppressing pile burial hole C is formed in the mountainous ground G, and a landslide suppressing pit T in the landslide suppressing pile burying hole C. Was to be buried.
この杭打ちやぐらYは、その構造上高所作業足場Bにに設置され、杭打ち作業が終わるごとに図示しないウインチによる引張作業よって杭打ちやぐらYを次の地滑り抑止杭埋設予定位置まで移動させるようにしていた。そのため作業能率が極めて悪いと共に、安定性も悪く移動時に倒壊等不測の事態が発生する危険性もあった。又、杭打ちやぐらに設けた吊りロープを昇降させる手段として動滑車機構を採用しているため、大きな倍力能力を発揮させるためには、それに比例して多くの操作時間をかけて吊りロープを操作しなければならず、操作能率が悪いと致命的な難点があった。その他後述のように種々の問題点があった。 Due to its structure, the pile driving tower Y is installed on the work platform B at a high place, and every time the pile driving operation is completed, the pile driving tower Y is moved to the next planned burying position for landslide prevention by pulling work by a winch (not shown). I was doing. Therefore, the work efficiency is extremely poor, and the stability is poor, and there is a risk that an unexpected situation such as a collapse may occur at the time of moving. In addition, since a moving pulley mechanism is used as a means for raising and lowering the suspension rope installed on the pile driving tower, in order to exert a large boosting ability, it takes a lot of operation time in proportion to the suspension rope mechanism. It had to be operated, and there was a fatal difficulty if the operation efficiency was poor. In addition, there were various problems as described later.
本発明は、高所山間部の地盤に地滑り抑止杭を効率よく埋設施工することが可能な地滑り抑止杭埋設施工方法を提案するものである。 The present invention proposes a landslide prevention pile burying construction method capable of efficiently burying a landslide prevention pile in the ground in a mountainous area of a high place.
上記課題を解決するための手段を、後述する実施形態の参照符号を付して説明すると、請求項1に係る発明の高所作業足場における地滑り抑止杭埋設施工方法は、図8に示すように、高所山間部Aの麓の作業低地Dから高所作業足場Bに向かって自走可能な自走搬送手段1が配設され、高所作業足場Bに門型クレーン2(図1)を設置するにあたって、作業低地Dにおいて当該門型クレーン2は前記自走搬送手段1によって搬送可能な程度の重量に分解して、図9の(a)〜図12の(b)に一例が示されるように複数の門型クレーン構成部材21〜2nに分割形成され、当該複数の門型クレーン構成部材21〜2nは前記自走搬送手段1によって作業低地Dより高所作業足場Bに搬送され、該高所作業足場Bにおいて複数のクレーン構成部材21〜2nは門型クレーン2に走行可能に組み立てられ、該高所作業足場Bにおいて走行可能に組み立てられた門型クレーン2に吊りロープ駆動装置31を介して吊支されたダウンザホールハンマー1によって前記地盤Gに地滑り防止杭埋設孔Cが形成されると共に、門型クレーン2に吊支された地滑り抑止杭Tが前記地滑り抑止杭埋設孔に埋設施工されるようにしたことを特徴とするものである。 The means for solving the above problems will be described with reference numerals of the embodiment described later. A method for burying a landslide-preventing pile in a work platform for aerial work according to the invention of claim 1 is as shown in FIG. , A self-propelled carrying means 1 capable of self-propelled from a working lowland D at the foot of the highland mountainous area A toward a highland working scaffold B is provided, and a gate crane 2 (Fig. 1) is mounted on the highland working scaffold B. Upon installation, the gate type crane 2 is disassembled into a weight that can be carried by the self-propelled carrying means 1 in the working lowland D, and an example is shown in FIGS. 9A to 12B. divided form into a plurality of portal crane component 2 1 to 2n as, the plurality of portal crane component 2 1 to 2n is transported to aerial work scaffolding B than working lowland D by the self transport means 1 a plurality of crane components 2 1 to 2n in the high plant work scaffolding B is drivable assembled on gantry crane 2, rope drive hanging gantry crane 2 which is assembled can travel in the high plant work scaffolding B The down-the-hole hammer 1 suspended via the device 31 forms a landslide prevention pile burial hole C in the ground G, and the landslide prevention pile T hung and suspended by the gate type crane 2 is in the landslide prevention pile burial hole. It is characterized by being buried.
又、請求項2に係る発明の高所作業足場における地滑り抑止杭埋設施工方法は、請求項1に記載の地滑り抑止杭埋設施工方法において、前記高所作業足場Bに走行可能に組み立てられた門型クレーン2にその走行方向に直交する方向に前記吊りロープ駆動装置31が変位移動可能に設けられ、該吊りロープ駆動装置31によってテーブルマシン4、ダウンザホールハンマー1又は地滑り抑止杭Tを変位移動した状態に門型クレーン2に吊支可能となっていることを特徴とするものである。 The method for burying a landslide-preventing pile in a work platform for aerial work according to the second aspect of the present invention is the method for burying a landslide-prevention pile in a method according to claim 1, wherein the gate is constructed so as to be capable of traveling on the work platform B for high places. A state in which the suspension rope driving device 31 is displaceably movable in a direction orthogonal to the traveling direction of the type crane 2, and the table machine 4, the down the hole hammer 1 or the landslide prevention pile T is displaced and moved by the suspension rope driving device 31. It is characterized in that it can be suspended and supported by the gate type crane 2.
又、請求項3に係る高所作業足場における地滑り抑止杭埋設施工方法は、請求項1又は2に記載の地滑り抑止杭埋設施工方法において、前記ダウンザホールハンマー1は、高所作業足場Bに設置したテーブルマシン4に回転駆動されながら地盤に打設されようになっていることを特徴とするものである。 Further, the method for burying a landslide-preventing pile in a work platform for aerial work according to claim 3 is the method for burying a landslide-prevention pile according to claim 1 or 2, wherein the down-the-hole hammer 1 is installed on a work platform B for aerial work. It is characterized in that it is designed to be driven into the ground while being rotationally driven by the table machine 4.
又、請求項4に係る高所作業足場における地滑り抑止杭埋設施工方法は、請求項1〜3の何れか記載の地滑り抑止杭埋設施工方法において、複数の門型クレーン構成部材21〜2nは、ボルト.ナット5によって互いに連結されて門型クレーン2に組み立てられるようになっていることを特徴とするものである。 Further, the method for burying a landslide suppressing pile in a work platform for high places according to claim 4 is the method for burying a landslide suppressing pile according to any one of claims 1 to 3, wherein a plurality of gate-type crane constituent members 2 1 to 2n are ,bolt. It is characterized in that it is connected to each other by a nut 5 and can be assembled into the portal crane 2.
又、請求項5に係る高所作業足場における地滑り抑止杭埋設施工方法は、請求項1〜4の何れかに記載の地滑り抑止杭埋設施工方法において、前記自走搬送手段3によって搬送可能な程度の重量の小型クローラクレーン6が該自走搬送手段3によって作業低地Dより高所作業足場Bに搬送されるようにしたことを特徴とするものである。 Further, the method for burying piles for suppressing landslides in aerial work scaffolds according to claim 5 is the method for burying piles for suppressing landslides according to any one of claims 1 to 4, to the extent that the self-propelled transporting means 3 can carry the landslides. The small-sized crawler crane 6 having the weight of 1 is transported from the working lowland D to the high-altitude work scaffold B by the self-propelled transporting means 3.
又、請求項6に記載の高所作業足場における地滑り抑止杭埋設施工方法は、請求項5に記載の地滑り抑止杭埋設施工方法において、高所作業足場Bに搬送された前記小型クローラクレーン6では揚程能力が低いため背丈の高いに門型クレーンをくみたてることができず、従って高所作業足場Bでは背丈の高い門型クレーン2を組み立てることが可能な揚程能力の高い分解型大型クローラクレーン7が前記小型クローラクレーン6とは別に組み立てられるようになっており、この際、該分解型大型クローラクレーン7は、総重量が前記小型クローラクレーン6よりも大で、前記自走搬送手段3による搬送能力を超えるためそのままでは搬送することができないため、該分解型大型クローラクレーン7は、作業低地Dにおいて前記自走搬送手段3によって搬送可能で程度の重量に分解して複数のクローラクレーン構成部材71〜7nに分割形成され、該複数のクローラクレーン構成部材71〜7nが前記自走搬送手段3によって作業低地Dより高所作業足場Bに搬送され、高所作業足場Bに搬送され複数のクローラクレーン構成部材71〜7nは、前記小型クローラクレーン6によって分解型大型クローラクレーン7に組み立てられ、しかして該分解型大型クローラクレーン7によって複数の門型クレーン構成部材21〜2nが門型クレーン2に組み立てられるようになっていることを特徴とするものである。 Further, the method for burying landslide prevention piles in aerial work scaffolding according to claim 6 is the method for burying landslide prevention piles according to claim 5, in which the small crawler crane 6 transported to the aerial work scaffold B is Since the lift capacity is low, it is not possible to build a gate crane with a high height. Therefore, at the work platform B for high places, a disassembled large crawler crane 7 with a high lift capacity that can assemble a tall gate crane 2 is used. The crawler crane 6 is assembled separately from the small crawler crane 6, and the total weight of the disassembled large crawler crane 7 is larger than that of the small crawler crane 6 and the carrying capacity of the self-propelled carrying means 3 is large. Since it cannot be conveyed as it is, the disassembling type large crawler crane 7 can be conveyed by the self-propelled conveying means 3 in the working lowland D and is disassembled to a certain weight and a plurality of crawler crane constituent members 7 1 is divided formed ~7N, is conveyed to the aerial work scaffolding B than work lowland D is the plurality of crawler cranes component 7 1 ~7n by the self conveying means 3, a plurality of crawlers is transported to aerial work scaffolding B The crane constituent members 7 1 to 7 n are assembled into the disassembling type large crawler crane 7 by the small crawler crane 6, so that the disassembling type large crawler crane 7 causes a plurality of gate type crane constituent members 2 1 to 2 n to be a gate type crane. It is characterized in that it can be assembled into 2.
又、請求項7に係る高所作業足場における地滑り抑止杭埋設施工方法は、請求項1〜6の何れかに記載の高所作業足場における地滑り抑止杭埋設施工方法において、先ず、前記門型クレーン2に吊支されてテーブルマシン4が地滑り抑止杭埋設予定地に設置され、次に、前記門型クレーン2に吊支されてダウンザホールハンマー1がテーブルマシン4に芯合わせされ、次に、前記門型クレーン2に吊支されてダウンザホールハンマー1がテーブルマシン4に回転駆動されながら地盤Gの岩盤支持層Grに達するまで掘進して地滑り防止杭埋設孔Cを形成され、次に前記門型クレーン2に吊支されてダウンザホールハンマー1が地滑り防止杭埋設孔Cから引き抜かれ、最後に、前記門型クレーン2に吊支された地滑り抑止杭Tが地滑り防止杭埋設孔Cに埋設施工されるようになっていること特徴とするものである。 The method for burying a landslide suppressing pile in a work platform for aerial work according to claim 7 is the method for burying a landslide prevention pile in a work place for high places according to any one of claims 1 to 6, wherein first, the gate-type crane is used. 2 and the table machine 4 is installed in the planned landslide prevention pile burial site. Then, the down-the-hole hammer 1 is suspended and supported by the gate-type crane 2 to align the table machine 4, and then the gate. The down-the-hole hammer 1 is hung by a crane 2 and is driven to rotate by a table machine 4 until it reaches a rock support layer Gr of the ground G to form a landslide prevention pile burial hole C, and then the portal crane 2 So that the down-the-hole hammer 1 is pulled out from the landslide prevention pile burial hole C, and finally the landslide prevention pile T hung and suspended by the gate crane 2 is buried in the landslide prevention pile burial hole C. It is a feature.
上記解決手段による発明の効果を、後述する実施形態の参照符号を付して説明すると、高所作業足場における地滑り抑止杭埋設施工方法は、図8に示すように、大型クレーンや大型杭打機等の大型重機を運送困難な高所山間部Aの麓の作業低地Dから高所作業足場Bに向かって自走可能なモノレールや索道ケーブル等の自走搬送手段3が配設され、高所作業足場Bに門型クレーン2(図1)を設置するにあたって、作業低地Dにおいて当該門型クレーン2は前記自走搬送手段3によって搬送可能な程度の重量に分解して図9の(a)〜図12の(b)に一例が示されるように複数の門型クレーン構成部材21〜2nに分割形成され、これによって、門型クレーン構成部材21〜2nを格別に又は搬送可能の程度に束ねて、当該複数のクレーン構成部材21〜2nを前記自走搬送手段3によって作業低地Dより高所作業足場Bに搬送することが可能である。 The effect of the invention by the above-mentioned solving means will be described with reference to the reference numerals of the embodiments to be described later. As shown in FIG. It is difficult to transport large heavy equipment such as a high altitude work place at the foot of the mountainous area A to the high work scaffold B. When installing the portal crane 2 (FIG. 1) on the work scaffold B, the portal crane 2 is disassembled into a weight that can be carried by the self-propelled carrying means 3 in the working lowland D, and FIG. an example in (b) of to 12 are separately formed on the plurality of portal crane component 2 1 to 2n as indicated, thereby, exceptionally or transportable extent of the gantry crane component 2 1 to 2n and bundled, it is possible to convey the plurality of crane components 2 1 to 2n in aerial work scaffolding B than working lowland D by the self conveying means 3.
このようにして、高所作業足場Bに搬送された複数の門型クレーン構成部材21〜2nを該高所作業足場Bにおいて門型クレーン2に組み立てるようにしたため、大型クレーンや大型杭打機等の大型重機を搬送困難な高所山間部Aにおいても容易に門型クレーン2を高所作業足場Bにおいて組立てることができる。 In this way, aerial because you assemble the gantry crane 2 scaffolds B plurality of portal crane component 2 1 to 2n transported to the in the high plant work scaffolding B, large cranes and large pile driver It is possible to easily assemble the portal crane 2 on the work platform B at a high place even in the mountainous region A at a high place where it is difficult to transport a large heavy machine such as.
そして、高所作業足場Bにおいて走行可能に組み立てられた門型クレーン2は、自走搬送手段1によって搬送可能な程度に複数の門型クレーン構成部材21〜2nに分割形成するものであるから、例えば各門型クレーン構成部材21〜2nの重量を搬送可能な限り増大したり、門型クレーン構成部材21〜2nの構成部数を増加することによって、大型の門型クレーン2を高所作業足場Bに組立てることが可能である。 The gantry crane 2 which is assembled can travel in aerial work scaffolding B, since is to split formed in a plurality of portal crane component 2 1 to 2n enough to be conveyed by the self-propelled conveying means 1 , for example, to increase as much as possible carry the weight of each portal crane component 2 1 to 2n, by increasing the construction parts of the portal crane structure member 2 1 to 2n, altitude large gantry crane 2 It can be assembled on the work scaffold B.
また、門型クレーン2は高所作業足場Bに走行可能に組み立てられるため、自走搬送手段3によって高所作業足場Bの積み込み位置に搬送されるダウンザホールハンマー1や地滑り抑止杭Tは、その積み込み位置まで門型クレーン2が走行することによって、ダウンザホールハンマー1や地滑り抑止杭Tは該門型クレーン2に迅速に受け渡すことができる。そのため多数のダウンザホールハンマー1を継ぎ足しながら地滑り防止杭埋設孔Cを能率的に形成することができと共に、該掘削形成された地滑り防止杭埋設孔Cに地滑り抑止杭Tを地滑り防止杭埋設孔Cに能率的に埋設施工することができる。 Further, since the gate-type crane 2 is assembled so as to be able to travel on the high-place work scaffold B, the down-the-hole hammer 1 and the landslide-preventing pile T that are transported to the loading position of the high-place work scaffold B by the self-propelled transport means 3 are not loaded. By moving the portal crane 2 to the position, the down-the-hole hammer 1 and the landslide prevention pile T can be quickly transferred to the portal crane 2. Therefore, it is possible to efficiently form the landslide prevention pile burying hole C while adding a large number of down-the-hole hammers 1, and at the same time, to the landslide prevention pile burying hole C, the landslide prevention pile T is laid in the excavated and formed landslide prevention pile burying hole C. It can be buried efficiently.
また、高所作業足場Bにおいて走行可能に組み立てられた門型クレーン2に吊りロープ駆動装置31を介して吊支されたダウンザホールハンマー1によって前記地盤Gに地滑り防止杭埋設孔Cが形成されると共に、門型クレーン2に吊支された地滑り抑止杭Tが前記地滑り抑止杭埋設孔に埋設施工されるようにしたため、吊りロープ駆動装置31によって迅速且つ容易にこれらの施工を行うことができる。 In addition, a landslide prevention pile burial hole C is formed in the ground G by the down-the-hole hammer 1 suspended by a gantry crane 2 assembled so as to be able to travel on the work platform B at high places via a suspension rope drive device 31. Since the landslide prevention pile T suspended from the gate crane 2 is embedded in the landslide prevention pile burying hole, the suspension rope drive device 31 can perform these constructions quickly and easily.
又、請求項2に係る発明の高所作業足場における地滑り抑止杭埋設施工方法によれば、前記高所作業足場Bに走行可能に組み立てられた門型クレーン2にその走行方向に直交する方向に前記吊りロープ駆動装置31が変位移動可能に設けられ、該吊りロープ駆動装置31によってデーブルマシン4、ダウンザホールハンマー1又は地滑り抑止杭Tを変位移動した状態に門型クレーン2に吊支可能となっているため、門型クレーン2の走行方向に適当間隔に地滑り抑止杭Tを埋設施工する際に、その走行方向に直交する方向に変位移動した位置で地滑り抑止杭Tを埋設施工することができるから、その走行方向に直交する方向に地滑り抑止杭Tを2列又は3列等の複数列に並列した状態で走行方向に適当間隔に形成することができ、地盤Gに複数の地滑り抑止杭Tを並列状態に形成することによって、地滑り抑止杭Tによる地滑り抑止効果を一層顕著に向上させることができる。 According to the method for embedding landslide-preventing piles in aerial work scaffolding of the invention according to claim 2, the gate-type crane 2 assembled to the aerial work scaffold B so that it can travel in a direction orthogonal to the traveling direction. The suspension rope drive device 31 is movably provided, and the suspension rope drive device 31 can suspend the table machine 2, the down-the-hole hammer 1 or the landslide prevention pile T on the portal crane 2 in a displaced state. Therefore, when burying the landslide prevention piles T at appropriate intervals in the traveling direction of the gate crane 2, it is possible to bury the landslide prevention piles T at a position displaced and moved in a direction orthogonal to the traveling direction. , The landslide prevention piles T can be formed at appropriate intervals in the traveling direction in a state where the landslide prevention piles T are arranged in a plurality of rows such as two rows or three rows in a direction orthogonal to the traveling direction, and a plurality of landslide prevention piles T are provided on the ground G. By forming the landslide prevention piles in the parallel state, the landslide prevention effect of the landslide prevention pile T can be more significantly improved.
又、請求項3に係る発明の高所作業足場における地滑り抑止杭埋設施工方法によれば、前記ダウンザホールハンマー1は、高所作業足場Bに設置したテーブルマシン4によって回転駆動されながら、その地盤G中に打撃掘進することによって、ダウンザホールハンマー1を地盤Gの岩盤支持層Grに円滑に到達させることができる。 Further, according to the method for burying landslide-preventing piles in aerial work scaffolding of the invention according to claim 3, the down-the-hole hammer 1 is rotatably driven by the table machine 4 installed in the aerial work scaffold B, and the ground G thereof is used. The down-the-hole hammer 1 can smoothly reach the rock support layer Gr of the ground G by digging into the ground.
又、請求項4に係る高所作業足場における地滑り抑止杭埋設施工方法によれば、複数の門型クレーン構成部材21〜2nは、ボルト.ナット5によって互いに連結され門型クレーン2に組み立てられるようになっているため、ボルト.ナット5の締付作業に自動締付具を用いることによって迅速容易に門型クレーン2に組み立てることができる。 Further, according to the landslide suppress pile burying construction method in aerial scaffold according to claim 4, a plurality of portal crane component 2 1 to 2n, the bolts. Since the nuts 5 are connected to each other to be assembled into the portal crane 2, the bolts. By using an automatic tightening tool for tightening the nut 5, the portal crane 2 can be assembled quickly and easily.
又、請求項5に係る高所作業足場における地滑り抑止杭埋設施工方法によれば、前記自走搬送手段3によって搬送可能な程度の重量の小型クローラクレーン6を該自走搬送手段3によって作業低地Dより高所作業足場Bに搬送するようにしたため、小型クローラクレーン6を高所作業足場Bに分解することなく搬送することができ、それがために高所作業足場Bにおいて小型クローラクレーン6を分解するなく、そのまま迅速に高所作業足場Bにおいて敷鉄板等の敷設作業等補助作業を行わせることができる。 Further, according to the method for burying piles for suppressing landslides in work platforms at high places according to claim 5, a small crawler crane 6 having a weight that can be transported by the self-propelled transporting means 3 is used by the self-propelled transporting means 3 for working lowland. Since the work crawler crane B is carried to the aerial work scaffold B from D, the small crawler crane 6 can be carried to the work aerial scaffold B without being disassembled. Without disassembling, it is possible to promptly perform auxiliary work such as laying work of a laid iron plate or the like on the work platform B at high places.
又、請求項6に係る高所作業足場における地滑り抑止杭埋設施工方法によれば、高所作業足場Bに搬送された前記小型クローラクレーン6では揚程能力が低いため背丈の高いに門型クレーン2を組み立てることができない。そこで高所作業足場Bでは背丈の高い門型クレーン2を組み立てることが可能な揚程能力の高い分解型大型クローラクレーン7が前記小型クローラクレーン6とは別に組み立てられるようになっている。しかしこの際、該分解型大型クローラクレーン7は、総重量が前記小型クローラクレーン6よりも大で、前記自走搬送手段3による搬送能力を超えるためそのままでは搬送することができないため、該分解型大型クローラクレーン7は、作業低地Dにおいて前記自走搬送手段3によって搬送可能で程度の重量に分解して複数のクローラクレーン構成部材71〜7nに分割形成される。そして、該複数のクローラクレーン構成部材71〜7nは前記自走搬送手段1によって作業低地Dより高所作業足場Bに搬送され、該高所作業足場Bに搬送され複数のクローラクレーン構成部材71〜7nは、前もって高所作業足場Bに搬送されている前記小型クローラクレーン6によって分解型大型クローラクレーン7に組み立てられることになる。しかして該分解型大型クローラクレーン7によって複数の門型クレーン構成部材21〜2nが門型クレーン2に組み立てられるようになっているため、門型クレーン2は、無理なく分解型大型クローラクレーン7によって組み立てられることができる。 Further, according to the method for burying landslide-preventing piles in a work platform for high places according to claim 6, the small crawler crane 6 transferred to the work platform for a high place B has a low lift capacity, so that the gate crane 2 has a high height. Can not be assembled. Therefore, in the aerial work scaffold B, the disassembly type large crawler crane 7 having a high lift capacity capable of assembling the tall gate type crane 2 can be assembled separately from the small crawler crane 6. However, at this time, since the total weight of the disassembled large crawler crane 7 is larger than that of the small crawler crane 6 and the conveying capacity of the self-propelled conveying means 3 is exceeded, it cannot be conveyed as it is. large cranes 7 are separately formed by decomposing the weight degree be conveyed by the self-propelled conveyor means 3 in the working lowland D to a plurality of the crawler crane components 7 1 ~7n. Then, the plurality of crawler crane constituent members 7 1 to 7 n are conveyed by the self-propelled conveying means 1 from the working lowland D to the high-place work scaffold B, and are conveyed to the high-place work scaffold B, and the plurality of crawler crane constituent members 7 1 to 7n are assembled into the disassembled large crawler crane 7 by the small crawler crane 6 which has been previously conveyed to the work platform B at a high place. Thus for by the decomposition type large crawler crane 7 plurality of portal crane component 2 1 to 2n adapted to be assembled to the gantry crane 2, gantry crane 2 is reasonably resolved large cranes 7 Can be assembled by.
又、請求項7に係る高所作業足場における地滑り抑止杭埋設施工方法によれば、先ず、前記門型クレーン2に吊支されてテーブルマシン4が地滑り抑止杭埋設予定地に設置され、次に、前記門型クレーン2に吊支されてダウンザホールハンマー1がテーブルマシン4に芯合わせされ、次に、前記門型クレーン2に吊支されてダウンザホールハンマー1がテーブルマシン4に回転駆動されながら地盤Gの岩盤支持層Grに達するまで掘進して地滑り防止杭埋設孔Cが形成され、次に、前記門型クレーン2に吊支されてダウンザホールハンマー1が地滑り防止杭埋設孔Cから引き抜かれ、最後に、前記門型クレーン2に吊支された地滑り抑止杭Tが地滑り防止杭埋設孔Cに埋設施工されるようになっているため、テーブルマシン4の地滑り抑止杭埋設予定地への設置から地滑り抑止杭Tの地滑り防止杭埋設孔Cへの埋設施工までの全てが高所作業足場Bを走行レールに案内されて走行する門型クレーン2の吊支操作によって行われることになり、これがために地滑り抑止杭Tを迅速に且つ円滑に地盤Gに埋設施工することができる。 Further, according to the method for burying landslide-preventing piles in aerial work scaffolds according to claim 7, first, the table machine 4 is suspended from the gate-type crane 2 and installed at the planned landslide-preventing pile burying site. , The down-the-hole hammer 1 is suspended from the gate-type crane 2 so that the down-the-hole hammer 1 is centered on the table machine 4, and then the down-the-hole hammer 1 is suspended from the gate-type crane 2 to be driven to rotate by the table machine 4 and the ground G. Digging until it reaches the rock support layer Gr of No. 2, a landslide prevention pile burial hole C is formed, then the down-the-hole hammer 1 is suspended from the gate type crane 2 and pulled out from the landslide prevention pile burial hole C, and finally Since the landslide prevention pile T suspended from the gate-type crane 2 is buried in the landslide prevention pile burial hole C, the table machine 4 is prevented from being installed at the landslide prevention pile burying site. Preventing the landslide of the pile T from being buried in the burying hole C for the landslide will be performed by the suspension operation of the portal crane 2 that is guided by the traveling rail on the work platform B at high altitude, and for this reason, the landslide will occur. The restraint pile T can be buried in the ground G quickly and smoothly.
本発明に係る掘削孔形成方法に用いる門型クレーンを高所作業足場に設置した状態で、ダウンザホールハンマーによって掘削孔形成作業状態を示す正面図である。It is a front view which shows a drilling hole forming work state by the down-the-hole hammer in the state which installed the gate type crane used for the drilling hole forming method which concerns on this invention on the aerial work scaffolding. 同側面図である。It is the same side view. 同平面図である。It is the same top view. (a)は、図2の側面図に示される門型クレーン上部の吊りロープ駆動装置の拡大側面図、(b)は、図1の正面図に示される門型クレーン上部の吊りロープ駆動装置の拡大正面図である。(A) is an enlarged side view of the suspension rope drive device above the portal crane shown in the side view of FIG. 2, and (b) is a suspension rope drive device above the portal crane shown in the front view of FIG. It is an enlarged front view. テーブルマシンの地滑り抑止杭予定位置から地滑り抑止杭の地滑り抑止杭埋設孔位置までの全ての作業工程が門型クレーンによる吊支操作によって行われることを説明する工程説明図である。It is a process explanatory view explaining that all the work processes from the landslide prevention pile planned position of a table machine to the landslide prevention pile burial hole position of a landslide prevention pile are performed by suspension support operation by a gate type crane. 掘削資機材の門型クレーンでの受け取りから門型クレーンの所要個所に設置する作業工程を示す説明図である。It is explanatory drawing which shows the work process which installs in a required location of a gate-type crane from receipt of excavation materials and equipment by a gate-type crane. (a)は、大型クローラークレーンと門型クレーンとの作業状態を示す平面図、(b)は、同側面図である。(A) is a top view which shows the working state of a large crawler crane and a gate type crane, (b) is the same side view. 作業低地から高所作業足場に至る自走搬送経路を自走する自走搬送手段を示す模式図である。It is a schematic diagram which shows the self-propelled conveyance means which self-propels in the self-propelled conveyance path from a work lowland to a high-place work scaffold. 門型クレーンを複数の門型クレーン構成部材に分割した状態の一部を示す図である。It is a figure showing a part of state where a gate type crane was divided into a plurality of gate type crane constituent members. 同じく門型クレーンの複数の門型クレーン構成部材に分割した状態の他の部分のクレーン構成部材を示す図である。It is a figure which shows the crane component member of the other part of the state which was similarly divided|segmented into the some gate type crane component member of a gate type crane. 同じく門型クレーンの複数の門型クレーン構成部材に分割した状態の他の部分のクレーン構成部材を示す図である。It is a figure which shows the crane component member of the other part of the state which was similarly divided|segmented into the some gate type crane component member of a gate type crane. 同じく門型クレーンの複数の門型クレーン構成部材に分割した状態の他の部分のクレーン構成部材を示す図である。It is a figure which shows the crane component member of the other part of the state which was similarly divided|segmented into the some gate type crane component member of a gate type crane. (a)は、門型クレーンにおける側面における複数の門型クレーン構成部材の組立状態を示す側面図、(b)は、正面図である。(A) is a side view showing an assembled state of a plurality of portal crane constituent members on a side surface of the portal crane, and (b) is a front view. (a)は、アウトリガー付きの小型クローラクレーンがそのブームとアウトリガーとを収納した状態の自走可能なアウトリガー付きの小型クローラクレーンを示す略図である。(b)は、分解型大型クローラクレーンを分解して複数のクローラクレーン構成部材に分解した状態を示す略図である。(A) is a schematic diagram showing a small crawler crane with an outrigger in which the small crawler crane with an outrigger accommodates the boom and the outrigger. (B) is a schematic diagram showing a state where the disassembled large crawler crane is disassembled and disassembled into a plurality of crawler crane constituent members. 従来技術を示すもので、高所作業足場に杭打ちやぐらを設置した状態で、その使用状態を示す側面図である。FIG. 10 is a side view showing a conventional technique and showing a usage state thereof in a state where a pile driving tower is installed on a work platform for high places. ダウンザホールハンマーの杭打ちやぐらでの受け取りからダウンザホールハンマーによる打設作業工程を示す説明図である。It is explanatory drawing which shows the driving|working operation process by a down-the-hole hammer from receipt by the pile driving of a down-the-hole hammer. 掘削資機材の杭打ちやぐらでの受け取りから杭打ちやぐらの所要個所に設置する作業工程を示す説明図である。It is explanatory drawing which shows the work process which installs in the required location of a pile driving tower from the receipt of excavation equipment in a pile driving tower.
図1及び図2は、高所山間部Aの地盤Gに繋ぎ桟12aによって枠組み状に多数の鋼製足場杭12を配置し、これら枠組みされた足場杭12に支持されて地盤Gに水平な高所作業足場Bを仮設し、この高所作業足場Bに門型クレーン2を設立した状態を示す。門型クレーン2は、前面側の左右の支柱13,14と後面側の左右の支柱15,16の4本の支柱によって門型に形成され、図1に示すように、正面視においては、4本の支柱13〜16は平行に直立状態に対向しているが、図2に示すように、側面視においては、前面側の左右の支柱13,14と後面側の左右支柱15,16とは互いに山形に傾斜状態に対向して設けられている。 1 and 2 show that a large number of steel scaffolding piles 12 are arranged in a frame shape by connecting beams 12a to the ground G in the mountainous area A of a high place, and are supported by these framed scaffolding piles 12 to be horizontal to the ground G. The work platform for high places B is temporarily installed, and the gate crane 2 is established on the work platform for high places B. The gate-type crane 2 is formed in a gate shape by four pillars of left and right front pillars 13 and 14 and rear right and left pillars 15 and 16, and as shown in FIG. The columns 13 to 16 of the book are parallel and face each other in an upright state, but as shown in FIG. 2, the left and right columns 13, 14 on the front side and the left and right columns 15, 16 on the rear side are seen in a side view. They are provided in a mountain shape so as to face each other in an inclined state.
そして、これらの支柱13〜16の下端部では、前面側から後面側にかけての右支柱13,15間および前面側から後面側にかけての左支柱14,16間に夫々台車17,18が取り付けられ、各台車17,18の前後端部には夫々走行ローラー19〜22が軸支され、高所作業足場Bに敷設された走行レール23,24に搭載されている。走行レール23,24は、地滑り抑止杭埋設孔Cを地盤Gに適当間隔に形成する配列に合わせて、この配列方向に並行に高所作業足場Bに設けられており、前面側の左右走行ローラー19,20に付属する走行モーター25によって走行駆動するようになっている。 Then, at the lower ends of the columns 13 to 16, carts 17 and 18 are attached between the right columns 13 and 15 from the front side to the rear side and between the left columns 14 and 16 from the front side to the rear side, respectively. Traveling rollers 19 to 22 are rotatably supported at the front and rear ends of the carriages 17 and 18, respectively, and are mounted on traveling rails 23 and 24 laid on the work platform B for high places. The traveling rails 23 and 24 are provided on the work platform B at high places in parallel with the arrangement direction in which the landslide prevention pile burying holes C are formed in the ground G at appropriate intervals, and the left and right traveling rollers on the front side. A traveling motor 25 attached to each of the motors 19 and 20 drives the vehicle.
4本の支柱13〜16の上端部では、正面梁材26と側面梁材27とによって門型に連結され、両梁材26,27によって、図3に示すように安全柵38で囲まれた点検作業台29が取り付けられている。点検作業台29には開口部30が設けられ、該開口部30に臨んで吊りロープ駆動装置31が懸架され、該吊りロープ駆動装置31は、後述のように、門型クレーン2の走行方向に対して直交する方向、即ち幅方向に移動できるようになっており、これによって複数の地滑り抑止杭埋設用掘削孔Cが走行方向と共に幅方向にも2列又は3列等複数列に並行に配列して門型クレーン2の走行方向に適当間隔に形成されるようになっている。 At the upper ends of the four columns 13 to 16, the front beam member 26 and the side beam member 27 are connected in a gate shape, and the two beam members 26 and 27 are surrounded by a safety fence 38 as shown in FIG. An inspection workbench 29 is attached. The inspection workbench 29 is provided with an opening 30 and a suspension rope driving device 31 is suspended so as to face the opening 30. The suspension rope driving device 31 is arranged in the traveling direction of the portal crane 2 as described later. It is designed to be movable in a direction orthogonal to the width direction, that is, in the width direction, whereby a plurality of landslide prevention pile burial holes C are arranged in parallel in a plurality of rows such as two rows or three rows in the width direction together with the traveling direction. Then, they are formed at appropriate intervals in the traveling direction of the portal crane 2.
吊りロープ駆動装置31は、図4の(a)および(b)に示すように、レール取付台32に取り付けられたレール33とこれにガイドされるローラ34によって門型クレーン2の走行方向に対して直交する幅方向に移動できるようになっており、これによって吊りロープ駆動部35から延びる吊りロープ36に転動リール37を介して取り付けられた吊りフック38は、図1に示すようにその実線位置から仮想線で示すように幅方向に迅速容易に変位できるようになっている。吊りロープ駆動部35の駆動用モーター39が取付ブラケット40に取り付けられ、吊りロープ駆動部35を含む吊りロープ駆動装置31はこれに連繋して吊り下げられる操作スイッチ41によって吊りロープ駆動装置31および前述の走行モーター25が作動される。 As shown in FIGS. 4(a) and 4(b), the suspension rope drive device 31 includes a rail 33 attached to a rail mount 32 and a roller 34 guided by the rail 33 with respect to the traveling direction of the portal crane 2. The suspension hooks 38 attached to the suspension rope 36 extending from the suspension rope drive unit 35 via the rolling reels 37 can be moved in the width direction orthogonal to each other, as shown in FIG. It can be displaced quickly and easily from the position in the width direction as shown by an imaginary line. The driving motor 39 of the suspension rope drive unit 35 is attached to the mounting bracket 40, and the suspension rope drive device 31 including the suspension rope drive unit 35 is suspended by the operation switch 41 linked to the suspension rope drive device 31 and the suspension rope drive device 31. The traveling motor 25 is operated.
図1に示すように、前後の右支柱13,15には点検作業台29を支えるための補助支柱41が桟木42によって取り付けられており、また図2に示すように、後面側の右支柱15には作業者が点検作業台29に登るための梯子43が取り付けられている。 As shown in FIG. 1, auxiliary struts 41 for supporting the inspection workbench 29 are attached to the front and rear right struts 13 and 15 by a shackle 42, and as shown in FIG. A ladder 43 for an operator to climb on the inspection work table 29 is attached to this.
そして、図1に示すように、高所作業足場Bには反力受け44を介して全周回転機構等からなるテーブルマシン4が設置され、ダウンザホールハンマー1は吊りフック38に吊支されて、その自重によってテーブルマシン4に抱持されて全周回転あるいは周方向に左右揺動しながら地盤G中に埋入され、ダウンザホールハンマー1の強力な掘進打撃作用とテーブルマシン4の回転作用によって地盤Gに地滑り抑止杭埋設孔Cが形成されることになる。ダウンザホールハンマー1又は地滑り抑止杭Tは、図1に示すようにその実線位置から仮想線で示すように幅方向に変位できる吊りフック38に吊持されて幅方向に変位した位置でも地盤Gに埋設孔Cを形成することができる。そして、門型クレーン2は、走行レール23,24にガイドされる走行ローラー19〜22および前面側の走行ローラー19,20に付属する走行モーター25によって、次の埋設孔Cが形成される予定位置まで走行駆動し、その位置に吊りフック38に吊持されてテーブルマシン4が設置され、次に該テーブルマシン4にダウンザホールハンマー1が抱持固定されてその予定位置の地盤Gに地滑り抑止杭埋設孔Cを形成することになる。なお、図1に示すように、ダウンザホールハンマー1の上端部にはスイベル機構45を介して高圧エアー導入用パイプ46に繋がれている。 Then, as shown in FIG. 1, a table machine 4 including an all-around rotating mechanism is installed on a work platform B at a high place via a reaction force receiver 44, and the down-the-hole hammer 1 is suspended and supported by a suspension hook 38. It is held by the table machine 4 by its own weight and is embedded in the ground G while rotating all around or swinging left and right in the circumferential direction, and by the powerful excavating impact of the down the hole hammer 1 and the rotating action of the table machine 4, the ground G is rotated. A landslide prevention pile burial hole C is formed in the landslide. The down-the-hole hammer 1 or the landslide restraining pile T is embedded in the ground G even when the down-the-hole hammer 1 or the landslide prevention pile T is suspended from a suspension hook 38 that can be displaced in the width direction from the solid line position as shown in FIG. The holes C can be formed. Then, the gate-type crane 2 is a planned position where the next buried hole C is formed by the traveling rollers 19 to 22 guided by the traveling rails 23 and 24 and the traveling motor 25 attached to the traveling rollers 19 and 20 on the front side. The table machine 4 is installed on the table machine 4 by being driven by the hanging hook 38, and then the down-the-hole hammer 1 is held and fixed on the table machine 4 and buried in the ground G at the predetermined position. The hole C will be formed. As shown in FIG. 1, a high pressure air introducing pipe 46 is connected to the upper end of the down the hole hammer 1 via a swivel mechanism 45.
図5の(a)〜(e)は、門型クレーン2に吊支されて、テーブルマシン4の地滑り抑止杭埋設予定位置への設置から、最終の地滑り抑止杭Tの地滑り防止杭埋設孔Cへの埋設施工までの工程を説明する工程説明図である。 5(a) to 5(e) are suspended from the gantry crane 2 and installed from the position where the table machine 4 is to be buried in the landslide prevention pile to the landslide prevention pile burial hole C of the final landslide prevention pile T. It is process explanatory drawing explaining the process to the burying construction in.
まず最初に、図5の(a)に示すように、高所山間部Aの高所作業足場Bの所定の積み込み位置に載置されているテーブルマシン4のところまで門型クレーン2が走行レールに案内されて走行し、その位置で門型クレーン2の吊りフック38でテーブルマシン4を吊支して、地滑り抑止杭埋設孔Cを形成する予定位置(仮想線で示す)まで走行し、その予定位置にテーブルマシン4を載置する。 First, as shown in FIG. 5( a ), the gate-type crane 2 travels to the table machine 4 placed at a predetermined loading position on the high-altitude work scaffold B in the high-altitude mountain portion A. And travels to the position where the table machine 4 is suspended by the hanging hooks 38 of the gate-type crane 2 at that position to reach the planned position (shown by a virtual line) where the landslide prevention pile burial hole C is formed. The table machine 4 is placed at the expected position.
つぎに、図5の(b)に示すように、高所作業足場Bの所定の積み込み位置に載置されているダウンザホールハンマー1の載置位置まで門型クレーン2が走行し、その位置でダウンザホールハンマー1を図示のように吊りロープ36の先端部にある吊りフック38にダウンザホールハンマー1を引っ掛け、ダウンザホールハンマー1を引き寄せながら門型クレーン2に吊支させる。 Next, as shown in FIG. 5B, the portal crane 2 travels to the loading position of the down-the-hole hammer 1 placed at a predetermined loading position on the work platform B at high places, and down-the-hole at that position. As shown in the drawing, the hammer 1 is hooked on the hanging hook 38 at the tip of the hanging rope 36, and the down-the-hole hammer 1 is pulled up to be suspended and supported by the portal crane 2.
つぎに、図5の(c)に示すように、門型クレーン2に吊支されたダウンザホールハンマー1をテーブルマシン4上に芯合わせしてテーブルマシン4に抱持させ、テーブルマシン4の回転作用とダウンザホールハンマー1の打撃掘進作用によって地盤Gを掘削し、継ぎ足し用ケーシング1aを継ぎ足しながらダウンザホールハンマー1を、矢印で示すように、土砂層Gsから岩盤支持層Grに達するまで掘削して、地滑り抑止杭Tの外径+100mm程度の孔径の地滑り防止杭埋設孔Cを形成する。例えば5m長のダウンザホールハンマー1で50m深さの埋設孔Cを形成することによってダウンザホールハンマー1が地盤Gの岩盤支持層Grに達するとすれば、ダウンザホールハンマー1に9本の5m長の継ぎ足し用ケーシング1aを継ぎ足しながら掘削作業を行う必要がある。 Next, as shown in FIG. 5C, the down-the-hole hammer 1 suspended from the gate crane 2 is centered on the table machine 4 and held by the table machine 4, and the rotating action of the table machine 4 is performed. And the ground G is excavated by the hammering action of the down-the-hole hammer 1, and the down-the-hole hammer 1 is excavated from the earth and sand layer Gs to the bedrock support layer Gr as shown by the arrow while adding the casing 1a for replenishment to suppress landslides. A landslide prevention pile embedding hole C having a hole diameter of about the outer diameter of the pile T+100 mm is formed. For example, if the down-the-hole hammer 1 reaches the rock support layer Gr of the ground G by forming a buried hole C having a depth of 50 m with the down-the-hole hammer 1 having a length of 5 m, the down-the-hole hammer 1 has 9 5 m-long casings for addition. It is necessary to perform excavation work while adding 1a.
つぎに、図5の(d)に示すように、門型クレーン2に吊支させて、地滑り防止杭埋設孔Cを掘削形成した継ぎ足し用ケーシング1a及びダウンザホールハンマー1を順次地盤Gから夫々の継ぎ足し部を開放しながら矢印で示すように引き抜く。特に、吊りロープ36及び吊りフック38は門型クレーン2の頂部に設置された吊りロープ駆動装置31に直結されているため強力に且つ迅速容易に引き抜き作業を行うことができる。 Next, as shown in FIG. 5(d), the casing 1a for suspension and the down-the-hole hammer 1 in which the landslide prevention pile burial hole C is excavated and suspended by being suspended from the portal crane 2 are sequentially supplemented from the ground G. While opening the part, pull out as shown by the arrow. In particular, since the suspension rope 36 and the suspension hook 38 are directly connected to the suspension rope drive device 31 installed at the top of the gate-type crane 2, it is possible to perform the pulling out operation strongly, quickly and easily.
そして最後に、図5の(e)に示すように、吊りフック38に吊持された地滑り抑止杭Tがその自重で、先の工程で掘削形成された地滑り防止杭埋設孔Cに矢印で示すように埋設されると共に、図示しないがモルタル等の根固め材を地滑り抑止杭Tと前記埋設孔Cとの間に充填して、地滑り抑止杭Tを強力に根固めすることになる。なお、50m深さの前記埋設孔Cに対して、一本の地滑り抑止杭Tの杭長が5mであれば、10本の地滑り抑止杭Tが継ぎ足し埋設されることになる。 Finally, as shown in (e) of FIG. 5, the landslide prevention pile T suspended by the suspension hook 38 is indicated by an arrow in the landslide prevention pile burial hole C formed by excavation in the previous step due to its own weight. While being buried as described above, a rooting material such as mortar (not shown) is filled between the landslide prevention pile T and the burial hole C to strongly solidify the landslide prevention pile T. If the pile length of one landslide prevention pile T is 5 m with respect to the burial hole C having a depth of 50 m, 10 landslide prevention piles T will be added and buried.
このように、門型クレーン2は高所作業足場Bに走行レールに案内されて走行可能に組み立てられるため、高所作業足場Bに搬されているダウンザホールハンマー1や地滑り抑止杭Tの存在位置直前まで門型クレーン2が走行することによって、ダウンザホールハンマー1や地滑り抑止杭Tを該門型クレーン2に迅速に受け取ることができ、そのため多数のダウンザホールハンマー1及び継ぎ足し用ケーシング1aを継ぎ足しながら地滑り抑止杭埋設孔Cを形成する際に極めて能率的に該埋設孔Cを形成することができると共に、多数の地滑り抑止杭Tを継ぎ足しながら地滑り防止杭埋設孔Cに能率的に埋設することができる。 In this way, since the portal crane 2 is guided by the traveling rail to the work platform for high places B to be assembled so that it can travel, immediately before the position where the down-the-hole hammer 1 and the landslide prevention pile T carried on the work platform for high places B exist. The down-the-hole hammer 1 and the landslide prevention pile T can be quickly received by the gantry-type crane 2 as the gate-type crane 2 travels up to that point, so that a large number of down-the-hole hammers 1 and the casing 1a for addition are added to prevent the landslide-prevention pile. The buried hole C can be formed extremely efficiently when the buried hole C is formed, and the buried hole C can be efficiently buried while adding a large number of landslide prevention piles T.
このことは、ダウンザホールハンマー1に限らず、その他の掘削資機材Eを所定の位置、例えば掘削孔形成予定位置まで移動させる場合にあっても有効である。 This is effective not only when the down-the-hole hammer 1 is moved, but also when other excavation equipment E is moved to a predetermined position, for example, a planned drill hole formation position.
これを図6の(a)〜(c)によって説明すると、高所作業足場Bへのテーブルマシン4や地滑り抑止杭T等の掘削資機材Eを、それらの自走搬送手段3による搬入位置やこれらを集積しておくの積み込み位置から掘削孔形成予定位置まで移動させる場合に、先ず、(a)に示すように、例えば高所作業足場Bで組み立てられ備えられている大型クローラクレーン7によって掘削資機材Eが適宜矢印aで示すように水平回転し、次に(b)に示すように、掘削資機材Eの吊持位置まで矢印bで示すように門型クレーン2が走行し、その吊持位置で掘削資機材Eを吊りフック38で受け取り、次に(c)に示すように、門型クレーン2は矢印cで示すようにそのまま掘削孔形成予定位置まで走行し、その予定位置に掘削資機材Eを高所作業足場Bの埋設孔形成予定位置に運び込むことができる。このように、門型クレーン2が大型クローラクレーン7に吊持されている掘削資機材Eの吊持位置と埋設孔形成予定位置との間を門型クレーン2が走行するだけで掘削資機材Eを迅速に埋設孔形成予定位置に持ち来すことができるため、埋設孔形成予定位置において能率的に埋設孔Cを形成するのを支援することができる。 This will be described with reference to (a) to (c) of FIG. 6. The excavation equipment E such as the table machine 4 and the landslide prevention pile T to the work platform B at high places is loaded into the scaffold B by the self-propelled transfer means 3 or the like. When moving these from the loading position where they are accumulated to the drill hole formation planned position, first, as shown in (a), for example, excavation is performed by a large crawler crane 7 that is assembled and provided on a work platform B for high places. The equipment E rotates horizontally as appropriate as indicated by the arrow a, and then, as shown in (b), the portal crane 2 travels to the suspension position of the excavation equipment E as indicated by the arrow b, and the suspension thereof is performed. At the holding position, the excavation equipment E is received by the hanging hook 38, and then, as shown in (c), the portal crane 2 travels as it is to the drilling hole formation planned position as shown by the arrow c, and excavates to the planned position. The equipment E can be carried to the position where the buried hole is to be formed on the work platform B for high places. As described above, the excavation equipment E is simply moved by the portal crane 2 between the suspension position of the excavation equipment E suspended from the large-sized crawler crane 7 and the planned buried hole formation position. Since it can be brought quickly to the buried hole formation planned position, it is possible to assist the efficient formation of the buried hole C at the buried hole formed planned position.
図7の(a)は、高所作業足場Bを平面視して、俯瞰的に大型クローラクレーン7と門型クレーン2との配置関係と門型クレーン2が高所作業足場Bの全長にわたって走行レール23,24が敷設され、走行レール23,24に搭載された門型クレーン2の走行方向とこれに直交する幅方向とに多数の地滑り抑止杭埋設孔Cが形成され、これらの埋設孔Cに地滑り抑止杭Tが埋設された状態を示すものである。図7の(b)は、その側面視状態を示すものである。 7(a) is a plan view of the aerial work scaffold B, and shows the bird's-eye view of the layout relationship between the large crawler crane 7 and the gate crane 2 and the gate crane 2 travels over the entire length of the aerial work scaffold B. Rails 23 and 24 are laid, and a large number of landslide prevention pile burying holes C are formed in the traveling direction of the gate type crane 2 mounted on the traveling rails 23 and 24 and in the width direction orthogonal to this, and these burying holes C It shows a state in which the landslide prevention pile T is buried. FIG. 7B shows the side view state.
これらの図示状態から分かるように、高所作業足場Bの所定の積み込み位置に積み込まれたダウンザホールハンマー1や掘削資機材Eは大型クローラクレーン7に受け取られ、この位置で大型クローラクレーン7は移動することなく、その直前位置まで走行レール23,24にガイドされて走行してきた門型クレーン2に受け渡すだけの操作だけで、地滑り抑止杭埋設孔Cを能率的に形成し、該埋設孔Cに地滑り抑止杭Tを埋設施工することができる。そして、大型クローラクレーン7と門型クレーン2との間には地滑り抑止杭Tの埋め込み状態が見えるだけで、ほぼ平面状態であるから、地滑り抑止杭Tの埋め込んだ上面位置をダウンザホールハンマー1や掘削資機材E等の資材置き場として有効に利用することができる。 As can be seen from these illustrated states, the down-the-hole hammer 1 and the excavation equipment E loaded at the predetermined loading position on the work platform B at high places are received by the large crawler crane 7, and the large crawler crane 7 moves at this position. The landslide prevention pile burial hole C can be efficiently formed in the burial hole C only by the operation of handing over the gate type crane 2 which has been guided by the traveling rails 23 and 24 to the position immediately before it. The landslide prevention pile T can be buried. The landslide prevention pile T can be seen to be embedded between the large-sized crawler crane 7 and the gate crane 2, and the landslide prevention pile T is embedded in the top surface position. It can be effectively used as a storage place for materials and equipment E and the like.
これに対し、図15に示す従来技術の高所作業足場に設置した杭打ちやぐらYによって、ダウンザホールハンマー1を地盤Gに打設して掘削孔Cを形成するためには、図16(a)〜(d)に示すような面倒な作業工程を経なければならない。先ず、(a)に示すように大型クローラクレーン7によって、高所作業足場Bに載置されているダウンザホールハンマー1を吊持するが、大型クローラクレーン7は地盤G表面へのアウトリガーの突っ張り作用によって支持されているからダウンザホールハンマー1を吊持して走行することができない。そのため、(a)に示すように大型クローラクレーン7は矢印aで示すように水平回転し、(b)に示すように大型クローラクレーン7は向きを変えて、その状態でダウンザホールハンマー1を矢印bで示すように高所作業足場Bに載置し、次に(c)に示すように、ダウンザホールハンマー1の載置した位置に大型クローラクレーン7が移動し、その移動位置で載置されているダウンザホールハンマー1を受け取って吊りロープRで吊持し、さらに矢印cで示すように水平回転して向きを変えて杭打ちやぐらYに到達すると、(d)に示すように吊りリールLの操作で吊りロープRを長く延ばしてダウンザホールハンマー1を吊持し、杭打ちやぐらYに設置されているテーブルマシン4に芯合わせしてテーブルマシン4に抱持固定させて、地盤に地滑り抑止杭埋設を形成することになる。このように、これらの大型クローラクレーン7の数次にわたる水平回転作業を経てダウンザホールハンマー1を杭打ちやぐらYの設置位置に至ることになるから掘削孔形成作業が極めて面倒で作業時間も多くかかるという難点があった。 On the other hand, in order to form the excavation hole C by driving the down-the-hole hammer 1 into the ground G by the pile driving tower Y installed on the high-place work scaffold of the prior art shown in FIG. 15, FIG. It is necessary to go through a troublesome work process as shown in (d). First, as shown in (a), the large-sized crawler crane 7 suspends the down-the-hole hammer 1 placed on the work platform B at a high place. The large-sized crawler crane 7 is supported by the outrigger's urging action on the surface of the ground G. Since it is supported, the down-the-hole hammer 1 cannot be hung up for traveling. Therefore, as shown in (a), the large crawler crane 7 horizontally rotates as shown by an arrow a, and as shown in (b), the large crawler crane 7 changes its direction. Then, the large crawler crane 7 is moved to the position where the down-the-hole hammer 1 is placed, as shown in (c), and is placed at the moving position. When the down-the-hole hammer 1 is received and suspended by the suspension rope R, and further horizontally rotated as shown by an arrow c to change its direction to reach the pile driving tower Y, the suspension reel L is operated as shown in (d). The hanging rope R is extended to suspend the down-the-hole hammer 1, and the table machine 4 installed in the pile driving tower Y is aligned with the table machine 4 to be held and fixed to the table machine 4 to form a landslide-preventing pile buried in the ground. Will be done. As described above, since the down-the-hole hammer 1 reaches the installation position of the pile driving tower Yagura Y through the horizontal rotation work of these large-sized crawler cranes several times, the drilling hole forming work is extremely troublesome and takes a lot of time. There were difficulties.
このことは、ダウンザホールハンマー1に限らず、その他のテーブルマシン4や地滑り抑止杭T等の掘削資機材Eを所定の位置、例えば掘削孔形成予定位置まで移動させる場合にあっても、図17の(a)〜(d)に示すように多くの作業工程を経る必要があった。例えば、(a)に示すように、高所作業足場Bの積み込み位置に積み込まれている掘削資機材Eを大型クローラクレーン7によって吊持し、この状態で、(b)、(c)および(d)に示すように、大型クローラクレーン7の数次にわたる水平回転作業を経て掘削資機材Eを杭打ちやぐらYの設置位置に至ることになるから埋設孔形成作業が極めて面倒で作業時間も多くかかるという難点があった。 This is not limited to the down-the-hole hammer 1, but also when other excavating equipment E such as the table machine 4 and the landslide prevention pile T is moved to a predetermined position, for example, a planned drilling hole forming position, as shown in FIG. It was necessary to go through many working steps as shown in (a) to (d). For example, as shown in (a), the excavation equipment E loaded at the loading position of the work platform B at high places is suspended by the large crawler crane 7, and in this state, (b), (c) and ( As shown in d), since the excavation equipment E reaches the installation position of the pile driving tower Y after the horizontal crawling work of the large crawler crane 7 for several times, the burial hole forming work is extremely troublesome and the working time is long. There was a drawback that it took.
これに対して,本発明によれば、高所作業足場Bに門型クレーン2を設置することができることによって、地滑り抑止杭埋設孔Cを従来の3〜4倍程度の非常に能率的に早く形成することができることが現場施工において判明している。 On the other hand, according to the present invention, since the gate-type crane 2 can be installed on the work platform B at a high place, the landslide prevention pile burial hole C is 3 to 4 times as fast as the conventional one, which is very efficient. It has been found in field construction that it can be formed.
このように、高所作業足場Bに門型クレーン2を設置することによって、これまで説明したように数多くの利点を有していたのであるが、従来にあっては、大型重機の運搬できない高所山間部Aに仮設した高所作業足場Bに門型クレーン2を設置することができなかったのである。 As described above, by installing the gate crane 2 on the work platform B at high places, there are many advantages as described above. However, in the conventional art, it is difficult to carry large heavy equipment. It was not possible to install the portal crane 2 on the high-place work scaffold B temporarily installed in the mountainous area A.
本発明では、鋭意研究し、現場施工によって多くの実験の結果、公的な強度試験にも合格した門型クレーン2を高所作業足場Bに設置することに成功したものである。 In the present invention, the gate-type crane 2 that has passed the official strength test as a result of many experiments conducted through intensive research and field construction has succeeded in being installed on the aerial work scaffold B.
以下に、これまで説明した多くの利点を有する門型クレーン2の設置方法の実施形態を主に説明することによって、本発明に係る地滑り抑止杭埋設施工方法を説明するものとする。 Hereinafter, the landslide suppressing pile burying construction method according to the present invention will be described by mainly describing the embodiment of the installation method of the gate crane 2 having many advantages described above.
すなわち、図8に示すように、大型クレーンや大型杭打ち機等の大型重機を搬送することが困難な高所山間部Aにおいて、その麓の作業低地Dから高所山間部Aに前述のように仮設した高所作業足場Bに向かって自走搬送経路3aが設けられ、これに走行可能なモノレールや索道ケーブル等の自走搬送手段3が配設される。自走搬送手段3が走行する自走する自走搬送経路3aは、図示のように走行レール47,48の中間部に設置したラック49に見られるように傾斜勾配に強いラックピニオンタイプのものを採用することが好ましい。又、図示しないが、自走搬送手段3である索道ケーブルは、空中に張り渡したワイヤーロープに搬送物を吊るして工事現場等に搬送物を搬送するもので、静止して張り渡したワイヤーロープに支持されて循環運転している曳策を曳くことによって曳策に吊るされた搬送物を工事現場等に搬送するものである。何れの自走搬送手段そのものは周知である。なお、高所作業足場Bには先ず最初の作業工程としてアウトリガー付きの小型クローラクレーン6が搬入され、後述のように、このアウトリガー付きの小型クローラクレーン6によって分解型大型クローラクレーン7が高所作業足場Bにおいて組み立てられることになる。 That is, as shown in FIG. 8, in the highland mountain area A where it is difficult to carry large heavy equipment such as large cranes and large pile driving machines, from the working lowland D at the foot to the highland mountain area A as described above. A self-propelled transport path 3a is provided toward the temporary high-place work scaffold B, on which the self-propelled transport means 3 such as a monorail or cableway cable that can run is disposed. The self-propelled transport path 3a on which the self-propelled transport means 3 travels is of a rack and pinion type that is strong against inclination as seen in a rack 49 installed in the middle of the traveling rails 47 and 48 as shown in the figure. It is preferable to adopt. Further, although not shown, the cableway cable which is the self-propelled transport means 3 is for suspending a transported object on a wire rope stretched in the air and transporting the transported item to a construction site. By pulling a tow measure that is supported by the tow and is circulating, the transported object hung on the tow route is transferred to a construction site or the like. Any self-propelled transport means themselves are well known. In addition, as a first work process, a small crawler crane 6 with an outrigger is carried into the aerial work scaffold B, and as described later, the disassembled large crawler crane 7 is operated by the small crawler crane 6 with an outrigger at a high place. It will be assembled on scaffold B.
そして、この自走搬送手段3によって、門型クレーン2の構成部材や掘削資機材Eを作業低地Dから高所作業足場Bに搬送するのであるが、自走搬送手段3によって搬送される高所山間部Aは急傾斜地であり、自走搬送手段3によって搬送される門型クレーン構成部材の重量には限界がある。そこで、本発明にあっては、高所作業足場Bに門型クレーン2を設置するにあたって、作業低地Dにおいて当該門型クレーン2を前記自走搬送手段3によって搬送可能で程度の重量に分解して後述のように複数の門型クレーン構成部材21〜2nに分割形成し、これによってクレーン構成部材21〜2nを格別に又は搬送可能の程度に束ねることによって、当該複数のクレーン構成部材21〜2nを前記自走搬送手段3によって作業低地Dより高所作業足場Bに搬送するようにしたことを特徴とするものである。 The self-propelled carrying means 3 carries the components of the gate-type crane 2 and the excavation equipment E from the working lowland D to the high-place work scaffold B. The mountainous area A is a steep sloping land, and the weight of the gate-type crane constituent members carried by the self-propelled carrying means 3 is limited. Therefore, according to the present invention, when the portal crane 2 is installed on the work platform B at a high place, the portal crane 2 is disassembled into a suitable weight in the working lowland D by the self-propelled transporting means 3. As will be described later, the plurality of gantry crane constituent members 2 1 to 2n are divided and formed, and thereby the crane constituent members 2 1 to 2n are bundled in a special or transportable manner, so that the plurality of crane constituent members 2 1 to 2n are carried by the self-propelled carrying means 3 from the work lowland D to the work scaffold B at a high place.
本実施形態においては、上述のように自走搬送手段1によって搬送可能な被搬送部の重量は、その一例として3t(3000kg)以下とした。したがって、被搬送物である上述の複数のクレーン構成部材21〜2nの少なくとも一構成部材21又は2nの重量が3t(3000kg)を超えると自走搬送手段3によって搬送することができない。 In the present embodiment, the weight of the transported portion that can be transported by the self-propelled transporting means 1 as described above is set to 3 t (3000 kg) or less. Therefore, it is impossible to transport by self-propelled conveyor means 3 and the weight of at least one component 2 1 or 2n plurality of crane components 2 1 to 2n above a conveyed object is more than 3t (3000 kg).
複数のクレーン構成部材21〜2nの一例は、図9〜図12に示されるような部材からなる。先ず、図9の(a)は、図1、特に図2に良く現れているように、門型クレーン2の台車17,18の部分であり、重量が例えば1100kg/台であるから、左右2台の台車17,18を束ねて自走搬送手段3によって搬送することができる。なお、この台車17,18には走行ローラー19〜22が軸支され、前面側の走行ローラー19,20には走行用モーター25が取り付けられてた状態となっている。これを門型クレーン構成部材21とする。 An example of a plurality of crane components 2 1 to 2n is composed of members, as shown in FIGS. 9 to 12. First, (a) of FIG. 9 shows the parts of the carriages 17 and 18 of the gate crane 2 as well shown in FIG. 1 and particularly FIG. 2, and the weight is, for example, 1100 kg/car. The carts 17 and 18 of the table can be bundled and conveyed by the self-propelled conveying means 3. Incidentally, traveling rollers 19 to 22 are rotatably supported on the carriages 17 and 18, and a traveling motor 25 is attached to the traveling rollers 19 and 20 on the front side. This is a gantry crane component 2 1.
図9の(b)は、前面側と後面側の右支柱13,15とこれに桟木42を介して一体に取り付けられる補助支柱41とこれに一体に取り付けた上側連結腕50aと下側連結腕50bの部分であり、支柱13,15および補助支柱41の上下部と上側連結腕50aと下側連結腕50bの先端部にはボルト.ナット取付用のフランジFが固着されている。重量が700kg/本である。これを門型クレーン構成部材22とする。 FIG. 9B shows the right and left right columns 13 and 15 on the front and rear sides, an auxiliary column 41 integrally attached to the right columns 13 and 15, and an upper connecting arm 50a and a lower connecting arm integrally attached to the auxiliary column 41. Bolts are attached to the upper and lower parts of the support columns 13 and 15 and the auxiliary support column 41, the upper connecting arm 50a and the lower connecting arm 50b. The nut mounting flange F is fixed. The weight is 700 kg/piece. This is a gantry crane component 2 2.
図9の(c)は、前面側と後面側の左支柱14,16とこれに一体に取り付けられている上側連結腕51aと下側連結腕51bの部分であり、支柱14,16の上下部と上側連結腕51aと下側連結腕51bの先端部にはボルト.ナット取付用のフランジFが固着されている。重量が例えは430kg/本である。これを門型クレーン構成部材23とする。図9の(b)に示す門型クレーン構成部材22および(c)に示す門型クレーン構成部材23の重量は軽いため、これらの部材は束ねて自走搬送手段3によって搬送することができる。 FIG. 9C shows the left and right front columns 14 and 16 on the front side and the upper coupling arm 51a and the lower coupling arm 51b integrally attached to the left columns 14 and 16, and the upper and lower portions of the columns 14 and 16 are shown. The upper connecting arm 51a and the lower connecting arm 51b have bolts at the tips thereof. The nut mounting flange F is fixed. The weight is, for example, 430 kg/piece. This is a gantry crane component 2 3. Lighter weight of the portal crane component 2 3 shown in gantry crane component 2 2 and (c) shown in FIG. 9 (b), be conveyed these members by the self-propelled conveying means 3 by bundling it can.
図10の(a)は、図2の門型クレーン2の側面側において前後面側右支柱13,15間および前後面側左支柱14,16間を繋ぐ上側補強桟52の構成部品である上側連結桟54であり、これを門型クレーン構成部材24とする。 FIG. 10A is a component of the upper reinforcing bar 52 that connects between the front and rear right columns 13, 15 and between the front and rear left columns 14, 16 on the side surface side of the portal crane 2 of FIG. a linking bar 54, which is referred to as gantry cranes component 2 4.
図10の(b)は同前後面側右支柱13,15間および前後面側左支柱14,16間を繋ぐ下側補強桟53の構成部品である下側連結桟55であり、これを門型クレーン構成部材25とする。図10の(a)に示す上側連結桟54と図10の(b)に示す下側連結桟55のの左右端部には、前述の図9の(b)および(c)に示される前後左右の支柱13,15,14,16に突設した上下側連結腕50a,50b,51a,51bの先端部のボルト.ナット取付用のフランジFにボルト.ナット5止めされるために同じくボルト.ナット取付用のフランジFが固着されている。 FIG. 10B shows a lower connecting bar 55 which is a component of the lower reinforcing bar 53 that connects the right and left front columns 13 and 15 and the left and right columns 14 and 16 of the front and rear surfaces. Type crane component 25 . At the left and right end portions of the upper connecting rail 54 shown in FIG. 10A and the lower connecting rail 55 shown in FIG. 10B, the front and rear portions shown in FIGS. 9B and 9C are provided. Bolts at the tips of the upper and lower connecting arms 50a, 50b, 51a, 51b protruding from the left and right columns 13, 15, 14, 16. Bolt on flange F for nut mounting. Nut 5 Also bolt to be stopped. The nut mounting flange F is fixed.
図10の(c)は、図1の門型クレーン2の正面上部側の正面梁材26であり、安全策26aが突設されている。これを門型クレーン構成部材26とする。 10C shows a front beam member 26 on the upper front side of the gate-type crane 2 shown in FIG. 1, and a safety measure 26a is provided on the front beam member 26a. This is referred to as a gate-type crane constituent member 26 .
図10の(d)は、図2の門型クレーン2の側面上部側の側面梁材26である。これを門型クレーン構成部材27とする。 FIG. 10D is a side beam member 26 on the upper side surface side of the gate-type crane 2 in FIG. 2. This is a gantry crane component 2 7.
図11の(a)は、図1の門型クレーン2の上部側の点検作業台29を構成する正面側の点検歩道28aと安全柵28bとからなる部材で、これを門型クレーン構成部材28とする。重量は1100kgである。 FIG. 11A is a member including an inspection sidewalk 28a on the front side and a safety fence 28b forming the inspection work bench 29 on the upper side of the portal crane 2 of FIG. 8 The weight is 1100 kg.
図11の(b)は、図1の門型クレーン2の上部側の点検作業台29を構成する背面側の点検歩道28aと安全柵28bとからなる部材で、これを門型クレーン構成部材29とする。重量は例えば1100kgである。門型クレーン構成部材26〜門型クレーン構成部材29の重量の合計は3000kg以下であるから、これらを束ねて自走搬送手段3によって搬送することができる。 FIG. 11B is a member composed of an inspection sidewalk 28a on the rear side and a safety fence 28b which constitute the inspection work bench 29 on the upper side of the portal crane 2 of FIG. Set to 9 . The weight is, for example, 1100 kg. Since the sum of the weight of the gantry crane component 2 6 through gantry crane component 2 9 or less 3000 kg, can be conveyed by the self-propelled conveying means 3 are bundled them.
図12の(a)は、図2の門型クレーン2の上部側の点検作業台29を構成する側面側の点検歩道28aと安全柵28bとからなる部材で、これを門型クレーン構成部材210とする。重量は例えば500kgである。 FIG. 12A is a member composed of an inspection sidewalk 28a on the side and a safety fence 28b constituting the inspection work bench 29 on the upper side of the gate crane 2 of FIG. Set to 10 . The weight is, for example, 500 kg.
図12の(b)は、図2の側面視においてよく分かるように、後面側の右支柱14の背面に沿って係止される梯子43であるこれを門型クレーン構成部材211 とする。重量は例えば300kgである。 (B) in FIG. 12, as best seen in the side view of FIG. 2, for this is a ladder 43 to be engaged along the back of the right strut 14 of the rear side portal crane component 2 11. The weight is, for example, 300 kg.
門型クレーン構成部材210と門型クレーン構成部材211との重量の合計は3000kg以下であるから、これらを束ねて自走搬送手段3によって搬送することができる。 Since the sum of the weight of the gantry crane component 2 10 and the gantry crane component 2 11 or less 3000 kg, can be conveyed by the self-propelled conveying means 3 are bundled them.
本実施形態においては、門型クレーン構成部材は11部材からなるが、勿論、その他必要に応じて複数のクレーン構成部材2Nに分割形成することができる。 In this embodiment, the portal crane constituent member is composed of 11 members, but of course, it can be divided into a plurality of crane constituent members 2 N if necessary.
このようにして、高所作業足場Bに搬送された複数の門型クレーン構成部材21〜2nを該高所作業足場Bにおいて門型クレーン2に組み立てるようにしたため、大型クレーンや大型杭打機等の大型重機を搬送困難な高所山間部Aにおいても容易に例えば総重量が20tで最大吊り荷重が4.8tの門型クレーン2を高所作業足場Bにおいて組立てることができる。 In this way, aerial because you assemble the gantry crane 2 scaffolds B plurality of portal crane component 2 1 to 2n transported to the in the high plant work scaffolding B, large cranes and large pile driver It is possible to easily assemble the portal crane 2 having a total weight of 20 tons and a maximum suspension load of 4.8 tons at the aerial work scaffold B even in a mountainous area A at a high place where it is difficult to transport a large heavy machine such as.
そして、自走搬送手段3によって搬送可能な程度に複数の門型クレーン構成部材21〜2nに分割形成するものであるから、例えば各門型クレーン構成部材21〜2nの重量を可能な限り増大したり、門型クレーン構成部材21〜2nの構成部数を増加することによって、最大吊り荷重が例えば40tまでの大型の門型クレーン2を高所作業足場Bに組立てることが可能である。 A plurality of because the gantry crane component 2 1 to 2n is to split forming, for example, as far as possible the weight of each portal crane component 2 1 to 2n enough to be conveyed by the self-propelled conveying means 3 increased or, by increasing the construction parts of the portal crane structure member 2 1 to 2n, it is possible to assemble a large gantry crane 2 up hanging load for example 40t in aerial work scaffolding B.
複数の門型クレーン構成部材21〜2nは、上述のように各部材にボルトナット連結用フランジFを固着されており、例えば、図2の要部拡大図である図13に示すように、門型クレーン2の構成する支柱13〜16と台車17と側面梁材27とに形成されているボルトナット連結用フランジFをボルト.ナット5によって互いに連結することによって門型クレーン2に組み立てられるようになっているため、ボルト.ナット5の締付作業に自動締付具を用いることによって迅速容易に門型クレーン2を組み立てることができる。 The plurality of portal crane component 2 1 to 2n, are fixed to the bolt nuts connecting flange F to each member as described above, for example, as shown in FIG. 13 is an enlarged view of FIG. 2, The bolts and nut coupling flanges F formed on the pillars 13 to 16, the carriage 17, and the side beam members 27 which constitute the gate type crane 2 are bolts. Since it can be assembled into the portal crane 2 by connecting them to each other by the nut 5, the bolt. The gate type crane 2 can be assembled quickly and easily by using an automatic tightening tool for tightening the nut 5.
ところで、図1に示すように、高所山間部Aの地盤Gに繋ぎ桟12aによって枠組み状に多数の鋼製足場杭12を配置し、これら枠組みされた足場杭12に支持されて地盤Gに水平状態に仮設された高所作業足場Bを示すが、高所作業足場Bにおいて多数の地滑り抑止杭埋設用掘削孔Cを能率的に掘削するために、図8に示すように高所作業足場Bはかなり広い作業面積に形成されている。そしてこの高所作業足場Bに沿って自走搬送経路3aが設けられ、これに自走搬送手段3が自走可能に配設される。 By the way, as shown in FIG. 1, a large number of steel scaffolding piles 12 are arranged in a frame shape by the connecting bars 12a on the ground G in the high mountain area A, and the ground G is supported by these framed scaffolding piles 12. The aerial work scaffold B temporarily installed in a horizontal state is shown. However, in order to efficiently excavate a large number of landslide prevention pile burial holes C in the aerial work scaffold B, as shown in FIG. B has a fairly large work area. A self-propelled transport path 3a is provided along the work platform B for high places, and the self-propelled transport means 3 is disposed on the self-propelled transport path 3a.
ところで、自走搬送手段3によって前述の門型クレーン構成部材21〜2nや、ダウンザホールハンマー1、テーブルマシンあるいは地滑り抑止杭T等の掘削資機材Eを高所作業足場Bに搬送するのであるが、これらの門型クレーン構成部材21〜2nを高所作業足場Bに搬入し、門型クレーン2に組み立てるために、その前の段階として、図8に示すように高所作業足場Bにアウトリガー付きの小型クローラクレーン6やアウトリガー付きの大型クローラクレーン7を搭載する必要がある。 Meanwhile, the self-propelled conveyor means 3 and the above-mentioned gantry crane component 2 1 to 2n, down-the-hole hammer 1, a table machine or landslide suppress pile T drilling equipment E, such as is to convey to the aerial scaffold B , carried these portal crane component 2 1 to 2n in aerial scaffold B, in order to assemble the gantry crane 2, outrigger as the previous stage, the aerial work scaffolding B as shown in FIG. 8 It is necessary to mount a small crawler crane 6 with an attached and a large crawler crane 7 with an outrigger.
アウトリガー付きの小型クローラクレーン6そのものは周知の構造のもので、図14の(a)に示すようにブーム6aやアウトリガー6bをクレーン本体に折り畳み状態でクローラー6cによって自走可能となっており、その重量は、自走搬送手段3によって搬送可能な例えば1770kgで、最大揚程能力が8.8m、最大吊り荷重が2.98tである。なお、現実的には作業可能な距離(作業半径)は1t程度の吊り荷重が限界である。
したがって、先ずアウトリガー付き小型クローラクレーン6を折り畳み状態で自走搬送手段3によって高所作業足場Bに搬送し、自走搬送手段3の荷台部を昇降手段によって高所作業足場Bと同一平面になるように持ち上げ、この状態でアウトリガー付き小型クローラクレーン6を高所作業足場Bに自走させて搬入することができる。そして、高所作業足場Bに搬入されたアウトリガー付き小型クローラクレーン6は、分解することなく、そのまま図8に示すようにブーム6aやアウトリガー6bを伸長して高所作業足場Bにおいて掘削補助作業を行わせることができる。
The small crawler crane 6 itself with an outrigger has a well-known structure, and as shown in FIG. 14(a), the boom 6a and the outrigger 6b can be self-propelled by the crawler 6c with the crane body folded. The weight is, for example, 1770 kg that can be carried by the self-propelled carrying means 3, the maximum lifting capacity is 8.8 m, and the maximum lifting load is 2.98 t. In reality, the workable distance (working radius) is limited to a suspension load of about 1t.
Therefore, first, the small crawler crane 6 with an outrigger is conveyed to the high-place work scaffold B by the self-propelled transport means 3 in a folded state, and the loading platform of the self-propelled transport means 3 is flush with the high-place work scaffold B by the elevating means. In this state, the small crawler crane 6 with an outrigger can be self-propelled and carried into the work platform B at high places. Then, the small crawler crane 6 with an outrigger carried into the aerial work scaffold B extends the boom 6a and the outrigger 6b as shown in FIG. Can be done.
ところで、アウトリガー付き小型クローラクレーン6は、1770km程度の小型のクレーンであり、ブーム6aの最大揚程能力が8.8mであるから、背丈が約10mもある門型クレーン2に組み立てたり、大型のダウンザホールハンマー1や地滑り抑止杭Tを門型クレーン2に吊支させる能力が不足している。 By the way, the small crawler crane 6 with an outrigger is a small crane of about 1770 km, and since the boom 6a has a maximum lifting capacity of 8.8 m, it can be assembled into a gate type crane 2 having a height of about 10 m, or a large down the hall. The ability to suspend the hammer 1 and the landslide prevention pile T on the portal crane 2 is insufficient.
そのため、図8に示すように、アウトリガー付き小型クローラクレーン6とは別に大型のアウトリガー付きの分解型大型クローラクレーン7を高所作業足場Bに搭載させる必要がある。周知のアウトリガー付きの分解型大型クローラクレーン7は、ブーム7aの最大揚程能力が17.2mであり、また最大吊り荷重が4.8tもあるため、、背丈が約10m以上の門型クレーン2を組み立てたり、大型のダウンザホールハンマー1や地滑り抑止杭Tを門型クレーン2に吊支させる能力は十分に具備する。
そこで、大型クローラクレーン7によって門型クレーン2を組み立てると共に、自走搬送手段3によって高所作業足場Bに搬送された大型のダウンザホールハンマー1や地滑り抑止杭T等の掘削資機材Eは大型クローラクレーン7によって、例えば図7に示すように、高所作業足場Bの走行レール23,24間の掘削資機材置き場に搬入され、この掘削資機材置き場に搬入載置されたダウンザホールハンマー1や地滑り抑止杭T等の掘削資機材Eは走行レール23,24上を走行する門型クレーン2によって受け取られ、地滑り抑止杭Tの埋設予定地に搬送され、この埋設予定地で地滑り防止杭埋設孔Cの形成や、地滑り抑止杭Tの埋設作業が行われることになる。具体的には、大型クローラクレーン7は、そのブーム7aによって高所作業足場Bに隣接する自走搬送手段3に搬送されたこれら掘削資機材Eを受け取り、受け取られた掘削資機材Eは、ブーム7aの向きを変えて走行レール23,24間の掘削資機材置き場に搬入載置される作業を負担し、その後は門型クレーン2によって搬送されることになるから、大型クローラクレーン7は殆ど移動することはなく、迅速で安全な施工作業を行うことができる。
Therefore, as shown in FIG. 8, in addition to the small crawler crane 6 with an outrigger, it is necessary to mount the disassembled large crawler crane 7 with a large outrigger on the work platform B at high places. The well-known disassembled large crawler crane 7 with an outrigger has a boom 7a with a maximum lifting capacity of 17.2 m and a maximum lifting load of 4.8 t. It has a sufficient ability to assemble and suspend the large down-the-hole hammer 1 and the landslide prevention pile T on the portal crane 2.
Accordingly, the excavation equipment E such as the large down-the-hole hammer 1 and the landslide prevention pile T, which are transported to the work platform B at high places by the self-propelled transportation means 3, while the gate-shaped crane 2 is assembled by the large-sized crawler crane. 7, for example, as shown in FIG. 7, the down-the-hole hammer 1 and the landslide prevention pile that have been carried in to the excavation equipment storage space between the traveling rails 23 and 24 of the work platform B at high places and have been loaded and mounted in this excavation equipment storage space. The excavation equipment E such as T is received by the gate-type crane 2 traveling on the traveling rails 23 and 24, and is transported to the planned burying site of the landslide prevention pile T, and the landslide prevention pile burial hole C is formed at the planned burying site. Alternatively, the work of burying the landslide prevention pile T will be performed. Specifically, the large crawler crane 7 receives the excavation equipment E transported by the boom 7 a to the self-propelled transportation means 3 adjacent to the work platform B at high places, and the received excavation equipment E is the boom. The large crawler crane 7 is mostly moved because the work of loading and placing it on the excavation equipment/material storage site between the traveling rails 23 and 24 by changing the direction of 7a is carried, and then it is carried by the gate type crane 2. Therefore, quick and safe construction work can be performed.
しかし、これら周知の分解型大型クローラクレーン7の総重量は7350kg(7.35t)あるため、被搬送物の搬送可能な限界重量が3tである自走搬送手段3に搭載して高所作業足場Bに搬送することは不可能である。
そこで、大型クローラクレーン7の総重量が前記自走搬送手段1による搬送能力を大幅に超えており、そのままでは分解型大型クローラクレーン7を高所作業足場Bに搬送することができない。そこで、図14の(b)に示すように、分解型大型クローラクレーン7を、作業低地Dにおいて前記自走搬送手段3によって搬送可能な重量の複数のクローラクレーン構成部材71〜7nに分割形成される。例えばブーム7aは1500kg、アウトリガー7bは1030kg、クレーン本体7cは1895kg、クローラ7dは1270kg、クレーン下部基台7eは1120kg、起伏シリンダ7fは156kg、カウンタウェイト7gは310kgであり、これらの単体は搬送可能な3t以下であるから、これらクローラクレーン構成部材71〜7nの単体ごとにあるいは数体束ねて前記自走搬送手段3によって作業低地Dから高所作業足場Bに搬送することができる。
However, since the total weight of these well-known disassembled large-sized crawler cranes 7 is 7350 kg (7.35 t), it is mounted on the self-propelled transporting means 3 where the limit weight of the transported object is 3 t, and is used as a scaffold for aerial work. It is impossible to carry to B.
Therefore, the total weight of the large crawler crane 7 greatly exceeds the carrying capacity of the self-propelled carrying means 1, and the disassembled large crawler crane 7 cannot be carried to the high-place work scaffold B as it is. Therefore, as shown in (b) of FIG. 14, divided form decomposable large cranes 7, wherein the plurality of crawler cranes component 7 1 ~7N of conveyable weight by the self-propelled conveying means 3 in the working lowland D To be done. For example, the boom 7a is 1500 kg, the outrigger 7b is 1030 kg, the crane body 7c is 1895 kg, the crawler 7d is 1270 kg, the crane lower base 7e is 1120 kg, the hoisting cylinder 7f is 156 kg, and the counterweight 7 g is 310 kg. These units can be transported. since such 3t or less, it can be transported to the aerial scaffold B from the work lowland D these cranes components 7 1 ~7n the self conveying means 3 for each alone or bundled number field of.
そして、作業低地Dより高所作業足場Bに搬送され複数のクローラクレーン構成部材71〜7nは、図8に示すように、前もって高所作業足場Bに搬送されている前記アウトリガー付きの小型クローラクレーン6によってアウトリガー付きの分解型大型クローラクレーン7に組み立てられることになる。 The work lowland aerial anchorage plurality of crawler cranes component 7 1 ~7n is conveyed to B than D, as shown in FIG. 8, previously mounted aerial anchorage B small crawler said with outrigger being conveyed to the The crane 6 will be assembled into a disassembled large crawler crane 7 with an outrigger.
このように、門型クレーン2や分解型大型クローラクレーン7は夫々搬送可能な部材に分解して高所作業足場Bに搬入されるが、このうち、高所作業足場Bに搬入された複数の門型クレーン構成部材21〜2n、その具体例として作業低地Dで図9の(a)乃至図12の(b)に示すような門型クレーン2の各構成部材部21〜211が高所作業足場Bに敷設した走行レール23,24上で門型クレーン2に組み立てられることになる。 As described above, the gate type crane 2 and the disassembling type large crawler crane 7 are disassembled into transportable members and are carried into the high-place work scaffold B. Among them, a plurality of the high-place work scaffolds B are carried in. gantry crane component 2 1 to 2n, the work lowland D as specific examples the components parts 2 1 to 2 11 of the portal crane 2 as shown in (b) of (a) to FIG. 12 FIG. 9 The gate-type crane 2 is assembled on the traveling rails 23 and 24 laid on the work platform B for high places.
その後、走行レール23,24上で組み立てられた門型クレーン2によって高所作業足場B上に、図5の(a)〜(e)に示すように、テーブルマシンの地滑り抑止杭予定位置から地滑り抑止杭の地滑り抑止杭埋設孔位置までの全ての作業工程が門型クレーンによる吊支操作によって行われるため、作業能率が極めて良好であり、地滑り抑止杭の地盤への埋設施工能力が従来の3〜4倍程度の非常に能率的に形成することが現場施工の結果判明したことは前述のとおりである。 After that, as shown in (a) to (e) of FIG. 5, the landslide-preventing piles of the table machine are used to slide the landslides on the work platform B at a high place by the gate-type crane 2 assembled on the traveling rails 23 and 24. The work efficiency is extremely good because all the work processes up to the landslide prevention pile burial hole position of the deterrent pile are performed by the suspension support operation by the gate type crane. As described above, it was found as a result of the on-site construction that the formation was about 4 times as highly efficient.
ここで、本実施形態において取り扱われる小型クローラクレーン6と大型クローラクレーン7との役割分担について纏めて説明すると次のとおりになる。 Here, the role sharing of the small crawler crane 6 and the large crawler crane 7 handled in the present embodiment will be summarized as follows.
(1)小型クローラクレーン6の役割
a 自走搬送手段3から大型クローラクレーン7のクローラクレーン構成部材71〜7nの高所作業足場Bへの取り込み作業
b 高所作業足場Bでの大型クローラクレーン7の組み立て作業
c 次の高所作業足場Bに移動するために大型クローラクレーン7の分解作業
d 次の高所作業足場Bに移動するために自走搬送手段3への大型クローラクレーン7のクローラクレーン構成部材71〜7nの積み込み作業
(2)大型クローラクレーン7の役割
a 自走搬送手段3から大型クローラクレーン7のクローラクレーン構成部材71〜7nの高所作業足場Bへの取り込み作業
b 高所作業足場Bでの門型クレーン2の組み立て作業
c 自走搬送手段3からダウンザホールハンマー1及びテーブルマシン4等の関連部材の高所作業足場Bへの取り込み作業
d 自走搬送手段3から地滑り抑止杭Tの高所作業足場Bへの取り込み作業
e 次の高所作業足場Bに移動するために門型クレーン2の解体作業
f 自走搬送手段3への門型クレーン構成部材21〜2nの積み込み作業
(3)大型クローラクレーン7又は小型クローラクレーン6のいずれでもできる作業
a 自走搬送手段3から高所作業足場Bで走行する門型クレーン2の走行レール23,24の高所作業足場Bへの取り込み作業
b 高所作業足場Bでの走行レール23,24の敷設作業
(1) Large crawler crane uptake working b aerial anchorage B from the role a self-propelled conveying means 3 of a small crawler cranes 6 to a crawler crane components 7 1 ~7N of aerial scaffold B large crawler crane 7 7 Assembling work c Disassembling work of the large crawler crane 7 to move to the next high-place work scaffold B d To move to the next high-place work scaffold B to the self-propelled transport means 3 Crawler of the large crawler crane 7 Loading work of crane components 7 1 to 7 n (2) Role of the large crawler crane 7 a Work of loading the crawler crane components 7 1 to 7 n of the large crawler crane 7 from the self-propelled transportation means 3 into the work platform B at high places b Assembly work of the portal crane 2 on the aerial work scaffold B c Work of incorporating the related members such as the down-the-hole hammer 1 and the table machine 4 into the aerial work scaffold B from the self-propelled transport means 3 d Landslide from the self-propelled transport means 3 Work to take the restraint pile T into the work platform for high places B e Demolition work of the gate crane 2 to move to the work platform for next high place B f The gate crane components 2 1 to 2n to the self-propelled transportation means 3 (3) Work that can be performed with either the large crawler crane 7 or the small crawler crane 6 a. Aerial work scaffolding of the traveling rails 23, 24 of the gate-type crane 2 traveling on the aerial work scaffold B from the self-propelled transportation means 3. Work for loading into B. Work for laying traveling rails 23, 24 on work platform B for high places
以上のように本発明の掘削孔形成方法によれば、大型クレーンや大型杭打機等の大型重機を搬送困難な高所山間部Aにおいて、該高所山間部Aに高所作業足場Bを仮設し、仮設された該高所作業足場Bにおいてダウンザホールハンマー1を高所山間部Aの地盤Gに打設することによって地滑り抑止杭埋設孔Cを形成する埋設孔形成方法において、高所山間部Aの麓の作業低地Dから高所作業足場Bに向かって門型クレーン2の構成部材21〜2nや掘削資機材Eを搬送可能なモノレールや索道ケーブル等の自走搬送手段3を配設し、高所作業足場Bに門型クレーン2を設置するにあたって、作業低地Dにおいて当該門型クレーン2を前記自走搬送手段3によって搬送可能で程度の重量に分解して複数の門型クレーン構成部材21〜2nに分割形成し、これによって門型クレーン構成部材21〜2nを格別に又は搬送可能の程度に束ねて、当該複数の門型クレーン構成部材21〜2nを前記自走搬送手段3によって作業低地Dより高所作業足場Bに搬送し、該高所作業足場Bにおいて複数の門型クレーン構成部材21〜2nを門型クレーン2に走行可能に組み立てることができ、また、分解型大型クローラクレーン7によって、門型クレーン2の組み立て能力は十分にあるが、自走搬送手段3の搬送限界荷重が超過するため、これらも搬送可能なクローラクレーン構成部材71〜7nに分解して、この分割構成部材71〜7nを自走搬送手段3によって高所作業足場Bに搬送して、高所作業足場Bにおいて分解型大型クローラクレーン7に組み立てて、これによって背丈の高い門型クレーン2を高所作業足場Bに走行可能に容易に組み立てることができ、且つ門型クレーン2の走行移動によって地滑り抑止杭埋設孔Cを能率的に形成し、これに地滑り抑止杭Tを能率的に埋設施工することができるに至ったものである。 As described above, according to the drilling hole forming method of the present invention, in a high altitude mountainous area A where it is difficult to transport a large heavy machine such as a large crane or a large pile driving machine, the high altitude working scaffold B is provided in the high altitude mountainous area A. In the embedding hole forming method of forming the landslide prevention pile embedding hole C by placing the down-the-hole hammer 1 on the ground G of the high-altitude mountain portion A in the temporarily-constructed high-altitude work scaffold B, disposed self conveying means 3 such as a transportable monorail and cableway cable work lowland D from aerial anchorage B in towards component 2 1 of portal crane 2 ~2n and drilling equipment E at the foot of the a When installing the portal crane 2 on the work platform B at a high place, the portal crane 2 can be transported by the self-propelled transporting means 3 in the working lowland D, and the portal crane 2 can be disassembled into a certain weight to form a plurality of portal cranes. member 2 1 divided formed to 2n, whereby a gantry crane component 2 1 to 2n are bundled on the degree of exceptionally or transportable, the self-propelled conveying said plurality of portal crane component 2 1 to 2n transported from work lowland D in aerial work scaffolding B by means 3, a plurality of portal crane component 2 1 to 2n can be assembled to be traveling in a gate-type crane 2 in the high plant work scaffolding B, also, decomposed by the decomposition type large cranes 7, assembling ability of the gantry crane 2 is sufficient, for conveying the limit load of the self-propelled conveying means 3 is exceeded, even transportable cranes component 7 1 ~7N these to, the split component 7 1 ~7N conveys the aerial scaffold B the self-propelled conveying means 3, assembled to decomposition type large crawler crane 7 in aerial scaffold B, whereby high tall gate The type crane 2 can be easily assembled so that it can travel on the work platform B at high places, and the landslide prevention pile burial hole C can be efficiently formed by the traveling movement of the gate type crane 2, and the landslide prevention pile T can be efficiently formed on this. It has become possible to bury underground.
A 高所山間部
B 高所作業足場
C 地滑り抑止杭埋設孔
D 作業低地
E 掘削資機材
G 地盤
T 地滑り抑止杭
G 地盤
1 ダウンザホールハンマー
2 門型クレーン
21〜2N 門型クレーン構成部材
3 自走搬送手段
4 テーブルマシン
5 ボルト.ナット
6 アウトリガー付きの小型クローラクレーン
6a ブーム
6b アウトリガー
7 アウトリガー付きの大型クローラクレーン
71〜7N クローラクレーン構成部材
7a ブーム7a
7b アウトリガー
A High mountain area B High work scaffold C Landslide prevention pile burial hole D Work lowland E Drilling equipment G Ground T Landslide prevention pile G Ground 1 Down the hole hammer 2 Gate crane
2 1 to 2 N Gate crane components 3 Self-propelled transportation means 4 Table machine 5 Bolts. Nut 6 Small crawler crane with outrigger 6a Boom 6b Outrigger 7 Large crawler crane with outrigger
7 1 to 7 N Crawler crane component 7a Boom 7a
7b outrigger

Claims (7)

  1. 高所山間部に仮設された高所作業足場において高所山間部の地盤に地滑り抑止杭を埋設施工する高所作業足場における地滑り抑止杭の埋設施工方法ににおいて、
    高所山間部の麓の作業低地から高所作業足場に向かって自走可能な自走搬送手段が配設され、
    高所作業足場に門型クレーンを設置するにあたって、作業低地において当該門型クレーンは前記自走搬送手段によって搬送可能な程度の重量に分解して複数の門型クレーン構成部材に分割形成され、
    当該複数の門型クレーン構成部材は前記自走搬送手段によって作業低地より高所作業足場に搬送され、
    該高所作業足場において複数の門型クレーン構成部材によって門型クレーンに走行可能に組み立てられ、該高所作業足場に走行可能に組み立てられた門型クレーンに吊りロープ駆動装置を介して吊支されたダウンザホールハンマーによって前記地盤に地滑り抑止杭埋設孔が形成されると共に、門型クレーンに吊支された地滑り抑止杭が前記地滑り抑止杭埋設孔に埋設施工されるようにした高所作業足場における地滑り抑止杭埋設施工方法。
    In the method of burying landslide prevention piles in high altitude work scaffolds, in which landslide prevention piles are buried in the ground of high altitude mountains in temporary work scaffolds temporarily installed in high altitude mountains,
    A self-propelled transportation means is provided that is capable of self-propelled from a work lowland at the foot of a mountain in a high place to a work platform at a high place,
    When installing the portal crane on a work platform at high places, the portal crane is divided into a plurality of portal crane constituent members by being decomposed into a weight that can be transported by the self-propelled transporting means in a working lowland,
    The plurality of portal crane components are transported by the self-propelled transporting means from a working lowland to a work platform at a high place,
    In the work platform for aerial work, a gate-type crane is assembled so as to be movable by a plurality of gate-type crane constituent members, and is suspended and supported via a suspension rope drive device to the gate-type crane that is assembled so as to be able to travel on the work platform for aerial work. A landslide prevention pile burying hole is formed in the ground by a down-the-hole hammer, and a landslide prevention pile suspended by a gate-type crane is buried in the landslide prevention pile burying hole. Construction method for embedding restraint piles.
  2. 前記高所作業足場に走行可能に組み立てられた門型クレーンにその走行方向に直交する方向に前記吊りロープ駆動装置が変位移動可能に設けられ、該吊りロープ駆動装置によっテーブルマシン、ダウンザホールハンマー又は地滑り抑止杭を変位移動した状態に門型クレーンに吊支可能となっている請求項1に記載の高所作業足場における地滑り抑止杭埋設施工方法。 The suspension rope drive device is displaceably provided in a direction orthogonal to the traveling direction on a gate-type crane that is assembled so as to be able to travel on the work platform at high places, and the table machine, down the hole hammer or by the suspension rope drive device. The method for burying a landslide-preventing pile in a work platform for high places according to claim 1, wherein the landslide-preventing pile can be suspended and supported by a gate-type crane while the landslide-preventing pile is displaced.
  3. 前記ダウンザホールハンマーは、高所作業足場に設置したテーブルマシンに回転駆動されながら地盤に打設されようになっている請求項1又は2に記載の高所作業足場における地滑り抑止杭埋設施工方法。 The landslide prevention pile burying construction method for an aerial work scaffold according to claim 1 or 2, wherein the down-the-hole hammer is driven into the ground while being rotationally driven by a table machine installed on the aerial work scaffold.
  4. 複数の門型クレーン構成部材は、ボルト.ナットによって互いに連結されて門型クレーンに組み立てられるようになっている請求項1〜3の何れかに記載の高所作業足場における地滑り抑止杭埋設施工方法。 Multiple portal crane components include bolts. The method for burying a landslide-preventing pile in a work platform for high places according to any one of claims 1 to 3, wherein the ridge-type crane is connected to each other by a nut to be assembled into a portal crane.
  5. 総重量が前記自走搬送手段によって搬送可能な程度の小型クローラクレーンが該自走搬送手段によって作業低地より高所作業足場に搬送されようにした請求項1〜4の何れかに記載の高所作業足場における地滑り抑止杭埋設施工方法。 5. A high place according to any one of claims 1 to 4, wherein a small crawler crane whose total weight can be carried by the self-propelled carrying means is adapted to be carried by the self-propelled carrying means from a work lowland to a work scaffold at a high place. Construction method for burying landslide prevention piles on work scaffolds.
  6. 高所作業足場に搬送された前記小型クローラクレーンでは揚程能力が低いため背丈の高いに門型クレーンをくみたてることができず、従って高所作業足場では背丈の高い門型クレーンを組み立てることが可能な揚程能力の高い分解型大型クローラクレーンが前記小型クローラクレーンとは別に組み立てられるようになっており、この際、該分解型大型クローラクレーンは、総重量が前記小型クローラクレーンよりも大で、前記自走搬送手段による搬送能力を超えるためそのままでは搬送することができないため、該分解型大型クローラクレーンは、作業低地において前記自走搬送手段によって搬送可能で程度の重量に分解して複数のクローラクレーン構成部材に分割形成され、該複数のクローラクレーン構成部材が前記自走搬送手段によって作業低地より高所作業足場に搬送され、高所作業足場に搬送され複数のクローラクレーン構成部材は、前記小型クローラクレーンによって分解型大型クローラクレーンに組み立てられ、しかして該分解型大型クローラクレーンによって複数の門型クレーン構成部材が門型クレーンに組み立てられるようになっている請求項5に記載の高所作業足場における地滑り抑止杭埋設施工方法。 Since the small crawler crane transferred to the aerial work scaffold has a low lifting capacity, it is not possible to build a gate-type crane with a high height, and therefore, it is possible to assemble a tall gate-type crane on the aerial work scaffold. A large disassembly type large crawler crane having a high lifting capacity can be assembled separately from the small crawler crane, wherein the large size disassembled large crawler crane has a total weight larger than that of the small crawler crane, and Since it cannot be conveyed as it is because it exceeds the conveying capacity of the traveling conveying means, the disassembling type large crawler crane can be conveyed by the self-propelling conveying means in a working lowland and is disassembled into a weight of a certain degree to form a plurality of crawler crane configurations. The plurality of crawler crane constituent members are divided into members, and the plurality of crawler crane constituent members are conveyed by the self-propelled conveying means from a working lowland to an aerial work scaffold, and are conveyed to the aerial work scaffold, and the plurality of crawler crane constituent members are the small crawler cranes. 6. A landslide on a high-altitude work scaffold according to claim 5, wherein the disassembled large crawler crane is assembled into a plurality of portal crane components by the disassembled large crawler crane. Construction method for embedding restraint piles
  7. 先ず、前記門型クレーンに吊支されてテーブルマシンが地滑り抑止杭埋設予定地に設置され、次に、前記門型クレーンに吊支されてダウンザホールハンマーがテーブルマシンに芯合わせされ、次に、前記門型クレーンに吊支されてダウンザホールハンマーがテーブルマシンに回転駆動されながら地盤の岩盤支持層に達するまで掘進して地滑り抑止杭埋設孔が形成され、次に、前記門型クレーンに吊支されてダウンザホールハンマーが地滑り抑止杭埋設孔から引き抜かれ、最後に、前記門型クレーンに吊支された地滑り抑止杭が地滑り抑止杭埋設孔に埋設施工されるようになっている請求項1〜6の何れかに記載の高所作業足場における地滑り抑止杭埋設施工方法。 First, the table machine is suspended from the gate-type crane and installed on the planned landslide prevention pile burial site.Next, the table machine is suspended from the gate-type crane and the down-the-hole hammer is centered on the table machine. The down-the-hole hammer was suspended by a gate-type crane and was driven to rotate by a table machine to excavate until it reached the rock support layer of the ground to form a landslide prevention pile burial hole, and then suspended by the gate-type crane. 7. The down-the-hole hammer is pulled out from the landslide prevention pile burying hole, and finally the landslide prevention pile suspended by the gate type crane is buried in the landslide prevention pile burying hole. A method for embedding landslide-preventing piles in aerial work scaffolding described in Crab.
JP2018216447A 2018-11-19 2018-11-19 Landslide prevention pile burial construction method in high place work scaffolding Active JP6506878B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018216447A JP6506878B1 (en) 2018-11-19 2018-11-19 Landslide prevention pile burial construction method in high place work scaffolding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018216447A JP6506878B1 (en) 2018-11-19 2018-11-19 Landslide prevention pile burial construction method in high place work scaffolding

Publications (2)

Publication Number Publication Date
JP6506878B1 JP6506878B1 (en) 2019-04-24
JP2020084447A true JP2020084447A (en) 2020-06-04

Family

ID=66324244

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018216447A Active JP6506878B1 (en) 2018-11-19 2018-11-19 Landslide prevention pile burial construction method in high place work scaffolding

Country Status (1)

Country Link
JP (1) JP6506878B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236277A (en) * 2020-03-12 2020-06-05 中交二公局第四工程有限公司 Construction method for reinforcing and treating inclination of anti-slide pile by counterfort structure

Also Published As

Publication number Publication date
JP6506878B1 (en) 2019-04-24

Similar Documents

Publication Publication Date Title
JP2020084447A (en) Installation method of land slide prevention pile for high place work platform
RU2141030C1 (en) Device for construction of mine shafts
JP5698886B2 (en) Drilling method for rock fall prevention fence post
JP3356048B2 (en) Construction method of elevated structure using building girder
JP2797244B2 (en) Shaft excavation device and shaft construction method
EP0351694B1 (en) Stopper apparatus for rotary reaction force
JP2004068526A (en) Slope reinforcing method
JP3204554U (en) On-board crane
JP6529378B2 (en) Invert construction method, tunnel construction method and Teruha crane for tunnel
TWI740251B (en) Low-headroom excavator and assembly method thereof
JPH11229751A (en) Widening device for existing tunnel
JP2009203750A (en) Excavating machine and excavation method
JP2007321429A (en) Underground structure construction method
JP2010053548A (en) Pile construction equipment and method for constructing cast-in-place concrete pile
JP2618798B2 (en) Multi-function excavator
CN212958743U (en) Special transport construction vehicle for inclined shaft rail installation
CN212953766U (en) Shaft excavation construction system
JP3357654B2 (en) Gantry used for tunnel excavation method
CN215108716U (en) Automatic anchor rod drill carriage
CN214662557U (en) Light high-pressure flexible gas pipe road crossing pipe frame
CN111979855B (en) Special transport construction vehicle for installing inclined shaft track and construction method
JP3969415B2 (en) Pile construction method
JP2021113444A (en) Underground structure conveyance device and underground structure conveyance method in open-cut method
CN212837840U (en) Tunnel wet blasting trolley walking device hinge lifting device
JP3151116B2 (en) Tunnel excavation method and gantry used for this method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20181127

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20181127

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20181219

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190206

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190206

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190306

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190329

R150 Certificate of patent or registration of utility model

Ref document number: 6506878

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150