concrete floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017153604A
Other languages
Japanese (ja)
Other versions
JP7017880B2 (en
Inventor
福井 真男
Masao Fukui
真男 福井
裕二 小関
Yuji Koseki
裕二 小関
秀之 大畑
Hideyuki Ohata
秀之 大畑
加藤 敏明
Toshiaki Kato
敏明 加藤
誠道 大場
Seido Oba
誠道 大場
孝之 岩城
Takayuki Iwaki
孝之 岩城
高行 富永
Takayuki Tominaga
高行 富永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Obayashi Road Corp
Original Assignee
Obayashi Corp
Obayashi Road Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp, Obayashi Road Corp filed Critical Obayashi Corp
Priority to JP2017153604A priority Critical patent/JP7017880B2/en
Publication of JP2019031838A publication Critical patent/JP2019031838A/en
Application granted granted Critical
Publication of JP7017880B2 publication Critical patent/JP7017880B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

【課題】アスファルト舗装層に浸透した雨水を、長期間滞留させることなくスムーズに排除できるようにする道路橋の防水排水構造を提供する。【解決手段】コンクリート床版11と、コンクリート壁高欄14と、アスファルト舗装層12とを含み、アスファルト舗装層12とコンクリート床版11との間に防水層13が配設されている道路橋50において、路面に降り注いだ雨水を排除するための防水排水構造であって、コンクリート壁高欄14の地覆部15のコンクリート床版11との接合部15aを、道路橋50の横断勾配に沿って貫通する横断方向水みち17が、道路橋50の延設方向Xに複数箇所に形成されている。横断方向水みち17の底面部17aは、地覆部15のコンクリート床版11との接合部15aを横断して、地覆部15の内側壁面15bを超えて外側壁面15cに至るまで延長させた、防水層13の外側延長部分13aによって覆われている。【選択図】図2PROBLEM TO BE SOLVED: To provide a waterproof drainage structure of a road bridge capable of smoothly removing rainwater permeating into an asphalt pavement layer without retaining it for a long period of time. SOLUTION: In a road bridge 50 including a concrete deck 11, a concrete wall balustrade 14, and an asphalt pavement layer 12, and a waterproof layer 13 is disposed between the asphalt pavement layer 12 and the concrete deck 11. , A waterproof drainage structure for removing rainwater that has poured onto the road surface, and penetrates the joint portion 15a of the ground covering portion 15 of the concrete wall railing 14 with the concrete deck 11 along the cross slope of the road bridge 50. Crossing direction water paths 17 are formed at a plurality of locations in the extension direction X of the road bridge 50. The bottom surface portion 17a of the water path 17 in the transverse direction crosses the joint portion 15a of the ground cover portion 15 with the concrete deck 11 and extends beyond the inner wall surface 15b of the ground cover portion 15 to the outer wall surface 15c. , It is covered by the outer extension portion 13a of the waterproof layer 13. [Selection diagram] Fig. 2

Description

本発明は、道路橋の防水排水構造に関し、特に、コンクリート床版と、コンクリート壁高欄と、アスファルト舗装層とを含み、アスファルト舗装層とコンクリート床版との間に防水層が配設されている道路橋に降り注いだ雨水を排除するための道路橋の防水排水構造に関する。   The present invention relates to a waterproof drainage structure for a road bridge, and in particular, includes a concrete floor slab, a concrete wall rail, and an asphalt pavement layer, and the waterproof layer is disposed between the asphalt pavement layer and the concrete floor slab. The present invention relates to a waterproof drainage structure of a road bridge to eliminate rainwater that has poured onto the road bridge.

例えば高速道路の高架橋等の道路橋は、橋桁に支持させて設けられた、現場打ちコンクリートやプレキャストコンクリートによるコンクリート床版の上に、アスファルト舗装層を敷設することによって、車両が走行する路面が形成されるようになっており、道路橋の幅員方向(横断方向)の側縁部分には、当該側縁部分に沿って、主として走行車両の運転者の視線を誘導したり、走行車両が道路の外側に逸脱するのを防止したりするための、コンクリート製の壁高欄が、道路橋の延設方向である縦断方向に連続して設置されている。   For example, road bridges such as viaducts on expressways form road surfaces on which vehicles run by laying an asphalt pavement layer on concrete floor slabs made of cast-in-place concrete or precast concrete supported by bridge girders. In the width direction (transverse direction) side edge portion of the road bridge, the driver's line of sight of the traveling vehicle is mainly guided along the side edge portion. A concrete wall rail for preventing the vehicle from deviating to the outside is continuously installed in the longitudinal direction which is the extending direction of the road bridge.

また、このような道路橋では、雨天時に降り注いだ雨水の影響によって、特にコンクリート床版が劣化しないように、コンクリート床版とアスファルト舗装層との間に介在させて、防水層を配設することで、路面に降り注いだ雨水が、例えば舗装層自体や、舗装の打継ぎ目や、コンクリート壁高欄の地覆部との境界部分を介してアスファルト舗装層の内部に浸透しても、浸透した雨水が、コンクリート床版には至らないようにする工夫がなされていると共に、浸透した雨水を道路橋の外部に排除して、防水層の上に長期間滞留しないようにする工夫がなされている(例えば、特許文献1、非特許文献1参照)。   Also, in such a road bridge, a waterproof layer should be provided between the concrete floor slab and the asphalt pavement layer so that the concrete floor slab will not be deteriorated by the influence of rain water that has been poured in rainy weather. Even if rainwater that has poured onto the road surface penetrates into the interior of the asphalt pavement layer, for example, through the boundary between the pavement layer itself, the pavement joints, and the ground cover of the concrete wall railings, In addition, it has been devised not to reach the concrete floor slab, and has been devised to exclude permeated rainwater to the outside of the road bridge so that it does not stay on the waterproof layer for a long time (for example, Patent Document 1, Non-Patent Document 1).

すなわち、従来の、路面に降り注いだ雨水がコンクリート床版には至らないようにすると共に、アスファルト舗装層に浸透した雨水を排除できるようにした道路橋の防水排水構造では、例えば図6に示すように、道路橋10’の排水勾配(横断勾配)に沿って敷設された防水層13’の幅員方向の端部を、コンクリート床版11’から立設する壁高欄14’の地覆部15’に沿って立ち上げて、浸透した雨水がコンクリート床版11’に至るのを遮断し、且つ浸透した雨水を、排水勾配(横断勾配)の下流側端部の地覆部15’の付近に滞留させて、滞留させた雨水を、地覆部15’に沿って縦断方向に流下させつつ、道路橋及びコンクリート壁高欄の延設方向(縦断方向)に所定の間隔を置いて設置された、防水層13’及びコンクリート床版11’を貫通する複数の水抜き用の排水管20’から、道路橋50’の下方に排除するようになっている。   That is, in the conventional waterproof drainage structure of a road bridge that prevents rainwater that has poured onto the road surface from reaching the concrete slab and that can remove rainwater that has penetrated the asphalt pavement layer, for example, as shown in FIG. In addition, the end portion in the width direction of the waterproof layer 13 ′ laid along the drainage gradient (transverse gradient) of the road bridge 10 ′ is a ground covering portion 15 ′ of the wall rail 14 ′ standing from the concrete floor slab 11 ′. To prevent the infiltrated rainwater from reaching the concrete slab 11 ', and the infiltrated rainwater stays in the vicinity of the ground cover 15' at the downstream end of the drainage gradient (transverse gradient). The rainwater that has been retained is allowed to flow down in the longitudinal direction along the ground cover 15 ′, and is installed at a predetermined interval in the extending direction (longitudinal direction) of the road bridge and the concrete wall rail. Layer 13 'and concrete From 'Multiple drainage pipe 20 for draining penetrating the' plate 11, so as to eliminate under the road bridge 50 '.

特開2005−171730号公報JP 2005-171730 A

2016年10月、土木学会発行、「道路橋床版防水システムガイドライン 2016 鋼構造シリーズ28」、P34October 2016, published by Japan Society of Civil Engineers, "Road Bridge Floor Waterproof System Guidelines 2016 Steel Structure Series 28", P34

しかしながら、図6に示す従来の道路橋の防水排水構造10’では、地覆部15’の付近に滞留させた雨水は、道路橋50’の縦断方向には、勾配が緩くて流下し難いため、排水管20’から雨水を水抜きしてスムーズに排除することは困難である。地覆部15’の付近に滞留させた雨水を水抜きしてスムーズに排除できるようにするには、道路橋10’の縦断方向に間隔を置いて配置される排水管20’の数を、多くすることが考えられるが、排水管20’の数を多くすると、排水管20’はコンクリート床版11’を貫通して設けられるものであることから、走行車両による交番載荷荷重を受けるコンクリート床版の構造上の弱点となるおそれがあり、また、排水管20’の穴明け作業や設置作業に多くの手間を要することになると共に、維持管理にもコストがかかることになる。   However, in the waterproof drainage structure 10 ′ for the conventional road bridge shown in FIG. 6, the rainwater retained in the vicinity of the ground cover portion 15 ′ has a gentle slope in the longitudinal direction of the road bridge 50 ′ and is difficult to flow down. It is difficult to drain the rainwater from the drain pipe 20 'and remove it smoothly. In order to drain the rainwater retained in the vicinity of the ground cover portion 15 ′ and smoothly remove it, the number of drain pipes 20 ′ arranged at intervals in the longitudinal direction of the road bridge 10 ′ Although it is conceivable to increase the number of drain pipes 20 ', since the drain pipes 20' are provided through the concrete floor slab 11 ', the concrete floor that receives an alternating load by the traveling vehicle. There is a possibility that it may be a weak point in the structure of the plate, and a lot of work is required for drilling and installing the drain pipe 20 ', and maintenance is also expensive.

また、図6に示す従来の道路橋の防水排水構造では、地覆部15’の付近に、浸透した雨水が長時間滞留し易くなることから、アスファルトの加水分解によりアスファルト舗装層12’と防水層13’との接着が不十分になって、特に滞留する雨水が高温になる夏季においては、アスファルト舗装層12’と防水層13’とが剥離し易くなり、例えば雨水が浸透するたびに剥離が広がることで、ポットホール、路面のひび割れ、アスファルト舗装層12’の基層12a’の砂利化等が発生して、アスファルト舗装層12’が損傷し易くなる。   Further, in the waterproof drainage structure of the conventional road bridge shown in FIG. 6, since the infiltrated rainwater is likely to stay in the vicinity of the ground cover portion 15 ′ for a long time, the asphalt pavement layer 12 ′ and the waterproofing layer are waterproofed by asphalt hydrolysis. In the summer when the rainwater staying at a high temperature becomes insufficient due to insufficient adhesion to the layer 13 ', the asphalt pavement layer 12' and the waterproof layer 13 'are easily peeled off, for example, every time rainwater permeates. As a result, the asphalt pavement layer 12 ′ is easily damaged due to the occurrence of potholes, cracks in the road surface, graveling of the base layer 12a ′ of the asphalt pavement layer 12 ′, and the like.

本発明は、簡易な構成によって、アスファルト舗装層に浸透した雨水が、コンクリート床版に至らないようにすることができると共に、アスファルト舗装層に浸透した雨水を、長期間滞留させることなく、スムーズに排除することのできる道路橋の防水排水構造を提供することを目的とする。   The present invention can prevent rainwater permeating the asphalt pavement layer from reaching the concrete floor slab with a simple configuration, and can smoothly prevent the rainwater permeating the asphalt pavement layer from staying for a long period of time. The object is to provide a waterproof drainage structure for road bridges that can be eliminated.

本発明は、コンクリート床版と、該コンクリート床版の側縁部分に沿って設置されるコンクリート壁高欄と、該コンクリート床版の上面に敷設されるアスファルト舗装層とを含み、該アスファルト舗装層と前記コンクリート床版との間に介在して防水層が配設されている道路橋において、路面に降り注いだ雨水を排除するために設けられる道路橋の防水排水構造であって、前記コンクリート壁高欄の地覆部の前記コンクリート床版の側縁部分との接合部を、道路橋の横断勾配に沿って貫通する排水用の横断方向水みちが、前記コンクリート壁高欄の延設方向に間隔をおいて複数箇所に形成されており、前記横断方向水みちの底面部は、前記地覆部の前記コンクリート床版の側縁部分との接合部を横断して、前記地覆部の内側壁面を超えて外側壁面に至るまで延長させた、前記防水層の外側延長部分によって覆われている道路橋の防水排水構造を提供することにより、上記目的を達成したものである。   The present invention includes a concrete floor slab, a concrete wall rail installed along a side edge portion of the concrete floor slab, and an asphalt pavement layer laid on the upper surface of the concrete floor slab, the asphalt pavement layer, A road bridge provided with a waterproof layer interposed between the concrete floor slabs, and a waterproof drainage structure for a road bridge provided to eliminate rainwater poured on the road surface. A transverse waterway for drainage that penetrates the joint of the ground cover with the side edge portion of the concrete slab along the crossing slope of the road bridge is spaced in the extending direction of the concrete wall rail. It is formed at a plurality of locations, and the bottom surface of the transverse waterway crosses the joint portion of the ground cover portion with the side edge portion of the concrete floor slab and exceeds the inner wall surface of the ground cover portion. Outside It was extended up to the surface by providing a waterproof drainage structure of a road bridge which is covered by the outer extended portion of the waterproof layer is obtained by achieving the above object.

そして、本発明の道路橋の防水排水構造は、前記横断方向水みちの両側の側面部が、止水枠材によって覆われていることが好ましい。   And as for the waterproof drainage structure of the road bridge of this invention, it is preferable that the side part of the both sides of the said cross direction waterway is covered with the water stop frame material.

また、本発明の道路橋の防水排水構造は、前記横断方向水みちに、浸透水排水用導水管が設置されていることが好ましい。   Moreover, in the waterproof drainage structure for a road bridge according to the present invention, it is preferable that a penetrating pipe for seepage water drainage is installed in the transverse water path.

さらに、本発明の道路橋の防水排水構造は、隣接する各一対の前記横断方向水みちの間の部分において、前記防水層は、前記地覆部の前記コンクリート床版の側縁部分との接合部に食い込むようにして配設されており、前記地覆部の内側壁面の下端部に沿って、底面部が前記防水層によって覆われた縦断方向水みちが、前記横断方向水みちと連通して形成されていることが好ましい。   Furthermore, in the waterproof drainage structure for a road bridge according to the present invention, the waterproof layer is joined to a side edge portion of the concrete floor slab of the ground covering portion in a portion between each pair of adjacent water grooves in the adjacent direction. A longitudinal water channel whose bottom surface is covered with the waterproof layer is communicated with the transverse water channel along the lower end portion of the inner wall surface of the ground covering portion. It is preferable to be formed.

さらにまた、本発明の道路橋の防水排水構造は、前記縦断方向水みちの、前記地覆部の前記コンクリート床版の側縁部分との接合部に沿った側面部が、止水枠材によって覆われていることが好ましい。   Furthermore, in the waterproof drainage structure for a road bridge according to the present invention, a side surface portion of the waterway in the longitudinal direction along the joint portion with the side edge portion of the concrete floor slab of the ground covering portion is formed by a waterstop frame material. Preferably it is covered.

また、本発明の道路橋の防水排水構造は、前記縦断方向水みちに、浸透水排水用導水管が設置されていることが好ましい。   In the waterproof drainage structure for a road bridge according to the present invention, it is preferable that a permeated water drainage conduit be installed in the longitudinal direction waterway.

さらに、本発明の道路橋の防水排水構造は、前記コンクリート壁高欄が、プレキャストコンクリート製の単位壁高欄を、目地部を介在させて延設方向に複数連設配置することによって設置されており、前記横断方向水みちは、前記目地部の直下部分における前記地覆部の前記コンクリート床版の側縁部分との接合部に形成されていることが好ましい。   Furthermore, in the waterproof drainage structure of the road bridge of the present invention, the concrete wall rail is installed by arranging a plurality of unit wall rails made of precast concrete in the extending direction through the joint portion, It is preferable that the transverse water path is formed at a joint portion of the ground covering portion with a side edge portion of the concrete floor slab in a portion directly below the joint portion.

さらにまた、本発明の道路橋の防水排水構造は、前記コンクリート床版が、プレキャストコンクリート製の単位床版を、縦横に複数連設配置することによって設けられていることが好ましい。   Furthermore, in the waterproof drainage structure for a road bridge according to the present invention, the concrete floor slab is preferably provided by arranging a plurality of unit floor slabs made of precast concrete vertically and horizontally.

また、本発明の道路橋の防水排水構造は、前記コンクリート壁高欄の外側壁面に支持させて、前記横断方向水みちの下流側端部の排出開口から排出される雨水を、衝突させることで下方に向けて流下させる、飛散防止部材が取り付けられていることが好ましい。   Further, the waterproof drainage structure of the road bridge of the present invention is supported by the outer wall surface of the concrete wall rail, and is caused to collide with rainwater discharged from the discharge opening at the downstream end of the transverse waterway. It is preferable that an anti-scattering member that is allowed to flow downward is attached.

本発明の道路橋の防水排水構造によれば、簡易な構成によって、アスファルト舗装層に浸透した雨水か、コンクリート床版に至らないようにすることができると共に、アスファルト舗装層に浸透した雨水を、長期間滞留させることなく、スムーズに排除することができる。   According to the waterproof drainage structure of the road bridge of the present invention, it is possible to prevent rainwater that has penetrated into the asphalt pavement layer or the concrete floor slab with a simple configuration, and rainwater that has penetrated into the asphalt pavement layer, It can be eliminated smoothly without staying for a long time.

本発明の好ましい一実施形態に係る道路橋の防水排水構造による防水排水機能を備える道路橋を例示する部分破断略示斜視図である。It is a partial fracture outline perspective view which illustrates a road bridge provided with a waterproof drainage function by a waterproof drainage structure of a road bridge concerning a preferred embodiment of the present invention. 本発明の好ましい一実施形態に係る道路橋の防水排水構造を説明する、図3のA−Aに沿った略示横断面図である。FIG. 4 is a schematic cross-sectional view taken along the line AA of FIG. 3 for explaining a waterproof drainage structure for a road bridge according to a preferred embodiment of the present invention. 本発明の好ましい一実施形態に係る道路橋の防水排水構造を説明する、図4のB−Bに沿った略示平断面図である。FIG. 5 is a schematic plan cross-sectional view taken along the line BB in FIG. 4, illustrating a waterproof drainage structure for a road bridge according to a preferred embodiment of the present invention. 本発明の好ましい一実施形態に係る道路橋の防水排水構造を説明する、図3のC−Cに沿った略示横断面図である。FIG. 4 is a schematic cross-sectional view taken along the line CC of FIG. 3 for explaining a waterproof drainage structure for a road bridge according to a preferred embodiment of the present invention. 本発明の好ましい一実施形態に係る道路橋の防水排水構造を説明する、図3のD−Dに沿った略示部分断面図である。It is a schematic fragmentary sectional view along DD of Drawing 3 explaining a waterproof drainage structure of a road bridge concerning one desirable embodiment of the present invention. 従来の道路橋の防水排水構造を説明する略示横断面図である。It is a schematic cross-sectional view illustrating a waterproof drainage structure of a conventional road bridge.

本発明の好ましい一実施形態に係る道路橋の防水排水構造10(図2参照)は、例えば図1に示す鋼桁床版橋による道路橋50の老朽化に伴う改修工事において、劣化した既設の現場打ち鉄筋コンクリート(RCコンクリート)によるコンクリート床版を、好ましくはプレキャストコンクリート(PCコンクリート)によるコンクリート床版11と取り換えて新設する際に、コンクリート床版11の上面に敷設されるアスファルト舗装層12との間に、防水層13を介在させて配設することで、道路橋50の路面に降り注いだ雨水が、アスファルト舗装層12を浸透しても、コンクリート床版11には至らないようにすると共に、アスファルト舗装層12に浸透した雨水をスムーズに排除できるようにして、コンクリート床版11やアスファルト舗装層12が、長期間に亘って損傷したり劣化したりしないようにするための構造として設けられるものである。   A waterproof drainage structure 10 (see FIG. 2) for a road bridge according to a preferred embodiment of the present invention is an existing structure that has deteriorated, for example, in repair work accompanying the aging of the road bridge 50 by a steel girder slab bridge shown in FIG. When a concrete floor slab made of cast-in-place reinforced concrete (RC concrete) is preferably replaced with a concrete floor slab 11 made of precast concrete (PC concrete), the asphalt pavement layer 12 laid on the upper surface of the concrete floor slab 11 In the meantime, by disposing the waterproof layer 13 therebetween, the rain water poured on the road surface of the road bridge 50 does not reach the concrete floor slab 11 even if it penetrates the asphalt pavement layer 12. In order to smoothly remove rainwater that has penetrated into the asphalt pavement layer 12, the concrete floor slab 11 and asphalt Preparative pavement layer 12 and is provided as a structure for preventing or degraded or damaged over an extended period of time.

すなわち、道路橋50の路面に降り注いだ雨水が、例えばアスファルト舗装層12の目地部や舗装自体を浸透してコンクリート床版11に至ると、コンクリート床版11に生じたクラック等を介して浸透した雨水がコンクリートの内部に侵入しやすくなり、これによりコンクリート床版11が早期に劣化してその耐久性が損なわれると共に、床版の疲労破壊を著しく早めることから、道路橋50では、このような雨水の侵入を防止して、舗装や床版の耐久性を向上させるために、コンクリート床版11とアスファルト舗装層12との間に介在させて、防水層13が配設されている。また、アスファルト舗装層12に浸透した雨水が、防水層13の上に長期間滞留すると、例えばアスファルトの加水分解によりアスファルト舗装層12と防水層13との接着が不十分になって、特に滞留する雨水が高温になる夏季においては、加水分解が促進されてアスファルト舗装層12と防水層13とが剥離し易くなり、雨水が浸透するたびに剥離が広がることで、ポットホール、路面のひび割れ、アスファルト舗装層12の基層12aの砂利化等が発生して、アスファルト舗装層12が損傷し易くなる。   That is, when rainwater poured on the road surface of the road bridge 50 penetrates the joints of the asphalt pavement layer 12 and the pavement itself and reaches the concrete floor slab 11, it penetrates through cracks and the like generated in the concrete floor slab 11. Rainwater is likely to enter the inside of the concrete, thereby deteriorating the concrete slab 11 at an early stage and impairing its durability, and significantly accelerates fatigue failure of the slab. In order to prevent rainwater from entering and improve the durability of the pavement and floor slab, a waterproof layer 13 is disposed between the concrete floor slab 11 and the asphalt pavement layer 12. In addition, when rainwater that has penetrated into the asphalt pavement layer 12 stays on the waterproof layer 13 for a long period of time, the adhesion between the asphalt pavement layer 12 and the waterproof layer 13 becomes insufficient due to, for example, hydrolysis of asphalt, and particularly stays. In the summer when rainwater becomes hot, hydrolysis is promoted and the asphalt pavement layer 12 and the waterproof layer 13 are easy to peel off, and the peeling spreads every time rainwater permeates, thereby causing potholes, cracks on the road surface, asphalt Graveling of the base layer 12a of the pavement layer 12 occurs and the asphalt pavement layer 12 is easily damaged.

このようなことから、従来の道路橋では、例えば図6に示すように、コンクリート床版11’の排水勾配(横断勾配)に沿って敷設された防水層13’の幅員方向の端部を、壁高欄14’の地覆部15’に沿って立ち上げて、アスファルト舗装層12’に浸透した雨水を、排水勾配(横断勾配)の下流側端部の、地覆部15’の付近の防水層13’の上に滞留させ、滞留させた雨水を、地覆部15’に沿って縦断方向に流下させつつ、道路橋10’及びコンクリート壁高欄14’の延設方向である縦断方向に所定の間隔を置いて設けられた、防水層13’及びコンクリート床版11’を貫通する複数の水抜き用の排水管20’から、道路橋10’の下方に排除するようになっていた。しかしながら上述のように、コンクリート床版11’の強度や、作業の手間及び維持管理のコストの点で、設置される排水管20’の数には限度があることから、少ない数の排水管20’では、速やかに雨水を排除することが難しかった。したがって、従来の防水排水構造10’では、地覆部15’に沿って点在している排水管20’による水抜き効果が十分に発揮されず、壁高欄14’の地覆部15’の付近の防水層13’の上に、浸透した雨水が長期間滞留することで、上述と同様に、アスファルトの加水分解によりアスファルト舗装層12’と防水層13’との接着が不十分になって、ポットホール、路面のひび割れ、アスファルト舗装層12’の基層12a’の砂利化等が発生し易くなっているのが現状である。   For this reason, in the conventional road bridge, for example, as shown in FIG. 6, the end in the width direction of the waterproof layer 13 ′ laid along the drainage gradient (transverse gradient) of the concrete slab 11 ′, The rainwater that rises along the ground cover 15 'of the wall rail 14' and penetrates into the asphalt pavement layer 12 'is waterproofed near the ground cover 15' at the downstream end of the drainage gradient (transverse slope). The rainwater staying on the layer 13 'is allowed to flow in the longitudinal direction along the ground cover 15', and predetermined in the longitudinal direction, which is the extending direction of the road bridge 10 'and the concrete wall rail 14'. The plurality of drainage drain pipes 20 ′ penetrating the waterproof layer 13 ′ and the concrete floor slab 11 ′ provided at intervals of the distance are excluded below the road bridge 10 ′. However, as described above, since the number of drain pipes 20 'is limited in terms of the strength of the concrete floor slab 11', labor and maintenance costs, a small number of drain pipes 20 are required. 'So it was difficult to remove rainwater promptly. Therefore, in the conventional waterproof drainage structure 10 ′, the drainage effect by the drain pipes 20 ′ scattered along the ground cover 15 ′ is not sufficiently exhibited, and the ground cover 15 ′ of the wall column 14 ′ Since the rainwater that has permeated stays on the nearby waterproof layer 13 'for a long period of time, the asphalt pavement layer 12' and the waterproof layer 13 'are not sufficiently bonded due to hydrolysis of the asphalt, as described above. In the present situation, potholes, cracks on the road surface, graveling of the base layer 12a ′ of the asphalt pavement layer 12 ′ are likely to occur.

本実施形態の道路橋の防水排水構造10は、上述のような、従来の防水排水構造10’による技術的課題を解消するためになされたもので、図2に示すように、道路橋50の排水勾配(横断勾配)を利用すると共に、コンクリート床版11とアスファルト舗装層12との間に介在して配設される防水層13を利用して、簡易且つ安価な構成によって、アスファルト舗装層12に浸透した雨水を、長期間滞留させることなく、道路橋50の外部にスムーズに排除できるようにするものである。   The waterproof drainage structure 10 for a road bridge according to the present embodiment has been made in order to solve the technical problems caused by the conventional waterproof drainage structure 10 'as described above. As shown in FIG. Asphalt pavement layer 12 has a simple and inexpensive structure using a drainage gradient (transverse gradient) and a waterproof layer 13 disposed between concrete floor slab 11 and asphalt pavement layer 12. Rainwater that has penetrated into the road can be smoothly removed outside the road bridge 50 without staying for a long time.

そして、本実施形態の道路橋の防水排水構造10は、コンクリート床版11と、コンクリート床版11の側縁部分11aに沿って設置されるコンクリート壁高欄14と、コンクリート床版11の上面に敷設されるアスファルト舗装層12とを含み、アスファルト舗装層12とコンクリート床版11との間に介在して防水層13が配設されている道路橋50において、路面に降り注いだ雨水を排除するために設けられる防水排水構造であって、図2及び図3に示すように、コンクリート壁高欄14の地覆部15のコンクリート床版11の側縁部分11aとの接合部15aを、道路橋50の横断勾配に沿って貫通する排水用の横断方向水みち17が、道路橋50の延設方向でもあるコンクリート壁高欄13の延設方向X(図1参照)に間隔をおいて複数箇所に形成されており、横断方向水みち17の底面部17aは、地覆部15のコンクリート床版11の側縁部分11aとの接合部15aを横断して、地覆部15の内側壁面15bを超えて外側壁面15cに至るまで延長させた、防水層13の外側延長部分13aによって覆われている。   And the waterproof drainage structure 10 of the road bridge of this embodiment is laid on the concrete floor slab 11, the concrete wall rail 14 installed along the side edge portion 11 a of the concrete floor slab 11, and the upper surface of the concrete floor slab 11. In order to eliminate rainwater that has poured onto the road surface in a road bridge 50 that includes an asphalt pavement layer 12 and a waterproof layer 13 is interposed between the asphalt pavement layer 12 and the concrete floor slab 11. 2 and FIG. 3, the joint 15 a of the ground cover 15 of the concrete wall rail 14 and the side edge portion 11 a of the concrete floor slab 11 is crossed by the road bridge 50. A transverse waterway 17 for drainage penetrating along the gradient is spaced in the extending direction X (see FIG. 1) of the concrete wall rail 13 which is also the extending direction of the road bridge 50. The bottom surface portion 17a of the transverse waterway 17 is formed at a plurality of locations, and crosses the joint portion 15a of the ground covering portion 15 with the side edge portion 11a of the concrete floor slab 11 so as to cross the inner wall surface of the ground covering portion 15. It is covered with an outer extension portion 13a of the waterproof layer 13 that extends beyond 15b to reach the outer wall surface 15c.

また、本実施形態では、道路橋の防水排水構造10は、図3及び図5に示すように、横断方向水みち17の両側の側面部17bが、止水枠材19によって覆われている。   Moreover, in this embodiment, as shown in FIGS. 3 and 5, in the waterproof drainage structure 10 for a road bridge, the side portions 17 b on both sides of the transverse water channel 17 are covered with the water stop frame material 19.

さらに、本実施形態では、図3及び図4に示すように、隣接する各一対の横断方向水みち17の間の部分において、防水層13は、地覆部15のコンクリート床版11の側縁部分11aとの接合部15aに食い込むようにして配設されており、地覆部15の内側壁面15bの下端部に沿って、底面部18aが防水層13によって覆われた縦断方向水みち18が(図4参照)、横断方向水みち17と連通して形成されている(図3参照)。縦断方向水みち18の、地覆部15のコンクリート床版11の側縁部分11aとの接合部15aに沿った側面部18bは、好ましくは止水枠材19によって覆われている。   Furthermore, in this embodiment, as shown in FIG.3 and FIG.4, in the part between each pair of adjacent transverse waterways 17, the waterproof layer 13 is a side edge of the concrete floor slab 11 of the ground covering part 15. FIG. A longitudinal direction water channel 18 is arranged so as to bite into the joint portion 15a with the portion 11a, and the bottom surface portion 18a is covered with the waterproof layer 13 along the lower end portion of the inner wall surface 15b of the ground covering portion 15. (Refer to FIG. 4), and formed in communication with the transverse waterway 17 (see FIG. 3). A side surface portion 18 b along the joint portion 15 a of the longitudinal direction water channel 18 with the side edge portion 11 a of the concrete floor slab 11 of the ground covering portion 15 is preferably covered with a water-stop frame material 19.

本実施形態では、防水排水構造10が設けられる道路橋50は、図1に示すように、鋼桁床版橋による道路橋となっている。すなわち、道路橋50は、鉄筋コンクリート製の橋脚51に両端部を支持させて、好ましくはI形鋼による橋桁52を、複数平行に延接させて架設すると共に、架設した橋桁52の上面フランジ部52aに支持させて、コンクリート床版11が設けられるようになっている。本実施形態では、上述のように、道路橋の老朽化に伴う改修工事において、例えば劣化した既設のRCコンクリートによるコンクリート床版を、既設のコンクリート壁高欄等と共に撤去した後に、橋桁52の上面に、好ましくはPCコンクリートによるコンクリート床版11を設置し直して道路橋50を改修する際に、本発明の防水排水構造10が設けられる。   In this embodiment, the road bridge 50 provided with the waterproof drainage structure 10 is a road bridge made of a steel girder floor slab bridge as shown in FIG. That is, the road bridge 50 is constructed by supporting both ends of a bridge pier 51 made of reinforced concrete, preferably a plurality of I-shaped steel bridge girder 52 extending in parallel, and an upper surface flange portion 52a of the bridge girder 52 erected. The concrete floor slab 11 is provided so as to be supported by the slab. In the present embodiment, as described above, in the renovation work accompanying the aging of the road bridge, for example, after the concrete floor slab made of deteriorated RC concrete is removed together with the existing concrete wall railing etc., the upper surface of the bridge girder 52 is removed. The waterproof drainage structure 10 of the present invention is provided when the road deck 50 is repaired by re-installing the concrete floor slab 11 made of PC concrete.

ここで、橋桁52の上面に設けられるコンクリート床版11が、PCコンクリートによる床版となっていることにより、現場における施工が容易になると共に、コンクリート床版11の上面を、横断方向の排水勾配(横断勾配)を設けた状態で、精度良く平坦に形成することが可能になる。これによって、コンクリート床版11の上面に敷設される防水層13の表面に沿って、浸透した雨水を道路橋50の横断方向に流下させることが可能になると共に、コンクリート床版11の上面に敷設される防水層13との間に、強固な接着性を確保することが可能になって、コンクリート床版11と防水層13との接着不良を原因として、例えばコンクリート床版11からの水蒸気によって防水層13がアスファルト舗装層12と共に持ち上げられる現象である、ブリスタリング現象が生じるのを、効果的に回避することが可能になる。   Here, the concrete floor slab 11 provided on the upper surface of the bridge girder 52 is a floor slab made of PC concrete, so that construction on the site is facilitated, and the upper surface of the concrete floor slab 11 has a drainage gradient in the transverse direction. With the (transverse gradient) provided, it can be formed accurately and flatly. As a result, it is possible to allow the permeated rainwater to flow down in the transverse direction of the road bridge 50 along the surface of the waterproof layer 13 laid on the upper surface of the concrete floor slab 11 and to lay on the upper surface of the concrete floor slab 11. It becomes possible to ensure strong adhesion between the waterproof layer 13 and the waterproof layer 13 to be waterproofed due to, for example, water vapor from the concrete floor slab 11 due to poor adhesion between the concrete floor slab 11 and the waterproof layer 13. It is possible to effectively avoid the occurrence of a blistering phenomenon, which is a phenomenon in which the layer 13 is lifted together with the asphalt pavement layer 12.

PCコンクリートによるコンクリート床版11は、例えば工場等において予め精度良く形成された、例えば矩形の平面形状備えるPCコンクリート製の単位床版を、公知の工法によって、橋桁52の上面に縦横に並べて複数連設配置すると共に、公知の連結冶具を用いてこれら複数の単位床版を一体として連結することによって、橋桁52に支持させた状態で容易に設けることができる。   The concrete floor slab 11 made of PC concrete is formed by, for example, a unit floor slab made of PC concrete having a rectangular plane shape, for example, which has been formed in advance at a factory or the like, arranged vertically on the upper surface of the bridge girder 52 by a known method. In addition to installing and arranging the unit floor slabs as a unit using a known connecting jig, the unit floor slabs can be easily provided while being supported by the bridge girder 52.

本実施形態では、コンクリート床版11の側縁部分11aに設置し直されるコンクリート壁高欄14は、PCコンクリート製の単位壁高欄14aを、目地部14bを介在させて道路橋50及びコンクリート壁高欄14の延設方向Xに複数連設配置することによって構成されるものとなっている。これによって、例えば工場等において、各々の単位壁高欄14aを精度良く形成できるので、優れた品質のコンクリート壁高欄14を設けることが可能になると共に、現場での施工が容易になる。   In this embodiment, the concrete wall height column 14 re-installed on the side edge portion 11a of the concrete slab 11 is a road wall 50 and the concrete wall height column 14 with the unit wall height column 14a made of PC concrete interposed by the joint portion 14b. It is comprised by arranging and arranging two or more in the extending direction X. As a result, for example, in a factory, each unit wall height column 14a can be formed with high accuracy, so that it is possible to provide a concrete wall height column 14 of excellent quality and to facilitate construction on site.

また、PCコンクリート製の複数の単位壁高欄14aによるコンクリート壁高欄14では、各々の単位壁高欄14aをコンクリート床版11の側縁部分11aに沿って設置する際に、図2及び図4に示すように、底面部14cとコンクリート床版11との間に、例えば20mm前後の高さ調整のため隙間14dを保持して、各々の単位壁高欄14aが据え付けられると共に、保持された隙間14dには、例えば無収縮モルタル21が充填されて固化することにより、当該隙間14dを埋めるようにして、コンクリート壁高欄14の地覆部15をコンクリート床版11の側縁部分11aに接合する、地覆部15の接合部15aを形成している。無収縮モルタル21は、保持された隙間14dに設置される矩形枠形状のバックアップ材22(図3参照)を、流出を防止するための型枠として用いて、このバックアップ材22によって周囲を囲まれる内側部分に充填されるようになっている。   Moreover, in the concrete wall height column 14 by the several unit wall height column 14a made from PC concrete, when installing each unit wall height column 14a along the side edge part 11a of the concrete floor slab 11, it shows in FIG.2 and FIG.4. Thus, between the bottom surface portion 14c and the concrete floor slab 11, for example, a gap 14d is held for height adjustment of about 20 mm, and each unit wall height column 14a is installed, and the held gap 14d includes For example, when the non-shrink mortar 21 is filled and solidified, the ground cover portion 15 of the concrete wall rail 14 is joined to the side edge portion 11a of the concrete floor slab 11 so as to fill the gap 14d. Fifteen joint portions 15a are formed. The non-shrink mortar 21 is surrounded by the backup material 22 using a rectangular frame-shaped backup material 22 (see FIG. 3) installed in the held gap 14d as a mold for preventing outflow. The inner part is filled.

バックアップ材22は、例えば縦横の幅が20mm前後の矩形の断面形状を備える、例えばクロロプレンゴムスポンジ等からなる棒状部材を枠状に組み付けることによって、単位壁高欄14aの横長矩形の底面部14cの形状と略同様の形状及び大きさの、矩形枠形状を有するように形成されている。バックアップ材22は、コンクリート床版11の側縁部分11aに沿った各々の単位壁高欄14aの取り付け位置に配置されて、単位壁高欄14aの据え付け時に高を調整するための、レベリング材としての機能も備えている。バックアップ材22は、止水性や遮水性を有する棒状部材を用いて形成することによって、後述するように、横断方向水みち17や縦断方向水みち18に沿って配置される部分のバックアップ材22は、これらの水みち17,18の側面部17b,18bを止水する、止水枠材19として機能するようになっている。   The backup material 22 has, for example, a rectangular cross-sectional shape with a vertical and horizontal width of about 20 mm. For example, a bar-shaped member made of, for example, chloroprene rubber sponge or the like is assembled in a frame shape, thereby forming the shape of the horizontally long rectangular bottom surface portion 14c of the unit wall column 14a It is formed so as to have a rectangular frame shape having substantially the same shape and size. The backup material 22 is disposed at the attachment position of each unit wall height column 14a along the side edge portion 11a of the concrete floor slab 11, and functions as a leveling material for adjusting the height when the unit wall height column 14a is installed. It also has. As will be described later, the backup material 22 is formed by using a rod-shaped member having a water-stopping property or a water-impervious property, so that the portion of the backup material 22 disposed along the transverse water channel 17 or the longitudinal water channel 18 is The side walls 17b and 18b of the water channels 17 and 18 function as a water-stop frame material 19 that stops water.

本実施形態では、コンクリート壁高欄14を構成する複数の単位壁高欄14aを据え付ける際にコンクリート床版11との間に保持される、高さ調整用の隙間14dを利用することで、コンクリート壁高欄14の地覆部15のコンクリート床版11との接合部15aを貫通する横断方向水みち17を、容易に形成することが可能になる。本実施形態では、コンクリート壁高欄14を構成する複数の単位壁高欄14aの、各隣接する一対の単位壁高欄14aの間の目地部14bの直下部分の隙間14dを利用して、コンクリート壁高欄14の地覆部15のコンクリート床版11との接合部15aを貫通する、横断方向水みち17が設けられる。   In the present embodiment, the concrete wall height column is used by using the height adjusting gap 14d held between the concrete floor slab 11 when installing the plurality of unit wall height columns 14a constituting the concrete wall height column 14. It is possible to easily form the transverse water channel 17 that penetrates the joint portion 15 a of the 14 ground covering portions 15 with the concrete floor slab 11. In the present embodiment, the concrete wall height column 14a is formed by using the gap 14d in the portion immediately below the joint portion 14b between each pair of adjacent unit wall height columns 14a of the plurality of unit wall height columns 14a constituting the concrete wall height column 14. A transverse water channel 17 is provided that penetrates the joint 15a of the ground cover 15 with the concrete floor slab 11.

本実施形態では、橋桁52の上面にPCコンクリート製の単位床版を縦横に並べて複数連設配置することで、コンクリート床版11を設置したら、好ましくはコンクリート壁高欄14を取り付けたり、アスファルト舗装層12を形成したりするのに先立って、コンクリート床版11の上面に、防水層13を敷設する。防水層13は、従来より道路橋50の防水層を形成する部材として公知の、シート系防水材、塗膜系防水材、舗装系防水材等の、種々の防水材料を用いて形成することができる。シート系防水材による防水材料としては、例えばアスファルト系防水シートや合成ゴム系防水シートを用いることができる。塗膜系防水材による防水材料としては、例えばゴム系溶剤型防水材、アスファルト系加熱型防水材、樹脂系硬化型防水材等を用いることができる。塗膜系防水材による防水材料としては、例えば接着層の上に重ね塗りして防水膜を形成することにより、防水層とするものを用いることができる。舗装系防水材による防水材料としては、例えばシートアスファルトと称するアスファルト混合物を、15〜25mm程度の舗装厚で施工することによって、防水層13とするものを用いることができる。例えば厚さが2〜15mm程度の繊維強化セメントボードを縦横に敷き並べて、防水層13を形成することもできる。本実施形態では、防水層13を形成する防水材料として、例えば合成ゴム系防水シートの上面及び下面に、アスファルト舗装層12やコンクリート床版11と接着させるための接着層を積層したものを、好ましく用いることができる。   In the present embodiment, a plurality of PC concrete unit floor slabs are arranged vertically and horizontally on the upper surface of the bridge girder 52, and when the concrete floor slab 11 is installed, preferably the concrete wall rail 14 is attached or the asphalt pavement layer is installed. Prior to forming 12, a waterproof layer 13 is laid on the upper surface of the concrete slab 11. The waterproof layer 13 may be formed using various waterproof materials, such as a sheet-based waterproof material, a coating-based waterproof material, and a pavement-based waterproof material, which are conventionally known as members that form the waterproof layer of the road bridge 50. it can. As a waterproof material using a sheet waterproof material, for example, an asphalt waterproof sheet or a synthetic rubber waterproof sheet can be used. As a waterproof material using a coating film-based waterproof material, for example, a rubber-based solvent-type waterproof material, an asphalt-based heat-resistant waterproof material, a resin-based curable waterproof material, and the like can be used. As a waterproof material by a coating-system waterproof material, what is used as a waterproof layer can be used, for example, by forming a waterproof film by repeatedly coating on an adhesive layer. As a waterproof material by a pavement-type waterproof material, what is used as the waterproof layer 13 can be used by, for example, constructing an asphalt mixture called sheet asphalt with a pavement thickness of about 15 to 25 mm. For example, the waterproof layer 13 can be formed by laying fiber reinforced cement boards having a thickness of about 2 to 15 mm vertically and horizontally. In the present embodiment, as a waterproof material for forming the waterproof layer 13, for example, a laminate in which an adhesive layer for bonding to the asphalt pavement layer 12 or the concrete floor slab 11 is laminated on the upper surface and the lower surface of a synthetic rubber-based waterproof sheet is preferable. Can be used.

防水層13は、コンクリート床版11の上面において、接着層を介して接着させながら、道路橋50の中央部分から、両側の側縁部分11aに向けて敷設されると共に、コンクリート床版11の側縁部分11aにおいては、バックアップ材22の内側に充填された無収縮モルタル21による、コンクリート壁高欄14の地覆部15のコンクリート床版11との接合部15aに、食い込む位置まで敷設される(図3、図4参照)。   The waterproof layer 13 is laid from the center portion of the road bridge 50 toward the side edge portions 11a on both sides while being bonded to the upper surface of the concrete floor slab 11 through an adhesive layer. In the edge portion 11a, the non-shrink mortar 21 filled inside the back-up material 22 is laid to a position where it bites into the joint portion 15a of the ground covering portion 15 of the concrete wall rail 14 with the concrete floor slab 11 (FIG. 3, see FIG.

また、防水層13は、コンクリート壁高欄14の地覆部15のコンクリート床版11との接合部15aに食い込んだ部分から、さらに道路橋50の横断方向の外側に延設する、外側延長部分13aを有している。外側延長部分13aは、横断方向水みち17の横幅よりも広い幅を備えるように形成されている(図5参照)。外側延長部分13aは、横断方向水みち17が設けられる各隣接する一対の単位壁高欄14aの間の目地部14bの直下部分となる領域において、設置されるコンクリート壁高欄14の地覆部15の内側壁面15bが配設される位置を超えて、外側壁面15cが配設される位置となるコンクリート床版11の端縁部に至る位置まで、延長して敷設されることになる(図2参照)。   Further, the waterproof layer 13 extends from the portion that bites into the joint portion 15a of the ground covering portion 15 of the concrete wall rail 14 to the concrete floor slab 11, and further extends outward in the transverse direction of the road bridge 50. have. The outer extension portion 13a is formed to have a width wider than the lateral width of the transverse waterway 17 (see FIG. 5). The outer extension portion 13a is formed in a region directly below the joint portion 14b between each pair of adjacent unit wall height columns 14a provided with the transverse water channel 17, and is provided on the ground cover portion 15 of the concrete wall height column 14 to be installed. It extends and lays over the position where the inner wall surface 15b is disposed to reach the edge of the concrete slab 11 where the outer wall surface 15c is disposed (see FIG. 2). ).

コンクリート床版11の上面に、防水層13を敷設したら、コンクリート床版11の側縁部分11aに沿ってコンクリート壁高欄14を設置する。コンクリート壁高欄14は、上述のように、予め工場等において形成した、PCコンクリート製の単位壁高欄14aを、目地部14bを介在させてコンクリート壁高欄14の延設方向Xに複数連設配置することによって、設置することができる。PCコンクリート製の複数の単位壁高欄14aは、上述のように、各々の配設位置に、高さ調整用の矩形枠形状のバックアップ材22を設置してから、設置したバックアップ材22の上に載置されて、コンクリート床版11の側縁部分11aに配設される。配設された複数の単位壁高欄14aは、公知の方法によって、単位壁高欄14aによるコンクリート壁高欄14の地覆部15、及びコンクリート床版11を貫通して締着される、固定用の高張力ボルト23(図3参照)を用いて、コンクリート床版11の側縁部分11aに沿って各々強固に固定される。   When the waterproof layer 13 is laid on the upper surface of the concrete floor slab 11, the concrete wall height column 14 is installed along the side edge portion 11 a of the concrete floor slab 11. As described above, the concrete wall height column 14 includes a plurality of unit wall height columns 14a made of PC concrete formed in advance in a factory or the like in the extending direction X of the concrete wall height column 14 with joint portions 14b interposed therebetween. Can be installed. As described above, the plurality of unit wall height columns 14a made of PC concrete are installed on the backup material 22 after the rectangular frame-shaped backup material 22 for height adjustment is installed at the respective arrangement positions. It is placed and disposed on the side edge portion 11 a of the concrete floor slab 11. The plurality of unit wall height columns 14a arranged are fastened through the ground cover 15 of the concrete wall height column 14 and the concrete floor slab 11 by the unit wall height column 14a and fastened by a known method. The tension bolts 23 (see FIG. 3) are used to firmly fix the side portions 11a of the concrete slab 11 respectively.

各々の単位壁高欄14aを高張力ボルト23を用いて固定したら、単位壁高欄14aやバックアップ材22に設けた注入口(図示せず)から、バックアップ材22の内側の、コンクリート壁高欄14の底面部14cとコンクリート床版11との間の隙間14dに、無収縮モルタル21を注入充填して固化させると共に、各隣接する一対の単位壁高欄14aの間の目地部14bに、目地モルタル24を充填して固化させることにより、複数連設配置されたPCコンクリート製の単位壁高欄14aが一体化された、コンクリート壁高欄14が形成される。またこれによって、各隣接する一対の単位壁高欄14aの間の目地部14bの直下部分には、図5及び図3に示すように、底面部17aが、地覆部15のコンクリート床版11との接合部15aを横断して延長させた、防水層13の外側延長部分13aによって覆われると共に、好ましくは両側の側面部17bが、バックアップ材22による止水枠材19によって覆われた、横断方向水みち17が、コンクリート壁高欄14の地覆部15のコンクリート床版11の側縁部分11aとの接合部15aを、道路橋50の横断勾配に沿って貫通した状態で設けられることになる。   When each unit wall height column 14a is fixed using the high tension bolt 23, the bottom surface of the concrete wall height column 14 inside the backup material 22 from the inlet (not shown) provided in the unit wall height column 14a or the backup material 22 is provided. The non-shrink mortar 21 is injected and filled in the gap 14d between the portion 14c and the concrete slab 11 and solidified, and the joint mortar 24 is filled in the joint portion 14b between each pair of adjacent unit wall rails 14a. Thus, the concrete wall height column 14 is formed by integrating the PC concrete unit wall height columns 14a arranged in series. Further, as shown in FIGS. 5 and 3, the bottom surface portion 17 a is connected to the concrete floor slab 11 of the ground covering portion 15 at a portion immediately below the joint portion 14 b between each pair of adjacent unit wall height columns 14 a. The transverse direction is covered by the outer extension portion 13a of the waterproof layer 13 that extends across the joint portion 15a, and preferably the side portions 17b on both sides are covered by the water-stop frame material 19 by the backup material 22. The water channel 17 is provided in a state of penetrating the joint 15 a with the side edge portion 11 a of the concrete floor slab 11 of the ground cover 15 of the concrete wall rail 14 along the crossing gradient of the road bridge 50.

ここで、本実施形態では、各隣接する一対の単位壁高欄14aの間の目地部14bに、目地モルタル24を充填して固化させる際に、目地部14bの下端部に沿って、目地部14bのスペーサを兼ねる止水枠材19’を設けておくことが好ましい。これによって、目地部14bに充填される目地モルタル24によって、横断方向水みち17が閉塞することになるのを回避できると共に、横断方向水みち17を流下する雨水によって、上方の目地モルタル24が侵食されることになるのを回避することが可能になる。   Here, in this embodiment, when the joint mortar 24 is filled and solidified in the joint part 14b between each pair of adjacent unit wall height columns 14a, the joint part 14b is formed along the lower end part of the joint part 14b. It is preferable to provide a water-stop frame member 19 ′ that also serves as a spacer. Accordingly, the joint mortar 24 filled in the joint portion 14b can be prevented from being blocked by the transverse water channel 17, and the upper joint mortar 24 is eroded by rain water flowing down the transverse water channel 17. It becomes possible to avoid being to be done.

また、本実施形態では、横断方向水みち17に、浸透水排水用導水管25を設置しておくことが好ましい。浸透水排水用導水管25は、水みちの内部に設置されて、水みちを目詰まりさせることなく、舗装層に浸透した雨水を速やかに排水できるようにする部材として設けられるメッシュ状の導水管であり、例えばスプリング状の導水管であるスプリングメッシュを、好ましく用いることができる。より具体的には、浸透水排水用導水管25として、商品名「コンクリートセイバー」(株式会社橋梁メンテナンス製)を用いることができる。横断方向水みち17に、浸透水排水用導水管25が設置されていることにより、横断方向水みち17が変形しないようにして、所定の排水流量を容易に確保することが可能になる。   Moreover, in this embodiment, it is preferable to install the permeated water drainage conduit 25 in the transverse water path 17. The permeated water drainage conduit 25 is a mesh-shaped conduit that is installed inside the waterway and is provided as a member that can quickly drain rainwater that has penetrated the pavement layer without clogging the waterway. For example, a spring mesh which is a spring-shaped water conduit can be preferably used. More specifically, the trade name “concrete saver” (manufactured by Bridge Maintenance Co., Ltd.) can be used as the permeated water drainage conduit 25. Since the permeated water drainage conduit 25 is installed in the transverse water path 17, it is possible to easily secure a predetermined drainage flow rate without the transverse water path 17 being deformed.

本実施形態では、矩形枠形状を備える高さ調整用のバックアップ材22は、横断方向の横幅である短辺方向の幅が、単位壁高欄14aの底面部14cの横断方向の横幅よりも、例えば20mm程度短くなるように形成されている。これによって、図3及び図4に示すように、バックアップ材22の一方の長辺部を、単位壁高欄14aによる地覆部15の外側壁面15cが配設される位置となる、コンクリート床版11の端縁部に沿わせて配置した状態で、バックアップ材22をコンクリート床版11の側縁部分11aに設置してから、設置したバックアップ材22の上に単位壁高欄14aを載置した際に、単位壁高欄14aの底面部14cの内側縁部の下方には、コンクリート壁高欄14の地覆部15のコンクリート床版11との接合部15aに食い込んで敷設された防水層13との間に、例えば高さが20mm前後、横幅が20mm程度の大きさの矩形の断面形状を有する隙間が、横断方向水みち17と連通した状態で保持される。後述するように、単位壁高欄14aによる両側のコンクリート壁高欄14の間の領域において、コンクリート床版11の上面に敷設された防水層13の上にアスファルト舗装層12を形成した際に、この単位壁高欄14aの底面部14cの内側縁部の下方に保持された隙間を利用して、縦断方向水みち18が、形成されることになる。形成された縦断方向水みち18は、地覆部15のコンクリート床版11の側縁部分11aとの接合部15aに沿った側面部18bが、好ましくは止水枠材19によって覆われた状態となっている。   In this embodiment, the backup material 22 for height adjustment having a rectangular frame shape has a width in the short side direction which is a horizontal width in the transverse direction, for example, is larger than a lateral width in the transverse direction of the bottom surface portion 14c of the unit wall height column 14a. It is formed to be shorter by about 20 mm. As a result, as shown in FIGS. 3 and 4, the concrete floor slab 11 in which one long side portion of the backup material 22 becomes a position where the outer wall surface 15 c of the ground covering portion 15 by the unit wall height column 14 a is disposed. When the backup material 22 is installed on the side edge portion 11a of the concrete slab 11 in a state of being arranged along the edge of the unit wall, the unit wall rail 14a is placed on the installed backup material 22 The unit wall height column 14a has a waterproof layer 13 below the inner edge of the bottom surface portion 14c and a waterproof layer 13 that digs into the joint portion 15a of the ground cover portion 15 of the concrete wall height column 14 and the concrete floor slab 11. For example, a gap having a rectangular cross-sectional shape with a height of around 20 mm and a width of about 20 mm is held in communication with the transverse water channel 17. As will be described later, when the asphalt pavement layer 12 is formed on the waterproof layer 13 laid on the upper surface of the concrete floor slab 11 in the region between the concrete wall height columns 14 on both sides by the unit wall height column 14a, this unit is formed. The longitudinal direction water channel 18 is formed using the gap held below the inner edge of the bottom surface portion 14c of the wall height column 14a. The formed longitudinal direction water path 18 has a state in which the side surface portion 18b along the joint portion 15a with the side edge portion 11a of the concrete floor slab 11 of the ground covering portion 15 is preferably covered with the water-stop frame material 19. It has become.

本実施形態では、防水層13を介在させてコンクリート床版11の上面に敷設されるアスファルト舗装層12は、好ましくは50〜100mm程度の厚さの基層12aと、40〜50mm程度の厚さの表層12bとからなる2層構造を備えており、公知の種々のアスファルト合材や舗装方法を用いて、容易に形成することができる。特に、基層12aについては、防水層13との間の空隙をできるだけ少なくして、雨水による浸透水が滞水する量を減らすことや、防水層13との接着力を増強することを目的として、密粒のアスファルト合材を用いて形成することが好ましい。   In the present embodiment, the asphalt pavement layer 12 laid on the upper surface of the concrete floor slab 11 with the waterproof layer 13 interposed, preferably has a base layer 12a having a thickness of about 50 to 100 mm and a thickness of about 40 to 50 mm. It has a two-layer structure composed of a surface layer 12b, and can be easily formed using various known asphalt composites and paving methods. In particular, with respect to the base layer 12a, the gap between the waterproof layer 13 is reduced as much as possible to reduce the amount of permeated water due to rainwater and to increase the adhesive force with the waterproof layer 13, It is preferable to use a dense asphalt mixture.

また、本実施形態では、アスファルト舗装層12を施工する際に、通水性を備える仕切り用の型枠材として、例えばメッシュ状の仕切り板(図示せず)を、単位壁高欄14aの底面部14cの内側縁部の下方に形成された上述の隙間と、アスファルト舗装層12との間を仕切るようにして、単位壁高欄14aによる地覆部15の内側壁面15bに添わせた状態で取り付けておく。これによって、アスファルト舗装層12を施工する際に、アスファルト合材が、単位壁高欄14aの底面部14cの内側縁部の下方の上述の隙間に流入して、縦断方向水みち18が形成されなくなるのを、効果的に回避することが可能になる。縦断方向水みち18には、横断方向水みち17と同様に、浸透水排水用導水管(図示せず)を設置しておくことが好ましい。これによって、縦断方向水みち17が変形しないようにして、所定の排水流量を容易に確保することが可能になると共に、縦断方向水みち18が、アスファルト合材によって目詰りするのを、より効果的に回避することが可能になる。またこれによって、上述のメッシュ状の仕切り板等の仕切り用の型枠材を用いることなく、アスファルト舗装層12を施工することも可能になる。   Moreover, in this embodiment, when constructing the asphalt pavement layer 12, for example, a mesh-like partition plate (not shown) is used as a partition form material having water permeability, and the bottom surface portion 14c of the unit wall height column 14a. The above-mentioned gap formed below the inner edge of the wall and the asphalt pavement layer 12 are partitioned so that they are attached to the inner wall surface 15b of the ground covering portion 15 by the unit wall rail 14a. . As a result, when the asphalt pavement layer 12 is constructed, the asphalt mixture flows into the above-described gap below the inner edge of the bottom surface portion 14c of the unit wall height column 14a, and the longitudinal direction water channel 18 is not formed. Can be effectively avoided. In the longitudinal direction water path 18, it is preferable to install a permeated water drainage conduit (not shown) in the same manner as the transverse direction water path 17. As a result, it is possible to easily secure a predetermined drainage flow rate so that the longitudinal direction waterway 17 is not deformed, and it is more effective that the longitudinal direction waterway 18 is clogged by the asphalt mixture. Can be avoided. This also makes it possible to construct the asphalt pavement layer 12 without using a partition formwork such as the mesh-shaped partition plate described above.

さらに、本実施形態では、図2に示すように、単位壁高欄14aによるコンクリート壁高欄14の例えば地覆部15における外側壁面15cに支持させて、横断方向水みち17の下流側端部の排出開口17cから排出される雨水を、衝突させることで下方に向けて流下させる、飛散防止部材26が取り付けられている。飛散防止部材26は、例えばステンレス板を折曲げ加工したり、お椀状に湾曲加工すること等によって、容易に形成することができる。飛散防止部材26は、例えばコンクリート壁高欄14の外側壁面15cに埋設した埋込ボルト26aに緩み止めナットを用いて固定することによって、横断方向水みち17の排出開口17を覆うようにして容易に取り付けることができる。飛散防止部材26が設けられていることにより、横断方向水みち17を介して排出される、アスファルト舗装層12を浸透した雨水の量が多くなった場合でも、コンクリート床版11の端面に沿って流下させることで、排出される雨水が道路橋50から離れた領域まで飛散することになるのを、効果的に回避することが可能になる。また、風による横断方向水みち17への雨水の吹込みや逆流を回避できるようにして、水みちが常に確保されるようにすることが可能になる。   Further, in the present embodiment, as shown in FIG. 2, the discharge of the downstream end of the transverse water channel 17 is supported by the outer wall surface 15c of the ground wall 15 of the concrete wall height column 14 by the unit wall height column 14a. A scattering prevention member 26 is attached, which causes rainwater discharged from the opening 17c to flow downward by colliding. The anti-scattering member 26 can be easily formed by, for example, bending a stainless steel plate or bending it into a bowl shape. The scattering prevention member 26 is easily fixed so as to cover the discharge opening 17 of the waterway 17 in the transverse direction, for example, by fixing the embedding bolt 26a embedded in the outer wall surface 15c of the concrete wall rail 14 with a locking nut. Can be attached. By providing the scattering prevention member 26, even when the amount of rainwater discharged through the transverse waterway 17 and penetrating the asphalt pavement layer 12 increases, the edge of the concrete floor slab 11 is increased. By letting it flow down, it is possible to effectively avoid the discharged rainwater from being scattered to a region away from the road bridge 50. In addition, it is possible to prevent the rainwater from being blown into the transverse waterway 17 by the wind and the reverse flow so that the waterway is always secured.

そして、上述の構成を備える本実施形態の道路橋の防水排水構造10によれば、簡易な構成によって、アスファルト舗装層12に浸透した雨水か、コンクリート床版11に至らないようにすることが可能になると共に、アスファルト舗装層12に浸透した雨水を、長期間滞留させることなく、スムーズに排除することが可能になる。   According to the waterproof drainage structure 10 for a road bridge of the present embodiment having the above-described configuration, it is possible to prevent rainwater that has penetrated the asphalt pavement layer 12 or the concrete floor slab 11 with a simple configuration. At the same time, the rainwater that has penetrated into the asphalt pavement layer 12 can be smoothly removed without being retained for a long period of time.

すなわち、本実施形態によれば、アスファルト舗装層12とコンクリート床版11との間に介在して防水層13が配設されており、コンクリート壁高欄14の地覆部15のコンクリート床版11の側縁部分11aとの接合部15aを、道路橋50の横断勾配に沿って貫通する排水用の横断方向水みち17が、コンクリート壁高欄13の延設方向Xに間隔をおいて複数箇所に形成されており、横断方向水みち17の底面部17aは、地覆部15のコンクリート床版11の側縁部分11aとの接合部15aを横断して、地覆部15の内側壁面15bを超えて外側壁面15cに至るまで延長させた、防水層13の外側延長部分13aによって覆われている。   That is, according to this embodiment, the waterproof layer 13 is disposed between the asphalt pavement layer 12 and the concrete floor slab 11, and the concrete floor slab 11 of the ground covering portion 15 of the concrete wall rail 14 is provided. A transverse water channel 17 for drainage that penetrates the joint 15a with the side edge portion 11a along the transverse gradient of the road bridge 50 is formed at a plurality of positions at intervals in the extending direction X of the concrete wall rail 13. The bottom surface portion 17a of the transverse waterway 17 crosses the joint portion 15a with the side edge portion 11a of the concrete floor slab 11 of the ground covering portion 15 and exceeds the inner wall surface 15b of the ground covering portion 15. The outer wall 13c is covered with an outer extension 13a of the waterproof layer 13 that extends to the outer wall 15c.

したがって、本実施形態によれば、アスファルト舗装層12とコンクリート床版11との間に介在して配設された防水層13によって、アスファルト舗装層12に浸透した雨水が、コンクリート床版11に至るのを効果的に遮断することが可能になると共に、防水層13を利用して、道路橋50の横断勾配に沿って傾斜する横断方向水みち17を、これの底面部17aを当該防水層13の外側延長部分13aによって覆った状態で、コンクリート床版11に貫通孔を設けることなく、簡易に形成することが可能になる。また横断方向水みち17を、コンクリート床版11に貫通孔を設けて構造的弱点とすることなく、コンクリート壁高欄13の延設方向Xに間隔をおいて数を増やして設けることが可能になる。これらによって、本実施形態によれば、アスファルト舗装層12に浸透した雨水を、長期間滞留させることなく、道路橋50の横断勾配に沿ってスムーズに排除することが可能になる。   Therefore, according to the present embodiment, rainwater that has penetrated into the asphalt pavement layer 12 reaches the concrete floor slab 11 by the waterproof layer 13 disposed between the asphalt pavement layer 12 and the concrete floor slab 11. Can be effectively blocked, and the waterproof layer 13 is used to make the transverse water channel 17 inclined along the crossing gradient of the road bridge 50 and the bottom surface portion 17a of the waterproof layer 13 to the waterproof layer 13. It is possible to easily form the concrete floor slab 11 without providing a through hole in a state covered with the outer extension portion 13a. Moreover, it becomes possible to provide the transverse direction waterway 17 by increasing the number at intervals in the extending direction X of the concrete wall column 13 without providing a through hole in the concrete floor slab 11 and making it a structural weak point. . Thus, according to the present embodiment, it is possible to smoothly remove rainwater that has penetrated into the asphalt pavement layer 12 along the crossing gradient of the road bridge 50 without staying for a long time.

また、本実施形態によれば、横断方向水みち17の両側の側面部17bや、縦断方向水みち18の地覆部15のコンクリート床版11との接合部15aに沿った側面部18bが、止水枠材19によって覆われているので、水みち以外の部分に水が浸透しようとするのを、効果的に回避することが可能になる。   Further, according to the present embodiment, the side surface portions 17b on both sides of the transverse direction water groove 17 and the side surface portion 18b along the joint portion 15a of the ground covering portion 15 of the longitudinal direction water groove 18 with the concrete floor slab 11 are provided. Since it is covered with the water-stop frame material 19, it is possible to effectively avoid water from penetrating into portions other than the water channel.

さらに、横断方向水みち17から排水される雨水の流量を測定することで、アスファルト舗装層12の損傷の程度を推定することが可能になり(水量が増えると危険信号)、道路橋50の予防保全や維持管理に役立てることが可能になる。   Furthermore, it is possible to estimate the degree of damage to the asphalt pavement layer 12 by measuring the flow rate of rainwater drained from the transverse waterway 17 (a danger signal when the amount of water increases), and prevention of the road bridge 50. It can be used for maintenance and maintenance.

なお、本発明は上記実施形態に限定されることなく種々の変更が可能である。例えば、横断方向水みちの側面部や、縦断方向水みちの側面部が、止水枠材によって覆われている必要は必ずしも無く、横断方向水みちや縦断方向水みちに、浸透水排水用導水管が設置されている必要は必ずしも無い。コンクリート床版は、複数のプレキャストコンクリート製の単位床版を連設配置することによって設けられている必要は必ずしも無く、現場打ちコンクリートによるコンクリート床版であっても良い。コンクリート壁高欄は、PCコンクリート製の単位壁高欄を複数連設配置することによって設置されるものである必要は必ずしもなく、現場打ちコンクリートによるコンクリート壁高欄や、いわゆるハーフPCによるコンクリート壁高欄であっても良い。   The present invention is not limited to the above-described embodiment, and various modifications can be made. For example, it is not always necessary to cover the lateral side of the water path in the transverse direction or the lateral side of the water path in the longitudinal direction with a water-stop frame material. It is not always necessary to install a water pipe. The concrete floor slab does not necessarily have to be provided by continuously arranging a plurality of unit floor slabs made of precast concrete, and may be a concrete floor slab made of in-situ concrete. The concrete wall rails do not necessarily have to be installed by arranging a plurality of unit wall rails made of PC concrete, and are concrete wall rails made of on-site concrete or so-called half PC concrete wall rails. Also good.

コンクリート壁高欄が、PCコンクリート製の単位壁高欄によるものである場合、横断方向水みちは、目地部の直下部分における、地覆部のコンクリート床版の側縁部分との接合部に設ける必要は必ずしも無く、単位壁高欄の中間部分の接合部に設けることもできる。コンクリート壁高欄が、現場打ちコンクリートやハーフPCによるものである場合、例えば地覆部の鉄筋と干渉しない位置に、地覆部のコンクリート床版との接合部を横断する箱抜きを設けておき、この箱抜きによって形成される、道路橋の横断勾配に沿って貫通する貫通孔を、排水用の横断方向水みちとすることができる。   When the concrete wall rail is a unit wall rail made of PC concrete, it is necessary to install the waterway in the transverse direction at the joint with the side edge portion of the concrete floor slab of the ground cover part immediately below the joint part. There is not necessarily, and it can also be provided at the junction of the middle part of the unit wall rail. If the concrete wall railing is made of cast-in-place concrete or half PC, for example, in a position where it does not interfere with the reinforcing bar of the ground cover part, a box opening across the joint with the concrete floor slab of the ground cover part is provided, The through-hole formed by this boxing and penetrating along the crossing gradient of the road bridge can be used as a transverse waterway for drainage.

10 防水排水構造
11 コンクリート床版
11a 側縁部分
12 アスファルト舗装層
12a 基層
12b 表層
13 防水層
13a 外側延長部分
14 コンクリート壁高欄
14a 単位壁高欄
14b 目地部
14c 底面部
14d 隙間
15 地覆部
15a コンクリート床版との接合部
15b 内側壁面
15c 外側壁面
17 横断方向水みち
17a 底面部
17b 側面部
18 縦断方向水みち
18a 底面部
18b 側面部
19 止水枠材
21 無収縮モルタル
22 バックアップ材
23 高張力ボルト
24 目地モルタル
25 浸透水排水用導水管
26 飛散防止部材
50 道路橋
X 道路橋(コンクリート壁高欄)の延設方向
DESCRIPTION OF SYMBOLS 10 Waterproof drainage structure 11 Concrete floor slab 11a Side edge part 12 Asphalt pavement layer 12a Base layer 12b Surface layer 13 Waterproof layer 13a Outer extension part 14 Concrete wall height column 14a Unit wall height column 14b Joint part 14c Bottom part 14d Crevice 15 Ground cover part 15a Concrete floor Joint portion 15b Inner wall surface 15c Outer wall surface 17 Cross direction water channel 17a Bottom surface portion 17b Side surface portion 18 Vertical direction water channel 18a Bottom surface portion 18b Side surface portion 19 Water-stop frame material 21 Non-shrink mortar 22 Backup material 23 High tension bolt 24 Joint mortar 25 Permeated water drainage conduit 26 Splash prevention member 50 Road bridge X Extension direction of road bridge (concrete wall railing)

Claims (9)

コンクリート床版と、該コンクリート床版の側縁部分に沿って設置されるコンクリート壁高欄と、該コンクリート床版の上面に敷設されるアスファルト舗装層とを含み、該アスファルト舗装層と前記コンクリート床版との間に介在して防水層が配設されている道路橋において、路面に降り注いだ雨水を排除するために設けられる道路橋の防水排水構造であって、
前記コンクリート壁高欄の地覆部の前記コンクリート床版の側縁部分との接合部を、道路橋の横断勾配に沿って貫通する排水用の横断方向水みちが、前記コンクリート壁高欄の延設方向に間隔をおいて複数箇所に形成されており、
前記横断方向水みちの底面部は、前記地覆部の前記コンクリート床版の側縁部分との接合部を横断して、前記地覆部の内側壁面を超えて外側壁面に至るまで延長させた、前記防水層の外側延長部分によって覆われている道路橋の防水排水構造。
A concrete floor slab, a concrete wall rail installed along a side edge portion of the concrete floor slab, and an asphalt pavement layer laid on an upper surface of the concrete floor slab, the asphalt pavement layer and the concrete floor slab In the road bridge in which a waterproof layer is interposed between the road bridge and the waterproof drainage structure of the road bridge provided to eliminate rainwater poured on the road surface,
The direction of the extension of the concrete wall rail is a transverse water channel for drainage that penetrates the joint of the ground cover of the concrete wall rail with the side edge portion of the concrete floor slab along the crossing gradient of the road bridge. Formed at multiple locations at intervals,
The bottom portion of the waterway in the transverse direction extends across the joint portion with the side edge portion of the concrete floor slab of the ground covering portion to reach the outer wall surface beyond the inner wall surface of the ground covering portion. A waterproof drainage structure for a road bridge covered by an outer extension of the waterproof layer.
前記横断方向水みちの両側の側面部は、止水枠材によって覆われている請求項1記載の道路橋の防水排水構造。   The waterproof drainage structure for a road bridge according to claim 1, wherein side surfaces on both sides of the transverse waterway are covered with a waterstop frame material. 前記横断方向水みちに、浸透水排水用導水管が設置されている請求項1又は2記載の道路橋の防水排水構造。   The waterproof drainage structure for a road bridge according to claim 1 or 2, wherein a water permeation pipe for seepage water drainage is installed in the transverse waterway. 隣接する各一対の前記横断方向水みちの間の部分において、前記防水層は、前記地覆部の前記コンクリート床版の側縁部分との接合部に食い込むようにして配設されており、前記地覆部の内側壁面の下端部に沿って、底面部が前記防水層によって覆われた縦断方向水みちが、前記横断方向水みちと連通して形成されている請求項1〜3のいずれか1項記載の道路橋の防水排水構造。   In a portion between each pair of adjacent transverse water channels, the waterproof layer is disposed so as to bite into a joint portion with a side edge portion of the concrete floor slab of the ground covering portion, The longitudinal direction water channel whose bottom surface is covered with the waterproof layer is formed in communication with the transverse direction water channel along the lower end of the inner wall surface of the ground cover. 1. Waterproof drainage structure for road bridges according to item 1. 前記縦断方向水みちの、前記地覆部の前記コンクリート床版の側縁部分との接合部に沿った側面部は、止水枠材によって覆われている請求項4記載の道路橋の防水排水構造。   The waterproof drainage of a road bridge according to claim 4, wherein a side surface portion of the waterway in the longitudinal direction along a joint portion of the ground covering portion with a side edge portion of the concrete floor slab is covered with a waterstop frame material. Construction. 前記縦断方向水みちに、浸透水排水用導水管が設置されている請求項4又は5記載の道路橋の防水排水構造。   The waterproof drainage structure for a road bridge according to claim 4 or 5, wherein a water permeation pipe for seepage water drainage is installed in the longitudinal direction waterway. 前記コンクリート壁高欄は、プレキャストコンクリート製の単位壁高欄を、目地部を介在させて延設方向に複数連設配置することによって設置されており、前記横断方向水みちは、前記目地部の直下部分における前記地覆部の前記コンクリート床版の側縁部分との接合部に形成されている請求項1〜6のいずれか1項記載の道路橋の防水排水構造。   The concrete wall rail is installed by arranging a plurality of unit wall rails made of precast concrete in the extending direction with a joint portion interposed therebetween, and the transverse water path is a portion immediately below the joint portion. The waterproof drainage structure for a road bridge according to any one of claims 1 to 6, wherein the waterproof cover drainage structure is formed at a joint portion between the ground cover portion and a side edge portion of the concrete floor slab. 前記コンクリート床版は、プレキャストコンクリート製の単位床版を、縦横に複数連設配置することによって設けられている請求項1〜7のいずれか1項記載の道路橋の防水排水構造。   The waterproof drainage structure for a road bridge according to any one of claims 1 to 7, wherein the concrete floor slab is provided by arranging a plurality of unit floor slabs made of precast concrete vertically and horizontally. 前記コンクリート壁高欄の外側壁面に支持させて、前記横断方向水みちの下流側端部の排出開口から排出される雨水を、衝突させることで下方に向けて流下させる、飛散防止部材が取り付けられている請求項1〜8のいずれか1項記載の道路橋の防水排水構造。   An anti-scattering member is attached to the outer wall surface of the concrete wall rail to allow rainwater discharged from the discharge opening at the downstream end of the transverse waterway to flow downward by colliding. The waterproof drainage structure for a road bridge according to any one of claims 1 to 8.
JP2017153604A 2017-08-08 2017-08-08 Waterproof drainage structure of road bridge Active JP7017880B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017153604A JP7017880B2 (en) 2017-08-08 2017-08-08 Waterproof drainage structure of road bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017153604A JP7017880B2 (en) 2017-08-08 2017-08-08 Waterproof drainage structure of road bridge

Publications (2)

Publication Number Publication Date
JP2019031838A true JP2019031838A (en) 2019-02-28
JP7017880B2 JP7017880B2 (en) 2022-02-09

Family

ID=65523169

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017153604A Active JP7017880B2 (en) 2017-08-08 2017-08-08 Waterproof drainage structure of road bridge

Country Status (1)

Country Link
JP (1) JP7017880B2 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109811802A (en) * 2019-02-01 2019-05-28 中铁一局集团厦门建设工程有限公司 A composite waterproof structure of comprehensive pipe gallery under adverse geological conditions
CN110042751A (en) * 2019-05-30 2019-07-23 福州大学 Asphalt mixture surfacing drainage arrangement and its construction method based on capillary principle
CN110080102A (en) * 2019-04-26 2019-08-02 中铁武汉勘察设计研究院有限公司 A Bridge Deck Drainage Structure for Bridges Over Railway
CN110359366A (en) * 2019-07-02 2019-10-22 中国公路工程咨询集团有限公司 It is a kind of using the bridge drainage structure of pervious concrete and the calculation method of pervious concrete permeability rate
CN110905061A (en) * 2019-10-28 2020-03-24 安徽海螺建材设计研究院有限责任公司 A kind of initial rainwater and flushing water collection device and collection method on wharf face
JP2020147973A (en) * 2019-03-13 2020-09-17 株式会社ピーエス三菱 Road bridge concrete floor board replacement method
CN114457739A (en) * 2022-03-02 2022-05-10 广州粤水建设有限公司 Accumulated water prevention and drainage treatment structure for road
CN115287967A (en) * 2022-07-11 2022-11-04 中电建路桥集团有限公司 Permanent road surface structure model
CN116876337A (en) * 2023-08-25 2023-10-13 中国铁道科学研究院集团有限公司铁道建筑研究所 Railway bridge deck waterproof and drainage system and preparation and construction methods of prefabricated waterproof protection layer of railway bridge deck waterproof and drainage system
CN117513147A (en) * 2023-12-11 2024-02-06 中冶京诚工程技术有限公司 Bridge anti-collision structure and its construction method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4862236A (en) * 1971-06-22 1973-08-30
JPS5336833U (en) * 1976-09-03 1978-03-31
JPH02109809U (en) * 1989-02-16 1990-09-03
JPH06146220A (en) * 1992-11-13 1994-05-27 Sogo Maintenance:Kk Road bridge
JP2000204517A (en) * 1999-01-11 2000-07-25 Omk:Kk Bridge drainage system
JP2002348926A (en) * 2001-05-22 2002-12-04 Sekisui Chem Co Ltd Drainage system
JP2013174099A (en) * 2012-02-27 2013-09-05 East Nippon Expressway Co Ltd Structure for protecting construction part in wall balustrade of floor slab waterproofing and method for constructing the same
KR101351895B1 (en) * 2013-09-11 2014-01-20 김원주 Concare surface drainage system of the bridge
JP2017002565A (en) * 2015-06-10 2017-01-05 西日本高速道路株式会社 Concrete slab structure and precast concrete slab
JP2017133185A (en) * 2016-01-26 2017-08-03 株式会社奥村組 Connecting structure for precast concrete wall member

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4862236A (en) * 1971-06-22 1973-08-30
JPS5336833U (en) * 1976-09-03 1978-03-31
JPH02109809U (en) * 1989-02-16 1990-09-03
JPH06146220A (en) * 1992-11-13 1994-05-27 Sogo Maintenance:Kk Road bridge
JP2000204517A (en) * 1999-01-11 2000-07-25 Omk:Kk Bridge drainage system
JP2002348926A (en) * 2001-05-22 2002-12-04 Sekisui Chem Co Ltd Drainage system
JP2013174099A (en) * 2012-02-27 2013-09-05 East Nippon Expressway Co Ltd Structure for protecting construction part in wall balustrade of floor slab waterproofing and method for constructing the same
KR101351895B1 (en) * 2013-09-11 2014-01-20 김원주 Concare surface drainage system of the bridge
JP2017002565A (en) * 2015-06-10 2017-01-05 西日本高速道路株式会社 Concrete slab structure and precast concrete slab
JP2017133185A (en) * 2016-01-26 2017-08-03 株式会社奥村組 Connecting structure for precast concrete wall member

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109811802A (en) * 2019-02-01 2019-05-28 中铁一局集团厦门建设工程有限公司 A composite waterproof structure of comprehensive pipe gallery under adverse geological conditions
JP7239356B2 (en) 2019-03-13 2023-03-14 株式会社ピーエス三菱 Concrete slab replacement method for highway bridges
JP2020147973A (en) * 2019-03-13 2020-09-17 株式会社ピーエス三菱 Road bridge concrete floor board replacement method
CN110080102A (en) * 2019-04-26 2019-08-02 中铁武汉勘察设计研究院有限公司 A Bridge Deck Drainage Structure for Bridges Over Railway
CN110042751A (en) * 2019-05-30 2019-07-23 福州大学 Asphalt mixture surfacing drainage arrangement and its construction method based on capillary principle
CN110042751B (en) * 2019-05-30 2024-02-06 福州大学 Asphalt pavement layer drainage device based on capillary principle and construction method thereof
CN110359366A (en) * 2019-07-02 2019-10-22 中国公路工程咨询集团有限公司 It is a kind of using the bridge drainage structure of pervious concrete and the calculation method of pervious concrete permeability rate
CN110905061A (en) * 2019-10-28 2020-03-24 安徽海螺建材设计研究院有限责任公司 A kind of initial rainwater and flushing water collection device and collection method on wharf face
CN114457739A (en) * 2022-03-02 2022-05-10 广州粤水建设有限公司 Accumulated water prevention and drainage treatment structure for road
CN114457739B (en) * 2022-03-02 2023-09-22 广州粤水建设有限公司 Ponding drainage treatment structure is prevented to road
CN115287967B (en) * 2022-07-11 2023-06-23 中电建路桥集团有限公司 Permanent pavement structure model
CN115287967A (en) * 2022-07-11 2022-11-04 中电建路桥集团有限公司 Permanent road surface structure model
CN116876337A (en) * 2023-08-25 2023-10-13 中国铁道科学研究院集团有限公司铁道建筑研究所 Railway bridge deck waterproof and drainage system and preparation and construction methods of prefabricated waterproof protection layer of railway bridge deck waterproof and drainage system
CN117513147A (en) * 2023-12-11 2024-02-06 中冶京诚工程技术有限公司 Bridge anti-collision structure and its construction method

Also Published As

Publication number Publication date
JP7017880B2 (en) 2022-02-09

Similar Documents

Publication Publication Date Title
JP7017880B2 (en) Waterproof drainage structure of road bridge
KR101355399B1 (en) Flexible jointing structure of road installation and constructing method thereof
JP2015224478A (en) Abutted-type expansion/contraction device for road bridge, and construction and repair methods therefor
KR100916973B1 (en) Construction method and structure of prestressed concrete pavement
KR101613784B1 (en) Integral abutment bridge construction method of old joint butment bridge
US20200256048A1 (en) Retaining Structure
KR101837093B1 (en) Construction structure for expansion joint of vehicle road
JP3168841U (en) Road bridge drainage equipment
KR100798654B1 (en) Expansion joint device with hybrid system and construction method thereof
JP5902468B2 (en) Construction method of buried joint structure, buried joint structure and buried joint construction bracket assembly
KR101122681B1 (en) Enlatged footbridge and bicycle road established in slope and breast wall, and constructing method of the same
KR101020414B1 (en) Extension joint structure for bridge
KR100898945B1 (en) Concrete arch bridge with channel and construction method
KR100847726B1 (en) Prestressed Concrete Pavement Structure and Construction Method
KR20110066465A (en) Side leak prevention device of construction structure using drainage trap
KR20090008070A (en) Superstructure of prefabricated bridge
JP6913328B1 (en) How to build a drainage gutter for a bridge deck
KR101036999B1 (en) Construction method of bridge construction using buried plate to avoid interference with rebar
US20220403641A1 (en) Method for using aerated autoclaved concrete in residential and commercial construction
JP4897551B2 (en) Pedestrian boundary drainage device
JP6652755B2 (en) Joint structure and joining method between road deck and PCa wall railing
KR100884780B1 (en) Prestressed Concrete Pavement Structure and Construction Method
KR101574701B1 (en) Rail type open channel for forest road and its constructing method
ITRM20110047A1 (en) EXHAUST DRAINAGE FOR METEORIC WATER EVACUATION SYSTEMS FROM WATERPROOFED COVERS.
JP6979642B2 (en) How to expand the capacity of drainage ditches

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200305

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210205

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210309

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20211102

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20211208

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220111

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220128

R150 Certificate of patent or registration of utility model

Ref document number: 7017880

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S631 Written request for registration of reclamation of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313631

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250