column
auxiliary
frame
existing
beam frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2016135861A
Other languages
Japanese (ja)
Other versions
JP7009724B2 (en
Inventor
毅 八木
Takeshi Yagi
毅 八木
圭二 井垣
Keiji Igaki
圭二 井垣
清 宮田
Kiyoshi Miyata
清 宮田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP2016135861A priority Critical patent/JP7009724B2/en
Publication of JP2018003559A publication Critical patent/JP2018003559A/en
Application granted granted Critical
Publication of JP7009724B2 publication Critical patent/JP7009724B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a column-beam frame repairing method that enables adjustment of a stress state of an existing beam, and a repaired column-beam frame.SOLUTION: A column-beam frame repairing method includes the steps of: removing an existing column (column 12) within an existing column-beam frame 10; constructing an auxiliary beam 24 within the column-beam frame 10; installing a jack member 32 between an undersurface of an existing beam (beam 14) of the column-beam frame 10 and the auxiliary beam 24; and jacking up the existing beam by the jack member 32.SELECTED DRAWING: Figure 3

Description

本発明は、柱梁架構改修方法及び改修柱梁架構に関する。   The present invention relates to a column beam frame repair method and a repaired column beam frame.

下記特許文献1には、柱梁架構の梁を支持する中間柱を撤去する際の、柱梁架構の補強方法が示されている。この補強方法では、中間柱は頂部を梁に残して撤去され、この頂部が添柱に支持された1対のアーチ部材で挟み込まれる。これにより、梁が受ける荷重を中間柱の頂部からアーチ部材を介して添柱に伝達し、梁の変形を抑制している。   Patent Literature 1 below discloses a method for reinforcing a column beam frame when removing an intermediate column that supports the beam of the column beam frame. In this reinforcing method, the intermediate column is removed leaving the top portion of the beam, and the top portion is sandwiched between a pair of arch members supported by the accessory column. As a result, the load received by the beam is transmitted from the top of the intermediate column to the accessory column via the arch member, thereby suppressing the deformation of the beam.

特開2010−37746号公報JP 2010-37746 A

しかし、梁が受ける荷重をアーチ部材で受けても、アーチ部材は梁の下部に載置されるだけなので梁の応力状態を調整することは難しく、梁の変形を抑制することは難しい。   However, even if the load received by the beam is received by the arch member, it is difficult to adjust the stress state of the beam because the arch member is only placed under the beam, and it is difficult to suppress the deformation of the beam.

また、鉛直方向の高さが小さい天井裏空間には、このようなアーチ部材を格納することが難しい。このため、天井裏空間を設けずにアーチ部材を露出させたり、天井裏空間の高さを大きく取る必要がある。すなわち、上記特許文献1の柱梁架構の補強方法では、梁の変形を抑制するための制約が大きい。   Moreover, it is difficult to store such an arch member in a ceiling space with a small vertical height. For this reason, it is necessary to expose the arch member without providing the ceiling space, or to increase the height of the ceiling space. In other words, the method for reinforcing a column beam structure in Patent Document 1 has a large restriction for suppressing the deformation of the beam.

本発明は上記事実を考慮して、既設梁の応力状態を調整できる柱梁架構改修方法及び改修柱梁架構を提供することを目的とする。   In view of the above facts, an object of the present invention is to provide a column beam frame repair method and a repaired column beam frame that can adjust the stress state of an existing beam.

請求項1の柱梁架構改修方法は、既設の柱梁架構内にある既設柱を撤去する工程と、前記柱梁架構内に補助梁を構築する工程と、前記柱梁架構の既設梁の下面と前記補助梁との間にジャッキ部材を設置する工程と、前記ジャッキ部材で前記既設梁をジャッキアップする工程と、を有する。   The method of repairing a column beam frame according to claim 1 includes a step of removing an existing column in an existing column beam frame, a step of constructing an auxiliary beam in the column beam frame, and a lower surface of the existing beam of the column beam frame And a step of installing a jack member between the auxiliary beam and a step of jacking up the existing beam with the jack member.

請求項1に記載の柱梁架構改修方法によると、補助梁を受け台として既設梁をジャッキ部材でジャッキアップできる。このため、既設柱を撤去しても、既設梁をジャッキアップすることにより既設梁の応力状態を調整し、撤去前の状態に戻すことができる。   According to the column beam frame repairing method of the first aspect, the existing beam can be jacked up with the jack member as the auxiliary beam receiving base. For this reason, even if the existing column is removed, the stress state of the existing beam can be adjusted by jacking up the existing beam, and the state before the removal can be restored.

請求項2の柱梁架構改修方法は、前記既設梁をジャッキアップした後、前記既設梁の下面と前記補助梁との間に荷重伝達部材を設置する工程を有する。   The column beam frame repair method according to claim 2 includes a step of installing a load transmission member between the lower surface of the existing beam and the auxiliary beam after jacking up the existing beam.

請求項2に記載の柱梁架構改修方法によると、ジャッキ部材が受ける荷重を、荷重伝達部材に盛りかえることができる。このため、ジャッキ部材を撤去して転用することができる。   According to the column beam frame renovation method of the second aspect, the load received by the jack member can be stored in the load transmission member. For this reason, a jack member can be removed and diverted.

請求項3の柱梁架構改修方法は、前記補助梁は、前記既設梁の側面に沿って2本延設され、前記ジャッキ部材は前記補助梁を繋ぐ繋ぎ梁に設置される。   In the column beam frame repair method according to a third aspect of the present invention, two auxiliary beams are extended along a side surface of the existing beam, and the jack member is installed on a connecting beam connecting the auxiliary beams.

請求項3に記載の柱梁架構改修方法によると、既設梁の側面に沿って補助梁が2本設置される。このため、補助梁が既設梁の下部に配置される場合と比較して、梁下空間を高くすることができる。また、補助梁1本あたりの部材寸法を小さくすることができる。   According to the column beam frame repairing method of the third aspect, two auxiliary beams are installed along the side surface of the existing beam. For this reason, compared with the case where an auxiliary beam is arrange | positioned under the existing beam, the space under a beam can be made high. Moreover, the member dimension per auxiliary beam can be reduced.

請求項4の改修柱梁架構は、既設の柱梁架構と、前記柱梁架構内に設けられた補助梁と、前記柱梁架構の既設梁の下面と前記補助梁との間に設けられ、前記既設梁を持ち上げた状態で固定された持上げ部材と、を有する。   The repaired column beam frame of claim 4 is provided between an existing column beam frame, an auxiliary beam provided in the column beam frame, a lower surface of the existing beam of the column beam frame, and the auxiliary beam, And a lifting member fixed in a state where the existing beam is lifted.

請求項4に記載の改修柱梁架構によると、補助梁を受け台として持上げ部材によって既設梁を持ち上げることができる。これにより、既設梁の応力状態を調整し、積載荷重の増加に伴う梁の変形や、柱を撤去した場合の梁の変形を抑制することができる。   According to the modified column beam frame of the fourth aspect, the existing beam can be lifted by the lifting member as a support beam. Thereby, the stress state of the existing beam can be adjusted, and the deformation of the beam accompanying an increase in the load load and the deformation of the beam when the column is removed can be suppressed.

本発明に係る柱梁架構改修方法及び改修柱梁架構によると、既設梁の応力状態を調整できる。   According to the column beam frame repair method and the modified column beam frame according to the present invention, the stress state of the existing beam can be adjusted.

(A)は本発明の第1実施形態に係る改修柱梁架構を示した平面図であり、(B)は(A)のB−B線断面図である。(A) is the top view which showed the repaired column beam frame concerning 1st Embodiment of this invention, (B) is the BB sectional drawing of (A). 本発明の第1実施形態に係る柱梁架構改修方法を示す立面図であり、(A)は梁下に支保工を設置した状態を示し、(B)は既設の柱を撤去した状態を示し、(C)は既設の柱の撤去部に跨る補助架構を設置した状態を示している。It is an elevation view which shows the column beam frame repair method which concerns on 1st Embodiment of this invention, (A) shows the state which installed the support under the beam, (B) shows the state which removed the existing column (C) has shown the state which installed the auxiliary frame over the removal part of the existing pillar. (A)は本発明の第1実施形態に係る柱梁架構改修方法において既設の梁と補助梁との間にジャッキ部材を設置した状態を示す立面拡大図であり、(B)は(A)のB−B線断面図である。(A) is an elevational view showing a state in which a jack member is installed between an existing beam and an auxiliary beam in the column beam frame repairing method according to the first embodiment of the present invention, and (B) is (A) It is a BB line sectional view of). (A)は本発明の第1実施形態に係る柱梁架構改修方法において既設の梁と補助梁との間にコンクリート部材を設置した状態を示す立面拡大図であり、(B)は(A)のB−B線断面図である。(A) is an elevational view showing a state in which a concrete member is installed between an existing beam and an auxiliary beam in the column beam frame repair method according to the first embodiment of the present invention, and (B) is (A) It is a BB line sectional view of). (A)は本発明の第1実施形態に係る柱梁架構改修方法及び改修柱梁架構において、既設の柱と補助柱にそれぞれスタッドボルトを接合し、既設の柱と補助柱との間にコンクリートを打設した状態を示す立面図であり、(B)は既設の柱と補助柱とをボルト接合した状態を示す立面図である。(A) is a method for repairing a column beam frame and a modified column beam frame according to the first embodiment of the present invention, in which stud bolts are respectively joined to an existing column and an auxiliary column, and concrete is provided between the existing column and the auxiliary column. FIG. 5B is an elevation view showing a state where the existing column and the auxiliary column are bolted together. (A)は本発明の第1実施形態に係る柱梁架構改修方法及び改修柱梁架構において、補助架構を十字に構成した例を示す平面図であり、(B)は既存の柱を撤去しないで補助架構を用いた例を示す平面図であり、(C)は補助柱を省略し補助梁だけを用いた例を示す立面図である。(A) is a top view which shows the example which comprised the auxiliary | assistant structure in the cross in the column beam structure repair method and repaired column beam structure which concern on 1st Embodiment of this invention, (B) does not remove the existing pillar. FIG. 6C is a plan view showing an example in which an auxiliary frame is used, and FIG. 8C is an elevational view showing an example in which auxiliary columns are omitted and only auxiliary beams are used. (A)は本発明の第2実施形態に係る改修柱梁架構を示した平面図であり、(B)は(A)のB−B線断面図である。(A) is the top view which showed the repaired column beam frame concerning 2nd Embodiment of this invention, (B) is the BB sectional drawing of (A). (A)は本発明の第2実施形態に係る柱梁架構改修方法において既設の梁と繋ぎ梁との間にジャッキ部材を載置した状態を示す平面拡大図であり、(B)は(A)のB−B線断面図である。(A) is the plane enlarged view which shows the state which mounted the jack member between the existing beam and the connecting beam in the column beam frame repair method which concerns on 2nd Embodiment of this invention, (B) is (A) It is a BB line sectional view of).

[第1実施形態]
(柱梁架構)
第1実施形態に係る柱梁架構改修方法が適用される柱梁架構10は、図1(A)、(B)に示すように、柱12と、柱12に架け渡された梁14とを備えている。なお、図1(B)は図1(A)に示されたB−B線断面図であり、図1(A)は図1(B)に示されたA−A線断面図である。
[First Embodiment]
(Column beam structure)
As shown in FIGS. 1A and 1B, a column beam frame 10 to which the column beam frame repair method according to the first embodiment is applied includes a column 12 and a beam 14 spanned over the column 12. I have. 1B is a cross-sectional view taken along line BB shown in FIG. 1A, and FIG. 1A is a cross-sectional view taken along line AA shown in FIG. 1B.

図1(A)、(B)は柱梁架構10の改修後の状態を示している。詳しくは後述するが、柱梁架構10は改修時に柱12が撤去され(撤去部12E)、改修後の状態(改修柱梁架構)においては補助柱22と補助梁24とを備えた補助架構20が、撤去部12Eに跨るようにして配置されている。さらに、撤去部12Eにおいて、梁14の下面と補助梁24の上面との間に、梁14が受ける荷重を補助架構20へ伝達する荷重伝達部材としてのコンクリートブロック34(図1(B)参照)が設けられている。なお、撤去部12Eは、撤去前に柱12が存在していた空間の部分全体を指す。   FIGS. 1A and 1B show a state after the column beam frame 10 has been repaired. As will be described in detail later, the column 12 is removed from the column beam frame 10 at the time of refurbishment (removal part 12E). However, it arrange | positions so that it may straddle the removal part 12E. Further, in the removal portion 12E, a concrete block 34 as a load transmission member that transmits the load received by the beam 14 to the auxiliary frame 20 between the lower surface of the beam 14 and the upper surface of the auxiliary beam 24 (see FIG. 1B). Is provided. In addition, the removal part 12E points out the whole part of the space where the pillar 12 existed before removal.

なお、図1(A)、(B)において柱12は一定間隔で配置されているが、本発明の実施形態はこれに限らず、間隔はバラバラでもよい。また、撤去部12Eは図1(A)、(B)に示されたような配置に限らず、例えば隣り合う柱12を撤去して複数スパンに亘って撤去部12Eを配置してもよい。さらに、補助架構20は、構成を分かり易くするために図1(A)のX方向及びY方向に沿って配置された状態が描かれているが、X方向、Y方向任意の方向に沿って配置することができる。   1A and 1B, the pillars 12 are arranged at regular intervals, but the embodiment of the present invention is not limited to this, and the intervals may vary. Moreover, the removal part 12E is not restricted to arrangement | positioning as shown to FIG. 1 (A) and (B), For example, the adjacent pillar 12 may be removed and the removal part 12E may be arrange | positioned over multiple spans. Further, the auxiliary frame 20 is drawn along the X direction and the Y direction in FIG. 1A for easy understanding of the configuration, but along the X direction and the Y direction in any direction. Can be arranged.

柱梁架構10は、地下階を備えた建物の最下階の架構とされ、柱梁架構10を支持する基礎梁16の上面16Aは、図示しない地下水位よりも低位置に形成されている。柱12を撤去した撤去部12Eは、上方から下方へ基礎梁16を強く押圧できないので、柱12が撤去されない部分と比較して、地下水から上向きに受ける水圧Pに抵抗する力が弱い。このため、撤去部12Eまたは撤去部12Eの周囲の基礎梁16から地中へ向かって、水圧Pに抵抗するための地中アンカー18が打込まれる。   The column beam frame 10 is a frame on the lowest floor of a building having an underground floor, and the upper surface 16A of the foundation beam 16 that supports the column beam frame 10 is formed at a lower position than a groundwater level (not shown). Since the removal part 12E which removed the pillar 12 cannot press the foundation beam 16 strongly from the upper part to the downward | lower direction, compared with the part where the pillar 12 is not removed, the force which resists the water pressure P received upward from groundwater is weak. For this reason, the underground anchor 18 for resisting the hydraulic pressure P is driven toward the ground from the removal part 12E or the foundation beam 16 around the removal part 12E.

なお、地下水位が基礎梁16の上面16Aよりも低い場合や、水圧Pが建物の構造上問題とならない場合は、地中アンカー18を設ける必要はない。また、柱梁架構改修方法が適用される柱梁架構10は、建物の最下階に限らず、任意の階とすることができる。   If the groundwater level is lower than the upper surface 16A of the foundation beam 16, or if the water pressure P does not pose a problem in the structure of the building, the underground anchor 18 need not be provided. Further, the column beam frame 10 to which the column beam frame repair method is applied is not limited to the lowest floor of the building, and may be an arbitrary floor.

(柱梁架構改修方法)
柱梁架構10において柱12を撤去する改修を行うためには、図2(A)に示すように、まず撤去対象となる柱12に支持されている梁14の下面14Aと基礎梁16の上面16Aとの間に仮設柱としての支保工90を設置して、梁14を支持する。
(Column beam frame repair method)
In order to perform the repair for removing the column 12 in the column beam frame 10, first, the lower surface 14A of the beam 14 supported by the column 12 to be removed and the upper surface of the foundation beam 16 are shown in FIG. A supporting work 90 as a temporary pillar is installed between 16A and the beam 14 is supported.

次に、図2(B)に示すように柱12を撤去する。このとき、後述するジャッキ部材32で梁14をジャッキアップしやすくするため、柱12は梁14の下面までの部分を平坦にはつり取ることが好ましい。   Next, the pillar 12 is removed as shown in FIG. At this time, in order to make it easy to jack up the beam 14 with a jack member 32 to be described later, it is preferable that the column 12 is flatly suspended up to the lower surface of the beam 14.

次に、図2(C)に示すように、支保工90を設置した梁14と直交する梁14に沿って、補助架構20を設置する。このとき補助架構20の補助柱22を、基礎梁16の上面16Aから立設し、柱梁架構10の柱12の側方に隙間を空けて配置する。補助柱22に支持される補助梁24は、柱梁架構10の梁14の下方に隙間を空けて延設される。これにより補助梁24は、図1(A)に示すように柱12を撤去した撤去部12Eに跨るようにして配置される。なお、補助柱22、補助梁24は何れもH形鋼で形成されているが、角型鋼管やCT形鋼、チャンネル材などを用いてもよい。   Next, as shown in FIG. 2C, the auxiliary frame 20 is installed along the beam 14 orthogonal to the beam 14 on which the support work 90 is installed. At this time, the auxiliary column 22 of the auxiliary frame 20 is erected from the upper surface 16 </ b> A of the foundation beam 16, and is arranged with a gap on the side of the column 12 of the column beam frame 10. The auxiliary beam 24 supported by the auxiliary column 22 is extended below the beam 14 of the column beam frame 10 with a gap. Thereby, the auxiliary beam 24 is arrange | positioned so that it may straddle the removal part 12E which removed the pillar 12 as shown to FIG. 1 (A). In addition, although the auxiliary column 22 and the auxiliary beam 24 are both formed of H-shaped steel, a square steel pipe, CT-shaped steel, a channel material, or the like may be used.

次に、図3(A)に示すように、撤去部12Eにおいて、梁14の下面14Aと補助梁24の上面24Aとの間に、ジャッキ部材32を設置する。図3(A)に示されたB−B線断面図である図3(B)に示すように、ジャッキ部材32は、撤去部12Eの中心部、即ち撤去された柱12(図2(A)参照)の軸方向の中心線CLが通る位置において、補助梁24に載置される。   Next, as shown in FIG. 3A, the jack member 32 is installed between the lower surface 14A of the beam 14 and the upper surface 24A of the auxiliary beam 24 in the removal portion 12E. As shown in FIG. 3B, which is a cross-sectional view taken along the line BB shown in FIG. 3A, the jack member 32 has a central portion of the removal portion 12E, that is, the removed column 12 (FIG. 2A). ))) At the position where the axial center line CL passes.

次に、ジャッキ部材32により梁14をジャッキアップして、支保工90(図2参照)が梁14から受ける荷重をジャッキ部材32へ盛り変え、支保工90を撤去する。ジャッキ部材32により梁14をジャッキアップすることで、梁14の応力状態は、柱12を撤去する前の応力状態となる。ジャッキ部材32が受ける荷重は、補助梁24を介して補助柱22へ伝達される。なお、ジャッキ部材32は、梁14をジャッキアップできるものであれば、ネジ式ジャッキ、油圧ジャッキ、エアージャッキなど、各種の構造の物を用いることができる。   Next, the beam 14 is jacked up by the jack member 32, the load received by the support 90 (see FIG. 2) from the beam 14 is changed to the jack member 32, and the support 90 is removed. When the beam 14 is jacked up by the jack member 32, the stress state of the beam 14 becomes the stress state before the column 12 is removed. The load received by the jack member 32 is transmitted to the auxiliary column 22 via the auxiliary beam 24. As the jack member 32, various structures such as a screw-type jack, a hydraulic jack, and an air jack can be used as long as the beam 14 can be jacked up.

次に、図4(A)、(B)に示すように、撤去部12Eにおいて、梁14の下面14Aと補助梁24の上面24Aとの間に、コンクリートブロック34を設置する。コンクリートブロック34は、予め所定のサイズに成形されたものを用いてもよいし、ジャッキ部材32によって梁14をジャッキアップした状態で、ジャッキ部材32の周囲に型枠を組み付け、梁14の下面14Aと補助梁24の上面24Aとの間にコンクリートを充填し硬化させることで形成してもよい。なお、コンクリートブロック34は、梁14が受ける荷重を補助架構20へ伝達するため、高強度コンクリートを用いることが望ましい。また、コンクリートブロック34に代えて、無収縮モルタル、鋼材などを用いることもできる。   Next, as shown in FIGS. 4A and 4B, the concrete block 34 is installed between the lower surface 14A of the beam 14 and the upper surface 24A of the auxiliary beam 24 in the removal portion 12E. The concrete block 34 may be formed in advance in a predetermined size, or in a state where the beam 14 is jacked up by the jack member 32, a formwork is assembled around the jack member 32, and the lower surface 14A of the beam 14 is assembled. It may be formed by filling concrete between the upper surface 24A of the auxiliary beam 24 and hardening it. The concrete block 34 is preferably made of high-strength concrete in order to transmit the load received by the beam 14 to the auxiliary frame 20. Further, in place of the concrete block 34, non-shrink mortar, steel material, or the like can be used.

次に、ジャッキ部材32をジャッキダウンして、ジャッキ部材32が梁14から受ける荷重をジャッキ部材32からコンクリートブロック34へ盛り変え、ジャッキ部材32を撤去する。以上の工程により、改修柱梁架構が形成される。   Next, the jack member 32 is jacked down, the load that the jack member 32 receives from the beam 14 is changed from the jack member 32 to the concrete block 34, and the jack member 32 is removed. The repaired column beam frame is formed by the above process.

(作用・効果)
第1実施形態に係る柱梁架構改修方法及び改修柱梁架構によると、補助梁24を受け台として、既設の梁14をジャッキ部材32でジャッキアップできる。このため、既設の柱12を撤去しても、梁14をジャッキアップすることにより、梁14の応力状態を調整して柱12の撤去前の状態に戻すことができる。
(Action / Effect)
According to the column beam frame repair method and the repaired column beam frame according to the first embodiment, the existing beam 14 can be jacked up by the jack member 32 using the auxiliary beam 24 as a pedestal. For this reason, even if the existing column 12 is removed, the stress state of the beam 14 can be adjusted and returned to the state before the column 12 is removed by jacking up the beam 14.

つまり、柱12を撤去した場合、撤去部12Eにおいて梁14は上階の荷重によって沈み込む(撓む)が、補助梁24に載置したジャッキ部材32で梁14をジャッキアップすることで、沈み込んだ分を押し戻すことができる。   That is, when the column 12 is removed, the beam 14 sinks (bends) due to the load on the upper floor in the removal portion 12E, but sinks by jacking up the beam 14 with the jack member 32 placed on the auxiliary beam 24. You can push back.

さらに、建物の改修時、用途変更などに伴い上階の積載荷重が従前よりも増える場合であっても、ジャッキアップにより梁14を押し戻す力を大きくすれば、積載荷重の増分に対応することができる。   Furthermore, even if the load capacity on the upper floor increases more than before due to a change in use, etc., when the building is renovated, if the force to push back the beam 14 is increased by jacking up, the load capacity can be increased. it can.

このため、既設の柱12を撤去しても、撤去された柱12に支持されていた梁14に与える構造的な負担を低減することができる。これにより、図1(A)に示すように、改修前よりも広い無柱空間Vを形成することができる。また、互いに隣接する柱12を撤去し、撤去した箇所ごとに補助架構20を設けることで、無柱空間Vを更に広くすることもできる。   For this reason, even if the existing pillar 12 is removed, the structural burden applied to the beam 14 supported by the removed pillar 12 can be reduced. Thereby, as shown to FIG. 1 (A), the columnless space V wider than before repair can be formed. Moreover, the pillar-free space V can be further widened by removing the pillars 12 adjacent to each other and providing the auxiliary frame 20 for each removed part.

また、本実施形態においては、ジャッキ部材32が梁14から受ける荷重をジャッキ部材32からコンクリートブロック34へ盛り変えることで、ジャッキ部材32を撤去できる。このため、ジャッキ部材32を任意の用途に転用することができる。   In the present embodiment, the jack member 32 can be removed by changing the load that the jack member 32 receives from the beam 14 from the jack member 32 to the concrete block 34. For this reason, the jack member 32 can be diverted to arbitrary uses.

なお、コンクリートブロック34は本発明における持ち上げ部材の一例であるが、持ち上げ部材の構成はこれに限らない。   In addition, although the concrete block 34 is an example of the lifting member in this invention, the structure of a lifting member is not restricted to this.

例えばジャッキ部材32は必ずしも撤去する必要はない。ジャッキ部材32を撤去しない場合、梁14から受ける荷重はジャッキ部材32を介して補助梁24に伝達できるので、コンクリートブロック34は設置しなくてもよい。コンクリートブロック34を設置しなければ、施工手間が減る。この場合、ジャッキ部材32が持ち上げ部材となる。   For example, the jack member 32 is not necessarily removed. When the jack member 32 is not removed, the load received from the beam 14 can be transmitted to the auxiliary beam 24 via the jack member 32, so that the concrete block 34 need not be installed. If the concrete block 34 is not installed, the construction labor is reduced. In this case, the jack member 32 is a lifting member.

あるいは、ジャッキ部材32の周囲にコンクリートを現場打ちし、このコンクリートにジャッキ部材32を埋設してもよい。ジャッキ部材32をコンクリートに埋設することで、ジャッキ部材32が破壊されてもコンクリートにより梁14を支えることができる。もしくは、コンクリートが破壊されてもジャッキ部材32により梁14を支えることができる。このため、梁14を支える機能を冗長化することができる。ジャッキ部材32及びコンクリートの双方が持ち上げ部材となる。   Alternatively, concrete may be cast on the periphery of the jack member 32 and the jack member 32 may be embedded in the concrete. By embedding the jack member 32 in the concrete, the beam 14 can be supported by the concrete even if the jack member 32 is broken. Alternatively, the beam 14 can be supported by the jack member 32 even when the concrete is destroyed. For this reason, the function which supports the beam 14 can be made redundant. Both the jack member 32 and the concrete serve as lifting members.

また、本実施形態においてジャッキ部材32は、柱12の撤去部12Eに設置される。柱12を撤去した際に、梁14の変形が最も大きくなる箇所は撤去部12Eであるが、この撤去部12Eにおいてジャッキ部材32を用いることで、梁14を効率的にジャッキアップすることができる。   Moreover, the jack member 32 is installed in the removal part 12E of the pillar 12 in this embodiment. When the column 12 is removed, the place where the deformation of the beam 14 becomes the largest is the removal portion 12E. By using the jack member 32 in the removal portion 12E, the beam 14 can be jacked up efficiently. .

なお、ジャッキ部材32は、撤去部12E以外の部分に設置することもできる。例えば図4(B)に二点鎖線で示したジャッキ部材32Aのように、撤去部12Eの周囲に複数設置してもよい。ジャッキ部材を複数設置すれば、ジャッキ部材1台あたりが負担する梁14からの荷重を小さくすることができる。このため、ジャッキ部材を小型化できる。また、ジャッキ部材32Aを撤去部12Eの周囲に設置し、撤去部12Eには設置しないことにより、撤去部12Eに設置するコンクリートブロック34を大きく形成することができる。このため、コンクリートブロック34が負担する単位体積当たりの荷重が低減されるので、コンクリートの強度を小さくすることができる。   In addition, the jack member 32 can also be installed in parts other than the removal part 12E. For example, a plurality of jack members 32A shown by a two-dot chain line in FIG. 4B may be installed around the removal portion 12E. If a plurality of jack members are installed, the load from the beam 14 borne by one jack member can be reduced. For this reason, a jack member can be reduced in size. Moreover, the concrete block 34 installed in the removal part 12E can be largely formed by installing the jack member 32A around the removal part 12E and not installing it in the removal part 12E. For this reason, since the load per unit volume which the concrete block 34 bears is reduced, the intensity | strength of concrete can be made small.

また、本実施形態において、補助架構20の補助柱22は柱梁架構10の柱12の側方に隙間を空けて配置されている。これにより、予め補助柱22と補助梁24とを組み合わせて門型の補助架構20を形成し、これを既存の柱梁架構10の内側へスライドさせることにより、容易に配置することができる。   In the present embodiment, the auxiliary pillars 22 of the auxiliary frame 20 are arranged with a gap on the side of the columns 12 of the column beam frame 10. Thereby, the auxiliary pillar 22 and the auxiliary beam 24 are combined in advance to form the gate-type auxiliary frame 20, and this can be easily arranged by sliding it inside the existing column beam frame 10.

なお、図5(A)に示すように、補助柱22と柱12との隙間にはコンクリートを充填してもよい。この場合、例えば補助柱22の柱12側の側面にスタッドボルト36を溶接し、柱12の補助柱22側の側面にもスタッドボルト36を埋め込むことで、コンクリートを介して、補助柱22に作用する軸力及び曲げ力を柱12へ伝達することができる。   As shown in FIG. 5A, the gap between the auxiliary column 22 and the column 12 may be filled with concrete. In this case, for example, the stud bolt 36 is welded to the side surface of the auxiliary column 22 on the column 12 side, and the stud bolt 36 is embedded also on the side surface of the column 12 on the auxiliary column 22 side, thereby acting on the auxiliary column 22 via concrete. The axial force and bending force to be transmitted can be transmitted to the column 12.

また、図5(B)に示すように、補助柱22を柱12へ近接させて、H形鋼で形成された補助柱22のフランジ22Fを、柱12の側面へボルト38を用いて固定してもよい。このような構成によっても、補助柱22に作用する軸力及び曲げ力を柱12へ伝達することができる。   Further, as shown in FIG. 5B, the auxiliary column 22 is brought close to the column 12 and the flange 22F of the auxiliary column 22 formed of H-shaped steel is fixed to the side surface of the column 12 with a bolt 38. May be. Even with such a configuration, the axial force and the bending force acting on the auxiliary column 22 can be transmitted to the column 12.

なお、図5(A)、(B)においてスタッドボルト36及びボルト38を柱12に固定するためには、例えば図示しない後施工アンカーを埋設すればよい。   In order to fix the stud bolt 36 and the bolt 38 to the pillar 12 in FIGS. 5A and 5B, for example, a post-construction anchor (not shown) may be embedded.

また、本実施形態において補助架構20は、補助柱22と補助梁24による門型の架構とされている。すなわち補助架構20は、既設の柱12及び梁14で形成される門型の柱梁架構10に沿う形状とされている。このため、例えば補助架構にアーチ部材などを用いる場合と比較して、補助架構を設置するための空間を少なくできる。したがって、改修後の建物に与えるプラン上の影響を小さくできる。   In the present embodiment, the auxiliary frame 20 is a gate-type frame made up of auxiliary columns 22 and auxiliary beams 24. That is, the auxiliary frame 20 has a shape along the gate-shaped column beam frame 10 formed by the existing columns 12 and beams 14. For this reason, compared with the case where an arch member etc. are used for an auxiliary frame, the space for installing an auxiliary frame can be decreased, for example. Therefore, the plan impact on the renovated building can be reduced.

なお、本実施形態においては撤去部12Eに門型の補助架構20を配置しているが、本発明の実施形態はこれに限らない。例えば図6(A)に示すように、撤去部12Eを中心として、X方向、Y方向の梁14それぞれに沿うような平面十字形状の補助架構26を配置してもよい。補助架構26においては、補助柱26Aが既存の柱12に沿って4本設置され、Y方向に隣接する補助柱26A間に補助梁26Bが架け渡され、X方向に隣接する補助柱26Aから補助梁26Bの中心部に、補助梁26Cが架け渡されている。   In the present embodiment, the gate-shaped auxiliary frame 20 is disposed in the removal portion 12E, but the embodiment of the present invention is not limited to this. For example, as shown in FIG. 6A, a planar cross-shaped auxiliary frame 26 may be disposed along the beam 14 in the X direction and the Y direction with the removal portion 12E as the center. In the auxiliary frame 26, four auxiliary columns 26A are installed along the existing columns 12, and auxiliary beams 26B are bridged between auxiliary columns 26A adjacent to each other in the Y direction, and are supplemented from auxiliary columns 26A adjacent to each other in the X direction. An auxiliary beam 26C is bridged over the center of the beam 26B.

これにより補助架構26は、梁14から受ける荷重を補助梁26B、26Cを介して4本の補助柱26Aへ伝達させることができる。したがって補助架構26は補助架構20(図1参照)と比べて、部材断面を小さくして、天井高を確保することができる。   Thereby, the auxiliary frame 26 can transmit the load received from the beam 14 to the four auxiliary columns 26A via the auxiliary beams 26B and 26C. Therefore, the auxiliary frame 26 can secure a ceiling height by reducing the member cross section compared to the auxiliary frame 20 (see FIG. 1).

また、本実施形態においては柱12を撤去して補助架構20を配置しているが、本発明の実施形態はこれに限らず、柱12を撤去しない場合でも、補助架構20を用いることができる。このように補助架構20を用いる場合としては、例えば図6(B)に示すように、隣接する柱12間のスパンが他の部分と比較して長い部分において、当該柱12間に架け渡された梁15の撓みを抑制する場合が挙げられる。このとき、例えば梁15の中央部をジャッキアップする。これにより、他の部分よりも柱のスパンが長い部分に他の部分よりも大きい積載荷重を与えても、構造耐力上問題が生じにくい。このため、建物を大きな面積が必要で大きな積載荷重が加わる用途(例えばプールなど)に改修することができる。   Further, in this embodiment, the column 12 is removed and the auxiliary frame 20 is arranged. However, the embodiment of the present invention is not limited to this, and the auxiliary frame 20 can be used even when the column 12 is not removed. . In the case where the auxiliary frame 20 is used in this way, for example, as shown in FIG. 6B, the span between the adjacent columns 12 is extended between the columns 12 in a portion where the span is longer than the other portions. The case where the bending of the beam 15 is suppressed is mentioned. At this time, for example, the central portion of the beam 15 is jacked up. As a result, even if a larger load is applied to a portion where the column span is longer than that of the other portion, a problem in structural strength hardly occurs. For this reason, a building can be renovated to an application (for example, a pool etc.) where a large area is required and a large load is applied.

また、本実施形態においては補助柱22及び補助梁24から形成された補助架構20を用いているが、本発明の実施形態はこれに限らない。例えば図6(C)に示したように、補助柱を省略し、端面を柱12の側面に固定した補助梁28を用いてもよい。すなわち、梁14をジャッキアップするジャッキ部材32の受け台として機能し、梁14を想定の応力範囲内でジャッキアップした際に破壊されるものでなければよい。補助梁28のように、補助柱を備えない機構とすることで、必要な部材を削減することができる。   Moreover, in this embodiment, although the auxiliary | assistant frame 20 formed from the auxiliary pillar 22 and the auxiliary beam 24 is used, embodiment of this invention is not restricted to this. For example, as shown in FIG. 6C, the auxiliary beam 28 in which the auxiliary column is omitted and the end surface is fixed to the side surface of the column 12 may be used. That is, it does not have to function as a cradle for the jack member 32 for jacking up the beam 14 and be destroyed when the beam 14 is jacked up within an assumed stress range. By using a mechanism such as the auxiliary beam 28 that does not include an auxiliary column, necessary members can be reduced.

なお、これらの図6(A)、(B)、(C)に示した各変形例は、同様の構成を以下に示す第2実施形態に係る柱梁架構改修方法及び改修柱梁架構においても適用することができる。   Each of the modified examples shown in FIGS. 6A, 6 </ b> B, and 6 </ b> C also has the same configuration in the column beam frame repair method and the repaired column beam frame according to the second embodiment shown below. Can be applied.

[第2実施形態]
(柱梁架構)
第2実施形態に係る柱梁架構改修方法及び改修柱梁架構では、図7(A)、(B)に示すように、補助柱42と補助梁44とを備えた補助架構40が、既設の梁14の側面に沿って2組延設されている。なお、図7(B)は図7(A)に示されたB−B線断面図であり、図7(A)は図7(B)に示されたA−A線断面図である。
[Second Embodiment]
(Column beam structure)
As shown in FIGS. 7A and 7B, in the column beam frame repair method and the repaired column beam frame according to the second embodiment, the auxiliary frame 40 including the auxiliary column 42 and the auxiliary beam 44 is provided. Two sets are extended along the side surface of the beam 14. 7B is a cross-sectional view taken along the line BB shown in FIG. 7A, and FIG. 7A is a cross-sectional view taken along the line AA shown in FIG. 7B.

第1実施形態における補助架構20は、柱12の撤去部12Eに跨って配置されていたが、第2実施形態における補助架構40は、撤去部12Eの両側に配置されており、平面位置が一致していない。   Although the auxiliary frame 20 in the first embodiment is disposed across the removal portion 12E of the pillar 12, the auxiliary frame 40 in the second embodiment is disposed on both sides of the removal portion 12E, and the planar position is the same. I have not done it.

図7(A)に示すように、補助柱42は既設の柱12の対向する2面に面して設置され、図7(B)に示すように、補助柱42の柱頭部には補助梁44を接合するためのブラケット42Aが溶接されている。なお、柱12における対向する2面とは、補助架構40の延設方向(図7(A)ではX方向)に沿った2面のことである。   As shown in FIG. 7A, the auxiliary pillars 42 are installed facing two opposing surfaces of the existing pillars 12, and as shown in FIG. A bracket 42A for joining 44 is welded. Note that the two opposing surfaces in the column 12 are two surfaces along the extending direction of the auxiliary frame 40 (X direction in FIG. 7A).

補助梁44は、図7(B)に示すように、両端部が補助柱42のブラケット42Aに接合され、中央部が凹状に変形した変形梁とされている。さらに詳述すると、補助梁44は、一端がブラケット42Aに接合され、梁14の側面に沿って延設された上段部44Aと、上段部44Aの他端に中間部材44Cを介して接合された下段部44Bと、を備えている。   As shown in FIG. 7B, the auxiliary beam 44 is a deformed beam whose both ends are joined to the bracket 42A of the auxiliary column 42 and whose center is deformed into a concave shape. More specifically, the auxiliary beam 44 has one end joined to the bracket 42A and joined to the upper step portion 44A extending along the side surface of the beam 14 and the other end of the upper step portion 44A via the intermediate member 44C. And a lower step portion 44B.

上段部44AはH形鋼で形成され、下フランジ44AHの下面が梁14の下面と高さを揃えて形成されている。また下段部44BもH形鋼で形成され、上フランジ44BHが梁14の下面よりも下方に形成されている。   The upper step portion 44A is formed of H-shaped steel, and the lower surface of the lower flange 44AH is formed so as to have the same height as the lower surface of the beam 14. The lower step portion 44B is also formed of H-shaped steel, and the upper flange 44BH is formed below the lower surface of the beam 14.

図8(A)、(B)に示すように、梁14を挟んで延設された2本の補助梁44は、撤去部12Eを跨ぐ繋ぎ梁50によって繋がれている。すなわち、下段部44B同士が、繋ぎ梁50によって繋がれている。なお、図8(B)は図8(A)に示されたB−B線断面図であり、図8(A)は図8(B)に示されたA−A線断面図である。   As shown in FIGS. 8A and 8B, the two auxiliary beams 44 extending across the beam 14 are connected by a connecting beam 50 straddling the removal portion 12E. That is, the lower step portions 44 </ b> B are connected by the connecting beam 50. 8B is a cross-sectional view taken along the line BB shown in FIG. 8A, and FIG. 8A is a cross-sectional view taken along the line AA shown in FIG. 8B.

さらに、撤去部12Eにおいて、梁14の下面と繋ぎ梁50の上面との間に、梁14が受ける荷重を繋ぎ梁50を介して補助架構40へ伝達する荷重伝達部材としてのコンクリートブロック34が設けられている。   Further, in the removal portion 12E, a concrete block 34 is provided between the lower surface of the beam 14 and the upper surface of the connecting beam 50 as a load transmission member that transmits the load received by the beam 14 to the auxiliary frame 40 via the connecting beam 50. It has been.

(柱梁架構改修方法)
第2実施形態に係る柱梁架構改修方法は、第1実施形態に係る柱梁架構改修方法と同様、まず図2(A)、(B)に示すように、梁14を支保工90で支持した上で、柱12を撤去する。その後、図7(A)、(B)に示すように補助架構40を梁14の両側面に沿って設置し、2組の補助架構40を繋ぎ梁50で繋ぐ。
(Column beam frame repair method)
The column beam frame repair method according to the second embodiment is similar to the column beam frame repair method according to the first embodiment. First, as shown in FIGS. After that, the pillar 12 is removed. Thereafter, as shown in FIGS. 7A and 7B, the auxiliary frame 40 is installed along both side surfaces of the beam 14, and the two sets of auxiliary frames 40 are connected by the beam 50.

その後、図8(A)、(B)に示すように、繋ぎ梁50の上面にジャッキ部材32を設置し、梁14をジャッキアップして、コンクリートブロック34を設置する。   Thereafter, as shown in FIGS. 8A and 8B, the jack member 32 is installed on the upper surface of the connecting beam 50, the beam 14 is jacked up, and the concrete block 34 is installed.

なお、上述したように第2実施形態においては、補助架構40は梁14の側面に沿って撤去部12Eの両側に配置され、撤去部12Eと平面位置が一致していない。このため、補助架構40は、柱12を撤去する前、あるいは支保工90を設置する前に設置することもできる。   As described above, in the second embodiment, the auxiliary frame 40 is disposed on both sides of the removal portion 12E along the side surface of the beam 14, and the removal portion 12E does not coincide with the planar position. For this reason, the auxiliary frame 40 can also be installed before the pillar 12 is removed or before the support 90 is installed.

(作用・効果)
第2実施形態に係る柱梁架構改修方法及び改修柱梁架構では、図7(B)に示すように、補助梁44の上段部44Aにおける下フランジ44AHの下面が、梁14の下面と高さを揃えて形成されている。このため、柱梁架構10に補助架構40を設置しても、梁下空間が低くなることを抑制できる。これにより、梁14の直下に設備配管92等が配置されている場合でも、この設備配管92と干渉することなく補助梁44を設置することができる。または、天井高が低くなることを抑制できる。
(Action / Effect)
In the column beam frame repair method and the repaired column beam frame according to the second embodiment, as shown in FIG. Are formed. For this reason, even if the auxiliary frame 40 is installed in the column beam frame 10, it is possible to suppress the space under the beam from being lowered. As a result, even when the equipment pipe 92 or the like is arranged directly below the beam 14, the auxiliary beam 44 can be installed without interfering with the equipment pipe 92. Or it can suppress that ceiling height becomes low.

また、第2実施形態に係る柱梁架構改修方法及び改修柱梁架構では、1箇所の撤去部12Eに対して補助梁44が2本設置され、さらに補助柱42が4本設置される。このため、補助梁44及び補助柱42それぞれの1本あたりの負担荷重を小さくして、部材寸法を小さくすることができる。このため、1部材当りの重量を小さくすることができるので、運搬効率、施工効率を高くすることができる。   Moreover, in the column beam frame repair method and the repaired column beam frame according to the second embodiment, two auxiliary beams 44 are installed for one removal portion 12E, and four auxiliary columns 42 are installed. For this reason, the burden load per each of the auxiliary beam 44 and the auxiliary column 42 can be reduced, and the member dimensions can be reduced. For this reason, since the weight per member can be made small, conveyance efficiency and construction efficiency can be made high.

また、第2実施形態に係る柱梁架構改修方法及び改修柱梁架構では、上述したように、補助架構40と撤去部12Eと平面位置が一致していない。このため、補助架構40を設置するタイミングを任意に決定することができる。したがって、施工計画の融通性が高い。   Moreover, in the column beam frame repair method and the repaired column beam frame according to the second embodiment, as described above, the auxiliary frame 40 and the removal portion 12E do not coincide with each other in a planar position. For this reason, the timing which installs the auxiliary frame 40 can be determined arbitrarily. Therefore, the flexibility of the construction plan is high.

以上説明したように、柱梁架構10の改修にあたっては、第1実施形態及び第2実施形態の柱梁架構改修方法及び改修柱梁架構の何れかを用いることができる。また、撤去部12Eが複数ある場合は、撤去部12E毎に、第1実施形態及び第2実施形態を適宜選択して用いることができる。さらに、これらの柱梁架構改修方法及び改修柱梁架構は、建物の新築時に柱梁架構10を補強するために用いることもできる。   As described above, in the repair of the column beam frame 10, any one of the column beam frame repair method and the modified column beam frame of the first embodiment and the second embodiment can be used. Moreover, when there are a plurality of removal parts 12E, the first embodiment and the second embodiment can be appropriately selected and used for each removal part 12E. Further, these column beam frame repair methods and the modified column beam frame can be used to reinforce the column beam frame 10 when a new building is constructed.

10 柱梁架構
12 柱(既設柱)
24、26B、28、44 補助梁
32 ジャッキ部材(持上げ部材)
34 コンクリートブロック(荷重伝達部材、持上げ部材)
50 繋ぎ梁
10 Column-beam frame 12 Column (existing column)
24, 26B, 28, 44 Auxiliary beam 32 Jack member (lifting member)
34 Concrete block (load transmission member, lifting member)
50 Connecting beams

Claims (4)

既設の柱梁架構内にある既設柱を撤去する工程と、
前記柱梁架構内に補助梁を構築する工程と、
前記柱梁架構の既設梁の下面と前記補助梁との間にジャッキ部材を設置する工程と、
前記ジャッキ部材で前記既設梁をジャッキアップする工程と、
を有する柱梁架構改修方法。
Removing the existing pillars in the existing pillar beam structure;
Building an auxiliary beam in the column beam frame;
Installing a jack member between the lower surface of the existing beam of the column beam frame and the auxiliary beam;
Jacking up the existing beam with the jack member;
Column beam frame repair method with
前記既設梁をジャッキアップした後、
前記既設梁の下面と前記補助梁との間に荷重伝達部材を設置する工程を有する請求項1に記載の柱梁架構改修方法。
After jacking up the existing beam,
The column beam frame repair method according to claim 1, further comprising a step of installing a load transmission member between a lower surface of the existing beam and the auxiliary beam.
前記補助梁は、前記既設梁の側面に沿って2本延設され、前記ジャッキ部材は前記補助梁を繋ぐ繋ぎ梁に設置される、請求項1又は請求項2に記載の柱梁架構改修方法。   3. The column beam frame repair method according to claim 1, wherein two of the auxiliary beams are extended along a side surface of the existing beam, and the jack member is installed on a connecting beam connecting the auxiliary beams. 4. . 既設の柱梁架構と、
前記柱梁架構内に設けられた補助梁と、
前記柱梁架構の既設梁の下面と前記補助梁との間に設けられ、前記既設梁を持ち上げた状態で固定された持上げ部材と、
を有する改修柱梁架構。
An existing column beam structure,
Auxiliary beams provided in the column beam frame,
A lifting member provided between the lower surface of the existing beam of the column beam frame and the auxiliary beam and fixed in a state where the existing beam is lifted;
Refurbished pillar beam frame.
JP2016135861A 2016-07-08 2016-07-08 Column-beam frame repair method and repair column-beam frame Active JP7009724B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016135861A JP7009724B2 (en) 2016-07-08 2016-07-08 Column-beam frame repair method and repair column-beam frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016135861A JP7009724B2 (en) 2016-07-08 2016-07-08 Column-beam frame repair method and repair column-beam frame

Publications (2)

Publication Number Publication Date
JP2018003559A true JP2018003559A (en) 2018-01-11
JP7009724B2 JP7009724B2 (en) 2022-01-26

Family

ID=60946018

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016135861A Active JP7009724B2 (en) 2016-07-08 2016-07-08 Column-beam frame repair method and repair column-beam frame

Country Status (1)

Country Link
JP (1) JP7009724B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111122040A (en) * 2019-12-30 2020-05-08 浙江瑞邦科特检测有限公司 Dynamic balance monitoring system in support column replacement
CN111395770A (en) * 2020-03-12 2020-07-10 中国一冶集团有限公司 Steel column installation error adjusting device and method
CN112878709A (en) * 2021-01-29 2021-06-01 中国五冶集团有限公司 Accurate and rapid fine adjustment device for large steel column installation and fine adjustment method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005188243A (en) * 2003-12-26 2005-07-14 Ohbayashi Corp Reinforcement structure of beam/slab in existing building
JP2006083515A (en) * 2004-09-14 2006-03-30 Takenaka Komuten Co Ltd Load temporary receiving method and load temporary receiving device
JP2015098751A (en) * 2013-11-20 2015-05-28 大和ハウス工業株式会社 Beam reinforcing method, auxiliary beam, and existing beam support

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005188243A (en) * 2003-12-26 2005-07-14 Ohbayashi Corp Reinforcement structure of beam/slab in existing building
JP2006083515A (en) * 2004-09-14 2006-03-30 Takenaka Komuten Co Ltd Load temporary receiving method and load temporary receiving device
JP2015098751A (en) * 2013-11-20 2015-05-28 大和ハウス工業株式会社 Beam reinforcing method, auxiliary beam, and existing beam support

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111122040A (en) * 2019-12-30 2020-05-08 浙江瑞邦科特检测有限公司 Dynamic balance monitoring system in support column replacement
CN111395770A (en) * 2020-03-12 2020-07-10 中国一冶集团有限公司 Steel column installation error adjusting device and method
CN111395770B (en) * 2020-03-12 2021-10-01 中国一冶集团有限公司 Steel column installation error adjusting device and method
CN112878709A (en) * 2021-01-29 2021-06-01 中国五冶集团有限公司 Accurate and rapid fine adjustment device for large steel column installation and fine adjustment method thereof
CN112878709B (en) * 2021-01-29 2022-08-19 中国五冶集团有限公司 Accurate and rapid fine adjustment device for large steel column installation and fine adjustment method thereof

Also Published As

Publication number Publication date
JP7009724B2 (en) 2022-01-26

Similar Documents

Publication Publication Date Title
JP6312459B2 (en) Truss beam construction method
CN103741832B (en) A kind of building truncated cylinder displacement shock isolating pedestal construction method and bracing or strutting arrangement
JP2018505981A (en) PC truss wall structure and construction method thereof
CN108005401A (en) A kind of support and change method of the column of existing frame structure base isolation reinforcement
KR100837608B1 (en) J.K Bracket Method
JP5503223B2 (en) Remodeling existing building
KR20200032316A (en) Method for Forming Top-down-typed Underground Strucutre using Trus-typed Support
JP5015049B2 (en) Pier extension method
JP2016196750A (en) Method for replacing base isolation device and base isolation structure
JP2017014853A (en) Method for replacing seismic isolator
JP2018003559A (en) Column-beam frame repairing method and repaired column-beam frame
KR200372315Y1 (en) Moving-fabricated supporting bracket structure of downward construction system
JP6441030B2 (en) How to add underground facilities
JP2020060000A (en) Body building method
JP2010255374A (en) Demolition method for skyscraper building
JP2016205051A (en) Construction method for structure
KR101130166B1 (en) Apparatus and method for replacing bearings of box girder bridge
JP6320242B2 (en) How to install temporary pillars
JP6529241B2 (en) Building foundation structure and construction method of building foundation structure
JP6655936B2 (en) Construction method of structure
JP6562544B2 (en) Cylindrical caisson scaffolding
KR101258330B1 (en) Temporary supporting system of steel beam and construstion method thereof
KR101586376B1 (en) Structure lifting method using steel pipe member with lifting jack
JP4658005B2 (en) Seismic isolation method for existing buildings
JP5123967B2 (en) Seismic isolation method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190625

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200518

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200630

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200730

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210105

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210208

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210803

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210927

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20211214

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20211224

R150 Certificate of patent or registration of utility model

Ref document number: 7009724

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150