JP2017203303A - Construction method of composite foundation structure - Google Patents

Construction method of composite foundation structure Download PDF

Info

Publication number
JP2017203303A
JP2017203303A JP2016095981A JP2016095981A JP2017203303A JP 2017203303 A JP2017203303 A JP 2017203303A JP 2016095981 A JP2016095981 A JP 2016095981A JP 2016095981 A JP2016095981 A JP 2016095981A JP 2017203303 A JP2017203303 A JP 2017203303A
Authority
JP
Japan
Prior art keywords
footing
foundation
steel
constructing
surface side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2016095981A
Other languages
Japanese (ja)
Other versions
JP6774781B2 (en
Inventor
裕一 冨岡
Yuichi Tomioka
裕一 冨岡
健一 水谷
Kenichi Mizutani
健一 水谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP2016095981A priority Critical patent/JP6774781B2/en
Publication of JP2017203303A publication Critical patent/JP2017203303A/en
Application granted granted Critical
Publication of JP6774781B2 publication Critical patent/JP6774781B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a construction method of a composite foundation structure capable of constructing base concrete footing without waiting for erection construction of a steel frame foundation part, and capable of also safely and rationally executing construction after foundation construction without waiting for completion of the base concrete footing.SOLUTION: A construction method of a composite foundation structure having base concrete footing 2 and a steel frame foundation part 3 fixed to the upper surface side of the base concrete footing 2, comprises a first step of constructing a first footing part 7 for supporting a vertical load of the steel frame foundation part 3 among the base concrete footing 2, a second step of constructing the steel frame foundation part 3 by supporting the vertical load by the first footing part 7 and a third step of constructing the base concrete footing 2 in a state of fixing the steel frame foundation part 3 to the upper surface side by constructing a second footing part 8 except for the first footing part 7 in the base concrete footing 2.SELECTED DRAWING: Figure 2

Description

本発明は、基礎コンクリートフーチングと、当該基礎コンクリートフーチングの上面側に定着される鉄骨基礎部分とを備えた複合基礎構造の構築方法に関する。   The present invention relates to a method for constructing a composite foundation structure including a foundation concrete footing and a steel foundation portion fixed on the upper surface side of the foundation concrete footing.

このような複合基礎構造では、基礎コンクリートフーチングの上面側に定着される所謂基礎立ち上がり部や基礎梁が、鉄骨で構成された鉄骨基礎部分であるため、基礎立ち上がり部や基礎梁までをコンクリートで構成する構造に比べて、工期の削減や労務数の削減を図ることができる。
そして、このような複合基礎構造の構築方法として、従来、布基礎コンクリートフーチングのコンクリートの打設前に、鉄骨基礎部分を地盤面から浮かせた所定位置に配置し、その状態で鉄骨基礎部分の下方側に突設したスタッドなどの定着材を埋め込む状態でコンクリートを打設して、鉄骨基礎部分を定着させる状態で布基礎コンクリートフーチングを構築する方法が知られている(例えば、特許文献1参照)。
In such a composite foundation structure, so-called foundation rising parts and foundation beams fixed on the upper surface side of the foundation concrete footing are steel foundation parts made of steel, so the foundation rising parts and foundation beams are made of concrete. Compared to the structure, the construction period can be reduced and the number of labor can be reduced.
And, as a method of constructing such a composite foundation structure, conventionally, before placing the concrete of the fabric foundation concrete footing, the steel foundation portion is placed at a predetermined position floating from the ground surface, and in that state, below the steel foundation portion. A method is known in which concrete is cast in a state where a fixing material such as a stud protruding from the side is embedded, and a fabric foundation concrete footing is constructed in a state in which the steel foundation portion is fixed (see, for example, Patent Document 1). .

特開2001−146752号公報(特に図1〜図3参照)Japanese Patent Laid-Open No. 2001-146752 (see FIGS. 1 to 3 in particular)

しかしながら、上記特許文献に記載の構築方法では、例えば、鉄骨の納入が遅れるなどの事情で鉄骨基礎部分の建方工事の開始が遅れると、その鉄骨基礎部分の建方工事の後工程となる布基礎コンクリートフーチングの構築も遅れることになり、その結果、全体工期の遅れは勿論、基礎工事以後の工事の施工に種々の制約をもたらすという問題がある。   However, in the construction method described in the above-mentioned patent document, for example, if the start of the construction work of the steel foundation part is delayed due to a delay in the delivery of the steel frame, for example, a cloth that is a subsequent process of the construction work of the steel foundation part The construction of the foundation concrete footing is also delayed, and as a result, there is a problem that various restrictions are imposed on the construction work after the foundation work as well as the overall construction period.

本発明は、このような従来の問題点に着目したもので、その目的は、鉄骨基礎部分の建方工事を待たずに基礎コンクリートフーチングの構築を可能とし、しかも、基礎コンクリートフーチングの完成を待たずに基礎工事以後の工事を安全かつ合理的に行うことのできる複合基礎構造の構築方法を提供することにある。   The present invention pays attention to such a conventional problem, and its purpose is to enable the construction of a foundation concrete footing without waiting for the construction work of the steel foundation and to wait for the foundation concrete footing to be completed. It is to provide a construction method of a composite foundation structure that can safely and rationally perform the construction after foundation construction.

本発明の第1特徴構成は、基礎コンクリートフーチングと、当該基礎コンクリートフーチングの上面側に定着される鉄骨基礎部分とを備えた複合基礎構造の構築方法であって、
前記基礎コンクリートフーチングのうちの前記鉄骨基礎部分の鉛直荷重を支持する第1フーチング部位を構築する第1ステップと、
当該第1ステップで構築した前記第1フーチング部位に鉛直荷重を支持させる状態で前記鉄骨基礎部分を構築する第2ステップと、
当該第2ステップの実施後、前記基礎コンクリートフーチングにおける前記第1フーチング部位以外の第2フーチング部位を構築して前記鉄骨基礎部分を上面側に定着させる状態で前記基礎コンクリートフーチングを構築する第3ステップを備えている点にある。
A first characteristic configuration of the present invention is a method for constructing a composite foundation structure including a foundation concrete footing and a steel foundation portion fixed on the upper surface side of the foundation concrete footing,
A first step of constructing a first footing portion that supports a vertical load of the steel foundation portion of the foundation concrete footing;
A second step of constructing the steel foundation in a state in which a vertical load is supported on the first footing region constructed in the first step;
After execution of the second step, a third step of constructing the foundation concrete footing in a state where a second footing part other than the first footing part in the foundation concrete footing is constructed and the steel foundation part is fixed on the upper surface side. It is in the point equipped with.

上記構成によれば、第1ステップにおいて、基礎コンクリートフーチングのうちの鉄骨基礎部分の鉛直荷重を支持する第1フーチング部位を構築するので、たとえ鉄骨の納入が遅れたとしても、鉄骨の納入に先立って第1フーチング部位の構築が可能となる。そして、第2ステップにおいて、その第1フーチング部位に鉛直荷重を支持させる状態で鉄骨基礎部分を構築するので、基礎コンクリートフーチングの一部である第1フーチング部位を構築するだけで、つまり、基礎コンクリートフーチングの完成を待たずに鉄骨基礎部分を所定の位置に構築して支持することができる。
その後、第3ステップにおいて、第1フーチング部位以外の第2フーチング部位を構築して鉄骨基礎部分を上面側に定着させる状態で基礎コンクリートフーチングを構築するのであるが、第2ステップの施工により鉄骨基礎部分を所定の位置に支持することができるので、第3ステップを待たずに、あるいは、第3ステップと並行して、例えば、鉄骨基礎部分の上に建物の柱を構築するなどの基礎工事以後の工事を施工することができ、施工手順の自由度が大幅に改善される。
According to the above configuration, in the first step, the first footing part that supports the vertical load of the steel foundation part of the foundation concrete footing is constructed. Therefore, even if the delivery of the steel frame is delayed, the delivery of the steel frame is preceded. Thus, the first footing part can be constructed. And in the 2nd step, since a steel foundation part is built in the state where a vertical load is supported by the 1st footing part, only the 1st footing part which is a part of foundation concrete footing is constructed, that is, foundation concrete. The steel foundation can be constructed and supported at a predetermined position without waiting for the footing to be completed.
After that, in the third step, the second concrete footing part other than the first footing part is constructed, and the foundation concrete footing is constructed with the steel foundation part fixed on the upper surface side. Since the part can be supported at a predetermined position, without waiting for the third step, or in parallel with the third step, for example, after the foundation work such as building the pillar of the building on the steel foundation part The degree of freedom of the construction procedure is greatly improved.

その場合、例えば、ジャッキや支持部材などからなる仮設の支持構造を構築し、その仮設の支持構造により鉄骨基礎部分を所定の位置に支持し、その状態で基礎工事以後の工事を施工することも考えられる。しかしながら、仮設の支持構造はいずれ撤去する必要があるため、あまり大掛かりな構造にすることもできず安全性の確保が難しい。
その点、本発明によれば、基礎コンクリートフーチングのうちの鉄骨基礎部分の鉛直荷重を支持する第1フーチング部位、つまり、基礎コンクリートフーチングの一部により鉄骨基礎部分を支持するので、非常に合理的であり、しかも、鉄骨基礎部分の鉛直荷重を支持する第1フーチング部位による支持であるから、鉄骨基礎部分の支持も確実で基礎工事以後の工事を安全に行うことができる。
In that case, for example, a temporary support structure composed of a jack, a support member, etc. is constructed, and the steel foundation portion is supported at a predetermined position by the temporary support structure, and the construction after the foundation work can be performed in that state. Conceivable. However, since it is necessary to remove the temporary support structure, it is not possible to make the structure too large and it is difficult to ensure safety.
In that respect, according to the present invention, the first foundation part that supports the vertical load of the steel foundation part of the foundation concrete footing, that is, the steel foundation part is supported by a part of the foundation concrete footing. In addition, since the support is provided by the first footing portion that supports the vertical load of the steel foundation portion, the support of the steel foundation portion is also reliable and the construction after the foundation construction can be performed safely.

本発明の第2特徴構成は、前記第1フーチング部位が、柱の直下に位置する柱直下部分を有する点にある。   The second characteristic configuration of the present invention is that the first footing portion has a portion directly below the column located immediately below the column.

上記構成によれば、鉄骨基礎部分の鉛直荷重を支持する第1フーチング部位が、柱の直下に位置する柱直下部分を有するので、第1フーチング部位による鉄骨基礎部分の支持がより確実となって安全性が向上し、特に、第3ステップを待たずに、あるいは、第3ステップと並行して、鉄骨基礎部分の上に柱を構築する場合に有効となる。   According to the said structure, since the 1st footing site | part which supports the vertical load of a steel-frame foundation part has a part directly under a pillar located directly under a pillar, the support of a steel foundation part by a 1st footing site | part becomes more reliable. Safety is improved, and it is particularly effective when a column is constructed on the steel foundation portion without waiting for the third step or in parallel with the third step.

本発明の第3特徴構成は、前記基礎コンクリートフーチングが、独立基礎コンクリートフーチングであり、
前記第1フーチング部位が、前記柱直下部分を含む下面側部位とその下面側部位の中央に位置する上面側中央部位を有して、縦断側面視において凸形状に設定され、
前記第2フーチング部位が、前記下面側部位の上方部で前記上面側中央部位の外周部に設定されている点にある。
In the third characteristic configuration of the present invention, the foundation concrete footing is an independent foundation concrete footing,
The first footing portion has a lower surface side portion including the portion directly below the pillar and an upper surface side central portion located at the center of the lower surface side portion, and is set to a convex shape in a longitudinal side view,
The second footing portion is set at an outer peripheral portion of the upper surface side central portion above the lower surface side portion.

上記構成によれば、基礎コンクリートフーチングが、独立基礎コンクリートフーチングであって、その独立基礎コンクリートフーチングの第1フーチング部位が、柱直下部分を含む下面側部位とその下面側部位の中央に位置する上面側中央部位を有し、縦断側面視で凸形状に設定されているので、その柱直下部分を含む凸形状の第1フーチング部位によって鉄骨基礎部分の鉛直荷重を確実に支持することができる。
そして、第2フーチング部位が、第1フーチング部位における下面側部位の上方部で上面側中央部位の外周部に設定されているので、第2フーチング部位の施工によって、第1フーチング部位により支持される鉄骨基礎部分を独立基礎コンクリートフーチングに確実に定着させることができる。
According to the said structure, a foundation concrete footing is an independent foundation concrete footing, Comprising: The 1st footing site | part of the independent foundation concrete footing is located in the center of the lower surface side part including a part directly under a pillar, and the lower surface side part. Since it has a side center part and is set in a convex shape in a longitudinal side view, the vertical load of the steel foundation part can be reliably supported by the convex first footing part including the part directly below the column.
And since the 2nd footing site | part is set to the outer peripheral part of the upper surface side center site | part above the lower surface side site | part in a 1st footing site | part, it is supported by the 1st footing site | part by construction of a 2nd footing site | part. The steel foundation can be firmly fixed to the independent foundation concrete footing.

本発明の第4特徴構成は、前記第1ステップにおいて、工事用アンカーボルトを保持するアンカーフレームを付設した埋設型枠を使用し、当該埋設型枠を埋設し、かつ、前記工事用アンカーボルトを突出させる状態で前記第1フーチング部位を構築する点にある。   According to a fourth characteristic configuration of the present invention, in the first step, an embedded mold having an anchor frame for holding a construction anchor bolt is used, the embedded mold is embedded, and the construction anchor bolt is The point is that the first footing part is constructed in a protruding state.

上記特徴構成によれば、第1ステップにおいて、工事用アンカーボルトを保持するアンカーフレームを付設した埋設型枠を使用し、当該埋設型枠を埋設し、かつ、工事用アンカーボルトを突出させる状態で第1フーチング部位を構築するので、第1フーチング部位の施工が容易で、かつ、工事用アンカーボルトの使用によって第1フーチング部位による鉄骨基礎部分の支持がより一層確実となり、基礎工事以後の工事を更に安全に行うことができる。   According to the above characteristic configuration, in the first step, in the state where the embedded formwork provided with the anchor frame holding the construction anchor bolt is used, the embedded formwork is embedded, and the construction anchor bolt protrudes. Since the first footing part is constructed, the construction of the first footing part is easy, and the use of the anchor bolts for construction makes the support of the steel foundation part by the first footing part even more reliable, and the construction after the foundation work can be carried out. Furthermore, it can be performed safely.

複合基礎構造を示す斜視図Perspective view showing composite foundation structure 複合基礎構造の構築方法を示す一部縦断正面図Partial longitudinal front view showing how to construct a composite foundation 複合基礎構造の構築に使用する埋設型枠の斜視図Perspective view of embedded formwork used for construction of composite foundation structure

本発明による複合基礎構造の構築方法の実施形態を図面に基づいて説明する。
本発明に係る複合基礎構造は、例えば、図1に示すように、地盤面1の上に設置される複数の鉄筋コンクリート製の独立基礎コンクリートフーチング2と、それら複数の独立基礎コンクリートフーチング2の上面に定着される鉄骨製の鉄骨基礎部分3などを備えて構成される。
鉄骨基礎部分3は、各独立基礎コンクリートフーチング2の上面に定着されて建物の柱15(図2(b)、(c)の仮想線参照)を支持する柱下鉄骨部位4と、その柱下鉄骨部位4どうしの間に亘らせて連結する鉄骨基礎梁5、更には、必要に応じて鉄骨基礎梁5どうしを連結する小梁(図示せず)などで構成される。各柱下鉄骨部位4の下側部分には、鉄骨基礎梁5を連結するための複数の連結用鉄骨部位4aが横側方へ突出する状態で連設され、各連結用鉄骨部位4aの下面からは、先端に頭部を有する多数のスタッドSがそれぞれ下方へ向けて突設されている。
An embodiment of a method for constructing a composite foundation structure according to the present invention will be described with reference to the drawings.
For example, as shown in FIG. 1, the composite foundation structure according to the present invention has a plurality of independent foundation concrete footings 2 made of reinforced concrete installed on the ground surface 1, and upper surfaces of the plurality of independent foundation concrete footings 2. It is provided with a steel base portion 3 made of steel frame to be fixed.
The steel foundation part 3 is fixed to the upper surface of each independent foundation concrete footing 2 and supports the pillar 15 of the building (see the phantom lines in FIGS. 2B and 2C), and the under-frame steel part 4 and the bottom of the pillar The steel foundation beam 5 is connected between the steel parts 4, and further, a small beam (not shown) for connecting the steel foundation beams 5 as necessary. A plurality of connecting steel parts 4a for connecting the steel foundation beam 5 are connected to the lower part of each lower steel part 4 in a state of projecting laterally, and the lower surface of each connecting steel part 4a. From the top, a large number of studs S each having a head at the tip are projected downward.

各独立基礎コンクリートフーチング2は、図2(a)、(b)に示すように、建物の柱15の直下に位置する柱直下部分6を有し、図2(c)に示すように、主として鉄骨基礎部分3の鉛直荷重を支持する第1フーチング部位7と、その第1フーチング部位7以外の部位で主として鉄骨基礎部分3を上面側に定着させるための第2フーチング部位8を有する。
第1フーチング部位7は、図2(a)に示すように、柱直下部分6を含む状態で平面視でほぼ正方形に形成された下面側部位7bと、柱直下部分6を含む状態で下面側部位7bの中央に位置する平面視でほぼ正方形の上面側中央部位7aとを一体的に有し、縦断側面視において凸形状に設定されている。
As shown in FIGS. 2 (a) and 2 (b), each independent foundation concrete footing 2 has a portion 6 directly below the pillar 15 of the building, and mainly as shown in FIG. 2 (c). It has the 1st footing site | part 7 which supports the vertical load of the steel frame basic | foundation part 3, and the 2nd footing site | part 8 for fixing the steel frame basic | foundation part 3 mainly on the upper surface side in sites other than the 1st footing site | part 7. FIG.
As shown in FIG. 2A, the first footing portion 7 includes a lower surface side portion 7 b formed in a substantially square shape in a plan view including the portion directly under the column 6, and a lower surface side including the portion directly below the column 6. It has a substantially square upper surface side central part 7a in plan view located in the center of the part 7b, and is set to a convex shape in a longitudinal side view.

この第1フーチング部位7には、図3に示すように、例えば、アングル状の型鋼などからなる枠部材9aと補強部材9bによりほぼ直方体形状に枠組みされた埋設型枠9が埋設されている。埋設型枠9の上端部には、上端に位置する枠部材9a間に亘る状態で型鋼または平板鋼のアンカーフレーム10が付設され、そのアンカーフレーム10を上下方向に貫通する状態で複数の工事用アンカーボルト11がナットなどで固着保持されている。
そして、埋設型枠9の上方周囲には、コンクリートの流出を抑制するため、ラスやエキスパンドメタルなどからなる金属製の網状体12が張設され、このような構成の埋設型枠9が、図2(a)に示すように、工事用アンカーボルト11を第1フーチング部位7の上面側中央部位7aから上方へ突出させた状態で、第1フーチング部位7の上面側中央部位7aの外周部から下面側部位7bの内部に亘って埋設されている。
As shown in FIG. 3, the first footing portion 7 is embedded with an embedded form 9 that is framed in a substantially rectangular parallelepiped shape by a frame member 9a made of, for example, an angle-shaped steel and a reinforcing member 9b. An anchor frame 10 made of mold steel or flat steel is attached to the upper end of the embedded mold 9 in a state extending between the frame members 9a located at the upper end, and is used for a plurality of constructions in a state of penetrating the anchor frame 10 in the vertical direction. The anchor bolt 11 is fixedly held by a nut or the like.
A metallic net 12 made of lath or expanded metal is stretched around the upper part of the embedded form 9 in order to suppress the outflow of concrete, and the embedded form 9 having such a configuration is illustrated in FIG. 2 (a), with the construction anchor bolt 11 projecting upward from the upper surface side central portion 7a of the first footing portion 7, from the outer peripheral portion of the upper surface side central portion 7a of the first footing portion 7. It is embed | buried over the inside of the lower surface side site | part 7b.

つぎに、この複合基礎構造の構築方法について説明する。
図2(a)を参照して、まず、複合基礎構造の施工地盤部分を掘削し、地盤改良後に捨てコンクリートを打設して地盤面1を構築し、墨出し後に所定の位置に埋設型枠9を配置し、適宜手段により地盤面1に固定する。
その後、図示はしないが、各埋設型枠9の内部および下方側の周囲に鉄筋を配筋し、かつ、コンクリート用の型枠を配設して、その型枠内と埋設型枠9内にコンクリートを打設する。そして、図2(a)に示すように、埋設型枠9を埋設した状態で、上面側中央部位7aと下面側部位7bを一体的に備えた第1フーチング部位7を構築する。
このように、構築方法の第1ステップでは、独立基礎コンクリートフーチング2のうちの鉄骨基礎部分3の鉛直荷重を支持し、かつ、柱15の直下に位置する柱直下部分6を有する第1フーチング部位7を構築する。
Next, a method for constructing this composite foundation structure will be described.
Referring to FIG. 2 (a), first, the construction ground part of the composite foundation structure is excavated, the ground surface 1 is constructed by placing abandoned concrete after the ground improvement, and the formwork buried in a predetermined position after inking 9 is disposed and fixed to the ground surface 1 by appropriate means.
After that, although not shown in the drawing, reinforcing bars are arranged inside and around each embedded form 9, and concrete molds are arranged in the form and embedded form 9. Place concrete. Then, as shown in FIG. 2 (a), the first footing part 7 having the upper surface side central part 7a and the lower surface side part 7b integrally is constructed in the state where the embedded mold 9 is embedded.
As described above, in the first step of the construction method, the first footing portion that supports the vertical load of the steel foundation portion 3 of the independent foundation concrete footing 2 and has the portion 6 directly below the column 15 that is located directly below the column 15. Build 7.

第1ステップ終了後の第2ステップでは、図2(b)に示すように、第1フーチング部位7の上面側中央部位7aの上に柱下鉄骨部位4を配置し、工事用アンカーボルト11を使用して固定する。そして、複数の柱下鉄骨部位4を構築した後、柱下鉄骨部位4の間に鉄骨基礎梁5を亘らせ、例えば、連結用鉄板13とボルト・ナット14を使用して柱下鉄骨部位4の連結用鉄骨部位4aと鉄骨基礎梁5の端部とを互いに連結固定する。
つまり、第2ステップでは、第1ステップで構築した第1フーチング部位7に鉛直荷重を支持させる状態で柱下鉄骨部位4と鉄骨基礎梁5からなる鉄骨基礎部分3を構築する。
In the second step after the completion of the first step, as shown in FIG. 2 (b), the columnar steel frame part 4 is arranged on the upper surface side central part 7a of the first footing part 7, and the construction anchor bolt 11 is attached. Use and fix. Then, after constructing a plurality of under-column steel parts 4, the steel foundation beam 5 is passed between the under-column steel parts 4, for example, using a connecting steel plate 13 and bolts / nuts 14, The connecting steel part 4 a for connection 4 and the end of the steel foundation beam 5 are connected and fixed to each other.
In other words, in the second step, the steel foundation portion 3 including the columnar steel portion 4 and the steel foundation beam 5 is constructed in a state where the first footing portion 7 constructed in the first step supports the vertical load.

この鉄骨基礎梁5の連結に際しては、図1を参照して、梁長さ方向が直交する複数の鉄骨基礎梁5にて4個の柱下鉄骨部位4を連結し、鉄骨基礎部分3が平面視で矩形になるようにしながら順次連結するのが好ましい。
すなわち、鉄骨基礎部分3が平面視で矩形になるように連結することにより鉄骨基礎部分3が強固な構造となって姿勢も安定する。したがって、後述する第3ステップを実行する前に、図2(b)において仮想線で示すように、鉄骨基礎部分3を構成する柱下鉄骨部位4の上方に建物の柱15を構築する際の安全性が向上する。
When connecting the steel foundation beams 5, referring to FIG. 1, the four steel pillar portions 4 are connected by a plurality of steel foundation beams 5 whose beam length directions are orthogonal to each other, and the steel foundation portion 3 is planar. It is preferable to sequentially connect them while making them rectangular as viewed.
That is, by connecting the steel foundation portion 3 so as to be rectangular in plan view, the steel foundation portion 3 becomes a strong structure and the posture is stabilized. Therefore, before executing the third step to be described later, as shown by the phantom line in FIG. 2B, when building the pillar 15 of the building above the pillar steel part 4 constituting the steel foundation part 3 Safety is improved.

第2ステップ終了後の第3ステップでは、図示はしないが、各第1フーチング部位7の上面側中央部位7aの周囲に鉄筋を配筋するとともに、コンクリート用の型枠を配設してコンクリートを打設する。つまり、各連結用鉄骨部位4aの下面に突設された多数のスタッドSを埋設して鉄骨基礎部分3を定着させるべく、図2(c)に示すように、第1フーチング部位7の下面側部位7bの上方部で上面側中央部位7aの外周部に第2フーチング部8を構築し、最終的に独立基礎コンクリートフーチング2を構築する。
このように、第3ステップでは、第1フーチング部位7以外の第2フーチング部位8を構築して鉄骨基礎部分3を上面側に定着させる状態で独立基礎コンクリートフーチング2を構築する。
そして、この第1ステップ〜第3ステップの工程を繰り返しながら複合基礎構造を構築するのである。
In the third step after the end of the second step, although not shown in the drawing, reinforcing bars are arranged around the upper surface side central portion 7a of each first footing portion 7, and a concrete mold is provided to place the concrete. To cast. That is, as shown in FIG. 2 (c), the lower surface side of the first footing portion 7 is used to fix the steel base portion 3 by embedding a large number of studs S projecting from the lower surface of each connecting steel portion 4a. The 2nd footing part 8 is constructed | assembled in the outer peripheral part of the upper surface side center site | part 7a in the upper part of the site | part 7b, and the independent foundation concrete footing 2 is finally constructed.
Thus, in the third step, the independent foundation concrete footing 2 is constructed in a state where the second footing region 8 other than the first footing region 7 is constructed and the steel foundation portion 3 is fixed on the upper surface side.
Then, the composite foundation structure is constructed while repeating the processes of the first step to the third step.

〔別実施形態〕
(1)先の実施形態では、第1ステップにおいて、埋設型枠9を使用し、その埋設型枠9を埋設した状態で第1フーチング部位7を構築する方法を示したが、埋設型枠9を使用することなく、例えば、必要に応じて工事用アンカーボルト11のみを埋設した状態で第1フーチング部位7を構築することも可能である。
また、第1フーチング部位7が、柱15の直下に位置する柱直下部分6を有する形態を示したが、例えば、中空のフーチング部位であっても鉄骨基礎部分3の鉛直荷重を支持することはできるので、必ずしも第1フーチング部位7が柱直下部分6を有している必要はない。
[Another embodiment]
(1) In the previous embodiment, in the first step, the embedded mold 9 was used, and the method for constructing the first footing part 7 with the embedded mold 9 embedded was shown. For example, it is also possible to construct the first footing part 7 in a state where only the construction anchor bolt 11 is embedded as necessary.
Moreover, although the 1st footing site | part 7 showed the form which has the part 6 directly under the pillar 15 located under the pillar 15, for example, even if it is a hollow footing site | part, supporting the vertical load of the steel foundation part 3 is not possible. Since it is possible, the first footing part 7 does not necessarily have to have the portion 6 directly under the pillar.

(2)先の実施形態では、基礎コンクリートフーチングの一例として独立基礎コンクリートフーチング2を示したが、例えば、布基礎コンクリートフーチングにもベタ基礎スラブにも適用可能である。
また、独立基礎コンクリートフーチング2において、第1フーチング部位7が、下面側部位7bと上面側中央部位7aとを一体的に備えた縦断側面視で凸形状に設定された例を示したが、第1フーチング部位7の形状は特に凸形状に限定されるものではない。
更に、鉄骨基礎部分3を構成する柱下鉄骨部位4として、鉄骨基礎梁5を連結するための連結用鉄骨部位4aを備えた柱下鉄骨部位4を示したが、連結用鉄骨部位4aを有しない柱下鉄骨部位4を使用して実施することもでき、また、その柱下鉄骨部位4と鉄骨基礎梁5との連結固定も、連結用鉄板13とボルト・ナット14に限らず、例えば、溶接によって連結固定することも可能である。
(2) In the previous embodiment, although the independent foundation concrete footing 2 was shown as an example of the foundation concrete footing, it can be applied to, for example, a cloth foundation concrete footing or a solid foundation slab.
Moreover, in the independent foundation concrete footing 2, although the 1st footing site | part 7 showed the example set to convex shape by the vertical side view integrally provided with the lower surface side site | part 7b and the upper surface side center site | part 7a, The shape of the 1 footing part 7 is not particularly limited to the convex shape.
Furthermore, although the columnar steel part 4 provided with the connecting steel part 4a for connecting the steel foundation beam 5 is shown as the columnar steel part 4 constituting the steel foundation part 3, the steel part 4a for connection is provided. It can also be carried out using the under-column steel part 4 that is not, and the connection and fixing of the under-column steel part 4 and the steel foundation beam 5 is not limited to the connecting iron plate 13 and the bolts and nuts 14, for example, It is also possible to connect and fix by welding.

2 基礎コンクリートフーチングの一例である独立基礎コンクリートフーチング
3 鉄骨基礎部分
6 柱直下部分
7 第1フーチング部位
7a 第1フーチング部位の上面側中央部位
7b 第1フーチング部位の下面側部位
8 第2フーチング部位
9 埋設型枠
10 アンカーフレーム
11 工事用アンカーボルト

2 Independent foundation concrete footing which is an example of foundation concrete footing 3 Steel foundation part 6 Directly under pillar 7 First footing part 7a Upper side central part of first footing part 7b Lower side part of first footing part 8 Second footing part 9 Embedded form 10 Anchor frame 11 Anchor bolt for construction

Claims (4)

基礎コンクリートフーチングと、当該基礎コンクリートフーチングの上面側に定着される鉄骨基礎部分とを備えた複合基礎構造の構築方法であって、
前記基礎コンクリートフーチングのうちの前記鉄骨基礎部分の鉛直荷重を支持する第1フーチング部位を構築する第1ステップと、
当該第1ステップで構築した前記第1フーチング部位に鉛直荷重を支持させる状態で前記鉄骨基礎部分を構築する第2ステップと、
当該第2ステップの実施後、前記基礎コンクリートフーチングにおける前記第1フーチング部位以外の第2フーチング部位を構築して前記鉄骨基礎部分を上面側に定着させる状態で前記基礎コンクリートフーチングを構築する第3ステップを備えている複合基礎構造の構築方法。
A method for constructing a composite foundation structure comprising a foundation concrete footing and a steel foundation portion fixed on the upper surface side of the foundation concrete footing,
A first step of constructing a first footing portion that supports a vertical load of the steel foundation portion of the foundation concrete footing;
A second step of constructing the steel foundation in a state in which a vertical load is supported on the first footing region constructed in the first step;
After execution of the second step, a third step of constructing the foundation concrete footing in a state where a second footing part other than the first footing part in the foundation concrete footing is constructed and the steel foundation part is fixed on the upper surface side. A method of constructing a composite foundation structure comprising
前記第1フーチング部位が、柱の直下に位置する柱直下部分を有する請求項1に記載の複合基礎構造の構築方法。   The method for constructing a composite foundation structure according to claim 1, wherein the first footing portion has a portion immediately below the column. 前記基礎コンクリートフーチングが、独立基礎コンクリートフーチングであり、
前記第1フーチング部位が、前記柱直下部分を含む下面側部位とその下面側部位の中央に位置する上面側中央部位を有して、縦断側面視において凸形状に設定され、
前記第2フーチング部位が、前記下面側部位の上方部で前記上面側中央部位の外周部に設定されている請求項2に記載の複合基礎構造の構築方法。
The foundation concrete footing is an independent foundation concrete footing;
The first footing portion has a lower surface side portion including the portion directly below the pillar and an upper surface side central portion located at the center of the lower surface side portion, and is set to a convex shape in a longitudinal side view,
The method for constructing a composite foundation structure according to claim 2, wherein the second footing part is set at an upper part of the lower surface part and an outer peripheral part of the upper surface side central part.
前記第1ステップにおいて、工事用アンカーボルトを保持するアンカーフレームを付設した埋設型枠を使用し、当該埋設型枠を埋設し、かつ、前記工事用アンカーボルトを突出させる状態で前記第1フーチング部位を構築する請求項1〜3のいずれか1項に記載の複合基礎構造の構築方法。


In the first step, the first footing portion is used in a state in which an embedded formwork provided with an anchor frame for holding the construction anchor bolt is used, the embedded formwork is embedded, and the construction anchor bolt protrudes. The method for constructing a composite foundation structure according to any one of claims 1 to 3.


JP2016095981A 2016-05-12 2016-05-12 How to build a composite foundation structure Active JP6774781B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016095981A JP6774781B2 (en) 2016-05-12 2016-05-12 How to build a composite foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016095981A JP6774781B2 (en) 2016-05-12 2016-05-12 How to build a composite foundation structure

Publications (2)

Publication Number Publication Date
JP2017203303A true JP2017203303A (en) 2017-11-16
JP6774781B2 JP6774781B2 (en) 2020-10-28

Family

ID=60322073

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016095981A Active JP6774781B2 (en) 2016-05-12 2016-05-12 How to build a composite foundation structure

Country Status (1)

Country Link
JP (1) JP6774781B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019132072A (en) * 2018-02-01 2019-08-08 旭化成ホームズ株式会社 Foundation structure and construction method of the same
JP2020165078A (en) * 2019-03-28 2020-10-08 日鉄建材株式会社 Construction method of rising member, foundation structure and foundation structure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6410838A (en) * 1987-07-02 1989-01-13 Tokyu Kensetsu Kk Box pulling basket retaining mold of iron pillar fixing part in src building
JPH07279184A (en) * 1994-04-11 1995-10-24 Daiwa House Ind Co Ltd Floating underground beam foundation for buildings
US5505033A (en) * 1988-12-06 1996-04-09 501 Hitachi Metals Ltd. Column base structure and connection arrangement
JPH09151463A (en) * 1995-11-22 1997-06-10 Marugami Komuten:Kk Column-integrated column base fixed foundation structure and its construction method
JP3047696U (en) * 1997-07-16 1998-04-24 英昭 向井 Building with steel aerial foundation beam structure
JP2000265574A (en) * 1999-03-18 2000-09-26 For You Planning Consultant:Kk Raised floor steel foundation beam method
JP2012162898A (en) * 2011-02-04 2012-08-30 Kawada Industries Inc Anchor frame, and construction method for foundation structure using anchor frame
JP2016070028A (en) * 2014-10-01 2016-05-09 株式会社竹中工務店 Substructure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6410838A (en) * 1987-07-02 1989-01-13 Tokyu Kensetsu Kk Box pulling basket retaining mold of iron pillar fixing part in src building
US5505033A (en) * 1988-12-06 1996-04-09 501 Hitachi Metals Ltd. Column base structure and connection arrangement
JPH07279184A (en) * 1994-04-11 1995-10-24 Daiwa House Ind Co Ltd Floating underground beam foundation for buildings
JPH09151463A (en) * 1995-11-22 1997-06-10 Marugami Komuten:Kk Column-integrated column base fixed foundation structure and its construction method
JP3047696U (en) * 1997-07-16 1998-04-24 英昭 向井 Building with steel aerial foundation beam structure
JP2000265574A (en) * 1999-03-18 2000-09-26 For You Planning Consultant:Kk Raised floor steel foundation beam method
JP2012162898A (en) * 2011-02-04 2012-08-30 Kawada Industries Inc Anchor frame, and construction method for foundation structure using anchor frame
JP2016070028A (en) * 2014-10-01 2016-05-09 株式会社竹中工務店 Substructure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019132072A (en) * 2018-02-01 2019-08-08 旭化成ホームズ株式会社 Foundation structure and construction method of the same
JP2020165078A (en) * 2019-03-28 2020-10-08 日鉄建材株式会社 Construction method of rising member, foundation structure and foundation structure

Also Published As

Publication number Publication date
JP6774781B2 (en) 2020-10-28

Similar Documents

Publication Publication Date Title
JP2018115489A (en) Anchor frame and construction method of steel structure using the same
JP2016098504A (en) Construction method for reinforced concrete structure, and reinforced concrete structure
JP2019056284A (en) Column base rebar unit and method of constructing structure using column base rebar unit
JP6632290B2 (en) Steel column leg structure and steel column leg construction method
JP6774781B2 (en) How to build a composite foundation structure
JP6543077B2 (en) Construction method of structure
JP6802675B2 (en) Beam-column joining method and joint member
JP6529379B2 (en) Invert formwork
JP7068146B2 (en) Independent footing foundation structure and its construction method
JP2019035214A (en) Concrete foundation reinforcement structure for pile
JP2018053563A (en) Column base anchor structure of a column having a steel frame and its construction method
JP6849491B2 (en) Exposed column base structure of steel columns and its construction method
JP6690988B2 (en) How to build a composite foundation structure
JP6441689B2 (en) How to install seismic isolation structures
JP2022116247A (en) Seismic isolation upper foundation structure fabrication method and foundation structure fabrication method
JP2000160687A (en) Construction method of mixed structure and precast concrete column
JP5574338B2 (en) Site precast method for foundation beam
JPH0533351A (en) Steel column base of steel structure and its construction method
JP6381096B2 (en) Construction structure, gantry and turbine generator facility, and method for manufacturing construction structure
JP6576204B2 (en) Slab construction method
JP6300228B2 (en) Flat slab structure
JP2022096117A (en) Equipment foundation structure
JP4392684B2 (en) Rebar rod jig, rebar rod assembly method
JP2020056163A (en) Installation adjustment jig and installation adjustment method
JPH06299718A (en) Construction of wall, floor in atomic power plant and wall slab thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190325

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200212

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200325

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200511

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200923

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20201005

R150 Certificate of patent or registration of utility model

Ref document number: 6774781

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150