JP2016095626A - Estimation device and estimation method - Google Patents

Estimation device and estimation method Download PDF

Info

Publication number
JP2016095626A
JP2016095626A JP2014230678A JP2014230678A JP2016095626A JP 2016095626 A JP2016095626 A JP 2016095626A JP 2014230678 A JP2014230678 A JP 2014230678A JP 2014230678 A JP2014230678 A JP 2014230678A JP 2016095626 A JP2016095626 A JP 2016095626A
Authority
JP
Japan
Prior art keywords
line model
time
series data
amount
net increase
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2014230678A
Other languages
Japanese (ja)
Other versions
JP6328539B2 (en
Inventor
将裕 横田
Masahiro Yokota
将裕 横田
恵 竹下
Megumi Takeshita
恵 竹下
研 西松
Ken Nishimatsu
研 西松
信祐 下川
Shinsuke Shimokawa
信祐 下川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NTT Advanced Technology Corp
Nippon Telegraph and Telephone Corp
Original Assignee
NTT Advanced Technology Corp
Nippon Telegraph and Telephone Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NTT Advanced Technology Corp, Nippon Telegraph and Telephone Corp filed Critical NTT Advanced Technology Corp
Priority to JP2014230678A priority Critical patent/JP6328539B2/en
Publication of JP2016095626A publication Critical patent/JP2016095626A/en
Application granted granted Critical
Publication of JP6328539B2 publication Critical patent/JP6328539B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

PROBLEM TO BE SOLVED: To enable the trend of a customer in a market to be grasped.SOLUTION: An estimation device comprises: a conversion section which converts time series data on each of the number of inflow persons, the number of outflow persons, and a net increase number of persons to be employed about the first competitive element into time series data with a time axis as log; a generation section which generates a broken-line model approximate to each converted time series data; and a first estimation section which estimates a change amount of inclination of the broken-line model related to the number of inflow persons or the broken-line model related to the number of outflow persons in a period of time not corresponding to a change point of the broken-line model related to the net increase number, as a reflow amount which does not affect the net increase number but is a component changing the number of inflow persons or the number of outflow persons.SELECTED DRAWING: Figure 2

Description

本発明は、推定装置及び推定方法に関する。   The present invention relates to an estimation apparatus and an estimation method.

商品やサービスの市場では、複数の事業者の商品又はサービスが競合し、それらが市場のシェアを競い合うことが一般的である。このような市場では、事業者の市場占有の情勢に変化が生じたとき、これを検知し、事業者の市場占有の間で、どのような相互作用や影響関係が生じたのかという情勢変化の構造を知ることができれば、また、生じた影響関係が、今後の市場の占有状況にどのような変化をもたらし得るのかという情勢変化の影響を分析し、評価することができれば、市場施策の実行や変更の判断をより的確に、かつ、迅速に行うことができる。このように、市場の情勢変化の構造と、これまでの影響と将来への影響とを定量的に推定する方法があれば、機会の損失や投資の失敗が減少する可能性が高くなり、経済に効率性をもたらすため、有用性が大きいと考えられる。   In the product and service market, it is common for products or services of a plurality of operators to compete and to compete for market share. In such a market, when changes occur in the market share of the operator, this is detected, and the change in the situation changes such as what kind of interaction or influence relationship has occurred between the market share of the business operator. If we can understand the structure, and if we can analyze and evaluate the impact of changes in the situation, such as how the resulting impact relationship can bring about future market occupancy, we will be able to implement market measures and Judgment of change can be made more accurately and quickly. Thus, if there is a way to quantitatively estimate the structure of market changes and past and future impacts, chances of lost opportunities and investment failures will increase, and economic Therefore, it is considered useful.

近年、上記目的を達成するために、市場成長の予測が開始されている(例えば、非特許文献1、特許文献1参照)。   In recent years, prediction of market growth has been started in order to achieve the above object (see, for example, Non-Patent Document 1 and Patent Document 1).

特許第4777941号公報Japanese Patent No. 47777941

S. Shimogawa, M. Shinno, and H. Saito, Structure of S-shaped growth in innovation diffusion, Physical Review E 85, 056121 (2012).S. Shimogawa, M. Shinno, and H. Saito, Structure of S-shaped growth in innovation diffusion, Physical Review E 85, 056121 (2012).

これまでの技術では情勢変化の構造を分析することはできたが、情勢が変化した際に、現在自社サービスを契約中の顧客が解約し他社に移行したのか(流出への影響)、本来、自社に加入する予定であった顧客があるきっかけ(例えばキャンペーンによるコストメリット)により他社と契約(流入への影響)したのかという、流入及び流出を含めたサービス間の顧客の動きを求める方法は確立されていない。また、事業主から見ると顧客数の純増に影響を与えないが、流入数及び流出数を変化させる成分(以下、「還流」という。)を求める方法についても確立されていない。   Until now, the technology has been able to analyze the structure of the change in the situation, but when the situation changed, whether the customer who currently contracted their services canceled and moved to another company (impact on the outflow), Established a method to determine the movement of customers between services including inflow and outflow, whether the customer who planned to join the company contracted with another company (impact on inflow) due to a certain opportunity (for example, cost merit by campaign) It has not been. In addition, from the perspective of the business owner, there is no impact on the net increase in the number of customers, but no method has been established for obtaining a component that changes the number of inflows and outflows (hereinafter referred to as “reflux”).

なお、還流は、競争が激しいサービスにおいて発生する状況であり、具体的には各社の顧客獲得施策等により、顧客はサービスを定期的に変えた方がメリットが発生する際に(例えば、携帯電話市場において、提供会社を変更することによるキャッシュバックを目当てとして、継続的に提供会社を変更する場合など)、定常的に流入又は流出する顧客が吊り合って存在する状況である。   Reflux is a situation that occurs in highly competitive services. Specifically, when customers benefit from changing their services regularly (for example, mobile phones) In the market, there is a situation where customers who regularly inflow or outflow exist in a market, for example, when the provider is changed continuously for the purpose of cashback by changing the provider.

本発明は、上記の点に鑑みてなされたものであって、市場における顧客の動きを把握可能とすること目的とする。   The present invention has been made in view of the above points, and an object thereof is to make it possible to grasp the movement of customers in the market.

そこで上記課題を解決するため、推定装置は、第一の競合要素に関する採用者の流入数、流出数、純増数のそれぞれに関する時系列データを、時間軸を対数にした時系列データに変換する変換部と、変換後のそれぞれの時系列データに近似した折れ線モデルを生成する生成部と、前記純増数に係る折れ線モデルの変化点に該当しない時期における、前記流入数に係る折れ線モデル又は前記流出数に係る折れ線モデルの傾きの変化量を、純増数には影響を与えないが、流入数又は流出数を変化させる成分である還流量として推定する第一の推定部と、を有する。   Therefore, in order to solve the above-mentioned problem, the estimation device converts the time series data regarding each of the number of inflows, outflows, and net increase of the employer regarding the first competitive element into time series data with a logarithmic time axis. , A generation unit that generates a line model approximating each time series data after conversion, and a line model or the number of outflows related to the number of inflows at a time not corresponding to a change point of the line model related to the net increase And a first estimation unit that estimates the amount of change in the slope of the line model as a recirculation amount that does not affect the net increase, but is a component that changes the number of inflows or outflows.

市場における顧客の動きを把握可能とすることができる。   It is possible to grasp the movement of customers in the market.

本発明の実施の形態における推定装置のハードウェア構成例を示す図である。It is a figure which shows the hardware structural example of the estimation apparatus in embodiment of this invention. 本発明の実施の形態における推定装置の機能構成例を示す図である。It is a figure which shows the function structural example of the estimation apparatus in embodiment of this invention. 契約者数記憶部の構成例を示す図である。It is a figure which shows the structural example of a contractor number memory | storage part. 流入出数記憶部の構成例を示す図である。It is a figure which shows the structural example of an inflow / outflow number memory | storage part. 折れ線モデル生成部が実行する処理手順の一例を説明するためのフローチャートである。It is a flowchart for demonstrating an example of the process sequence which a broken line model production | generation part performs. 還流量推定部が実行する処理手順の一例を説明するためのフローチャートである。It is a flowchart for demonstrating an example of the process sequence which a recirculation | reflux amount estimation part performs. 影響量推定部が実行する処理手順の一例を説明するためのフローチャートである。It is a flowchart for demonstrating an example of the process sequence which an influence amount estimation part performs.

本実施の形態では、消費者向けのサービス又は商品等(以下、「サービス」で統一する。)の市場において、サービスを提供する事業者等の競合要素が、顧客の獲得を巡って競合する場合において、競合サービス間の顧客の変動数と、事業主から見ると顧客数の純増に影響を与えないが、流入数及び流出数を変化させる成分(以下、「還流」という。)と等について推定を行う推定装置10について説明する。   In the present embodiment, in the market for services or products for consumers (hereinafter referred to as “service”), competing factors such as service providers compete for customer acquisition. The number of customer fluctuations between competing services and the component that changes the number of inflows and outflows (hereinafter referred to as “reflux”), although not affecting the net increase in the number of customers from the perspective of the business owner, are estimated. The estimation device 10 that performs the above will be described.

以下、図面に基づいて本発明の実施の形態を説明する。図1は、本発明の実施の形態における推定装置のハードウェア構成例を示す図である。図1の推定装置10は、それぞれバスBで相互に接続されているドライブ装置100、補助記憶装置102、メモリ装置103、CPU104、及びインタフェース装置105等を有する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. FIG. 1 is a diagram illustrating a hardware configuration example of an estimation apparatus according to an embodiment of the present invention. The estimation device 10 in FIG. 1 includes a drive device 100, an auxiliary storage device 102, a memory device 103, a CPU 104, an interface device 105, and the like that are mutually connected by a bus B.

推定装置10での処理を実現するプログラムは、CD−ROM等の記録媒体101によって提供される。プログラムを記憶した記録媒体101がドライブ装置100にセットされると、プログラムが記録媒体101からドライブ装置100を介して補助記憶装置102にインストールされる。但し、プログラムのインストールは必ずしも記録媒体101より行う必要はなく、ネットワークを介して他のコンピュータよりダウンロードするようにしてもよい。補助記憶装置102は、インストールされたプログラムを格納すると共に、必要なファイルやデータ等を格納する。   A program that realizes processing in the estimation apparatus 10 is provided by a recording medium 101 such as a CD-ROM. When the recording medium 101 storing the program is set in the drive device 100, the program is installed from the recording medium 101 to the auxiliary storage device 102 via the drive device 100. However, the program need not be installed from the recording medium 101 and may be downloaded from another computer via a network. The auxiliary storage device 102 stores the installed program and also stores necessary files and data.

メモリ装置103は、プログラムの起動指示があった場合に、補助記憶装置102からプログラムを読み出して格納する。CPU104は、メモリ装置103に格納されたプログラムに従って推定装置10に係る機能を実行する。インタフェース装置105は、ネットワークに接続するためのインタフェースとして用いられる。   The memory device 103 reads the program from the auxiliary storage device 102 and stores it when there is an instruction to start the program. The CPU 104 executes a function related to the estimation device 10 according to a program stored in the memory device 103. The interface device 105 is used as an interface for connecting to a network.

図2は、本発明の実施の形態における推定装置の機能構成例を示す図である。図2において、推定装置10は、対数原点設定部11、対数時間変換部12、折れ線モデル生成部13、還流量推定部14、及び影響量推定部15等を有する。これら各部は、推定装置10にインストールされた1以上のプログラムが、CPU104に実行させる処理により実現される。推定装置10は、また、流入出数記憶部121及び契約者数記憶部122等を利用する。流入出数記憶部121及び契約者数記憶部122は、補助記憶装置102、又は推定装置10にネットワークを介して接続可能な記憶装置等を用いて実現可能である。   FIG. 2 is a diagram illustrating a functional configuration example of the estimation device according to the embodiment of the present invention. 2, the estimation device 10 includes a log origin setting unit 11, a log time conversion unit 12, a polygonal line model generation unit 13, a reflux amount estimation unit 14, an influence amount estimation unit 15, and the like. Each of these units is realized by processing that one or more programs installed in the estimation apparatus 10 cause the CPU 104 to execute. The estimation apparatus 10 also uses an inflow / outflow number storage unit 121, a contractor number storage unit 122, and the like. The inflow / outflow number storage unit 121 and the contractor number storage unit 122 can be realized using a storage device or the like that can be connected to the auxiliary storage device 102 or the estimation device 10 via a network.

契約者数記憶部122は、或るサービスの契約者数(採用者数)の時系列データを記憶する。例えば、契約者数記憶部122には、相互に競合する各サービス(例えば、フレッツ光(登録商標)やauひかり(登録商標)等)の契約者数N,j=1,2,・・・Aについての、現在又は過去の或る時期までの時間区間[T,T]の時系列データD={(t,N(t),k=1,2,・・・,A)}が記憶されている。ここで、jは、サービスを区別するための添え字であり、kは、時期(例えば、月別であれば月)を区別するための添え字である。 The contractor number storage unit 122 stores time-series data of the number of contractors (the number of employers) of a certain service. For example, the number of contractors storage unit 122 stores the number of contractors N j , j = 1, 2,... For each service (for example, FLET'S Hikari (registered trademark), au Hikari (registered trademark), etc.) competing with each other. Time-series data D j = {(t k , N j (t k ), k = 1, 2,..., A for a time interval [T 0 , T 1 ] up to a certain time in the past or in the past ., A)} is stored. Here, j is a subscript for distinguishing the service, and k is a subscript for distinguishing the time (for example, month if monthly).

図3は、契約者数記憶部の構成例を示す図である。図3において、契約者数記憶部122には、サービスごとに、時期別の契約者数が記憶されている。   FIG. 3 is a diagram illustrating a configuration example of the contractor number storage unit. In FIG. 3, the contractor number storage unit 122 stores the number of contractors for each service for each time period.

なお、相互に競合する各サービス(自社・他社全て含む)に関する契約者数の時系列データについては、固定ブロードバンドサービスを例にとれば、総務省が提供している"電気通信サービスの契約数及びシェアに関するデータ"が利用されてもよい。   As for the time series data of the number of contractors for each competing service (including in-house and all other companies), the fixed broadband service is taken as an example of the “Number of telecommunications service contracts provided by the Ministry of Internal Affairs and Communications. "Share data" may be used.

流入出数記憶部121は、自社のサービスに関する新規契約者数(流入数)、新規解約者数(流出数)、純増者数の時系列データを記憶する。純増者数は、契約者数の時系列データの一定期間ごとの差分から算出することができる。或る時間区間[t,t]の純増者数をI[t0,t1]は、I[t0,t1]=D(t)−D(t)により算出される。 The inflow / outflow number storage unit 121 stores time-series data of the number of new contractors (inflows), the number of new churners (outflows), and the number of net increasers regarding their services. The net increase in number can be calculated from the difference for each fixed period of the time-series data of the number of contractors. The net increase number I [t0, t1] in a certain time interval [t 0 , t 1 ] is calculated by I [t0, t1] = D j (t 1 ) −D j (t 0 ).

図4は、流入出数記憶部の構成例を示す図である。図4において、流入出数記憶部121には、自社のサービスについて、月別の流入数、流出数、及び純増数が記憶されている。   FIG. 4 is a diagram illustrating a configuration example of the inflow / outflow number storage unit. In FIG. 4, the inflow / outflow number storage unit 121 stores the inflow number, outflow number, and net increase number for each service for each company.

なお、自社サービスの流入数の時系列データ及び流出数の時系列データに関しては、自社システムで管理されている値が利用されてもよい。また、本実施の形態において、「自社」とは、推定装置10を利用している事業者をいう。「他社」とは、自社が提供するサービスと競合するサービスを提供する事業者をいう。   Note that values managed by the company system may be used for the time series data of the number of inflows of the company service and the time series data of the number of outflows. Further, in the present embodiment, “in-house” refers to a business entity that uses the estimation device 10. “Other companies” refers to businesses that provide services that compete with services provided by the company.

対数原点設定部11は、契約者数記憶部122又は流入出数記憶部121に記憶されている各時系列データから対数時間の原点を設定する。対数時間の原点の設定は、例えば、特許文献1の段落0035等が参考とされてもよい。   The logarithmic origin setting unit 11 sets the logarithmic time origin from each time series data stored in the contractor number storage unit 122 or the inflow / outflow number storage unit 121. For example, paragraph 0035 of Patent Document 1 may be referred to for setting the logarithmic time origin.

対数時間変換部12は、契約者数記憶部122又は流入出数記憶部121に記憶されている各時系列データの時間軸を対数に変換する処理を実行する。例えば、契約者数記憶部122の契約者数の時系列データが、
D={N(t),t,i=1,2,・・・,n}
であるとすると、対数時間変換部12は、これに対して、時間を対数化させたデータ
DL={N(t),log(t),i=1,2,・・・,n}
を算出する。
The logarithmic time conversion unit 12 executes a process of converting the time axis of each time series data stored in the contractor number storage unit 122 or the inflow / outflow number storage unit 121 into a logarithm. For example, the time-series data of the number of contractors in the contractor number storage unit 122 is
D = {N (t i ), t i , i = 1, 2,..., N}
In this case, the logarithmic time conversion unit 12 responds to the data DL = {N (t i ), log (t i ), i = 1, 2,. }
Is calculated.

なお、時系列データの時間軸を対数に変換する処理は、例えば、特許文献1が参考とされてもよい。   For example, Patent Document 1 may be referred to for the process of converting the time axis of the time series data into a logarithm.

折れ線モデル生成部13は、対数時間変換部12による時間軸の変換後の、累積の契約者数、累積の流入数、累積の流出数、及び累積の純増数のそれぞれの時系列データを近似した折れ線モデルを生成する。   The polygonal line model generation unit 13 approximates the time series data of the cumulative number of contractors, the cumulative inflow number, the cumulative outflow number, and the cumulative net increase after the time axis conversion by the logarithmic time conversion unit 12. Generate a line model.

還流量推定部14は、流入数の折れ線モデル又は流出数の折れ線モデルの変化点(折れ点)における傾きの変化量に基づいて、各年の還流量の増減量を推定し、更に、各年の還流量の増減量に基づいて、各年の或る時期における還流量を推定する。   The reflux amount estimation unit 14 estimates an increase / decrease amount of the reflux amount in each year based on the change amount of the slope at the change point (break point) of the inflow number line model or the outflow number line model. Based on the amount of increase / decrease in the amount of reflux, the amount of reflux at a certain time of each year is estimated.

影響量推定部15は、自社サービスに関する純増数の時系列データの折れ線モデルと、流入数の折れ線モデル又は流出数の折れ線モデルと、他社サービスに関する契約者数の時系列データの折れ線モデルとに基づいて、自社サービスに関する流入数又は流出数に影響を与えた他社サービスと、当該影響の影響量とを推定する。   The influence amount estimation unit 15 is based on a line model of the time series data of the net increase related to the company's service, a line model of the number of inflows or a line model of the number of outflows, and a line model of the time series data of the number of contractors related to services of other companies. Thus, we estimate the services of other companies that have affected the number of inflows or outflows related to in-house services, and the amount of the impact.

以下、推定装置10が実行する処理手順について説明する。図5は、折れ線モデル生成部が実行する処理手順の一例を説明するためのフローチャートである。図5の処理手順は、対数時間変換部12によって時間が対数化された後の、自社及び他社のそれぞれの契約者数の時系列データ、自社に関する流入数の時系列データ、自社に関する流出数の時系列データ、及び自社に関する純増数の時系列データのそれぞれについて実行される。   Hereinafter, the process procedure which the estimation apparatus 10 performs is demonstrated. FIG. 5 is a flowchart for explaining an example of a processing procedure executed by the polygonal line model generation unit. The processing procedure of FIG. 5 includes the time series data of the number of contractors of each company and other companies, the time series data of the number of inflows related to the company, and the number of outflows related to the company after the time is logarithmized by the log time conversion unit 12. It is executed for each of the time series data and the time series data of the net increase related to the company.

ステップS101において、折れ線モデル生成部13は、処理対象の時系列データについて、ユーザによって予め指定された折れ位置候補で指定区間を分割したそれぞれの区間に対して直線による近似手順を実行する。なお、指定区間とは、時間区間[T,T]内のいずれかの区間であって、ユーザによって予め指定された区間である。 In step S <b> 101, the polygonal line model generation unit 13 executes an approximation procedure using straight lines for each section obtained by dividing the designated section by the folding position candidates designated in advance by the user for the time series data to be processed. The designated section is any section in the time section [T 0 , T 1 ] and is a section designated in advance by the user.

続いて、折れ線モデル生成部13は、折れ位置候補で必ずしも折れるわけではないため、それぞれの折れ位置候補について、前後数点で傾きの差が所定の傾きの閾値以上に変化しているかを評価し、閾値以上であればその折れ位置候補を折れ点とする(S102)。したがって、閾値未満である折れ位置候補は、折れ点とはされない。   Subsequently, the broken line model generation unit 13 does not necessarily fold at the fold position candidates, and therefore, for each fold position candidate, evaluates whether or not the difference in inclination has changed beyond a predetermined inclination threshold at several points before and after. If it is equal to or greater than the threshold, the fold position candidate is set as a break point (S102). Therefore, a break position candidate that is less than the threshold value is not a break point.

続いて、折れ線モデル生成部13は、ステップS102において得られた各折れ点を初期の折れ点とし、各折れ点の区間に関して、公知の線形回帰の方法を用いて回帰直線を生成する(S103)。その結果、処理対象の時系列データに関して、折れ線モデルが得られる。   Subsequently, the broken line model generation unit 13 sets each broken point obtained in step S102 as an initial broken point, and generates a regression line using a known linear regression method for each broken point section (S103). . As a result, a line model is obtained for the time-series data to be processed.

続いて、折れ線モデル生成部13では、得られた折れ線モデルと、処理対象の時系列データとの平均二乗誤差を算出し、当該平均二乗差の和を誤差とする(S104)。当該誤差が予め設定された閾値1(Th1)を上回る場合(S105でYES)、折れ線モデル生成部13は、区間毎の平均二乗誤差が最大の区間(以下、「最大区間」という。)について、新区分点を導入する。具体的には、折れ線モデル生成部13は、ユーザによって予め指定された刻み値δの幅で、新区分点の候補を最大区間の開始点の隣から最大区間の終了点まで移動させつつ(S106)、最大区間が新区分点によって分割された2区間のそれぞれについて回帰直線を生成し(S107)、平均二乗誤差の和が最小となる新区分点を、折れ点に追加する(S108)。すなわち、ステップS106及びS107は、新区分点が移動されつつ繰り返し実行される。   Subsequently, the broken line model generation unit 13 calculates a mean square error between the obtained broken line model and the time-series data to be processed, and sets the sum of the mean square differences as an error (S104). When the error exceeds a preset threshold value 1 (Th1) (YES in S105), the polygonal line model generation unit 13 determines a section having the maximum mean square error for each section (hereinafter referred to as “maximum section”). Introduce new division points. Specifically, the polygonal line model generation unit 13 moves the candidate for the new segment point from the start point of the maximum section to the end point of the maximum section with the width of the step value δ designated in advance by the user (S106). ), A regression line is generated for each of the two sections obtained by dividing the maximum section by the new section points (S107), and a new section point having the smallest sum of mean square errors is added to the breakpoint (S108). That is, steps S106 and S107 are repeatedly executed while the new division point is moved.

折れ点の追加の結果、折れ線モデルの各線分区間のうちの最小区間の幅が、所定の閾値2(Th2)未満であれば(S109でYES)、折れ線モデル生成部13は、折れ線モデルの生成に失敗したと判定し(S110)、図5の処理を終了する。当該最小区間の幅が、所定の閾値2(Th2)以上であれば(S109でNO)、折れ線モデル生成部13は、ステップS103以降を繰り返す。   If the width of the minimum segment among the segment segments of the polygonal line model is less than the predetermined threshold value 2 (Th2) as a result of the addition of the polygonal points (YES in S109), the polygonal line model generation unit 13 generates the polygonal line model. (S110), the process of FIG. 5 is terminated. If the width of the minimum section is equal to or greater than the predetermined threshold 2 (Th2) (NO in S109), the polygonal line model generation unit 13 repeats step S103 and subsequent steps.

S104において算出された誤差が閾値1(Th1)以下である場合(S105でNO)、折れ線モデル生成部13は、生成された折れ線モデルを特定するための情報として、例えば、各折れ点の座標値と各区間の傾きとを出力する(S111)。出力された値は、例えば、メモリ装置103又は補助記憶装置102に記憶される。   When the error calculated in S104 is equal to or less than the threshold value 1 (Th1) (NO in S105), the broken line model generation unit 13 uses, for example, the coordinate value of each broken point as information for specifying the generated broken line model. And the slope of each section are output (S111). The output value is stored in the memory device 103 or the auxiliary storage device 102, for example.

なお、自社サービスの流入数の時系列データの折れ線モデル、及び自社サービスの流出数の時系列データの折れ線モデルのそれぞれの傾きの変化(速度変化)は、自社サービスの市場占有規模の増加又は減少の速度を特徴付ける数値である。   In addition, changes in the slope (change in speed) of the time series data line model of the number of in-house services inflow and the time series data of the number of out-flows of in-house services increase or decrease the market share of the in-house service market. It is a numerical value that characterizes the speed.

続いて、還流量推定部14が実行する処理手順について説明する。図6は、還流量推定部が実行する処理手順の一例を説明するためのフローチャートである。図6の処理は、例えば、ユーザによる指示に応じて開始されてもよいし、図5の処理に続いて実行されてもよい。   Subsequently, a processing procedure executed by the reflux amount estimation unit 14 will be described. FIG. 6 is a flowchart for explaining an example of a processing procedure executed by the reflux amount estimation unit. The process of FIG. 6 may be started in response to an instruction from the user, for example, or may be executed following the process of FIG.

ステップS201において、還流量推定部14は、還流時期及び還流初期年の入力を、ユーザから受け付ける。還流時期とは、還流の影響を顕著に観測出来るとユーザが判断した時期である。本実施の形態において、各時系列データは、月別であるため、還流時期としては、特定の月(例えば、年度初めの4月等)が入力される。また、還流初期年は、還流量の算出を開始する年の前年にあたる年であり、例えば、競争が激化していないとユーザが判断した年(還流量が0であるとみなせる年)が入力される。   In step S201, the recirculation amount estimation unit 14 receives an input of a recirculation time and a recirculation initial year from the user. The reflux time is a time when the user determines that the influence of reflux can be observed remarkably. In this embodiment, since each time series data is monthly, a specific month (for example, April at the beginning of the year) is input as the return time. The initial year of reflux is the year before the year in which the calculation of the amount of reflux is started. For example, the year when the user determines that competition has not intensified (the year in which the amount of reflux can be regarded as 0) is input. The

続いて、還流量推定部14は、流入数の時系列データと流出数の時系列データとのうち、還流量の算出の際に分析対象とするデータを選択する(S202)。具体的には、流入数の時系列データと流出数の時系列データとのうち、折れ線モデル生成部13で生成された折れ線モデルが、時系列的に安定している方が選択される。時系列的に安定している折れ線モデルとは、時系列データに対して誤差(例えば、平均二乗誤差の和)が、相対的に小さい折れ線モデルをいう。時系列的に安定している方が選択されるのは、現実に近い状態を示す折れ線モデルを選択して、現実の状況に対して相対的に誤差が小さい分析結果を得るためである。   Subsequently, the recirculation amount estimation unit 14 selects data to be analyzed in calculating the recirculation amount from the time series data of the inflow number and the time series data of the outflow number (S202). Specifically, the time series data generated by the line model generation unit 13 is selected from the time series data of the number of inflows and the time series data of the number of outflows. A broken line model that is stable in time series is a broken line model that has a relatively small error (for example, the sum of mean square errors) with respect to time series data. The reason why the one that is stable in time series is selected is to select a polygonal line model indicating a state close to reality and obtain an analysis result having a relatively small error relative to the actual situation.

例えば、折れ線モデル生成部13で生成された折れ線モデルのフィッティング誤差が、閾値以内であり、相対的にフィッティング誤差が小さい方のデータが選択されてもよい。具体的には、折れ線モデル生成部13が、流入数の時系列データの折れ線モデル及び流出数の時系列データの折れ線モデルを生成する際に実行する回帰分析において生成される決定係数(R)を用いて、以下の式(1)のように、決定係数が閾値ε以上であり、決定係数が相対的に大きい方が選択されてもよい。 For example, the data with the fitting error of the polygonal line model generated by the polygonal line model generation unit 13 being within the threshold value and having a relatively small fitting error may be selected. Specifically, the determination coefficient (R 2 ) generated in the regression analysis executed when the line model generation unit 13 generates the line model of the time series data of the inflow number and the line model of the time series data of the outflow number. May be selected such that the determination coefficient is equal to or greater than the threshold ε and the determination coefficient is relatively large, as in the following equation (1).

Figure 2016095626
但し、他の方法によって、分析対象とするデータが選択されてもよい。以下、選択された方のデータを、「選択データ」という。
Figure 2016095626
However, data to be analyzed may be selected by other methods. Hereinafter, the selected data is referred to as “selected data”.

選択条件に該当するデータ無い場合、例えば、決定係数が閾値ε以上であるデータが無い場合(S203でNO)、還流量推定部14は、影響量の算出はできないと判定して、図6の処理を終了する。   When there is no data corresponding to the selection condition, for example, when there is no data whose determination coefficient is equal to or greater than the threshold ε (NO in S203), the reflux amount estimation unit 14 determines that the influence amount cannot be calculated, and FIG. The process ends.

流入数の時系列データと流出数の時系列データとのうちのいずれかが選択データとして選択された場合(S203でYES)、還流量推定部14は、分析対象の年(以下、「分析対象年」という。)を、還流初期年の翌年に設定する(S204)。   When any one of the time series data of the number of inflows and the time series data of the number of outflows is selected as the selection data (YES in S203), the reflux amount estimation unit 14 selects the year of analysis (hereinafter, “analysis target”). Year ") is set to the year following the initial reflux year (S204).

続いて、還流量推定部14は、分析対象年の還流時期に該当する月において、純増数の時系列データの折れ線モデルに変化点(折れ点)が有るか(傾きの変化が有るか)、すなわち、純増の速度が変化しているか否かを判定する(S205)。分析対象年の還流時期において、純増数の時系列データの折れ線モデルに変化点が有る場合(S205でYES)、還流量推定部14は、分析対象年の還流量の増減量に、既定値として、分析対象年の前年に関して設定された還流量の増減量(人数/年)を設定する(S206)。なお、純増数の速度の変化は、例えば、競合サービスの攻勢(例えば、割引施策等)により発生しうる。また、還流初期年の還流量の増減量は、0である。   Subsequently, the reflux amount estimation unit 14 determines whether there is a change point (break point) in the line model of the time series data of the net increase (whether there is a change in slope) in the month corresponding to the return time of the year to be analyzed. That is, it is determined whether or not the rate of net increase has changed (S205). If there is a change point in the line model of the time series data of the net increase at the return time of the analysis target year (YES in S205), the return amount estimation unit 14 sets the increase / decrease amount of the return amount of the analysis year as a default value. Then, the increase / decrease amount (number of persons / year) of the reflux amount set for the previous year of the analysis target year is set (S206). Note that the change in the rate of the net increase can occur due to, for example, a competitive service offensive (for example, a discount measure). The increase / decrease amount of the reflux amount in the initial reflux year is zero.

一方、分析対象年の還流時期において、純増数の時系列データの折れ線モデルに変化点が無い場合(S205でNO)、還流量推定部14は、選択データの折れ線モデルに関して、還流時期における速度(傾き)の変化量を算出し、当該変化量を、分析対象年に対する還流量の増減量として設定する(S207)。当該変化量は、当該変化点直後の速度(傾き)−当該変化点直前の速度(傾き)によって算出される。   On the other hand, when there is no change point in the line model of the time series data of the net increase at the reflux time of the year to be analyzed (NO in S205), the reflux amount estimation unit 14 relates to the speed at the reflux time with respect to the line model of the selected data ( (Slope) change amount is calculated, and the change amount is set as an increase / decrease amount of the reflux amount with respect to the analysis target year (S207). The amount of change is calculated by the speed (slope) immediately after the change point−the speed (slope) immediately before the change point.

すなわち、純増数が変化していない時期において、流入数又は流出数が変化した場合、その変化の要因は、純増数には影響を与えないが、流入数又は流出数を変化させる成分である還流であると推定できる。したがって、当該流入数又は流出数の速度の変化量は、還流量であると推定することができる。   That is, when the number of inflows or outflows changes at a time when the net increase has not changed, the factor of the change does not affect the net increase, but is a component that changes the inflow or outflow. It can be estimated that. Therefore, it can be estimated that the amount of change in the speed of the inflow number or the outflow number is the reflux amount.

続いて、還流量推定部14は、ステップS206又はS207において設定された、分析対象年の還流量の増減量を、分析対象年の前年の還流量に加算して、分析対象年の還流量を求める(S208)。求められた還流量は、分析対象年を示す値に対応付けられて、例えば、補助記憶装置102又はメモリ装置103に記憶される。なお、還流初期年の還流量は、0である。   Subsequently, the reflux amount estimation unit 14 adds the increase / decrease amount of the reflux amount in the analysis target year set in step S206 or S207 to the reflux amount in the previous year of the analysis target year, thereby calculating the reflux amount in the analysis target year. Obtain (S208). The obtained reflux amount is associated with a value indicating the year to be analyzed and stored in the auxiliary storage device 102 or the memory device 103, for example. The reflux amount in the initial reflux year is zero.

続いて、還流量推定部14は、分析対象年を1年進める(S209)。続いて、還流量推定部14は、分析対象年が、所持データの最新年より大きいか否かを判定する(S210)。所持データの最新年とは、流入出数記憶部121に記憶されている時系列データの中で、最新の時系列データの時間が示す年である。分析対象年が、所持データの最新年以下である場合(S210でNO)、ステップS205以降が繰り返される。分析対象年が、所持データの最新年より大きい場合(S210でYES)、図6の処理は終了する。   Subsequently, the reflux amount estimation unit 14 advances the analysis target year by one year (S209). Subsequently, the reflux amount estimation unit 14 determines whether or not the analysis target year is larger than the latest year of possessed data (S210). The latest year of possessed data is a year indicating the time of the latest time-series data among the time-series data stored in the inflow / outflow number storage unit 121. When the analysis target year is less than or equal to the latest year of possessed data (NO in S210), Step S205 and subsequent steps are repeated. When the analysis target year is larger than the latest year of possessed data (YES in S210), the process of FIG. 6 ends.

なお、ステップS210における判定は、所持データの最新年が、折れ線モデルの生成に関して指定される指定期間の最後の年に置き換えられて行われてもよい。   Note that the determination in step S210 may be performed by replacing the latest year of possessed data with the last year of the designated period designated for generation of the line model.

続いて、影響量推定部15が実行する処理手順について説明する。図7は、影響量推定部が実行する処理手順の一例を説明するためのフローチャートである。   Subsequently, a processing procedure executed by the influence amount estimation unit 15 will be described. FIG. 7 is a flowchart for explaining an example of a processing procedure executed by the influence amount estimation unit.

ステップS301において、影響量推定部15は、自社サービスの純増数の時系列データの折れ線モデルを取得する。続いて、影響量推定部15は、当該折れ線モデルの変化点を抽出する(S302)。例えば、折れ線モデル生成部13によって、変化点の座標値が記憶されている場合、当該座標値が取得される。なお、当該折れ線モデルに複数の変化点が有る場合、ステップS303以降は、変化点ごとに実行される。以下、処理対象とされている変化点を、「対象変化点」という。   In step S301, the influence amount estimation unit 15 acquires a line model of time-series data of the net increase of the company service. Subsequently, the influence amount estimation unit 15 extracts a change point of the broken line model (S302). For example, when the coordinate value of the change point is stored by the broken line model generation unit 13, the coordinate value is acquired. In addition, when there are a plurality of change points in the broken line model, Step S303 and subsequent steps are executed for each change point. Hereinafter, a change point that is a processing target is referred to as a “target change point”.

続いて、影響量推定部15は、ステップS202において還流量推定部14によって選択された選択データの折れ線モデルに関して、対象変化点と同時期(同月)において、変化点が有るか否かを判定する(S303)。   Subsequently, the influence amount estimation unit 15 determines whether or not there is a change point in the same period (same month) as the target change point with respect to the broken line model of the selection data selected by the reflux amount estimation unit 14 in step S202. (S303).

選択データの折れ線モデルに関して該当する変化点が有る場合(S303でYES)、影響量推定部15は、当該選択データ(流入数又は流出数)が、他社の競合サービスの影響を受けたと判定し(S304)、当該選択データの折れ線モデルの当該変化点における傾きの変化量(人数/年)(当該変化点直後の傾き−当該変化点直前の傾き)を、選択データに関する影響量として算出する(S305)。   When there is a corresponding change point with respect to the polyline model of the selected data (YES in S303), the influence amount estimation unit 15 determines that the selected data (number of inflows or outflows) has been affected by the competitor service of the other company ( S304) The change amount of the inclination (number of persons / year) at the change point of the polygonal line model of the selection data (the inclination immediately after the change point−the inclination immediately before the change point) is calculated as the influence amount related to the selection data (S305). ).

すなわち、純増数が変化した時期において、流入数又は流出数が変化している場合、当該変化は、還流に基づくものではなく、他社サービスからの影響(他社サービスに関する流出又は流入)が原因であると推定することができる。したがって、当該変化の変化量は、他社サービスの影響量であると推定することができる。   In other words, if the number of inflows or outflows changes when the net increase changes, the change is not based on recirculation, but is caused by the influence of other companies 'services (outflows or inflows related to other companies' services). Can be estimated. Therefore, it can be estimated that the change amount of the change is the influence amount of the service of other companies.

一方、選択データの折れ線モデルに関して該当する変化点が無い場合(S303でNO)、影響量推定部15は、流入数の時系列データと流出数の時系列データとのうち、選択データとして選択されなかった方の時系列データ(以下、「非選択データ」という。)が、他社の競合サービスの影響を受けたと判定する(S306)。例えば、選択データが流出数に関する時系列データであれば、流入数に関する時系列データが、非選択データである。   On the other hand, when there is no corresponding change point with respect to the polyline model of the selected data (NO in S303), the influence amount estimation unit 15 is selected as selection data from the time-series data of the inflow number and the time-series data of the outflow number. It is determined that the time series data that has not been received (hereinafter referred to as “non-selected data”) has been influenced by the competitor's competing service (S306). For example, if the selected data is time-series data regarding the number of outflows, the time-series data regarding the number of inflows is non-selected data.

続いて、影響量推定部15は、"純増=流入―流出"の関係式に基づき、純増数の速度変化と、選択データの速度変化とから、非選択データに関する影響量を算出する(S307)。具体的には、流出数側が選択データである場合、流入数に関する影響量は、上記関係式に基づいて、以下のように求めることができる。   Subsequently, the influence amount estimation unit 15 calculates the influence amount relating to the non-selected data from the speed change of the net increase and the speed change of the selected data based on the relational expression “net increase = inflow−outflow” (S307). . Specifically, when the outflow number side is selection data, the influence amount related to the inflow number can be obtained as follows based on the relational expression.

流入数に関する影響量=流出数の速度変化+純増数の速度変化
ここで、流出数の速度変化及び純増数の速度変化は、それぞれ、対象変化点に係る月の前後の速度変化(傾きの変化)であり、その値は正又は負である。
Influence amount related to the number of inflows = Speed change of the outflow number + Speed change of the net increase Here, the speed change of the outflow number and the speed change of the net increase are the speed change before and after the month related to the target change point (change in slope), respectively. ) And its value is positive or negative.

また、仮に、流入数側が選択データである場合、流出数に関する影響量は、以下のように求めることができる。   Further, if the inflow number side is selection data, the influence amount relating to the outflow number can be obtained as follows.

流出数に関する影響量=流入数の速度変化−純増数の速度変化
なお、ステップS307は、対象変化点に係る時期において選択データの折れ線モデルが変化点を有さない場合に実行される。すなわち、ステップS307は、対象変化点に係る時期における選択データの折れ線モデルの速度変化が0である場合には、非選択データ側が、正又は負の純増数の速度変化分が影響を受けたものと推定し、当該速度変化分を、非選択データ側に関する影響量とする趣旨である。したがって、上記の通り、流入数側が選択データである場合には、流出数に関する影響量が算出されているのである。仮に、流出数側が選択データである場合には、ステップS307では、流入数に関する影響量が算出される。
Influence amount relating to outflow number = speed change in inflow number−speed change in net increase Note that step S307 is executed when the polygonal line model of the selection data does not have a change point at the time related to the target change point. That is, in step S307, when the speed change of the polyline model of the selected data at the time related to the target change point is 0, the non-selected data side is affected by the speed change of the positive or negative net increase. The speed change is assumed to be an influence amount on the non-selected data side. Therefore, as described above, when the inflow number side is the selection data, the influence amount related to the outflow number is calculated. If the outflow number side is selection data, the influence amount related to the inflow number is calculated in step S307.

なお、ステップS305又はS307において算出される、自社サービスの流入数又は流出数に関する影響量は、他社サービスからの流出数又は他社サービスへの流入数の速度変化であると推定することができる。すなわち、自社サービスの流入数に関する影響量は、他社サービスから流出数の速度変化であり、自社サービスの流出数に関する影響量は、他社サービスへの流入数の速度変化であると推定することができる。   In addition, it can be estimated that the influence amount regarding the number of inflows or outflows of the company service calculated in step S305 or S307 is a speed change of the number of outflows from other company services or the number of inflows into other company services. In other words, it can be estimated that the influence amount related to the number of inflows of company services is a change in the number of outflows from other company services, and the influence amount related to the number of outflows of company services is a change in the number of inflows to other company services. .

ステップS305又はS307に続いて、影響量推定部15は、各他社サービスのそれぞれの契約数者数の時系列データの折れ線モデルを取得する(S308)。続いて、影響量推定部15は、他社サービスの契約者数の時系列データの折れ線モデルの中から、対象変化点に係る時期(月)に変化点を有する折れ線モデルに係る他社サービスが、ステップS305又はS307における影響量に係る影響を与えた他社サービスであると判定する(S309)。例えば、自社サービスの流出速度が増加しており、他社サービスの純増速度が増加している場合、自社サービスから流出した顧客がその他社サービスを契約(採用)したと判定できる。この場合に算出される影響量は、流出数の速度変化である。なお、該当する折れ線モデルが複数有る場合、当該折れ線モデルに係る複数の他社サービスが、影響を与えた他社サービスであるとして判定されてもよい。なお、自社サービスの流入数に関して影響を与えた他社サービスは、例えば、自社サービスへの直接的又は間接的な流出元の他社サービスであると推定できる。間接的とは、当該他社サービスから自社サービスへの契約者の流れにおいて、当該他社サービスと自社サービスとの間に更に別の他社サービスが介在している状態をいう。また、自社サービスの流出数に関して影響を与えた他社サービスは、例えば、自社サービスからの直接的又は間接的な流出先の他社サービスであると推定できる。   Subsequent to step S305 or S307, the influence amount estimation unit 15 obtains a line model of time series data of the number of subscribers of each company's service (S308). Subsequently, the influence amount estimation unit 15 determines whether the service of the other company related to the line model having a change point at the time (month) related to the target change point from among the line model of the time series data of the number of subscribers of the service of the other company. It is determined that the service is a service of another company that has influenced the influence amount in S305 or S307 (S309). For example, if the outflow rate of the company service is increasing and the net increase rate of the service of the other company is increasing, it can be determined that the customer outflowing from the company service has contracted (adopted) the service of the other company. The influence amount calculated in this case is a change in the number of outflows. In addition, when there are a plurality of applicable line model, it may be determined that a plurality of other company services related to the broken line model are the other company services that have influenced. In addition, it can be estimated that the service of another company that has influenced the number of inflows of the company service is, for example, the service of another company that directly or indirectly leaks into the company service. Indirect means a state in which another competitor service is interposed between the competitor service and the company service in the flow of the contractor from the company service to the company service. In addition, it can be estimated that the service of another company that has influenced the number of outflows of the company service is, for example, the service of another company directly or indirectly from the company service.

上述したように、本実施の形態によれば、市場における顧客の動きを把握可能とすることができる。例えば、事業主から見ると顧客数の純増に影響を与えないが、流入数及び流出数を変化させる成分である還流量を推定することができる。また、純増に影響を与える流入数又は流出数に基づいて、他社のサービスによって自社のサービスが受けた影響量や、当該影響量に係る影響元の他社サービスを推定することができる。   As described above, according to the present embodiment, it is possible to grasp the movement of customers in the market. For example, when viewed from the business owner, it does not affect the net increase in the number of customers, but it is possible to estimate the amount of reflux that is a component that changes the number of inflows and outflows. In addition, based on the number of inflows or outflows that affect the net increase, it is possible to estimate the amount of influence received by the services of other companies on the services of other companies and the services of other companies that are affected by the influence amount.

なお、本実施の形態では、サービスを提供する事業者が競合要素である例について説明したが、商品を販売する事業者等、市場において他の事業者と競合しうる他の競合要素に関して、本実施の形態が適用されてもよい。   In the present embodiment, an example in which a service provider is a competitive element has been described. However, with respect to other competitive elements that can compete with other operators in the market, such as a business that sells products, Embodiments may be applied.

なお、本実施の形態において、対数時間変換部12は、変換部の一例である。折れ線モデル生成部13は、生成部の一例である。還流量推定部14は、第一の推定部の一例である。影響量推定部15は、第二の推定部の一例である。   In the present embodiment, the logarithmic time conversion unit 12 is an example of a conversion unit. The polygonal line model generation unit 13 is an example of a generation unit. The reflux amount estimation unit 14 is an example of a first estimation unit. The influence amount estimation unit 15 is an example of a second estimation unit.

以上、本発明の実施例について詳述したが、本発明は斯かる特定の実施形態に限定されるものではなく、特許請求の範囲に記載された本発明の要旨の範囲内において、種々の変形・変更が可能である。   As mentioned above, although the Example of this invention was explained in full detail, this invention is not limited to such specific embodiment, In the range of the summary of this invention described in the claim, various deformation | transformation・ Change is possible.

10 推定装置
11 対数原点設定部
12 対数時間変換部
13 折れ線モデル生成部
14 還流量推定部
15 影響量推定部
100 ドライブ装置
101 記録媒体
102 補助記憶装置
103 メモリ装置
104 CPU
105 インタフェース装置
121 流入出数記憶部
122 契約者数記憶部
B バス
DESCRIPTION OF SYMBOLS 10 Estimation apparatus 11 Logarithmic origin setting part 12 Logarithmic time conversion part 13 Polygonal line model production | generation part 14 Reflux amount estimation part 15 Influence amount estimation part 100 Drive apparatus 101 Recording medium 102 Auxiliary storage apparatus 103 Memory apparatus 104 CPU
105 Interface Device 121 Inflow / Outflow Number Storage Unit 122 Contractor Number Storage Unit B Bus

Claims (7)

第一の競合要素に関する採用者の流入数、流出数、純増数のそれぞれに関する時系列データを、時間軸を対数にした時系列データに変換する変換部と、
変換後のそれぞれの時系列データに近似した折れ線モデルを生成する生成部と、
前記純増数に係る折れ線モデルの変化点に該当しない時期における、前記流入数に係る折れ線モデル又は前記流出数に係る折れ線モデルの傾きの変化量を、純増数には影響を与えないが、流入数又は流出数を変化させる成分である還流量として推定する第一の推定部と、
を有することを特徴とする推定装置。
A conversion unit that converts time-series data regarding the number of inflows, outflows, and net increase of employers regarding the first competitive element into time-series data with a logarithmic time axis;
A generator that generates a line model approximating each converted time series data;
The amount of change in the slope of the line model related to the number of inflows or the line model related to the number of outflows at a time not corresponding to the change point of the line model related to the net increase does not affect the net increase, but the number of inflows Alternatively, a first estimation unit that estimates a reflux amount that is a component that changes the outflow number,
The estimation apparatus characterized by having.
前記第一の推定部は、前記流入数に係る折れ線モデル又は前記流出数に係る折れ線モデルのうち、それぞれの折れ線モデルに係る変換後の時系列データとの誤差が相対的に小さい折れ線モデルについての、前記純増数に係る折れ線モデルの変化点に該当しない時期における傾きの変化量を、前記還流量として推定する、
ことを特徴とする請求項1記載の推定装置。
The first estimation unit is configured for a line model with a relatively small error with respect to the time-series data after conversion related to each line model among the line model related to the number of inflows or the line model related to the number of outflows. , Estimating the amount of change in the slope at a time not corresponding to the changing point of the polygonal line model related to the net increase as the reflux amount,
The estimation apparatus according to claim 1.
第一の競合要素に関する採用者の流入数、流出数、純増数のそれぞれに関する時系列データを、時間軸を対数にした時系列データに変換する変換部と、
変換後のそれぞれの時系列データに近似した折れ線モデルを生成する生成部と、
前記純増数に係る第一の折れ線モデルの変化点に係る時期において、前記流入数に係る第二の折れ線モデル又は前記流出数に係る第三の折れ線モデルが変化点を有する場合に、当該変化点に係る時期における前記第二の折れ線モデル又は前記第三の折れ線モデルの傾きの変化量を、前記第一の競合要素と競合する1以上の第二の競合要素のいずれかからの、前記流入数又は前記流出数に関する影響量として推定する第二の推定部と、
を有することを特徴とする推定装置。
A conversion unit that converts time-series data regarding the number of inflows, outflows, and net increase of employers regarding the first competitive element into time-series data with a logarithmic time axis;
A generator that generates a line model approximating each converted time series data;
If the second line model related to the number of inflows or the third line model related to the number of outflows has a change point at the time related to the change point of the first line model related to the net increase, the change point The amount of inflow from one of the one or more second competing elements competing with the first competing element for the amount of change in the slope of the second bent line model or the third broken line model at the time concerning Or a second estimation unit for estimating the influence amount relating to the number of outflows,
The estimation apparatus characterized by having.
前記第二の推定部は、前記第二の折れ線モデル又は前記第三の折れ線モデルのうち、それぞれの折れ線モデルに係る変換後の時系列データとの誤差が相対的に小さい方の折れ線モデルが、前記第一の折れ線モデルの変化点に係る時期において変化点を有さない場合は、当該時期における前記第一の折れ線モデルの傾きの変化量を、前記流入数及び前記流出数のうち前記誤差が相対的に大きい方に関する、いずれかの前記第二の競合要素からの影響量として推定する、
ことを特徴とする請求項3記載の推定装置。
The second estimation unit, the second line model or the third line model, the line model of which the error is relatively smaller with the time-series data after conversion related to each line model, When there is no change point at the time related to the change point of the first broken line model, the amount of change in the slope of the first broken line model at the time is calculated as the error among the inflow number and the outflow number. Estimated as the influence amount from any of the second competitive factors with respect to the relatively larger one,
The estimation apparatus according to claim 3.
前記変換部は、更に、それぞれの前記第二の競合要素に関する採用者数の時系列データを、時間軸を対数にした時系列データに変換し、
前記生成部は、更に、前記第二の競合要素のそれぞれの採用者数に係る変換後の時系列データに近似した折れ線モデルを生成し、
前記第二の推定部は、更に、前記第二の競合要素のそれぞれの採用者数に係る折れ線モデルのうち、前記第一の折れ線モデルの変化点に係る時期において変化点を有する折れ線モデルに係る前記第二の競合要素を、前記影響量に係る影響元であると推定する、
ことを特徴とする請求項3又は4記載の推定装置。
The conversion unit further converts the time series data of the number of employers related to each of the second competitive elements into time series data with a logarithmic time axis,
The generation unit further generates a line model approximating the time series data after conversion relating to the number of employers of each of the second competitive elements,
The second estimation unit further relates to a line model having a change point at a time point related to a change point of the first line model among the line models related to the number of employers of the second competitive element. Presuming that the second competitive factor is an influence source related to the influence amount;
The estimation apparatus according to claim 3 or 4, characterized by the above.
コンピュータが、
第一の競合要素に関する採用者の流入数、流出数、純増数のそれぞれに関する時系列データを、時間軸を対数にした時系列データに変換する変換手順と、
変換後のそれぞれの時系列データに近似した折れ線モデルを生成する生成手順と、
前記純増数に係る折れ線モデルの変化点に該当しない時期における、前記流入数に係る折れ線モデル又は前記流出数に係る折れ線モデルの傾きの変化量を、純増数には影響を与えないが、流入数又は流出数を変化させる成分である還流量として推定する第一の推定手順と、
を実行することを特徴とする推定方法。
Computer
A conversion procedure for converting time-series data regarding the number of inflows, outflows, and net increase of employers regarding the first competitive element into time-series data with a logarithmic time axis;
Generation procedure to generate a line model approximating each time series data after conversion,
The amount of change in the slope of the line model related to the number of inflows or the line model related to the number of outflows at a time not corresponding to the change point of the line model related to the net increase does not affect the net increase, but the number of inflows Alternatively, a first estimation procedure for estimating the amount of reflux, which is a component that changes the outflow number,
The estimation method characterized by performing.
コンピュータが、
第一の競合要素に関する採用者の流入数、流出数、純増数のそれぞれに関する時系列データを、時間軸を対数にした時系列データに変換する変換手順と、
変換後のそれぞれの時系列データに近似した折れ線モデルを生成する生成手順と、
前記純増数に係る第一の折れ線モデルの変化点に係る時期において、前記流入数に係る第二の折れ線モデル又は前記流出数に係る第三の折れ線モデルが変化点を有する場合に、当該変化点に係る時期における前記第二の折れ線モデル又は前記第三の折れ線モデルの傾きの変化量を、前記第一の競合要素と競合する1以上の第二の競合要素のいずれかからの、前記流入数又は前記流出数に関する影響量として推定する第二の推定手順と、
を実行することを特徴とする推定方法。
Computer
A conversion procedure for converting time-series data regarding the number of inflows, outflows, and net increase of employers regarding the first competitive element into time-series data with a logarithmic time axis;
Generation procedure to generate a line model approximating each time series data after conversion,
If the second line model related to the number of inflows or the third line model related to the number of outflows has a change point at the time related to the change point of the first line model related to the net increase, the change point The amount of inflow from one of the one or more second competing elements competing with the first competing element for the amount of change in the slope of the second bent line model or the third broken line model at the time concerning Or a second estimation procedure for estimating the influence amount related to the number of outflows,
The estimation method characterized by performing.
JP2014230678A 2014-11-13 2014-11-13 Estimation apparatus and estimation method Active JP6328539B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014230678A JP6328539B2 (en) 2014-11-13 2014-11-13 Estimation apparatus and estimation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014230678A JP6328539B2 (en) 2014-11-13 2014-11-13 Estimation apparatus and estimation method

Publications (2)

Publication Number Publication Date
JP2016095626A true JP2016095626A (en) 2016-05-26
JP6328539B2 JP6328539B2 (en) 2018-05-23

Family

ID=56071131

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014230678A Active JP6328539B2 (en) 2014-11-13 2014-11-13 Estimation apparatus and estimation method

Country Status (1)

Country Link
JP (1) JP6328539B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020174049A1 (en) * 2001-05-14 2002-11-21 Yasutomi Kitahara Apparatus and method for supporting investment decision making, and computer program
JP2011133945A (en) * 2009-12-22 2011-07-07 Nippon Telegr & Teleph Corp <Ntt> Demand forecast device, demand forecast method, and program
JP2014215761A (en) * 2013-04-24 2014-11-17 日本電信電話株式会社 Method and device for analyzing change in market situation by using hierarchical relation between commodity categories
JP2014215715A (en) * 2013-04-23 2014-11-17 日本電信電話株式会社 Device and method for analyzing change in market situation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020174049A1 (en) * 2001-05-14 2002-11-21 Yasutomi Kitahara Apparatus and method for supporting investment decision making, and computer program
JP2011133945A (en) * 2009-12-22 2011-07-07 Nippon Telegr & Teleph Corp <Ntt> Demand forecast device, demand forecast method, and program
JP2014215715A (en) * 2013-04-23 2014-11-17 日本電信電話株式会社 Device and method for analyzing change in market situation
JP2014215761A (en) * 2013-04-24 2014-11-17 日本電信電話株式会社 Method and device for analyzing change in market situation by using hierarchical relation between commodity categories

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
下川 信祐外2名: "ビッグデータ技術のトラフィック分析への応用 新しいS字成長曲線モデルを利用した需要構造マクロ分析技術", NTT技術ジャーナル, vol. 第25巻第7号, JPN6018012204, 1 July 2013 (2013-07-01), JP, pages 25 - 28 *

Also Published As

Publication number Publication date
JP6328539B2 (en) 2018-05-23

Similar Documents

Publication Publication Date Title
US10417650B1 (en) Distributed and automated system for predicting customer lifetime value
US8180710B2 (en) System, method and computer program product for an interactive business services price determination and/or comparison model
Dubreuil et al. Construction of bootstrap confidence intervals on sensitivity indices computed by polynomial chaos expansion
CN110020877B (en) Click rate prediction method, click rate determination method and server
JP5373870B2 (en) Prediction device, prediction method, and program
US20150278403A1 (en) Methods and systems for modeling crowdsourcing platform
WO2016188498A1 (en) Wireless network throughput evaluating method and device
JP6647992B2 (en) Design support equipment
JP7010674B2 (en) Power Demand Forecasting Device, Power Demand Forecasting Method and Program
JP6069460B1 (en) Device, method and program for selecting explanatory variables
RU2640637C2 (en) Method and server for conducting controlled experiment using prediction of future user behavior
CN112352235A (en) Causal analysis
US9188968B2 (en) Run-time characterization of on-demand analytical model accuracy
JP2017227994A (en) Human flow prediction device, parameter estimation device, method and program
JP6328539B2 (en) Estimation apparatus and estimation method
US20150269587A1 (en) Methods for predicting customer satisfaction and devices thereof
JP5636922B2 (en) Performance prediction apparatus, performance prediction method, and program
JP2015184818A (en) Server, model application propriety determination method and computer program
JP2012181739A (en) Man-hour estimation device, man-hour estimation method, and man-hour estimation program
CN110852322A (en) Method and device for determining region of interest
JP2014215761A (en) Method and device for analyzing change in market situation by using hierarchical relation between commodity categories
JP4956380B2 (en) Communication band calculation apparatus, method, and program
JP2014215715A (en) Device and method for analyzing change in market situation
JP6324124B2 (en) Prediction system, prediction method, and prediction program
US9785904B2 (en) Methods and systems for demonstrating and applying productivity gains

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170214

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20170214

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20170214

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180223

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180417

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180418

R150 Certificate of patent or registration of utility model

Ref document number: 6328539

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150