JP2016067146A - Power supply system - Google Patents

Power supply system Download PDF

Info

Publication number
JP2016067146A
JP2016067146A JP2014195215A JP2014195215A JP2016067146A JP 2016067146 A JP2016067146 A JP 2016067146A JP 2014195215 A JP2014195215 A JP 2014195215A JP 2014195215 A JP2014195215 A JP 2014195215A JP 2016067146 A JP2016067146 A JP 2016067146A
Authority
JP
Japan
Prior art keywords
power
power source
distributed
distributed power
power generation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2014195215A
Other languages
Japanese (ja)
Other versions
JP6428093B2 (en
Inventor
▲高▼田 和政
和政 ▲高▼田
Kazumasa Takada
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aisin Corp
Original Assignee
Aisin Seiki Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aisin Seiki Co Ltd filed Critical Aisin Seiki Co Ltd
Priority to JP2014195215A priority Critical patent/JP6428093B2/en
Publication of JP2016067146A publication Critical patent/JP2016067146A/en
Application granted granted Critical
Publication of JP6428093B2 publication Critical patent/JP6428093B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Abstract

PROBLEM TO BE SOLVED: To provide a power supply system that makes a user feel no inconvenience and effectively suppresses a power consumption peak.SOLUTION: A controller estimates a power generation amount of a first distributed power supply (using renewable energy) on the basis of meteorological information acquired in advance (S110); and, when the estimated power generation amount is smaller than a power amount necessary for a load, compensates for its shortage power amount by power generation of a second distributed power supply (S112, 122). The controller determines, on the basis of at least information related to a peak cut request, start time of a second distributed power supply operation control unit starting power generation using the second distributed power supply (power generation using a gas) (S116-120).SELECTED DRAWING: Figure 2

Description

本発明は、電力供給システムに関する。   The present invention relates to a power supply system.

電力供給システムの一形式として、特許文献1に示されているものが知られている。電力供給システムは、特許文献1の図1に示すように、各時間帯Tに設定されているエネルギー利用価格PTnや利用者Uが享受できる追加サービスSTnを提示し、利用者Uが希望する時間帯Tに利用予約を変更した場合に、変更後の時間帯Tに設定されているエネルギー利用価格PTnおよび追加サービスSTnのいずれか一方または両方を利用予約変更した利用者Uに割り当てる調整装置、および、エネルギー利用価格PTnや利用者Uが享受できる追加サービスSTnを受信した場合に、利用者Uが希望する時間帯Tへの利用予約の変更を受け付け、その変更情報を調整装置に送る利用者装置を備える。 As one type of power supply system, one disclosed in Patent Document 1 is known. As shown in FIG. 1 of Patent Document 1, the power supply system presents an energy usage price P Tn set in each time zone T n and an additional service S Tn that can be enjoyed by the user U. A user who has changed the use reservation at one or both of the energy use price P Tn and the additional service S Tn set in the changed time zone T n when the use reservation is changed in the desired time zone T n When the adjustment device allocated to U and the energy usage price P Tn or the additional service S Tn that can be enjoyed by the user U are received, the change of the use reservation to the time zone T n desired by the user U is accepted, and A user device for sending change information to the adjustment device is provided.

特開2007−3345423号公報JP 2007-3345423 A

上述した特許文献1に記載の電力供給システムにおいては、エネルギー利用の時間帯の変更に利用者が応じた場合には、実際に利用者がエネルギーを使用した時間帯におけるエネルギー代金の割引を行うといったインセンティブを提供することにより、利用者に対してエネルギー利用時間帯の変更を促すことが可能となる。   In the power supply system described in Patent Document 1 described above, when the user responds to a change in the time zone of energy use, the user actually discounts the energy price in the time zone in which the user uses energy. By providing an incentive, it is possible to prompt the user to change the energy usage time zone.

しかし、この電力供給システムにおいては、利用者が希望通りの時間に家電製品を使用できなかったり、また、利用者にピークカット要請があった場合、利用者が利用時間帯を変更しないため、消費電力ピークを効果的に抑制できなかったりするという問題があった。   However, in this power supply system, if the user cannot use the home appliance at the desired time, or if the user requests a peak cut, the user will not change the usage time zone. There has been a problem that the power peak cannot be effectively suppressed.

そこで、本発明は、上述した問題を解消するためになされたもので、電力供給システムにおいて、利用者に不便さを感じさせず、かつ、消費電力ピークを効果的に抑制することを目的とする。   Therefore, the present invention has been made to solve the above-described problems, and it is an object of the present invention to effectively suppress the power consumption peak without causing the user to feel inconvenience in the power supply system. .

上記の課題を解決するため、請求項1に係る電力供給システムは、系統電源と、系統電源に主電線を介して電気的に接続されている負荷と、再生可能なエネルギーを使用して電力を生成して主電線に送電する第一分散型電源と、化石燃料を利用して電力を生成して主電線に送電する第二分散型電源と、第一分散型電源および第二分散型電源を制御する制御装置と、を備えている電力供給システムであって、制御装置は、第一分散型電源の発電量を、事前に取得した気象情報に基づいて推定する推定部と、推定部によって推定された発電量が負荷の必要電力量に対して小さい場合、その不足電力量を第二分散型電源の発電によって補う第二分散型電源運転制御部と、第二分散型電源運転制御部による第二分散型電源の発電の開始時刻を、少なくともピークカット要請に係る情報に基づいて決定する決定部と、を備えている。   In order to solve the above problems, a power supply system according to claim 1 is configured to supply power using a system power source, a load electrically connected to the system power source via a main wire, and renewable energy. A first distributed power source that generates and transmits power to the main wire, a second distributed power source that generates power using fossil fuel and transmits the power to the main wire, and a first distributed power source and a second distributed power source. A control device that controls the power supply system, wherein the control device estimates the power generation amount of the first distributed power source based on weather information acquired in advance, and the estimation unit estimates the power generation amount When the generated power generation amount is smaller than the required power amount of the load, the second distributed power source operation control unit that compensates for the insufficient power amount by the power generation of the second distributed power source and the second distributed power source operation control unit Reduce the start time of power generation with two distributed power sources Also comprises a determination unit for determining based on the information relating to the peak cut request, the.

これによれば、気象情報に基づいて推定された第一分散型電源の発電量が、負荷の必要電力量(利用者が使用を希望する家電製品の総消費量に相当する)に対して小さい場合、その不足電力量は第二分散型電源の発電によって補うことができる。よって、利用者にピークカット要請があった時間帯と重なったとしも、利用者は希望通りの時間に家電製品を使用できる。さらに、第二分散型電源の発電開始時刻は、少なくともピークカット要請に係る情報に基づいて決定される。よって、第二分散型電源はピークカット時間帯に発電することができ、系統電源から買電しなくてすむため、消費電力ピークを効果的に抑制することができる。このように、電力供給システムは、利用者に不便さを感じさせず、かつ、消費電力ピークを効果的に抑制することができる。   According to this, the power generation amount of the first distributed power source estimated based on weather information is smaller than the required power amount of the load (corresponding to the total consumption amount of home appliances that the user desires to use). In this case, the shortage of electric power can be compensated by power generation of the second distributed power source. Therefore, even if it overlaps with the time when the user requested peak cut, the user can use the home appliance at the desired time. Furthermore, the power generation start time of the second distributed power source is determined based on at least information related to the peak cut request. Therefore, the second distributed power source can generate power during the peak cut time period, and it is not necessary to purchase power from the system power source. Therefore, the power consumption peak can be effectively suppressed. Thus, the power supply system does not make the user feel inconvenient and can effectively suppress the power consumption peak.

本発明の一実施形態における電力供給システムの概要図である。It is a schematic diagram of the power supply system in one embodiment of the present invention. 図1に示す制御装置で実行される制御プログラムのフローチャートである。It is a flowchart of the control program performed with the control apparatus shown in FIG.

以下、本発明による電力供給システムの一実施形態について図1に示す電力供給システム概要図に基づいて説明する。電力供給システム10は、系統電源11、負荷12、主電線13、第一分散型電源14、第二分散型電源15、蓄電池16、分電盤17および制御装置18を備えている。   Hereinafter, an embodiment of a power supply system according to the present invention will be described based on a schematic diagram of a power supply system shown in FIG. The power supply system 10 includes a system power supply 11, a load 12, a main wire 13, a first distributed power supply 14, a second distributed power supply 15, a storage battery 16, a distribution board 17, and a control device 18.

系統電源11は、負荷12に主電線13を介して電気的に接続されており、負荷12に電力(交流電力)を供給している。負荷12は、第一分散型電源14、第二分散型電源15および蓄電池16とは別体に配設されている電力負荷であり、例えば家庭内に配設されているテレビなどの家電製品である。   The system power supply 11 is electrically connected to the load 12 via the main electric wire 13, and supplies power (AC power) to the load 12. The load 12 is a power load arranged separately from the first distributed power supply 14, the second distributed power supply 15, and the storage battery 16, and is a home appliance such as a television installed in a home, for example. is there.

第一分散型電源14、第二分散型電源15および蓄電池16は、主電線13に対して並列に接続されている。主電線13には、分電盤17が配設されている。系統電源11、負荷12、第一分散型電源14、第二分散型電源15および蓄電池16は、分電盤17に接続されている。本実施形態の電力供給システム10は、1つの第一分散型電源14と、1つの第二分散型電源15とから構成されているが、第一分散型電源14および第二分散型電源15はいずれも少なくとも1つ以上で構成されるようにしてもよい。   The first distributed power source 14, the second distributed power source 15, and the storage battery 16 are connected in parallel to the main wire 13. A distribution board 17 is disposed on the main electric wire 13. The system power supply 11, the load 12, the first distributed power supply 14, the second distributed power supply 15 and the storage battery 16 are connected to a distribution board 17. The power supply system 10 according to the present embodiment includes one first distributed power source 14 and one second distributed power source 15, but the first distributed power source 14 and the second distributed power source 15 are Any of them may be composed of at least one.

第一分散型電源14は、分電盤17内において主電線13に接続されている。第一分散型電源14は、再生可能なエネルギーを使用して電力を生成して主電線13に送電する。第一分散型電源14は、自然環境の中で繰り返し起こる現象から作り出すエネルギーである再生可能なエネルギー(例えば太陽光、水力、風力など)を使用した分散型電源である。本実施形態では、第一分散型電源14は、太陽光発電装置を備えており、太陽光発電装置によって発電された電力を所定の電力・電圧に変換して主電線13に出力するように構成されている。   The first distributed power source 14 is connected to the main electric wire 13 in the distribution board 17. The first distributed power source 14 generates electric power using renewable energy and transmits the electric power to the main electric wire 13. The first distributed power source 14 is a distributed power source that uses renewable energy (for example, sunlight, hydraulic power, wind power, etc.) that is energy generated from a phenomenon that occurs repeatedly in a natural environment. In the present embodiment, the first distributed power source 14 includes a solar power generation device, and is configured to convert the power generated by the solar power generation device into predetermined power / voltage and output it to the main wire 13. Has been.

第二分散型電源15は、分電盤17内において主電線13に接続されている。第二分散型電源15は、化石燃料を利用して電力を生成して主電線13に送電する。第二分散型電源15は、供給されるガス(化石燃料の一種であるガス、例えば天然ガス、液化石油ガス)によって発電を行うガス発電装置を有する分散型電源である。ガス発電装置は、例えば、燃料電池発電装置(固体酸化物型燃料電池(SOFC)発電装置、固体高分子形燃料電池(PEFC)発電装置など)、ガスエンジン方式発電装置、ガスタービン方式発電装置などである。本実施形態では、ガス発電装置は、燃料電池発電装置(固体高分子形燃料電池発電装置が好適である)である。第二分散型電源15は、ガス発電装置(固体高分子形燃料電池発電装置)によって発電された電力を所定の電力・電圧に変換して主電線13に出力するように構成されている。   The second distributed power source 15 is connected to the main electric wire 13 in the distribution board 17. The second distributed power source 15 generates electric power using fossil fuel and transmits it to the main electric wire 13. The second distributed power source 15 is a distributed power source having a gas power generation device that generates power using supplied gas (a gas that is a kind of fossil fuel, such as natural gas or liquefied petroleum gas). Examples of the gas power generator include a fuel cell power generator (a solid oxide fuel cell (SOFC) power generator, a polymer electrolyte fuel cell (PEFC) power generator, etc.), a gas engine power generator, a gas turbine power generator, and the like. It is. In the present embodiment, the gas power generation device is a fuel cell power generation device (a polymer electrolyte fuel cell power generation device is preferable). The second distributed power source 15 is configured to convert the power generated by the gas power generation device (solid polymer fuel cell power generation device) into predetermined power / voltage and output it to the main electric wire 13.

蓄電池16は、分電盤17内において主電線13に接続されている。蓄電池16は、例えばリチウムイオン電池である。蓄電池16は、系統電源11、第一分散型電源14、および第二分散型電源15からの電力を蓄えたり、蓄えている電力を負荷12に供給したりする。なお、蓄電池16と、各電源11,14,15との間の接続・開放の切り替えは、制御装置18の指示にしたがって分電盤17が行っている。   The storage battery 16 is connected to the main electric wire 13 in the distribution board 17. The storage battery 16 is, for example, a lithium ion battery. The storage battery 16 stores power from the system power supply 11, the first distributed power supply 14, and the second distributed power supply 15, and supplies the stored power to the load 12. In addition, the switchboard 17 performs connection / release switching between the storage battery 16 and each of the power supplies 11, 14, 15 in accordance with instructions from the control device 18.

分電盤17は、系統電源11、負荷12、第一分散型電源14、第二分散型電源15および蓄電池16に接続されている。分電盤17は、制御装置18の指示にしたがって、系統電源11、負荷12、第一分散型電源14、第二分散型電源15、蓄電池16の間の接続・開放の切り替えを行っている。   The distribution board 17 is connected to the system power supply 11, the load 12, the first distributed power supply 14, the second distributed power supply 15, and the storage battery 16. The distribution board 17 switches connection / release among the system power supply 11, the load 12, the first distributed power supply 14, the second distributed power supply 15, and the storage battery 16 in accordance with instructions from the control device 18.

制御装置18は、第一分散型電源14、第二分散型電源15、蓄電池16および分電盤17と互いに通信可能に接続されている。制御装置18は、第一分散型電源14、第二分散型電源15、蓄電池16および分電盤17を制御する。制御装置18は、インターネット20を介して、天気予報などの気象情報、電気料金、ガス料金、およびピークカット要請を取得する。制御装置18は、マイクロコンピュータ(図示省略)を有しており、マイクロコンピュータは、バスを介してそれぞれ接続された入出力インターフェース、CPU、RAMおよびROM(いずれも図示省略)を備えている。CPUは、第一分散型電源14、第二分散型電源15、蓄電池16および分電盤17を制御する。RAMはCPUが実行するプログラムの実行に必要な変数を一時的に記憶するものであり、ROMは前記プログラムを記憶するものである。   The control device 18 is connected to the first distributed power source 14, the second distributed power source 15, the storage battery 16, and the distribution board 17 so as to communicate with each other. The control device 18 controls the first distributed power source 14, the second distributed power source 15, the storage battery 16, and the distribution board 17. The control device 18 acquires weather information such as weather forecasts, electricity charges, gas charges, and peak cut requests via the Internet 20. The control device 18 includes a microcomputer (not shown), and the microcomputer includes an input / output interface, a CPU, a RAM, and a ROM (all not shown) connected via a bus. The CPU controls the first distributed power source 14, the second distributed power source 15, the storage battery 16, and the distribution board 17. The RAM temporarily stores variables necessary for executing the program executed by the CPU, and the ROM stores the program.

次に上述した電力供給システム10の作動について図2に示すフローチャートに基づいて説明する。制御装置18は、そのフローチャートに沿ったプログラムを所定時間毎に繰り返し実行する。   Next, the operation of the above-described power supply system 10 will be described based on the flowchart shown in FIG. The control device 18 repeatedly executes the program according to the flowchart every predetermined time.

制御装置18は、ステップS102において、インターネット20経由で動的電気料金を取得する。動的電気料金は、通常の電気料金と同様に時間帯別に電気料金が設定されているが、通常の電気料金より割高に設定されている時間帯がある。例えば、午後1:00〜午後3:00の時間帯の料金は、通常の昼間料金と比較して高く(例えば5倍)設定されている。   In step S <b> 102, the control device 18 acquires a dynamic electricity bill via the Internet 20. As for the dynamic electricity rate, the electricity rate is set for each time zone in the same manner as the normal electricity rate, but there is a time zone set higher than the normal electricity rate. For example, the charge in the time zone from 1:00 pm to 3:00 pm is set higher (for example, five times) than the normal daytime charge.

制御装置18は、ステップS104において、取得した動的電気料金からピークカット要請(ピークシフト要請)があるか否かを判定する。制御装置18は、動的電気料金の時間帯のなかに、通常の昼間料金より高く設定された時間帯があれば、ピークカット要請があると判定する。また、制御装置18は、インターネット20経由で電気事業者からピークカット要請情報を直接受け取った場合、ピークカット要請があると判定してもよい。ピークカットは、最大電気消費量そのものを下げることをいう。ピークカットは、系統電源11から供給される電力量を下げることでもある。ピークシフトは、昼間の電力需要ピーク時の電力消費を抑え、余力のある夜間に電力消費を分散させることをいう。ピークシフトは、昼間での分散型電源の発電を抑え、夜間に分散型電源の発電を分散させることでもある。
なお、動的電気料金、および電気事業者からのピークカット要請は、ピークカット要請に係る情報である。
In step S104, the control device 18 determines whether or not there is a peak cut request (peak shift request) from the acquired dynamic electricity bill. The control device 18 determines that there is a peak cut request if there is a time zone set higher than the normal daytime fee in the time zone of the dynamic electricity bill. The control device 18 may determine that there is a peak cut request when the peak cut request information is directly received from the electric utility via the Internet 20. Peak cut refers to reducing the maximum electricity consumption itself. The peak cut is also to reduce the amount of power supplied from the system power supply 11. The peak shift is to suppress power consumption at the time of peak power demand in the daytime and to distribute power consumption at night with sufficient power. The peak shift is also to suppress the power generation of the distributed power source in the daytime and to distribute the power generation of the distributed power source at night.
In addition, the dynamic electricity bill and the peak cut request from the electric power company are information related to the peak cut request.

制御装置18は、ピークカット要請があると判定した場合(ステップS104にて「YES」)、ステップS106にてピークカット時間帯を取得する。具体的には、ステップS106において、制御装置18は、通常の昼間料金より高く設定された時間帯をピークカット時間帯として取得する。また、制御装置18は、電気事業者からピークカット要請情報を直接受け取った場合、その情報に含まれているピークカット時間帯をそのまま利用してもよい。   When it is determined that there is a peak cut request (“YES” in step S104), the control device 18 acquires a peak cut time zone in step S106. Specifically, in step S106, the control device 18 acquires a time zone set higher than a normal daytime charge as a peak cut time zone. Moreover, when the control device 18 directly receives the peak cut request information from the electric power company, the control device 18 may use the peak cut time zone included in the information as it is.

制御装置18は、ピークカット要請がないと判定した場合(ステップS104にて「NO」)、または、ステップS106の処理が終了した後、プログラムをステップS108に進めて、第一分散型電源14の発電量を、事前に取得した気象情報に基づいて推定する(推定部)。具体的には、最初に、制御装置18は、ステップS108において、インターネット20経由で天気予報などの気象情報を取得する。気象情報は、翌日以降の予想される気象情報である。電力供給システムが設置されている場所の、時間帯毎の天気、晴天率、日照時間を含むのが好ましい。次に、制御装置18は、ステップS110において、先にステップS108にて取得した気象情報から、太陽光発電装置による発電量を推定する。例えば、翌日の太陽光発電装置による発電量は、翌日の日照時間に、太陽光発電装置の単位時間あたりの発電量を乗じて算出することができる。   When it is determined that there is no peak cut request ("NO" in step S104), or after the process of step S106 is completed, the control device 18 advances the program to step S108, and the first distributed power supply 14 A power generation amount is estimated based on weather information acquired in advance (estimation unit). Specifically, first, the control device 18 acquires weather information such as a weather forecast via the Internet 20 in step S108. The weather information is expected weather information from the next day. It is preferable to include the weather, fine weather rate, and sunshine hours for each time zone where the power supply system is installed. Next, in step S110, the control device 18 estimates the amount of power generated by the solar power generation device from the weather information previously acquired in step S108. For example, the amount of power generated by the solar power generation device on the next day can be calculated by multiplying the amount of power generated per unit time of the solar power generation device by the sunshine time on the next day.

なお、風力発電装置である場合、気象情報は、風向き、風の強さを含むのが好ましい。この場合、翌日の風力発電装置による発電量は、翌日の時間帯毎の風量に、風力発電装置の単位時間あたりの発電量を乗じ、一日分の発電量(各時間帯の発電量)を積算して算出することができる。   In the case of a wind power generator, the weather information preferably includes the wind direction and the strength of the wind. In this case, the amount of power generated by the wind power generator on the next day is multiplied by the amount of power generated per unit time of the wind power generator per hour on the next day, and the amount of power generated per day (the amount of power generated in each time zone) is It can be calculated by integrating.

制御装置18は、ステップS110(推定部)によって推定された発電量(推定発電量)が負荷12の必要電力量に対して小さい場合、その不足電力量を第二分散型電源15の発電によって補う(第二分散型電源運転制御部:ステップS112,122)。負荷12の必要電力量は、負荷12の一日の電力消費パターン(時間帯毎)であり、記憶部(図示しない)に記憶されている。この電力消費パターンは、常に学習・更新されている。不足電力量は、一日の電力消費パターンから推定電力量を減算することで算出することができる。不足電力量は、時間帯毎に算出することができる。
ステップS112において、制御装置18は、推定発電量が負荷12の必要電力量に対して小さいか否かを判定する。なお、推定発電量が負荷12の必要電力量の所定割合(例えば80%)に対して小さいか否かを判定するようにしてもよい。
When the power generation amount (estimated power generation amount) estimated in step S110 (estimating unit) is smaller than the required power amount of the load 12, the control device 18 compensates for the shortage power amount by the power generation of the second distributed power source 15. (Second distributed power operation control unit: Steps S112 and 122). The required power amount of the load 12 is a daily power consumption pattern (for each time zone) of the load 12, and is stored in a storage unit (not shown). This power consumption pattern is constantly learned and updated. The insufficient power amount can be calculated by subtracting the estimated power amount from the daily power consumption pattern. The amount of insufficient power can be calculated for each time zone.
In step S <b> 112, the control device 18 determines whether or not the estimated power generation amount is smaller than the required power amount of the load 12. In addition, you may make it determine whether estimated electric power generation amount is small with respect to the predetermined ratio (for example, 80%) of the required electric energy of the load 12. FIG.

制御装置18は、時間帯毎において不足電力量がある場合、ステップS112にて「YES」と判定し、ステップS114〜122において第二分散型電源の運転(発電)を制御する。一方、制御装置18は、時間帯毎において不足電力量がない場合、ステップS112にて「NO」と判定し、ステップS124において第二分散型電源の運転(発電)を行わない。   When there is an insufficient amount of power for each time period, the control device 18 determines “YES” in step S112, and controls the operation (power generation) of the second distributed power source in steps S114 to S122. On the other hand, if there is no insufficient power amount for each time period, the control device 18 determines “NO” in step S112, and does not operate (power generation) the second distributed power source in step S124.

ピークカット要請がない場合には、制御装置18は、ステップS114にて「NO」と判定し、ピークカット時間帯に基づいて第二分散型電源15の発電時間帯を決定する。すなわち、制御装置18は、動的電気料金(ピークカット要請に係る情報)から電気料金の割高な時間帯を選択し、その時間帯をピークカット時間帯に設定し、ピークカット時間帯を発電時間帯に決定する。これにより、利用者は、割高な電気を購入しなくても、第二分散型電源15の発電により負荷12に必要な電力を賄うことができる。
なお、発電時間帯は、発電運転の開始時刻から終了時刻までの時間帯である。なお、発電時間帯の代わりに運転時間帯を決定するようにしてもよい。運転時間帯は、起動運転の開始時刻から停止運転の終了時刻までの時間帯である。
When there is no peak cut request, the control device 18 determines “NO” in step S114, and determines the power generation time zone of the second distributed power source 15 based on the peak cut time zone. That is, the control device 18 selects an expensive time zone of the electricity rate from the dynamic electricity rate (information related to the peak cut request), sets the time zone as the peak cut time zone, and sets the peak cut time zone as the power generation time. Decide on a belt. Thereby, the user can cover the power required for the load 12 by the power generation of the second distributed power source 15 without purchasing expensive electricity.
The power generation time zone is a time zone from the start time to the end time of the power generation operation. Note that the operation time zone may be determined instead of the power generation time zone. The operation time zone is a time zone from the start time of the start operation to the end time of the stop operation.

ピークカット要請がある場合には、制御装置18は、ピークカット時間帯に第二分散型電源15を発電させたときに、利用者が受ける第一利益と、ピークカット時間帯とは異なるピークシフト時間帯に第二分散型電源15を発電させたときに、利用者が受ける第二利益と、を比較することにより、第二分散型電源15の発電時間帯を決定する(決定部)。   When there is a peak cut request, the control device 18 causes the first benefit received by the user when the second distributed power source 15 generates power during the peak cut time period, and a peak shift different from the peak cut time period. The power generation time zone of the second distributed power source 15 is determined by comparing the second benefit received by the user when the second distributed power source 15 is generated during the time zone (decision unit).

具体的には、制御装置18は、ステップS116において、第一利益および第二利益を算出し、それぞれ算出した第一利益と第二利益とを比較する。第一利益は、ピークシフトに協力することにより利用者が受け取る利益(ピークシフト協力費。例えば、電気料金のキャッシュバック)と、ピークカット時間帯に第二分散型電源を発電させたときに使用されるガスのガス料金との差分として算出することができる。第二利益は、ピークシフトに協力することにより利用者が受け取る利益と、ピークシフト時間帯に第二分散型電源を発電させたときに使用されるガスのガス料金との差分として算出することができる。   Specifically, in step S116, the control device 18 calculates the first profit and the second profit, and compares the calculated first profit and the second profit, respectively. The first profit is the profit that the user receives by cooperating with the peak shift (peak shift cooperation cost. For example, cashback of electricity charges) and used when generating the second distributed power source during peak cut time It can be calculated as a difference from the gas charge of the gas to be made. The second profit can be calculated as the difference between the profit received by the user by cooperating with the peak shift and the gas charge of the gas used when the second distributed power source is generated during the peak shift time period. it can.

なお、第二分散型電源を運転させた際に発生する熱エネルギー(貯湯水)も、利用者の利益として考慮するのが好ましい。また、ピークシフト時間帯は、不足電力量を賄うことができる発電量(すなわち出力電力量と発電時間との積)、その発電量に必要なガス量、発電時間帯のガス料金から設定されている。   In addition, it is preferable to consider the thermal energy (hot water storage water) which generate | occur | produces when operating a 2nd distributed power supply as a user's profit. The peak shift time zone is set based on the amount of power generation that can cover the amount of power shortage (that is, the product of the output power amount and the power generation time), the amount of gas required for that power generation amount, and the gas charge for the power generation time zone. Yes.

制御装置18は、第二利益(ピークシフト時間帯に第二分散型電源15を発電)が、第一利益(ピークカット時間帯に第二分散型電源15を発電)より大きい場合、ステップS116にて「YES」と判定し、ピークシフト時間帯に基づいて第二分散型電源15の発電時間帯を決定する(ステップS118)。具体的には、制御装置18は、ピークシフト時間帯の開始時刻より所定時間(例えば1時間)前の時刻を起動運転の開始時刻に決定し、ピークシフト時間帯の終了時刻を停止運転の開始時刻に決定する。なお、ピークシフト時間帯と発電時間帯は一致する。   If the second profit (power generation of the second distributed power supply 15 during the peak shift time period) is greater than the first profit (power generation of the second distributed power supply 15 during the peak cut time period), the control device 18 proceeds to step S116. "YES" is determined, and the power generation time zone of the second distributed power supply 15 is determined based on the peak shift time zone (step S118). Specifically, the control device 18 determines a time before a predetermined time (for example, 1 hour) from the start time of the peak shift time zone as the start time of the start operation, and sets the end time of the peak shift time zone as the start of the stop operation. Decide on time. The peak shift time zone and the power generation time zone coincide.

一方、制御装置18は、第二利益が第一利益より小さい場合、ステップS116にて「NO」と判定し、ピークカット時間帯に基づいて第二分散型電源15の発電時間帯を決定する(ステップS120)。具体的には、制御装置18は、ピークカット時間帯の開始時刻より所定時間(例えば1時間)前の時刻を起動運転の開始時刻に決定し、ピークカット時間帯の終了時刻を停止運転の開始時刻に決定する。なお、ピークカット時間帯と発電時間帯は一致する。   On the other hand, when the second profit is smaller than the first profit, the control device 18 determines “NO” in step S116 and determines the power generation time zone of the second distributed power supply 15 based on the peak cut time zone ( Step S120). Specifically, the control device 18 determines a time before a predetermined time (for example, one hour) from the start time of the peak cut time zone as the start time of the start operation, and sets the end time of the peak cut time zone as the start of the stop operation. Decide on time. The peak cut time zone and the power generation time zone are the same.

制御装置18は、ステップS122において、上述のように決定された発電時間帯において第二分散型電源15の発電運転を行う。ひいては、起動運転、停止運転も、決定された時間に沿って行われる。   In step S122, the control device 18 performs the power generation operation of the second distributed power source 15 in the power generation time period determined as described above. As a result, the start operation and the stop operation are also performed along the determined time.

上述した説明から明らかなように、本実施形態に係る電力供給システム10は、系統電源11と、系統電源11に主電線13を介して電気的に接続されている負荷12と、再生可能なエネルギーを使用して電力を生成して主電線13に送電する第一分散型電源14と、化石燃料を利用して電力を生成して主電線13に送電する第二分散型電源15と、第一分散型電源14および第二分散型電源15を制御する制御装置18と、を備えている電力供給システム10であって、制御装置18は、第一分散型電源14の発電量を、事前に取得した気象情報に基づいて推定する推定部(制御装置18:ステップS110)と、推定部によって推定された発電量が負荷12の必要電力量に対して小さい場合、その不足電力量を第二分散型電源15の発電によって補う第二分散型電源運転制御部(制御装置18:ステップS112,122)と、第二分散型電源運転制御部による第二分散型電源15の発電の開始時刻を、少なくともピークカット要請に係る情報に基づいて決定する決定部(制御装置18:ステップS116−120)と、を備えている。   As is clear from the above description, the power supply system 10 according to the present embodiment includes a system power supply 11, a load 12 electrically connected to the system power supply 11 via the main wire 13, and renewable energy. A first distributed power source 14 that generates electric power using power and transmits the electric power to the main electric wire 13; a second distributed power source 15 that generates electric power using fossil fuel and transmits the electric power to the main electric wire 13; The power supply system 10 includes a control device 18 that controls the distributed power source 14 and the second distributed power source 15, and the control device 18 obtains the power generation amount of the first distributed power source 14 in advance. When the power generation amount estimated by the estimation unit (control device 18: step S110) and the estimation unit estimated based on the meteorological information is smaller than the required power amount of the load 12, the insufficient power amount is converted into the second distributed type. Power generation by power supply 15 Therefore, at least the peak cut request relates to the start time of power generation of the second distributed power source 15 by the second distributed power source operation control unit (control device 18: Steps S112 and 122) and the second distributed power source operation control unit to supplement. And a determination unit (control device 18: step S116-120) that determines based on the information.

これによれば、気象情報に基づいて推定された第一分散型電源14の発電量が、負荷12の必要電力量(利用者が使用を希望する家電製品の総消費量に相当する)に対して小さい場合、その不足電力量は第二分散型電源15の発電によって補うことができる。よって、利用者にピークカット要請があった時間帯と重なったとしも、利用者は希望通りの時間に家電製品を使用できる。さらに、第二分散型電源15の発電開始時刻は、少なくともピークカット要請に係る情報に基づいて決定される。よって、第二分散型電源15はピークカット時間帯に発電することができ、系統電源11から買電しなくてすむため、消費電力ピークを効果的に抑制することができる。このように、電力供給システム10は、利用者に不便さを感じさせず、かつ、消費電力ピークを効果的に抑制することができる。   According to this, the power generation amount of the first distributed power source 14 estimated based on the weather information corresponds to the required power amount of the load 12 (corresponding to the total consumption amount of home appliances that the user desires to use). If the power is small, the power shortage can be compensated by the power generation of the second distributed power source 15. Therefore, even if it overlaps with the time when the user requested peak cut, the user can use the home appliance at the desired time. Furthermore, the power generation start time of the second distributed power supply 15 is determined based on at least information related to the peak cut request. Therefore, the second distributed power supply 15 can generate power during the peak cut time period, and it is not necessary to purchase power from the system power supply 11. Therefore, the power consumption peak can be effectively suppressed. In this way, the power supply system 10 does not make the user feel inconvenient and can effectively suppress the power consumption peak.

また、電力供給システム10において、決定部(制御装置18:ステップS116−120)は、ピークカット要請に係る情報のうちピークカット時間帯に第二分散型電源15を発電させたときに、利用者が受ける第一利益と、ピークカット時間帯とは異なるピークシフト時間帯に第二分散型電源15を発電させたときに、利用者が受ける第二利益と、を比較することにより、第二分散型電源15の発電の開始時刻を決定する。
これによれば、利用者の受ける利益が大きい時間帯に、第二分散型電源15の発電が実行されるので、利用者は経済的なメリットを享受する。
Further, in the power supply system 10, the determination unit (control device 18: Step S <b> 116-120) uses the second distributed power source 15 to generate power during the peak cut time period in the information related to the peak cut request. By comparing the first profit received by the user with the second profit received by the user when the second distributed power source 15 is generated in a peak shift time zone different from the peak cut time zone, The start time of power generation of the mold power source 15 is determined.
According to this, since the power generation of the second distributed power supply 15 is executed in a time zone in which the profit received by the user is large, the user enjoys an economic merit.

また、電力供給システム10において、第一分散型電源14は、太陽光発電装置を有する分散型電源であり、第二分散型電源15は、供給されるガスによって発電を行うガス発電装置を有する分散型電源である。
これによれば、一般的に安価にて普及している分散型電源を使用することにより、安価な電力供給システム10を提供することができる。
In the power supply system 10, the first distributed power source 14 is a distributed power source having a solar power generation device, and the second distributed power source 15 is a distributed power source having a gas power generation device that generates power using supplied gas. Type power supply.
According to this, it is possible to provide an inexpensive power supply system 10 by using a distributed power source that is generally popular at low cost.

また、電力供給システム10において、ガス発電装置は、固体高分子形燃料電池、ガスエンジン方式発電装置、およびガスタービン方式発電装置のいずれかを有する発電装置である。
これによれば、起動運転にかかる時間が比較的短時間であるため、省エネを実現することができる。
In the power supply system 10, the gas power generation device is a power generation device having any of a polymer electrolyte fuel cell, a gas engine type power generation device, and a gas turbine type power generation device.
According to this, since the time required for the start-up operation is relatively short, energy saving can be realized.

なお、上述した実施形態においては、発電時間帯の決定は、少なくとも第2分散型電源15の発電が開始される前日以前に行われるのが好ましく、深夜の時間帯に第2分散型電源15の発電が行われることを考慮して深夜の時間帯より前に行われるのがより好ましい。   In the embodiment described above, the determination of the power generation time zone is preferably performed at least before the day before the power generation of the second distributed power source 15 is started, and the second distributed power source 15 is set in the midnight time zone. Considering that power generation is performed, it is more preferable to perform it before the midnight time zone.

また、上述した実施形態において、不足電力を第二分散型電源15による発電だけでなく、蓄電池16に蓄えられている電力によって賄うようにしてもよい。蓄電池16に蓄えられている電力は、第一および第二分散型電源14,15の発電を事前に蓄えたものでもよく、系統電源11から購入したものでもよい。系統電源11から購入したものは、電気料金に割安な深夜電力が好ましい。   Further, in the above-described embodiment, the insufficient power may be covered not only by the power generation by the second distributed power source 15 but also by the power stored in the storage battery 16. The power stored in the storage battery 16 may be stored in advance from the power generation of the first and second distributed power sources 14 and 15, or may be purchased from the system power supply 11. Those purchased from the system power supply 11 are preferably late-night power, which is cheaper than the electricity bill.

10…電力供給システム、11…系統電源、12…負荷、13…主電線、14…第一分散型電源、15…第二分散型電源、16…蓄電池、17…分電盤、18…制御装置(推定部、第二分散型電源運転制御部、決定部)。   DESCRIPTION OF SYMBOLS 10 ... Power supply system, 11 ... System power supply, 12 ... Load, 13 ... Main electric wire, 14 ... First distributed power source, 15 ... Second distributed power source, 16 ... Storage battery, 17 ... Distribution board, 18 ... Control device (Estimation unit, second distributed power operation control unit, determination unit).

Claims (4)

系統電源と、
前記系統電源に主電線を介して電気的に接続されている負荷と、
再生可能なエネルギーを使用して電力を生成して前記主電線に送電する第一分散型電源と、
化石燃料を利用して電力を生成して前記主電線に送電する第二分散型電源と、
前記第一分散型電源および前記第二分散型電源を制御する制御装置と、
を備えている電力供給システムであって、
前記制御装置は、
前記第一分散型電源の発電量を、事前に取得した気象情報に基づいて推定する推定部と、
前記推定部によって推定された発電量が前記負荷の必要電力量に対して小さい場合、その不足電力量を前記第二分散型電源の発電によって補う第二分散型電源運転制御部と、
前記第二分散型電源運転制御部による前記第二分散型電源の発電の開始時刻を、少なくともピークカット要請に係る情報に基づいて決定する決定部と、
を備えている電力供給システム。
System power supply,
A load electrically connected to the system power supply via a main wire;
A first distributed power source that uses renewable energy to generate electrical power and transmit it to the main wire;
A second distributed power source that generates power using fossil fuel and transmits the power to the main wire;
A control device for controlling the first distributed power source and the second distributed power source;
A power supply system comprising:
The controller is
An estimation unit that estimates the power generation amount of the first distributed power source based on weather information acquired in advance;
When the power generation amount estimated by the estimation unit is small with respect to the required power amount of the load, a second distributed power operation control unit that compensates for the insufficient power amount by power generation of the second distributed power source,
A determination unit that determines a power generation start time of the second distributed power source by the second distributed power source operation control unit based on at least information related to a peak cut request;
Power supply system equipped with.
前記決定部は、前記ピークカット要請に係る情報のうちピークカット時間帯に前記第二分散型電源を発電させたときに、利用者が受ける第一利益と、前記ピークカット時間帯とは異なるピークシフト時間帯に前記第二分散型電源を発電させたときに、前記利用者が受ける第二利益と、を比較することにより、前記第二分散型電源の発電の開始時刻を決定する請求項1記載の電力供給システム。   The determination unit includes a first benefit received by a user when generating the second distributed power source during a peak cut time period in the information relating to the peak cut request, and a peak different from the peak cut time period The power generation start time of the second distributed power source is determined by comparing the second benefit received by the user when the second distributed power source is generated during a shift time period. The power supply system described. 前記第一分散型電源は、太陽光発電装置を有する分散型電源であり、前記第二分散型電源は、供給されるガスによって発電を行うガス発電装置を有する分散型電源である請求項1または請求項2記載の電力供給システム。   The first distributed power source is a distributed power source having a solar power generation device, and the second distributed power source is a distributed power source having a gas power generation device that generates power with supplied gas. The power supply system according to claim 2. 前記ガス発電装置は、固体高分子形燃料電池、ガスエンジン方式発電装置、およびガスタービン方式発電装置のいずれかを有する発電装置である請求項3記載の電力供給システム。   The power supply system according to claim 3, wherein the gas power generation device is a power generation device including any one of a polymer electrolyte fuel cell, a gas engine type power generation device, and a gas turbine type power generation device.
JP2014195215A 2014-09-25 2014-09-25 Power supply system Active JP6428093B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014195215A JP6428093B2 (en) 2014-09-25 2014-09-25 Power supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014195215A JP6428093B2 (en) 2014-09-25 2014-09-25 Power supply system

Publications (2)

Publication Number Publication Date
JP2016067146A true JP2016067146A (en) 2016-04-28
JP6428093B2 JP6428093B2 (en) 2018-11-28

Family

ID=55805987

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014195215A Active JP6428093B2 (en) 2014-09-25 2014-09-25 Power supply system

Country Status (1)

Country Link
JP (1) JP6428093B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018121385A (en) * 2017-01-23 2018-08-02 ダイキン工業株式会社 Hydraulic power generating system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120029711A1 (en) * 2011-03-08 2012-02-02 General Electric Company Generator demand response behavior
WO2013111541A1 (en) * 2012-01-23 2013-08-01 京セラ株式会社 Power-generation amount prediction apparatus, correction method for power-generation amount prediction, and natural energy power generation system
JP2013198360A (en) * 2012-03-22 2013-09-30 Toshiba Corp Energy management device, management method of the same and energy management program

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120029711A1 (en) * 2011-03-08 2012-02-02 General Electric Company Generator demand response behavior
WO2013111541A1 (en) * 2012-01-23 2013-08-01 京セラ株式会社 Power-generation amount prediction apparatus, correction method for power-generation amount prediction, and natural energy power generation system
JP2013198360A (en) * 2012-03-22 2013-09-30 Toshiba Corp Energy management device, management method of the same and energy management program

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018121385A (en) * 2017-01-23 2018-08-02 ダイキン工業株式会社 Hydraulic power generating system

Also Published As

Publication number Publication date
JP6428093B2 (en) 2018-11-28

Similar Documents

Publication Publication Date Title
US10454285B2 (en) Electricity distribution system and electricity distribution method
JP2008141926A (en) Home power storage device, on-vehicle power storage device, power supply/storage system and power storage control method
US20130057214A1 (en) Charging system for an electric vehicle
JP6166512B2 (en) Control device, power system, and control method
JP2015092822A (en) Power conditioner and calculation method
JP6143821B2 (en) Power supply system
US20230035591A1 (en) Power management system, electric vehicle supply equipment, server, and adjustment method of power supply and demand balance
JP6462369B2 (en) Power supply system
JP6109209B2 (en) Power supply system
JP2018007364A (en) Power management device and program
JP6428093B2 (en) Power supply system
JP5940263B2 (en) Power control apparatus and power control method
JP6246091B2 (en) Power supply system
JP5851359B2 (en) Storage battery control system
JP2016140245A (en) Power supply system
JP5912070B2 (en) Control device, fuel cell system and control method
KR102152344B1 (en) Electric power controlling system for estimating required power of PV for minimizing fee power
JP7386029B2 (en) power supply system
JP2013219908A (en) In-district power supply system
JP6128999B2 (en) Power accommodation system and control procedure determination apparatus for the power accommodation system
JP2021057180A (en) Power supply system
JP2016052156A (en) Power supply system
JP6637402B2 (en) Energy management device, control method thereof, and thermoelectric supply system
JP7165045B2 (en) building power supply system
JP2018121450A (en) Charge and discharge device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170808

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180528

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180626

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180809

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20181002

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20181015

R151 Written notification of patent or utility model registration

Ref document number: 6428093

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151