JP2015094752A - トランス接続相判定装置、方法、及びプログラム - Google Patents
トランス接続相判定装置、方法、及びプログラム Download PDFInfo
- Publication number
- JP2015094752A JP2015094752A JP2013236192A JP2013236192A JP2015094752A JP 2015094752 A JP2015094752 A JP 2015094752A JP 2013236192 A JP2013236192 A JP 2013236192A JP 2013236192 A JP2013236192 A JP 2013236192A JP 2015094752 A JP2015094752 A JP 2015094752A
- Authority
- JP
- Japan
- Prior art keywords
- transformer
- phase
- current
- connection phase
- correlation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R21/00—Arrangements for measuring electric power or power factor
- G01R21/133—Arrangements for measuring electric power or power factor by using digital technique
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
- G01R31/66—Testing of connections, e.g. of plugs or non-disconnectable joints
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
【解決手段】電流値計算部14が、複数の配電線の2つの組み合わせに対応した相のいずれかに接続されたトランスに接続された少なくとも1つの需要家で消費された電力に起因する相電流を計算する。相関係数計算部16が、相電流と、複数の配電線の各々を流れる線電流の各々との相関係数の各々を計算する。接続相判定部18が、相関係数が最小の線電流に対応した配電線以外の配電線を組み合わせた相を、トランスが接続された相と判定する。
【選択図】図2
Description
電力市場の自由化をはじめとする電力事業の規制改革や、再生可能電力普及の流れの中において、電力の伝達手段である送配電系統に求められる機能が、昨今大きく変わって来ている。このうち配電系統においては、今後多数の導入が予想される太陽光発電(Photovoltaics、PV)などの分散型電源への対処が大きな課題である。その一例として、配電系統の供給電圧を一定の範囲内(例えば、101±6V、202±20Vなど)に収めるように電圧管理する必要がある。
(1)センサ内蔵開閉器の測定値
・配電系統の高圧側の線電流(a線、b線、c線)
・配電系統の高圧側の線間電圧(a−b線間、b−c線間、c−a線間)
(2)通信機能付き電力メータの測定値
・需要家の消費電力量(通信機能付き電力メータを導入している一部需要家のみ)
(3)需要家の管理情報
・各需要家とトランスとの接続関係(トランスの接続相は不明)
図2に示すように、本実施形態に係るトランス接続相判定装置10は、需要家選択部12、電流値計算部14、相関係数計算部16、接続相判定部18、及び出力処理部20を備える。
次に、本実施形態に係るトランス接続相判定装置10の作用について説明する。トランス接続相判定装置10に、接続相の判定対象のトランスを示すトランスIDが入力されると、トランス接続相判定装置10において、図5に示すトランス接続相判定処理が実行される。
複数の配電線の2つの組み合わせに対応した相のいずれかに接続されたトランスに接続された少なくとも1つの需要家で消費された電力に対応する電流と、前記複数の配電線の各々を流れる線電流の各々との相関を示す相関値の各々を計算する相関値計算部と、
前記相関値の各々に基づいて、前記トランスが接続された相を判定する判定部と、
を含むトランス接続相判定装置。
前記判定部は、相関が最も低いことを示す相関値に対応した線電流が流れる配電線以外の配電線の組み合わせに対応した相を、前記トランスが接続された相であると判定する付記1記載のトランス接続相判定装置。
前記少なくとも1つの需要家で消費された電力量を取得し、取得した電力量を電流値に変換する電流値計算部を含む付記1または付記2記載のトランス接続相判定装置。
前記電流値計算部は、複数の需要家の各々で消費された電力量の各々を取得した場合には、電力量の各々を加算した値を、仮想的な1つの需要家で消費された電力量とする付記3記載のトランス接続相判定装置。
コンピュータに、
複数の配電線の2つの組み合わせに対応した相のいずれかに接続されたトランスに接続された少なくとも1つの需要家で消費された電力に対応する電流と、前記複数の配電線の各々を流れる線電流の各々との相関を示す相関値の各々を計算し、
前記相関値の各々に基づいて、前記トランスが接続された相を判定する
ことを含む処理を実行させるトランス接続相判定方法。
前記トランスが接続された相を判定する際に、相関が最も低いことを示す相関値に対応した線電流が流れる配電線以外の配電線の組み合わせに対応した相を、前記トランスが接続された相であると判定する付記5記載のトランス接続相判定装置。
前記コンピュータに、前記少なくとも1つの需要家で消費された電力量を取得し、取得した電力量を電流値に変換することをさらに含む処理を実行させる付記5または付記6記載のトランス接続相判定方法。
前記電力量を電流値に変換する際に、複数の需要家の各々で消費された電力量の各々を取得した場合には、電力量の各々を加算した値を、仮想的な1つの需要家で消費された電力量とする付記7記載のトランス接続相判定方法。
コンピュータに、
複数の配電線の2つの組み合わせに対応した相のいずれかに接続されたトランスに接続された少なくとも1つの需要家で消費された電力に対応する電流と、前記複数の配電線の各々を流れる線電流の各々との相関を示す相関値の各々を計算し、
前記相関値の各々に基づいて、前記トランスが接続された相を判定する
ことを含む処理を実行させるためのトランス接続相判定プログラム。
前記トランスが接続された相を判定する際に、相関が最も低いことを示す相関値に対応した線電流が流れる配電線以外の配電線の組み合わせに対応した相を、前記トランスが接続された相であると判定する付記9記載のトランス接続相判定プログラム。
前記コンピュータに、前記少なくとも1つの需要家で消費された電力量を取得し、取得した電力量を電流値に変換することをさらに含む処理を実行させるための付記9または付記10記載のトランス接続相判定プログラム。
前記電力量を電流値に変換する際に、複数の需要家の各々で消費された電力量の各々を取得した場合には、電力量の各々を加算した値を、仮想的な1つの需要家で消費された電力量とする付記11記載のトランス接続相判定プログラム。
12 需要家選択部
14 電流値計算部
16 相関係数計算部
18 接続相判定部
20 出力処理部
22 配電情報記憶部
24 消費電力データ記憶部
26 線電流データ記憶部
Claims (6)
- 複数の配電線の2つの組み合わせに対応した相のいずれかに接続されたトランスに接続された少なくとも1つの需要家で消費された電力に対応する電流と、前記複数の配電線の各々を流れる線電流の各々との相関を示す相関値の各々を計算する相関値計算部と、
前記相関値の各々に基づいて、前記トランスが接続された相を判定する判定部と、
を含むトランス接続相判定装置。 - 前記判定部は、相関が最も低いことを示す相関値に対応した線電流が流れる配電線以外の配電線の組み合わせに対応した相を、前記トランスが接続された相であると判定する請求項1記載のトランス接続相判定装置。
- 前記少なくとも1つの需要家で消費された電力量を取得し、取得した電力量を電流値に変換する電流値計算部を含む請求項1または請求項2記載のトランス接続相判定装置。
- 前記電流値計算部は、複数の需要家の各々で消費された電力量の各々を取得した場合には、電力量の各々を加算した値を、仮想的な1つの需要家で消費された電力量とする請求項3記載のトランス接続相判定装置。
- コンピュータに、
複数の配電線の2つの組み合わせに対応した相のいずれかに接続されたトランスに接続された少なくとも1つの需要家で消費された電力に対応する電流と、前記複数の配電線の各々を流れる線電流の各々との相関を示す相関値の各々を計算し、
前記相関値の各々に基づいて、前記トランスが接続された相を判定する
ことを含む処理を実行させるトランス接続相判定方法。 - コンピュータに、
複数の配電線の2つの組み合わせに対応した相のいずれかに接続されたトランスに接続された少なくとも1つの需要家で消費された電力に対応する電流と、前記複数の配電線の各々を流れる線電流の各々との相関を示す相関値の各々を計算し、
前記相関値の各々に基づいて、前記トランスが接続された相を判定する
ことを含む処理を実行させるためのトランス接続相判定プログラム。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013236192A JP6209951B2 (ja) | 2013-11-14 | 2013-11-14 | トランス接続相判定装置、方法、及びプログラム |
US14/519,244 US10197613B2 (en) | 2013-11-14 | 2014-10-21 | Transformer connection phase determination device, method, and program |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013236192A JP6209951B2 (ja) | 2013-11-14 | 2013-11-14 | トランス接続相判定装置、方法、及びプログラム |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2015094752A true JP2015094752A (ja) | 2015-05-18 |
JP6209951B2 JP6209951B2 (ja) | 2017-10-11 |
Family
ID=53044493
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2013236192A Active JP6209951B2 (ja) | 2013-11-14 | 2013-11-14 | トランス接続相判定装置、方法、及びプログラム |
Country Status (2)
Country | Link |
---|---|
US (1) | US10197613B2 (ja) |
JP (1) | JP6209951B2 (ja) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015161541A (ja) * | 2014-02-26 | 2015-09-07 | 富士通株式会社 | トランス接続相判定装置、トランス接続相判定方法、およびトランス接続相判定プログラム |
JP2015161607A (ja) * | 2014-02-27 | 2015-09-07 | 富士通株式会社 | トランス接続相判定装置、方法、及びプログラム |
JP2016073136A (ja) * | 2014-09-30 | 2016-05-09 | 富士通株式会社 | トランス接続相判定プログラム、トランス接続相判定方法、およびトランス接続相判定装置 |
JP2017032357A (ja) * | 2015-07-30 | 2017-02-09 | 富士通株式会社 | 接続相判定プログラム、方法および装置 |
JP2017083397A (ja) * | 2015-10-30 | 2017-05-18 | 富士通株式会社 | 接続相判定信頼度算出プログラム、装置、及び方法 |
JP2022048473A (ja) * | 2020-09-15 | 2022-03-28 | 富士電機株式会社 | 接続相判別システム |
US11789052B2 (en) | 2020-08-07 | 2023-10-17 | Fujitsu Limited | Transformer connection phase determination program, device, and method |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6435756B2 (ja) * | 2014-09-30 | 2018-12-12 | 富士通株式会社 | トランス接続相判定装置、方法、及びプログラム |
CN107785875B (zh) * | 2017-10-16 | 2020-04-24 | 中国电力科学研究院 | 一种计算单极接地故障时产生线路操作过电压的方法及系统 |
CN110459877B (zh) * | 2018-05-08 | 2021-11-19 | 西安光启尖端技术研究院 | 一种用于测量阵列天线的相位补偿方法和装置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011101565A (ja) * | 2009-11-09 | 2011-05-19 | Chugoku Electric Power Co Inc:The | 三相配電線の電圧不平衡原因の特定支援方法、及びこの方法に用いる情報処理装置 |
US20120221265A1 (en) * | 2011-02-28 | 2012-08-30 | International Business Machines Corporation | Systems and methods for phase identification |
JP2012198033A (ja) * | 2011-03-18 | 2012-10-18 | Mitsubishi Electric Corp | 相判別装置 |
JP2013050445A (ja) * | 2011-08-03 | 2013-03-14 | General Electric Co <Ge> | 相識別の方法およびシステム |
JP2015076994A (ja) * | 2013-10-09 | 2015-04-20 | 富士通株式会社 | 相判定プログラム、相判定方法および相判定装置 |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003185693A (ja) | 2001-12-17 | 2003-07-03 | Toko Electric Corp | 配電線路の相判別装置 |
EP1756594B1 (en) | 2004-05-25 | 2010-03-10 | Enel Distribuzione S.p.A. | Method and apparatus for detecting the wiring phase of an arbitrary unknown phase voltage relative to a reference phase voltage |
BRPI0801469B1 (pt) * | 2008-05-13 | 2016-12-13 | Ct De Pesquisas De En Elétrica Cepel | sistema de monitoramento para transformadores usado em sistema de medição indireta de energia elétrica em uma instalação de medição de energia elétrica e método de monitoramento e diagnóstico de transformadores em uma instalação de medição indireta de energia elétrica. |
WO2012020857A1 (ko) * | 2010-08-11 | 2012-02-16 | Jun Myung Soo | 전력 계측방법 및 전력 계측장치 |
US9122618B2 (en) * | 2011-12-12 | 2015-09-01 | Mbh Consulting Ltd. | Systems, apparatus and methods for quantifying and identifying diversion of electrical energy |
WO2014125590A1 (ja) * | 2013-02-14 | 2014-08-21 | 三菱電機株式会社 | 判定装置、判定方法、およびプログラム |
US9945889B2 (en) * | 2013-02-19 | 2018-04-17 | Mitsubishi Electric Research Laboratories, Inc. | Method for detecting power theft in a power distribution system |
US20150094965A1 (en) * | 2013-09-30 | 2015-04-02 | Battelle Memorial Institute | Electrical Power Grid Monitoring Apparatus, Articles of Manufacture, and Methods of Monitoring Equipment of an Electrical Power Grid |
-
2013
- 2013-11-14 JP JP2013236192A patent/JP6209951B2/ja active Active
-
2014
- 2014-10-21 US US14/519,244 patent/US10197613B2/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011101565A (ja) * | 2009-11-09 | 2011-05-19 | Chugoku Electric Power Co Inc:The | 三相配電線の電圧不平衡原因の特定支援方法、及びこの方法に用いる情報処理装置 |
US20120221265A1 (en) * | 2011-02-28 | 2012-08-30 | International Business Machines Corporation | Systems and methods for phase identification |
JP2012198033A (ja) * | 2011-03-18 | 2012-10-18 | Mitsubishi Electric Corp | 相判別装置 |
JP2013050445A (ja) * | 2011-08-03 | 2013-03-14 | General Electric Co <Ge> | 相識別の方法およびシステム |
JP2015076994A (ja) * | 2013-10-09 | 2015-04-20 | 富士通株式会社 | 相判定プログラム、相判定方法および相判定装置 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015161541A (ja) * | 2014-02-26 | 2015-09-07 | 富士通株式会社 | トランス接続相判定装置、トランス接続相判定方法、およびトランス接続相判定プログラム |
JP2015161607A (ja) * | 2014-02-27 | 2015-09-07 | 富士通株式会社 | トランス接続相判定装置、方法、及びプログラム |
JP2016073136A (ja) * | 2014-09-30 | 2016-05-09 | 富士通株式会社 | トランス接続相判定プログラム、トランス接続相判定方法、およびトランス接続相判定装置 |
JP2017032357A (ja) * | 2015-07-30 | 2017-02-09 | 富士通株式会社 | 接続相判定プログラム、方法および装置 |
JP2017083397A (ja) * | 2015-10-30 | 2017-05-18 | 富士通株式会社 | 接続相判定信頼度算出プログラム、装置、及び方法 |
US11789052B2 (en) | 2020-08-07 | 2023-10-17 | Fujitsu Limited | Transformer connection phase determination program, device, and method |
JP7484550B2 (ja) | 2020-08-07 | 2024-05-16 | 富士通株式会社 | トランス接続相判定プログラム、装置、及び方法 |
JP2022048473A (ja) * | 2020-09-15 | 2022-03-28 | 富士電機株式会社 | 接続相判別システム |
Also Published As
Publication number | Publication date |
---|---|
US10197613B2 (en) | 2019-02-05 |
US20150134281A1 (en) | 2015-05-14 |
JP6209951B2 (ja) | 2017-10-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6209951B2 (ja) | トランス接続相判定装置、方法、及びプログラム | |
JP6409286B2 (ja) | トランス接続相判定装置、方法、及びプログラム | |
US9292794B2 (en) | Voltage-based clustering to infer connectivity information in smart grids | |
JP6435756B2 (ja) | トランス接続相判定装置、方法、及びプログラム | |
RU2625913C2 (ru) | Анализ распределительной системы, использующий данные электросчетчиков | |
JP5665619B2 (ja) | 相判別装置 | |
Muscas et al. | Smart electric energy measurements in power distribution grids | |
JP6331465B2 (ja) | トランス接続相判定装置、トランス接続相判定方法、およびトランス接続相判定プログラム | |
JP2013044752A (ja) | 位相識別システム及び方法 | |
Urquhart et al. | Impacts of demand data time resolution on estimates of distribution system energy losses | |
RU2651610C1 (ru) | Способ выявления мест возникновения и величин нетехнических потерь энергии в электрических сетях по данным синхронных измерений | |
Abasi et al. | Determining the contribution of different effective factors to individual voltage unbalance emission in n-bus radial power systems | |
Rasmussen et al. | Interval estimation of voltage magnitude in radial distribution feeder with minimal data acquisition requirements | |
RU2607674C2 (ru) | Способ определения энергопотребления в электрической установке и электрическая установка переменного тока | |
JP2022030902A (ja) | トランス接続相判定プログラム、装置、及び方法 | |
JP5372124B2 (ja) | 配電系統管理支援装置、配電系統管理支援装置の制御方法及びプログラム | |
KR20110063184A (ko) | 발전 시스템에서의 발전량 및 부하량 측정 장치 | |
JP2015139322A (ja) | 電力ネットワークシステム | |
JP6202988B2 (ja) | 電力計測システム、電力計測方法、及びプログラム | |
JP6540460B2 (ja) | 接続相判定信頼度算出プログラム、装置、及び方法 | |
JP5335005B2 (ja) | 配電系統計算装置及び配電系統計算方法 | |
JP7215226B2 (ja) | 接続相推定装置、接続相推定プログラム及び接続相推定方法 | |
KR101043096B1 (ko) | 전력 품질 측정 방법 및 시스템 | |
JP2019154133A (ja) | 高圧本線の電圧を求める方法およびシステム | |
Renner | Flicker source identification in meshed high voltage grids |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20160804 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20170526 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20170606 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20170801 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20170815 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20170828 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6209951 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |