JP2012241311A - Half-precast beam, method of manufacturing half-precast beam, and method of constructing skeleton of building structure - Google Patents

Half-precast beam, method of manufacturing half-precast beam, and method of constructing skeleton of building structure Download PDF

Info

Publication number
JP2012241311A
JP2012241311A JP2011108754A JP2011108754A JP2012241311A JP 2012241311 A JP2012241311 A JP 2012241311A JP 2011108754 A JP2011108754 A JP 2011108754A JP 2011108754 A JP2011108754 A JP 2011108754A JP 2012241311 A JP2012241311 A JP 2012241311A
Authority
JP
Japan
Prior art keywords
concrete
wall
precast beam
half precast
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2011108754A
Other languages
Japanese (ja)
Inventor
Kenichi Naito
憲一 内藤
Nobuyuki Kuroiwa
信行 黒岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP2011108754A priority Critical patent/JP2012241311A/en
Publication of JP2012241311A publication Critical patent/JP2012241311A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

【課題】現場での作業を簡易にし、施工工数を削減することにより工期を短縮することを可能とすることができるハーフプレキャスト梁、前記ハーフプレキャスト梁の製造方法、及び建築構造物の躯体の施工方法を提供する。
【解決手段】ハーフプレキャスト梁1は、建築構造物の躯体を構成するハーフプレキャスト梁1であって、梁1断面の外周部に水平方向に延在するように配置された複数の梁主筋11と、梁1の延在する方向に間隔をおいて梁主筋11を囲むように設けられた複数のせん断補強筋12と、梁1の両側下部に上下方向の貫通空間33が形成されるように対向して配置され、梁主筋11及びせん断補強筋12の一部をその内部に配置して形成されたプレキャストコンクリート板13とを備える。
【選択図】図4
[PROBLEMS] To reduce the construction period by simplifying the work on site and reducing the number of construction steps, a method for producing the half precast beam, and the construction of the building structure of the building structure Provide a method.
A half precast beam (1) is a half precast beam (1) constituting a housing of a building structure, and a plurality of beam main bars (11) arranged so as to extend horizontally in an outer peripheral portion of a cross section of the beam (1). A plurality of shear reinforcement bars 12 provided so as to surround the beam main bar 11 with an interval in the extending direction of the beam 1, and so as to form a vertical penetration space 33 in the lower part on both sides of the beam 1. And a precast concrete plate 13 formed by disposing a part of the beam main reinforcing bar 11 and the shear reinforcing bar 12 therein.
[Selection] Figure 4

Description

本発明は、ハーフプレキャスト梁、ハーフプレキャスト梁の製造方法、及び建築構造物の躯体の施工方法に関するものである。   The present invention relates to a half precast beam, a method for manufacturing a half precast beam, and a method for constructing a building structure.

一般に、ラーメン構造の鉄筋コンクリート造の集合住宅やホテル等の中高層建築物においては、柱と梁で地震荷重や風荷重等の水平荷重を負担し、建物の強度を確保している。ここで、建物の強度をさらに高めるために、柱と梁の間に耐震壁を設ける場合がある。この場合、現場で梁の直下に梁主筋やせん断補強筋を配筋して、配筋した箇所にコンクリートを打設することにより耐震壁を施工する方法が採られている。   Generally, in medium- and high-rise buildings such as reinforced concrete apartment buildings and hotels with a ramen structure, pillars and beams bear horizontal loads such as seismic loads and wind loads to ensure the strength of the building. Here, in order to further increase the strength of the building, a seismic wall may be provided between the column and the beam. In this case, a method of constructing a seismic wall by placing beam main bars and shear reinforcement bars directly under the beam at the site, and placing concrete in the arranged places.

一方、近年の大地震の影響もあり、鉄筋コンクリート造の超高層建築物においても、耐震性を一層強化するために耐震壁が採用される場合があり、耐震壁を設ける建築物が多く見られるようになってきた。   On the other hand, due to the recent large earthquakes, reinforced concrete high-rise buildings may be equipped with seismic walls to further enhance seismic resistance, and many buildings with seismic walls are seen. It has become.

例えば、特許文献1には、既存の建築物の梁の下方に耐震壁を施工する方法として、プレキャストコンクリートブロックを用いる方法が提案されている。ここで、梁及び梁の直下に設けられた耐震壁を鉛直方向から断面視すると、梁の厚さより耐震壁の厚さが薄くなっている。そして、梁と耐震壁の接合部分ではコンクリートの入隅が形成され、また梁の下端部ではコンクリートの出隅が形成されている。   For example, Patent Document 1 proposes a method using a precast concrete block as a method for constructing a seismic wall under a beam of an existing building. Here, when the cross section of the beam and the earthquake-resistant wall provided immediately below the beam is viewed from the vertical direction, the thickness of the earthquake-resistant wall is thinner than the thickness of the beam. A concrete corner is formed at the joint between the beam and the seismic wall, and a concrete corner is formed at the lower end of the beam.

特開平9−328908号公報JP 9-328908 A

しかしながら、特許文献1のような耐震壁を新規に施工する場合には、上述の梁と耐震壁との間に生じる入隅及び出隅の形状を、現場でコンクリートを打設して形成するために、該入隅及び出隅の形状に対応した型枠を製作しなければならない。しかし、該型枠は、短い距離の間で入隅及び出隅が交互に配されるという複雑な形状をしているため、型枠の製作に時間や手間がかかるという問題点があった。
また、施工された出隅及び入隅において、正確な平面や直角が形成されていない場合がある。この場合には、不要なコンクリートを取り除くはつり作業や、設計図通りに仕上げるためにコンクリートを左官する等の補修作業が必要となり、時間や手間がかかり、結果として費用が生じるという問題点があった。
一方、耐震壁の厚さを梁の厚さと同じになるようにコンクリートを通常より厚く打設することにより、入隅及び出隅を設けない方法もある。しかし、この場合は耐震壁として本来必要とされている以上のコンクリートを打設しなければならず、時間や手間がかかるという問題点があった。
また、超高層建築物に耐震壁を設ける場合には高強度コンクリートを使用するが、高強度コンクリートはコンクリートの打設管理や施工後の養生管理が厳密に行わなくてはならので、手間がかかるという問題点があった。
However, when a seismic wall such as that of Patent Document 1 is newly constructed, the shape of the entrance corner and the exit corner generated between the above-described beam and the earthquake resistant wall is formed by placing concrete on site. In addition, a formwork corresponding to the shape of the entrance corner and the exit corner must be manufactured. However, since the mold has a complicated shape in which the entrance corner and the exit corner are alternately arranged within a short distance, there is a problem that it takes time and labor to manufacture the mold.
In addition, there may be cases where an accurate plane or right angle is not formed at the constructed corners and corners. In this case, there is a problem in that it takes time and labor, resulting in cost, as it requires lifting work to remove unnecessary concrete and repair work such as plastering concrete to finish it according to the design drawing. .
On the other hand, there is a method that does not provide the entrance corner and the exit corner by placing the concrete thicker than usual so that the thickness of the earthquake resistant wall becomes the same as the thickness of the beam. However, in this case, there is a problem in that it takes time and effort because it is necessary to cast more concrete than is originally required as a seismic wall.
In addition, high-strength concrete is used when installing earthquake-resistant walls in high-rise buildings, but high-strength concrete is time-consuming because concrete placement management and curing management after construction must be performed strictly. There was a problem.

本発明は、前述の従来技術における問題を解決するために、超高層建築物を始めとする建築物において、現場での作業を簡易にし、施工工数を削減することにより工期を短縮することを可能とする予め工場で製造されたハーフプレキャスト梁、前記ハーフプレキャスト梁の製造方法、及び建築構造物の躯体の施工方法を提供することを目的とするものである。
ここで、ハーフプレキャスト梁とは、梁の内部の全部にプレキャストコンクリートを打設するのではなく、建築構造物として完成した後には床板と一体となる梁の上部にはコンクリートを打設せずに、一部の主筋及びせん断補強筋を露出した状態にさせておく梁を言う。
In order to solve the above-mentioned problems in the prior art, the present invention makes it possible to shorten the construction period by simplifying the work at the site and reducing the number of construction man-hours in buildings such as high-rise buildings. An object of the present invention is to provide a half precast beam manufactured in advance in a factory, a method of manufacturing the half precast beam, and a method of constructing a building structure.
Here, half-precast beams do not cast precast concrete all over the interior of the beam, but do not cast concrete on the upper part of the beam that is integrated with the floorboard after it is completed as a building structure. A beam that keeps some main bars and shear reinforcement bars exposed.

上記目的を達成するために、本発明は以下の手段を採用している。
すなわち、本発明に係るハーフプレキャスト梁は、建築構造物の躯体を構成するハーフプレキャスト梁であって、梁断面の外周部に水平方向に延在するように配置された複数の梁主筋と、前記梁の延在する方向に間隔をおいて前記梁主筋を囲むように設けられた複数のせん断補強筋と、前記梁の両側下部に上下方向の貫通空間が形成されるように対向して配置され、前記梁主筋及び前記せん断補強筋の一部をその内部に配置して形成されたプレキャストコンクリート板とを備えることを特徴とする。
In order to achieve the above object, the present invention employs the following means.
That is, the half precast beam according to the present invention is a half precast beam constituting a housing of a building structure, and a plurality of beam main bars arranged to extend in the horizontal direction on the outer peripheral portion of the beam cross section, A plurality of shear reinforcement bars provided so as to surround the beam main bar at intervals in the extending direction of the beam, and arranged so as to be opposed to each other so as to form a vertical through space in the lower part on both sides of the beam. And a precast concrete plate formed by disposing a part of the beam main reinforcing bar and the shear reinforcing bar therein.

この構成では、ハーフプレキャスト梁は、梁断面の外周部に配置された梁主筋と、該梁主筋を囲むように設けられたせん断補強筋と、梁主筋及びせん断補強筋の一部をその内部に配置するプレキャストコンクリート板とを備える。よって、ハーフプレキャスト梁を使用すれば、現場で梁を構成する梁主筋及びせん断補強筋を配筋して、コンクリート打設する作業が不要なので、現場における簡易作業性を得ることができる。   In this configuration, the half precast beam has a beam main bar arranged on the outer periphery of the beam cross section, a shear reinforcement provided so as to surround the beam main reinforcement, and a part of the beam main reinforcement and the shear reinforcement inside. A precast concrete board to be arranged. Therefore, if a half precast beam is used, the work of placing the beam main bar and the shear reinforcing bar constituting the beam on the site and placing the concrete is unnecessary, so that a simple workability at the site can be obtained.

また、本発明に係るハーフプレキャスト梁の製造方法は、上方に突出した凸部を有する土台を設置する土台設置工程と、前記水平板の上であって、前記土台の外側に、コンクリート用外型枠を仮設する外型枠仮設工程と、前記土台の上に予め組み立てられた前記梁主筋及び前記せん断補強筋を有する梁筋を設置する梁筋設置工程と、前記土台の上にコンクリート用内型枠を仮設する内型枠仮設工程と、前記コンクリート用外型枠と前記コンクリート用内型枠との間に、コンクリートを打設する打設工程と、前記コンクリート用内型枠及び前記コンクリート用外型枠を撤去する型枠撤去工程とを備えることを特徴とする。   The half precast beam manufacturing method according to the present invention includes a base installation step of installing a base having a convex portion protruding upward, and an outer mold for concrete on the horizontal plate and outside the base. Temporary outer frame forming step for temporarily setting a frame, a beam reinforcing step for installing the beam reinforcing bar pre-assembled on the base and a beam reinforcing member having the shear reinforcement, and an inner mold for concrete on the base A temporary inner frame forming step for temporarily setting a frame; a placing step for placing concrete between the outer mold frame for concrete and the inner mold frame for concrete; the inner mold frame for concrete and the outer wall for concrete And a form removal process for removing the form.

このようなハーフプレキャスト梁の製造方法によれば、土台設置工程によって土台を設置し、梁筋仮設工程によって土台の上に梁筋を敷設する。また、外型枠仮設工程、及び内型枠仮設工程によって後工程でコンクリートを打設する際に使用するコンクリート用外型枠及びコンクリート用内型枠を形成し、打設工程によってコンクリート用外型枠及びコンクリート用内型枠の間にコンクリートを打設することができる。これにより、工場で、梁主筋とせん断補強筋とプレキャストコンクリート板とを備えるハーフプレキャスト梁の製造が可能となる。   According to such a method of manufacturing a half precast beam, the foundation is installed by the foundation installation process, and the beam reinforcement is laid on the foundation by the beam reinforcement temporary installation process. In addition, the concrete outer mold and the concrete inner mold to be used when placing concrete in a later process by the outer mold temporary process and the inner mold temporary process are formed, and the concrete outer mold is formed by the casting process. Concrete can be placed between the frame and the inner mold for concrete. Thereby, a half precast beam provided with a beam main bar, a shear reinforcement bar, and a precast concrete board can be manufactured in a factory.

また、本発明に係るハーフプレキャスト梁の製造方法は、前記内型枠仮設工程は、前記コンクリート用内型枠として、前記梁筋と干渉しない形状に形成されるとともに、上下方向に分割された分割コンクリート用内型枠を上下方向に敷設し、前記型枠撤去工程は、前記分割コンクリート用内型枠を順に撤去することを特徴とする。   Further, in the method for producing a half precast beam according to the present invention, the inner mold temporary setting step is formed as a shape that does not interfere with the beam streak as the concrete inner mold and is divided in the vertical direction. The concrete inner mold is laid in the vertical direction, and the mold removing step sequentially removes the divided concrete inner mold.

このようなハーフプレキャスト梁の製造方法によれば、コンクリート用型枠仮設工程ではコンクリート用内型枠をハーフプレキャスト梁の梁主筋及びせん断補強筋と干渉しない状態で仮設することができ、また型枠撤去工程では分割されたコンクリート用内型枠を上から順に撤去することにより完全に撤去することができる。よって、梁筋の形状に対応したコンクリート用内型枠を使用することにより、確実にプレキャストコンクリート板を製造することができる。   According to such a method for producing a half precast beam, in the concrete formwork temporary setting step, the concrete inner formwork can be temporarily set up without interfering with the beam main bar and the shear reinforcement bar of the half precast beam. In the removal process, it can be completely removed by removing the divided concrete molds in order from the top. Therefore, a precast concrete board can be reliably manufactured by using the concrete inner formwork corresponding to the shape of a beam.

また、本発明に係る建築構造物の躯体の施工方法は、床から上下方向に延在する壁縦筋及び一の水平方向に延在する壁横筋を有する壁筋を組み立てる壁筋組立工程と、前記壁筋の外周にコンクリート用型枠を仮設する型枠仮設工程と、前記コンクリート用型枠の内部にコンクリートを打設して壁を形成する第一打設工程と、前記コンクリート用型枠を撤去する型枠撤去工程と、前記壁の上方に受け材を仮設する受け材仮設工程と、前記壁及び前記受け材の上方にハーフプレキャスト梁を設置する梁設置工程と、前記壁の上方にスラブ板を設置するスラブ板設置工程と、前記スラブ板の上方及び前記ハーフプレキャスト梁の内部にコンクリートを打設する第二打設工程と、前記受け材を撤去する受け材撤去工程とを備えることを特徴とする。   In addition, the construction method of the building structure of the building structure according to the present invention includes a wall reinforcement assembly process for assembling a wall reinforcement having a vertical wall extending vertically from a floor and a horizontal wall extending horizontally in one horizontal direction, and A temporary form forming step for temporarily placing a concrete formwork on the outer periphery of the wall reinforcement, a first placing step for forming a wall by placing concrete inside the concrete formwork, and the concrete formwork Form removal process to remove, receiving material temporary process to temporarily install a receiving material above the wall, beam installation process to install a half precast beam above the wall and the receiving material, and a slab above the wall A slab plate installing step for installing a plate, a second placing step for placing concrete above the slab plate and inside the half precast beam, and a receiving material removing step for removing the receiving material. Features.

このような建築構造物の躯体の施工方法によれば、壁筋組立工程により壁の構造を構成する壁筋を組み立てることができる。また、型枠仮設工程により後工程でコンクリートを打設する際に使用するコンクリート用型枠を形成し、第一打設工程によりコンクリート用型枠の内部にコンクリートを打設することができ、型枠撤去工程により型枠を撤去する。これにより、コンクリートを壁筋の外側に打設することができるので、建築構造物の躯体を構成する壁を施工することができる。
また、受け材仮設工程により後工程で設置するハーフプレキャスト梁を支持するため受け材を壁の上方に仮設し、梁設置工程によりハーフプレキャスト梁を受け材の上方に設置する。よって、ハーフプレキャスト梁は、受け材及び受け材の下方の壁に支持される。次に、スラブ板設置工程により壁の上方にスラブ板を設置し、第二打設工程によりスラブ板の上方及びハーフプレキャスト梁の内部にコンクリートを打設することができ、受け材撤去工程により受け材を撤去する。これにより、ハーフプレキャスト梁の内部及びスラブ板の上方にコンクリートを打設することができるので、建築構造物の躯体を構成する梁、及びスラブを施工することができる。
また、予め工場で製造されたハーフプレキャスト梁を使用するので、現場で梁主筋及びせん断補強筋を配筋する必要がない。よって、現場での作業を簡易にし、施工工数を削減することにより工期を短縮することを可能とする。
また、ハーフプレキャスト梁を構成するプレキャストコンクリート板は、現場でハーフプレキャスト梁の内部に打設するコンクリートの型枠の役割を担うので、現場でハーフプレキャスト梁の内部に打設するための型枠を設置する必要がなく、現場での作業を簡易にし、施工工数を削減することができる。
According to such a construction method for a building structure, the wall bars constituting the wall structure can be assembled by the wall bar assembly process. In addition, a concrete formwork to be used when placing concrete in a later process is formed by a temporary formwork process, and concrete can be placed inside the concrete formwork by a first placing process. The formwork is removed by the frame removal process. Thereby, since concrete can be laid out on the outer side of a wall line, the wall which comprises the frame of a building structure can be constructed.
In addition, a receiving material is temporarily installed above the wall to support a half precast beam to be installed in a later process by the receiving material temporary setting process, and the half precast beam is installed above the receiving material by the beam setting process. Thus, the half precast beam is supported by the receiving material and the lower wall of the receiving material. Next, the slab plate can be installed above the wall by the slab plate installation process, and the concrete can be placed above the slab plate and inside the half precast beam by the second placement process. Remove material. Thereby, since concrete can be cast inside the half precast beam and above the slab plate, it is possible to construct the beam and slab that form the frame of the building structure.
Moreover, since the half precast beam previously manufactured at the factory is used, it is not necessary to arrange the beam main bar and the shear reinforcement bar in the field. Therefore, the work on site can be simplified and the construction period can be shortened by reducing the number of construction steps.
In addition, the precast concrete plate that constitutes the half precast beam plays the role of the concrete formwork placed inside the half precast beam at the site, so a formwork for placing inside the half precast beam at the site is provided. There is no need to install it, and the work on site can be simplified and the number of construction steps can be reduced.

また、本発明に係る建築構造物の躯体の施工方法は、床に支保工を設置する支保工設置工程と、前記床から上下方向に延在する壁縦筋及び一の水平方向に延在する壁横筋を有する壁筋を組み立てる壁筋組立工程と、請求項1に記載のハーフプレキャスト梁を前記支保工に支持されるように設置する梁設置工程と、前記壁筋の外周であり、前記ハーフプレキャスト梁の下方にコンクリート用型枠を仮設する型枠仮設工程と、前記コンクリート用型枠の内部及びハーフプレキャスト梁の内部にコンクリートを打設して壁を形成する第一打設工程と、前記支保工及び前記コンクリート用型枠を撤去する撤去工程と、前記壁の上方にスラブ板を設置するスラブ板設置工程と、前記スラブ板の上方及び前記ハーフプレキャスト梁の内部に前記コンクリートを打設する第二打設工程とを備えることを特徴とする。   Moreover, the construction method of the frame of the building structure which concerns on this invention is the support work installation process which installs a support work on a floor, the wall vertical line extended in the up-down direction from the said floor, and one horizontal direction. A wall reinforcement assembly process for assembling a wall reinforcement having a horizontal wall reinforcement; a beam installation process for installing the half precast beam according to claim 1 to be supported by the support; and an outer periphery of the wall reinforcement; A temporary form forming step for temporarily setting a concrete formwork below the precast beam, a first placing step for forming a wall by placing concrete in the concrete formwork and in the half precast beam, and A removal step of removing the support and the formwork for concrete, a slab plate installation step of installing a slab plate above the wall, and the concrete above the slab plate and inside the half precast beam. Characterized in that a and a second shot setting step of pouring.

このような建築構造物の躯体の施工方法によれば、壁筋組立工程により壁の構造を構成する壁筋を組み立てることができる。また、支保工設置工程により後工程で仮設するコンクリート用型枠を支持する支保工を設置し、型枠設置工程により後工程でコンクリートを打設する際に使用するコンクリート用型枠を形成し、第一打設工程によりコンクリート用型枠の内部にコンクリートを打設することができ、撤去工程により支保工及びコンクリート用型枠を撤去する。これにより、コンクリートを壁筋の外側に打設することができるので、建築構造物の躯体を構成する壁を施工することができる。
また、梁設置工程によりハーフプレキャスト梁を設置し、第一打設工程及び第二打設工程でハーフプレキャスト梁の内部にコンクリートを打設することができる。これにより、建築構造物の躯体を構成する梁を施工することができる。
また、スラブ板設置工程により壁の上方にスラブ板を設置し、第二打設工程によりスラブ板の上方にコンクリートを打設することができる。これにより、スラブ板の上方にコンクリートを打設することができるので、建築構造物の躯体を構成するスラブを施工することができる。
また、予め工場で製造されたハーフプレキャスト梁を使用するので、現場で梁主筋及びせん断補強筋を配筋する必要がない。よって、現場での作業を簡易にし、施工工数を削減することにより工期を短縮することを可能とする。
また、ハーフプレキャスト梁を構成するプレキャストコンクリート板は、現場でハーフプレキャスト梁の内部に打設するコンクリートの型枠の役割を担うので、現場でハーフプレキャスト梁の内部に打設するための型枠を設置する必要がなく、現場での作業を簡易にし、施工工数を削減することができる。
According to such a construction method for a building structure, the wall bars constituting the wall structure can be assembled by the wall bar assembly process. In addition, a support for supporting the concrete formwork temporarily set up in the subsequent process is installed by the support installation process, and a concrete formwork used when placing concrete in the subsequent process by the formwork setting process is formed. Concrete can be placed inside the concrete formwork by the first placing process, and the support work and the concrete formwork are removed by the removal process. Thereby, since concrete can be laid out on the outer side of a wall line, the wall which comprises the frame of a building structure can be constructed.
Moreover, a half precast beam can be installed by a beam installation process, and concrete can be cast in the inside of a half precast beam by a 1st casting process and a 2nd casting process. Thereby, the beam which comprises the frame of a building structure can be constructed.
Moreover, a slab board can be installed above the wall by the slab board installation process, and concrete can be placed above the slab board by the second placement process. Thereby, since concrete can be cast above a slab board, the slab which comprises the frame of a building structure can be constructed.
Moreover, since the half precast beam previously manufactured at the factory is used, it is not necessary to arrange the beam main bar and the shear reinforcement bar in the field. Therefore, the work on site can be simplified and the construction period can be shortened by reducing the number of construction steps.
In addition, the precast concrete plate that constitutes the half precast beam plays the role of the concrete formwork placed inside the half precast beam at the site, so a formwork for placing inside the half precast beam at the site There is no need to install it, and the work on site can be simplified and the number of construction steps can be reduced.

本発明に係るハーフプレキャスト梁、前記ハーフプレキャスト梁の製造方法、及び建築構造物の躯体の施工方法によれば、超高層建築物を始めとする建築物において、現場での作業を簡易にし、施工工数を削減することにより工期を短縮することを可能とすることができる。   According to the half precast beam according to the present invention, the method of manufacturing the half precast beam, and the construction method of the building structure, in a building including a super high-rise building, the work at the site is simplified and the construction is performed. It is possible to shorten the construction period by reducing the number of steps.

建築構造物の構成を示す縦断面図である。It is a longitudinal cross-sectional view which shows the structure of a building structure. 建築構造物の構成を示す図1のA−A断面図である。It is AA sectional drawing of FIG. 1 which shows the structure of a building structure. 建築構造物の構成を示す図1のB−B断面図である。It is BB sectional drawing of FIG. 1 which shows the structure of a building structure. 本発明の一実施形態に係るハーフプレキャスト梁の斜視図である。It is a perspective view of the half precast beam concerning one embodiment of the present invention. 本発明の建築構造物の躯体の第一実施形態の施工方法を示すフロー図である。It is a flowchart which shows the construction method of 1st embodiment of the housing of the building structure of this invention. 本発明の建築構造物の躯体の第一実施形態の施工方法における(a)壁筋組立工程、(b)型枠仮設工程、(c)第一打設工程について示す、断面図である。It is sectional drawing shown about the (a) wall reinforcement assembly process in the construction method of the first embodiment of the housing of the building structure of this invention, (b) Formwork temporary installation process, (c) 1st placement process. 本発明の建築構造物の躯体の第一実施形態の施工方法における(a)型枠撤去工程、(b)養生後、(c)受け材仮設工程について示す、断面図である。It is sectional drawing shown about the (a) formwork removal process in the construction method of 1st embodiment of the housing of the building structure of this invention, (b) after curing, and (c) receiving material temporary installation process. 本発明の建築構造物の躯体の第一実施形態の施工方法における(a)梁設置工程、(b)スラブ板設置工程、(c)第二打設工程、(d)養生撤去後について示す、断面図である。(A) beam installation step, (b) slab plate installation step, (c) second placement step, (d) after curing removal in the construction method of the first embodiment of the building structure of the present invention, It is sectional drawing. 本発明の建築構造物の躯体の第一実施形態の施工方法における(a)施工前、(b)壁筋組立工程、(c)型枠仮設工程ついて示す、立面図である。It is an elevational view showing (a) before construction, (b) wall reinforcement assembly process, and (c) formwork temporary installation process in the construction method of the first embodiment of the building structure of the present invention. 本発明の建築構造物の躯体の第一実施形態の施工方法における(a)第一打設工程、(b)型枠撤去工程、(c)養生後について示す、立面図である。It is an elevational view showing (a) first placing step, (b) formwork removing step, and (c) after curing in the construction method of the first embodiment of the building structure of the present invention. 本発明の建築構造物の躯体の第一実施形態の施工方法における(a)受け材仮設工程、(b)梁設置工程、スラブ板設置工程(c)柱上部打設後、(d)第二打設工程について示す、立面図である。(A) Receiving material temporary installation process, (b) Beam installation process, slab plate installation process (c) Pillar top placement, (d) 2nd in the construction method of the first embodiment of the building structure of the present invention It is an elevation view shown about a placing process. 本発明の建築構造物の躯体の第二実施形態の施工方法を示すフロー図である。It is a flowchart which shows the construction method of 2nd embodiment of the frame of the building structure of this invention. 本発明の建築構造物の躯体の第二実施形態の施工方法における(a)施工前、(b)支保工設置工程、(c)壁筋組立工程、梁設置工程について示す、断面図である。It is sectional drawing shown about (a) before construction, (b) support construction installation process, (c) wall reinforcement assembly process, and beam installation process in the construction method of the second embodiment of the building structure of the present invention. 本発明の建築構造物の躯体の第二実施形態の施工方法における(a)型枠仮設工程、(b)第一打設工程、(c)撤去工程について示す、断面図である。It is sectional drawing shown about the (a) formwork temporary installation process, (b) 1st placement process, and (c) removal process in the construction method of 2nd embodiment of the housing of the building structure of this invention. 本発明の建築構造物の躯体の第二実施形態の施工方法における(a)スラブ板設置工程、(b)第二打設工程について示す、断面図である。It is sectional drawing shown about the (a) slab board installation process in the construction method of 2nd embodiment of the housing of the building structure of this invention, (b) 2nd placement process. 本発明の建築構造物の躯体の第二実施形態の施工方法における(a)施工前、(b)支保工設置工程、(c)壁筋組立工程、梁設置工程ついて示す、立面図である。It is an elevational view showing (a) before construction, (b) support construction installation process, (c) wall reinforcement assembly process, beam installation process in the construction method of the second embodiment of the building structure of the present invention. . 本発明の建築構造物の躯体の第二実施形態の施工方法における(a)型枠仮設工程、(b)第一打設工程、(c)撤去工程ついて示す、立面図である。It is an elevational view showing the (a) formwork temporary installation step, (b) first placement step, and (c) removal step in the construction method of the second embodiment of the building structure of the present invention. 本発明の建築構造物の躯体の第二実施形態の施工方法における(a)養生後、(b)大梁型枠設置後、(c)大梁施工後ついて示す、立面図である。It is an elevational view showing (a) after curing, (b) after installation of a large beam formwork, and (c) after installation of a large beam in the construction method of the second embodiment of the building structure of the present invention. 本発明の建築構造物の躯体の第二実施形態の施工方法における(a)スラブ板設置工程、第二打設工程(b)養生後ついて示す、立面図である。It is an elevational view showing the (a) slab plate installation step and the second placement step (b) after curing in the construction method of the second embodiment of the building structure of the present invention. 本発明の一実施形態に係るハーフプレキャスト梁の製造方法を示すフロー図である。It is a flowchart which shows the manufacturing method of the half precast beam which concerns on one Embodiment of this invention. 本発明の一実施形態に係るハーフプレキャスト梁の製造方法における(a)土台設置工程、(b)外型枠仮設工程、(c)梁筋設置工程について示す、断面図である。It is sectional drawing shown about the (a) foundation installation process in the manufacturing method of the half precast beam which concerns on one Embodiment of this invention, (b) outer formwork temporary installation process, (c) beam reinforcement installation process. 本発明の一実施形態に係るハーフプレキャスト梁の製造方法における内型枠仮設工程について示す、断面図である。It is sectional drawing shown about the inner-frame temporary installation process in the manufacturing method of the half precast beam which concerns on one Embodiment of this invention. 本発明の一実施形態に係るハーフプレキャスト梁の製造方法における(a)打設工程、(b)型枠撤去工程1、(c)型枠撤去工程2について示す、断面図である。It is sectional drawing shown about the (a) placement process, (b) Formwork removal process 1, (c) Formwork removal process 2 in the manufacturing method of the half precast beam which concerns on one Embodiment of this invention. 本発明の一実施形態に係るハーフプレキャスト梁の製造方法における(a)型枠撤去工程3、(b)型枠撤去工程4、(c)ハーフプレキャスト梁離脱後について示す、断面図である。It is sectional drawing shown after (a) formwork removal process 3, (b) formwork removal process 4, and (c) half precast beam separation in the manufacturing method of the half precast beam which concerns on one Embodiment of this invention.

以下、図面を参照し、本発明の一実施形態のハーフプレキャスト梁1について説明する。
図1乃至図3は、建築構造物の躯体10の構成を示している。
図1に示すように、建築構造物の躯体10は、各部屋を区切る壁3と、該壁3の直上に設けられたハーフプレキャスト梁1と、該ハーフプレキャスト梁1の一部と一体となって上階の床を構成するスラブ2とを備える。
以下においては、水平方向のうちハーフプレキャスト梁1が延在する方向である図2の左右方向をX方向、もう一方の水平方向である図1の左右方向をY方向、上下方向をZ方向と称する(以下同じ)。
Hereinafter, a half precast beam 1 according to an embodiment of the present invention will be described with reference to the drawings.
FIGS. 1 to 3 show the structure of a housing 10 of a building structure.
As shown in FIG. 1, a building structural body 10 is integrated with a wall 3 separating each room, a half precast beam 1 provided immediately above the wall 3, and a part of the half precast beam 1. And a slab 2 constituting the upper floor.
In the following, the horizontal direction in FIG. 2 in which the half precast beam 1 extends in the horizontal direction is the X direction, the other horizontal direction in FIG. 1 is the Y direction, and the vertical direction is the Z direction. (Hereinafter the same).

以下、ハーフプレキャスト梁1について詳細に説明する。
ハーフプレキャスト梁1は、X方向に延在するように配置された梁主筋11と、梁主筋11を囲むように設けられたせん断補強筋12と、ハーフプレキャスト梁1の両側の下部に対向して形成されたプレキャストコンクリート板13とを備える。
Hereinafter, the half precast beam 1 will be described in detail.
The half precast beam 1 is opposed to beam main bars 11 arranged so as to extend in the X direction, shear reinforcing bars 12 provided so as to surround the beam main bars 11, and lower portions on both sides of the half precast beam 1. The formed precast concrete board 13 is provided.

図4に示すように、梁主筋11は、YZ断面で略矩形をなすハーフプレキャスト梁1断面の外周部において、Y方向及びZ方向に複数配されるとともに、X方向に延在している。本実施形態では、梁主筋11は、ハーフプレキャスト梁1断面のY方向の両側部に各1本、Z方向の上側、下側、及び上側と下側の中間部で1本ずつ配筋されている。
なお、上記数字は一例であり、適宜設定可能である。
As shown in FIG. 4, a plurality of beam main bars 11 are arranged in the Y direction and the Z direction at the outer peripheral portion of the cross section of the half precast beam 1 having a substantially rectangular shape in the YZ section, and extend in the X direction. In the present embodiment, the beam main reinforcing bars 11 are arranged one by one on both sides in the Y direction of the cross section of the half precast beam 1, one on each of the upper and lower sides in the Z direction, and the upper and lower intermediate portions. Yes.
In addition, the said number is an example and can be set suitably.

せん断補強筋12は、YZ断面で梁主筋11を囲むように設けるとともに、X方向に所定の間隔をもって複数配されている。本実施形態では、せん断補強筋12は外周部に位置する梁主筋11を包囲するとともに、Y方向の下側及び中間部に位置する梁主筋11を包囲して配筋されている。   The shear reinforcement bars 12 are provided so as to surround the beam main bars 11 in the YZ section, and a plurality of shear reinforcement bars 12 are arranged at a predetermined interval in the X direction. In this embodiment, the shear reinforcing bar 12 surrounds the beam main bar 11 located on the outer peripheral part, and surrounds the beam main bar 11 positioned on the lower side and the middle part in the Y direction.

プレキャストコンクリート板13は、ハーフプレキャスト梁1のY方向両側の下部において、梁主筋11及びせん断補強筋12の一部をその内部に配置するとともに、対向して形成されている。本実施形態では、Z方向の中間部及び下側の梁主筋11を上下方向にその内部に配置するように形成され、X方向に延設されている。
また、プレキャストコンクリート板13はY方向の両側に対向して設けられているので、ハーフプレキャスト梁1はY方向の中心部付近ではZ方向に貫通空間33が形成されている。
The precast concrete plate 13 is formed so as to face the lower part of both sides in the Y direction of the half precast beam 1 while arranging a part of the beam main reinforcing bar 11 and the shear reinforcing bar 12 therein. In the present embodiment, the intermediate portion in the Z direction and the lower beam main reinforcing bar 11 are formed so as to be arranged in the vertical direction and extend in the X direction.
Moreover, since the precast concrete board 13 is provided facing both sides in the Y direction, the half precast beam 1 has a through space 33 formed in the Z direction in the vicinity of the center in the Y direction.

次に、本発明の建築構造物の躯体10の第一実施形態の施工方法について説明する。
この製造方法は、図5に示すように、壁筋組立工程S11と、型枠仮設工程S12と、第一打設工程S13と、型枠撤去工程S14と、受け材仮設工程S15と、梁設置工程S16と、スラブ板設置工程S17と、第二打設工程S18と、受け材撤去工程S19とを備える。
以下、図6乃至図11を用いて、詳細に説明する。
Next, the construction method of 1st embodiment of the housing 10 of the building structure of this invention is demonstrated.
As shown in FIG. 5, this manufacturing method includes a wall reinforcement assembly step S11, a formwork temporary step S12, a first placement step S13, a formwork removal step S14, a receiving material temporary step S15, and a beam installation. A process S16, a slab plate installation process S17, a second placing process S18, and a receiving material removing process S19 are provided.
This will be described in detail below with reference to FIGS.

前工程として、図9(a)に示すように躯体10を施工する階のスラブ2を施工する。
次に、壁筋組立工程S11を実行する。
すなわち、図6(a)に示すように、床からZ方向に延在する壁縦筋31及びX方向に延在する壁横筋32を有する壁筋34を組み立てる。本実施形態では、Y方向に間隔をおいて2本の壁縦筋31が配筋され、該壁縦筋31の外周を囲むようにZ方向に間隔をおいて複数本の壁横筋32が配筋されている。
なお、図6(a)に示す構造をY方向から見た立面図を、図9(b)に示す。
As a pre-process, as shown in FIG. 9A, the slab 2 on the floor where the housing 10 is constructed is constructed.
Next, wall reinforcement assembly process S11 is performed.
That is, as shown in FIG. 6A, a wall bar 34 having wall vertical bars 31 extending from the floor in the Z direction and wall horizontal bars 32 extending in the X direction is assembled. In the present embodiment, two vertical wall bars 31 are arranged at intervals in the Y direction, and a plurality of horizontal wall bars 32 are arranged at intervals in the Z direction so as to surround the outer periphery of the vertical wall bars 31. It is streaked.
FIG. 9B shows an elevation view of the structure shown in FIG. 6A viewed from the Y direction.

次に、型枠仮設工程S12を実行する。
すなわち、図6(b)に示すように、壁筋34のY方向における両外側に該壁筋34と間隔をおいて、X方向に延設されたコンクリート用型枠101を仮設する。
なお、図6(b)に示す構造をY方向から見た立面図を、図9(c)に示す。
Next, the mold temporary installation process S12 is executed.
That is, as shown in FIG. 6B, the concrete form 101 extending in the X direction is temporarily installed on both outer sides in the Y direction of the wall reinforcement 34 with a space from the wall reinforcement 34.
FIG. 9C shows an elevation view of the structure shown in FIG. 6B viewed from the Y direction.

次に、第一打設工程S13を実行する。
すなわち、図6(c)に示すように、コンクリート102を、壁筋34のY方向における両外側に仮設されたコンクリート用型枠101の間に打設する。これにより、壁筋34と打設されたコンクリート102とを有する壁3が形成される。
なお、図6(c)に示す構造をY方向から見た立面図を、図10(a)に示す。
Next, the first placing step S13 is executed.
That is, as shown in FIG. 6C, the concrete 102 is placed between the concrete molds 101 temporarily provided on both outer sides in the Y direction of the wall bars 34. Thereby, the wall 3 which has the wall reinforcement 34 and the cast concrete 102 is formed.
FIG. 10A shows an elevational view of the structure shown in FIG. 6C viewed from the Y direction.

次に、型枠撤去工程S14を実行する。
すなわち、図7(a)に示すように、第一打設工程S13で使用したコンクリート用型枠101を撤去する。その後、図7(b)に示すように、コンクリート102の温度、湿度を所定の範囲に維持するために、ビニール105等で養生する。
なお、図7(a)、(b)に示す構造をY方向から見た立面図を、それぞれ図10(b)、(c)に示す。
Next, the mold removal step S14 is executed.
That is, as shown to Fig.7 (a), the concrete formwork 101 used by 1st placement process S13 is removed. Then, as shown in FIG.7 (b), in order to maintain the temperature and humidity of the concrete 102 in a predetermined range, it cures with the vinyl 105 grade | etc.,.
FIGS. 10B and 10C are elevation views of the structure shown in FIGS. 7A and 7B as viewed from the Y direction.

次に、受け材仮設工程S15を実行する。
すなわち、図7(c)に示すように、第一打設工程S13で形成された壁3の上方に受け材103を仮設する。本実施形態では、受け材103は、アングル等の留め金具であり、壁3をY方向の両側から挟みこむことにより固定されている。また、受け材103の上面は、後工程で設置するハーフプレキャスト梁1を支持する。
なお、受け材103の形状は上述に限られず、壁3に固定されるとともに、ハーフプレキャスト梁1を支持することができれば、任意の形状でよい。
ここで、図7(c)に示す構造をY方向から見た立面図を、図11(a)に示す。
Next, receiving material temporary construction process S15 is performed.
That is, as shown in FIG.7 (c), the receiving material 103 is temporarily installed above the wall 3 formed by 1st placement process S13. In this embodiment, the receiving material 103 is a fastener such as an angle, and is fixed by sandwiching the wall 3 from both sides in the Y direction. Moreover, the upper surface of the receiving material 103 supports the half precast beam 1 installed in a later process.
Note that the shape of the receiving member 103 is not limited to the above, and may be any shape as long as it is fixed to the wall 3 and can support the half precast beam 1.
Here, an elevation view of the structure shown in FIG. 7C viewed from the Y direction is shown in FIG.

次に、梁設置工程S16を実行する。
すなわち、図8(a)に示すように、壁3及び受け材103の上方に、ハーフプレキャスト梁1を設置する。ここで、ハーフプレキャスト梁1のY方向の中心部付近ではZ方向に貫通空間33が形成されている。よって、壁縦筋31の上方からハーフプレキャスト梁1を下方に移動することにより、ハーフプレキャスト梁1の貫通空間33に壁縦筋31を挿通させて、ハーフプレキャスト梁1を設置することができる。
Next, the beam installation step S16 is executed.
That is, as shown in FIG. 8A, the half precast beam 1 is installed above the wall 3 and the receiving material 103. Here, a through space 33 is formed in the Z direction in the vicinity of the center of the half precast beam 1 in the Y direction. Therefore, by moving the half precast beam 1 downward from above the wall vertical bars 31, the wall vertical bars 31 can be inserted into the through space 33 of the half precast beam 1 and the half precast beams 1 can be installed.

次に、スラブ板設置工程S17を実行する。
すなわち、図8(b)に示すように、スラブ板21をハーフプレキャスト梁1のプレキャストコンクリート板13の上側に係止させるようにして設置する。
なお、図8(b)に示す構造をY方向から見た立面図を、図11(b)に示す。
その後、図11(c)に示すように、柱上にコンクリートを打設する。
Next, slab board installation process S17 is performed.
That is, as shown in FIG. 8B, the slab plate 21 is installed so as to be locked on the upper side of the precast concrete plate 13 of the half precast beam 1.
In addition, the elevation which looked at the structure shown in FIG.8 (b) from the Y direction is shown in FIG.11 (b).
Then, as shown in FIG.11 (c), concrete is cast on a pillar.

次に、第二打設工程S18を実行する。
すなわち、図8(c)に示すように、スラブ板21の上方及びハーフプレキャスト梁1の内部にコンクリート104を打設する。
Next, the second placing step S18 is executed.
That is, as shown in FIG. 8C, concrete 104 is placed above the slab plate 21 and inside the half precast beam 1.

次に、受け材撤去工程S19を実行する。
すなわち、図8(d)に示すように、ハーフプレキャスト梁1を取り付けるために仮設された図7(c)に示す受け材103を撤去する。
なお、図8(c)に示す構造をY方向から見た立面図を、図11(d)に示す。
Next, receiving material removal process S19 is performed.
That is, as shown in FIG. 8 (d), the receiving material 103 shown in FIG. 7 (c) temporarily installed for attaching the half precast beam 1 is removed.
FIG. 11D shows an elevation view of the structure shown in FIG. 8C viewed from the Y direction.

本実施形態の建築構造物の躯体10の施工方法によれば、壁筋組立工程S11により壁3の内側部分を構成する壁縦筋31及び壁横筋32を組み立て、第一打設工程S13により壁3の外側部分を構成するコンクリート102を施工する。これにより、建築構造物の躯体10を構成する壁3として耐震壁を施工することができる。
また、スラブ板設置工程S17によりスラブ2の下側を構成するスラブ板21を設置し、第二打設工程S18によりスラブ2の上側を構成するコンクリート104を施工する。これにより、建築構造物の躯体10を構成するスラブ2を施工することができる。
また、受け材仮設工程S15により後工程で設置するハーフプレキャスト梁1を支持する受け材103を設置し、その後、梁設置工程S16によりハーフプレキャスト梁1を設置する。次に、第二打設工程S18によりハーフプレキャスト梁1の内部にコンクリート104を施工する。これにより、受け材103がハーフプレキャスト梁1を確実に支持するとともに、ハーフプレキャスト梁1の内部にコンクリート104を充填することができる。よって、建築構造物の躯体10を構成する梁を施工することができる。
また、梁としては予め工場で製造されたハーフプレキャスト梁1を使用するので、現場で複数の梁主筋11及びせん断補強筋12を配筋する必要がなく、予め複数の梁主筋11及びせん断補強筋12を配筋されたハーフプレキャスト梁1を受け材103の上方に設置すればよい。よって、現場での作業を簡易にし、施工工数を削減することにより工期を短縮することを可能とする。
また、ハーフプレキャスト梁1を構成するプレキャストコンクリート板13は、現場でハーフプレキャスト梁1の内部に打設するコンクリート104の型枠の役割を担う。よって、現場でコンクリート104を打設するために必要となる型枠を仮設し、さらに撤去する必要がないので、現場での作業を簡易にし、施工工数を削減することができる。
According to the construction method of the building structure frame 10 of the present embodiment, the wall vertical bars 31 and the horizontal wall bars 32 constituting the inner portion of the wall 3 are assembled by the wall bar assembling process S11, and the wall is formed by the first placing process S13. The concrete 102 which comprises the outer part of 3 is constructed. Thereby, a seismic wall can be constructed as the wall 3 which comprises the housing 10 of a building structure.
Moreover, the slab board 21 which comprises the lower side of the slab 2 is installed by slab board installation process S17, and the concrete 104 which comprises the upper side of the slab 2 is constructed by the second placing process S18. Thereby, the slab 2 which comprises the housing 10 of a building structure can be constructed.
Moreover, the receiving material 103 which supports the half precast beam 1 installed in a post process is installed by the receiving material temporary installation process S15, and then the half precast beam 1 is installed by the beam installation process S16. Next, concrete 104 is constructed inside the half precast beam 1 in the second placing step S18. Thereby, the receiving material 103 can reliably support the half precast beam 1 and can fill the inside of the half precast beam 1 with the concrete 104. Therefore, the beam which comprises the housing 10 of a building structure can be constructed.
Further, since the half precast beam 1 manufactured in advance at the factory is used as the beam, it is not necessary to arrange a plurality of beam main bars 11 and shear reinforcement bars 12 on site, and a plurality of beam main bars 11 and shear reinforcement bars in advance. What is necessary is just to install the half precast beam 1 in which 12 is arranged above the receiving material 103. Therefore, the work on site can be simplified and the construction period can be shortened by reducing the number of construction steps.
Moreover, the precast concrete board 13 which comprises the half precast beam 1 plays the role of the formwork of the concrete 104 cast | placed in the inside of the half precast beam 1 on the spot. Therefore, since it is not necessary to temporarily form a formwork necessary for placing the concrete 104 on site and further remove it, it is possible to simplify the work on site and reduce the number of construction steps.

次に、本発明の建築構造物の躯体10の第二実施形態の施工方法について説明する。
この製造方法は、図12に示すように、支保工設置工程S21と、壁筋組立工程S22と、梁設置工程S23と、型枠仮設工程S24と、第一打設工程S25と、撤去工程S26と、スラブ板設置工程S27と、第二打設工程S28とを備える。
以下、図13乃至図15を用いて、詳細に説明する。
Next, the construction method of 2nd embodiment of the frame 10 of the building structure of this invention is demonstrated.
As shown in FIG. 12, the manufacturing method includes a support installation step S21, a wall reinforcement assembly step S22, a beam installation step S23, a formwork temporary step S24, a first placement step S25, and a removal step S26. And a slab plate installation step S27 and a second placement step S28.
This will be described in detail below with reference to FIGS.

前工程として、図13(a)に示すように躯体10を施工する階のスラブ2を施工する。図16(a)は、図13(a)で示す構造をY方向から見た立面図である。
次に、支保工設置工程S21を実施する。
すなわち、図13(b)に示すように、支柱112と、横材113と、斜材114と、梁支持材115とを備える支保工111を組み立てる。支柱112をZ方向に立設し、支柱112の下端に横材113の一端を取り付け、支柱112の上端と横材113の他端を斜材114で連結するとともに、連結箇所をそれぞれ締結する。また、支柱112の下端、及び斜材114の下端をそれぞれ地面に取り付ける。図16(b)に示すように、本実施形態では、支保工111は柱間で3箇所に設けられている。
また、梁支持材115は、後工程で設置するハーフプレキャスト梁1と係止する係止部116と、支柱112に取り付けられた取付部117とを備える。本実施形態では、係止部116にはハーフプレキャスト梁1を支持するためのネジ孔が設けられ(不図示)、取付部117は支柱112とビス等で固定されている。
なお、支保工111の構成は上述に限られず、後工程で設置するハーフプレキャスト梁1を支持することができれば任意の構成でよい。
ここで、図13(b)に示す構造をY方向から見た立面図を、図16(b)に示す。
As a pre-process, as shown in FIG. 13A, the slab 2 on the floor where the frame 10 is constructed is constructed. FIG. 16A is an elevation view of the structure shown in FIG. 13A viewed from the Y direction.
Next, a support installation step S21 is performed.
That is, as shown in FIG. 13 (b), a support 111 including a support 112, a cross member 113, a diagonal member 114, and a beam support member 115 is assembled. The support column 112 is erected in the Z direction, one end of the cross member 113 is attached to the lower end of the support column 112, the upper end of the support column 112 and the other end of the cross member 113 are connected by the diagonal member 114, and the connection portions are fastened. Moreover, the lower end of the support | pillar 112 and the lower end of the diagonal material 114 are each attached to the ground. As shown in FIG. 16B, in the present embodiment, the support work 111 is provided at three places between the columns.
Further, the beam support member 115 includes a locking portion 116 that locks with the half precast beam 1 to be installed in a subsequent process, and a mounting portion 117 that is mounted on the support column 112. In the present embodiment, the locking portion 116 is provided with a screw hole for supporting the half precast beam 1 (not shown), and the mounting portion 117 is fixed to the support column 112 with a screw or the like.
The structure of the support 111 is not limited to the above, and any structure may be used as long as it can support the half precast beam 1 installed in a subsequent process.
Here, an elevation view of the structure shown in FIG. 13B as seen from the Y direction is shown in FIG.

次に、壁筋組立工程S22を実施する。
すなわち、図13(c)に示すように、床からZ方向に延在する壁縦筋31及びX方向に延在する壁横筋32を有する壁筋34を組み立てる。本実施形態では、Y方向に間隔をおいて2本の壁縦筋31が配筋され、該壁縦筋31の外周を囲むようにZ方向に間隔をおいて複数本の壁横筋32が配筋されている。
なお、図13(c)に示す構造をY方向から見た立面図を、図16(c)に示す。
Next, wall reinforcement assembly process S22 is implemented.
That is, as shown in FIG. 13C, a wall bar 34 having wall vertical bars 31 extending in the Z direction and wall horizontal bars 32 extending in the X direction from the floor is assembled. In the present embodiment, two vertical wall bars 31 are arranged at intervals in the Y direction, and a plurality of horizontal wall bars 32 are arranged at intervals in the Z direction so as to surround the outer periphery of the vertical wall bars 31. It is streaked.
FIG. 16C shows an elevation view of the structure shown in FIG. 13C viewed from the Y direction.

次に、梁設置工程S23を実施する。
すなわち、図13(c)に示すように、支保工設置工程S21で設置された支保工111の梁支持材115の係止部116に支持されるようにハーフプレキャスト梁1を設置する。本実施形態では、ハーフプレキャスト梁1には予めインサートネジが設けられており(不図示)、支保工111の梁支持材115のネジ孔と位置を合わせて、ネジ止めすることによりハーフプレキャスト梁1と支保工111を固定する。
ここで、ハーフプレキャスト梁1のY方向の中心部付近ではZ方向に貫通空間33が形成されている。よって、壁縦筋31の上方からハーフプレキャスト梁1を下方に移動することにより、ハーフプレキャスト梁1の貫通空間33に壁縦筋31を挿通させて、ハーフプレキャスト梁1を設置することができる。
なお、ハーフプレキャスト梁1と支保工111との固定方法は上述の方法に限られず、固定可能であれば任意の構成でよい。
Next, a beam installation step S23 is performed.
That is, as shown in FIG.13 (c), the half precast beam 1 is installed so that it may be supported by the latching | locking part 116 of the beam support material 115 of the support 111 installed by support work installation process S21. In the present embodiment, the half precast beam 1 is provided with an insert screw (not shown) in advance. The half precast beam 1 is aligned with the screw hole of the beam support member 115 of the support 111 and screwed. And fix the support 111.
Here, a through space 33 is formed in the Z direction in the vicinity of the center of the half precast beam 1 in the Y direction. Therefore, by moving the half precast beam 1 downward from above the wall vertical bars 31, the wall vertical bars 31 can be inserted into the through space 33 of the half precast beam 1 and the half precast beams 1 can be installed.
In addition, the fixing method of the half precast beam 1 and the support work 111 is not restricted to the above-mentioned method, Arbitrary structures may be sufficient if it can fix.

次に、型枠仮設工程S24を実施する。
すなわち、図14(a)に示すように、壁筋34のY方向における両外側に該壁筋34と間隔をおいて、X方向に延設されたコンクリート用型枠101を仮設する。
なお、図14(a)に示す構造をY方向から見た立面図を、図17(a)に示す。
Next, a temporary form forming step S24 is performed.
That is, as shown in FIG. 14A, concrete formwork 101 extending in the X direction is temporarily provided on both outer sides in the Y direction of the wall reinforcement 34 with a space from the wall reinforcement 34.
FIG. 17A shows an elevation view of the structure shown in FIG. 14A viewed from the Y direction.

次に、第一打設工程S25を実施する。
すなわち、図14(b)に示すように、コンクリート118を壁筋34のY方向における両外側に仮設されたコンクリート用型枠101の間、及びハーフプレキャスト梁1の内部におけるプレキャストコンクリート板13の上面まで打設する。これにより、壁筋34と打設されたコンクリート118とを有する壁3が形成される。
なお、図14(b)に示す構造をY方向から見た立面図を、図17(b)に示す。
Next, the first placing step S25 is performed.
That is, as shown in FIG. 14 (b), the top surface of the precast concrete plate 13 between the concrete mold 101 temporarily provided on both outer sides in the Y direction of the wall bars 34 and the inside of the half precast beam 1, as shown in FIG. To hit. Thereby, the wall 3 which has the wall reinforcement 34 and the cast concrete 118 is formed.
FIG. 17B shows an elevation view of the structure shown in FIG. 14B viewed from the Y direction.

次に、撤去工程S26を実施する。
すなわち、図14(c)に示すように、第一打設工程S25で使用したコンクリート用型枠101、及び該コンクリート用型枠101を支持する支保工111を撤去する。次に、図15(a)に示すように、コンクリート118の温度、湿度を所定の範囲に維持するために、ビニール105等で養生する。
なお、図14(c)、図15(a)に示す構造をY方向から見た立面図を、それぞれ図17(c)、図18(a)に示す。
その後、図18(b)に示すように大梁型枠を設置し、図18(c)に示すように大梁にコンクリートを打設する。
Next, removal process S26 is implemented.
That is, as shown in FIG.14 (c), the concrete formwork 101 used by 1st placement process S25 and the support work 111 which supports this concrete formwork 101 are removed. Next, as shown in FIG. 15A, the concrete 118 is cured with vinyl 105 or the like in order to maintain the temperature and humidity of the concrete 118 within a predetermined range.
Note that elevation views of the structure shown in FIGS. 14C and 15A viewed from the Y direction are shown in FIGS. 17C and 18A, respectively.
Thereafter, a large beam formwork is installed as shown in FIG. 18 (b), and concrete is placed on the large beam as shown in FIG. 18 (c).

次に、スラブ板設置工程S27を実施する。
すなわち、図15(a)に示すように、スラブ板21をハーフプレキャスト梁1のプレキャストコンクリート板13の上側に係止させるようにして設置する。
なお、図15(a)に示す構造をY方向から見た立面図を、図19(a)に示す。
Next, slab board installation process S27 is implemented.
That is, as shown to Fig.15 (a), it installs so that the slab board 21 may be latched on the upper side of the precast concrete board 13 of the half precast beam 1. FIG.
FIG. 19A shows an elevation view of the structure shown in FIG. 15A viewed from the Y direction.

次に、第二打設工程S28を実施する。
すなわち、図15(b)に示すように、スラブ板21の上方及びハーフプレキャスト梁1の内部にコンクリート119を打設する。
なお、図15(b)に示す構造をY方向から見た立面図を、図19(b)に示す。
Next, the second placing step S28 is performed.
That is, as shown in FIG. 15 (b), concrete 119 is placed above the slab plate 21 and inside the half precast beam 1.
FIG. 19B shows an elevation view of the structure shown in FIG. 15B viewed from the Y direction.

本実施形態の建築構造物の躯体10の施工方法によれば、壁筋組立工程S22により壁3の内側部分を構成する壁縦筋31及び壁横筋32を組み立て、第一打設工程S25により壁3の外側部分を構成するコンクリート118を施工する。これにより、建築構造物の躯体10を構成する壁3として耐震壁を施工することができる。
また、スラブ板設置工程S27によりスラブ2の下側を構成するスラブ板21を設置し、第二打設工程S28によりスラブ2の上側を構成するコンクリート119を施工する。これにより、建築構造物の躯体10を構成するスラブ2を施工することができる。
また、第一打設工程S25により、コンクリート118をハーフプレキャスト梁1の下部に充填することができる。そして、支保工設置工程S21により後工程で設置するハーフプレキャスト梁1を支持するために梁支持材115を設置し、その後、梁設置工程S23によりハーフプレキャスト梁1を設置する。次に、第二打設工程S28によりコンクリート119をハーフプレキャスト梁1の内部に充填することができる。これにより、梁支持材115がハーフプレキャスト梁1を確実に支持するとともに、コンクリート119をハーフプレキャスト梁1の内部の全部に充填することができる。よって、建築構造物の躯体10を構成する梁を施工することができる。
また、梁としては予め工場で製造されたハーフプレキャスト梁1を使用するので、現場で複数の梁主筋11及びせん断補強筋12を配筋する必要がなく、予め複数の梁主筋11及びせん断補強筋12を配筋されたハーフプレキャスト梁1を受け材の上方に設置すればよい。よって、現場での作業を簡易にし、施工工数を削減することにより工期を短縮することを可能とする。
また、ハーフプレキャスト梁1を構成するプレキャストコンクリート板13は、現場でハーフプレキャスト梁1の内部に打設するコンクリート119の型枠の役割を担う。よって、現場でコンクリート119を打設するために必要となる型枠を仮設し、さらに撤去する必要がないので、現場での作業を簡易にし、施工工数を削減することができる。
According to the construction method of the building structure frame 10 of the present embodiment, the wall vertical bars 31 and the horizontal wall bars 32 constituting the inner portion of the wall 3 are assembled by the wall bar assembling process S22, and the wall is formed by the first placing process S25. The concrete 118 which comprises the outer part of 3 is constructed. Thereby, a seismic wall can be constructed as the wall 3 which comprises the housing 10 of a building structure.
Moreover, the slab board 21 which comprises the lower side of the slab 2 is installed by slab board installation process S27, and the concrete 119 which comprises the upper side of the slab 2 is constructed by the second placing process S28. Thereby, the slab 2 which comprises the housing 10 of a building structure can be constructed.
Moreover, the concrete 118 can be filled in the lower part of the half precast beam 1 by 1st placement process S25. And the beam support material 115 is installed in order to support the half precast beam 1 installed in a post process by the support installation process S21, and then the half precast beam 1 is installed by the beam installation process S23. Next, the concrete 119 can be filled into the half precast beam 1 by the second placing step S28. As a result, the beam support member 115 can reliably support the half precast beam 1 and the concrete 119 can be filled in the entire interior of the half precast beam 1. Therefore, the beam which comprises the housing 10 of a building structure can be constructed.
Further, since the half precast beam 1 manufactured in advance at the factory is used as the beam, it is not necessary to arrange a plurality of beam main bars 11 and shear reinforcement bars 12 on site, and a plurality of beam main bars 11 and shear reinforcement bars in advance. What is necessary is just to install the half precast beam 1 in which 12 is arranged above the receiving material. Therefore, the work on site can be simplified and the construction period can be shortened by reducing the number of construction steps.
Moreover, the precast concrete board 13 which comprises the half precast beam 1 plays the role of the formwork of the concrete 119 cast | placed in the inside of the half precast beam 1 on the spot. Therefore, there is no need to temporarily form and dismantle the formwork necessary for placing concrete 119 on site, so the work on site can be simplified and the number of construction steps can be reduced.

次に、本発明の一実施形態のハーフプレキャスト梁1の製造方法について説明する。
この製造方法は、図20に示すように、土台設置工程S01と、外型枠仮設工程S02と、梁筋設置工程S03と、内型枠仮設工程S04と、打設工程S05と、型枠撤去工程S06とを備える。
以下、図21乃至図24を用いて、詳細に説明する。
Next, the manufacturing method of the half precast beam 1 of one Embodiment of this invention is demonstrated.
As shown in FIG. 20, the manufacturing method includes a foundation installation step S01, an outer formwork temporary installation process S02, a beam reinforcement installation process S03, an inner formwork temporary installation process S04, a placement process S05, and a mold removal. Step S06.
This will be described in detail below with reference to FIGS.

まず、土台設置工程S01を実行する。
すなわち、図21(a)に示すように、基板122と該基板122の上面から上方に突出した複数の凸部123とを備えるとともに、X方向に延設された土台121を敷設する。
First, the base installation step S01 is executed.
That is, as shown in FIG. 21A, a base plate 122 and a plurality of convex portions 123 protruding upward from the upper surface of the substrate 122 are provided, and a base 121 extending in the X direction is laid.

次に、外型枠仮設工程S02を実行する。
すなわち、図21(b)に示すように、X方向に延設された2枚のコンクリート用外型枠125を、土台121の凸部123のY方向における外側に凸部123と間隔をおいて仮設する。
Next, an outer mold temporary installation step S02 is executed.
That is, as shown in FIG. 21B, the two concrete outer mold frames 125 extending in the X direction are spaced apart from the convex portion 123 on the outer side in the Y direction of the convex portion 123 of the base 121. Temporary.

次に、梁筋設置工程S03を実行する。
すなわち、図21(c)に示すように、土台121の凸部123の上方であり、2枚のコンクリート用外型枠125の間に、ハーフプレキャスト梁1の梁主筋11及びせん断補強筋12を構成するように予め組み立てられた梁筋15を設置する。該梁筋15はコンクリート用外型枠125との間に間隙をおいて配されている。
Next, a beam reinforcing step S03 is executed.
That is, as shown in FIG. 21 (c), the beam main reinforcement 11 and the shear reinforcement 12 of the half precast beam 1 are located above the convex portion 123 of the base 121 and between the two concrete outer molds 125. Pre-assembled beam bars 15 are installed to configure. The beam 15 is arranged with a gap between the concrete outer formwork 125.

次に、内型枠仮設工程S04を実行する。
すなわち、図22(a)乃至(c)に示すように、土台121の凸部123の上方にコンクリート用内型枠126を仮設する。本実施形態では、コンクリート用型枠101は、せん断補強筋12と干渉しない形状に形成されるとともに、Z方向に3分割された分割コンクリート用型枠127が用いられている。よって、敷設された状態で下方に位置する分割コンクリート用型枠127から順に土台121の上に敷設する。
なお、コンクリート用内型枠126の構成は上記に限られず、せん断補強筋12と干渉しなければよい。
Next, an inner mold temporary setting step S04 is executed.
That is, as shown in FIGS. 22A to 22C, the concrete inner mold 126 is temporarily installed above the convex portion 123 of the base 121. In this embodiment, the concrete mold 101 is formed in a shape that does not interfere with the shear reinforcement 12 and a divided concrete mold 127 that is divided into three in the Z direction is used. Therefore, it lays on the base 121 in order from the divided concrete formwork 127 positioned below in the laid state.
Note that the configuration of the concrete inner mold 126 is not limited to the above, and it does not have to interfere with the shear reinforcement 12.

次に、打設工程S05を実行する。
すなわち、図23(a)に示すように、外型枠仮設工程S02、及び内型枠仮設工程S04によって仮設されたコンクリート用外型枠125とコンクリート用内型枠126の間にコンクリート131を打設する。
Next, the placing step S05 is executed.
That is, as shown in FIG. 23A, concrete 131 is placed between the concrete outer mold 125 and the concrete inner mold 126 temporarily installed in the outer mold temporary setting step S02 and the inner mold temporary setting step S04. Set up.

次に、型枠撤去工程S06を実行する。
すなわち、図23(b)乃至図24(b)に示すように、打設工程S05で型枠として使用したコンクリート用外型枠125及びコンクリート用内型枠126を撤去する。本実施形態では、コンクリート用内型枠126として分割コンクリート用型枠127が使用されているので、仮設された状態で上方から順に撤去する。
Next, the mold removal step S06 is performed.
That is, as shown in FIGS. 23B to 24B, the concrete outer formwork 125 and the concrete inner formwork 126 used as the formwork in the placing step S05 are removed. In this embodiment, since the divided concrete mold 127 is used as the concrete inner mold 126, the concrete is removed in order from the top in a temporarily installed state.

上述のハーフプレキャスト梁1の製造方法によれば、梁筋設置工程S03によりハーフプレキャスト梁1を構成する梁主筋11及びせん断補強筋12を配筋することができる。また、土台設置工程S01、外型枠仮設工程S02、及び内型枠仮設工程S04により、後工程で打設するコンクリート131の型枠を形成し、形成された型枠に打設工程S05により確実にコンクリート131を充填することができるので、ハーフプレキャスト梁1を構成するプレキャストコンクリート板13を製造することができる。また、プレキャストコンクリート板13は対向して設けられているので、該プレキャストコンクリート板13に挟まれた部分には、Z方向に貫通した貫通空間33が形成される。
上述の工程は工場で行うことができるため、予め工場にてハーフプレキャスト梁1を製造することができる。
According to the manufacturing method of the above-mentioned half precast beam 1, the beam main reinforcement 11 and the shear reinforcement 12 which comprise the half precast beam 1 can be arranged by the beam reinforcement installation process S03. In addition, the formwork of the concrete 131 to be placed in the subsequent process is formed by the foundation installation process S01, the outer moldwork temporary process S02, and the inner moldwork temporary process S04, and the formed moldwork is surely secured by the casting process S05. Since the concrete 131 can be filled, the precast concrete board 13 which comprises the half precast beam 1 can be manufactured. Moreover, since the precast concrete board 13 is provided facing, the penetration space 33 penetrated to the Z direction is formed in the part pinched by the precast concrete board 13.
Since the above-described steps can be performed in a factory, the half precast beam 1 can be manufactured in advance in the factory.

尚、上述した実施の形態において示した組立手順、あるいは各構成部材の諸形状や組み合わせ等は一例であって、本発明の主旨から逸脱しない範囲において設計要求等に基づき種々変更可能である。   It should be noted that the assembling procedure shown in the above-described embodiment, the various shapes and combinations of the constituent members, and the like are merely examples, and various modifications can be made based on design requirements and the like without departing from the gist of the present invention.

1…ハーフプレキャスト梁
2…スラブ
3…壁
10…躯体
11…梁主筋
12…せん断補強筋
13…プレキャストコンクリート板
15…梁筋
21…スラブ板
31…壁縦筋
32…壁横筋
33…貫通空間
101…コンクリート用型枠
102、104、118、119、131…コンクリート(第一打設工程)
103…受け材
111…支保工
121…土台
123…凸部
125…コンクリート用外型枠
126…コンクリート用内型枠
127…分割コンクリート用内型枠
S01…土台設置工程
S02…外型枠仮設工程
S03…梁筋設置工程
S04…内型枠設置工程
S05…打設工程
S06…型枠撤去工程
S11、S22…壁筋組立工程
S12、S24…型枠仮設工程
S13、S25…第一打設工程
S14…型枠撤去工程
S15…受け材仮設工程
S16、S23…梁設置工程
S17、S27…スラブ板設置工程
S18、S28…第二打設工程
S19…受け材撤去工程
S21…支保工設置工程
S26…撤去工程
DESCRIPTION OF SYMBOLS 1 ... Half precast beam 2 ... Slab 3 ... Wall 10 ... Body 11 ... Beam main reinforcement 12 ... Shear reinforcement 13 ... Precast concrete board 15 ... Beam reinforcement 21 ... Slab board 31 ... Wall vertical reinforcement 32 ... Wall transverse reinforcement 33 ... Penetration space 101 ... Concrete formwork 102, 104, 118, 119, 131 ... Concrete (first placing process)
DESCRIPTION OF SYMBOLS 103 ... Receiving material 111 ... Supporting work 121 ... Base 123 ... Convex part 125 ... Concrete outer formwork 126 ... Concrete inner formwork 127 ... Divided concrete inner formwork S01 ... Base installation process S02 ... Outer form temporary installation process S03 ... Beam bar installation process S04 ... Inner formwork installation process S05 ... Placement process S06 ... Formwork removal process S11, S22 ... Wall reinforcement assembly process S12, S24 ... Formwork temporary installation process S13, S25 ... First placement process S14 ... Form removal step S15 ... Temporary receiving step S16, S23 ... Beam installation step S17, S27 ... Slab plate installation step S18, S28 ... Second placement step S19 ... Receiving material removal step S21 ... Supporting installation step S26 ... Removal step

Claims (5)

建築構造物の躯体を構成するハーフプレキャスト梁であって、
梁断面の外周部に水平方向に延在するように配置された複数の梁主筋と、
前記梁の延在する方向に間隔をおいて前記梁主筋を囲むように設けられた複数のせん断補強筋と、
前記梁の両側下部に上下方向の貫通空間が形成されるように対向して配置され、前記梁主筋及び前記せん断補強筋の一部をその内部に配置して形成されたプレキャストコンクリート板とを備えることを特徴とするハーフプレキャスト梁。
A half precast beam that forms the building structure,
A plurality of beam main bars arranged to extend in the horizontal direction on the outer periphery of the beam cross-section;
A plurality of shear reinforcement bars provided so as to surround the beam main bar at intervals in the extending direction of the beam;
A precast concrete plate disposed opposite to each other so as to form a vertically penetrating space at both lower portions of the beam, and formed by arranging a part of the beam main reinforcing bar and the shear reinforcing bar therein. A half-precast beam characterized by that.
請求項1に記載の前記ハーフプレキャスト梁の製造方法であって、
上方に突出した凸部を有する土台を設置する土台設置工程と、
前記凸部の外側に、コンクリート用外型枠を仮設する外型枠仮設工程と、
前記凸部の上に予め組み立てられた前記梁主筋及び前記せん断補強筋を有する梁筋を設置する梁筋設置工程と、
前記凸部の上にコンクリート用内型枠を仮設する内型枠仮設工程と、
前記コンクリート用外型枠と前記コンクリート用内型枠との間に、コンクリートを打設する打設工程と、
前記コンクリート用内型枠及び前記コンクリート用外型枠を撤去する型枠撤去工程とを備えることを特徴とするハーフプレキャスト梁の製造方法。
It is a manufacturing method of the half precast beam according to claim 1,
A foundation installation step of installing a foundation having a convex portion protruding upward;
An outer mold temporary installation step of temporarily setting an outer mold for concrete on the outside of the convex part;
A beam reinforcement installation step of installing a beam reinforcement having the beam reinforcement and the shear reinforcement reinforcement pre-assembled on the convex portion;
An inner mold temporary installation step of temporarily setting an inner mold for concrete on the convex part;
A placing step of placing concrete between the concrete outer formwork and the concrete inner formwork;
A method for producing a half precast beam, comprising: a mold removing step for removing the inner mold for concrete and the outer mold for concrete.
請求項2に記載のハーフプレキャスト梁の製造方法において、
前記内型枠仮設工程は、前記コンクリート用内型枠として、前記梁筋と干渉しない形状に形成されるとともに、上下方向に分割された分割コンクリート用内型枠を上下方向に敷設し、
前記型枠撤去工程は、前記分割コンクリート用内型枠を順に撤去することを特徴とするハーフプレキャスト梁の製造方法。
In the manufacturing method of the half precast beam according to claim 2,
The inner mold temporary construction step, as the inner mold for concrete, is formed in a shape that does not interfere with the beam streaks, and lays the divided concrete inner mold divided in the vertical direction in the vertical direction,
In the method for producing a half precast beam, the mold removing step includes sequentially removing the divided concrete inner mold.
建築構造物の躯体の施工方法であって、
床から上下方向に延在する壁縦筋及び一の水平方向に延在する壁横筋を有する壁筋を組み立てる壁筋組立工程と、
前記壁筋の外周にコンクリート用型枠を仮設する型枠仮設工程と、
前記コンクリート用型枠の内部にコンクリートを打設して壁を形成する第一打設工程と、
前記コンクリート用型枠を撤去する型枠撤去工程と、
前記壁の上方に受け材を仮設する受け材仮設工程と、
前記壁及び前記受け材の上方に請求項1に記載のハーフプレキャスト梁を設置する梁設置工程と、
前記壁の上方にスラブ板を設置するスラブ板設置工程と、
前記スラブ板の上方及び前記ハーフプレキャスト梁の内部にコンクリートを打設する第二打設工程と、
前記受け材を撤去する受け材撤去工程とを備えることを特徴とする建築物の躯体の施工方法。
A construction method for a building structure,
A wall reinforcement assembly process for assembling a wall reinforcement having a vertical wall extension extending vertically from the floor and a horizontal wall extension extending horizontally;
A temporary form forming step for temporarily placing a concrete form on the outer periphery of the wall reinforcement;
A first placing step of placing concrete into the concrete formwork to form a wall;
A mold removal step of removing the concrete mold;
A receiving material temporary setting step of temporarily setting a receiving material above the wall;
A beam installation step of installing the half precast beam according to claim 1 above the wall and the receiving material;
A slab plate installation step of installing a slab plate above the wall;
A second placing step of placing concrete above the slab plate and inside the half precast beam;
A method for constructing a building frame, comprising: a receiving material removing step of removing the receiving material.
建築構造物の躯体の施工方法であって、
床に支保工を設置する支保工設置工程と、
前記床から上下方向に延在する壁縦筋及び一の水平方向に延在する壁横筋を有する壁筋を組み立てる壁筋組立工程と、
請求項1に記載のハーフプレキャスト梁を前記支保工に支持されるように設置する梁設置工程と、
前記壁筋の外周であり、前記ハーフプレキャスト梁の下方にコンクリート用型枠を仮設する型枠仮設工程と、
前記コンクリート用型枠の内部及びハーフプレキャスト梁の内部にコンクリートを打設して壁を形成する第一打設工程と、
前記支保工及び前記コンクリート用型枠を撤去する撤去工程と、
前記壁の上方にスラブ板を設置するスラブ板設置工程と、
前記スラブ板の上方及び前記ハーフプレキャスト梁の内部に前記コンクリートを打設する第二打設工程とを備えることを特徴とする建築物の躯体の施工方法。
A construction method for a building structure,
A support installation process for installing a support on the floor;
A wall reinforcement assembling process for assembling a wall reinforcement having a vertical wall extension extending vertically from the floor and a horizontal wall extension extending horizontally;
A beam installation step of installing the half precast beam according to claim 1 to be supported by the support;
A temporary form forming step for temporarily installing a concrete formwork below the half precast beam, the outer periphery of the wall reinforcement,
A first casting step of casting concrete into the concrete formwork and the half precast beam to form a wall;
A removal step of removing the support and the concrete formwork;
A slab plate installation step of installing a slab plate above the wall;
And a second placing step of placing the concrete above the slab plate and inside the half precast beam.
JP2011108754A 2011-05-13 2011-05-13 Half-precast beam, method of manufacturing half-precast beam, and method of constructing skeleton of building structure Withdrawn JP2012241311A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011108754A JP2012241311A (en) 2011-05-13 2011-05-13 Half-precast beam, method of manufacturing half-precast beam, and method of constructing skeleton of building structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011108754A JP2012241311A (en) 2011-05-13 2011-05-13 Half-precast beam, method of manufacturing half-precast beam, and method of constructing skeleton of building structure

Publications (1)

Publication Number Publication Date
JP2012241311A true JP2012241311A (en) 2012-12-10

Family

ID=47463335

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011108754A Withdrawn JP2012241311A (en) 2011-05-13 2011-05-13 Half-precast beam, method of manufacturing half-precast beam, and method of constructing skeleton of building structure

Country Status (1)

Country Link
JP (1) JP2012241311A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106854899A (en) * 2017-01-18 2017-06-16 黄坤坤 Assembled ring muscle is fastened and is anchored concrete shear force wall vertical connection structure
CN109773952A (en) * 2019-01-29 2019-05-21 中交武汉港湾工程设计研究院有限公司 A kind of short-term matching segment beam circulation flow production line and its production method
CN115874758A (en) * 2022-12-14 2023-03-31 福建建泰建筑科技有限责任公司 Prefabricated ultrahigh-performance concrete member and preparation method thereof
CN116084298A (en) * 2023-03-16 2023-05-09 上海市城市建设设计研究总院(集团)有限公司 Construction measures of layered cover beam and construction method of layered cover beam
JP2023153476A (en) * 2022-04-05 2023-10-18 五洋建設株式会社 Precast concrete members and framework construction method using precast concrete members

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106854899A (en) * 2017-01-18 2017-06-16 黄坤坤 Assembled ring muscle is fastened and is anchored concrete shear force wall vertical connection structure
CN109773952A (en) * 2019-01-29 2019-05-21 中交武汉港湾工程设计研究院有限公司 A kind of short-term matching segment beam circulation flow production line and its production method
CN109773952B (en) * 2019-01-29 2023-09-15 中交武汉港湾工程设计研究院有限公司 Short line matching segment beam circulating flow production line and production method thereof
JP2023153476A (en) * 2022-04-05 2023-10-18 五洋建設株式会社 Precast concrete members and framework construction method using precast concrete members
CN115874758A (en) * 2022-12-14 2023-03-31 福建建泰建筑科技有限责任公司 Prefabricated ultrahigh-performance concrete member and preparation method thereof
CN116084298A (en) * 2023-03-16 2023-05-09 上海市城市建设设计研究总院(集团)有限公司 Construction measures of layered cover beam and construction method of layered cover beam

Similar Documents

Publication Publication Date Title
KR101556545B1 (en) Method for constructing using a double wall Precast Concrete
CN100424283C (en) Construction method for high-rise building with SRC structure
KR101903628B1 (en) Precast Double Wall Structure with Enhanced Seismic Performance and Construction method thereof
KR100937745B1 (en) Constructing method using precast concrete column
KR102197689B1 (en) Vertical core structure horizontally assembled and construction method therewith
KR101726779B1 (en) Fastening Device for Preventing the Buoyancy of Hollow Body for Hollow Slab
JP2012241311A (en) Half-precast beam, method of manufacturing half-precast beam, and method of constructing skeleton of building structure
KR101386415B1 (en) Floor structure and modular unit of modular building and method for manufacturing the same
KR102312319B1 (en) Magnetic assembly type mold panel
JP2018123537A (en) Method of constructing mat foundation, tubular formwork and mat foundation structure
KR101415699B1 (en) Mold for column
KR102425150B1 (en) External insulation construction method in which the gang form is supported by a reinforcing material to improve construction safety
KR102104382B1 (en) Steel beam, composite column, and joint structure of the same
KR102266630B1 (en) Construction method of building with composite beam structure using module deck
JP5869717B1 (en) Existing concrete structure reinforcement structure
JP3384785B2 (en) Construction method of damping wall
KR101880813B1 (en) A sandwitch pc pannel structure and construction method of structure using thereof
KR101697361B1 (en) Prefabricated columns and beams and slabs connecting structure
JP2002357009A (en) Damping beam and method of building damping beam
KR100885765B1 (en) Composite panel in which metal skeleton panel and thin panel are connected by shear connector and outer wall construction method
KR100747665B1 (en) Slab formwork and slab construction method using the same
TWI701373B (en) Method for constructing construction structure of multi-floor building
KR102634082B1 (en) Bracket reinforcement structure of hollow-core column and its construction method
KR20140046322A (en) Building and fabrication method using the module house
KR102955103B1 (en) Slab Opening Covering Structure and a Construction Method for the same

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20140805