JP2012107430A - Construction method of underground structure - Google Patents

Construction method of underground structure Download PDF

Info

Publication number
JP2012107430A
JP2012107430A JP2010257158A JP2010257158A JP2012107430A JP 2012107430 A JP2012107430 A JP 2012107430A JP 2010257158 A JP2010257158 A JP 2010257158A JP 2010257158 A JP2010257158 A JP 2010257158A JP 2012107430 A JP2012107430 A JP 2012107430A
Authority
JP
Japan
Prior art keywords
underground structure
construction
ring
dismantling
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2010257158A
Other languages
Japanese (ja)
Other versions
JP5811389B2 (en
Inventor
Shigeki Ono
重記 小野
Masaki Wada
昌樹 和田
Kazuyuki Oki
和之 沖
Satoru Kishida
了 岸田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP2010257158A priority Critical patent/JP5811389B2/en
Publication of JP2012107430A publication Critical patent/JP2012107430A/en
Application granted granted Critical
Publication of JP5811389B2 publication Critical patent/JP5811389B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a construction method of an underground structure capable of shortening a construction period while reducing influence on surroundings and reducing or omitting lighting equipment and ventilation equipment further.SOLUTION: The construction method of an underground structure is for constructing a new underground structure while demolishing an existing underground structure. By alternately performing a demolition process of constructing earth retaining 100 around the existing underground structure and then demolishing a part positioned on the top story in the remaining existing underground structure and a ring construction process of constructing outer peripheral rings 3,4,5,6 with openings 30,40,50,60 formed at the center part, which are the outer peripheral part of the new underground structure, inside a space formed by the demolition process, the outer peripheral part of the new underground structure is successively constructed from the top story while successively demolishing the existing underground structure from the top story, and after the demolition of the existing underground structure is ended, the center part of the new underground structure is constructed on the inner side of the openings 30,40,50,60 of the outer peripheral rings 3,4,5,6.

Description

本発明は、既存地下構造物の解体工事を伴う地下構造物の施工方法に関する。   The present invention relates to a method for constructing an underground structure that involves the dismantling of an existing underground structure.

近年、床面積が広くて大深度の大規模地下構造を持った既存建物を解体し、その場所に、同じく大深度で床面積が広い大規模地下構造を持った新規建物を新築する建設工事がある。このような建設工事では、周辺のインフラや建物等への影響を防止するために、既存地下構造物の周りに山留めを構築しつつ、その山留めの土圧による変形(倒れ)を抑制する必要がある。
上記した建設工事の施工方法としては、従来、例えば下記の2つの方法が考えられる。
In recent years, an existing building with a large underground structure with a large floor area and a large depth has been demolished, and a new building with a large underground structure with a large depth and a large floor area has been newly constructed at that location. is there. In such construction work, in order to prevent the influence on the surrounding infrastructure and buildings, it is necessary to construct a mountain retaining around the existing underground structure and to suppress the deformation (falling) of the mountain retaining due to earth pressure. is there.
Conventionally, for example, the following two methods are conceivable as the construction method of the construction work described above.

(1)全面切梁工法
この工法は、まず、既存建物の上部構造を解体した後、既存建物の地下構造の周りに山留めを築造し、その後、既存地下構造物を上層階から順次解体しながら、山留めの内側の全面に切梁を水平方向に架設していく。この切梁によって、既存地下構造物の解体による山留めの変形を抑制することができる。そして、既存地下構造物の解体終了後、根切り及び床付けをそれぞれ行って耐圧盤を形成する。次に、耐圧盤から地下部分の鉄骨建て方を行ってから1階スラブを先行打設し、その後、地下部分を最下階から順次施工(順打ち工法)し、また、それに並行して地上部分の鉄骨建て方を行って地上工事を進める。これにより、地下工事と地上工事とを同時進行させることができるので、工期の短縮を図ることができる。
(1) Full beam method This method involves first dismantling the superstructure of the existing building, then building a retaining ring around the underground structure of the existing building, and then dismantling the existing underground structure sequentially from the upper floor. Then, lay the beam in the horizontal direction on the entire inner surface of the mountain. This cutting beam can suppress the deformation of the mountain retaining due to the dismantling of the existing underground structure. Then, after the dismantling of the existing underground structure is completed, root cutting and flooring are performed to form a pressure-resistant panel. Next, after building the steel part of the underground part from the pressure platen, the first floor slab was placed in advance, and then the underground part was constructed sequentially from the lowest floor (forward construction method), and in parallel with that, the ground Proceed with groundwork by building part of the steel frame. Thereby, since the underground work and the ground work can proceed simultaneously, the construction period can be shortened.

(2)全面逆打工法
この工法は、既存建物の上部構造を解体した後、既存建物の地下構造の周りに山留めを築造し、その後、既存地下構造物を上層階から順次解体するごとに、その解体によって形成された空間に新規地下構造物のスラブを上層階から順次築造していく(例えば下記特許文献1参照。)。すなわち、まず、既存地下構造物の地下1階部分(1階梁スラブ及び地下1階柱壁)を解体し、その後、新規構造物の1階スラブを全面に亘って築造する。続いて、既存地下構造物の地下2階部分(地下1階梁スラブ及び地下2階柱壁)を解体し、その後、新規構造物の地下1階スラブを全面に亘って築造する。このように既存地下構造物の解体と新規構造物の築造を繰り返すことで、既存地下構造物が上層階から順次解体されながら新規構造物が上層階から順次築造される。この工法によれば、順次築造される新規構造物のスラブが山留めを支持する支保工となり、しかも、上記した切梁よりも信頼性が高いため、大深度・大面積の大規模地下工事であっても山留めの変形を確実に抑制することができ、周辺インフラ等への影響を低減することができる。また、新規構造物の1階スラブを築造した後、地下工事と並行して地上部分の鉄骨建て方を行って地上工事を進める。これにより、地下工事と地上工事とを同時進行させることができるので、工期の短縮を図ることができる。
(2) Full-face reverse hammering method This method involves dismantling the superstructure of the existing building, building a retaining ring around the underground structure of the existing building, and then dismantling the existing underground structure sequentially from the upper floor. Slabs of new underground structures are sequentially built from the upper floors in the space formed by the dismantling (see, for example, Patent Document 1 below). That is, first, the first-floor part of the existing underground structure (the first-floor beam slab and the first-floor pillar wall) is disassembled, and then the first-floor slab of the new structure is built over the entire surface. Subsequently, the second basement part of the existing underground structure (the first basement beam slab and the second basement column wall) is demolished, and then the first basement slab of the new structure is built over the entire surface. By repeating the dismantling of the existing underground structure and the construction of the new structure in this manner, the new underground structure is sequentially built from the upper floor while the existing underground structure is sequentially demolished from the upper floor. According to this construction method, the slabs of new structures that are built sequentially become support structures that support the mountain retaining, and because it is more reliable than the above-mentioned beams, it is a large-scale underground work with a large depth and large area. However, it is possible to reliably suppress the deformation of the mountain retaining and reduce the influence on the surrounding infrastructure and the like. In addition, after the construction of the first floor slab of a new structure, the ground work will be carried out by building a steel frame on the ground part in parallel with the underground work. Thereby, since the underground work and the ground work can proceed simultaneously, the construction period can be shortened.

特開2002−61213号公報JP 2002-61213 A

しかしながら、大規模工事において上記した全面切梁工法を行うと、山留めの変形を十分に抑制することが難しい。また、全面切梁工法では、相当数の切梁が必要であるため、切梁の設置や解体に相当な時間を要することになり、地下工事の工期が長くなるという問題がある。また、既存地下構造物を解体時に山留めの内側に切梁が架設されており、大型重機を使用することが難しいため、小型重機によって解体作業を行うことになり、解体作業の工期が長くなるという問題がある。特に、既存地下構造物が比較的新しい場合、躯体の高強度であって小型重機での解体が困難な場合がある。   However, when the above-mentioned full beam method is performed in a large-scale construction, it is difficult to sufficiently suppress the deformation of the retaining ring. In addition, since the full-cut beam method requires a considerable number of cut beams, it takes a considerable amount of time to install and dismantle the cut beams, and there is a problem that the construction period of the underground work becomes long. In addition, the existing underground structure is built with a beam inside the retaining ring at the time of dismantling, and it is difficult to use large heavy machinery, so dismantling work will be done with small heavy machinery, and the construction period of dismantling work will be long There's a problem. In particular, when the existing underground structure is relatively new, there is a case where the frame has high strength and is difficult to disassemble with a small heavy machine.

また、上記した全面逆打工法では、先行して築造される新規構造物のスラブが全面に亘って形成されるので、そのスラブの下で行われる解体作業の作業空間は、大型重機を使用できるほどの十分な高さはない。そのため、小型重機で既存地下構造物の解体を行うことになるので、解体作業の工期が長くなるという問題がある。また、新規構造物の1階スラブが築造されることで地下部分が閉塞され、地下工事の作業場は日中であっても暗くなるため、多数の照明設備が必要である。また、上記したように地下部分が閉塞された後も、重機よる解体作業を行うため、この重機の排気ガスが地下工事の作業場に溜まりやすい。このため、地下工事の作業場の換気を行う換気設備を多数設置する必要があり、また、排気ガスの発生量を抑えるために重機の運転台数を制限すると工期が長くなる。   In addition, since the slab of the new structure to be built in advance is formed over the entire surface in the above-described whole surface reverse driving method, a large heavy machine can be used as a work space for the dismantling work performed under the slab. It is not high enough. Therefore, since the existing underground structure is dismantled with a small heavy machine, there is a problem that the construction period of the dismantling work becomes long. In addition, the construction of the first floor slab of a new structure blocks the underground part, and the work site of the underground work becomes dark even during the daytime, so a large number of lighting facilities are required. In addition, even after the underground portion is blocked as described above, since the dismantling work by the heavy machinery is performed, the exhaust gas of the heavy machinery is likely to accumulate in the underground construction work place. For this reason, it is necessary to install a large number of ventilation equipment for ventilating the work site of the underground construction, and if the number of operating heavy machines is limited in order to reduce the amount of exhaust gas generated, the construction period becomes longer.

本発明は、上記した従来の問題が考慮されたものであり、周辺への影響を低減しつつ、工期短縮を図ることができ、さらに、照明設備や換気設備を削減或いは省略することができる地下構造物の施工方法を提供することを目的としている。   The present invention takes the above-described conventional problems into consideration, and can reduce the work period while reducing the influence on the surroundings, and further can reduce or omit lighting equipment and ventilation equipment. It aims at providing the construction method of a structure.

本発明に係る地下構造物の施工方法は、既存地下構造物を解体しつつ新規地下構造物を構築する地下構造物の施工方法であって、前記既存地下構造物の周りに山留めを築造した後、残存する前記既存地下構造物のうちで最も上層階に位置する部分を解体する解体工程と、該解体工程によって形成された空間内に、前記新規地下構造物の外周部であって中央部分に開口が形成された外周リングを築造するリング築造工程と、を交互に行うことで、前記既存地下構造物を上層階から順次解体しながら前記新規地下構造物の外周部を上層階から順次築造し、前記既存地下構造物の解体終了後、前記外周リングの開口の内側に前記新規地下構造物の中央部分を築造することを特徴としている。   The construction method of an underground structure according to the present invention is a construction method of an underground structure that constructs a new underground structure while dismantling the existing underground structure, and after building a mountain retaining around the existing underground structure A dismantling process for dismantling a portion located on the uppermost floor of the remaining existing underground structure, and a space formed by the dismantling process in an outer peripheral part and a central part of the new underground structure By alternately performing a ring construction process for constructing an outer ring with openings formed therein, the existing underground structure is sequentially disassembled from the upper floor, and the outer periphery of the new underground structure is sequentially constructed from the upper floor. After the dismantling of the existing underground structure, the central part of the new underground structure is built inside the opening of the outer ring.

このような特徴により、新規地下構造物の外周部である外周リングが先行して築造されるので、この外周リングによって山留めの変形が抑制され、切梁が省略或いは削減される。また、新規に築造される構造物の中央部分は、先行して築造された外周リングの開口によって吹き抜け状に形成されるので、その外周リングの開口から、既存地下構造物の解体作業に使用する重機や機材、並びに新規地下構造物の資材等が搬入される。また、外周リングの開口によって地下工事の作業場の中央部は、大型重機を使用できるだけの十分な高さ(大空間)が確保される。また、地下工事の作業場には外周リングの開口から太陽光が照射され、また、その外周リングの開口から地下工事の作業場の換気が行われる。   With such a feature, the outer ring, which is the outer peripheral part of the new underground structure, is built in advance, so that the outer ring suppresses the deformation of the retaining ring, and the beam is omitted or reduced. Moreover, since the central part of the newly constructed structure is formed in a blow-by shape by the opening of the outer peripheral ring built in advance, it is used for the dismantling work of the existing underground structure from the opening of the outer peripheral ring. Heavy machinery, equipment, and materials for new underground structures will be carried in. In addition, the opening of the outer ring ensures a sufficient height (large space) at the center of the underground construction work site to allow large heavy machinery to be used. In addition, sunlight is radiated from the opening of the outer ring to the underground work place, and the underground work place is ventilated from the opening of the outer ring.

また、本発明に係る地下構造物の施工方法は、前記リング構築工程の前に、前記既存地下構造物を貫通すると共に該既存地下構造物の下方の地盤に支持される構真柱を建て込み、該構真柱によって前記外周リングを支持することが好ましい。
これにより、構真柱によって外周リングが支持されるので、外周リングを仮支持する支保工が省略或いは削減される。
The underground structure construction method according to the present invention includes, before the ring construction step, a built-in column that penetrates the existing underground structure and is supported by the ground below the existing underground structure. The outer peripheral ring is preferably supported by the true pillar.
Thereby, since an outer periphery ring is supported by a structure pillar, the support work which supports an outer periphery ring temporarily is abbreviate | omitted or reduced.

また、本発明に係る地下構造物の施工方法は、前記外周リングの開口は、平面視において、矩形の角部にハンチが形成された多角形状、又は、円形状に形成されていることが好ましい。
これにより、山留めから外周リングに外力が作用したときに、その応力が一箇所に集中しにくく分散されやすくなるので、外周リングの開口を大きく形成することができる。
In the underground structure construction method according to the present invention, it is preferable that the opening of the outer ring is formed in a polygonal shape or a circular shape in which a haunch is formed at a rectangular corner in a plan view. .
As a result, when an external force acts on the outer peripheral ring from the mountain clamp, the stress is less likely to be concentrated in one place and is easily dispersed, so that the opening of the outer peripheral ring can be formed larger.

本発明に係る地下構造物の施工方法によれば、山留めの変形を抑制する外周リングは切梁に比べて信頼性が高いので、大深度・大面積の大規模地下工事であっても山留めの変形を確実に抑制することができる。また、切梁を省略或いは削減することができるので、切梁の設置解体の工程が短縮或いは省略され、工期短縮を図ることができる。   According to the construction method of the underground structure according to the present invention, the outer ring that suppresses deformation of the mountain retaining ring is more reliable than the cut beam, so even if it is a large-scale underground construction with a large depth and large area, Deformation can be reliably suppressed. Further, since the cutting beams can be omitted or reduced, the process of installing and disassembling the cutting beams can be shortened or omitted, and the construction period can be shortened.

また、先行して築造される外周リングは中央に開口が形成され、地下工事の作業場の中央部には大型重機を使用できるだけの十分な高さ(大空間)が確保されるので、解体作業に大型重機を投入することができる。これにより、解体作業の工期短縮を図ることができる。また、既存地下構造物が比較的に新しく高強度である場合でも、大型重機を使用することで容易に解体することができる。
また、外周リングの開口から地下工事の作業場に太陽光が照射されるので、地下工事の作業場が非常に明るい。したがって、照明設備を削減或いは省略することができる。
また、外周リングの開口によって地下工事の作業場の換気が行われるので、地下工事の作業場に重機の排気ガスが溜まりにくい。したがって、換気設備を削減或いは省略することができる。また、地下工事の作業場の換気を十分に行うことができるので、排気量の大きい大型の重機を多数同時に運転することができ、解体作業の工期短縮を図ることができる。
In addition, the outer ring that is built in advance has an opening in the center, and a sufficient height (large space) is secured in the central part of the underground work place to allow large heavy machinery to be used. Large heavy machinery can be introduced. Thereby, the work period of the dismantling work can be shortened. Even when the existing underground structure is relatively new and high in strength, it can be easily dismantled by using a large heavy machine.
Moreover, since sunlight is irradiated to the underground construction workplace from the opening of the outer ring, the underground construction workplace is very bright. Therefore, the lighting equipment can be reduced or omitted.
Further, since the work of the underground work is ventilated by the opening of the outer ring, the exhaust gas of heavy equipment is difficult to accumulate in the work of the underground work. Therefore, ventilation equipment can be reduced or omitted. In addition, since the work place of the underground construction can be sufficiently ventilated, a large number of large heavy machinery having a large displacement can be operated at the same time, and the work period of the dismantling work can be shortened.

本発明の実施の形態を説明するための施工中の新規地下構造物の斜視図である。It is a perspective view of a new underground structure under construction for explaining an embodiment of the present invention. 本発明の実施の形態を説明するための地下工事の施工状況(一次解体工程・山留め工程・構真柱建込工程)を表した断面図である。It is sectional drawing showing the construction condition (a primary dismantling process, a mountain retaining process, a construction pillar construction process) of the underground construction for demonstrating embodiment of this invention. 本発明の実施の形態を説明するための地下工事の施工状況(一次リング築造工程)を表した断面図である。It is sectional drawing showing the construction condition (primary ring construction process) of the underground construction for demonstrating embodiment of this invention. 本発明の実施の形態を説明するための地下工事の施工状況(二次解体工程)を表した断面図である。It is sectional drawing showing the construction condition (secondary dismantling process) of the underground construction for demonstrating embodiment of this invention. 本発明の実施の形態を説明するための地下工事の施工状況(二次リング築造工程)を表した断面図である。It is sectional drawing showing the construction condition (secondary ring construction process) of the underground construction for demonstrating embodiment of this invention. 本発明の実施の形態を説明するための地下工事の施工状況(三次解体工程)を表した断面図である。It is sectional drawing showing the construction condition (tertiary dismantling process) of the underground construction for demonstrating embodiment of this invention. 本発明の実施の形態を説明するための地下工事の施工状況(三次リング築造工程)を表した断面図である。It is sectional drawing showing the construction condition (tertiary ring construction process) of the underground construction for demonstrating embodiment of this invention. 本発明の実施の形態を説明するための地下工事の施工状況(四次解体工程)を表した断面図である。It is sectional drawing showing the construction condition (quaternary dismantling process) of the underground construction for demonstrating embodiment of this invention. 本発明の実施の形態を説明するための地下工事の施工状況(四次リング築造工程)を表した断面図である。It is sectional drawing showing the construction condition (quaternary ring construction process) of the underground construction for demonstrating embodiment of this invention. 本発明の実施の形態を説明するための地下工事の施工状況(最終根切工程)を表した断面図である。It is sectional drawing showing the construction condition (final root cutting process) of the underground construction for demonstrating embodiment of this invention. 本発明の実施の形態を説明するための地下工事の施工状況(基礎床築造工程)を表した断面図である。It is sectional drawing showing the construction condition (foundation floor construction process) of the underground construction for demonstrating embodiment of this invention. 本発明の実施の形態を説明するための地下工事の施工状況(地下中央部築造工程)を表した断面図である。It is sectional drawing showing the construction condition (underground center part construction process) of the underground construction for demonstrating embodiment of this invention.

以下、本発明に係る地下構造物の施工方法の実施の形態について、図面に基いて説明する。   Hereinafter, an embodiment of a construction method for an underground structure according to the present invention will be described with reference to the drawings.

以下に説明する解体・建設工事は、床面積が広くて大深度の大規模地下構造を持った既存建物を解体して、その場所に同じく大規模地下構造を持った新規建物を新築する工事であり、本実施の形態では、主に地下構造物の施工方法について説明する。   The dismantling / construction work described below involves dismantling an existing building with a large underground structure with a large floor area and a new building with the same large underground structure at that location. In the present embodiment, the construction method of the underground structure will be mainly described.

本実施の形態における地下構造物の施工方法は、既存地下構造物10を上層階から順次解体しながら新規地下構造物1の外周部を上層階から順次築造(逆打工法)して図1に示すように平面視中央部分に大開口30,40,50,60が形成された新規地下構造物1´を築造した後、その開口30,40,50,60に新規地下構造物1の中央部を下層階から順次築造(順打工法)して新規地下構造物1を構築する方法である。   The construction method of the underground structure in the present embodiment is that the existing underground structure 10 is sequentially dismantled from the upper floor while the outer periphery of the new underground structure 1 is sequentially built from the upper floor (reverse placement method) to FIG. As shown, after constructing a new underground structure 1 ′ having a large opening 30, 40, 50, 60 formed in the central portion in plan view, the central portion of the new underground structure 1 is formed in the opening 30, 40, 50, 60. This is a method of constructing a new underground structure 1 by sequentially building the building from the lower floor (sequential construction method).

詳しく説明すると、まず、既存建物の図示せぬ上部構造を解体した後、図2に示すように、既存地下構造物10の最上階部分を解体し、且つ、既存地下構造物10の周りに山留め100を築造し、さらに、新規地下構造物1のスラブを支持するための構真柱2を建て込む。   In detail, first, an upper structure (not shown) of an existing building is dismantled, and then the uppermost part of the existing underground structure 10 is dismantled and is piled around the existing underground structure 10 as shown in FIG. 100 is built, and a construction pillar 2 for supporting the slab of the new underground structure 1 is built.

具体的に説明すると、まず、残存する既存地下構造物10のうちで最も上層階に位置する地下1階部分11を解体する解体工程(一次解体工程)を行う。すなわち、既存地下構造物10の1階梁スラブ11a及び地下1階柱壁11bをそれぞれ公知の解体方法で解体する。そして、解体完了後、その解体によって形成された空間に、後述する山留め工程や構真柱建込工程の際に、図示せぬ山留め機や構真柱2の建て込みを行うためのケーシング回転掘削機等を据えるための図示せぬ構台を架設する。   Specifically, first, a dismantling process (primary dismantling process) for disassembling the underground first floor portion 11 located on the uppermost floor among the remaining existing underground structures 10 is performed. That is, the first-story beam slab 11a and the underground first-story columnar wall 11b of the existing underground structure 10 are each dismantled by a known dismantling method. Then, after the dismantling is completed, a casing rotating excavation for installing a not-illustrated mountain retaining machine and the structural pillar 2 in the space formed by the dismantling after the dismantling process and the structural pillar construction process described later. A gantry (not shown) is installed to install the machine.

次に、山留め100を築造する山留め工程を行う。この山留め工程は、公知の山留め工事で行うことが可能であり、山留め100としては、例えばSMW(Soil Mixing Wall)壁などがある。   Next, a mountain retaining process for constructing the mountain retaining 100 is performed. This mountain-clamping process can be performed by a publicly-known mountain-clamping work. Examples of the mountain-clamping 100 include an SMW (Soil Mixing Wall) wall.

次に、上記した構真柱2を建て込む構真柱建込工程を行う。この構真柱2は、鋼管や形鋼などの鋼材からなる柱部材であり、既存地下構造物10の下方の地盤G内に定着されて支持され、後述する新規地下構造物1の耐圧版の上面から立設されている。そして、構真柱2は、既存地下構造物10を貫通し、新規地下構造物1の1階床の位置の上方まで突出している。このような構真柱2を建て込む方法としては、まず、図示せぬケーシング回転掘削機によって図示せぬケーシングを回転させて既存地下構造物10に貫通させ、既存地下構造物10の下方の地盤Gの所定深さまで削孔する。続いて、その地盤Gに形成された孔の中に構真柱2の下端部を挿入すると共にコンクリートを打設して仮設杭20を形成する。これにより、構真柱2の下端部が仮設杭20で固定され、既存地下構造物10を貫通する構真柱2が立設される。なお、この構真柱2を建て込む位置に、既存地下構造物10の柱がある場合には、まず、その既存柱の周りに図示せぬ補強PC壁を築造し、その後、既存柱やそれに接合された既存梁などをワイヤソーなどで切断して揚重することで解体し、その後、図示せぬケーシング回転掘削機による削孔を行う。   Next, a construction pillar construction process for constructing the construction pillar 2 described above is performed. The structural pillar 2 is a pillar member made of steel such as a steel pipe or a section steel, and is fixed and supported in the ground G below the existing underground structure 10, and is a pressure plate of the new underground structure 1 described later. Stands from the top. The construction pillar 2 penetrates through the existing underground structure 10 and protrudes to the upper position of the first floor of the new underground structure 1. As a method of building such a structural pillar 2, first, a casing (not shown) is rotated by a casing rotary excavator (not shown) to penetrate the existing underground structure 10, and the ground below the existing underground structure 10 is placed. Drill holes to a predetermined depth of G. Next, the temporary pile 20 is formed by inserting the lower end of the structural pillar 2 into the hole formed in the ground G and placing concrete. Thereby, the lower end part of the construction pillar 2 is fixed by the temporary pile 20, and the construction pillar 2 penetrating the existing underground structure 10 is erected. In addition, when there is a pillar of the existing underground structure 10 at the position where the structural pillar 2 is built, first, a reinforcing PC wall (not shown) is built around the existing pillar, and then the existing pillar and The joined existing beams are disassembled by cutting them with a wire saw and lifting them, and then drilling with a casing rotary excavator (not shown).

次に、図3に示すように、上記した図示せぬ構台を解体・撤去した後、上述した地下1階部分11を解体する解体工程によって形成された空間内に、新規地下構造物1の1階床部分の外周部を構成する環状の外周リング3を築造するリング築造工程(一次リング築造工程)を行う。この外周リング3は、新規地下構造物1の1階部分のスラブ及び梁からなる床版部材であり、外周リング3の中央部分には開口30が形成されている。なお、この外周リング3はグランドラインと略同じ高さ位置に配設されるので、山留め100から外周リング3にかかる外力(土圧)は小さい。そのため、外周リング3の開口30は、図1に示すように、種々の施工性を考慮して平面視矩形状に形成されている。   Next, as shown in FIG. 3, after dismantling and removing the above-described gantry, 1 of the new underground structure 1 is placed in the space formed by the dismantling process of disassembling the underground first floor portion 11 described above. A ring construction process (primary ring construction process) for constructing an annular outer ring 3 constituting the outer periphery of the floor portion is performed. The outer peripheral ring 3 is a floor slab member made of slabs and beams of the first floor portion of the new underground structure 1, and an opening 30 is formed in the central portion of the outer peripheral ring 3. In addition, since this outer periphery ring 3 is arrange | positioned in the substantially same height position as a ground line, the external force (earth pressure) applied to the outer periphery ring 3 from the mountain retaining 100 is small. Therefore, the opening 30 of the outer peripheral ring 3 is formed in a rectangular shape in plan view in consideration of various workability as shown in FIG.

上記した外周リング3の構造としては、例えば、鉄骨梁とデッキスラブからなる構造や、鉄筋コンクリート造のスラブと梁が一体に形成されたプレキャストコンクリートからなる構造、鉄骨梁或いは鉄骨鉄筋コンクリート梁と鉄筋コンクリート造のスラブとを在来工法で一体に形成した構造などがある。
また、図3に示すように、上記した外周リング3の梁部分を上記した構真柱2に接合することで、構真柱2によって外周リング3を支持させる。このとき、山留め100と外周リング3との間に斜めに架けられた図示せぬ斜梁や切梁を部分的或いは一時的に設置してもよい。これにより、外周リング3の変形を抑制することができる。
Examples of the structure of the outer ring 3 include a structure composed of a steel beam and a deck slab, a structure composed of precast concrete in which a slab and a beam made of reinforced concrete are integrally formed, a steel beam or a steel reinforced concrete beam and a reinforced concrete structure. There is a structure in which the slab is integrally formed by a conventional method.
Further, as shown in FIG. 3, the outer ring 3 is supported by the true pillar 2 by joining the beam portion of the outer peripheral ring 3 to the true pillar 2 described above. At this time, an oblique beam or a cutting beam (not shown) that is slanted between the mountain stopper 100 and the outer ring 3 may be partially or temporarily installed. Thereby, a deformation | transformation of the outer periphery ring 3 can be suppressed.

次に、図4に示すように、残存する既存地下構造物10のうちで最も上層階に位置する地下2階部分12を解体する解体工程(二次解体工程)を行う。すなわち、既存地下構造物10の地下1階梁スラブ12a及び地下2階柱壁12bをそれぞれ公知の解体方法で解体する。このとき、解体作業を行う図示せぬ重機や機材を上記した外周リング3の開口30から既存地下構造物10の地下1階梁スラブ12a上に降ろす。また、解体で発生した鉄くずやコンクリートガラを上記した外周リング3の開口30から揚重して搬出する。   Next, as shown in FIG. 4, a dismantling process (secondary dismantling process) is performed to dismantle the underground second floor portion 12 located on the uppermost floor among the remaining existing underground structures 10. That is, the underground 1st floor beam slab 12a and the underground 2nd floor pillar wall 12b of the existing underground structure 10 are each dismantled by a known dismantling method. At this time, unillustrated heavy machinery and equipment for performing the dismantling work are lowered onto the first-floor beam slab 12a of the existing underground structure 10 from the opening 30 of the outer ring 3 described above. Moreover, the iron scrap and concrete glass generated by dismantling are lifted from the opening 30 of the outer peripheral ring 3 and carried out.

次に、図5に示すように、上述した地下2階部分12の解体工程によって形成された空間内に、新規地下構造物1の地下1階床部分の外周部を構成する環状の外周リング4を築造するリング築造工程(二次リング築造工程)を行う。この外周リング4は、新規地下構造物1の地下1階部分のスラブ及び梁からなる床版部材であり、外周リング4の中央部分には開口40が形成されている。この開口40は、上記した1階部分の外周リング3の開口30と略同じ大きさに形成されていると共に平面視において重なる位置に形成されている。また、この外周リング4はグランドラインよりも下方の位置に配設されるので、山留め100から外周リング4にある程度の外力(土圧)がかかる。そのため、外周リング4の開口40は、図1に示すように、概ね平面視矩形状に形成されていると共にその矩形状の角部にハンチ41が形成されており、平面視多角形状(八角形状)に形成されている。   Next, as shown in FIG. 5, an annular outer ring 4 that constitutes the outer peripheral portion of the first basement floor portion of the new underground structure 1 in the space formed by the dismantling process of the second basement floor portion 12 described above. The ring construction process (secondary ring construction process) is performed. The outer peripheral ring 4 is a floor slab member made of a slab and a beam of the first underground portion of the new underground structure 1, and an opening 40 is formed in the central portion of the outer peripheral ring 4. The opening 40 is formed in a position that is substantially the same size as the opening 30 of the outer peripheral ring 3 of the first floor portion described above and overlaps in plan view. Further, since the outer peripheral ring 4 is disposed at a position below the ground line, a certain amount of external force (earth pressure) is applied from the mountain stopper 100 to the outer peripheral ring 4. Therefore, as shown in FIG. 1, the opening 40 of the outer ring 4 is generally formed in a rectangular shape in plan view, and a haunch 41 is formed in the corner of the rectangular shape. ).

なお、上記した地下1階部分の外周リング4は、上記した1階部分の外周リング3と同様に種々の構造にすることが可能である。また、上記した地下1階部分の外周リング4は、図5に示すように、上記した1階部分の外周リング3と同様に上記した構真柱2で支持される。
また、地下1階部分の外周リング4を築造するための資材や機材等は上記した外周リング3の開口30から既存地下構造物10の地下2階梁スラブ13a上に降ろす。
また、地下1階部分の外周リング4を築造した後、新規地下構造物1の地下1階部分の柱壁32を築造する。このとき、構真柱2の地下1階部分の周りに図示せぬ鉄筋を配筋すると共に外周コンクリート21を打設して構真柱2の地下1階部分を仕上げる。
In addition, the outer periphery ring 4 of the above-mentioned first-floor part can be made into various structures like the above-described outer-periphery ring 3 of the first floor part. Further, as shown in FIG. 5, the outer ring 4 in the above-described first-floor portion is supported by the above-described construction pillar 2 in the same manner as the outer-ring 3 in the first-floor portion.
Further, materials, equipment, and the like for constructing the outer peripheral ring 4 of the first basement floor part are lowered onto the second basement beam slab 13a of the existing underground structure 10 from the opening 30 of the outer peripheral ring 3 described above.
In addition, after the outer peripheral ring 4 of the first basement floor portion is built, the column wall 32 of the first basement floor portion of the new underground structure 1 is built. At this time, reinforcing bars (not shown) are arranged around the first basement portion of the structural pillar 2 and the outer concrete 21 is placed to finish the first basement portion of the structural pillar 2.

次に、図6に示すように、残存する既存地下構造物10のうちで最も上層階に位置する地下3階部分13を解体する解体工程(三次解体工程)を行う。すなわち、既存地下構造物10の地下2階梁スラブ13a及び地下3階柱壁13bをそれぞれ公知の解体方法で解体する。このとき、解体作業を行う図示せぬ重機や機材を上記した外周リング3,4の開口30,40から既存地下構造物10の地下2階梁スラブ13a上に降ろす。また、解体で発生した鉄くずやコンクリートガラを上記した外周リング3,4の開口30,40から揚重して搬出する。   Next, as shown in FIG. 6, a dismantling process (tertiary dismantling process) for disassembling the underground third floor portion 13 located on the uppermost floor among the remaining existing underground structures 10 is performed. That is, the underground second-floor beam slab 13a and the underground third-floor column wall 13b of the existing underground structure 10 are each dismantled by a known dismantling method. At this time, unillustrated heavy machinery and equipment for performing the dismantling work are lowered onto the underground second-floor beam slab 13a of the existing underground structure 10 from the openings 30, 40 of the outer peripheral rings 3, 4. Moreover, the iron scraps and concrete glass generated by dismantling are lifted from the openings 30 and 40 of the outer peripheral rings 3 and 4 and carried out.

次に、図7に示すように、上述した地下3階部分13の解体工程によって形成された空間内に、新規地下構造物1の地下2階床部分の外周部を構成する環状の外周リング5を築造するリング築造工程(三次リング築造工程)を行う。この外周リング5は、新規地下構造物1の地下2階部分のスラブ及び梁からなる床版部材であり、外周リング5の中央部分には開口50が形成されている。この開口50は、上記した1階部分及び地下1階部分の外周リング3,4の開口30,40と略同じ大きさに形成されていると共に平面視において重なる位置に形成されている。また、この外周リング5は地下1階部分の外周リング4よりも更に下方の位置に配設されるので、山留め100から外周リング5にかかる外力(土圧)は地下1階部分の外周リング4よりも大きい。そのため、外周リング5の開口50は、図1に示すように、概ね平面視矩形状に形成されていると共にその矩形状の角部に、地下1階部分の外周リング4のハンチ41よりも大きいハンチ51が形成されており、平面視多角形状(八角形状)に形成されている。   Next, as shown in FIG. 7, an annular outer ring 5 that constitutes the outer peripheral portion of the second basement floor portion of the new underground structure 1 in the space formed by the dismantling process of the third basement floor portion 13 described above. The ring construction process (tertiary ring construction process) is performed. The outer peripheral ring 5 is a floor slab member made of slabs and beams of the second basement portion of the new underground structure 1, and an opening 50 is formed in the central portion of the outer peripheral ring 5. The opening 50 is formed to be substantially the same size as the openings 30 and 40 of the outer peripheral rings 3 and 4 of the first-floor portion and the first-floor first-floor portion, and is formed at a position overlapping in plan view. Further, since the outer ring 5 is disposed at a position further lower than the outer ring 4 in the first basement portion, the external force (earth pressure) applied to the outer ring 5 from the retaining ring 100 is the outer ring 4 in the first basement portion. Bigger than. Therefore, as shown in FIG. 1, the opening 50 of the outer ring 5 is generally formed in a rectangular shape in plan view, and is larger at the rectangular corner than the haunch 41 of the outer ring 4 of the first basement portion. A haunch 51 is formed and is formed in a polygonal shape (octagonal shape) in plan view.

なお、上記した地下2階部分の外周リング5は、上記した1階部分及び地下1階部分の外周リング3,4と同様に種々の構造にすることが可能である。また、上記した地下2階部分の外周リング5は、図7に示すように、上記した1階部分及び地下1階部分の外周リング3,4と同様に上記した構真柱2で支持される。
また、地下2階部分の外周リング5を築造するための資材や機材等は上記した外周リング3,4の開口30,40から既存地下構造物10の地下3階梁スラブ14a上に降ろす。
また、地下2階部分の外周リング5を築造した後、新規地下構造物1の地下2階部分の柱壁42を築造する。このとき、構真柱2の地下2階部分の周りに図示せぬ鉄筋を配筋すると共に外周コンクリート22を打設して構真柱2の地下2階部分を仕上げる。
In addition, the outer periphery ring 5 of the above-described second-floor portion can have various structures in the same manner as the above-described outer-rings 3 and 4 of the first-floor portion and the first-floor portion. Further, as shown in FIG. 7, the outer ring 5 of the above-described second-floor portion is supported by the above-described construction pillar 2 in the same manner as the outer-rings 3 and 4 of the first-floor portion and the first-floor portion. .
In addition, materials, equipment, and the like for constructing the outer peripheral ring 5 of the second basement part are lowered onto the third basement beam slab 14a of the existing underground structure 10 from the openings 30 and 40 of the outer peripheral rings 3 and 4 described above.
In addition, after the outer ring 5 of the second basement is built, the column wall 42 of the second basement of the new underground structure 1 is built. At this time, reinforcing bars (not shown) are arranged around the second basement floor portion of the structural pillar 2 and the outer concrete 22 is placed to finish the second basement floor portion of the structural pillar 2.

次に、図8に示すように、残存する既存地下構造物10の最下階の地下4階部分14を解体する解体工程(四次解体工程)を行う。すなわち、既存地下構造物10の地下3階梁スラブ14a及び地下4階柱壁14bをそれぞれ公知の解体方法で解体する。このとき、解体作業を行う図示せぬ重機や機材を上記した外周リング3,4,5の開口30,40,50から既存地下構造物10の地下3階梁スラブ14a上に降ろす。また、解体で発生した鉄くずやコンクリートガラを上記した外周リング3,4,5の開口30,40,50から揚重して搬出する。   Next, as shown in FIG. 8, a dismantling process (fourth dismantling process) for disassembling the lowermost fourth-floor portion 14 of the lowermost floor of the existing underground structure 10 is performed. That is, the underground third-story beam slab 14a and the fourth-story pillar wall 14b of the existing underground structure 10 are each dismantled by a known dismantling method. At this time, unillustrated heavy machinery and equipment for performing the dismantling work are lowered onto the underground third-floor beam slab 14a of the existing underground structure 10 through the openings 30, 40, 50 of the outer peripheral rings 3, 4, 5 described above. In addition, iron scrap and concrete glass generated by dismantling are lifted and carried out from the openings 30, 40, 50 of the outer peripheral rings 3, 4, 5 described above.

次に、図9に示すように、上述した地下4階部分14の解体工程によって形成された空間内に、新規地下構造物1の地下3階床部分の外周部を構成する環状の外周リング6を築造するリング築造工程(四次リング築造工程)を行う。この外周リング6は、新規地下構造物1の地下3階部分のスラブ及び梁からなる床版部材であり、外周リング6の中央部分には開口60が形成されている。この開口60は、上記した1階部分、地下1階部分及び地下2階部分の外周リング3,4,5の開口30,40,50と略同じ大きさに形成されていると共に平面視において重なる位置に形成されている。また、この外周リング6は地下2階部分の外周リング5よりも更に下方の位置に配設されるので、山留め100から外周リング6にかかる外力(土圧)は地下2階部分の外周リング5よりも大きい。そのため、外周リング6の開口60は、図1に示すように、平面視略円形状に形成されている。   Next, as shown in FIG. 9, an annular outer ring 6 that constitutes the outer peripheral part of the third basement floor portion of the new underground structure 1 in the space formed by the dismantling process of the fourth basement floor portion 14 described above. The ring construction process (fourth ring construction process) is performed. The outer peripheral ring 6 is a floor slab member made of a slab and a beam of the third basement floor portion of the new underground structure 1, and an opening 60 is formed in the central portion of the outer peripheral ring 6. The opening 60 is formed to have substantially the same size as the openings 30, 40, 50 of the outer ring 3, 4, 5 of the first floor part, the first basement part, and the second basement part, and overlaps in plan view. Formed in position. Further, since the outer ring 6 is disposed at a position further below the outer ring 5 in the second basement part, the external force (earth pressure) applied to the outer ring 6 from the mountain retaining 100 is the outer ring 5 in the second basement part. Bigger than. Therefore, the opening 60 of the outer peripheral ring 6 is formed in a substantially circular shape in plan view as shown in FIG.

なお、上記した地下3階部分の外周リング6は、上記した1階部分、地下1階部分及び地下2階部分の外周リング3,4,5と同様に種々の構造にすることが可能である。また、上記した地下3階部分の外周リング6は、図9に示すように、上記した1階部分、地下1階部分及び地下2階部分の外周リング3,4,5と同様に上記した構真柱2で支持される。
また、地下3階部分の外周リング6を築造するための資材や機材等は上記した外周リング3,4,5の開口30,40,50から既存地下構造物10の地下4階の基礎スラブ15上に降ろす。
また、地下3階部分の外周リング6を築造した後、新規地下構造物1の地下3階部分の柱壁52を築造する。このとき、構真柱2の地下3階部分の周りに図示せぬ鉄筋を配筋すると共に外周コンクリート23を打設して構真柱2の地下3階部分を仕上げる。
In addition, the outer ring 6 of the above-described third basement portion can have various structures in the same manner as the outer peripheral rings 3, 4, and 5 of the first floor portion, the first basement portion, and the second basement portion. . Further, as shown in FIG. 9, the outer ring 6 of the above-mentioned third basement portion is constructed in the same manner as the outer ring 3, 4 and 5 of the above-mentioned first floor portion, the first basement portion and the second basement portion. Supported by the main pillar 2.
Further, materials and equipment for constructing the outer ring 6 of the third basement portion are the basic slab 15 on the fourth basement floor of the existing underground structure 10 through the openings 30, 40, 50 of the outer ring 3, 4, 5 described above. Take it down.
In addition, after the outer ring 6 in the third basement is built, the column wall 52 in the third basement of the new underground structure 1 is built. At this time, reinforcing bars (not shown) are arranged around the third basement floor portion of the structural pillar 2 and the outer peripheral concrete 23 is placed to finish the third basement portion of the structural pillar 2.

次に、図10に示すように、既存地下構造物10の地下4階の基礎スラブ15を解体すると共に最終根切りを行って床付けを行う最終根切工程を行う。このとき、解体作業や根切り作業を行う図示せぬ重機や機材を上記した外周リング3,4,5,6の開口30,40,50,60から既存地下構造物10の地下4階の基礎スラブ15上に降ろす。また、解体で発生した鉄くずやコンクリートガラ、及び、根切りで発生した土砂を上記した外周リング3,4,5,6の開口30,40,50,60から揚重して搬出する。   Next, as shown in FIG. 10, a final root cutting process is performed in which the foundation slab 15 on the fourth floor underground of the existing underground structure 10 is dismantled and final root cutting is performed to perform flooring. At this time, heavy machinery and equipment (not shown) that perform dismantling work and root cutting work from the above-described openings 30, 40, 50, and 60 of the outer ring 3, 4, 5, 6, and the foundation of the fourth basement floor of the existing underground structure 10 Lower on slab 15. In addition, iron scrap and concrete glass generated by dismantling and earth and sand generated by root cutting are lifted and carried out from the openings 30, 40, 50, 60 of the outer peripheral rings 3, 4, 5, 6 described above.

次に、図11に示すように、上述した最終根切工程で形成された床付け面上に新規地下構造物1の地下4階の基礎床7を全面に亘って築造する基礎床築造工程を行う。この基礎床7を築造するための資材や機材等は上記した外周リング3,4,5,6の開口30,40,50,60から床付け面上に降ろす。
また、基礎床7を築造した後、新規地下構造物1の地下4階部分の柱壁62を築造する。このとき、構真柱2の地下4階部分の周りに図示せぬ鉄筋を配筋すると共に外周コンクリート24を打設して構真柱2の地下4階部分を仕上げる。
以上により、図1に示すように、平面視中央部分に大開口30,40,50,60が形成された新規地下構造物1´が築造される。
Next, as shown in FIG. 11, a foundation floor construction process for constructing the foundation floor 7 of the fourth basement floor of the new underground structure 1 over the entire surface on the flooring surface formed in the above-described final root cutting process. Do. Materials, equipment, etc. for constructing the foundation floor 7 are lowered onto the flooring surface from the openings 30, 40, 50, 60 of the outer peripheral rings 3, 4, 5, 6 described above.
In addition, after the foundation floor 7 is constructed, the pillar wall 62 of the fourth underground floor portion of the new underground structure 1 is constructed. At this time, reinforcing bars (not shown) are arranged around the basement 4 floor portion of the structural pillar 2 and the outer concrete 24 is placed to finish the basement 4 floor portion of the structural pillar 2.
As described above, as shown in FIG. 1, a new underground structure 1 ′ having large openings 30, 40, 50, 60 formed in the center portion in plan view is built.

次に、図12に示すように、各階の外周リング3,4,5,6の開口30,40,50,60の内側に新規地下構造物1の中央部分を下層階から順次築造する地下中央部築造工程を行う。具体的には、まず、新規地下構造物1の中央部分の図示せぬ柱梁鉄骨の建て方を行う。このとき、新規地下構造物1の図示せぬ地上部分の第一節の鉄骨建て方を同時に行うことが可能である。続いて、地下3階の外周リング6の開口60の内側に新規地下構造物1の地下3階の中央部の梁スラブ63を築造すると共に、地下4階の中央部の柱壁64を築造する。その後、地下2階の外周リング5の開口50の内側に新規地下構造物1の地下2階の中央部の梁スラブ53を築造すると共に、地下3階の中央部の柱壁54を築造する。その後、地下1階の外周リング4の開口40の内側に新規地下構造物1の地下1階の中央部の梁スラブ43を築造すると共に、地下2階の中央部の柱壁44を築造する。その後、1階の外周リング3の開口30の内側に新規地下構造物1の1階の中央部の梁スラブ33を築造すると共に、地下1階の中央部の柱壁34を築造する。   Next, as shown in FIG. 12, the center of the basement in which the central portion of the new underground structure 1 is built sequentially from the lower floor inside the openings 30, 40, 50, 60 of the outer peripheral rings 3, 4, 5, 6 on each floor. Perform the part building process. Specifically, first, a pillar beam steel frame (not shown) in the central portion of the new underground structure 1 is built. At this time, it is possible to simultaneously perform the steel frame construction of the first section of the ground portion (not shown) of the new underground structure 1. Subsequently, the beam slab 63 at the center of the third basement of the new underground structure 1 is built inside the opening 60 of the outer ring 6 of the third basement, and the column wall 64 at the center of the fourth basement is built. . Thereafter, the beam slab 53 at the center of the second basement of the new underground structure 1 is built inside the opening 50 of the outer peripheral ring 5 of the second basement, and the column wall 54 at the center of the third basement is built. Thereafter, a beam slab 43 in the center of the first basement of the new underground structure 1 is built inside the opening 40 of the outer peripheral ring 4 on the first basement, and a column wall 44 in the center of the second basement is built. Thereafter, the beam slab 33 in the center of the first floor of the new underground structure 1 is built inside the opening 30 of the outer ring 3 on the first floor, and the column wall 34 in the center of the first floor of the underground is built.

以上により、新規地下構造物1が完成する。なお、上述した地下中央部築造工程と並行して、新規地下構造物1の図示せぬ地上部分の鉄骨建て方等の躯体工事を行うことが可能である。   The new underground structure 1 is completed by the above. In addition, in parallel with the above-described underground central portion building process, it is possible to perform a frame construction such as a method of building a steel frame on a ground portion (not shown) of the new underground structure 1.

上記した地下構造物の施工方法によれば、残存する既存地下構造物10のうちで最も上層階に位置する部分を解体する解体工程と、その解体工程によって形成された空間内に外周リング3,4,5,6を築造するリング築造工程と、を交互に行うことで、既存地下構造物10が上層階から順次解体されるごとに、新規地下構造物1の外周部である外周リング3,4,5,6が先行して築造されるので、これらの外周リング3〜6によって山留め100の変形が抑制される。外周リング3,4,5,6は切梁に比べて信頼性が高いので、大深度・大面積の大規模地下工事であっても山留め100の変形を確実に抑制することができる。また、切梁を省略或いは削減することができるので、切梁の設置解体の工程が短縮或いは省略され、工期短縮を図ることができる。   According to the construction method for the underground structure described above, the dismantling process for dismantling the portion of the remaining existing underground structure 10 located on the uppermost floor, and the outer ring 3 in the space formed by the dismantling process. By alternately performing the ring construction process of constructing 4, 5, and 6, each time the existing underground structure 10 is sequentially dismantled from the upper floor, the outer ring 3 that is the outer periphery of the new underground structure 1 Since 4, 5 and 6 are built in advance, the deformation of the retaining ring 100 is suppressed by these outer peripheral rings 3 to 6. Since the outer peripheral rings 3, 4, 5, and 6 are more reliable than the cut beams, the deformation of the retaining ring 100 can be reliably suppressed even in a large-scale underground construction with a large depth and large area. Further, since the cutting beams can be omitted or reduced, the process of installing and disassembling the cutting beams can be shortened or omitted, and the construction period can be shortened.

また、新規に築造される構造物の中央部分は、先行して築造された外周リング3,4,5,6の開口30,40,50,60によって吹き抜け状に形成されており、地下工事の作業場の中央部は、大型重機を使用できるだけの十分な高さ(大空間)が確保される。これにより、解体作業に大型重機を投入することができ、解体作業の工期短縮を図ることができる。また、既存地下構造物10が比較的に新しく高強度である場合でも、大型重機を使用することで容易に解体することができる。   In addition, the central part of the newly constructed structure is formed in a blow-off shape by the openings 30, 40, 50, 60 of the outer peripheral rings 3, 4, 5, 6 that have been constructed in advance. The center of the workplace is secured to have a height (large space) sufficient to use large heavy machinery. Thereby, a large heavy machine can be thrown into the dismantling work, and the work period of the dismantling work can be shortened. Moreover, even when the existing underground structure 10 is relatively new and has high strength, it can be easily disassembled by using a large heavy machine.

また、外周リング3,4,5,6の開口30,40,50,60から地下工事の作業場に太陽光が照射されるので、地下工事の作業場が非常に明るい。したがって、照明設備を削減或いは省略することができる。   Moreover, since sunlight is irradiated from the openings 30, 40, 50, 60 of the outer peripheral rings 3, 4, 5, 6 to the underground construction workplace, the underground construction workplace is very bright. Therefore, the lighting equipment can be reduced or omitted.

また、外周リング3,4,5,6の開口30,40,50,60によって地下工事の作業場の換気が行われるので、地下工事の作業場に重機の排気ガスが溜まりにくい。したがって、換気設備を削減或いは省略することができる。また、地下工事の作業場の換気を十分に行うことができるので、排気量の大きい大型の重機を多数同時に運転することができ、解体作業の工期短縮を図ることができる。   Further, since the underground work place is ventilated by the openings 30, 40, 50, and 60 of the outer peripheral rings 3, 4, 5, and 6, exhaust gas from heavy machinery is unlikely to collect in the underground work place. Therefore, ventilation equipment can be reduced or omitted. In addition, since the work place of the underground construction can be sufficiently ventilated, a large number of large heavy machinery having a large displacement can be operated at the same time, and the work period of the dismantling work can be shortened.

また、構真柱2によって外周リング3,4,5,6が支持されるので、外周リング3,4,5,6を仮支持する支保工が省略或いは削減される。これにより、仮設費を低減させることができると共に工期短縮を図ることができる。   Further, since the outer ring 3, 4, 5, 6 is supported by the construction pillar 2, the support work for temporarily supporting the outer ring 3, 4, 5, 6 is omitted or reduced. Thereby, temporary cost can be reduced and the work period can be shortened.

また、複数段の外周リング3,4,5,6のうち、地下1階部分の外周リング4及び地下2階部分の外周リング5の開口40,50は、平面視において矩形の角部にハンチ41,51が形成された多角形状に形成されており、また、地下3階部分の外周リング6の開口60は、平面視円形状に形成されているので、山留め100からそれらの外周リング4,5,6に外力が作用したときに、その応力が一箇所に集中しにくく分散されやすくなる。これにより、外周リング3,4,5,6の開口30,40,50,60を大きく形成することができ、地下作業場に多数の大型重機を配置することができるので、解体作業の工期を短縮することができる。
なお、土圧は深度が深いほど大きくなるので、複数段の外周リング3,4,5,6のうち下層階のものほど山留め100からかかる外力が大きくなる。したがって、上記した実施の形態では、外周リング4,5のハンチ41,51が下層階にいくに従い大きくなり、ハンチ41,51を有する外周リング4,5の下方に、平面視円形の開口60が形成された外周リング6が配設されている。これにより、外周リング3,4,5,6の開口30,40,50,60を大きく形成しつつ山留め100の変形を効果的に抑制することができる。
In addition, the openings 40 and 50 of the outer ring 4 of the first basement and the outer ring 5 of the second basement are hunched at rectangular corners in plan view. 41 and 51 are formed in a polygonal shape, and the opening 60 of the outer peripheral ring 6 of the third basement floor portion is formed in a circular shape in plan view. When an external force is applied to 5 and 6, the stress is less likely to concentrate on one place and is easily dispersed. As a result, the openings 30, 40, 50, 60 of the outer ring 3, 4, 5, 6 can be formed large, and a large number of large heavy machinery can be arranged in the underground work place, thereby shortening the work period of the dismantling work. can do.
In addition, since the earth pressure increases as the depth increases, the external force applied from the pile 100 increases in the lower floor among the plurality of outer peripheral rings 3, 4, 5, 6. Therefore, in the above-described embodiment, the haunches 41 and 51 of the outer ring 4 and 5 become larger toward the lower floor, and the circular opening 60 in plan view is formed below the outer rings 4 and 5 having the haunches 41 and 51. The formed outer ring 6 is disposed. Thereby, deformation | transformation of the mountain retaining 100 can be suppressed effectively, forming the opening 30,40,50,60 of the outer periphery rings 3,4,5,6 large.

以上、本発明に係る地下構造物の施工方法の実施の形態について説明したが、本発明は上記した実施の形態に限定されるものではなく、その趣旨を逸脱しない範囲で適宜変更可能である。
例えば、上記した実施の形態では、地下4階の既存地下構造物10を解体して同じく地下4階の新規地下構造物1を新築する場合の施工方法について説明しているが、本発明は、既存地下構造物や新規地下構造物の階数は適宜変更可能である。
As mentioned above, although embodiment of the construction method of the underground structure which concerns on this invention was described, this invention is not limited to above-described embodiment, In the range which does not deviate from the meaning, it can change suitably.
For example, in the above-described embodiment, the construction method in the case where the existing underground structure 10 on the fourth basement floor is dismantled and a new underground structure 1 on the fourth basement floor is newly constructed has been described. The number of existing underground structures and new underground structures can be changed as appropriate.

また、上記した実施の形態では、地下工事と並行して地上工事を進める施工方法であるが、本発明は、地下工事が完了した後、地上工事を開始する施工方法であってもよく、また、地上工事を行わない場合であってもよい。   In the above-described embodiment, the construction method is to proceed with the ground work in parallel with the underground work, but the present invention may be a construction method for starting the ground work after the underground work is completed. The ground work may not be performed.

また、上記した実施の形態では、新規地下構造物1の最上階部分(1階部分)の外周リング3の開口30が平面視矩形に形成され、新規地下構造物1の中間層階部分(地下1階部分及び地下2階部分)の外周リング4,5の開口40,50がハンチ41,51を有する平面視多角形状に形成され、新規地下構造物1の最下階部分(地下3階部分)の外周リング6の開口60が平面視円形に形成されているが、本発明は、外周リングの開口の形状を適宜変更することが可能である。例えば、複数段の外周リングの開口が全段に亘って平面視円形状又はハンチを有する平面視多角形状に形成されていてもよく、或いは、許容応力が高い外周リングであれば矩形状の開口にすることも可能である。   Further, in the above-described embodiment, the opening 30 of the outer peripheral ring 3 of the uppermost floor portion (first floor portion) of the new underground structure 1 is formed in a rectangular shape in plan view, and the middle floor portion (underground) of the new underground structure 1 The openings 40 and 50 of the outer peripheral rings 4 and 5 of the first floor part and the second basement part) are formed in a polygonal shape in plan view having the hunches 41 and 51, and the lowermost floor part (the third basement part of the basement) ) Of the outer peripheral ring 6 is formed in a circular shape in plan view, but in the present invention, the shape of the opening of the outer peripheral ring can be appropriately changed. For example, the openings of the outer peripheral rings of a plurality of stages may be formed in a circular shape in plan view or a polygonal shape in plan view having a haunch over the entire stage, or a rectangular opening if the outer peripheral ring has a high allowable stress. It is also possible to make it.

また、上記した実施の形態では、外周リング3を形成する前に構真柱2を建てて、その構真柱2によって外周リング3,4,5,6を支持しているが、本発明は、他の方法で外周リング3,4,5,6を支持することも可能である。例えば、山留め100の内面と外周リング3,4,5,6との間に斜めに架設された斜材や切梁によって外周リング3,4,5,6を支持してもよく、或いは、山留め100の鋼材に突設されて外周リング3,4,5,6に定着されたスタッドコネクタによって外周リング3,4,5,6を支持してもよい。   In the above-described embodiment, the construction pillar 2 is built before the outer ring 3 is formed, and the outer rings 3, 4, 5, and 6 are supported by the construction pillar 2. It is also possible to support the outer ring 3, 4, 5, 6 by other methods. For example, the outer rings 3, 4, 5, and 6 may be supported by diagonal members or cut beams installed obliquely between the inner surface of the mountain stopper 100 and the outer rings 3, 4, 5, and 6, or The outer peripheral rings 3, 4, 5, 6 may be supported by stud connectors protruding from 100 steel materials and fixed to the outer peripheral rings 3, 4, 5, 6.

その他、本発明の主旨を逸脱しない範囲で、上記した実施の形態における構成要素を周知の構成要素に置き換えることは適宜可能であり、また、上記した変形例を適宜組み合わせてもよい。   In addition, in the range which does not deviate from the main point of this invention, it is possible to replace suitably the component in above-mentioned embodiment with a well-known component, and you may combine the above-mentioned modification suitably.

1 新規地下構造物
2 構真柱
3,4,5,6 外周リング
10 既存地下構造物
30,40,50,60 開口
41,51 ハンチ
100 山留め
DESCRIPTION OF SYMBOLS 1 New underground structure 2 True pillar 3, 4, 5, 6 Outer ring 10 Existing underground structure 30,40,50,60 Opening 41,51 Haunch 100 Yamazuchi

Claims (3)

既存地下構造物を解体しつつ新規地下構造物を構築する地下構造物の施工方法であって、
前記既存地下構造物の周りに山留めを築造した後、
残存する前記既存地下構造物のうちで最も上層階に位置する部分を解体する解体工程と、
該解体工程によって形成された空間内に、前記新規地下構造物の外周部であって中央部分に開口が形成された外周リングを築造するリング築造工程と、
を交互に行うことで、前記既存地下構造物を上層階から順次解体しながら前記新規地下構造物の外周部を上層階から順次築造し、
前記既存地下構造物の解体終了後、前記外周リングの開口の内側に前記新規地下構造物の中央部分を築造することを特徴とする地下構造物の施工方法。
A construction method of an underground structure that constructs a new underground structure while dismantling an existing underground structure,
After building a retaining ring around the existing underground structure,
A dismantling step of dismantling a part located on the uppermost floor of the remaining existing underground structure;
In the space formed by the dismantling process, a ring building process for building an outer ring that is an outer peripheral part of the new underground structure and an opening is formed in the central part;
By alternately deconstructing the existing underground structure from the upper floor while sequentially dismantling the existing underground structure from the upper floor,
After the dismantling of the existing underground structure, a method for constructing the underground structure is characterized in that a central portion of the new underground structure is built inside the opening of the outer ring.
請求項1に記載の地下構造物の施工方法において、
前記リング構築工程の前に、前記既存地下構造物を貫通すると共に該既存地下構造物の下方の地盤に支持される構真柱を建て込み、
該構真柱によって前記外周リングを支持することを特徴とする地下構造物の施工方法。
In the construction method of the underground structure according to claim 1,
Prior to the ring construction process, a structural pillar that penetrates the existing underground structure and is supported on the ground below the existing underground structure is built,
A construction method for an underground structure, wherein the outer ring is supported by the structural pillar.
請求項1または2に記載の地下構造物の施工方法において、
前記外周リングの開口は、平面視において、矩形の角部にハンチが形成された多角形状、又は、円形状に形成されていることを特徴とする地下構造物の施工方法。
In the construction method of the underground structure according to claim 1 or 2,
The opening of the outer peripheral ring is formed in a polygonal shape in which a haunch is formed at a rectangular corner or a circular shape in a plan view.
JP2010257158A 2010-11-17 2010-11-17 Construction method for underground structures Active JP5811389B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010257158A JP5811389B2 (en) 2010-11-17 2010-11-17 Construction method for underground structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010257158A JP5811389B2 (en) 2010-11-17 2010-11-17 Construction method for underground structures

Publications (2)

Publication Number Publication Date
JP2012107430A true JP2012107430A (en) 2012-06-07
JP5811389B2 JP5811389B2 (en) 2015-11-11

Family

ID=46493310

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010257158A Active JP5811389B2 (en) 2010-11-17 2010-11-17 Construction method for underground structures

Country Status (1)

Country Link
JP (1) JP5811389B2 (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015108098A1 (en) * 2014-01-20 2015-07-23 鹿島建設株式会社 Dismantling method
JP2015137454A (en) * 2014-01-20 2015-07-30 鹿島建設株式会社 Demolition method
JP2015183498A (en) * 2014-03-26 2015-10-22 鹿島建設株式会社 Demolition method
JP2017119953A (en) * 2015-12-28 2017-07-06 株式会社竹中工務店 Building method using reverse out method
JP2017166139A (en) * 2016-03-14 2017-09-21 大成建設株式会社 Construction method of underground structure
JP2018044339A (en) * 2016-09-13 2018-03-22 大成建設株式会社 Disassembling method of existing underground skeleton
JP2018066220A (en) * 2016-10-20 2018-04-26 株式会社竹中工務店 Reconstruction method of underground skeleton
JP2020125630A (en) * 2019-02-05 2020-08-20 大成建設株式会社 Building construction method
KR102400229B1 (en) * 2021-12-20 2022-05-20 박차순 Method for demolishing underground building
JP2022132363A (en) * 2018-01-24 2022-09-08 株式会社竹中工務店 Structure construction method
KR20230105190A (en) * 2022-01-03 2023-07-11 박차순 Method for demolishing underground building
JP7352048B1 (en) 2022-09-06 2023-09-27 北京城建設計▲発▼展集団股▲ふん▼有限公司 Construction method of large-span station with open wings and semi-top-down excavation and semi-reverse drilling

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03275816A (en) * 1990-03-26 1991-12-06 Shimizu Corp Building method for main slab in underground space
JPH08134942A (en) * 1994-11-15 1996-05-28 Takenaka Komuten Co Ltd Construction method for underground structure
JP2001262594A (en) * 2000-03-17 2001-09-26 Kajima Corp Building construction method of underground structure
JP2004092053A (en) * 2002-08-29 2004-03-25 Shimizu Corp Construction method for composite underground wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03275816A (en) * 1990-03-26 1991-12-06 Shimizu Corp Building method for main slab in underground space
JPH08134942A (en) * 1994-11-15 1996-05-28 Takenaka Komuten Co Ltd Construction method for underground structure
JP2001262594A (en) * 2000-03-17 2001-09-26 Kajima Corp Building construction method of underground structure
JP2004092053A (en) * 2002-08-29 2004-03-25 Shimizu Corp Construction method for composite underground wall

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015137454A (en) * 2014-01-20 2015-07-30 鹿島建設株式会社 Demolition method
WO2015108098A1 (en) * 2014-01-20 2015-07-23 鹿島建設株式会社 Dismantling method
JP2015183498A (en) * 2014-03-26 2015-10-22 鹿島建設株式会社 Demolition method
JP2017119953A (en) * 2015-12-28 2017-07-06 株式会社竹中工務店 Building method using reverse out method
JP2017166139A (en) * 2016-03-14 2017-09-21 大成建設株式会社 Construction method of underground structure
JP2018044339A (en) * 2016-09-13 2018-03-22 大成建設株式会社 Disassembling method of existing underground skeleton
JP2018066220A (en) * 2016-10-20 2018-04-26 株式会社竹中工務店 Reconstruction method of underground skeleton
JP7293568B2 (en) 2018-01-24 2023-06-20 株式会社竹中工務店 Construction method of structures
JP2022132363A (en) * 2018-01-24 2022-09-08 株式会社竹中工務店 Structure construction method
JP2020125630A (en) * 2019-02-05 2020-08-20 大成建設株式会社 Building construction method
JP7182485B2 (en) 2019-02-05 2022-12-02 大成建設株式会社 building construction method
KR102400229B1 (en) * 2021-12-20 2022-05-20 박차순 Method for demolishing underground building
KR20230105190A (en) * 2022-01-03 2023-07-11 박차순 Method for demolishing underground building
KR102601694B1 (en) 2022-01-03 2023-11-14 박차순 Method for demolishing underground building
JP7352048B1 (en) 2022-09-06 2023-09-27 北京城建設計▲発▼展集団股▲ふん▼有限公司 Construction method of large-span station with open wings and semi-top-down excavation and semi-reverse drilling
JP2024037138A (en) * 2022-09-06 2024-03-18 北京城建設計▲発▼展集団股▲ふん▼有限公司 Method for constructing large-span station by two-wing open type semi-covered excavation and semi-reverse construction

Also Published As

Publication number Publication date
JP5811389B2 (en) 2015-11-11

Similar Documents

Publication Publication Date Title
JP5811389B2 (en) Construction method for underground structures
JP6103667B1 (en) Construction method of underground structure
JP6274406B2 (en) Construction method of new underground structure with dismantling of existing underground structure
KR100967497B1 (en) Method for constructing an underground structure
JP2013256793A (en) Construction method for underground structure, and underground structure
JP2015025292A (en) Building construction method and building
JP5424669B2 (en) Building demolition method
JP5038170B2 (en) How to rebuild a structure
JP5977412B2 (en) Basement of new building using existing building
JP4362824B2 (en) Reverse strike method
JP6710999B2 (en) Temporary receiving method for existing structures
JP2020125630A (en) Building construction method
JP2006249784A (en) Foundation structure of base isolation building and its construction method
JP6768477B2 (en) How to build an underground structure
JP2020070701A (en) Underground structure, building and method for constructing underground structure
JP6357366B2 (en) Horizontal movement restraint method
JP5925231B2 (en) Building construction method and underground building of new building
JP6052541B2 (en) Seismic isolation method for existing buildings
JP6220659B2 (en) Position adjustment method of reaction force receiving member and top of column
JP2016199957A (en) Floor preceding method
JP5506057B2 (en) Building construction method
JP6948908B2 (en) Construction method of segments, buried structures and buried structures
JP2006002428A (en) Reinforcing method of existing floor and base isolation method of existing building
JP2020097826A (en) Construction method
KR101026112B1 (en) The construction method of underground structure using mega-structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130808

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140326

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140819

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20141016

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20141216

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150210

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150804

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150902

R150 Certificate of patent or registration of utility model

Ref document number: 5811389

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150