JP2011234486A - Solar battery power supply device - Google Patents

Solar battery power supply device Download PDF

Info

Publication number
JP2011234486A
JP2011234486A JP2010102043A JP2010102043A JP2011234486A JP 2011234486 A JP2011234486 A JP 2011234486A JP 2010102043 A JP2010102043 A JP 2010102043A JP 2010102043 A JP2010102043 A JP 2010102043A JP 2011234486 A JP2011234486 A JP 2011234486A
Authority
JP
Japan
Prior art keywords
voltage
control
capacitor
solar cell
charge pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2010102043A
Other languages
Japanese (ja)
Other versions
JP5024420B2 (en
Inventor
Tadamichi Tagawa
忠道 田川
Takashi Yoshikawa
隆 吉川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Oki Electric Industry Co Ltd
Original Assignee
Oki Electric Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oki Electric Industry Co Ltd filed Critical Oki Electric Industry Co Ltd
Priority to JP2010102043A priority Critical patent/JP5024420B2/en
Publication of JP2011234486A publication Critical patent/JP2011234486A/en
Application granted granted Critical
Publication of JP5024420B2 publication Critical patent/JP5024420B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a solar battery power supply device capable of charging power close to the maximum output power level of a solar battery even if there is a fluctuation in a terminal voltage of a second capacitor.SOLUTION: A solar battery power supply device comprises: a charge pump circuit 13 for stepping down the voltage of a solar battery 11 connected to an input side to 1/N by arranging serially connected N-units of first capacitors to be N-units of parallelly connected capacitors; a super capacitor Csc 14 for charging the output voltage of the charge pump circuit; an AD conversion part 15 for detecting the charging voltage of the super capacitor Csc; and a control part 20 for setting a low value for the N when the voltage detected by the AD conversion part is high while setting a high value for the N when the detected voltage is low.

Description

本発明は、太陽電池電源装置に関し、特に、太陽電池の発電電力を効率良く充電させるための装置に関する。   The present invention relates to a solar cell power supply device, and more particularly to a device for efficiently charging generated power of a solar cell.

ユビキタス社会においては、小型の太陽電池パネルで、室内光などの低い照明による微弱なエネルギー環境でも急速に蓄電する小型の電源装置が有用である。そして、蓄電池としては、充放電を繰り返すため、スーパーキャパシタなどのコンデンサが最適であり、これらに効率よく充電することが必要である。また、太陽電池パネルは、I-V特性と称する非線形の特性を有しているため、動作点の設定が重要となる。
そこで、例えば、特許文献1には、太陽電池の発電電力と負荷電力とを測定しつつ、太陽電池の最大出力電力点で稼働させるように電力変換制御する技術が開示されている。なお、この技術は、入射光量の急激な変動を考慮しており、動作点が最大出力電力点から短絡電流点に移行した場合、一定時間定電圧制御を行い、安定点に復帰させるようになっている。
In the ubiquitous society, a small-sized power supply device that rapidly stores electricity even in a weak energy environment with low illumination such as room light is useful with a small solar cell panel. And as a storage battery, in order to repeat charging / discharging, capacitors, such as a super capacitor, are optimal, and it is necessary to charge these efficiently. Moreover, since the solar cell panel has a non-linear characteristic called an IV characteristic, the setting of the operating point is important.
Thus, for example, Patent Document 1 discloses a technique for performing power conversion control so as to operate at the maximum output power point of a solar cell while measuring the generated power and load power of the solar cell. This technology takes into account sudden fluctuations in the amount of incident light, and when the operating point shifts from the maximum output power point to the short-circuit current point, constant voltage control is performed for a certain period of time to return to the stable point. ing.

特開2005−073321号公報(図3及び段落0012)Japanese Patent Laying-Open No. 2005-077331 (FIG. 3 and paragraph 0012)

ところで、特許文献1に開示されている技術は、入出力の電圧や電流の測定を頻繁に行い、動作点を定めており、これにかかる制御用電力が大きく、小さい電力を取り扱う用途では使用できない。また、スーパーキャパシタ(第2のコンデンサ)を充電するためには、負荷インピーダンスが低いため、端子電圧が低い場合には電流制限機能が働くため、効率の良い充電ができなかった。   By the way, the technique disclosed in Patent Document 1 frequently measures input / output voltages and currents and determines an operating point. The control power required for this measurement is large and cannot be used in applications where small power is handled. . Further, in order to charge the supercapacitor (second capacitor), since the load impedance is low, the current limiting function works when the terminal voltage is low, so that efficient charging cannot be performed.

本発明はこのような問題点を解決するためになされたものであり、第2のコンデンサの端子電圧が変動していても太陽電池の最大出力電力点近傍で充電することができる太陽電池電源装置を提供することを目的とする。   The present invention has been made to solve such a problem, and is capable of charging near the maximum output power point of the solar cell even when the terminal voltage of the second capacitor fluctuates. The purpose is to provide.

前記目的を達成するため、第1の発明の太陽電池電源装置は、直列接続されたN個の第1のコンデンサを前記N個並列接続することにより、入力側に接続された太陽電池の電圧を前記N分の1に降圧するチャージポンプと、前記チャージポンプの出力電圧を充電する第2のコンデンサと、前記第2のコンデンサの充電電圧を検出する電圧検出部と、前記電圧検出部が検出した検出電圧が高いときには、前記Nを小さな値に設定し、低いときには前記Nを大きな値に設定する制御部とを備えることを特徴とする。   In order to achieve the above object, a solar cell power supply device according to a first aspect of the present invention is configured to reduce the voltage of a solar cell connected to the input side by connecting the N first capacitors connected in series to each other in parallel. A charge pump that steps down to 1 / N, a second capacitor that charges the output voltage of the charge pump, a voltage detector that detects a charge voltage of the second capacitor, and the voltage detector detects And a control unit that sets the N to a small value when the detection voltage is high, and sets the N to a large value when the detection voltage is low.

これによれば、太陽電池が発電した発電電圧で直列接続されたN個の第1のコンデンサが充電される。そして、第1のコンデンサが並列接続されると共に、第2のコンデンサに並列接続される。これにより、各第1のコンデンサに充電された電荷の一部がN個重ね合わさり、第2のコンデンサに電荷を補充する。このため、第2のコンデンサの端子電圧は上昇する。したがって、起動時や負荷変動が大きいとき等、第2のコンデンサの端子電圧が安定しない変動時や低いとき等には、Nを大きな値に設定することにより、充電を速めることができる。前記第2のコンデンサは、定格電圧が前記太陽電池の開放電圧よりも低いスーパーキャパシタであることが好ましい。   According to this, the N first capacitors connected in series with the generated voltage generated by the solar cell are charged. The first capacitor is connected in parallel and is connected in parallel to the second capacitor. As a result, N of the charges charged in the first capacitors are overlapped to replenish the second capacitors with charges. For this reason, the terminal voltage of the second capacitor increases. Therefore, charging can be accelerated by setting N to a large value when the terminal voltage of the second capacitor is unstable or low, such as during startup or when load fluctuation is large. The second capacitor is preferably a super capacitor having a rated voltage lower than an open voltage of the solar cell.

第2の発明の太陽電池電源装置は、前記した太陽電池電源装置と、前記第2のコンデンサ出力電圧を安定化するスイッチング電源装置とを備えることを特徴とする。このようにすることで、第2のコンデンサの端子電圧が変動しても、太陽電池の最大出力電力点を通る動作点を推移して充電することができる。   According to a second aspect of the present invention, there is provided a solar cell power supply device including the above-described solar cell power supply device and a switching power supply device that stabilizes the second capacitor output voltage. By doing in this way, even if the terminal voltage of the second capacitor fluctuates, the operating point passing through the maximum output power point of the solar cell can be changed and charged.

本発明によれば、第2のコンデンサの端子電圧が変動していても太陽電池の最大出力電力点近傍で充電することができる太陽電池電源装置を提供することができる。   ADVANTAGE OF THE INVENTION According to this invention, even if the terminal voltage of a 2nd capacitor | condenser is fluctuating, the solar cell power supply device which can be charged near the maximum output power point of a solar cell can be provided.

本実施形態の太陽電池電源装置の構成図である。It is a block diagram of the solar cell power supply device of this embodiment. 本実施形態の太陽電池の等価回路図(図2(a))と出力特性図(図2(b))である。FIG. 2 is an equivalent circuit diagram (FIG. 2A) and an output characteristic diagram (FIG. 2B) of the solar cell of the present embodiment. 本実施形態のチャージポンプ回路の回路図である。It is a circuit diagram of the charge pump circuit of this embodiment. 本実施形態のチャージポンプ回路のコンデンサ接続図である。It is a capacitor | condenser connection diagram of the charge pump circuit of this embodiment. 本実施形態のI−V出力特性図である。It is an IV output characteristic figure of this embodiment. 本実施形態のタイミング生成部における制御シーケンス図である。It is a control sequence figure in the timing generation part of this embodiment. 本実施形態のSW制御フローチャートである。It is a SW control flowchart of this embodiment.

(実施形態)
以下、本発明を実施するための形態(以下、「本実施形態」という。)を、図1乃至図7を参照して説明する。
(Embodiment)
Hereinafter, a mode for carrying out the present invention (hereinafter referred to as “the present embodiment”) will be described with reference to FIGS. 1 to 7.

図1は、太陽電池システム100における本実施形態の太陽電池電源装置、及び太陽電池充電装置を説明するための構成図である。太陽電池電源装置2は、太陽電池充電装置1と、太陽電池充電装置1の出力端T2と接地端との間に接続されたスーパーキャパシタCsc14(第2のコンデンサ)とを備え、入力端T1と接地端とに間に太陽電池11が接続され、出力端T3に負荷5が外部に接続されるようになっている。これにより、太陽電池電源装置2は、太陽電池11が発電した発電電力を、太陽電池充電装置1を介してスーパーキャパシタCsc14に蓄電し、この蓄積された電力を負荷5に供給することができる。   FIG. 1 is a configuration diagram for explaining the solar cell power supply device and the solar cell charging device of the present embodiment in the solar cell system 100. The solar battery power supply device 2 includes a solar battery charger 1, and a super capacitor Csc14 (second capacitor) connected between the output terminal T2 of the solar battery charger 1 and the ground terminal, and the input terminal T1. A solar cell 11 is connected between the ground end and a load 5 is connected to the outside at the output end T3. Thereby, the solar cell power supply device 2 can store the generated power generated by the solar cell 11 in the supercapacitor Csc14 via the solar cell charging device 1, and supply the accumulated power to the load 5.

また、太陽電池電源装置3は、破線のように太陽電池電源装置2の出力端T3と負荷5との間にスイッチング電源装置(SW−REG)4が挿入されている。これにより、スーパーキャパシタCsc14の広い端子電圧範囲において、出力端T4を介して負荷5に安定な電圧が印加される。   Moreover, as for the solar cell power supply device 3, the switching power supply device (SW-REG) 4 is inserted between the output terminal T3 of the solar cell power supply device 2 and the load 5 as indicated by a broken line. As a result, a stable voltage is applied to the load 5 via the output terminal T4 in the wide terminal voltage range of the supercapacitor Csc14.

太陽電池11は、光エネルギーを電気エネルギーに変換するものであり、アモルファスSi太陽電池を使用している。
図2は、発電素子である太陽電池11の等価回路図(図2(a))と太陽電池11の出力特性図(図2(b))とを示す。太陽電池11は、定電流源IphとダイオードDと抵抗器Rshとの並列回路と、抵抗器Rsとの直列回路で表現され、電流Iが流れるとき、電圧Eが発生する。太陽電池11は、定電流源IPhの電流値が光量(入射エネルギー)によって増減し、開放電圧VocがダイオードDの順方向電圧となり、十分な光量があるときはダイオードDのオン電圧が所定の開放電圧Vocとなる。また、太陽電池11は、等価回路で表される直列抵抗と並列抵抗などによって決まる、電流電圧値に応じた最大出力電力点(MPP)を持つ。なお、アモルファスSi太陽電池の場合、開放電圧Vocは、5V程度となるものが多く用いられている。
The solar cell 11 converts light energy into electrical energy, and uses an amorphous Si solar cell.
FIG. 2 shows an equivalent circuit diagram (FIG. 2A) of the solar cell 11 as a power generation element and an output characteristic diagram of the solar cell 11 (FIG. 2B). The solar cell 11 is expressed by a parallel circuit of a constant current source Iph , a diode D and a resistor R sh and a series circuit of a resistor R s, and a voltage E is generated when the current I flows. In the solar cell 11, the current value of the constant current source I Ph increases or decreases depending on the amount of light (incident energy), the open circuit voltage Voc becomes the forward voltage of the diode D, and when there is a sufficient amount of light, the on-voltage of the diode D is predetermined. The open circuit voltage Voc is obtained. Further, the solar cell 11 has a maximum output power point (MPP) corresponding to a current voltage value determined by a series resistance and a parallel resistance represented by an equivalent circuit. In the case of an amorphous Si solar cell, an open circuit voltage Voc of about 5V is often used.

スーパーキャパシタCsc14は、太陽電池充電装置1の出力電力を蓄電するものであり、例えば、電気二重層キャパシタ(EDLC)により構成される。スーパーキャパシタCsc14は、3.0V程度の定格電圧を有し、この定格電圧(3.0V)は、太陽電池の開放電圧Voc(5V)よりも低い。スイッチング電源装置(SW−REG)4は、幅が広い入力電圧(例えば、0.8V〜3.0V)に対して、出力電圧を安定にするものであり、効率がよければ、入力電力と出力電力とがほぼ等しい。   The supercapacitor Csc14 stores the output power of the solar battery charger 1, and is configured by, for example, an electric double layer capacitor (EDLC). Supercapacitor Csc14 has a rated voltage of about 3.0V, and this rated voltage (3.0V) is lower than the open circuit voltage Voc (5V) of the solar cell. The switching power supply (SW-REG) 4 stabilizes the output voltage with respect to a wide input voltage (for example, 0.8 V to 3.0 V). Power is almost equal.

太陽電池充電装置1は、図1に示すように、入力キャパシタCin12(第3のコンデンサ)、チャージポンプ回路13、AD変換部15(電圧検出部)、制御部20および電源21を備え、制御部20は、制御選択部16、スイッチング(以後、SWと記載する。)制御部17およびタイミング生成部18を備えて構成される。   As shown in FIG. 1, the solar battery charging device 1 includes an input capacitor Cin12 (third capacitor), a charge pump circuit 13, an AD conversion unit 15 (voltage detection unit), a control unit 20, and a power source 21, and includes a control unit. 20 includes a control selection unit 16, a switching (hereinafter referred to as SW) control unit 17, and a timing generation unit 18.

入力キャパシタCin12は、太陽電池11の発電電力を一時的に蓄積するコンデンサであり、チャージポンプ回路13に安定した電力を供給することができる。   The input capacitor Cin12 is a capacitor that temporarily accumulates the generated power of the solar battery 11, and can supply stable power to the charge pump circuit 13.

チャージポンプ回路13は、太陽電池11および入力キャパシタCin12から供給される入力電力を、適切な電圧の出力電力に変換する回路であり、SW制御部17からの信号によって制御され、スーパーキャパシタCsc14に接続されている。   The charge pump circuit 13 is a circuit that converts input power supplied from the solar cell 11 and the input capacitor Cin12 into output power of an appropriate voltage, and is controlled by a signal from the SW control unit 17 and connected to the supercapacitor Csc14. Has been.

そして、チャージポンプ回路13は、入力電圧の1/3の電圧を出力し、入力電流の3倍の出力電流を流すモード(以後、×3制御と称する。)と、入力電圧の1/2の電圧を出力し、入力電流の2倍の出力電流を流すモード(以後、×2制御と称する。)と、入力電圧を変更せずに出力するモード(以後、×1制御と称する。)と、入出力共にOFF状態とするモード(以後、OFF制御と称する。)とを備えている。そして、チャージポンプ回路13は、これらのモードが出力電圧の高低に応じて切り替えられる。   The charge pump circuit 13 outputs a voltage that is 1/3 of the input voltage, and flows a current that is three times as large as the input current (hereinafter referred to as x3 control). A mode for outputting a voltage and flowing an output current twice as large as the input current (hereinafter referred to as x2 control), and a mode for outputting the input voltage without change (hereinafter referred to as x1 control). A mode in which both input and output are in an OFF state (hereinafter referred to as OFF control) is provided. In the charge pump circuit 13, these modes are switched according to the level of the output voltage.

AD変換部15(電圧検出部)は、スーパーキャパシタCsc14の端子電圧をデジタルデータとなるAD変換値Vadに変換し、変換信号を制御選択部16に出力するものである。このAD変換部15は、タイミング生成部18から出力される制御信号により制御される。   The AD conversion unit 15 (voltage detection unit) converts the terminal voltage of the supercapacitor Csc14 into an AD conversion value Vad serving as digital data, and outputs a conversion signal to the control selection unit 16. The AD conversion unit 15 is controlled by a control signal output from the timing generation unit 18.

制御選択部16は、AD変換部15で変換されたスーパーキャパシタCsc14の端子電圧のAD変換値Vadに応じて制御方法を決定し、その情報をSW制御部17に出力する。   The control selection unit 16 determines a control method according to the AD conversion value Vad of the terminal voltage of the supercapacitor Csc 14 converted by the AD conversion unit 15, and outputs the information to the SW control unit 17.

SW制御部17は、制御選択部16からの情報およびタイミング生成部18からの制御信号からSW制御信号を生成して、生成されたSW制御信号をチャージポンプ回路13の制御端CONTに供給する。   The SW control unit 17 generates a SW control signal from the information from the control selection unit 16 and the control signal from the timing generation unit 18 and supplies the generated SW control signal to the control terminal CONT of the charge pump circuit 13.

そして、タイミング生成部18は、システム制御を行うタイミング信号を生成し、AD変換部15およびSW制御部17に供給する。   Then, the timing generation unit 18 generates a timing signal for performing system control and supplies the timing signal to the AD conversion unit 15 and the SW control unit 17.

電源21は、AD変換部15および制御部20に駆動電圧Vccを印加するための電源である。この電源21は、入力端T1を介して太陽電池11の発電電力の一部が供給されるが、駆動電圧Vccがキャパシタ14の充電電圧よりも速く立ち上がるようになっている。   The power source 21 is a power source for applying a drive voltage Vcc to the AD conversion unit 15 and the control unit 20. The power supply 21 is supplied with a part of the generated power of the solar cell 11 via the input terminal T1, but the drive voltage Vcc rises faster than the charging voltage of the capacitor 14.

次いで、図3を参照してチャージポンプ回路13の構成を説明する。チャージポンプ回路13は、等しい容量値を持つ3つの第1のコンデンサとしてのフライキャップコンデンサCf0、Cf1、Cf2および8つの半導体スイッチSWi(スイッチ素子)、SWs0、SWs1、SWg0、SWg1、SWo0、SWo1、SWo2を備えて構成される。そして、それぞれの半導体スイッチは、SW制御部17からの制御信号によりON/OFF制御され、チャージポンプ回路13のチャージポンプ機能が実現される。なお、チャージポンプ回路13のクロック周波数fは、太陽電池11が大光量を受けたときの最大出力電力点(MPP)での出力電力をフライキャップコンデンサCf0、Cf1、Cf2(の直列回路)に蓄えることができる周波数以上の値に定められる。   Next, the configuration of the charge pump circuit 13 will be described with reference to FIG. The charge pump circuit 13 includes fly cap capacitors Cf0, Cf1, Cf2 as three first capacitors having equal capacitance values and eight semiconductor switches SWi (switch elements), SWs0, SWs1, SWg0, SWg1, SWo0, SWo1, It is configured with SWo2. Each semiconductor switch is ON / OFF controlled by a control signal from the SW control unit 17, and the charge pump function of the charge pump circuit 13 is realized. The clock frequency f of the charge pump circuit 13 stores the output power at the maximum output power point (MPP) when the solar cell 11 receives a large amount of light in flycap capacitors Cf0, Cf1, Cf2 (series circuit thereof). It is set to a value that is higher than the frequency that can be.

チャージポンプ回路13は、入力端INPと半導体スイッチSWiの一端とが接続され、半導体スイッチSWiの他端と半導体スイッチSWo0の一端とフライキャップコンデンサCf0の一端とが接続され、半導体スイッチSWo0の他端と出力端OUTPとが接続されている。
また、チャージポンプ回路13は、フライキャップコンデンサCf0の他端と半導体スイッチSWs0の一端と半導体スイッチSWg0の一端とが接続され、半導体スイッチSWg0の他端と共通接地端COMとが接続されている。
また、チャージポンプ回路13は、半導体スイッチSWs0の他端とフライキャップコンデンサCf1の一端と半導体スイッチSWo1の一端とが接続され、半導体スイッチSWo1の他端と出力端OUTPとが接続されている。
チャージポンプ回路13は、フライキャップコンデンサCf1の他端と半導体スイッチSWg1の一端と半導体スイッチSWs1の一端とが接続され、半導体スイッチSWg1の他端と共通接地端COMとが接続されている。
また、チャージポンプ回路13は、半導体スイッチSWs1の他端とフライキャップコンデンサCf2の一端と半導体スイッチSWo2の一端とが接続され、半導体スイッチSWo2の他端と出力端OUTPとが接続されている。
チャージポンプ回路13は、フライキャップコンデンサCf2の他端と共通接地端COMとが接続されている。
The charge pump circuit 13 is connected to the input terminal INP and one end of the semiconductor switch SWi, and connected to the other end of the semiconductor switch SWi, one end of the semiconductor switch SWo0, and one end of the flycap capacitor Cf0, and the other end of the semiconductor switch SWo0. And the output terminal OUTP are connected.
In the charge pump circuit 13, the other end of the flycap capacitor Cf0, one end of the semiconductor switch SWs0, and one end of the semiconductor switch SWg0 are connected, and the other end of the semiconductor switch SWg0 and the common ground terminal COM are connected.
In the charge pump circuit 13, the other end of the semiconductor switch SWs0, one end of the fly cap capacitor Cf1, and one end of the semiconductor switch SWo1 are connected, and the other end of the semiconductor switch SWo1 and the output end OUTP are connected.
In the charge pump circuit 13, the other end of the flycap capacitor Cf1, one end of the semiconductor switch SWg1, and one end of the semiconductor switch SWs1 are connected, and the other end of the semiconductor switch SWg1 and the common ground terminal COM are connected.
In the charge pump circuit 13, the other end of the semiconductor switch SWs1, one end of the fly cap capacitor Cf2, and one end of the semiconductor switch SWo2 are connected, and the other end of the semiconductor switch SWo2 and the output end OUTP are connected.
In the charge pump circuit 13, the other end of the fly cap capacitor Cf2 and the common ground terminal COM are connected.

ここで、図4を参照して、チャージポンプ回路13の動作について説明する。図4(a)は、チャージポンプ回路13の×3制御における充電時と放電時の動作を示し、図4(b)は、チャージポンプ回路13の×2制御における充電時と放電時の動作を示す。   Here, the operation of the charge pump circuit 13 will be described with reference to FIG. 4A shows the operation at the time of charging and discharging in the × 3 control of the charge pump circuit 13, and FIG. 4B shows the operation at the time of charging and discharging in the × 2 control of the charge pump circuit 13. Show.

チャージポンプ回路13において、図4(a)に示すように、×3制御の充電時(S3c)の接続では、半導体スイッチSWiをONに設定し、太陽電池11の発電電圧Eを、入力キャパシタCin12から等しい容量値(C)を有する3つの直列接続のフライキャップコンデンサCf0、Cf1、Cf2に充電させる。   In the charge pump circuit 13, as shown in FIG. 4 (a), in the charge connection (S3c) of the × 3 control, the semiconductor switch SWi is set to ON, and the generated voltage E of the solar cell 11 is changed to the input capacitor Cin12. To three series-connected fly cap capacitors Cf0, Cf1, and Cf2 having the same capacitance value (C).

そして、チャージポンプ回路13において、×3制御の放電時(S3d)の接続では、半導体スイッチSWiをOFFに設定し、3つのフライキャップコンデンサCf0、Cf1、Cf2を並列接続して、電圧を1/3(E/3)に降圧する。
そして、出力側の半導体スイッチSWo(図3のSWo0、SWo1、SWo2)をONして、スーパーキャパシタCsc14に接続させる。
In the charge pump circuit 13, the connection at the time of discharging in the × 3 control (S 3 d), the semiconductor switch SWi is set to OFF, the three fly cap capacitors Cf 0, Cf 1, Cf 2 are connected in parallel, and the voltage is reduced to 1 / Step down to 3 (E / 3).
Then, the semiconductor switch SWo on the output side (SWo0, SWo1, SWo2 in FIG. 3) is turned on and connected to the supercapacitor Csc14.

この×3制御の放電時(S3d)の接続により、各フライキャップコンデンサに充電された電力がスーパーキャパシタCsc14を充電し端子電圧を上昇させる。
そして、この×3制御の放電時(S3d)の接続により、各フライキャップコンデンサに充電された電荷の総和(CE)の一部(ΔQ)は、スーパーキャパシタCsc14に移動し、スーパーキャパシタCsc14の電圧は遷移により上昇する。このときの平均充電電流Icは、クロック周期(電荷を転送する転送周期)をΔTとすると、Ic=ΔQ/ΔTとなる。
By the connection at the time of discharge (S3d) of the × 3 control, the power charged in each fly cap capacitor charges the super capacitor Csc14 and increases the terminal voltage.
Then, due to the connection at the time of discharging (S3d) of × 3 control, a part (ΔQ) of the total charge (CE) charged in each fly cap capacitor moves to the supercapacitor Csc14, and the voltage of the supercapacitor Csc14 Rises with a transition. The average charging current Ic at this time is Ic = ΔQ / ΔT, where ΔT is a clock period (transfer period for transferring charge).

次に、放電時(S3d)から充電時(S3c)に戻るとき、電荷(ΔQ)の移動により低減した各フライキャップコンデンサCf0、Cf1、Cf2の電圧がE/3に戻る。このときの各フライキャップコンデンサCf0、Cf1、Cf2に太陽電池11から移動する電荷量は、ΔQ/3に等しい。したがって、クロック周期ΔTよりも短い所定時間の間に直列コンデンサに流れる電流I1は、スーパーキャパシタCsc14を充電する平均充電電流Icの1/3に等しくなる。 Next, when returning from discharging (S3d) to charging (S3c), the voltages of the fly cap capacitors Cf0, Cf1, and Cf2 reduced by the movement of the charge (ΔQ) return to E / 3. At this time, the amount of charge transferred from the solar cell 11 to each of the fly cap capacitors Cf0, Cf1, and Cf2 is equal to ΔQ / 3. Therefore, the current I 1 flowing through the series capacitor during a predetermined time shorter than the clock period ΔT is equal to 1/3 of the average charging current Ic for charging the supercapacitor Csc14.

また、スーパーキャパシタCsc14においては、移動した電荷の直流成分が定常値まで充電される。また、等価直列抵抗(クロック周波数fにおいては、等価並列抵抗に対応する)により、交流成分が消費される。そして、定常状態においては、太陽電池11の発電電流とスーパーキャパシタCsc14の等価直列抵抗による消費電流とが釣り合うことがある。また、釣り合わないまでも、太陽電池11が最大電力点でなく、開放電圧近辺で動作する。   In the supercapacitor Csc14, the DC component of the moved charge is charged to a steady value. Further, an AC component is consumed by an equivalent series resistance (corresponding to an equivalent parallel resistance at the clock frequency f). In a steady state, the generated current of the solar cell 11 and the consumption current due to the equivalent series resistance of the supercapacitor Csc14 may be balanced. Moreover, even if it does not balance, the solar cell 11 does not operate at the maximum power point but near the open circuit voltage.

また、チャージポンプ回路13において、図4(b)に示すように、×2制御の充電時(S2c)の接続では、半導体スイッチSWiをONに設定し、太陽電池11の発電電圧Eを、入力キャパシタCin12から等しい容量値(C)を有する2つの直列接続のフライキャップコンデンサCf0、Cf1に充電させる。このとき、各フライキャップコンデンサには、それぞれ、等しい電荷(CE/2)が充電される。
そして、チャージポンプ回路13において、×2制御の放電時(S2d)の接続では、半導体スイッチSWiをOFFに設定し、2つのフライキャップコンデンサCf0、Cf1を並列接続して、電圧を1/2(E/2)に降圧する。
そして、出力側の半導体スイッチSWo(図3のSWo0、SWo1)をONして、スーパーキャパシタCsc14に接続させる。
In the charge pump circuit 13, as shown in FIG. 4B, the semiconductor switch SWi is set to ON and the generated voltage E of the solar cell 11 is input in the connection at the time of charging (S 2 c) of × 2 control. Two series-connected fly cap capacitors Cf0 and Cf1 having the same capacitance value (C) are charged from the capacitor Cin12. At this time, each of the fly cap capacitors is charged with an equal charge (CE / 2).
In the charge pump circuit 13, the connection at the time of discharging in the × 2 control (S 2 d), the semiconductor switch SWi is set to OFF, the two fly cap capacitors Cf 0 and Cf 1 are connected in parallel, and the voltage is reduced to 1/2 ( Step down to E / 2).
Then, the semiconductor switch SWo on the output side (SWo0, SWo1 in FIG. 3) is turned on and connected to the super capacitor Csc14.

この×2制御の放電時(S2d)の接続により、各フライキャップコンデンサに充電された電力の一部がスーパーキャパシタCsc14を充電し端子電圧を上昇させる。
そして、この×2制御の放電時(S2d)の接続により、各フライキャップコンデンサに充電された電荷の一部(ΔQ)は、放電により低減したスーパーキャパシタCsc14の電荷を補充する。これにより、スーパーキャパシタCsc14の電圧が遷移する。このときの平均電流Icは、クロック周期をΔTとすると、Ic=ΔQ/ΔTとなる。
By the connection at the time of discharging (S2d) of × 2 control, a part of the electric power charged in each fly cap capacitor charges the super capacitor Csc14 and increases the terminal voltage.
Then, by the connection at the time of discharging (S2d) of × 2 control, a part of the charge (ΔQ) charged in each flycap capacitor supplements the charge of the supercapacitor Csc14 reduced by the discharge. As a result, the voltage of the supercapacitor Csc14 transitions. The average current Ic at this time is Ic = ΔQ / ΔT, where the clock cycle is ΔT.

そして、表1は、制御選択部16で用いる制御テーブルを示す。この制御テーブルは、AD変換部15で検出されたスーパーキャパシタCsc14の端子電圧であるAD変換値Vadに対するチャージポンプ回路13の制御方法を示すものである。   Table 1 shows a control table used in the control selection unit 16. This control table shows the control method of the charge pump circuit 13 with respect to the AD conversion value Vad, which is the terminal voltage of the supercapacitor Csc14 detected by the AD converter 15.

Figure 2011234486
Figure 2011234486

図5を参照して、表1に示した制御テーブルによるチャージポンプ回路13のI−V出力特性を説明する。なお、図5は、制御テーブルによるI−V特性曲線を太実線で示し、細実線は、制御テーブルのOFF制御が行われる領域のI−V特性曲線を示している。
チャージポンプ回路13は、AD変換値Vadが1.5以下(Vad≦1.5V)の場合には、×3制御、すなわち、出力電流を入力電流の3倍に変換し、出力電圧を入力電圧の1/3に降圧する制御が行われる。この場合、チャージポンプ回路13の出力側の最大出力電力点MPP3近傍(図5中の楕円領域)で動作する。
チャージポンプ回路13は、AD変換値Vadが1.5を超え2.4以下(1.5V<Vad≦2.4V)の場合には、×2制御、すなわち、出力電流を入力電流の2倍に変換し、出力電圧を入力電圧の1/2に降圧する制御が行われる。この場合、チャージポンプ回路13の出力側の最大出力電力点MPP2近傍(図5中の楕円領域)で動作する。
チャージポンプ回路13は、AD変換値Vadが2.4を超え3.0以下(2.4V<Vad≦3.0V)の場合には、×1制御、すなわち、入力端INPと出力端OUTPとを直接接続する制御が行われる。
そして、チャージポンプ回路13は、AD変換値VadがスーパーキャパシタCsc14の耐電圧3.0Vを超える(3.0V<Vad)場合には、OFF制御、すなわち、入力と出力とを切断する制御が行われる。
With reference to FIG. 5, the IV output characteristics of the charge pump circuit 13 according to the control table shown in Table 1 will be described. Note that FIG. 5 shows the IV characteristic curve by the control table by a thick solid line, and the thin solid line shows the IV characteristic curve of the region where the OFF control of the control table is performed.
When the AD conversion value Vad is 1.5 or less (Vad ≦ 1.5V), the charge pump circuit 13 performs x3 control, that is, converts the output current to three times the input current, and converts the output voltage to the input voltage. Control is performed to reduce the voltage to 1/3 of. In this case, it operates near the maximum output power point MPP3 on the output side of the charge pump circuit 13 (the elliptical region in FIG. 5).
When the AD conversion value Vad exceeds 1.5 and is 2.4 or less (1.5V <Vad ≦ 2.4V), the charge pump circuit 13 performs x2 control, that is, the output current is twice the input current. And the output voltage is reduced to ½ of the input voltage. In this case, it operates near the maximum output power point MPP2 on the output side of the charge pump circuit 13 (the elliptical region in FIG. 5).
When the AD conversion value Vad exceeds 2.4 and is equal to or less than 3.0 (2.4V <Vad ≦ 3.0V), the charge pump circuit 13 performs x1 control, that is, the input terminal INP and the output terminal OUTP. Is controlled to connect directly.
When the AD conversion value Vad exceeds the withstand voltage 3.0V of the supercapacitor Csc14 (3.0V <Vad), the charge pump circuit 13 performs OFF control, that is, control for cutting off the input and the output. Is called.

なお、この制御を切り替えるときのAD変換値Vadの値1.5、2.4、3.0は、実際に使用する太陽電池11の開放電圧VocやスーパーキャパシタCsc14の定格電圧により決定される。太陽電池11の最大出力電力点MPPは開放電圧Vocの0.7倍程度なので、2分割や3分割するときの第2のコンデンサの電圧閾値が、太陽電池11の開放電圧Voc(の近傍の値(開放電圧Vocと最大出力電力点の電圧との間の電圧))に応じて定められれば、太陽電池11を最大出力電力点近傍で動作させることができる。また、AD変換値Vadの値3.0は、スーパーキャパシタCsc14の定格電圧により決定される。   Note that the AD conversion values Vad of 1.5, 2.4, and 3.0 when this control is switched are determined by the open circuit voltage Voc of the solar cell 11 actually used and the rated voltage of the supercapacitor Csc14. Since the maximum output power point MPP of the solar cell 11 is about 0.7 times the open circuit voltage Voc, the voltage threshold value of the second capacitor when dividing into two or three is a value in the vicinity of the open voltage Voc (of the solar cell 11). (Voltage between open circuit voltage Voc and maximum output power point voltage)), solar cell 11 can be operated near the maximum output power point. Further, the value 3.0 of the AD conversion value Vad is determined by the rated voltage of the supercapacitor Csc14.

そして、表2は、SW制御部17からのSW制御信号(充電および放電)の制御状態に対するチャージポンプ回路13の8つの半導体SWである各SWの具体的なSW制御状況(ON/OFF)を示すテーブルである。   Table 2 shows specific SW control states (ON / OFF) of the respective SWs that are the eight semiconductor SWs of the charge pump circuit 13 with respect to the control state of the SW control signal (charging and discharging) from the SW control unit 17. It is a table to show.

Figure 2011234486
Figure 2011234486

表2は、×3制御での充電状態S3cおよび放電状態S3dにおけるチャージポンプ回路13の各SWのSW制御状況(ON/OFF)と、×2制御での充電状態S2cおよび放電状態S2dにおけるチャージポンプ回路13の各SWのSW制御状況(ON/OFF)とを示す。さらに、表2は、×1制御での制御状態S1およびOFF制御での制御状態S0におけるチャージポンプ回路13の各SWのSW制御状況(ON/OFF)も同様に示す。   Table 2 shows the SW control status (ON / OFF) of each SW of the charge pump circuit 13 in the charge state S3c and the discharge state S3d in the × 3 control, and the charge pump in the charge state S2c and the discharge state S2d in the × 2 control. The SW control status (ON / OFF) of each SW of the circuit 13 is shown. Further, Table 2 similarly shows the SW control status (ON / OFF) of each SW of the charge pump circuit 13 in the control state S1 in the x1 control and the control state S0 in the OFF control.

表2において、×3制御での充電状態S3cおよび放電状態S3dを実行するために、充電状態S3cでは、半導体スイッチSWi、SWs0、SWs1がONに設定され、半導体スイッチSWg0、SWg1、SWo0、SWo1、SWo2がOFFに設定される。放電状態S3dでは、半導体スイッチSWi、SWs0、SWs1がOFFに設定され、半導体スイッチSWg0、SWg1、SWo0、SWo1、SWo2はONに設定される。   In Table 2, in order to execute the charge state S3c and the discharge state S3d in the × 3 control, in the charge state S3c, the semiconductor switches SWi, SWs0, SWs1 are set to ON, and the semiconductor switches SWg0, SWg1, SWo0, SWo1, SWo2 is set to OFF. In the discharge state S3d, the semiconductor switches SWi, SWs0, SWs1 are set to OFF, and the semiconductor switches SWg0, SWg1, SWo0, SWo1, SWo2 are set to ON.

また、×2制御での充電状態S2cおよび放電状態S2dを実行するために、充電状態S2cでは、半導体スイッチSWi、SWs0、SWg1がONに設定され、半導体スイッチSWs1、SWg0、SWo0、SWo1、SWo2がOFFに設定される。放電状態S2dでは、半導体スイッチSWi、SWs0、SWs1、SWo2がOFFに設定され、半導体スイッチSWg0、SWg1、SWo0、SWo1がONに設定される。   Further, in order to execute the charge state S2c and the discharge state S2d in the × 2 control, in the charge state S2c, the semiconductor switches SWi, SWs0, SWg1 are set to ON, and the semiconductor switches SWs1, SWg0, SWo0, SWo1, SWo2 are set. Set to OFF. In the discharge state S2d, the semiconductor switches SWi, SWs0, SWs1, and SWo2 are set to OFF, and the semiconductor switches SWg0, SWg1, SWo0, and SWo1 are set to ON.

そして、×1制御での制御状態S1では、半導体スイッチSWiおよびSWo0がONに設定され、半導体スイッチSWs0、SWs1、SWg0、SWg1、SWo1、SWo2がOFFに設定される。さらに、OFF制御での制御状態S0では、8つの半導体スイッチすべてがOFFに設定される。   In the control state S1 in the x1 control, the semiconductor switches SWi and SWo0 are set to ON, and the semiconductor switches SWs0, SWs1, SWg0, SWg1, SWo1, and SWo2 are set to OFF. Further, in the control state S0 in the OFF control, all eight semiconductor switches are set to OFF.

さらに、図6は、タイミング生成部18が行う制御シーケンス図であり、AD変換部15およびSW制御部17における制御状態を示している。タイミング生成部18により、AD変換部15における制御周期が決定され、制御周期内の先頭でAD変換が行われ、残りの周期内においては、SW制御部17による所定のSW制御が行われる。   Further, FIG. 6 is a control sequence diagram performed by the timing generation unit 18 and shows control states in the AD conversion unit 15 and the SW control unit 17. The timing generation unit 18 determines a control cycle in the AD conversion unit 15, performs AD conversion at the head in the control cycle, and performs predetermined SW control by the SW control unit 17 in the remaining cycle.

SW制御部17におけるSW制御は、制御周期の先頭のAD変換においてS0制御が行われ、残りの周期内において所定のSW制御である×3制御、×2制御、×1制御およびOFF制御を行うことができるシーケンスとなっている。   In the SW control in the SW control unit 17, S0 control is performed in AD conversion at the head of the control cycle, and predetermined SW control × 3 control, × 2 control, × 1 control, and OFF control are performed in the remaining cycle. It is a sequence that can.

所定のSW制御パターンは、×3制御では、充電状態S3c、OFF制御S0、放電状態S3dおよびOFF制御S0を1サイクル(クロック周期ΔT)としたサイクルの繰り返しであり、×2制御では、充電状態S2c、OFF制御S0、放電状態S2dおよびOFF制御S0を1サイクル(クロック周期ΔT)としたサイクルの繰り返しである。また、×1制御では、S1制御と制御周期の最後にOFF制御S0が行われるSW制御パターンであり、OFF制御では、制御周期内がOFF制御S0のSW制御パターンである。   The predetermined SW control pattern is a repetition of a cycle in which the charge state S3c, the OFF control S0, the discharge state S3d, and the OFF control S0 are one cycle (clock period ΔT) in the × 3 control, and in the × 2 control, the charge state S2c, the OFF control S0, the discharge state S2d, and the OFF control S0 are repeated cycles with one cycle (clock period ΔT). Further, in the × 1 control, the SW control pattern is the SW control pattern in which the OFF control S0 is performed at the end of the S1 control and the control cycle, and in the OFF control, the SW control pattern of the OFF control S0 is in the control cycle.

そして、本実施形態の制御部20によるチャージポンプ回路13のSW制御フローを、図7を参照して説明する。   Then, the SW control flow of the charge pump circuit 13 by the control unit 20 of the present embodiment will be described with reference to FIG.

まず、SW制御が開始されると、制御部20は、SW制御部17をOFF制御状態S0とし、チャージポンプ回路13において、すべてのSWをOFFに設定する。そして、AD変換部15においてAD変換を実行してAD変換値Vadを取得する(ステップS101)。   First, when the SW control is started, the control unit 20 sets the SW control unit 17 to the OFF control state S0, and sets all the SWs to OFF in the charge pump circuit 13. Then, the AD conversion unit 15 performs AD conversion to acquire an AD conversion value Vad (step S101).

そして、取得したAD変換値Vadが1.5以下か否かを判定し(ステップS102)、以下であれば(Yes)、×3制御を行う(ステップS111)。   Then, it is determined whether or not the acquired AD conversion value Vad is 1.5 or less (step S102). If it is less (Yes), x3 control is performed (step S111).

×3制御においては、まず、制御部20は、SW制御部17を×3制御の充電状態S3cとし、チャージポンプ回路13を、半導体スイッチSWi、SWs0、SWs1をONに設定し、半導体スイッチSWg0、SWg1、SWo0、SWo1、SWo2をOFFに設定する。この設定により、図4(a)×3制御の充電時(S3c)に示すように、チャージポンプ回路13では、入力キャパシタCin12の蓄積電荷の一部が半導体スイッチSWiを介して3つの直列接続のフライキャップコンデンサCf0、Cf1、Cf2に充電される、×3制御の充電時の接続となる。この状態を所定時間(入力キャパシタCin12と3つの直列接続のフライキャップコンデンサCf0、Cf1、Cf2とがほぼ等電位となるまでの時間)保持(ステップS111)した後、次ステップ(ステップS112)へ進む。   In the × 3 control, the control unit 20 first sets the SW control unit 17 to the charge state S3c of the × 3 control, sets the charge pump circuit 13 to the semiconductor switches SWi, SWs0, and SWs1, and turns on the semiconductor switches SWg0, SWg1, SWo0, SWo1, and SWo2 are set to OFF. With this setting, as shown in FIG. 4 (a) × 3 control charge (S3c), in the charge pump circuit 13, a part of the charge stored in the input capacitor Cin12 is connected in three series via the semiconductor switch SWi. This is a connection at the time of charge of the x3 control in which the fly cap capacitors Cf0, Cf1, and Cf2 are charged. This state is maintained for a predetermined time (time until the input capacitor Cin12 and the three series-connected fly cap capacitors Cf0, Cf1, and Cf2 are substantially equipotential) (step S111), and then proceeds to the next step (step S112). .

つぎに、制御部20は、SW制御部17をOFF制御状態S0とし、チャージポンプ回路13を、すべてのSWをOFFに設定し、この状態を所定時間(スイッチング遅延を吸収するための微少時間)保持(ステップS112)した後、次ステップ(ステップS113)へ進む。   Next, the control unit 20 sets the SW control unit 17 to the OFF control state S0, sets the charge pump circuit 13 to OFF, and maintains this state for a predetermined time (a minute time for absorbing the switching delay). After holding (step S112), the process proceeds to the next step (step S113).

そして、制御部20は、SW制御部17を×3制御の放電状態S3dとし、チャージポンプ回路13を、半導体スイッチSWi、SWs0、SWs1をOFFに設定し、半導体スイッチSWg0、SWg1、SWo0、SWo1、SWo2をONに設定する。この設定により、チャージポンプ回路13は、図4(a)×3制御の放電時(S3d)に示す接続となり、3つのフライキャップコンデンサCf0、Cf1、Cf2は並列接続となり、電圧が1/3に降圧されてスーパーキャパシタCsc14に出力される。この状態を所定時間(それぞれのフライキャップコンデンサとスーパーキャパシタCsc14とがほぼ同電位と成るまでの時間)保持(ステップS113)した後、次ステップ(ステップS114)へ進む。   Then, the control unit 20 sets the SW control unit 17 to the discharge state S3d of x3 control, sets the charge pump circuit 13 to the semiconductor switches SWi, SWs0, and SWs1, and sets the semiconductor switches SWg0, SWg1, SWo0, SWo1, Set SWo2 to ON. With this setting, the charge pump circuit 13 is connected as shown in FIG. 4 (a) × 3 control discharge (S3d), and the three fly cap capacitors Cf0, Cf1, and Cf2 are connected in parallel, and the voltage is reduced to 1/3. The voltage is stepped down and output to the supercapacitor Csc14. This state is maintained for a predetermined time (time until each flycap capacitor and supercapacitor Csc14 become substantially the same potential) (step S113), and then the process proceeds to the next step (step S114).

制御部20は、SW制御部17をOFF制御状態S0とし、チャージポンプ回路13を、すべてのSWをOFFに設定し、この状態を所定時間(スイッチング遅延を吸収するための微少時間)保持(ステップS114)した後、次ステップ(ステップS115)へ進む。   The control unit 20 sets the SW control unit 17 to the OFF control state S0, sets the charge pump circuit 13 to OFF, and holds this state for a predetermined time (a minute time to absorb the switching delay) (step After step S114, the process proceeds to the next step (step S115).

そして、タイミング生成部18は、SW制御部17のSW制御が終了か否かを判定し(ステップS115)、継続する場合(No)は、再度×3制御が行われ(ステップS111の戻り)、所定の時間が経過して終了する場合には(Yes)、開始(ステップS101)へ戻る。   Then, the timing generation unit 18 determines whether or not the SW control of the SW control unit 17 is finished (Step S115). When the timing generation unit 18 continues (No), the x3 control is performed again (return of Step S111), When the predetermined time has elapsed and the process ends (Yes), the process returns to the start (step S101).

タイミング制御部18は、以上のステップS111乃至ステップS115を繰り返し実行することで×3制御を行う。   The timing control unit 18 performs the x3 control by repeatedly executing the above steps S111 to S115.

一方、制御部20は、取得したAD変換値Vadの判定(ステップS102)においてAD変換値Vadが1.5を超えている場合には(No)、次ステップ(ステップS103)へ進む。   On the other hand, when the AD conversion value Vad exceeds 1.5 in the determination of the acquired AD conversion value Vad (step S102) (No), the control unit 20 proceeds to the next step (step S103).

そして、取得したAD変換値Vadが2.4以下か否かを判定(ステップS103)し、以下であれば(Yes)、×2制御を行う(ステップS121)。   Then, it is determined whether or not the acquired AD conversion value Vad is equal to or less than 2.4 (step S103). If it is equal to or less (Yes), x2 control is performed (step S121).

×2制御では、先ず、制御部20は、SW制御部17を×2制御の充電状態S2cとし、チャージポンプ回路13を、半導体スイッチSWi、SWs0、SWg1をONに設定し、半導体スイッチSWs1、SWg0、SWo0、SWo1、SWo2をOFFに設定する。この設定により、図4(b)×2制御の充電時(S2c)に示すように、チャージポンプ回路13では、入力キャパシタCin12の蓄積電荷の一部が半導体スイッチSWiを介して2つの直列接続のフライキャップコンデンサCf0、Cf1に充電される、×2制御の充電時の接続となる。この状態を所定時間(入力キャパシタCin12と2つの直列接続のフライキャップコンデンサCf0、Cf1とがほぼ等電位となるまでの時間)保持(ステップS121)した後、次ステップ(ステップS122)へ進む。   In the × 2 control, first, the control unit 20 sets the SW control unit 17 to the charge state S2c of the × 2 control, sets the charge pump circuit 13 to the semiconductor switches SWi, SWs0, and SWg1, and turns on the semiconductor switches SWs1, SWg0. , SWo0, SWo1, and SWo2 are set to OFF. With this setting, as shown in FIG. 4 (b) × 2 control charging (S2c), in the charge pump circuit 13, a part of the charge stored in the input capacitor Cin12 is connected in two series via the semiconductor switch SWi. This is a connection at the time of charging of × 2 control, in which the fly cap capacitors Cf0 and Cf1 are charged. This state is held for a predetermined time (the time until the input capacitor Cin12 and the two series-connected flycap capacitors Cf0 and Cf1 are substantially equipotential) (step S121), and then the process proceeds to the next step (step S122).

制御部20は、SW制御部17をOFF制御状態S0とし、チャージポンプ回路13を、すべてのSWをOFFに設定し、この状態を所定時間(スイッチング遅延を吸収するための微少時間)保持(ステップS122)した後、次ステップ(ステップS123)へ進む。   The control unit 20 sets the SW control unit 17 to the OFF control state S0, sets the charge pump circuit 13 to OFF, and holds this state for a predetermined time (a minute time to absorb the switching delay) (step After step S122, the process proceeds to the next step (step S123).

そして、制御部20は、SW制御部17を×2制御の放電状態S2dとし、チャージポンプ回路13を、半導体スイッチSWi、SWs0、SWs1、SWo2をOFFに設定し、半導体スイッチSWg0、SWg1、SWo0、SWo1をONに設定する。この設定により、チャージポンプ回路13は、図4(b)×2制御の放電時(S2d)に示す接続となり、2つのフライキャップコンデンサCf0、Cf1は並列接続となり、電圧が1/2に降圧されてスーパーキャパシタCsc14に出力される。この状態を所定時間(それぞれのフライキャップコンデンサとスーパーキャパシタCsc14とがほぼ同電位と成るまでの時間)保持(ステップS123)した後、次ステップ(ステップS124)へ進む。   Then, the control unit 20 sets the SW control unit 17 to the discharge state S2d of x2 control, the charge pump circuit 13 sets the semiconductor switches SWi, SWs0, SWs1, and SWo2 to OFF, and the semiconductor switches SWg0, SWg1, SWo0, Set SWo1 to ON. With this setting, the charge pump circuit 13 is connected as shown in FIG. 4 (b) × 2 control discharge (S2d), and the two fly cap capacitors Cf0 and Cf1 are connected in parallel, and the voltage is stepped down by half. To the supercapacitor Csc14. This state is maintained for a predetermined time (time until each flycap capacitor and supercapacitor Csc14 become substantially the same potential) (step S123), and then the process proceeds to the next step (step S124).

制御部20は、SW制御部17をOFF制御状態S0とし、チャージポンプ回路13を、すべてのSWをOFFに設定し、この状態を所定時間(スイッチング遅延を吸収するための微少時間)保持(ステップS124)した後、次ステップ(ステップS125)へ進む。   The control unit 20 sets the SW control unit 17 to the OFF control state S0, sets the charge pump circuit 13 to OFF, and holds this state for a predetermined time (a minute time to absorb the switching delay) (step After step S124, the process proceeds to the next step (step S125).

そして、制御部20は、タイミング生成部18によりSW制御部17のSW制御が終了か否かを判定(ステップS125)し、継続する場合(No)は、再度×2制御が行われ(ステップS121に戻り)、所定の時間が経過して終了する場合には(Yes)、開始(ステップS101)へ戻る。   And the control part 20 determines whether SW control of the SW control part 17 is complete | finished by the timing generation part 18 (step S125), and when continuing (No), x2 control is performed again (step S121). If the predetermined time elapses (Yes), the process returns to the start (Step S101).

タイミング制御部18は、以上のステップS121乃至ステップS125を繰り返し実行することで×2制御を行う。   The timing control unit 18 performs the x2 control by repeatedly executing the above steps S121 to S125.

一方、制御部20は、取得したAD変換値Vadの判定(ステップS103)において、取得したAD変換値Vadが2.4を超えている場合には(No)、次ステップ(ステップS104)へ進む。   On the other hand, in the determination of the acquired AD conversion value Vad (step S103), the control unit 20 proceeds to the next step (step S104) when the acquired AD conversion value Vad exceeds 2.4 (No). .

そして、取得したAD変換値Vadが3.0以下か否かを判定(ステップS104)し、以下であれば(Yes)、×1制御を行う(ステップS131)。   Then, it is determined whether or not the acquired AD conversion value Vad is equal to or less than 3.0 (step S104). If it is equal to or less (Yes), x1 control is performed (step S131).

×1制御では、制御部20は、SW制御部17を×1制御の状態S1とし、チャージポンプ回路13を、半導体スイッチSWiおよびSWo0をONに設定し、半導体スイッチSWs0、SWs1、SWg0、SWg1、SWo1、SWo2をOFFに設定する。この設定により、チャージポンプ回路13は、入出力が直接接続された状態となる。この状態を所定時間(スイッチング遅延を吸収するための微少時間)保持(ステップS131)した後、次ステップ(ステップS132)へ進む。   In the × 1 control, the control unit 20 sets the SW control unit 17 to the state S1 of the × 1 control, sets the charge pump circuit 13 to the semiconductor switches SWi and SWo0, and switches the semiconductor switches SWs0, SWs1, SWg0, SWg1, SWo1 and SWo2 are set to OFF. With this setting, the charge pump circuit 13 is in a state where the input and output are directly connected. After holding this state for a predetermined time (a minute time for absorbing the switching delay) (step S131), the process proceeds to the next step (step S132).

タイミング制御部18は、このステップS131により、×1制御を行う。   The timing control unit 18 performs x1 control in step S131.

そして、制御部20は、SW制御部17をOFF制御状態S0とし、チャージポンプ回路13を、すべてのSWをOFFに設定し、この状態を所定時間(スイッチング遅延を吸収するための微少時間)保持(ステップS132)した後、次ステップ(ステップS101)へ戻る。   Then, the control unit 20 sets the SW control unit 17 to the OFF control state S0, sets the charge pump circuit 13 to OFF, and maintains this state for a predetermined time (a minute time for absorbing the switching delay). After (step S132), the process returns to the next step (step S101).

一方、制御部20は、取得したAD変換値Vadの判定(ステップS104)において、取得したAD変換値Vadが3.0を超えている場合には(No)、次ステップ(ステップS105)へ進む。   On the other hand, in the determination of the acquired AD conversion value Vad (step S104), the control unit 20 proceeds to the next step (step S105) when the acquired AD conversion value Vad exceeds 3.0 (No). .

OFF制御では、制御部20は、SW制御部17をOFF制御の状態S0とし、チャージポンプ回路13を、すべてのSWをOFFに設定し、この状態を所定時間保持(ステップS105)した後、開始(ステップS101)へ戻る。   In the OFF control, the control unit 20 sets the SW control unit 17 to the OFF control state S0, sets the charge pump circuit 13 to OFF, holds this state for a predetermined time (step S105), and then starts. Return to (Step S101).

このステップS105により、OFF制御が行われる。一連の制御プログラムが終了する。   In step S105, OFF control is performed. A series of control programs ends.

以上の×3制御、×2制御、×1制御、およびOFF制御により、スーパーキャパシタCsc14は、その端子電圧の上昇に伴い、図5に示した太実線をトレースするチャージポンプ13からの放電電流で充電される。このため、本実施形態においては、本実施形態でない図5に示した太破線をトレースする場合と比較して、低電圧側ほど大きな充電電流、すなわち、大きな充電電力による充電が可能となり、高効率な充電を行うことができる。   With the above x3 control, x2 control, x1 control, and OFF control, the supercapacitor Csc14 has a discharge current from the charge pump 13 that traces the thick solid line shown in FIG. Charged. For this reason, in this embodiment, compared with the case where the thick broken line shown in FIG. 5 which is not the present embodiment is traced, charging with a larger charging current, that is, a larger charging power is possible on the lower voltage side, and high efficiency is achieved. Can be recharged.

また、本実施形態の太陽電池電源装置3のスイッチング電源装置4は、出力電圧を一定に保つため、入力電圧(=キャパシタ電圧)が低下した場合には、それを補うため入力電流(=キャパシタの出力電流)が増加するように動作するので、正帰還となり急激にキャパシタの放電が進む。したがって、太陽電池電源装置3は、負荷が重くて、キャパシタの放電が激しく電圧が低下した場合でも、チャージポンプ回路13からキャパシタに流れる平均電流が増加するので、キャパシタの充電電圧が速く復帰する。   Further, the switching power supply 4 of the solar battery power supply 3 of the present embodiment keeps the output voltage constant, so that when the input voltage (= capacitor voltage) decreases, the input current (= capacitor of the capacitor) is compensated for it. Since the output current is increased, positive feedback occurs and the capacitor discharges rapidly. Therefore, in the solar cell power supply device 3, even when the load is heavy and the capacitor discharge is intense and the voltage drops, the average current flowing from the charge pump circuit 13 to the capacitor increases, so the charging voltage of the capacitor quickly recovers.

本発明によれば、簡単な装置構成により太陽電池による充電を高効率に実現することが可能な太陽電池電源装置を得ることができる。
例えば、超低消費電力のプログラマブルデバイスを使用することで容易に装置構成を実現可能であり、AD変換頻度も低くてよいため、省電力動作が可能となる。
ADVANTAGE OF THE INVENTION According to this invention, the solar cell power supply device which can implement | achieve charging by a solar cell with high efficiency with a simple apparatus structure can be obtained.
For example, an apparatus configuration can be easily realized by using an ultra-low power consumption programmable device and the AD conversion frequency may be low, so that a power saving operation is possible.

また、更に効率の向上を図るためには、太陽電池充電装置1のチャージポンプ回路13の構成に、フライキャップコンデンサCf3、半導体スイッチSWs2、SWg2、SWo3を追加することにより×4制御や、また更に、フライキャップコンデンサCf4、半導体スイッチSWs3、SWg3、SWo4を追加することにより×5制御も容易に実現することが可能である。   Further, in order to further improve the efficiency, x4 control can be performed by adding a fly cap capacitor Cf3 and semiconductor switches SWs2, SWg2, and SWo3 to the configuration of the charge pump circuit 13 of the solar battery charger 1. By adding the fly cap capacitor Cf4 and the semiconductor switches SWs3, SWg3, and SWo4, × 5 control can be easily realized.

1 太陽電池充電装置
2、3 太陽電池電源装置
4 SW−REG(スイッチング電源装置)
5 負荷
11 太陽電池
12 入力キャパシタCin(第3のコンデンサ)
13 チャージポンプ回路(チャージポンプ)
14 スーパーキャパシタCsc(第2のコンデンサ)
15 AD変換部(電圧検出部)
16 制御選択部
17 SW制御部
18 タイミング生成部
20 制御部
21 電源
100 太陽電池システム
MPP 太陽電池最大出力電力点、出力側最大出力電力点
MPP2、MPP3 出力側最大出力電力点
SWi(スイッチ素子)、SWs0、SWs1、SWg0、SWg1、SWo0、SWo1、SWo2、SWo 半導体スイッチ
Cf0、Cf1、Cf2 フライキャップコンデンサ(第1のコンデンサ)
T1 入力端
T2、T3、T4 出力端
INP 入力端
OUTP 出力端
COM 共通接地端
CONT 制御端
DESCRIPTION OF SYMBOLS 1 Solar cell charging device 2, 3 Solar cell power supply device 4 SW-REG (switching power supply device)
5 Load 11 Solar cell 12 Input capacitor Cin (third capacitor)
13 Charge pump circuit (charge pump)
14 Supercapacitor Csc (second capacitor)
15 AD converter (voltage detector)
16 control selection unit 17 SW control unit 18 timing generation unit 20 control unit 21 power source 100 solar cell system MPP solar cell maximum output power point, output side maximum output power point MPP2, MPP3 output side maximum output power point SWi (switch element), SWs0, SWs1, SWg0, SWg1, SWo0, SWo1, SWo2, SWo Semiconductor switch Cf0, Cf1, Cf2 Fly cap capacitor (first capacitor)
T1 input terminal T2, T3, T4 output terminal INP input terminal OUTP output terminal COM common ground terminal CONT control terminal

Claims (7)

直列接続されたN個の第1のコンデンサを前記N個並列接続することにより、入力側に接続された太陽電池の電圧を前記N分の1に降圧するチャージポンプと、
前記チャージポンプの出力電圧を充電する第2のコンデンサと、
前記第2のコンデンサの充電電圧を検出する電圧検出部と、
前記電圧検出部が検出した検出電圧が高いときには、前記Nを小さな値に設定し、低いときには前記Nを大きな値に設定する制御部と
を備えることを特徴とする太陽電池電源装置。
A charge pump for stepping down the voltage of the solar cell connected to the input side to 1 / N by connecting the N first capacitors connected in series to each other in parallel;
A second capacitor for charging the output voltage of the charge pump;
A voltage detector for detecting a charging voltage of the second capacitor;
And a control unit that sets the N to a small value when the detected voltage detected by the voltage detection unit is high, and sets the N to a large value when the detected voltage is low.
前記チャージポンプは、前記太陽電池による充電時に前記N個の第1のコンデンサを直列に接続し、放電時に前記N個の第1のコンデンサを並列に接続することを特徴とする請求項1に記載の太陽電池電源装置。   The said charge pump connects the said N 1st capacitor | condenser in series at the time of the charge by the said solar cell, and connects the said N 1st capacitor | condenser in parallel at the time of discharge. Solar cell power supply. 前記第2のコンデンサは、定格電圧が前記太陽電池の開放電圧よりも低いスーパーキャパシタであることを特徴とする請求項1又は請求項2に記載の太陽電池電源装置。   The solar cell power supply device according to claim 1 or 2, wherein the second capacitor is a supercapacitor having a rated voltage lower than an open voltage of the solar cell. 前記制御部は、前記検出電圧が、前記太陽電池の開放電圧と最大出力電力点の電圧との中間点の所定電圧に基づいた基準電圧を跨ぐときに前記Nを切り替えることを特徴とする請求項1乃至請求項3の何れか一項に記載の太陽電池電源装置。   The control unit switches the N when the detected voltage crosses a reference voltage based on a predetermined voltage at an intermediate point between an open voltage of the solar cell and a voltage at a maximum output power point. The solar cell power supply device according to any one of claims 1 to 3. 前記制御部は、起動時に前記Nを大きな値に設定し、前記第2のコンデンサの電圧の定常時に前記Nを小さな値に設定することを特徴とする請求項1乃至請求項4の何れか一項に記載の太陽電池電源装置。   5. The control unit according to claim 1, wherein the controller sets the N to a large value at startup and sets the N to a small value when the voltage of the second capacitor is steady. The solar cell power supply device according to item. 前記太陽電池に第3のコンデンサが並列接続され、
前記チャージポンプは、前記N個の第1のコンデンサが前記直列接続された直列コンデンサの一端と前記第3のコンデンサの一端との間にスイッチ素子が挿入されていることを特徴とする請求項1乃至請求項5の何れか一項に記載の太陽電池電源装置。
A third capacitor is connected in parallel to the solar cell,
2. The charge pump according to claim 1, wherein a switch element is inserted between one end of the series capacitor in which the N first capacitors are connected in series and one end of the third capacitor. The solar cell power supply device according to any one of claims 5 to 5.
請求項1に記載の太陽電池電源装置と、
前記第2のコンデンサの出力電圧を安定化するスイッチング電源装置と
を備えることを特徴とする太陽電池電源装置。
The solar cell power supply device according to claim 1,
And a switching power supply device that stabilizes an output voltage of the second capacitor.
JP2010102043A 2010-04-27 2010-04-27 Solar cell power supply Expired - Fee Related JP5024420B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010102043A JP5024420B2 (en) 2010-04-27 2010-04-27 Solar cell power supply

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010102043A JP5024420B2 (en) 2010-04-27 2010-04-27 Solar cell power supply

Publications (2)

Publication Number Publication Date
JP2011234486A true JP2011234486A (en) 2011-11-17
JP5024420B2 JP5024420B2 (en) 2012-09-12

Family

ID=45323221

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010102043A Expired - Fee Related JP5024420B2 (en) 2010-04-27 2010-04-27 Solar cell power supply

Country Status (1)

Country Link
JP (1) JP5024420B2 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013115913A (en) * 2011-11-28 2013-06-10 Omron Corp Voltage conversion circuit and electronic apparatus
CN104505882A (en) * 2014-12-15 2015-04-08 深圳航天东方红海特卫星有限公司 Power supply control circuit
CN104635082A (en) * 2015-01-30 2015-05-20 中国矿业大学 Method and device for testing super capacitor
CN106899032A (en) * 2015-12-21 2017-06-27 新唐科技股份有限公司 Power optimization device and method for energy collection equipment
JP6418705B1 (en) * 2017-09-15 2018-11-07 武雄 岩井 Capacitor power supply
JP2020511104A (en) * 2017-04-13 2020-04-09 オッポ広東移動通信有限公司Guangdong Oppo Mobile Telecommunications Corp., Ltd. Charged device and charging method
CN112512174A (en) * 2019-08-26 2021-03-16 湖南耐普恩科技有限公司 Photovoltaic street lamp control device and photovoltaic street lamp equipment
JP2021511770A (en) * 2018-01-18 2021-05-06 シグニファイ ホールディング ビー ヴィSignify Holding B.V. Input voltage compatible power conversion
US11233423B2 (en) 2017-04-07 2022-01-25 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Device to-be-charged, wireless charging apparatus, and wireless charging method
US11689029B2 (en) 2016-10-12 2023-06-27 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Terminal with charging circuit and device thereof
CN116736929A (en) * 2023-06-26 2023-09-12 浙江大学 Photovoltaic string global maximum power point tracking method and system based on region segmentation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001037090A (en) * 1999-07-21 2001-02-09 Okamura Kenkyusho:Kk Remaining amount display device for capacitor charging system
JP2004120831A (en) * 2002-09-24 2004-04-15 Terakawa Soji Charge and discharge device
JP2005341661A (en) * 2004-05-24 2005-12-08 Kiyotsugu Tsuji Charger and discharger
JP2006042523A (en) * 2004-07-28 2006-02-09 Ado System Kk Power supply

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001037090A (en) * 1999-07-21 2001-02-09 Okamura Kenkyusho:Kk Remaining amount display device for capacitor charging system
JP2004120831A (en) * 2002-09-24 2004-04-15 Terakawa Soji Charge and discharge device
JP2005341661A (en) * 2004-05-24 2005-12-08 Kiyotsugu Tsuji Charger and discharger
JP2006042523A (en) * 2004-07-28 2006-02-09 Ado System Kk Power supply

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013115913A (en) * 2011-11-28 2013-06-10 Omron Corp Voltage conversion circuit and electronic apparatus
CN104505882A (en) * 2014-12-15 2015-04-08 深圳航天东方红海特卫星有限公司 Power supply control circuit
CN104635082A (en) * 2015-01-30 2015-05-20 中国矿业大学 Method and device for testing super capacitor
CN106899032A (en) * 2015-12-21 2017-06-27 新唐科技股份有限公司 Power optimization device and method for energy collection equipment
US11689029B2 (en) 2016-10-12 2023-06-27 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Terminal with charging circuit and device thereof
US11233423B2 (en) 2017-04-07 2022-01-25 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Device to-be-charged, wireless charging apparatus, and wireless charging method
US11539219B2 (en) 2017-04-07 2022-12-27 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Wireless charging device and method, and device to be charged
US11368050B2 (en) 2017-04-07 2022-06-21 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Wireless charging device, method, and device to-be-charged
US11355963B2 (en) 2017-04-07 2022-06-07 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Device to-be-charged, wireless charging apparatus, and wireless charging method
US11631985B2 (en) 2017-04-13 2023-04-18 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Device to be charged with multiple charging channels, charging method, and charging control circuit with multiple charging channels
JP6992080B2 (en) 2017-04-13 2022-01-13 オッポ広東移動通信有限公司 Device to be charged and charging method
US11171499B2 (en) 2017-04-13 2021-11-09 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Device to be charged with multiple charging channels, charging method, and charging control circuit with multiple charging channels
JP2020511104A (en) * 2017-04-13 2020-04-09 オッポ広東移動通信有限公司Guangdong Oppo Mobile Telecommunications Corp., Ltd. Charged device and charging method
JP2019054640A (en) * 2017-09-15 2019-04-04 武雄 岩井 Capacitor power supply device
JP6418705B1 (en) * 2017-09-15 2018-11-07 武雄 岩井 Capacitor power supply
JP2021511770A (en) * 2018-01-18 2021-05-06 シグニファイ ホールディング ビー ヴィSignify Holding B.V. Input voltage compatible power conversion
JP7330985B2 (en) 2018-01-18 2023-08-22 シグニファイ ホールディング ビー ヴィ Input voltage adaptive power conversion
CN112512174A (en) * 2019-08-26 2021-03-16 湖南耐普恩科技有限公司 Photovoltaic street lamp control device and photovoltaic street lamp equipment
CN116736929A (en) * 2023-06-26 2023-09-12 浙江大学 Photovoltaic string global maximum power point tracking method and system based on region segmentation
CN116736929B (en) * 2023-06-26 2024-05-28 浙江大学 Photovoltaic string global maximum power point tracking method and system based on region segmentation

Also Published As

Publication number Publication date
JP5024420B2 (en) 2012-09-12

Similar Documents

Publication Publication Date Title
JP5024420B2 (en) Solar cell power supply
CN102136800B (en) Switching regulaor
CN103135653B (en) Maximum power point tracking controller, point tracking system and point tracking method
US20120139516A1 (en) Power supply circuit with adaptive input selection and method for power supply
US20170288440A1 (en) Secondary control device and charging system having the same
TW201128905A (en) Solar power management system with maximum power tracking
US10056847B2 (en) Hybrid power conversion system and method of determining efficiency using the same
TW201534037A (en) Inverting apparatus
US10216211B2 (en) Control method and control circuit for voltage switch circuit and usb power delivery
Katayama et al. New topology for dc–dc converters used in fuel cell–electric double layer capacitor hybrid power source systems for mobile devices
CN110875686A (en) Electronic converter and method of operating an electronic converter
JP5937442B2 (en) DC-DC converter
CN103929048A (en) Zero-crossing detection circuit of switching power supply
CN104184319A (en) Charge pump circuit as well as control circuit and control method thereof
Yi et al. An energy-adaptive MPPT power management unit for micro-power vibration energy harvesting
CN111200361A (en) Self-powered double-input double-output energy collecting circuit with maximum power tracking function
CN102545600A (en) Power supply circuit capable of adaptively adjusting input and power supply method
CN204633599U (en) Power charge pump and use the electric power management circuit of this power charge pump
TWI704755B (en) Power supply apparatus and method of operating the same
CN111010029B (en) Light-load frequency reduction circuit of charge pump based on current control
CN210246607U (en) Energy collection control circuit with reconfigurable working mode and DC-DC converter
CN109639118B (en) Self-powered circuit of switching power supply, control chip, switching power supply and electric device
CN108631565A (en) Two-stage type Switching Power Supply
CN109768705A (en) A kind of control method for realizing low quiescent current in switch buck converter
CN103856046A (en) Voltage-reducing type voltage conversion device

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120514

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120522

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120604

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150629

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 5024420

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees