JP2010515845A - Bridge module - Google Patents
Bridge module Download PDFInfo
- Publication number
- JP2010515845A JP2010515845A JP2009545509A JP2009545509A JP2010515845A JP 2010515845 A JP2010515845 A JP 2010515845A JP 2009545509 A JP2009545509 A JP 2009545509A JP 2009545509 A JP2009545509 A JP 2009545509A JP 2010515845 A JP2010515845 A JP 2010515845A
- Authority
- JP
- Japan
- Prior art keywords
- bridge
- bridge module
- floor
- connection
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000725 suspension Substances 0.000 claims description 41
- 238000009434 installation Methods 0.000 claims description 24
- 238000001125 extrusion Methods 0.000 abstract description 6
- 238000010276 construction Methods 0.000 description 3
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T29/00—Metal working
- Y10T29/49—Method of mechanical manufacture
- Y10T29/4998—Combined manufacture including applying or shaping of fluent material
Abstract
橋モジュール(1)は、フロア(3)、及びフロアの長さ方向エッジ(7)に対してヒンジ止めされる2つの直角側部(5)を有する。各ヒンジ(9)は、互いへと押され得る2つの押出し片(11)及び(13)によって形成され、各ヒンジは、側部(5)が互いに向かう方向においてフロア(3)に向かって折り畳まれ得るのみであるように作られる。各側部(5)は、1つの押出し片(21)を有して作られ、押出し片(21)の一部(11)は、ヒンジ(9)の一部を形成する。フロア(3)のエッジ(7)は、間にプラスチック板(25)がある桁によって形成される。桁は、ヒンジ(9)の他の部分を形成する1つの押出し片(13)を有して各々形成される。
The bridge module (1) has a floor (3) and two right-hand sides (5) hinged to the longitudinal edge (7) of the floor. Each hinge (9) is formed by two extruded pieces (11) and (13) that can be pushed towards each other, and each hinge is folded towards the floor (3) in the direction that the sides (5) are towards each other. It is made to be only possible. Each side (5) is made with one extruded piece (21), part (11) of the extruded piece (21) forming part of the hinge (9). The edge (7) of the floor (3) is formed by girders with a plastic plate (25) in between. The girders are each formed with one extruded piece (13) that forms the other part of the hinge (9).
Description
本発明は、吊橋架設設備に対する橋モジュール(a bridge module for a suspension bridge installation)に係り、当該橋モジュールは、細長いフロア(床)、及びフロアの長手方向エッジに対してヒンジを介して接続される2つの垂直側部を有する。該ヒンジは、側部が互いに向かう方向においてフロアに向かって折り畳まれ得るのみであるように、また互いに対して少なくとも90度回転され得るように、作られる。 The present invention relates to a bridge module for a suspension bridge installation for a suspension bridge erection facility, the bridge module being connected to an elongated floor (floor) and a longitudinal edge of the floor via hinges. Has two vertical sides. The hinges are made so that the sides can only be folded towards the floor in the direction towards each other and can be rotated at least 90 degrees relative to each other.
JP 10 088 7878 A(特許文献1)から、側部がフロアに対してヒンジ留めされるエレベータのプラットフォーム(lift platform)は既知である。各側部は、互いに対して接続されるバーを有して作られ、側部は、別個のヒンジを介してフロアに対して接続される。 From JP 10 088 7878 A, a lift platform is known in which the sides are hinged to the floor. Each side is made with bars connected to each other, and the sides are connected to the floor via separate hinges.
本発明は、より容易に製造され得る冒頭に記載された種類の橋モジュールを与える、ことを目的とする。 The present invention aims to provide a bridge module of the kind described at the beginning which can be manufactured more easily.
この目的に対して、本発明に従った橋モジュールは、ヒンジが互いへと押され得る2つの押出し片(extrusion pieces)を有すること、及び、各側部がカットアウト開口を有する1つの押出し片から作られ、該押出し片がヒンジの1つの片の1つ(one of the pieces of one of the hinges)であること、を特徴とする。 For this purpose, the bridge module according to the invention has two extrusion pieces whose hinges can be pushed towards each other, and one extrusion piece with a cut-out opening on each side. And the extruded piece is one of the hinges of one piece of the hinges.
フロアと、一体にされたヒンジを介してフロアに対してヒンジ留めされ且つ一個構成で各々が作られる(each made of one piece)2つの側部とを備える構造は、US−A−1 462 541(特許文献2)から既知である、ことが留意される。しかしながら、これは、吊橋架設設備に対する橋モジュールではなく、ヒンジ留めされた側壁を有するU字型部分スラブである。 A structure comprising a floor and two sides hinged to the floor via an integral hinge and each made in one piece is described in US-A-1 462 541. It is noted that this is known from US Pat. However, this is not a bridge module for a suspension bridge installation, but a U-shaped partial slab with hinged side walls.
フロアはまた、間にプラスチック板を有する2つの桁を望ましくは有する。該桁は、1つの押出し片から各々形成され、押出し片の1つは、ヒンジの1つである。 The floor also desirably has two girders with a plastic plate in between. The girders are each formed from one extruded piece, one of the extruded pieces being one of the hinges.
本発明はまた、本発明に従った橋モジュールを有する吊橋架設設備に係る。吊橋架設設備に関し、本発明は、当該吊橋架設設備が滑車ユニット(テークルユニット、tackling unit)も有する、ことを特徴とする。該滑車ユニットは、内部に滑車機構(tackling mechanism)を有するボックスを与えられ、また、橋モジュールの端部又は側部に対して滑車ユニットを接続するための接続装置を与えられる。該接続装置は、望ましくは下部及び上部接続素子と、ボックスに対して直角に延在し且つ下部接続素子に対して接続される2つの突起とを有する。 The invention also relates to a suspension bridge installation with a bridge module according to the invention. The present invention relates to a suspension bridge construction facility, and the present invention is characterized in that the suspension bridge construction facility also includes a pulley unit (tackle unit). The pulley unit is provided with a box having a tackling mechanism inside and is provided with a connection device for connecting the pulley unit to the end or side of the bridge module. The connection device preferably has a lower and upper connection element and two projections extending perpendicular to the box and connected to the lower connection element.
本発明に従った吊橋架設設備の更に他の実施例は、吊橋架設設備が滑車ユニットも有する、ことを特徴とする。該滑車ユニットは、内部に滑車機構を有するケージフレームを与えられる。該滑車機構はケージフレームに対して固定され、ケージフレームは、橋モジュールに対する接続のための接続装置を与えられる。ケージフレームは、不注意に落下する場合の損傷から滑車ユニットを保護する。 A further embodiment of the suspension bridge installation facility according to the invention is characterized in that the suspension bridge installation facility also has a pulley unit. The pulley unit is provided with a cage frame having a pulley mechanism therein. The pulley mechanism is fixed with respect to the cage frame, which is provided with a connection device for connection to the bridge module. The cage frame protects the pulley unit from damage if it falls inadvertently.
本発明は、本発明に従った橋モジュール及び吊橋架設設備の実施例が示される図面に基づいて、以下においてより完全に説明される。 The invention will be explained more fully in the following on the basis of drawings in which embodiments of the bridge module and suspension bridge installation according to the invention are shown.
図1及び2は、夫々展開されるとき並びに折り畳まれるときの本発明に従った橋モジュールの一実施例を断面で示す。橋モジュール1は、細長いフロア3、及びフロアの長手方向エッジ7に対してヒンジ止めされる2つの直角側部5を有する。 1 and 2 show in cross section one embodiment of a bridge module according to the present invention when unfolded and folded, respectively. The bridge module 1 has an elongated floor 3 and two right-hand sides 5 that are hinged to a longitudinal edge 7 of the floor.
図3を参照すると、各ヒンジ9は、互いへと押され得る2つの押出し片11及び13によって形成され、該ヒンジは、側部5が互いに向かう方向においてフロアに向かって折り畳まれ得るのみであるように作られる。かかる押出し片の1つ13は、円筒形のシリンダ15、及びそれから距離を隔てて同心半円壁17を有する。他の押出し片11は、更なる半円壁19を備える。該半円壁は、シリンダに対して同心であり、シリンダ15と壁17との間における空間へ押され得る。押出し片11,13は、互いに対して90度回転され得る。 Referring to FIG. 3, each hinge 9 is formed by two extruded pieces 11 and 13 that can be pushed towards each other, which hinges can only be folded towards the floor in the direction in which the sides 5 face each other. Made as follows. One such extruded piece 13 has a cylindrical cylinder 15 and a concentric semicircular wall 17 spaced from it. The other extruded piece 11 comprises a further semicircular wall 19. The semicircular wall is concentric with the cylinder and can be pushed into the space between the cylinder 15 and the wall 17. The extruded pieces 11, 13 can be rotated 90 degrees relative to each other.
各側部5は、図4に示される通り、カットアウト開口を有する押出し片21を有して作られ、押出し片21の一部11は、ヒンジ9の1つの一部を形成する。 Each side 5 is made with an extruded piece 21 having a cut-out opening, as shown in FIG. 4, and a portion 11 of the extruded piece 21 forms a part of the hinge 9.
フロア3のエッジ7は、図1に示される通り、間にプラスチック板25がある桁によって形成される。桁は各々、ヒンジ9の他の部分を形成する押出し片13によって形成される。 The edge 7 of the floor 3 is formed by girders with a plastic plate 25 between them, as shown in FIG. Each girder is formed by an extruded piece 13 which forms the other part of the hinge 9.
橋モジュール1はまた、図5に示される通り、ゴムバンド29を有して側部5に対して接続されるレスト27を備える。図2に示される折り畳まれた位置において、レスト27は側部5上にある。図1中の展開された位置において、レストは、側部5から距離を隔てられ、図1には示されていない。 The bridge module 1 also includes a rest 27 having a rubber band 29 and connected to the side portion 5 as shown in FIG. In the folded position shown in FIG. 2, the rest 27 is on the side 5. In the deployed position in FIG. 1, the rest is spaced from the side 5 and is not shown in FIG.
図6は、本発明に従った吊橋架設設備の接続モジュール31を斜視図で示す。この接続モジュールは、2つの橋モジュールを互いに対して接続させ得るか、あるいは橋モジュールを作業ケージに対して接続させ得る(図9参照)。接続モジュール31は、作業ケージ及び橋モジュールのフロアにおける穴に係合するよう4つの垂直接続ピン35を有する下方部33を備える。接続モジュールはまた、2つの脚部37を有し、該脚部は、下方部33上において固定され、側部及びレストが接続され得る。 FIG. 6 shows in perspective view a connection module 31 of a suspension bridge installation facility according to the invention. This connection module can connect the two bridge modules to each other or connect the bridge module to the work cage (see FIG. 9). The connection module 31 comprises a lower part 33 with four vertical connection pins 35 to engage holes in the floor of the work cage and bridge module. The connection module also has two legs 37, which can be fixed on the lower part 33 and the side and rest can be connected.
各脚部37は、共にヒンジ留めされる2つの部分37A及び37Bを備え、該部分は、図7に示される通り、ロッキングピン39によって共にロックされ得る。ロッキングピン39は、部分37Bにおける穴においてクランプするよう押され得、それによって脚部と一体にされるため、別個のロッキングピンは必要とされない。図8は、脚部37を上方から示す。ピン41は、橋モジュールの側部に対する接続のためのものであり、ピン43は、レストに対する接続のためのものである。 Each leg 37 comprises two parts 37A and 37B hinged together, which parts can be locked together by a locking pin 39 as shown in FIG. Since the locking pin 39 can be pushed to clamp in the hole in the portion 37B, thereby being integrated with the leg, a separate locking pin is not required. FIG. 8 shows the leg 37 from above. Pin 41 is for connection to the side of the bridge module and pin 43 is for connection to the rest.
図9は、本発明に従った吊橋架設設備の第1の実施例の作業ケージを示す。この作業ケージ45は、橋モジュールの端部に対して接続され得るか、あるいは、2つの橋モジュール間において設置され得、橋モジュールは、互いに対して整列されるか、あるいは90度の角度にされる。後者の場合、作業ケージは、角片を形成する。 FIG. 9 shows the working cage of the first embodiment of the suspension bridge erection facility according to the present invention. This working cage 45 can be connected to the end of the bridge module or can be installed between two bridge modules, the bridge modules being aligned with each other or at an angle of 90 degrees. The In the latter case, the working cage forms a square piece.
作業ケージ45は、橋モジュールに対して接続されるときに橋モジュールのフロアに対して接続されるフロア48、及び、フロアの側部上に存在するボックス47を備える。該ボックスにおいては、橋モジュールに対する接続のために、並びに作業ケージに対してエンドレスト(an end rest)を接続するよう、橋モジュールに対して接続されるときに橋モジュールのフロアに対して接続される。吊橋架設設備は望ましくは、2つのケージを備え、該2つのケージの間には、1つ又はそれより多くの橋モジュールがある。吊橋架設設備は、滑車装置でもあるかかる2つのケージによって屋根の梁上に懸架され得る。橋モジュールが接続されない作業ケージの側部は、エンドレスト49によって閉鎖され得る。 The work cage 45 comprises a floor 48 connected to the bridge module floor when connected to the bridge module, and a box 47 present on the side of the floor. In the box, it is connected to the floor of the bridge module when connected to the bridge module for connection to the bridge module as well as to connect an end rest to the work cage. The The suspension bridge installation preferably comprises two cages, with one or more bridge modules between the two cages. The suspension bridge installation can be suspended on the roof beam by such two cages which are also pulley devices. The side of the working cage where the bridge module is not connected can be closed by an endrest 49.
図10及び11は、本発明に従った吊橋架設設備の第2の実施例を多種の角度で示す。この吊橋架設設備51は、橋モジュール53及び2つの滑車ユニット55を有する。各滑車ユニットは、内部に滑車機構(図示せず)を有するボックス57を与えられる。2つの車輪59は、ボックスの下部に対して固定される。 10 and 11 show a second embodiment of the suspension bridge installation facility according to the invention at various angles. The suspension bridge installation facility 51 includes a bridge module 53 and two pulley units 55. Each pulley unit is provided with a box 57 having a pulley mechanism (not shown) therein. Two wheels 59 are fixed to the lower part of the box.
滑車ユニット55はまた、橋モジュール53の端部又は側部に対する接続のための装置を与えられる。かかる接続装置は、図12及び13に示される通り、下部及び上部接続素子61及び63によって形成される。突起65は、図14に示される通り、下部接続素子63に対して接続され得るため、橋モジュール53に対する接続は、特に滑車ユニット55が橋モジュールの側部に対して接続される場合、より強くなり得る。本願では中空であるかかる突起65は、ボックス57に対して直角に突出する。滑車ユニット55は、動くのが容易であるトローリーとして使用される。 The pulley unit 55 is also provided with a device for connection to the end or side of the bridge module 53. Such a connection device is formed by lower and upper connection elements 61 and 63 as shown in FIGS. Since the protrusion 65 can be connected to the lower connecting element 63 as shown in FIG. 14, the connection to the bridge module 53 is stronger, especially when the pulley unit 55 is connected to the side of the bridge module. Can be. Such a protrusion 65, which is hollow in the present application, protrudes at right angles to the box 57. The pulley unit 55 is used as a trolley that is easy to move.
図15及び16は、本発明に従った吊橋架設設備の第3の実施例を夫々正面図及び側面図で示す。この吊橋架設設備71はまた、橋モジュール73及び2つの滑車ユニット75を備える。各滑車ユニットは、内部に滑車機構79を有するケージフレーム77を与えられ、該滑車機構は、図16に示される通りケージに対して固定される。2つの車輪81は、ケージフレーム77の下部に対して固定される。ケージフレーム77は、橋モジュール73に対して接続される補助フレーム85に対する接続のための接続装置83を与えられる。 15 and 16 show a third embodiment of the suspension bridge erection facility according to the present invention in a front view and a side view, respectively. The suspension bridge construction facility 71 also includes a bridge module 73 and two pulley units 75. Each pulley unit is provided with a cage frame 77 having a pulley mechanism 79 therein, which is fixed relative to the cage as shown in FIG. The two wheels 81 are fixed to the lower part of the cage frame 77. The cage frame 77 is provided with a connection device 83 for connection to an auxiliary frame 85 connected to the bridge module 73.
図17及び18は、滑車ユニット75を多種の角度で示し、図19は、足場パイプ(scaffold pipe)87が接続される滑車ユニット75を示す。滑車ユニット75は、この足場パイプ87を掴むことによって容易に動かされ得る。
上述において本発明は、図面に基づいて説明されるが、本発明は、図示される実施例にいかようにも制限されない、ことが留意されるべきである。本発明はまた、請求項によって定義付けられるコンテクスト内において、図示される実施例から逸脱して全ての実施例に及ぶ。
17 and 18 show the pulley unit 75 at various angles, and FIG. 19 shows the pulley unit 75 to which a scaffold pipe 87 is connected. The pulley unit 75 can be easily moved by grasping the scaffold pipe 87.
While the present invention is described above with reference to the drawings, it should be noted that the present invention is not limited in any way to the illustrated embodiments. The invention also extends to all embodiments within the context defined by the claims, deviating from the illustrated embodiments.
Claims (12)
細長いフロアと、
該フロアの長さ方向エッジに対して接続される2つの垂直側部と、
を有し、
該側部は、前記フロアに対してヒンジ止めされる、
ことを特徴とする橋モジュール。 A bridge module for suspension bridge installation equipment,
An elongated floor,
Two vertical sides connected to the longitudinal edge of the floor;
Have
The side is hinged to the floor;
A bridge module characterized by that.
ことを特徴とする請求項1記載の橋モジュール。 The hinge is made so that the sides can only be folded towards the floor in the direction towards each other,
The bridge module according to claim 1.
ことを特徴とする請求項1又は2記載の橋モジュール。 The hinges each have two extruded pieces that can be pushed toward each other and rotated at least 90 degrees relative to each other.
The bridge module according to claim 1 or 2, characterized in that
ことを特徴とする請求項3記載の橋モジュール。 Each side is made with one extruded piece having a cutout opening, the extruded piece being one of the extruded pieces of the hinge,
The bridge module according to claim 3.
ことを特徴とする請求項3又は4記載の橋モジュール。 The floor has two girders with a plastic plate in between, each of the girders being formed with one extruded piece, one of the extruded pieces being one of the hinges,
The bridge module according to claim 3 or 4, characterized by the above.
該レストは、前記側部の上方において距離を隔てて存在し、ゴムバンドによって前記側部に対して接続される、
ことを特徴とする請求項1乃至5のうちいずれか一項記載の橋モジュール。 A rest,
The rest exists at a distance above the side and is connected to the side by a rubber band.
The bridge module according to claim 1, wherein the bridge module is a bridge module.
前記橋モジュールの端部に対して接続され得るか、あるいは2つの橋モジュール間において設置され得る作業ケージを有し、
該作業ケージは、前記橋モジュールに接続されるときに前記橋モジュールのフロアに対して接続されるフロアを有し、
該作業ケージは、一側上においてボックスを有し、他側上においては、橋モジュールに対する接続及び前記作業ケージに対するエンドレストの接続に対する接続装置を与えられる、
ことを特徴とする吊橋架設設備。 A suspension bridge installation facility comprising the bridge module according to any one of claims 1 to 6,
Having a working cage that can be connected to the end of the bridge module or installed between two bridge modules;
The working cage has a floor that is connected to the floor of the bridge module when connected to the bridge module;
The work cage has a box on one side, and on the other side is provided with a connection device for connection to the bridge module and connection of the endrest to the work cage.
Suspension bridge erection equipment characterized by this.
内部に滑車機構を有するボックスを与えられる滑車ユニットを有し、
該滑車ユニットはまた、前記橋モジュールの側部の端部に対して該滑車ユニットを接続するための接続装置を与えられる、
ことを特徴とする吊橋架設設備。 A suspension bridge installation facility comprising the bridge module according to any one of claims 1 to 6,
Having a pulley unit provided with a box having a pulley mechanism inside;
The pulley unit is also provided with a connection device for connecting the pulley unit to a side end of the bridge module.
Suspension bridge erection equipment characterized by this.
ことを特徴とする請求項8記載の吊橋架設設備。 The connection device includes a lower and upper connection element, and two protrusions that project at right angles to the box and are connected to the lower connection element.
The suspension bridge erection equipment according to claim 8.
滑車ユニットを有し、
該滑車ユニットは、内部に滑車機構を有するケージフレームを与えられ、該滑車機構は、前記ケージフレームに対して固定され、前記ケージフレームは、前記橋モジュールに対する接続のための接続装置を与えられる、
ことを特徴とする吊橋架設設備。 A suspension bridge installation facility comprising the bridge module according to any one of claims 1 to 6,
A pulley unit,
The pulley unit is provided with a cage frame having a pulley mechanism therein, the pulley mechanism is fixed to the cage frame, and the cage frame is provided with a connection device for connection to the bridge module,
Suspension bridge erection equipment characterized by this.
該接続モジュールは、前記橋モジュール、前記更なる橋モジュール、及び/又は作業ケージのフロアにおける穴に係合するための4つの垂直接続ピンを有する下方部と、側部及びレストが接続され得る2つの脚部とを有する、
ことを特徴とする請求項7,8,9又は10記載の吊橋架設設備。 The suspension bridge installation facility has at least one connection module capable of connecting the bridge module to a working cage or further bridge module belonging to the suspension bridge installation facility,
The connection module can be connected to the lower part with four vertical connection pins for engaging the hole in the bridge module, the further bridge module and / or the floor of the work cage, the side and the rest 2 Having two legs,
The suspension bridge erection facility according to claim 7, 8, 9 or 10.
ことを特徴とする請求項11記載の吊橋架設設備。 Each leg has two parts that are hinged together, which parts can be locked together with a locking pin, the locking pin being moved to clamp in a hole in one of the parts obtain,
The suspension bridge erection facility according to claim 11.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NL2000425A NL2000425C1 (en) | 2007-01-10 | 2007-01-10 | Bridge module for a suspension bridge installation, as well as suspension bridge installation provided with the bridge module. |
NL2000425 | 2007-01-10 | ||
PCT/NL2008/050021 WO2008085051A1 (en) | 2007-01-10 | 2008-01-10 | Bridge module |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2010515845A true JP2010515845A (en) | 2010-05-13 |
JP5538900B2 JP5538900B2 (en) | 2014-07-02 |
Family
ID=39246776
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2009545509A Expired - Fee Related JP5538900B2 (en) | 2007-01-10 | 2008-01-10 | Bridge module |
Country Status (8)
Country | Link |
---|---|
US (2) | US20090321185A1 (en) |
EP (1) | EP2102432A1 (en) |
JP (1) | JP5538900B2 (en) |
CN (1) | CN101680232A (en) |
AU (1) | AU2008203985B2 (en) |
CA (1) | CA2675294A1 (en) |
NL (1) | NL2000425C1 (en) |
WO (1) | WO2008085051A1 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101845884B (en) * | 2010-05-21 | 2012-01-11 | 四川华山建筑有限公司 | Synchronous lifting control method of attached lifting scaffold |
NL2022888B1 (en) | 2019-04-05 | 2020-10-08 | Altrex Bv | Platform for a suspension bridge |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1462541A (en) * | 1923-04-13 | 1923-07-24 | Richard D Gallagher | Portable bridge |
JPH1088787A (en) * | 1996-09-10 | 1998-04-07 | Nissei Ltd | Knocked-down gondola in elevatable parking device |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US498178A (en) * | 1893-05-23 | William valentine leonard | ||
US2507965A (en) * | 1946-05-25 | 1950-05-16 | Gen Motors Corp | Hinge |
US3359594A (en) * | 1965-04-02 | 1967-12-26 | Pastoor Beno Johannes | Folding closures |
GB1205591A (en) * | 1967-04-17 | 1970-09-16 | Stephens And Carter Ltd | Sectional working platforms or stagings |
US3907066A (en) * | 1974-06-21 | 1975-09-23 | Robert E Newton | Wing-type scaffold system |
US4315345A (en) * | 1980-01-03 | 1982-02-16 | Schijf Hendrikus J | Profiled hinge joint |
FR2669474B1 (en) * | 1990-11-19 | 1993-06-18 | Electricite De France | MODULAR HELICOPTERED PLATFORM, INTENDED TO BE DEPOSITED ON AERIAL CABLES. |
FR2675964B1 (en) * | 1991-04-29 | 1995-03-10 | Electricite De France | HELIPORTED NACELLE AND METHOD FOR REPLACING A SLEEVE ON AN AERIAL CABLE. |
US5617931A (en) * | 1994-08-11 | 1997-04-08 | L. E. Zygmun And Company, Inc. | Modular scaffolding system |
CA2147199A1 (en) * | 1995-04-18 | 1996-10-19 | Vittorio De Zen | Extruded hinge members and folding doors formed therefrom |
EP0824166A3 (en) * | 1996-08-14 | 1998-10-28 | Krupp Fördertechnik GmbH | Troughbridge |
FR2779763B1 (en) * | 1998-06-12 | 2000-08-11 | Fit Carrosserie | SECTIONAL CLOSING DOOR |
JP4147340B2 (en) * | 2000-04-03 | 2008-09-10 | 長谷川工業株式会社 | Tubing device |
BE1013678A3 (en) * | 2000-09-20 | 2002-06-04 | Power Climber Bv Met Beperkte | Improvements to workmen's cradles |
US6513862B2 (en) * | 2000-11-17 | 2003-02-04 | Fukuvi Usa, Inc. | Door panel and door assembly |
US20070163731A1 (en) * | 2006-01-17 | 2007-07-19 | Chiu Jou Aluminium Co., Ltd. | Overlap of one pair of semicircles for the folding combining structure |
US7607513B1 (en) * | 2007-11-29 | 2009-10-27 | Elmo Rojas | Telescoping lifting hand truck with a folding platform |
-
2007
- 2007-01-10 NL NL2000425A patent/NL2000425C1/en not_active IP Right Cessation
-
2008
- 2008-01-10 WO PCT/NL2008/050021 patent/WO2008085051A1/en active Application Filing
- 2008-01-10 AU AU2008203985A patent/AU2008203985B2/en not_active Ceased
- 2008-01-10 EP EP08705090A patent/EP2102432A1/en not_active Withdrawn
- 2008-01-10 JP JP2009545509A patent/JP5538900B2/en not_active Expired - Fee Related
- 2008-01-10 CA CA002675294A patent/CA2675294A1/en not_active Abandoned
- 2008-01-10 CN CN200880002017.3A patent/CN101680232A/en active Pending
-
2009
- 2009-07-09 US US12/500,309 patent/US20090321185A1/en not_active Abandoned
-
2012
- 2012-12-18 US US13/719,226 patent/US20130153337A1/en not_active Abandoned
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1462541A (en) * | 1923-04-13 | 1923-07-24 | Richard D Gallagher | Portable bridge |
JPH1088787A (en) * | 1996-09-10 | 1998-04-07 | Nissei Ltd | Knocked-down gondola in elevatable parking device |
Also Published As
Publication number | Publication date |
---|---|
EP2102432A1 (en) | 2009-09-23 |
US20130153337A1 (en) | 2013-06-20 |
WO2008085051A1 (en) | 2008-07-17 |
JP5538900B2 (en) | 2014-07-02 |
CA2675294A1 (en) | 2008-07-17 |
US20090321185A1 (en) | 2009-12-31 |
NL2000425C1 (en) | 2008-07-11 |
AU2008203985B2 (en) | 2014-02-20 |
AU2008203985A1 (en) | 2008-07-17 |
CN101680232A (en) | 2010-03-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7628563B2 (en) | Fitting for a T-slot structure | |
US9062448B2 (en) | Pivotally erectable structural frame system | |
US10704276B2 (en) | Access structure integration assembly and integrated access systems and methods of using the same | |
WO2016006063A1 (en) | Elevator car and method for assembling same | |
KR200432482Y1 (en) | The assembly scaffolding | |
US10435895B2 (en) | Adjustable platform extension bracket for work platform systems and related methods | |
US20180127244A1 (en) | Elevator counterweight assembly | |
JP2010515845A (en) | Bridge module | |
JP6241967B2 (en) | Access structure integrated assembly and integrated access system and method of using the same | |
JP6520533B2 (en) | Overhead crane support device and load receiving member | |
JP2016069815A (en) | Foldable unit house | |
JP5837332B2 (en) | Working staircase for stairs | |
KR100728668B1 (en) | The stage for a scaffolding | |
JP5260844B2 (en) | Multipurpose stage | |
JP6846098B2 (en) | Beam frame mounting structure, beam frame receiving member and beam frame passing member used for this | |
JP2008088666A (en) | Balcony unit | |
KR20180002609U (en) | Installation set of safety net for exit of apartment | |
JP6762531B2 (en) | Ladder device with pinch device and pinch device | |
JP6573946B2 (en) | Access structure integrated assembly and integrated access system and method of using the same | |
KR100758349B1 (en) | Working deck for installing outer wall of apartment | |
JP6491895B2 (en) | Reinforcement frame for temporary structures | |
KR20220078561A (en) | Monorail systems and related scaffolding structures, systems and methods of use | |
KR200378230Y1 (en) | die | |
KR20090008787U (en) | The fixing structure of cages guide bar for contructing gangfoom | |
JP2011219965A (en) | Construction machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20110105 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20120104 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20120820 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20120904 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20121204 |
|
A602 | Written permission of extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A602 Effective date: 20121211 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20130104 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20130121 |
|
A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20130123 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20130123 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20130709 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20131007 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20140408 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5538900 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20140430 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |