JP2010189872A - Door frame and construction method - Google Patents

Door frame and construction method Download PDF

Info

Publication number
JP2010189872A
JP2010189872A JP2009033184A JP2009033184A JP2010189872A JP 2010189872 A JP2010189872 A JP 2010189872A JP 2009033184 A JP2009033184 A JP 2009033184A JP 2009033184 A JP2009033184 A JP 2009033184A JP 2010189872 A JP2010189872 A JP 2010189872A
Authority
JP
Japan
Prior art keywords
frame
door
opening
wall surface
frame body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2009033184A
Other languages
Japanese (ja)
Inventor
Shigenobu Fujishin
成信 藤新
Atsushi Katayama
篤 片山
Naozumi Nishida
直純 西田
Ryu Imuta
龍 井無田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nissho Industry Co Ltd
Original Assignee
Nissho Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nissho Industry Co Ltd filed Critical Nissho Industry Co Ltd
Priority to JP2009033184A priority Critical patent/JP2010189872A/en
Publication of JP2010189872A publication Critical patent/JP2010189872A/en
Pending legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a door frame having both adaptability capable of responding to an error in the wall thickness of an opening part and satisfactory workability, and a construction method of the door frame. <P>SOLUTION: The door frame 1 includes halved first frame bodies 111 and 121 to be provided on an opening edge on one wall surface S1 side of an opening K, and halved second frame bodies 112 and 122 provided on an opening edge on the other wall surface S2 side thereof. Each of the first frame bodies 111 and 121 includes a door stop part 111a, 121a formed at the tip inside the opening K and a holding part 111b, 121b holding an overlap part with the door stop part 111a, 121a. The door frame 1 can be attached even after putting a wall panel P by attaching the first frame bodies 111 and 121 from the one wall surface S1 side, fixing column members Kx and beam members Ky within a fixing space R, and fitting the second frame bodies 112 and 122 to the first frame bodies 111 and 121 from the other wall surface S2 side. <P>COPYRIGHT: (C)2010,JPO&amp;INPIT

Description

本発明は、壁面の開口に設けられる扉を開閉自在に保持する扉枠およびその施工方法に関する。   The present invention relates to a door frame that holds a door provided at an opening of a wall surface so as to be freely opened and closed, and a construction method thereof.

オフィスビルやテナントビル、マンションなどにおいては、出入口として壁面の開口部に扉が設けられる。この扉は開口部に設置される扉枠により開閉自在に保持される。
このような扉枠について、開口部の一方の壁面側に設けられる前枠と、他方の壁面側と設けられる後枠との、二つの枠体から形成された特許文献1に記載されたものが知られている。
In an office building, a tenant building, a condominium, etc., a door is provided at the opening of the wall surface as an entrance. This door is held openably and closable by a door frame installed in the opening.
About such a door frame, what was described in patent document 1 formed from the two frames of the front frame provided in the one wall surface side of an opening part, and the rear frame provided in the other wall surface side is described. Are known.

特許文献1に記載の建具枠は、二分割された前枠と後枠の組合せから成り、前枠の内側面に戸当たりが一連にG形状に形成され、戸当たりのリップ部が後枠の内側面に接して見込み寸法の調整を自在とすることで、取り付け壁の厚みの大小または途中段階での変更でも適用させることができるものである。この特許文献1に記載の建具枠であれば、周辺壁の種別や厚みの決定時期によらず、壁厚の変更や不具合に柔軟に対応でき、予め前枠と後枠とを作製して準備しておくことが可能である。   The joinery frame described in Patent Document 1 is composed of a combination of a front frame and a rear frame that are divided into two parts, door stops are formed in a G shape in series on the inner surface of the front frame, and the lip portion of the door stop is the rear frame. By adjusting the expected dimension in contact with the inner side surface, the thickness of the mounting wall can be adjusted, or even a change in the middle stage can be applied. With the joinery frame described in Patent Document 1, it is possible to flexibly deal with changes in wall thicknesses and problems, regardless of the type of peripheral wall and the determination time of the thickness, and prepare by preparing a front frame and a rear frame in advance. It is possible to keep it.

特開2006−316446号公報JP 2006-316446 A

特許文献1に記載の建具枠では、前枠と後枠とを溶接またはボルトとナットとで結合した後に、壁の開口部に配置し、繋ぎ材を介して下地養生材(柱)と接合しているので、取り付ける順序としては、まず柱に結合した前枠と後枠とを、繋ぎ材を介して接合した後に、壁ボード材(壁面パネル)を建て付けることになる。   In the joinery frame described in Patent Document 1, the front frame and the rear frame are welded or joined to each other with bolts and nuts, then placed in the opening of the wall, and joined to the base curing material (column) through the connecting material. Therefore, as a mounting order, first, the front frame and the rear frame coupled to the pillar are joined via the connecting material, and then the wall board material (wall panel) is built.

しかし、柱を建てる作業者と、壁面パネルを貼る作業者とは、同じ作業者であることが多いため、まず、開口部を形成する柱を建て、この柱に扉枠を接合し、そして壁面パネルを建て付けるという手順では、柱を建てた作業者は、扉枠の施工が完了するまで待たなくてはならない。   However, since the worker who builds the pillar and the worker who sticks the wall panel are often the same worker, first build the pillar that forms the opening, join the door frame to this pillar, and In the procedure of building a panel, the worker who built the pillar must wait until the door frame construction is completed.

例えば、扉枠の設置工事が遅れたり、設置が必要な扉枠の数が多かったりすると、壁面パネルを貼るまでの手待ちの期間が長くなる。作業者は、手待ちの期間が長くなることで他の現場での作業に入ることがあるが、他の現場での作業が遅延してしまうと、扉枠の設置が完了して壁面パネルの建て付け待ちとなっても、今度は他の現場から抜けることができず、壁面パネルを貼る現場に戻れなくなってしまう。そうなると、工程の調整や管理が非常に厳しい状況になってしまう。従って、業種の異なるそれぞれの作業者が、出戻りすることなく順序よく施工現場で作業を行うことができる高い施工性を有する扉枠が望まれている。   For example, if the installation work of the door frame is delayed or the number of door frames that need to be installed is large, the waiting period until the wall panel is pasted becomes long. Workers may enter work at other sites due to the longer waiting period, but if the work at other sites is delayed, the installation of the door frame is completed and the wall panel is installed. Even if it is waiting to be built, it will not be possible to exit from the other site, and it will not be possible to return to the site where the wall panel is pasted. Then, the process adjustment and management will be very difficult. Accordingly, there is a demand for a door frame having high workability that enables workers of different industries to perform work on a construction site in order without going back and forth.

そこで本発明は、開口部の壁厚に誤差が生じても対応することができる対応性と、良好な施工性とを兼ね備えた扉枠および扉枠の施工方法を提供することを目的とする。   Then, an object of this invention is to provide the construction method of the door frame and the door frame which has the compatibility which can respond even if an error arises in the wall thickness of an opening part, and favorable workability | operativity.

本発明の扉枠は、壁面の開口部の一方の壁面側の開口縁部に設けられる第1枠体と、前記開口部の他方の壁面側の開口縁部に設けられる第2枠体とを備え、前記第1枠体には、開口部内側の先端に設けられた戸当たり部と、前記戸当たり部の裏側に設けられ、前記戸当たり部と重なり合う前記第2枠体の内側先端部分を裏側から前記戸当たり部と共に挟み込む保持部とが形成されていることを特徴とする。   The door frame of the present invention includes a first frame provided at an opening edge on one wall surface side of the opening of the wall surface, and a second frame provided at an opening edge on the other wall surface side of the opening. The first frame body includes a door stop portion provided at the front end inside the opening, and an inner front end portion of the second frame body provided on the back side of the door stop portion and overlapping the door stop portion. A holding portion that is sandwiched together with the door stop portion from the back side is formed.

また、本発明の扉枠の施工方法は、壁面の開口部の一方の壁面側の開口縁部に設けられる第1枠体と、前記開口部の他方の壁面側の開口縁部に設けられる第2枠体とを備えた扉枠を前記開口部へ取り付ける方法であって、前記開口部内側の先端に設けられた戸当たり部と、前記戸当たり部の裏側に設けられ、前記戸当たり部と重なり合う前記第2枠体の内側先端部分を裏側から前記戸当たり部と共に挟み込む保持部とが形成された第1枠体を、前記一方の壁面側から配置する工程と、前記第1枠体を前記開口部に固定する工程と、前記第2枠体を前記他方の壁面側から前記開口部へ配置して、前記第2枠体の内側先端部分を前記戸当たり部と前記保持部との間に挿入する工程と、前記第2枠体を前記開口部に固定する工程とを含むことを特徴とする。   Further, the door frame construction method of the present invention includes a first frame body provided at an opening edge portion on one wall surface side of the opening portion of the wall surface and an opening edge portion provided on the other wall surface side of the opening portion. A method of attaching a door frame comprising two frame bodies to the opening, wherein the door stop is provided at the front end inside the opening, provided on the back side of the door stop, and the door stop A step of disposing from the one wall surface side a first frame formed with a holding portion that sandwiches the inner end portion of the second frame overlapping with the door stop from the back side; and A step of fixing to the opening, and disposing the second frame body from the other wall surface side to the opening, and placing an inner front end portion of the second frame body between the door stop portion and the holding portion. Including a step of inserting and a step of fixing the second frame to the opening. To.

本発明の扉枠は、第1枠体と第2枠体との2つの枠体から形成されている。第1枠体は、壁面の開口部の一方の壁面側の開口縁部に設けられる。第2枠体は、開口部の他方の壁面側の開口縁部に設けられる。この2つの枠体を開口部に設置するときには、第1枠体を、一方の壁面側から配置した後に、第1枠体を開口部に固定する。次に、第2枠体を他方の壁面側から開口部へ配置して、第2枠体の内側先端部分を、開口部内側の先端に設けられた戸当たり部と保持部との間に挿入する。戸当たり部の裏側に設けられた保持部は、戸当たり部と重なり合う第2枠体の内側先端部分を裏側から戸当たり部と共に挟み込むので、扉枠を開口部に設置するより以前に、第1枠体と第2枠体とを連結する必要がない。従って、壁面ができた後に、扉枠の施工が可能である。また、戸当たり部と保持部とで第2枠体を挟み込んでいるだけなので、開口部の施工誤差が原因で、壁厚が厚くなったり、薄くなったりしても、戸当たり部と第2枠体の内側先端部分との重なり合い度合いが変わるだけである。従って、外観からは重なり度合いが変わったことが戸当たり部に隠れて判別できないので、開口部の壁厚に誤差が生じても対応することができる。   The door frame of the present invention is formed of two frames, a first frame and a second frame. The first frame body is provided at an opening edge portion on one wall surface side of the opening portion of the wall surface. A 2nd frame is provided in the opening edge part of the other wall surface side of an opening part. When these two frames are installed in the opening, the first frame is fixed to the opening after the first frame is arranged from one wall surface side. Next, the second frame is arranged from the other wall surface side to the opening, and the inner front end portion of the second frame is inserted between the door stop provided at the front end of the opening and the holding portion. To do. The holding portion provided on the back side of the door stop portion sandwiches the inner front end portion of the second frame that overlaps with the door stop portion together with the door stop portion from the back side, so that the first before the door frame is installed in the opening portion. There is no need to connect the frame and the second frame. Therefore, the door frame can be constructed after the wall surface is formed. In addition, since the second frame body is only sandwiched between the door stop portion and the holding portion, even if the wall thickness becomes thicker or thinner due to the construction error of the opening portion, Only the degree of overlap with the inner tip portion of the frame changes. Therefore, it can be determined from the appearance that the degree of overlap is hidden behind the door stop, so that even if an error occurs in the wall thickness of the opening, it can be dealt with.

前記第1枠体は、壁面パネルによる一方の壁面側から開口部内側へ延び、枠部材により形成された前記開口部の内側面と前記第1枠体の裏側面との間に固定用空間を確保する略L字状に形成され、前記第2枠体は、壁面パネルによる他方の壁面側から開口部内側へ延び、前記戸当たり部と前記保持部との間に挿入可能とした略L字状に形成されているのが望ましい。
第1枠体は、壁面パネルによる一方の壁面側から開口部内側へ延びた略L字状に形成されているが、開口部を形成する枠部材と第1枠体の裏側面との間には固定用空間が確保された形状なので、壁面を形成する壁面パネルが開口部を形成する枠部材に建て付けられた後でも、第1枠体を枠部材に固定することができる。そして、第2枠体は、他方の壁面側から開口部内側へ延びた略L字状に形成されているので、第1枠体を固定した後に、第2枠体を他方の壁面側から第1枠体の戸当たり部と前記保持部との間に挿入して固定することができる。
The first frame extends from one wall surface side of the wall panel to the inside of the opening, and a fixing space is formed between the inner side surface of the opening formed by the frame member and the back side surface of the first frame body. The second frame is formed in a substantially L-shape to be secured, and the second frame extends from the other wall surface side of the wall panel to the inside of the opening and can be inserted between the door stop portion and the holding portion. It is desirable to be formed in a shape.
The first frame is formed in a substantially L shape extending from one wall surface side to the inside of the opening by the wall surface panel, but between the frame member forming the opening and the back side surface of the first frame. Since the fixing space is secured, the first frame can be fixed to the frame member even after the wall panel forming the wall surface is built on the frame member forming the opening. And since the 2nd frame is formed in the substantially L shape extended from the other wall side to the opening part inner side, after fixing the 1st frame, the 2nd frame is changed from the other wall side. It can be inserted and fixed between the door stop portion of the one frame body and the holding portion.

前記第1枠体に裏側面に配置される第1連結部材と、該第1連結部材と連結可能な前記枠部材の位置に配置され、ねじ部材により前記枠部材と接続される第2連結部材とを備え、前記第1連結部材と前記第2連結部材とは前記固定空間内でねじ部材により連結されているのが望ましい。第1連結部材と第2連結部材とで第1枠体と枠部材とを連結することで、溶接を使うことなく固定することができる。   A first connecting member disposed on the back side of the first frame body, and a second connecting member disposed at a position of the frame member connectable to the first connecting member and connected to the frame member by a screw member Preferably, the first connecting member and the second connecting member are connected by a screw member in the fixed space. It can fix, without using welding by connecting a 1st frame and a frame member with a 1st connection member and a 2nd connection member.

前記第1枠体の裏側面と前記枠部材の取付面とに相互に接するS字状の連結部材が前記固定空間内に設けられ、前記S字状の連結部材は、前記第1枠体と前記枠部材とにねじ部材により連結することも可能である。S字状の連結部材により第1枠体と枠部材とを連結することで、溶接を使うことなく固定することができる。   An S-shaped connecting member that is in contact with a back side surface of the first frame and a mounting surface of the frame member is provided in the fixed space, and the S-shaped connecting member is connected to the first frame. It is also possible to connect to the frame member by a screw member. It can fix without using welding by connecting a 1st frame and a frame member by a S-shaped connection member.

前記第2枠体を前記枠部材に固定するための固定治具が設けられ、前記固定治具は、前記第2枠体と前記枠部材との間に空間を確保する筒状のスペーサ部材と、前記第2枠体から前記スペーサ部材を挿通して、前記枠部材に螺着するねじ部材とを備えているのが望ましい。第1枠体には固定用空間が確保されているため、第2枠体を第1枠体と接続した状態では第2枠体と枠部材との間に空間ができる。従って、第2枠体を枠材に固定するときに、単に平ねじで固定すると第2枠体の表面が凹むおそれがある。そこで、第2枠体と枠部材との間に空間を確保するスペーサ部材をねじ部材が挿通して枠部材へ螺着する固定治具を用いることで、第2枠体と枠部材との間の空間を確保した状態で、第2枠体を枠部材に固定することができる。   A fixing jig for fixing the second frame body to the frame member is provided, and the fixing jig includes a cylindrical spacer member that secures a space between the second frame body and the frame member. It is desirable that a screw member inserted through the spacer member from the second frame body and screwed to the frame member is provided. Since a fixing space is secured in the first frame body, a space is formed between the second frame body and the frame member in a state where the second frame body is connected to the first frame body. Therefore, when the second frame is fixed to the frame member, the surface of the second frame may be recessed if it is simply fixed with a flat screw. Therefore, by using a fixing jig in which a screw member is inserted into a spacer member that secures a space between the second frame and the frame member and is screwed to the frame member, the space between the second frame and the frame member is used. The second frame can be fixed to the frame member in a state in which the space is secured.

前記第1枠体および/または前記第2枠体は、縦枠部と横枠部との接続が、それぞれ分離可能に形成されていると、第1枠体および/または第2枠体のそれぞれの縦枠部と横枠部とを分離した状態で保管したり、施工現場へ搬入したりすることができるので、広い保管場所が不要であり、搬送も容易である。   When the first frame body and / or the second frame body are formed so that the connection between the vertical frame portion and the horizontal frame portion is separable, the first frame body and / or the second frame body respectively. Since the vertical frame portion and the horizontal frame portion can be stored in a separated state or can be carried into the construction site, a large storage place is not required and transportation is easy.

本発明の構成によれば、戸当たり部と重なり合う第2枠体の内側先端部分を裏側から戸当たり部と共に挟み込むので、壁面ができた後に、扉枠の施工が可能である。また、本発明の構成によれば、壁厚に誤差が生じても、外観からは重なり度合いが変わったことが戸当たり部に隠れて判別できないので、開口部の壁厚に誤差が生じても対応することができる。従って、本発明は、開口部の壁厚に誤差が生じても対応することができる対応性と、良好な施工性とを兼ね備えることができる。   According to the structure of this invention, since the inner side front-end | tip part of the 2nd frame which overlaps with a door stop part is inserted | pinched with a door stop part from the back side, construction of a door frame is possible after a wall surface is made. Further, according to the configuration of the present invention, even if an error occurs in the wall thickness, it can not be determined from the appearance that the degree of overlap is hidden behind the door stop, so even if an error occurs in the wall thickness of the opening. Can respond. Therefore, the present invention can have both the compatibility that can cope with an error in the wall thickness of the opening and the good workability.

本発明の実施の形態に係る扉枠に扉を装着した状態を示す図であり、(A)は正面図、(B)は水平断面図である。It is a figure which shows the state which mounted | wore the door frame which concerns on embodiment of this invention, (A) is a front view, (B) is a horizontal sectional view. 図1に示す扉枠および扉のA−A線断面図である。It is the AA sectional view taken on the line of a door frame and a door shown in FIG. 図1に示す扉枠および扉のB−B線断面図である。It is a BB sectional drawing of a door frame and a door shown in FIG. フック板を示す平面図である。It is a top view which shows a hook board. 蝶番部分の扉枠の取り付け構造を示す図であり、(A)は図1に示すはC−C線の一部断面図、(B)はコ字板を示す斜視図、(C)L字板を示す斜視図である。It is a figure which shows the attachment structure of the door frame of a hinge part, (A) is a partial sectional view of CC line shown in FIG. 1, (B) is a perspective view which shows a U-shaped board, (C) L-shape It is a perspective view which shows a board. 第2枠体の固定状態を説明するための図である。It is a figure for demonstrating the fixed state of a 2nd frame. 第1枠体の端部を示す図であり、(A)は長手方向に沿って見た図、(B)は(A)のD−D線矢視図である。It is a figure which shows the edge part of a 1st frame, (A) is the figure seen along the longitudinal direction, (B) is the DD arrow line view of (A). 溶接により第1枠体を柱部材に固定する場合を示す図であり、(A)は垂直断面図、(B)は水平断面図である。It is a figure which shows the case where a 1st frame is fixed to a column member by welding, (A) is a vertical sectional view, (B) is a horizontal sectional view. 本発明の実施の形態に係る扉枠の変形例を示す水平断面図である。It is a horizontal sectional view showing a modification of a door frame according to an embodiment of the present invention. 本発明の実施の形態に係る扉枠の変形例を示す垂直断面図である。It is a vertical sectional view showing a modification of the door frame according to the embodiment of the present invention.

本発明の実施の形態に係る扉枠を図1から図8に基づいて説明する
図1(A)および同図(B)に示すように、本実施の形態に係る扉枠1は、鋼板を折り曲げて形成され、壁面S1,S2の開口部Kに設けられる開き戸2を、3ヵ所に取り付けられた蝶番Hにより開閉自在に保持するものである。この開き戸2は、高さが約2m,幅が0.9mの矩形状に形成されている。
The door frame which concerns on embodiment of this invention is demonstrated based on FIGS. 1-8 As shown to FIG. 1 (A) and the same figure (B), the door frame 1 which concerns on this Embodiment is a steel plate. The hinged door 2 formed by bending and provided in the opening K of the wall surfaces S1 and S2 is held openably and closable by hinges H attached at three locations. The hinged door 2 is formed in a rectangular shape having a height of about 2 m and a width of 0.9 m.

この開口部Kは、図2および図3に示すように、枠部材である断面C形の軽量鉄骨製(C型鋼)による2本の柱部材Kx,Kxと、柱部材Kx,Kxに架設されたC型鋼による梁部材Kyとで形成されている。床Fに対して立設されている柱部材Kxには、C型鋼による補強部材Kzが設けられている。柱部材Kx,Kxと梁部材Kyおよび補強部材Kzは、壁面S1,S2を形成する壁面パネルPにより外装されている。壁面パネルPは、設計により2枚重ね、3枚重ねとすることがあるが、本実施の形態では、両側を1枚の壁面パネルPで覆っている。   As shown in FIGS. 2 and 3, the opening K is installed on two column members Kx and Kx made of a lightweight steel frame (C-shaped steel) having a C-shaped cross section as a frame member, and the column members Kx and Kx. And a beam member Ky made of C-shaped steel. The column member Kx that is erected with respect to the floor F is provided with a reinforcing member Kz made of C-shaped steel. The column members Kx, Kx, the beam member Ky, and the reinforcing member Kz are covered with a wall surface panel P that forms the wall surfaces S1, S2. Depending on the design, the wall panel P may be stacked two or three, but in this embodiment, both sides are covered with one wall panel P.

扉枠1は、柱部材Kx,Kxに取り付けられる縦枠部11,11と梁部材Kyに取り付けられる横枠部12とで形成された三方枠である。縦枠部11は、第1枠体111と、第2枠体112とで2分割され、横枠部12は、第1枠体121と第2枠体122とで2分割されている。   The door frame 1 is a three-way frame formed by vertical frame portions 11 and 11 attached to the column members Kx and Kx and a horizontal frame portion 12 attached to the beam member Ky. The vertical frame part 11 is divided into two parts by a first frame body 111 and a second frame body 112, and the horizontal frame part 12 is divided into two parts by a first frame body 121 and a second frame body 122.

第1枠体111,121は、開口部Kの一方の壁面S1側の開口縁部に設けられる。第1枠体111,121は、断面が全体的に略L字状に形成されている。詳細には、第1枠体111,121は、壁面パネルPによる一方の壁面S1側から開口部K内側へ延びるように形成され、柱部材Kxと梁部材Kyとで形成されたコ字状の開口部の内側面と第1枠体111,121の裏側面との間に固定用空間Rが確保されている。   The first frame bodies 111 and 121 are provided at the opening edge portion on the one wall surface S1 side of the opening K. The first frames 111 and 121 have a substantially L-shaped cross section as a whole. Specifically, the first frames 111 and 121 are formed so as to extend from one wall surface S1 side by the wall surface panel P to the inside of the opening K, and are formed in a U-shape formed by the column member Kx and the beam member Ky. A fixing space R is secured between the inner side surface of the opening and the back side surfaces of the first frame bodies 111 and 121.

第1枠体111,121には、開口部K内側の先端に戸当たり部111a,121aが設けられている。また、第1枠体111,121には、戸当たり部111a,121aの裏側に、保持部111b,121bが設けられている。この保持部111b,121bは、戸当たり部111a,121aの先端に、戸当たり部111a,121aの下端から上端までの長さの略U字状に屈曲させた板体を溶接することで形成されている。   The first frame bodies 111, 121 are provided with door stop portions 111a, 121a at the inner ends of the openings K. The first frame bodies 111 and 121 are provided with holding portions 111b and 121b on the back side of the door stop portions 111a and 121a. The holding portions 111b and 121b are formed by welding a plate body bent in a substantially U shape having a length from the lower end to the upper end of the door stop portions 111a and 121a at the tips of the door stop portions 111a and 121a. ing.

第1枠体111,121には、戸当たり部111a,121aの裏側面から固定用空間Rに向かって延びる係止部材131(第1連結部材)が溶接されている。この係止部材131は、柱部材Kxおよび梁部材Kyにねじ止めされたフック板132(第2連結部材)の先端に引っ掛けられている。ここで、フック板132について、図4に基づいて説明する。フック板132は、折り曲げられ、係止部材131と係止するフック部132aが設けられた一端部側とは反対側の他端側に、ねじ止め用の貫通孔が3ヵ所設けられている。このねじ止め用の貫通孔は、2つの長孔132bと2つの長孔132bの間に位置する丸孔132cとが形成されている。   The first frame members 111 and 121 are welded with locking members 131 (first connecting members) extending from the back side surfaces of the door stop portions 111a and 121a toward the fixing space R. The locking member 131 is hooked on the tip of a hook plate 132 (second connecting member) that is screwed to the column member Kx and the beam member Ky. Here, the hook plate 132 will be described with reference to FIG. The hook plate 132 is bent, and three through holes for screwing are provided on the other end side opposite to the one end side provided with the hook portion 132a to be engaged with the engaging member 131. This screwing through hole is formed with two elongated holes 132b and a round hole 132c positioned between the two elongated holes 132b.

この係止部材131およびフック板132は、横枠部12の中央部に設けられている。また、係止部材131およびフック板132は、縦枠部11に4ヵ所設けられている。ここで係止部材131およびフック板132の取り付け位置について詳細に説明する。係止部材131およびフック板132は、図1(A)に示すように、蝶番Hが設けられている3ヵ所の間の2ヵ所と、上端および蝶番Hの間と、下端および蝶番の間との合計4ヵ所に設けられている。   The locking member 131 and the hook plate 132 are provided in the central portion of the horizontal frame portion 12. Further, the locking member 131 and the hook plate 132 are provided in four places on the vertical frame portion 11. Here, the attachment positions of the locking member 131 and the hook plate 132 will be described in detail. As shown in FIG. 1 (A), the locking member 131 and the hook plate 132 are provided at two places between the three places where the hinge H is provided, between the upper end and the hinge H, and between the lower end and the hinge. There are a total of 4 locations.

図5(A)〜同図(C)に示すように、蝶番Hが設けられる位置には、コ字板141(第1連結具)が、ねじ部材N1によりねじ止めすることで、第1枠体111に取り付けられている。コ字板141の両側端部には、補強用の矩形状のリブ板141a,141aが設けられている。
また、L字板142(第2連結具)が、柱部材Kxに設けられている。このL字板142の両側端部には、補強の三角形状のリブ板142a,142aが設けられている。L字板142は、柱部材Kxにねじ止めされている。
コ字板141とL字板142とは、柱部材Kxまたは第1枠体111の各面に対しての立設面同士が突き合わされた状態でねじ止めされている。そして、コ字板141とL字板142の対向面同士を突き合わせた状態で、L字板142側からねじ部材N2を挿通させてねじ止めすることで、柱部材Kxと第1枠体111とが固定されている。
As shown in FIGS. 5A to 5C, the U-shaped plate 141 (first connector) is screwed with the screw member N1 at the position where the hinge H is provided, so that the first frame It is attached to the body 111. Reinforcing rectangular rib plates 141 a and 141 a are provided at both side ends of the U-shaped plate 141.
Further, an L-shaped plate 142 (second connector) is provided on the column member Kx. Reinforcing triangular rib plates 142 a and 142 a are provided at both ends of the L-shaped plate 142. The L-shaped plate 142 is screwed to the column member Kx.
The U-shaped plate 141 and the L-shaped plate 142 are screwed in a state in which the standing surfaces with respect to each surface of the column member Kx or the first frame body 111 are abutted with each other. Then, in a state where the opposing surfaces of the U-shaped plate 141 and the L-shaped plate 142 are abutted with each other, the screw member N2 is inserted from the L-shaped plate 142 side and is screwed, so that the column member Kx and the first frame 111 and Is fixed.

本実施の形態では、蝶番Hが設けられる位置に、コ字板141が、第1枠体111と柱部材Kxとの連結に用いられているが、強度が確保できるなら、全部を係止部材131とフック板132との連結としてもよい。   In the present embodiment, the U-shaped plate 141 is used to connect the first frame body 111 and the column member Kx at the position where the hinge H is provided. 131 and hook plate 132 may be connected.

図2および図3に示すように、第2枠体112,122は、開口部Kの他方の壁面S2側の開口縁部に設けられる。第2枠体112,122は、断面が全体的に略L字状に形成されている。詳細には、第2枠体112,122は、壁面パネルPによる他方の壁面S2側から開口部内側へ延び、戸当たり部111a,121aと保持部111b,121bとの間に挿入されている。   As shown in FIGS. 2 and 3, the second frame bodies 112 and 122 are provided at the opening edge of the opening K on the other wall surface S <b> 2 side. The second frames 112 and 122 have a generally L-shaped cross section as a whole. Specifically, the second frame bodies 112 and 122 extend from the other wall surface S2 side of the wall panel P to the inside of the opening, and are inserted between the door stop portions 111a and 121a and the holding portions 111b and 121b.

ここで、第2枠体112,122を柱部材Kxと梁部材Kyに固定する固定治具について、図6に基づいて説明する。なお、図6においては、梁部材Kyに横枠部12が固定されている状態を示しており、柱部材Kxに縦枠部11が固定されている状態は、梁部材Kyが柱部材Kxに代わり、横枠部12の第2枠体122が縦枠部11の第2枠体112に代わるだけなので省略している。   Here, a fixing jig for fixing the second frames 112 and 122 to the column member Kx and the beam member Ky will be described with reference to FIG. FIG. 6 shows a state in which the horizontal frame portion 12 is fixed to the beam member Ky, and a state in which the vertical frame portion 11 is fixed to the column member Kx indicates that the beam member Ky is fixed to the column member Kx. Instead, the second frame 122 of the horizontal frame portion 12 is simply replaced with the second frame 112 of the vertical frame portion 11 and is omitted.

図6に示すように、第2枠体122は、梁部材Kyに固定治具15により固定されている。この固定治具15は、固定用空間Rと連通する第2枠体122と梁部材Kyとの隙間(空間)を確保するための筒状のスペーサ部材151と、第2枠体122からスペーサ部材151を挿通して、梁部材Kyへ螺着するねじ部材152とを備えている。このスペーサ部材151は、第2枠体122の裏側面に溶接されている。第2枠体122には、おもて面側からスペーサ部材151の位置が視認できるように、スペーサ部材151の孔と連通する貫通孔が設けられている。   As shown in FIG. 6, the second frame 122 is fixed to the beam member Ky by the fixing jig 15. The fixing jig 15 includes a cylindrical spacer member 151 for securing a gap (space) between the second frame body 122 communicating with the fixing space R and the beam member Ky, and a spacer member from the second frame body 122. 151, and a screw member 152 that is inserted through 151 and screwed to the beam member Ky. The spacer member 151 is welded to the back side surface of the second frame body 122. The second frame body 122 is provided with a through hole communicating with the hole of the spacer member 151 so that the position of the spacer member 151 can be visually recognized from the front surface side.

本実施の形態に係る扉枠1は、前後に2分割されているだけでなく、縦枠部11と横枠部12とが、それぞれ分離可能に形成されている。つまり扉枠1は、6つのパーツに分割されている。図7(A)および同図(B)に示すように、縦枠部11の第1枠体111を例に説明すると、第1枠体111の両端部には、貫通孔が形成されたL字金具161にナット162が孔位置を合わせて溶接された接続部材16が設けられている。この接続部材16に、図示しない横枠部12の第1枠体121の端部を直角に合わせてねじ止めすることで、2本の縦枠部11の第1枠体111,111と横枠部12の第1枠体121とを連結することができる。   The door frame 1 according to the present embodiment is not only divided into two parts in the front-rear direction, but also a vertical frame part 11 and a horizontal frame part 12 are formed so as to be separable. That is, the door frame 1 is divided into six parts. As shown in FIGS. 7A and 7B, the first frame body 111 of the vertical frame portion 11 will be described as an example. The first frame body 111 has L formed with through holes at both ends. A connecting member 16 in which a nut 162 is welded with a hole position aligned is provided on the bracket 161. The first frame bodies 111 and 111 of the two vertical frame portions 11 and the horizontal frame are secured to the connecting member 16 by screwing the end portions of the first frame body 121 of the horizontal frame portion 12 (not shown) at right angles. The first frame 121 of the part 12 can be connected.

以上のように構成された本発明の実施の形態に係る扉枠1の施工方法について、図面に基づいて説明する。
扉枠1を取り付ける開口部Kには、既に、柱部材Kxが補強部材Kzと共に立設され、柱部材Kx同士の間を梁部材Kyが架設され、これらを覆うように壁面パネルPが貼られ、蝶番Hと共にコ字板141が取り付けられるものとする。
The construction method of the door frame 1 which concerns on embodiment of this invention comprised as mentioned above is demonstrated based on drawing.
In the opening K to which the door frame 1 is attached, the column member Kx is already erected together with the reinforcing member Kz, the beam member Ky is installed between the column members Kx, and the wall panel P is pasted so as to cover them. The U-shaped plate 141 is attached together with the hinge H.

まず、柱部材KxのL字板142を取り付けた間の3ヵ所に、フック板132を等間隔に取り付ける。また、梁部材Kyの中央部にもフック板132を取り付ける。このとき、フック板132を、長孔132bを通してねじを軽く締めて取り付けるだけで、丸孔132cにはねじを取り付けない。つまり、フック板132は仮固定された状態である。   First, the hook plates 132 are attached at equal intervals at three positions between the L-shaped plates 142 of the column members Kx. A hook plate 132 is also attached to the central portion of the beam member Ky. At this time, the hook plate 132 is attached only by lightly tightening the screw through the long hole 132b, and the screw is not attached to the round hole 132c. That is, the hook plate 132 is temporarily fixed.

(第1枠体の取り付け)
次に、連結されて2分割された三方枠の状態の第1枠体111,121を、一方の壁面S1側から開口部Kに配置する。第1枠体111,121を配置する際には、係止部材131がフック板132より前となる位置まで、第1枠体111,121を前進させた後、柱部材Kxまたは梁部材Ky側に押し当てながら後退させる。そうすることで、係止部材131がフック板132のフック部132aに引っ掛かる。その状態でフック板132の位置を調整して丸孔132cにねじをねじ込むと共に、長孔132bに取り付けたねじをねじ込み、フック板132を本固定する。
(Attaching the first frame)
Next, the first frame bodies 111 and 121 that are connected and divided into three-way frames are arranged in the opening K from the one wall surface S1 side. When the first frames 111 and 121 are disposed, after the first frames 111 and 121 are advanced to the position where the locking member 131 is in front of the hook plate 132, the column members Kx or the beam member Ky side Retreat while pressing against. By doing so, the locking member 131 is hooked on the hook portion 132 a of the hook plate 132. In this state, the position of the hook plate 132 is adjusted to screw a screw into the round hole 132c, and the screw attached to the long hole 132b is screwed to permanently fix the hook plate 132.

このとき、第1枠体111,121同士の間の開口を測り、開き戸2が取付可能な幅が確保されているかを確認する。幅が広すぎる場合には、第1枠体111,121を移動させて調整する。係止部材131とフック板132とは固定されていないため、係止部材131がフック板132に摺動しながら移動することで、第1枠体111,121を移動させて調整することができる。従って、設計値と実際の状態とが多少異なっていても、第1枠体111同士の間隔を調整することで合わせることができる。   At this time, the opening between the first frame bodies 111 and 121 is measured, and it is confirmed whether or not a width capable of attaching the hinged door 2 is secured. If the width is too wide, the first frame 111, 121 is moved and adjusted. Since the locking member 131 and the hook plate 132 are not fixed, the first frame bodies 111 and 121 can be moved and adjusted by moving the locking member 131 while sliding on the hook plate 132. . Therefore, even if the design value and the actual state are slightly different, they can be adjusted by adjusting the interval between the first frames 111.

次に、第1枠体111に蝶番Hと共に取り付けられているコ字板141の位置に合わせて、柱部材KxにL字板142をねじ止めすると共にコ字板141とL字板142とをねじ部材N2によりねじ止めする。これで、第1枠体111が柱部材Kxに固定され,第1枠体121が梁部材Kyに固定される。
このように柱部材Kxおよび梁部材Kyに壁面パネルPが貼られて状態であっても、固定用空間Rを利用して、第1枠体111と柱部材Kx,および第1枠体121と梁部材Kyとを連結することができるので、第1枠体111,121を開口部Kに取り付けることができる。
Next, according to the position of the U-shaped plate 141 attached to the first frame 111 together with the hinge H, the L-shaped plate 142 is screwed to the column member Kx, and the U-shaped plate 141 and the L-shaped plate 142 are attached. Screwed with the screw member N2. Thus, the first frame body 111 is fixed to the column member Kx, and the first frame body 121 is fixed to the beam member Ky.
Thus, even if the wall surface panel P is affixed to the column member Kx and the beam member Ky, the first frame 111, the column member Kx, and the first frame 121 are utilized using the fixing space R. Since the beam member Ky can be connected, the first frames 111 and 121 can be attached to the opening K.

(第2枠体の取り付け)
連結された三方枠の状態の第2枠体112,122を、他方の壁面S2側から開口部Kに配置する。第2枠体112,122を配置する際には、第1枠体111,121の戸当たり部111a,121aと、保持部111b,121bとの間の隙間に、第2枠体112,122の内側先端部分を挿入しながら行う。
(Attaching the second frame)
The connected second frame bodies 112 and 122 in a three-way frame state are arranged in the opening K from the other wall surface S2 side. When the second frames 112 and 122 are arranged, the second frames 112 and 122 are inserted into the gaps between the door stop portions 111a and 121a of the first frames 111 and 121 and the holding portions 111b and 121b. While inserting the inner tip.

次に、第2枠体112,122の裏側面に設けられたスペーサ部材151の位置に合わせて設けられた貫通孔にねじ部材152を、スペーサ部材151を挿通させて柱部材Kxと梁部材Kyとにねじ込む。第2枠体112,122と柱部材Kxおよび梁部材Kyとの間に、固定用空間Rと連通する空間が確保されていても、スペーサ部材151が隙間を支持するので、ねじ部材152を強くねじ込んでも、第2枠体112,122のおもて面に、ねじ部材152の頭部の押圧による凹みが生じることはない。   Next, the screw member 152 is inserted into the through hole provided in accordance with the position of the spacer member 151 provided on the back side surface of the second frames 112 and 122, and the column member Kx and the beam member Ky are inserted through the spacer member 151. And screw in. Even if a space communicating with the fixing space R is secured between the second frame bodies 112 and 122 and the column member Kx and the beam member Ky, the spacer member 151 supports the gap, so that the screw member 152 is strengthened. Even if it is screwed in, there is no dent due to the pressing of the head of the screw member 152 on the front surface of the second frame bodies 112, 122.

このように、戸当たり部111a,121aの裏側に設けられた保持部111b,121bは、戸当たり部111a,121aと重なり合う第2枠体112,122の内側先端部分を裏側から戸当たり部111a,121aと共に挟み込むので、扉枠1を開口部に設置するより以前に、第1枠体111,121と第2枠体112,122とを連結しておく必要がない。従って、柱部材Kxと梁部材Kyとに壁面パネルPを貼り合わせた後に、扉枠1の施工が可能である。また、戸当たり部111a,121aと保持部111b,121bとで第2枠体112,122を挟み込んでいるだけなので、開口部Kを形成する柱部材Kxや梁部材Kyの施工誤差が原因で、壁厚が厚くなったり、薄くなったりしても、戸当たり部111a,121aと第2枠体112,122の内側先端部分との重なり合い度合いが変わるだけである。例え、重なり合い度合いが変わったとしても戸当たり部111a,121aにより隠れるので外観には変化がない。従って、本実施の形態に係る扉枠1は、開口部の壁厚に誤差が生じても対応することができる対応性と、良好な施工性とを兼ね備えている。   As described above, the holding portions 111b and 121b provided on the back sides of the door stop portions 111a and 121a are arranged so that the inner front end portions of the second frames 112 and 122 that overlap the door stop portions 111a and 121a from the back side to the door stop portions 111a and 111a, Since it is inserted together with 121a, it is not necessary to connect the first frame bodies 111 and 121 and the second frame bodies 112 and 122 before the door frame 1 is installed in the opening. Accordingly, the door frame 1 can be installed after the wall surface panel P is bonded to the column member Kx and the beam member Ky. Also, since the second frame 112, 122 is only sandwiched between the door stop portions 111a, 121a and the holding portions 111b, 121b, due to the construction error of the column member Kx and the beam member Ky that form the opening K, Even if the wall thickness is increased or decreased, the degree of overlap between the door stop portions 111a and 121a and the inner front end portions of the second frames 112 and 122 only changes. For example, even if the overlapping degree is changed, the appearance is not changed because it is hidden by the door stop portions 111a and 121a. Therefore, the door frame 1 according to the present embodiment has both the ability to cope with an error in the wall thickness of the opening and the good workability.

また、戸当たり部111a,121aと保持部111b,121bとが形成されている第1枠体111,121とを予め作り置きしておけば、設計段階で壁厚が最終的に決定してから第2枠体112,122を作製しても、第2枠体112,122の形状は、第1枠体111,121より簡易な、単に鋼板をほぼL字状に折り曲げただけの構造であるため、短期間に作製することができる。従って、短納期でも対応することができるので、施工に対して迅速に準備することができる。   Moreover, if the first frame bodies 111 and 121 in which the door stop portions 111a and 121a and the holding portions 111b and 121b are formed in advance, the wall thickness is finally determined at the design stage. Even when the second frames 112 and 122 are produced, the shapes of the second frames 112 and 122 are simpler than the first frames 111 and 121, and are simply a structure in which a steel plate is simply bent into an L shape. Therefore, it can be produced in a short time. Therefore, since it can respond even in a short delivery time, it can prepare for construction quickly.

本実施の形態では、第1枠体111,121と第2枠体112,122とを、縦枠部11および横枠部12ごとに分割した状態としているので、保管場所を省スペース化が図れ、施工現場への搬入を容易とすることができる。この分割は、縦枠部11または横枠部12のいずれか一方でもよい。
なお、本実施の形態に係る扉枠1を、防火扉が設けられる開口部に設置する場合には、縦枠部11および横枠部12をねじ止めによる連結ではなく、一体構造とすることで、必要な強度を確保することができる。
In the present embodiment, since the first frame bodies 111 and 121 and the second frame bodies 112 and 122 are divided into the vertical frame portion 11 and the horizontal frame portion 12, the storage space can be saved. It can be easily carried into the construction site. This division may be either the vertical frame portion 11 or the horizontal frame portion 12.
In addition, when installing the door frame 1 which concerns on this Embodiment in the opening part in which a fire prevention door is provided, by making the vertical frame part 11 and the horizontal frame part 12 into the integral structure instead of the connection by screwing. The required strength can be ensured.

また、本実施の形態では、第1枠体111および柱部材Kxと,第1枠体121および梁部材Kyとを、L字板142同士で連結したり、係止部材131とフック板132とで連結したりしているが、例えば、図8(A)および同図(B)に示すように、第1枠体111および柱部材Kxと,第1枠体121および梁部材Kyとを、固定用空間Rを溶接用空間として利用して、アンカー18(接続棒)を介在させて溶接にて固定することも可能である。しかし、第1枠体111,121を溶接で固定する際に、固定用空間Rの奥側方向に向かって、電気溶接の溶接棒の先端から飛び散る溶接炎が壁面パネルPの開口部K側の端部を焦がすおそれがある。従って、本実施の形態のように、溶接による連結ではなく、ねじ止め、または係止による連結を行う方がよい。そうすることで、壁面S1,S2として壁面パネルPを貼っただけの状態、壁面パネルPにクロスを貼った状態、壁面S1,S2に塗装した状態でも、扉枠1を安心して取り付けることができる。   In the present embodiment, the first frame body 111 and the column member Kx, and the first frame body 121 and the beam member Ky are connected by the L-shaped plates 142, or the locking member 131 and the hook plate 132 are connected. For example, as shown in FIG. 8A and FIG. 8B, the first frame body 111 and the column member Kx, and the first frame body 121 and the beam member Ky, The fixing space R can be used as a welding space and can be fixed by welding with an anchor 18 (connection rod) interposed. However, when the first frames 111 and 121 are fixed by welding, the welding flame that scatters from the tip of the welding rod for electric welding toward the back side of the fixing space R is on the opening K side of the wall panel P. There is a risk of scorching the edges. Therefore, it is better to perform the connection by screwing or locking rather than the connection by welding as in the present embodiment. By doing so, the door frame 1 can be safely attached even in a state where the wall surface panel P is pasted as the wall surface S1, S2, a state where a cloth is pasted on the wall surface panel P, and a state where the wall surface S1, S2 is painted. .

また、開き戸2の開閉時に最も負荷が掛かる蝶番Hの部分に、蝶番Hと共にコ字板141がねじ止めされていることで、コ字板141が第1枠体111を固定するための固定部材として機能するだけでなく、第1枠体111を補強する補強部材としての機能も備えている。また、コ字板141を蝶番Hと共にねじ止めすることで、溶接や他のねじによる固定を行わなくてもよい。   In addition, the U-shaped plate 141 is screwed together with the hinge H to the hinge H where the load is most applied when the hinged door 2 is opened and closed, so that the U-shaped plate 141 fixes the first frame body 111. As well as a reinforcing member that reinforces the first frame 111. In addition, by fixing the U-shaped plate 141 together with the hinge H, it is not necessary to perform welding or fixing with other screws.

更に、本実施の形態では、保持部111b,121bは、溶接により戸当たり部111a,121aに取り付けられているが、折り曲げにより一体的に形成してもよい。   Further, in the present embodiment, the holding portions 111b and 121b are attached to the door stop portions 111a and 121a by welding, but may be integrally formed by bending.

(変形例)
次に、本発明の実施の形態に係る扉枠1の変形例について、図9および図10に基づいて説明する。なお、図9および図10においては、図2および図3と同じ構成のものは同符号を付して説明を省略する。
(Modification)
Next, the modification of the door frame 1 which concerns on embodiment of this invention is demonstrated based on FIG. 9 and FIG. 9 and FIG. 10, the same components as those in FIG. 2 and FIG.

図9および図10に示す扉枠10は、開き戸2の重量が重い場合に好適なものとしている。扉枠10の第1枠体は111,121のそれぞれは、柱部材Kxと梁部材Kyとに、通し金具である固定部材17により固定されている。   The door frame 10 shown in FIGS. 9 and 10 is suitable when the weight of the hinged door 2 is heavy. Each of the first frame bodies 111 and 121 of the door frame 10 is fixed to the column member Kx and the beam member Ky by a fixing member 17 which is a through metal fitting.

固定部材17は、断面が、J字状の枠体側ねじ止め部171と、L字状の枠部材側ねじ止め部172とが一体的に形成されたS字状の連結部材である。
J字状の枠体側ねじ止め部171は、第1枠体111,121の裏側の奥側に位置し、第1枠体111,121とおもて面側からねじ止めされる。
L字状の枠部材側ねじ止め部172は、戸当たり部121aから柱部材Kxまたは梁部材Kyの方向へ向かい、柱部材Kxまたは梁部材Kyに沿って折れ曲がりねじ止めされる。
固定部材17の柱部材Kxとのねじ止め位置は、蝶番H(図2参照)の位置の3ヵ所と、蝶番H同士の間の2ヵ所と、上端から蝶番Hまでの間の位置と、下端から蝶番Hまでの間の位置との7ヵ所としている。また、梁部材Kyとのねじ止め位置は、中央部の1ヵ所である。
The fixing member 17 is an S-shaped connecting member in which a J-shaped frame body side screwing portion 171 and an L-shaped frame member side screwing portion 172 are integrally formed.
The J-shaped frame body side screwing portion 171 is located on the back side behind the first frame bodies 111 and 121 and is screwed to the first frame bodies 111 and 121 from the front surface side.
The L-shaped frame member side screwing portion 172 is bent and screwed along the column member Kx or the beam member Ky from the door stop portion 121a toward the column member Kx or the beam member Ky.
The fixing position of the fixing member 17 to the column member Kx is three positions of the hinge H (see FIG. 2), two positions between the hinges H, a position between the upper end and the hinge H, and a lower end. To 7 locations with hinges H. Further, the screwing position with the beam member Ky is one place in the central portion.

この固定部材17が第1枠体111,121の裏側面と、柱部材Kxおよび梁部材Kyの取付面とに相互に接した状態でねじ止めされていることで、第1枠体111を梁部材Kyに,第1枠体121を梁部材Kyに、強固に固定することができるので、重量の重い開き戸2であっても扉枠10は開き戸2を支持することができる。
また、この変形例においても、第1枠体111を柱部材Kxに,第1枠体121を梁部材Kyに、溶接により固定していないので、壁面パネルPにクロスを貼った状態でも、壁面S1,S2を塗装した状態でも、扉枠10の施工を行っても問題はない。
The fixing member 17 is screwed in a state in which the fixing member 17 is in contact with the back side surfaces of the first frame bodies 111 and 121 and the mounting surfaces of the column member Kx and the beam member Ky, so that the first frame body 111 is fixed to the beam. Since the first frame body 121 can be firmly fixed to the beam member Ky to the member Ky, the door frame 10 can support the hinged door 2 even if the door is heavy.
Also in this modified example, the first frame 111 is not fixed to the column member Kx, and the first frame 121 is not fixed to the beam member Ky by welding. There is no problem even if the door frame 10 is constructed even in a state where S1 and S2 are painted.

本発明は、壁面の開口に設けられる扉枠に好適であり、三方枠だけでなく四方枠においても適用できる。また、本発明の扉枠に取り付けられる扉は、片開きの開き戸だけでなく量開き(観音開き)の扉や、折戸、引き戸でもよい。   The present invention is suitable for a door frame provided in an opening of a wall surface, and can be applied not only to a three-sided frame but also to a four-sided frame. Moreover, the door attached to the door frame of this invention may be not only a single swing door, but also a door with a volume opening (a double door), a folding door, or a sliding door.

1,10 扉枠
11 縦枠部
111 第1枠体
111a 戸当たり部
111b 保持部
112 第2枠体
12 横枠部
121 第1枠体
121a 戸当たり部
121b 保持部
121c 係止部材
122 第2枠体
131 係止部材
132 フック板
132a フック部
132b 長孔
132c 丸孔
141 コ字板
141a リブ板
142 L字板
142a リブ板
15 固定治具
151 スペーサ部材
152 ねじ部材
16 接続部材
161 L字金具
162 ナット
17 固定部材
18 アンカー
2 開き戸
K 開口部
Kx 柱部材
Ky 梁部材
Kz 補強部材
H 蝶番
P 壁面パネル
S1,S2 壁面
F 床
R 固定用空間
N1,N2 ねじ部材
DESCRIPTION OF SYMBOLS 1,10 Door frame 11 Vertical frame part 111 1st frame 111a Door stop part 111b Holding part 112 2nd frame 12 Horizontal frame part 121 1st frame 121a Door stop part 121b Holding part 121c Locking member 122 2nd frame Body 131 Locking member 132 Hook plate 132a Hook portion 132b Long hole 132c Round hole 141 C-shaped plate 141a Rib plate 142 L-shaped plate 142a Rib plate 15 Fixing jig 151 Spacer member 152 Screw member 16 Connecting member 161 L-shaped bracket 162 Nut 17 fixing member 18 anchor 2 hinged door K opening Kx pillar member Ky beam member Kz reinforcing member H hinge P wall panel S1, S2 wall surface F floor R fixing space N1, N2 screw member

Claims (7)

壁面の開口部の一方の壁面側の開口縁部に設けられる第1枠体と、
前記開口部の他方の壁面側の開口縁部に設けられる第2枠体とを備え、
前記第1枠体には、開口部内側の先端に設けられた戸当たり部と、前記戸当たり部の裏側に設けられ、前記戸当たり部と重なり合う前記第2枠体の内側先端部分を裏側から前記戸当たり部と共に挟み込む保持部とが形成されていることを特徴とする扉枠。
A first frame provided at an opening edge on one wall surface side of the opening of the wall surface;
A second frame provided on the opening edge of the other wall surface of the opening,
The first frame body is provided with a door contact portion provided at the front end inside the opening, and an inner front end portion of the second frame body provided on the back side of the door contact portion and overlapping the door contact portion from the back side. A door frame formed with a holding portion sandwiched together with the door stop portion.
前記第1枠体は、壁面パネルによる一方の壁面側から開口部内側へ延び、枠部材により形成された前記開口部の内側面と前記第1枠体の裏側面との間に固定用空間を確保する略L字状に形成され、
前記第2枠体は、壁面パネルによる他方の壁面側から開口部内側へ延び、前記戸当たり部と前記保持部との間に挿入可能とした略L字状に形成されている請求項1記載の扉枠。
The first frame extends from one wall surface side of the wall panel to the inside of the opening, and a fixing space is formed between the inner side surface of the opening formed by the frame member and the back side surface of the first frame body. It is formed in a substantially L shape to secure,
The said 2nd frame is extended in the opening part inner side from the other wall surface side by a wall surface panel, and is formed in the substantially L-shape which can be inserted between the said door stop part and the said holding | maintenance part. Door frame.
前記第1枠体に裏側面に配置される第1連結部材と、
該第1連結部材と連結可能な前記枠部材の位置に配置され、ねじ部材により前記枠部材と接続される第2連結部材とを備え、
前記第1連結部材と前記第2連結部材とは、前記固定空間内でねじ部材により連結されている請求項2記載の扉枠。
A first connecting member disposed on a back side surface of the first frame;
A second connecting member disposed at a position of the frame member connectable to the first connecting member and connected to the frame member by a screw member;
The door frame according to claim 2, wherein the first connecting member and the second connecting member are connected by a screw member in the fixed space.
前記第1枠体の裏側面と前記枠部材の取付面とに、相互に接するS字状の連結部材が前記固定空間内に設けられ、
前記S字状の連結部材は、前記第1枠体と前記枠部材とにねじ部材により連結されている請求項2記載の扉枠。
S-shaped connecting members that are in contact with each other are provided in the fixed space on the back side surface of the first frame and the mounting surface of the frame member,
The door frame according to claim 2, wherein the S-shaped connecting member is connected to the first frame body and the frame member by a screw member.
前記第2枠体を前記枠部材に固定するための固定治具が設けられ、
前記固定治具は、前記第2枠体と前記枠部材との間に空間を確保する筒状のスペーサ部材と、前記第2枠体から前記スペーサ部材を挿通して、前記枠部材に螺着するねじ部材とを備えている請求項2記載の扉枠。
A fixing jig for fixing the second frame body to the frame member is provided,
The fixing jig includes a cylindrical spacer member that secures a space between the second frame body and the frame member, and the spacer member is inserted from the second frame body and screwed to the frame member. The door frame of Claim 2 provided with the screw member to do.
前記第1枠体および/または前記第2枠体は、縦枠部と横枠部との接続が、それぞれ分離可能に形成されている請求項1から3のいずれかの項に記載の扉枠。   The door frame according to any one of claims 1 to 3, wherein the first frame body and / or the second frame body are formed so that the connection between the vertical frame portion and the horizontal frame portion is separable. . 壁面の開口部の一方の壁面側の開口縁部に設けられる第1枠体と、前記開口部の他方の壁面側の開口縁部に設けられる第2枠体とを備えた扉枠を前記開口部へ取り付ける扉枠の施工方法であって、
前記開口部内側の先端に設けられた戸当たり部と、前記戸当たり部の裏側に設けられ、前記戸当たり部と重なり合う前記第2枠体の内側先端部分を裏側から前記戸当たり部と共に挟み込む保持部とが形成された第1枠体を、前記一方の壁面側から配置する工程と、
前記第1枠体を前記開口部に固定する工程と、
前記第2枠体を前記他方の壁面側から前記開口部へ配置して、前記第2枠体の内側先端部分を前記戸当たり部と前記保持部との間に挿入する工程と、
前記第2枠体を前記開口部に固定する工程とを含むことを特徴とする扉枠の施工方法。
A door frame including a first frame provided at an opening edge on one wall surface side of the opening of the wall surface and a second frame provided at an opening edge on the other wall surface side of the opening is the opening. It is a construction method of the door frame attached to the part,
A door stopper provided at the tip inside the opening, and a holding provided between the door stopper and the inner tip of the second frame that is provided on the back side of the door stopper and overlaps with the door stopper. A step of arranging the first frame formed with the portion from the one wall surface side;
Fixing the first frame to the opening;
Disposing the second frame body from the other wall surface side to the opening, and inserting an inner front end portion of the second frame body between the door stop portion and the holding portion;
And a step of fixing the second frame to the opening.
JP2009033184A 2009-02-16 2009-02-16 Door frame and construction method Pending JP2010189872A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009033184A JP2010189872A (en) 2009-02-16 2009-02-16 Door frame and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009033184A JP2010189872A (en) 2009-02-16 2009-02-16 Door frame and construction method

Publications (1)

Publication Number Publication Date
JP2010189872A true JP2010189872A (en) 2010-09-02

Family

ID=42816196

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009033184A Pending JP2010189872A (en) 2009-02-16 2009-02-16 Door frame and construction method

Country Status (1)

Country Link
JP (1) JP2010189872A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012167527A (en) * 2011-02-14 2012-09-06 Nissho Kogyo Kk Recyclable door frame
JP2015151854A (en) * 2014-02-14 2015-08-24 日章工業株式会社 Fitting construction method of door frame outer door
CN106103877A (en) * 2015-03-03 2016-11-09 日章工业株式会社 Doorframe structure body and the installation method of doorframe structure body
JP2017218854A (en) * 2016-06-10 2017-12-14 清水建設株式会社 Door and door attachment structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5924880U (en) * 1982-08-05 1984-02-16 立山アルミニウム工業株式会社 Sash frame gap adjustment device
JPS5957687U (en) * 1982-10-07 1984-04-14 神鋼アルフレツシユ株式会社 Installation structure of renovated window frame
JPH10238220A (en) * 1997-02-28 1998-09-08 Juken Sangyo Co Ltd Width adjusting frame material
JPH1113350A (en) * 1997-06-25 1999-01-19 Sasakura Eng Co Ltd Method and device for attaching fitting frame to concrete wall in building

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5924880U (en) * 1982-08-05 1984-02-16 立山アルミニウム工業株式会社 Sash frame gap adjustment device
JPS5957687U (en) * 1982-10-07 1984-04-14 神鋼アルフレツシユ株式会社 Installation structure of renovated window frame
JPH10238220A (en) * 1997-02-28 1998-09-08 Juken Sangyo Co Ltd Width adjusting frame material
JPH1113350A (en) * 1997-06-25 1999-01-19 Sasakura Eng Co Ltd Method and device for attaching fitting frame to concrete wall in building

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012167527A (en) * 2011-02-14 2012-09-06 Nissho Kogyo Kk Recyclable door frame
JP2015151854A (en) * 2014-02-14 2015-08-24 日章工業株式会社 Fitting construction method of door frame outer door
CN106103877A (en) * 2015-03-03 2016-11-09 日章工业株式会社 Doorframe structure body and the installation method of doorframe structure body
CN106103877B (en) * 2015-03-03 2017-10-31 日章工业株式会社 The installation method of doorframe structure body and doorframe structure body
JP2017218854A (en) * 2016-06-10 2017-12-14 清水建設株式会社 Door and door attachment structure

Similar Documents

Publication Publication Date Title
JP4467750B2 (en) Metal frame structure
JP3811177B1 (en) Lip channel steel and its fittings
US20060010809A1 (en) Metal header frame for a building wall
RU2535311C2 (en) Form panel for concrete structures
JP2010189872A (en) Door frame and construction method
KR101142047B1 (en) Junction structure of frames of curtain wall system
JP5380686B2 (en) Installation method of door frame
US20110271614A1 (en) Jamb stud connector and method of use thereof
JP2017179960A (en) Installation metal fitting for fireproof member, and fireproof structure of beam
JP5286525B2 (en) Cylindrical strut connection structure
JP6267062B2 (en) Building structures and unit buildings
KR20170056871A (en) Fire door reinforced intensity
KR101365063B1 (en) Fire door frame
RU2737883C1 (en) Connecting element for nonload-bearing structure to provide sliding compensating movement
JP6971032B2 (en) Mounting structure of opening frame and its mounting construction method
KR20110000741U (en) Mounting bracket for cabinet
JP5294780B2 (en) Eyeless frame structure
JP4943934B2 (en) Blindfold panel fixing structure
JP5733611B2 (en) Reusable door frame
JP2021188447A (en) Fixture mounting structure and construction method for fixture mounting structure
JP2012122240A (en) Connection metal fitting for folded-plate roof
JPH0667061B2 (en) Electric appliance storage board
JP5398460B2 (en) Horizontal material joining device
TWM546419U (en) Engagement assembly and supporting connection member
JP3001341U (en) Reinforcement device for communication equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Effective date: 20120210

Free format text: JAPANESE INTERMEDIATE CODE: A621

A977 Report on retrieval

Effective date: 20121114

Free format text: JAPANESE INTERMEDIATE CODE: A971007

A131 Notification of reasons for refusal

Effective date: 20121211

Free format text: JAPANESE INTERMEDIATE CODE: A131

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20130618