Prior art keywords
building unit
temporary
beams
building
columns
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2007338374A
Other languages
Japanese (ja)
Inventor
Hideki Kaihara
英樹 貝原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kanto Jidosha Kogyo KK
Toyota Motor East Japan Inc
Original Assignee
Kanto Jidosha Kogyo KK
Kanto Auto Works Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kanto Jidosha Kogyo KK, Kanto Auto Works Ltd filed Critical Kanto Jidosha Kogyo KK
Priority to JP2007338374A priority Critical patent/JP2009155986A/en
Publication of JP2009155986A publication Critical patent/JP2009155986A/en
Pending legal-status Critical Current

Links

Abstract

<P>PROBLEM TO BE SOLVED: To provide a building unit reduced in raw material by eliminating the double installation of floor beams, ceiling beams and columns in an abutting section. <P>SOLUTION: In the building unit 10 comprising beams 11, 12 and columns 13 and used in a unit prefab construction method, a pair of columns 13 positioned on both sides of at least one side face 14 of the other adjacent unit are removably installed as a temporary column 13b. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、プレハブユニット工法に使用される建物ユニットに関するものである。   The present invention relates to a building unit used in a prefabricated unit construction method.

従来、プレハブユニット工法に使用される建物ユニットは、例えば図7に示すように構成されている。図7において、建物ユニット1は箱状に構成されており、より詳細には長方形の床を画成する枠状に接続された四つの床梁2と、同様に長方形の天井を画成する枠状に接続された四つの天井梁3と、これらの床梁2と天井梁3の角部を垂直方向に接続する四本の柱4と、から構成されている。   Conventionally, the building unit used for the prefabricated unit method is configured as shown in FIG. 7, for example. In FIG. 7, the building unit 1 is configured in a box shape, and more specifically, four floor beams 2 connected in a frame shape that defines a rectangular floor, and a frame that similarly defines a rectangular ceiling. The four ceiling beams 3 connected in a shape, and the four pillars 4 that connect the corner portions of the floor beams 2 and the ceiling beams 3 in the vertical direction.

さらに、床梁2は、図示のように長手方向に延びる一方の梁2aから反対側の梁2bに向かって互いに並行に延びる複数本、図示の場合、七本の床小梁2cを支持している。同様に、天井梁3は、図示のように長手方向に延びる一方の梁3aから反対側の梁3bに向かって互いに並行に延びる複数本、図示の場合、七本の天井小梁3cを支持している。   Further, the floor beam 2 supports a plurality of, in the illustrated case, seven floor beams 2c extending in parallel from one beam 2a extending in the longitudinal direction to the opposite beam 2b as illustrated. Yes. Similarly, the ceiling beam 3 supports a plurality of ceiling beams 3c extending in parallel with each other from one beam 3a extending in the longitudinal direction toward the opposite beam 3b as shown in the drawing, and in the illustrated case, seven ceiling beams 3c. ing.

このような構成の建物ユニット1は、それ自体、互いに接続された床梁2,天井梁3及び柱4、そして床小梁2c及び天井小梁3cにより、建物構築時に必要な強度を備えており、各床梁2,天井梁3及び柱4は、それぞれ必要な強度を得るための断面性能を備えている。   The building unit 1 having such a structure itself has a strength necessary for building construction by the floor beam 2, the ceiling beam 3 and the column 4, and the floor beam 2c and the ceiling beam 3c connected to each other. Each floor beam 2, ceiling beam 3 and column 4 each have a cross-sectional performance for obtaining the required strength.

建物ユニット1はそれぞれ工場で製造され、建築現場に運搬されて、建築現場において図7(B)に示すように互いに隣接配置される。そして、互いに隣接する建物ユニット1,1の互いに対向する側面が突き合わされ、ボルト等により互いに接続されて建物を構成する。   Each of the building units 1 is manufactured at a factory, transported to a building site, and arranged adjacent to each other as shown in FIG. And the mutually opposing side surfaces of the building units 1 and 1 that are adjacent to each other are abutted and connected to each other with bolts or the like to form a building.

ここで、各建物ユニット1は、工場生産率が高いことから、品質確保と建築現場における工期短縮等のために、工場において床及び天井を組み付けする必要があり、これらの床及び天井を固定するために、前述した床小梁2c及び天井小梁3cを備えなければならない。
さらに、床面から天井面の間に、部屋を区切るための内部壁(間仕切り壁)を取り付けたり、キッチン等の装備品を工場で設置するので、工場から出荷する際には、床小梁2c及び天井小梁3cを架設する必要がある。このため、工場出荷時には、建物ユニット1は必ず前述した箱状に形成されていなければならない。
Here, since each building unit 1 has a high factory production rate, it is necessary to assemble floors and ceilings in the factory in order to ensure quality and shorten the construction period at the construction site, and these floors and ceilings are fixed. Therefore, the floor beam 2c and the ceiling beam 3c described above must be provided.
Furthermore, since an internal wall (partition wall) for partitioning the room is attached between the floor surface and the ceiling surface, and equipment such as a kitchen is installed in the factory, when shipping from the factory, the floor beam 2c And the ceiling beam 3c need to be installed. For this reason, at the time of factory shipment, the building unit 1 must be formed in the box shape described above.

ところで、従来、一般的ないわゆる軸組工法においては、使用する梁の許容スパンに応じて柱等を設置する、具体的には、図8(A)に示すように、床梁5,天井梁6及び柱7によりA×Bの空間を構築する場合、長さA方向には中間の柱が設定されず、また幅B方向には中間に一本の柱7が設定される。これにより、各所における強度を確保している。   By the way, in the conventional so-called frame construction method, columns and the like are installed according to the allowable span of the beam to be used. Specifically, as shown in FIG. In the case where an A × B space is constructed by 6 and pillars 7, an intermediate pillar is not set in the length A direction, and a single pillar 7 is set in the width B direction. Thereby, the strength in each place is secured.

他方、上述した建物ユニット1によりA×Bの空間を構築する場合には、例えば図8(B)に示すように、幅B方向に建物ユニット1が二つ並んで配置される。この場合、建物ユニット1を並べることによって、A×Bの空間が構築される。   On the other hand, when an A × B space is constructed by the building unit 1 described above, two building units 1 are arranged side by side in the width B direction, for example, as shown in FIG. In this case, an A × B space is constructed by arranging the building units 1.

しかしながら、建物ユニット1,1の互いに突き合わされる側面において、図8(B)に示すように、床梁2,天井梁3及び二本の柱4がそれぞれ二重に配置されてしまう。このため、建物ユニット1,1の突き合わせ部分においては、所定の断面性能を有する床梁2,天井梁3及び柱4が二重に配置されることによって、結果として必要以上の断面性能を備えることになってしまい、材料コストが高くなってしまう。また、建物内部においても、柱が二重に配置されることによって、内部空間即ち居住空間等の利用可能空間が狭くなると共に、間取り計画が制限されることになってしまう。   However, as shown in FIG. 8 (B), the floor beams 2, the ceiling beams 3, and the two pillars 4 are arranged in a double manner on the side surfaces of the building units 1 and 1 that face each other. For this reason, in the butt | matching part of the building units 1 and 1, the floor beam 2, the ceiling beam 3, and the pillar 4 which have predetermined | prescribed cross-sectional performance are arrange | positioned doubly, and as a result, the cross-sectional performance more than necessary is provided. This increases the material cost. In addition, even in the building, the double arrangement of the pillars reduces the available space such as the internal space, that is, the living space, and restricts the floor plan.

本発明は以上の点に鑑み、突き合わせ部分における床梁,天井梁及び柱の二重配置を回避し、原材料を少なくすることのできる建物ユニットを提供することを目的としている。   In view of the above points, an object of the present invention is to provide a building unit that can avoid the double arrangement of floor beams, ceiling beams, and columns in the butted portion, and can reduce raw materials.

上記目的を達成するため、本発明は、梁及び柱から成るユニットプレハブ工法で使用される建物ユニットであって、他のユニットに隣接する少なくとも一つの側面の両側に位置する一対の柱が、着脱可能な仮柱として構成されていることを特徴とする。   In order to achieve the above object, the present invention is a building unit used in a unit prefabricated method comprising beams and columns, and a pair of columns located on both sides of at least one side surface adjacent to another unit is attached and detached. It is configured as a possible temporary pillar.

建物ユニットは、好ましくは、一対の仮柱が非仮柱に比して低い断面性能を有する柱である。   The building unit is preferably a column in which a pair of temporary columns has a lower cross-sectional performance than a non-temporary column.

建物ユニットは、好ましくは、他のユニットに隣接する少なくとも一つの側面の上下縁に位置する一対の梁が、着脱可能な仮梁として構成されている。   The building unit is preferably configured such that a pair of beams positioned at the upper and lower edges of at least one side surface adjacent to the other unit are detachable temporary beams.

建物ユニットは、好ましくは、一対の仮梁が非仮梁に比して低い断面性能を有する梁である。   The building unit is preferably a beam in which a pair of temporary beams has lower cross-sectional performance than a non-temporary beam.

また、仮梁は、好ましくは、対向する反対側の梁または仮梁との間に設けられた天井小梁または床小梁を支持する。   Further, the temporary beam preferably supports a ceiling beam or a floor beam provided between the opposite beam or temporary beam on the opposite side.

建物ユニットは、当該建物ユニットが他の建物ユニットと連結されて、一つの建物を構築するとき、他の建物ユニットの側面に対向する両側に仮柱を有する側面が、他の建物ユニットに対して接続されることが望ましい。   When a building unit is connected to another building unit to construct one building, the side having temporary columns on both sides opposite to the side of the other building unit is It is desirable to be connected.

建物ユニットは、好ましくは、柱及び梁を構成する枠状の連結フレームを有し、この連結フレームを介して他の建物ユニットに接続される。   The building unit preferably has a frame-like connecting frame that forms columns and beams, and is connected to another building unit via this connecting frame.

本発明による建物ユニットは、好ましくは、他の建物ユニットに接続されるとき、前記他の建物ユニットに対向する側面の両側の仮柱及び/又は仮梁が取り外される。   When the building unit according to the present invention is connected to another building unit, temporary columns and / or temporary beams on both sides of the side surface facing the other building unit are preferably removed.

上記構成によれば、仮柱が非仮柱に比して低い断面性能を有する柱として形成され、また仮梁が非仮梁に比して低い断面性能を有する梁として形成されることによって、当該建物ユニットを他の建物ユニットに対して突き合わせた状態で、突き合わせ部分で建物として所定の断面性能を有する柱及び梁が二重に配置されることがないので、材料コストが低減されると共に、内部空間が二重の柱により制限されることがない。   According to the above configuration, the temporary column is formed as a column having a low cross-sectional performance compared to a non-temporary column, and the temporary beam is formed as a beam having a low cross-sectional performance compared to a non-temporary beam, In the state where the building unit is abutted against other building units, columns and beams having a predetermined cross-sectional performance as a building at the abutting portion are not doubled, so that the material cost is reduced, The internal space is not limited by double pillars.

梁が、対向する反対側の梁との間に設けられた天井小梁または床小梁を支持することにより、天井小梁または床小梁が梁または仮梁によって確実に支持される。   The beam supports the ceiling beam or floor beam provided between the opposite beam and the opposite beam, so that the ceiling beam or floor beam is reliably supported by the beam or temporary beam.

当該建物ユニットが他の建物ユニットと連結されて一つの建物を構築するとき、他の建物ユニットの側面に対向する両側に仮柱を有する側面が、他の建物ユニットに対して接続される場合には、突き合わせ部分において、他の建物ユニットの柱が当該建物ユニットの柱として作用することにより、所定の断面性能を得ることができる。   When the building unit is connected to another building unit to construct one building, the side with temporary columns on both sides facing the side of the other building unit is connected to the other building unit. In the abutting portion, a column of another building unit acts as a column of the building unit, so that a predetermined cross-sectional performance can be obtained.

柱及び梁を構成する枠状の連結フレームを有し、この連結フレームを介して他の建物ユニットに接続される場合には、他の建物ユニットの突き合わせ部分にも仮柱及び仮梁が配置されていても、この連結フレームの柱及び梁によって所定の断面性能を得ることができる。   When it has a frame-like connecting frame that constitutes a pillar and a beam and is connected to another building unit via this connecting frame, the temporary column and the temporary beam are also arranged at the abutting part of the other building unit. Even so, a predetermined cross-sectional performance can be obtained by the columns and beams of the connecting frame.

他の建物ユニットに接続されるとき、前記他の建物ユニットに対向する側面の両側の仮柱または仮梁が取り外される場合には、建物の所定の強度を確保するためには寄与しない仮柱または仮梁が取り外されても、必要な建物の強度が得られると共に、取り外された仮柱または仮梁は再利用され得ることになり、材料コストがより一層低減される。   When connecting to another building unit, if the temporary pillars or temporary beams on both sides of the side facing the other building unit are removed, the temporary pillars that do not contribute to ensuring the predetermined strength of the building or Even if the temporary beam is removed, the necessary building strength can be obtained, and the removed temporary column or beam can be reused, thereby further reducing the material cost.

このように、本発明によれば、他の建物ユニットに対する突き合わせ部分における柱または梁が仮柱または仮梁として形成されることによって、建物を構築する場合に、柱や梁が二重に配置されることがなく、材料コストが低減され得ると共に、広い内部空間が確保される。   As described above, according to the present invention, when a building is constructed by forming a column or a beam at a butt portion with respect to another building unit as a temporary column or a temporary beam, the column or the beam is arranged in a double manner. The material cost can be reduced and a large internal space is secured.

以下、図面に示した実施形態に基づいて本発明を詳細に説明する。
図1は本発明による建物ユニットの一実施形態の構成を示している。建物ユニット10は箱状に構成されており、より詳細には長方形の床を画成する枠状に接続された四つの床梁11と、同様に長方形の天井を画成する枠状に接続された四つの天井梁12と、これらの床梁11と天井梁12の角部を垂直方向に接続する四本の柱13と、から構成されている。
Hereinafter, the present invention will be described in detail based on the embodiments shown in the drawings.
FIG. 1 shows the configuration of an embodiment of a building unit according to the present invention. The building unit 10 is configured in a box shape, and more specifically, the four floor beams 11 connected in a frame shape that defines a rectangular floor, and a frame shape that similarly defines a rectangular ceiling. The four ceiling beams 12 and four pillars 13 that connect the corner portions of the floor beams 11 and the ceiling beams 12 in the vertical direction.

床梁11は、長手方向に延びる一方の梁から反対側の梁に向かって互いに並行に延びる複数本、図示の場合、七本の床小梁11aを支持している。同様に、天井梁12は、長手方向に延びる一方の梁から反対側の梁に向かって互いに並行に延びる複数本、図示の場合、七本の天井小梁12aを支持している。   The floor beam 11 supports a plurality of, in the illustrated case, seven floor beams 11a extending in parallel with each other from one beam extending in the longitudinal direction toward the opposite beam. Similarly, the ceiling beam 12 supports a plurality of ceiling beams 12a extending in parallel with each other from one beam extending in the longitudinal direction toward the opposite beam, in the illustrated case, seven ceiling beams 12a.

ここで、建物ユニット10は、図面右手前の側面14が、他の建物ユニットに対し隣接して配置されて接続されるようになっている。このために、建物ユニット10は、この側面14を画成する床梁,天井梁及び両側の柱が、仮床梁11b,仮天井梁12b及び仮柱13bとして形成されている。ここで、仮梁以外の梁を非仮梁、仮柱以外の柱を非仮柱とする。
仮床梁11b,仮天井梁12b及び仮柱13bは、非仮梁及び非仮柱に比して低い断面性能を有する。より具体的には、工場生産後に建築現場に搬送され、他の建物ユニットと接続されて、建物を構築するまでの間、建物ユニット10自体が箱型を維持するために必要最低限の断面性能を有する程度に、細く形成されている。これにより、各床小梁11aは、それぞれ床梁11及び仮床梁11bにより支持され、また各天井小梁12aは、それぞれ天井梁12及び仮天井梁12bにより支持されることになる。
Here, the building unit 10 is configured such that a side surface 14 on the right front side of the drawing is disposed adjacent to and connected to other building units. For this reason, in the building unit 10, the floor beams, ceiling beams, and columns on both sides that define the side surface 14 are formed as temporary floor beams 11b, temporary ceiling beams 12b, and temporary columns 13b. Here, beams other than temporary beams are non-temporary beams, and columns other than temporary columns are non-temporary columns.
The temporary floor beam 11b, the temporary ceiling beam 12b, and the temporary column 13b have lower cross-sectional performance than the non-temporary beam and the non-temporary column. More specifically, the minimum cross-sectional performance necessary for the building unit 10 itself to maintain a box shape until it is transported to the building site after factory production, connected to other building units, and constructed a building. It is formed thin enough to have Thereby, each floor beam 11a is supported by the floor beam 11 and the temporary floor beam 11b, respectively, and each ceiling beam 12a is supported by the ceiling beam 12 and the temporary ceiling beam 12b, respectively.

さらに、仮柱13bは、それぞれ対応する床梁11,天井梁12の一端に対して着脱可能に接続されるように、接続金具13cを備えている。接続金具13cは様々な態様が実施可能であり、例えば図3(A)から(D)に示すように構成されている。即ち、図3(A)に示すように、接続金具13cは仮柱13bの上端面により構成されており、天井梁12と仮梁12bとを接続するジョイントピース12cの下面に突き合わせられて、下方からボルト等により固定される。   Furthermore, the temporary column 13b is provided with a connection fitting 13c so as to be detachably connected to one end of the corresponding floor beam 11 and ceiling beam 12, respectively. The connection fitting 13c can be implemented in various modes, and is configured as shown in FIGS. 3A to 3D, for example. That is, as shown in FIG. 3 (A), the connection fitting 13c is constituted by the upper end surface of the temporary column 13b, and is brought into contact with the lower surface of the joint piece 12c that connects the ceiling beam 12 and the temporary beam 12b. Fixed with bolts.

また、図3(B)に示すように、接続金具13cは、仮柱13bの上端から水平方向に張り出しており、この張り出し部分が、ジョイントピース12cに近い仮梁12bに対してボルト等により固定されるようになっていてもよい。
さらに、図3(C)に示すように、接続金具13cは、仮柱13bの上端の側縁から垂直に上方に向かって張り出しており、この張り出し部分が、接続コーナー部のジョイントピース12cに近い梁12の側面に対してボルト等により固定されるようになっていてもよい。
As shown in FIG. 3B, the connection fitting 13c projects horizontally from the upper end of the temporary column 13b, and this projecting portion is fixed to the temporary beam 12b near the joint piece 12c by bolts or the like. You may come to be.
Further, as shown in FIG. 3C, the connection fitting 13c projects vertically upward from the side edge of the upper end of the temporary column 13b, and this projecting portion is close to the joint piece 12c of the connection corner portion. It may be fixed to the side surface of the beam 12 with a bolt or the like.

また、図3(D)に示すように、仮柱13がアングル材により構成されており、その隅部が内側になるように配置されて、仮柱13の上端の各面が、それぞれ天井梁12及び仮梁12bの端面に対向してボルト等により固定されることにより、それ自体接続金具として機能するようになっていてもよい。この場合には、ジョイントピース12cが不要であると共に、他の建物ユニットと組み合わせて建物を構築した後に、仮柱13は取り外されない。
以上は、天井梁12と仮柱13bとの接続について説明したが、床梁11と仮柱13bとの接続も同様に行なわれる。
Further, as shown in FIG. 3D, the temporary column 13 is made of an angle material, and is arranged so that the corners thereof are inside, and each surface at the upper end of the temporary column 13 is respectively a ceiling beam. 12 and the end face of the temporary beam 12b may be fixed with bolts or the like so as to function as a connection fitting. In this case, the joint piece 12c is not necessary, and the temporary pillar 13 is not removed after the building is constructed in combination with other building units.
Although the connection between the ceiling beam 12 and the temporary column 13b has been described above, the connection between the floor beam 11 and the temporary column 13b is performed in the same manner.

本発明実施形態による建物ユニット10は以上のように構成されており、図7に示した従来と同様の構成の建物ユニット1に対して接続する場合には、図2(A)に示すように、本発明による建物ユニット10の側面14を建物ユニット1の側面に対向させて、図2(B)に示すように突き合わせる。
この状態から、図4(A)に示すように、天井梁12及び仮天井梁12bの接続部分、即ちジョイントピース12cを、建物ユニット1の柱4の上端側面に設けられた取付板4cに対してボルト等により固定する。さらに、図2に示すように、天井梁3に接続金具31を備えておき、これを仮天井梁12bにおける接続金具31に対応する部分に備えた被接続部(図示省略)に接続してもよい。
The building unit 10 according to the embodiment of the present invention is configured as described above. When the building unit 10 is connected to the building unit 1 having the same configuration as that shown in FIG. 7, as shown in FIG. The side surface 14 of the building unit 10 according to the present invention is opposed to the side surface of the building unit 1 and is abutted as shown in FIG.
From this state, as shown in FIG. 4A, the connecting portion of the ceiling beam 12 and the temporary ceiling beam 12b, that is, the joint piece 12c, is attached to the mounting plate 4c provided on the upper end side surface of the column 4 of the building unit 1. Secure with bolts. Further, as shown in FIG. 2, a connection fitting 31 is provided on the ceiling beam 3, and this is connected to a connected portion (not shown) provided in a portion corresponding to the connection fitting 31 in the temporary ceiling beam 12 b. Good.

ここで、ジョイントピース12cは、図4(B)に示すように、横断面「コ」字状に形成されており、柱4に対向する面にボルト等を挿通するための取付孔12dが備えられていてもよい。なお、ジョイントピース12cは、図4(C)に示すように、板状に構成され、天井梁12または仮梁12bの端面に対して取り付けられていてもよい。また、ジョイントピース12cは、図4(D)に示すように、天井梁12または仮梁12bの側面により構成され、この側面に取付孔12dが備えられていてもよい。
以上は天井梁12の接続について説明したが、床梁11の接続も同様に行なわれる。
Here, as shown in FIG. 4B, the joint piece 12 c is formed in a cross-sectional “U” shape, and is provided with a mounting hole 12 d for inserting a bolt or the like in a surface facing the column 4. It may be done. As shown in FIG. 4C, the joint piece 12c may have a plate shape and may be attached to the end surface of the ceiling beam 12 or the temporary beam 12b. Moreover, the joint piece 12c is comprised by the side surface of the ceiling beam 12 or the temporary beam 12b, and the attachment hole 12d may be provided in this side surface, as shown in FIG.4 (D).
Although the connection of the ceiling beam 12 has been described above, the connection of the floor beam 11 is similarly performed.

このようにして構築された建物20は、図2(B)に示すように、建物ユニット10の突き合わせ面14において、床梁11,天井梁12そして柱13が二重にならない。
また、建物ユニット10は、その突き合わせ面14において、建物ユニット1の床梁2,天井梁3及び柱4により支持され、建物構築時に必要な強度がこれらの床梁2,天井梁3及び柱4によって確保される。
As shown in FIG. 2B, the building 20 constructed in this way does not have double floor beams 11, ceiling beams 12, and pillars 13 on the abutting surface 14 of the building unit 10.
Further, the building unit 10 is supported by the floor beam 2, the ceiling beam 3 and the column 4 of the building unit 1 on the abutting surface 14, and the strength required for building construction is such that the floor beam 2, the ceiling beam 3 and the column 4 are provided. Secured by.

仮床梁11b,仮天井梁12b及び仮柱13bは、建物構築の際に建物ユニット10に取り付けられたままであってもよいが、建物ユニット10を建物ユニット1に対して接続する前または後に、これら仮床梁11b,仮天井梁12b及び仮柱13bが取り外されてもよい。取り外された仮床梁11b,仮天井梁12b及び仮柱13bは、再び、建物ユニット10を製造する場合に再利用される。   The temporary floor beam 11b, the temporary ceiling beam 12b, and the temporary column 13b may remain attached to the building unit 10 at the time of building construction, but before or after connecting the building unit 10 to the building unit 1, These temporary floor beam 11b, temporary ceiling beam 12b, and temporary column 13b may be removed. The removed temporary floor beam 11b, the temporary ceiling beam 12b, and the temporary column 13b are reused when the building unit 10 is manufactured again.

さらに、このようにして組み立てられた建物ユニット10及び建物ユニット1から成る建物20は、図5に示すように上下方向に関して二段に重ねられてもよい。この場合は、従来の建物ユニット1を上下方向に二段に重ねる場合と同様にして、二階建ての建物30が構築される。   Furthermore, the building 20 composed of the building unit 10 and the building unit 1 assembled in this way may be stacked in two stages in the vertical direction as shown in FIG. In this case, a two-story building 30 is constructed in the same manner as when the conventional building units 1 are stacked in two stages in the vertical direction.

図6は、図1に示した建物ユニット10を二つ並べて接続する場合を示している。この場合、各建物ユニット10の突き合わせ面14において、床梁11,天井梁12及び柱13として作用する枠状の連結フレーム40が使用される。
連結フレーム40は、床梁41,天井梁42及び両側の柱43から長方形の枠状に形成されている。これらの床梁41,天井梁42及び両側の柱43は、建物ユニット10における床梁11,天井梁12及び両側の柱13と同じ寸法で形成されている。
FIG. 6 shows a case where two building units 10 shown in FIG. 1 are connected side by side. In this case, a frame-like connecting frame 40 that acts as the floor beam 11, the ceiling beam 12, and the column 13 is used on the abutting surface 14 of each building unit 10.
The connection frame 40 is formed in a rectangular frame shape from the floor beam 41, the ceiling beam 42, and the pillars 43 on both sides. The floor beams 41, the ceiling beams 42, and the columns 43 on both sides are formed with the same dimensions as the floor beams 11, the ceiling beams 12, and the columns 13 on both sides in the building unit 10.

そして、二つの建物ユニット10が、それぞれ突き合わせ面14が互いに対向するように隣接して、連結フレーム40を挟むようにして配置され、図6(B)に示すように突き合わせられる。この状態から、各建物ユニット10の突き合わせ面14に在る短手方向の床梁11,天井梁12の端面が、連結フレーム40に対してボルト等により固定され、建物50が構築されることになる。この場合、仮柱13bのみが取り外されており、仮床梁11b,仮天井梁12bはそのまま残されている。   Then, the two building units 10 are arranged adjacent to each other so that the butting surfaces 14 face each other and sandwich the connecting frame 40, and are butted as shown in FIG. 6B. From this state, the end surfaces of the floor beam 11 and the ceiling beam 12 in the short direction existing on the abutting surface 14 of each building unit 10 are fixed to the connection frame 40 with bolts or the like, and the building 50 is constructed. Become. In this case, only the temporary pillar 13b is removed, and the temporary floor beam 11b and the temporary ceiling beam 12b are left as they are.

この建物50は、前述した建物20と同様に、建物ユニット10の突き合わせ面14において、床梁11,天井梁12そして柱13が二重にならない。また、建物ユニット10は、その突き合わせ面14において、連結フレーム40の床梁41,天井梁42及び柱43により支持され、建物構築時に必要な強度が連結フレーム40によって確保され得る。この場合も、各建物ユニット10の仮床梁11b,仮天井梁12bは、取り外されてもよく、また仮柱13bがそのまま残されてもよい。   In this building 50, the floor beam 11, the ceiling beam 12, and the column 13 do not double on the butting surface 14 of the building unit 10, as in the building 20 described above. Moreover, the building unit 10 is supported by the floor beam 41, the ceiling beam 42, and the pillar 43 of the connection frame 40 on the abutting surface 14, and the strength required for building construction can be ensured by the connection frame 40. Also in this case, the temporary floor beam 11b and the temporary ceiling beam 12b of each building unit 10 may be removed, or the temporary column 13b may be left as it is.

本発明はその趣旨を逸脱しない範囲において様々な形態で実施することができる。
例えば、建物ユニット10は、その一側の側面のみが突き合わせ面14として、この突き合わせ面14内に位置する床梁11,天井梁12及び柱13が、それぞれ仮床梁11b,仮天井梁12b及び仮柱13bとして構成されているが、これに限らず、建物ユニット10の複数の側面が突き合わせ面14として、この突き合わせ面14内に位置する床梁11,天井梁12及び柱13が、それぞれ仮床梁11b,仮天井梁12b及び仮柱13bとして構成されていてもよい。
The present invention can be implemented in various forms without departing from the spirit of the present invention.
For example, the building unit 10 has only one side surface as a butting surface 14, and the floor beam 11, the ceiling beam 12 and the column 13 located in the butting surface 14 are respectively provided with the temporary floor beam 11b, the temporary ceiling beam 12b and Although it is configured as the temporary pillar 13b, the present invention is not limited to this, and a plurality of side surfaces of the building unit 10 serve as the abutting surface 14, and the floor beam 11, the ceiling beam 12 and the column 13 located in the abutting surface 14 are respectively provisional. You may be comprised as the floor beam 11b, the temporary ceiling beam 12b, and the temporary pillar 13b.

以上述べたように、本発明によれば、突き合わせ部分における床梁,天井梁及び柱の二重配置を回避するようにした、極めて優れた建物ユニットが提供される。   As described above, according to the present invention, an extremely excellent building unit that avoids the double arrangement of the floor beam, the ceiling beam, and the column at the abutting portion is provided.

本発明による建物ユニットの一実施形態の構成を示す概略斜視図である。It is a schematic perspective view which shows the structure of one Embodiment of the building unit by this invention. 図1の建物ユニットを従来の箱状の建物ユニットに突き合わせる場合において、(A)は接続前の、(B)は接続後の状態を示す概略斜視図である。In the case where the building unit of FIG. 1 is abutted against a conventional box-shaped building unit, (A) is a schematic perspective view before connection and (B) is a schematic perspective view showing a state after connection. 図2に示す突き合わせ状態の建物ユニットを縦方向に二段に積み重ねる状態を示す概略斜視図である。FIG. 3 is a schematic perspective view showing a state in which the building units in a butted state shown in FIG. 2 are stacked in two stages in the vertical direction. 図1の建物ユニットにおける隅部における仮柱の納まり状態の複数の例を示す部分拡大斜視図である。It is a partial expansion perspective view which shows the some example of the provisional state of the temporary pillar in the corner in the building unit of FIG. 図2の建物ユニットの突き合わせ部分における接続された梁の納まり状態の複数の例を示す部分拡大斜視図である。FIG. 3 is a partial enlarged perspective view showing a plurality of examples of a connected state of beams connected to a butted portion of the building unit of FIG. 2. 図1の建物ユニットを二つ横に並べて連結フレームを介して突き合わせる場合において、(A)は接続前の、(B)は接続後の状態を示す概略斜視図である。2A is a schematic perspective view showing a state before connection and FIG. 2B is a state after connection when two building units of FIG. 従来の建物ユニットの一例の構成を二つ横に並べて突き合わせる場合において、(A)は接続前の、(B)は接続後の状態を示す概略斜視図である。In the case where two configurations of a conventional building unit are arranged side by side, (A) is a schematic perspective view before connection, and (B) is a schematic perspective view showing a state after connection. (A)は従来の軸組工法による建物、(B)は図7の建物ユニットによる建物における床梁,天井梁及び柱の組合せ状態を示す概略斜視図である。(A) is the building by the conventional frame construction method, (B) is a schematic perspective view which shows the combination state of the floor beam in the building by the building unit of FIG. 7, a ceiling beam, and a column.

符号の説明Explanation of symbols

10 建物ユニット
11 床梁
11a 床小梁
11b 仮梁
12 天井梁
12a 天井小梁
12b 仮梁
12c ジョイントピース
12d 取付孔
13 柱
13b 仮柱
13c 接続金具
14 突き合わせ面
20,30,50 建物
40 連結フレーム
41 床梁
42 天井梁
43 柱
DESCRIPTION OF SYMBOLS 10 Building unit 11 Floor beam 11a Floor beam 11b Temporary beam 12 Ceiling beam 12a Ceiling beam 12b Temporary beam 12c Joint piece 12d Mounting hole 13 Column 13b Temporary column 13c Connection fitting 14 Abutting surface 20,30,50 Building 40 Connection frame 41 Floor beam 42 Ceiling beam 43 Column

Claims (8)

梁及び柱から成るユニットプレハブ工法で使用される建物ユニットであって、
他のユニットに隣接する少なくとも一つの側面の両側に位置する一対の柱が、着脱可能な仮柱として構成されていることを特徴とする、建物ユニット。
A building unit used in a unit prefabricated method consisting of beams and columns,
A building unit, wherein a pair of columns located on both sides of at least one side surface adjacent to another unit is configured as a detachable temporary column.
前記一対の仮柱が、非仮柱に比して低い断面性能を有する柱であることを特徴とする、請求項1に記載の建物ユニット。   The building unit according to claim 1, wherein the pair of temporary columns are columns having low cross-sectional performance as compared with non-temporary columns. 他のユニットに隣接する少なくとも一つの側面の上下縁に位置する一対の梁が、着脱可能な仮梁として構成されていることを特徴とする、請求項1または2に記載の建物ユニット。   The building unit according to claim 1 or 2, wherein a pair of beams positioned at the upper and lower edges of at least one side surface adjacent to another unit are configured as detachable temporary beams. 前記一対の仮梁が、非仮梁に比して低い断面性能を有する梁であることを特徴とする、請求項3に記載の建物ユニット。   The building unit according to claim 3, wherein the pair of temporary beams are beams having lower cross-sectional performance than non-temporary beams. 前記仮梁が、対向する反対側の梁または仮梁との間に設けられた天井小梁または床小梁を支持することを特徴とする、請求項3または4に記載の建物ユニット。   The building unit according to claim 3 or 4, wherein the temporary beam supports a ceiling beam or a floor beam provided between the opposite beam or the temporary beam. 当該建物ユニットが他の建物ユニットと連結されて一つの建物を構築するとき、他の建物ユニットの側面に対向する両側に仮柱を有する側面が、他の建物ユニットに対して接続されることを特徴とする、請求項1から5の何れかに記載の建物ユニット。   When the building unit is connected to another building unit to construct one building, the side having temporary columns on both sides facing the side of the other building unit is connected to the other building unit. The building unit according to any one of claims 1 to 5, characterized in that it is a feature. 柱及び梁を構成する枠状の連結フレームを有し、この連結フレームを介して他の建物ユニットに接続されることを特徴とする、請求項1から5の何れかに記載の建物ユニット。   The building unit according to any one of claims 1 to 5, further comprising a frame-shaped connecting frame that constitutes a pillar and a beam, and connected to another building unit via the connecting frame. 他の建物ユニットに接続されるとき、前記他の建物ユニットに対向する側面の両側の仮柱または仮梁が取り外されることを特徴とする、請求項1から7の何れかに記載の建物ユニット。   The building unit according to any one of claims 1 to 7, wherein when connected to another building unit, temporary columns or temporary beams on both sides of a side surface facing the other building unit are removed.
JP2007338374A 2007-12-27 2007-12-27 Building unit Pending JP2009155986A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007338374A JP2009155986A (en) 2007-12-27 2007-12-27 Building unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007338374A JP2009155986A (en) 2007-12-27 2007-12-27 Building unit

Publications (1)

Publication Number Publication Date
JP2009155986A true JP2009155986A (en) 2009-07-16

Family

ID=40960283

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007338374A Pending JP2009155986A (en) 2007-12-27 2007-12-27 Building unit

Country Status (1)

Country Link
JP (1) JP2009155986A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017066670A (en) * 2015-09-29 2017-04-06 積水化学工業株式会社 Unit with temporary support material, unit building, and construction method for unit building
JP2020165228A (en) * 2019-03-29 2020-10-08 大建工業株式会社 Unit room, unit room connecting member, and construction method unit room
JP2020165227A (en) * 2019-03-29 2020-10-08 大建工業株式会社 Unit room and unit room connection
JP2020176432A (en) * 2019-04-17 2020-10-29 トヨタホーム株式会社 Beam connection structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06146602A (en) * 1992-11-16 1994-05-27 Sekisui Chem Co Ltd Temporary beam fitting structure for building unit
JPH09317197A (en) * 1996-05-28 1997-12-09 Sekisui Chem Co Ltd Reinforcing method unit building and building unit
JP2006144309A (en) * 2004-11-17 2006-06-08 Sekisui Chem Co Ltd Building unit and unit building

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06146602A (en) * 1992-11-16 1994-05-27 Sekisui Chem Co Ltd Temporary beam fitting structure for building unit
JPH09317197A (en) * 1996-05-28 1997-12-09 Sekisui Chem Co Ltd Reinforcing method unit building and building unit
JP2006144309A (en) * 2004-11-17 2006-06-08 Sekisui Chem Co Ltd Building unit and unit building

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017066670A (en) * 2015-09-29 2017-04-06 積水化学工業株式会社 Unit with temporary support material, unit building, and construction method for unit building
JP2020165228A (en) * 2019-03-29 2020-10-08 大建工業株式会社 Unit room, unit room connecting member, and construction method unit room
JP2020165227A (en) * 2019-03-29 2020-10-08 大建工業株式会社 Unit room and unit room connection
JP2020176432A (en) * 2019-04-17 2020-10-29 トヨタホーム株式会社 Beam connection structure

Similar Documents

Publication Publication Date Title
JP2005240358A (en) Unit building
JP2009209551A (en) Unit building and reinforcing member
JP2009155986A (en) Building unit
KR100805732B1 (en) Building structure using modular unit
JP2010084465A (en) Connecting structure, unit building, and method for constructing the unit building
JP5123603B2 (en) Unit type building and construction method of unit type building
JP5128313B2 (en) Unit building
JP5362333B2 (en) Unit building
JP2009035990A (en) Reinforced beam, unit building, and method of constructing unit building
JP5501725B2 (en) Unit building
JP5312163B2 (en) Unit building
JP2010090593A (en) Floor structure and method for constructing unit building
JP2018123601A (en) Partition panel
KR20090092540A (en) Attachment of Unit Modular System, Modular Unit And Manufacturing Method of The Modular Unit
KR20070047958A (en) Panel box module in modular housing
JP2013079545A (en) Unit building and construction method for unit building
KR20170105935A (en) H-beam type steel frame unit set for frame construction of steel house
JP2009228232A (en) Unit type building
JP6860354B2 (en) Building structure
JP2003074122A (en) Unit building and expansion unit
JP2006144309A (en) Building unit and unit building
JP5000881B2 (en) Unit type building and construction method of the unit type building
JP6789152B2 (en) Building unit and its manufacturing method
JP5362893B2 (en) Unit building
JP2008274694A (en) Unit building

Legal Events

Date Code Title Description
RD02 Notification of acceptance of power of attorney

Effective date: 20100922

Free format text: JAPANESE INTERMEDIATE CODE: A7422

A977 Report on retrieval

Effective date: 20101022

Free format text: JAPANESE INTERMEDIATE CODE: A971007

A711 Notification of change in applicant

Effective date: 20101026

Free format text: JAPANESE INTERMEDIATE CODE: A712

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101028

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20101026

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20110304