JP2008274570A - Precast concrete column, and method for joining precast concrete column and precast concrete beam together - Google Patents

Precast concrete column, and method for joining precast concrete column and precast concrete beam together Download PDF

Info

Publication number
JP2008274570A
JP2008274570A JP2007116197A JP2007116197A JP2008274570A JP 2008274570 A JP2008274570 A JP 2008274570A JP 2007116197 A JP2007116197 A JP 2007116197A JP 2007116197 A JP2007116197 A JP 2007116197A JP 2008274570 A JP2008274570 A JP 2008274570A
Authority
JP
Japan
Prior art keywords
column
prestressed concrete
concrete beam
precast concrete
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2007116197A
Other languages
Japanese (ja)
Inventor
Hiroshi Fujita
洋 藤田
Yukio Fujiwara
幸男 藤原
Hiroharu Mori
弘晴 森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Engineering Corp
Original Assignee
JFE Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Engineering Corp filed Critical JFE Engineering Corp
Priority to JP2007116197A priority Critical patent/JP2008274570A/en
Publication of JP2008274570A publication Critical patent/JP2008274570A/en
Pending legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a precast concrete column which can be manufactured at a low cost and which can shorten a construction period by enhancing jointing workability when a column body and a beam are joined together and dispensing with the placing of concrete, and a method for joining the precast concrete column and a prestressed concrete beam together. <P>SOLUTION: A protrusion 117, which is protruded from first-fourth supporting surfaces 113a-114d, is provided on the upper section of the column body 21 by a notched section 115 which forms first-fourth supporting surfaces (113b and 113d) for supporting a one-end-side bottom surface of the prestressed concrete beam 3, and first-fourth abutting surfaces (114b-114b) abutting on a butt surface of the prestressed concrete beam 3 in the state of facing it. The protrusion 117 is provided with through-holes 118 and 119 which allow the insertion of a beam-direction beam PC steel material 33 and a span-direction beam PC steel material 35 from the beam 3. A head top surface of the column body 21 is an upstair supporting surface 112 for supporting the column body 11 on an upstair. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、工場から作製された状態で建築現場へ搬入されるプレキャストコンクリート製の柱およびプレキャストコンクリート製の柱とプレストレストコンクリート梁との接合方法に関する。   The present invention relates to a precast concrete column that is carried into a construction site in a state of being manufactured from a factory, and a method for joining a precast concrete column and a prestressed concrete beam.

従来のプレキャストコンクリート製の柱としては、例えば、特許文献1,2に記載されたものがある。   Examples of conventional precast concrete columns include those described in Patent Documents 1 and 2.

特許文献1に記載のプレストレスコンクリート構造物における柱と梁の接合構造は、柱に突設された梁受け用顎に梁の端部を支持させ、梁がPC鋼線によりプレストレスが付与されて柱に緊張定着されるとともに、柱の梁受け用顎と梁の端部との間に、柱と梁よりも強度の大きい充填材を設けたものである。   In the prestressed concrete structure described in Patent Document 1, the column-to-beam joint structure is such that the beam end is supported by a beam receiving jaw protruding from the column, and the beam is prestressed by a PC steel wire. In addition to being fixed in tension on the column, a filler having a higher strength than the column and the beam is provided between the beam receiving jaw of the column and the end of the beam.

また、特許文献2のプレキャストコンクリート製の柱は、下階柱の上部に、主体部の外径より小径の突部が、主体部と一体に上方へ突設され、突部の四方には主体部の外面から内側へ切り欠いた切欠部が、軸芯と直行する方向に貫通して形成され、切欠部の下端にPCa梁を受ける受面が形成されたものである。   Further, in the column made of precast concrete of Patent Document 2, a protrusion having a smaller diameter than the outer diameter of the main part is provided on the upper part of the lower floor pillar, and protrudes upward integrally with the main part. A notch part cut out inward from the outer surface of the part is formed so as to penetrate in a direction perpendicular to the axis, and a receiving surface for receiving the PCa beam is formed at the lower end of the notch part.

特開平11−172762号公報Japanese Patent Laid-Open No. 11-172762 特開2003−268875号公報JP 2003-268875 A

しかし、特許文献1に記載の柱と梁の接合構造では、プレキャストコンクリート製の柱の所定高さに、梁を受ける梁受け用顎が、軸線とは直交する方向に突出形成されているので、成型するときの型枠が複雑である。従って、梁受け用顎の無いプレキャストコンクリート製の柱を成型するための型枠に比べてコストが高くなる。   However, in the joint structure of the column and beam described in Patent Document 1, the beam receiving jaw for receiving the beam is formed to protrude in a direction perpendicular to the axis at a predetermined height of the column made of precast concrete. Formwork when molding is complicated. Therefore, the cost is higher than a mold for molding a precast concrete column without a beam receiving jaw.

また、特許文献2に記載のプレキャストコンクリート製の柱では、PCa製の梁を受面の縁部に掛け置きした後に、梁と突部との間にできた空隙部に、現場打ちコンクリートを流し込んでいるため、コンクリートを成型するための型枠が必要である。型枠は、使い捨ての消耗品なので、大量に使用することでコストが増大してしまう。また、環境保全の観点から使い捨てとなる型枠は好ましくない。更に、現場でコンクリートの打設は、型枠の組み立て、コンクリートの流し込みおよび硬化、型枠の取り外しと煩雑な工程が必要なので、工期短縮を阻害する要因である。   In addition, in the precast concrete column described in Patent Document 2, the cast-in-place concrete is poured into the gap formed between the beam and the protrusion after the beam made of PCa is hung on the edge of the receiving surface. Therefore, a formwork for molding concrete is necessary. Since the formwork is a disposable consumable, the cost increases when used in large quantities. Moreover, the formwork which becomes disposable from a viewpoint of environmental conservation is not preferable. Furthermore, concrete placement on site is a factor that hinders shortening the construction period because it requires complicated steps such as mold assembly, concrete pouring and hardening, mold removal and the like.

そこで本発明は、低いコストで作製でき、柱本体と梁とを接合する際の接合作業性が向上すると共にコンクリートの打設を不要とすることで、工期の短縮を図ることができるプレキャストコンクリート製の柱およびプレキャストコンクリート製の柱とプレストレストコンクリート梁との接合方法を提供することを目的とする。   Therefore, the present invention can be manufactured at a low cost, improves workability when joining the column main body and the beam, and eliminates the need for placing concrete, thereby shortening the work period. It is an object of the present invention to provide a method for joining a prestressed concrete beam and a precast concrete column.

本発明のプレキャストコンクリート製の柱は、頭頂面が上階の柱本体を支持する支持面となる柱本体の上部に、プレストレストコンクリート梁の一端側の底面を支持する水平面と、前記プレストレストコンクリート梁の突き合わせ面に対向して当接する垂直面とを形成する切欠部を設け、前記垂直面と、前記垂直面と反対となる面との間に、前記プレストレストコンクリート梁からの緊張体が挿通する貫通孔が設けられていることを特徴とする。   The column made of precast concrete according to the present invention has a horizontal surface that supports the bottom surface of one end side of the prestressed concrete beam on the top of the column body whose top surface is a support surface that supports the column body on the upper floor, and the prestressed concrete beam. A through-hole through which a tension body from the prestressed concrete beam passes is provided between the vertical surface and a surface opposite to the vertical surface. Is provided.

本発明のプレキャストコンクリート製の柱は、プレストレストコンクリート梁の一端側の底面を支持する水平面と、前記プレストレストコンクリート梁の突き合わせ面に対向して当接する垂直面とを形成する切欠部が設けられているので、この水平面にプレストレストコンクリート梁を載置することで、従来のプレキャストコンクリート製の柱のように、梁受け用顎を突出形成しなくても、プレストレストコンクリート梁を安定して上部に架設することができる。また、前記垂直面と、前記垂直面と反対となる面との間に、プレストレストコンクリート梁からの緊張体が挿通する貫通孔が設けられているので、水平面に載置したプレストレストコンクリート梁の突き合わせ面を、切欠部の垂直面に突き当てた状態で、この垂直面と反対となる面側から緊張体に引っ張り緊張力を付与することで、プレストレストコンクリート梁を柱本体に密着させた状態で固定することができる。従って、本発明のプレキャストコンクリート製の柱は、プレストレストコンクリート梁をコンクリートの打設なしに、密着固定することが可能なので、コンクリートを打設するための型枠が不要である。   The precast concrete column of the present invention is provided with a notch portion that forms a horizontal plane that supports the bottom surface of one end side of the prestressed concrete beam and a vertical surface that abuts against the butted surface of the prestressed concrete beam. So, by placing the prestressed concrete beam on this horizontal plane, the prestressed concrete beam can be stably laid on the upper part without the need to project the beam receiving jaw like a conventional precast concrete column. Can do. Further, since a through hole through which a tension body from the prestressed concrete beam is inserted is provided between the vertical surface and a surface opposite to the vertical surface, the butt surface of the prestressed concrete beam placed on the horizontal surface In the state where it is abutted against the vertical surface of the notch, the prestressed concrete beam is fixed in close contact with the column body by applying tension to the tension body from the surface opposite to the vertical surface. be able to. Accordingly, the precast concrete column of the present invention can fix and fix the prestressed concrete beam without placing concrete, so that a formwork for placing concrete is unnecessary.

前記柱本体の頭頂面が、上階の柱本体を支持する支持面であり、前記切欠部は、前記プレストレストコンクリート梁の一端側の高さと、前記プレストレストコンクリート梁が支持する床面の厚みとの合計の高さに調整されているのが望ましい。   The top surface of the column main body is a support surface that supports the column main body on the upper floor, and the notch portion has a height on one end side of the prestressed concrete beam and a thickness of a floor surface supported by the prestressed concrete beam. It is desirable to adjust to the total height.

切欠部の高さを、プレストレストコンクリート梁の一端側の高さと、前記プレストレストコンクリート梁が支持する床面の厚みとの合計とすることで、切欠部の水平面にプレストレストコンクリート梁を載置し、そして床面を形成して、柱本体の頭頂面に上階の柱本体を配設すると、それぞれの間に隙間なく設けることができる、   Placing the prestressed concrete beam on the horizontal surface of the notch, with the height of the notch being the sum of the height of one end of the prestressed concrete beam and the thickness of the floor supported by the prestressed concrete beam; and When the floor surface is formed and the column main body on the upper floor is arranged on the top surface of the column main body, it can be provided without any gap between them.

前記柱本体の上部には、他のプレストレストコンクリート梁の一端側の底面を支持する他の水平面と、前記他のプレストレストコンクリート梁の突き合わせ面に対向して当接する他の垂直面とを形成する他の切欠部が設けられ、前記他の垂直面と反対となる面との間にも、前記他のプレストレストコンクリート梁からの緊張体が挿通する他の貫通孔が設けられ、前記貫通孔と前記他の貫通孔とは、段違いに配置されていることが望ましい。   In the upper part of the column main body, other horizontal planes that support the bottom surface of one end side of the other prestressed concrete beam and other vertical planes that face and abut the butting surface of the other prestressed concrete beam The other through hole through which the tension body from the other prestressed concrete beam is inserted is also provided between the surface opposite to the other vertical surface, and the through hole and the other It is desirable that the through-holes be arranged in steps.

例えば、梁を柱本体の上部に接合する場合、梁の長さが短いものであれば緊張体による梁への支持は不要なため水平面に載置するだけで十分である。しかし、梁の長さが長くなると緊張体による支持が必要となるため、柱本体に対して複数の梁を固定する場合には、貫通孔と他の貫通孔とが段違いに配置されていれば、プレストレストコンクリート梁の緊張体と他のプレストレストコンクリート梁の緊張体とを交差するように配置することができるので、柱本体に対して複数のプレストレストコンクリート梁を固定させることができる。   For example, when the beam is joined to the upper part of the column main body, if the beam has a short length, it is sufficient to place it on a horizontal plane because it is not necessary to support the beam with a tension body. However, as the length of the beam becomes longer, support by a tension body is required, so when fixing a plurality of beams to the column main body, if the through hole and the other through hole are arranged in a different manner Since the tension body of the prestressed concrete beam and the tension body of the other prestressed concrete beam can be arranged so as to cross each other, a plurality of prestressed concrete beams can be fixed to the column main body.

本発明のプレキャストコンクリート製の柱とプレストレストコンクリート梁との接合方法は、柱本体の上部に、プレストレストコンクリート梁の一端側の底面を支持する水平面と、前記プレストレストコンクリート梁の突き合わせ面に対向して当接する垂直面とを形成する切欠部が設けられ、前記垂直面と、前記垂直面と反対となる面との間に、前記プレストレストコンクリート梁からの緊張体が挿通する貫通孔が設けられているプレキャストコンクリート製の柱と、前記プレストレストコンクリート梁とを接合する接合方法であって、前記プレキャストコンクリート製の柱を立設する工程と、前記プレストレストコンクリート梁の一端側の底面を、前記水平面に載置する工程と、前記プレストレストコンクリート梁から延びる緊張体を前記貫通孔に挿通させる工程と、前記緊張体に緊張力を付与して、前記前記プレストレストコンクリート梁の突き合わせ面を、前記垂直面に密着させて固定する工程とを含むことを特徴とする。   The method for joining a precast concrete column and a prestressed concrete beam according to the present invention is such that a horizontal surface supporting the bottom surface of one end side of the prestressed concrete beam is opposed to the butt surface of the prestressed concrete beam at the top of the column body. A precast in which a notch portion is formed to form a vertical surface that comes into contact, and a through-hole through which a tension body from the prestressed concrete beam is inserted is provided between the vertical surface and a surface opposite to the vertical surface A joining method for joining a concrete column and the prestressed concrete beam, the step of standing the precast concrete column, and placing a bottom surface of one end side of the prestressed concrete beam on the horizontal plane A tension body extending from the prestressed concrete beam, A step for inserting the through hole, the tension imparted to the tension member, the abutting face of the said prestressed concrete beam, characterized in that it comprises a step of fixing by close contact with the vertical plane.

本発明のプレキャストコンクリート製の柱とプレストレストコンクリート梁との接合方法によれば、立設された柱本体上部に切欠部によってできた水平面に、プレストレストコンクリート梁の一端側の底面を載置するので、安定した状態でプレストレストコンクリート梁を柱本体に配置することができる。そして、プレストレストコンクリート梁から延びる緊張体を貫通孔に挿通させ、緊張力を付与することで、プレストレストコンクリート梁の突き合わせ面を切欠部によってできた垂直面に密着させて固定させる。そうすることで、コンクリートの打設なしにプレキャストコンクリート製の柱とプレストレストコンクリート梁との接合することができる。   According to the method of joining the precast concrete column and the prestressed concrete beam of the present invention, the bottom surface on one end side of the prestressed concrete beam is placed on the horizontal surface formed by the notch at the upper part of the column body that is erected. Prestressed concrete beams can be placed on the column body in a stable state. And the tension body extended from a prestressed concrete beam is penetrated to a through-hole, and the butt surface of a prestressed concrete beam is closely_contact | adhered to the perpendicular | vertical surface made by the notch part, and is fixed. By doing so, it is possible to join the precast concrete column and the prestressed concrete beam without placing concrete.

本発明のプレキャストコンクリート製の柱は、柱本体から水平方向に突出するものがなく、プレストレストコンクリート梁をコンクリートの打設なしに、密着固定することで、コンクリートを打設するための型枠が不要なので、低いコストで作製でき、工期の短縮を図ることができる。   The columns made of precast concrete according to the present invention do not protrude in the horizontal direction from the column main body, and the formwork for placing concrete is not required by closely fixing the prestressed concrete beam without placing concrete. Therefore, it can be manufactured at a low cost, and the construction period can be shortened.

本発明の実施の形態に係るプレキャストコンクリート製の柱を、図面に基づいて説明する。図1は、本発明の実施の形態に係るプレキャストコンクリート製の柱を用いた立体駐車場の一部拡大した平面図である。図2は、図1に示す立体駐車場の正面図である。   A column made of precast concrete according to an embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a partially enlarged plan view of a multi-story parking lot using precast concrete columns according to an embodiment of the present invention. FIG. 2 is a front view of the multi-story parking lot shown in FIG.

図1および図2に示すように、建物100は、平面視して矩形状に形成された床スラブ101に、車両102が駐車する立体駐車場である。建物100は、外柱1同士の間、および外柱1と中柱2との間で、プレストレストコンクリート梁(以下、単に梁と称す。)3が架設されている。   As shown in FIGS. 1 and 2, the building 100 is a three-dimensional parking lot in which a vehicle 102 is parked on a floor slab 101 formed in a rectangular shape in plan view. In the building 100, prestressed concrete beams (hereinafter simply referred to as beams) 3 are installed between the outer pillars 1 and between the outer pillars 1 and the middle pillars 2.

次に、外柱1および中柱2のついて詳細に説明するが、まず、外柱1について、図3から図5に基づいて説明する。図3は、本発明の実施の形態に係るプレキャストコンクリート製の柱とプレストレストコンクリート梁との接合構造を示す図である。図4は、図1に示す立体駐車場の外柱としてのプレキャストコンクリート製の柱とプレストレストコンクリート梁との接合構造を示すA部を拡大した垂直断面図である。図5は、図4に示す外柱としてのプレキャストコンクリート製の柱とプレストレストコンクリート梁との接合構造を示す水平断面図である。なお、図3は、最上階のプレキャストコンクリート製の柱を示すものであり、図4は、中階または最下階のプレキャストコンクリート製の柱を示すものである。また、図3においては、床スラブ、PC鋼棒およびPC鋼材を挿通する外柱、および梁の貫通孔は省略している。   Next, the outer column 1 and the middle column 2 will be described in detail. First, the outer column 1 will be described with reference to FIGS. FIG. 3 is a diagram showing a joint structure between a precast concrete column and a prestressed concrete beam according to an embodiment of the present invention. FIG. 4 is an enlarged vertical sectional view of a portion A showing a joint structure of a precast concrete column and a prestressed concrete beam as an outer column of the multi-story parking lot shown in FIG. FIG. 5 is a horizontal sectional view showing a joint structure of a precast concrete column and a prestressed concrete beam as the outer column shown in FIG. FIG. 3 shows a column made of precast concrete on the uppermost floor, and FIG. 4 shows a column made of precast concrete on the middle floor or the lowermost floor. In FIG. 3, the floor slab, the outer column through which the PC steel bar and the PC steel material are inserted, and the through-hole of the beam are omitted.

図3から図5に示すように、外柱1は、柱本体11が平面視して矩形状に形成されたプレキャストコンクリート製の柱である。柱本体11には、軸線方向に沿って4本の柱定着用の緊張体であるPC鋼棒12が挿通する貫通孔111が設けられている。   As shown in FIGS. 3 to 5, the outer column 1 is a column made of precast concrete in which the column body 11 is formed in a rectangular shape in plan view. The column main body 11 is provided with through holes 111 through which the PC steel rods 12 that are four column fixing tension members are inserted along the axial direction.

柱本体11の頭頂面には、上階の柱4(外柱1)を支持する上階柱支持面112が形成されている。柱本体11と上階の柱4とは、シーリングを介して接続される。柱本体11の上階柱支持面112には、PC鋼棒12の端部を固定する緊張定着具13が設けられている。   An upper floor column support surface 112 that supports the upper floor column 4 (outer column 1) is formed on the top surface of the column body 11. The pillar body 11 and the pillar 4 on the upper floor are connected via a ceiling. A tension fixing tool 13 for fixing the end of the PC steel rod 12 is provided on the upper-floor column support surface 112 of the column main body 11.

柱本体11の上部には、梁3の一端側の底面31を支持する水平面であり、梁受用顎として機能する第1〜第3支持面113a〜113cと、梁3の突き合わせ面32に対向して当接する垂直面である第1〜第3当接面114a〜114cとを形成する切欠部115が、建物100の外側となる外側面116以外の3ヵ所に設けられている。   The top of the column body 11 is a horizontal plane that supports the bottom surface 31 on one end side of the beam 3, and faces the first to third support surfaces 113 a to 113 c that function as a beam receiving jaw and the butting surface 32 of the beam 3. Cutout portions 115 that form first to third contact surfaces 114 a to 114 c that are vertical surfaces that contact each other are provided at three locations other than the outer surface 116 that is the outside of the building 100.

つまり、柱本体11の上部の3ヵ所に設けられた切欠部115によって、第1〜第3支持面113a〜113cが平面視してコ字状に形成されることで、第1〜第3支持面113a〜113cから突出した突出部117が形成されている。   In other words, the first to third support surfaces 113a to 113c are formed in a U shape in plan view by the notches 115 provided at the three upper portions of the column main body 11, so that the first to third support is formed. A protruding portion 117 protruding from the surfaces 113a to 113c is formed.

この突出部117には、第1支持面113aと、第1支持面113aの反対となる第3支持面113cとの間に、緊張体である桁方向梁PC鋼材33を挿通させるための貫通孔118が設けられている。この桁方向梁PC鋼材33は、突出部117を挟んで配置される梁3,3の軸線に沿って形成された貫通孔34を挿通して、両方の隅柱(図示せず)にて緊張定着具で固定されている。   A through-hole for allowing the projecting portion 117 to pass the beam-shaped beam PC steel material 33, which is a tension body, between the first support surface 113a and the third support surface 113c opposite to the first support surface 113a. 118 is provided. This girder beam PC steel material 33 is inserted through a through-hole 34 formed along the axis of the beams 3 and 3 arranged with the protruding portion 117 interposed therebetween, and is tensioned at both corner pillars (not shown). It is fixed with a fixing tool.

また、突出部117には、貫通孔118と、平面視して直交するように、かつ段違いに、緊張体であるスパン方向梁PC鋼材35を挿通させるための貫通孔119が設けられている。このスパン方向梁PC鋼材35の端部は、緊張定着具36により突出部117に固定されている。緊張定着具36は、突出部117に埋没するように設けられている。この突出部117は、梁3の高さHと床スラブ101の厚みTとの合計の高さに形成されている。   Further, the projecting portion 117 is provided with a through hole 119 through which the span direction beam PC steel material 35 that is a tension body is inserted so as to be orthogonal to the through hole 118 in a plan view. The end portion of the span direction beam PC steel material 35 is fixed to the protruding portion 117 by a tension fixing tool 36. The tension fixing tool 36 is provided so as to be buried in the protruding portion 117. The protrusion 117 is formed to have a total height of the height H of the beam 3 and the thickness T of the floor slab 101.

次に、本実施の形態に係る中柱2について、図6および図7に基づいて説明する。図6は、図1に示す立体駐車場の中柱としてのプレキャストコンクリート製の柱とプレストレストコンクリート梁との接合構造を示すB部を拡大した垂直水平断面図である。図7は、図6に示す中柱としてのプレキャストコンクリート製の柱とプレストレストコンクリート梁との接合構造を示す水平断面図である。なお、図6および図7においては、図3から図5と同じ機能のものは同符号を付して説明を省略する。   Next, the middle pillar 2 according to the present embodiment will be described with reference to FIGS. 6 and 7. FIG. 6 is an enlarged vertical horizontal cross-sectional view of a portion B showing a joint structure between a precast concrete column and a prestressed concrete beam as a middle column of the multi-story parking lot shown in FIG. 1. FIG. 7 is a horizontal cross-sectional view showing a joint structure between a precast concrete column and a prestressed concrete beam as the middle column shown in FIG. 6. 6 and 7, components having the same functions as those in FIGS. 3 to 5 are denoted by the same reference numerals and description thereof is omitted.

図6および図7に示すように、中柱2は、外柱1と同様に、柱本体11が平面視して矩形状に形成されたプレキャストコンクリート製の柱である。柱本体21の頭頂面には、上階の柱4(中柱2)を支持する上階柱支持面112が形成されている。   As shown in FIGS. 6 and 7, the middle column 2 is a precast concrete column in which the column main body 11 is formed in a rectangular shape in plan view, like the outer column 1. On the top surface of the column main body 21, an upper column support surface 112 that supports the column 4 (middle column 2) on the upper floor is formed.

柱本体21の上部には、外柱1の第1〜第3支持面113a〜113cの他に、梁3の一端側を支持する水平面である第4支持面113dが設けられている。つまり、柱本体21の上部において、第2当接面114bとは反対となる側にも切欠部115を設けることで、第4支持面113dと、第4当接面114dが形成されている。そして第4支持面113dに梁3の底面31を支持させることで、中柱2を中心として十字状に梁3を架設することができる。   In addition to the first to third support surfaces 113 a to 113 c of the outer column 1, a fourth support surface 113 d that is a horizontal plane that supports one end side of the beam 3 is provided on the top of the column main body 21. That is, the fourth support surface 113d and the fourth contact surface 114d are formed by providing the notch 115 on the opposite side of the column main body 21 from the second contact surface 114b. By supporting the bottom surface 31 of the beam 3 on the fourth support surface 113d, the beam 3 can be installed in a cross shape with the middle column 2 as the center.

以上のように構成された本発明の実施の形態に係るプレキャストコンクリート製の柱とプレストレストコンクリート梁との接合方法について、中柱2を例に、図6および図7に基づいて説明する。なお、外柱1については、中柱2の第4支持面113dおよび第4当接面114dが設けられていない以外は、同じなので省略する。   A method for joining a precast concrete column and a prestressed concrete beam according to the embodiment of the present invention configured as described above will be described with reference to FIGS. 6 and 7 taking the middle column 2 as an example. The outer pillar 1 is the same except that the fourth support surface 113d and the fourth contact surface 114d of the middle pillar 2 are not provided, and thus the outer pillar 1 is omitted.

まず、中柱2を立設し、柱本体21の上階柱支持面112にてPC鋼棒12の端部を緊張定着具13により固定する。次に、中柱2を立設した後に桁方向の梁3を架設する場合には、桁方向の梁3の端部の底面を、例えば、まず、第1支持面113aに載置する。そして、突出部117を挟んで第1支持面113aとは反対側である第3支持面113cに、桁方向の梁3の端部の底面を載置する。次に、一方の桁方向の梁3からの桁方向梁PC鋼材33を、中柱2の貫通孔118内を介して、他方の桁方向の梁3内へ挿通させる。そして、この桁方向梁PC鋼材33に緊張力を付与することで、梁3,3の突き合わせ面32は、第1当接面114aと第3当接面114cとに密着する。梁3,3の突き合わせ面32と、第1当接面114aおよび第3当接面114cとの間には、無収縮モルタルを目地材として充填されているので、隙間無く密着した状態となる。   First, the middle pillar 2 is erected, and the end of the PC steel rod 12 is fixed by the tension fixing tool 13 on the upper floor pillar support surface 112 of the pillar body 21. Next, when the beam 3 in the spar direction is erected after the middle pillar 2 is erected, the bottom surface of the end of the beam 3 in the spar direction is first placed on the first support surface 113a, for example. Then, the bottom surface of the end portion of the beam 3 in the spar direction is placed on the third support surface 113c opposite to the first support surface 113a with the protruding portion 117 interposed therebetween. Next, the cross beam PC steel material 33 from the beam 3 in one girder direction is inserted into the beam 3 in the other girder direction through the through hole 118 of the middle column 2. Then, by applying tension to the beam-direction beam PC steel material 33, the butting surfaces 32 of the beams 3 and 3 are in close contact with the first contact surface 114a and the third contact surface 114c. Since the non-shrink mortar is filled as a joint material between the butting surfaces 32 of the beams 3 and 3 and the first contact surface 114a and the third contact surface 114c, they are in close contact with each other without a gap.

スパン方向の梁3を中柱2へ架設するときも、上述した桁方向の梁3を架設したときと同様に、スパン方向の梁3,3を、第2支持面113bおよび第4支持面113dに載置した後に、一方のスパン方向の梁3からのスパン方向梁PC鋼材35を、中柱2の貫通孔118内を介して、他方のスパン方向の梁3内へ挿通させて。スパン方向梁PC鋼材35に緊張力を付与する。そうすることで、梁3,3の突き合わせ面32は、第2当接面114bと第4当接面114dとに密着する。   When the span-direction beam 3 is installed on the middle column 2, the span-direction beams 3 and 3 are connected to the second support surface 113b and the fourth support surface 113d in the same manner as when the beam 3 in the spar direction is installed. , The span steel beam PC steel material 35 from one span direction beam 3 is inserted into the other span direction beam 3 through the through hole 118 of the middle column 2. Tension is applied to the span direction beam PC steel material 35. By doing so, the butting surfaces 32 of the beams 3 and 3 are in close contact with the second contact surface 114b and the fourth contact surface 114d.

突出部117に、貫通孔118と貫通孔119とが段違いに配置されていることで、梁3の桁方向梁PC鋼材33とスパン方向梁PC鋼材35とが交差するように配置することができるので、柱本体21に対して複数の梁3を固定させることができる。   By arranging the through hole 118 and the through hole 119 in the protruding portion 117 in a stepped manner, the beam direction beam PC steel material 33 of the beam 3 and the span direction beam PC steel material 35 can be arranged to intersect each other. Therefore, the plurality of beams 3 can be fixed to the column main body 21.

次に、床スラブ101を、梁3の上面から柱本体11の頭頂面である上階支持面112までの厚みT2に形成する。この突出部117は、梁3の高さHと床スラブ101の厚みTとの合計の高さに形成されているので、中柱2と、上階の柱4と、梁3とを、それぞれ隙間無く設けることができる。   Next, the floor slab 101 is formed to a thickness T2 from the upper surface of the beam 3 to the upper floor support surface 112 that is the top surface of the column body 11. Since this protrusion 117 is formed to a total height of the height H of the beam 3 and the thickness T of the floor slab 101, the middle column 2, the upper column 4 and the beam 3 are respectively connected to each other. It can be provided without a gap.

このように、中柱2の上部には、梁3の底面31を支持する第1〜第4支持面113a〜113dと、梁3の突き合わせ面32に対向して当接する第1〜4当接面114a〜114dとを形成する切欠部115が設けられているので、この第1〜第4支持面113a〜113dに梁3を載置することで、従来のプレキャストコンクリート製の柱のように、梁受け用顎を突出形成しなくても、安定して梁3を柱本体21の上部に架設することができる。   As described above, the first to fourth contact surfaces 113 a to 113 d that support the bottom surface 31 of the beam 3 and the first to fourth contacts that contact the butting surface 32 of the beam 3 are disposed on the middle column 2. Since the notches 115 that form the surfaces 114a to 114d are provided, by placing the beam 3 on the first to fourth support surfaces 113a to 113d, like a conventional column made of precast concrete, Even if the beam receiving jaw is not protruded, the beam 3 can be stably installed on the upper portion of the column main body 21.

また、突出部117には、桁方向梁PC鋼材33およびスパン方向梁PC鋼材35が挿通する貫通孔118,119が設けられているので、水平面である第1〜第4支持面113a〜113dに載置した梁3の突き合わせ面32を、切欠部115の第1〜4当接面114a〜114dに突き当てた状態で、桁方向梁PC鋼材33またはスパン方向梁PC鋼材35に、引っ張り緊張力を付与することで、梁3を柱本体21に密着した状態で固定することができる。従って、中柱2は、梁3をコンクリートの打設なしに、密着固定することが可能なので、コンクリートを打設するための型枠が不要である。よって、中柱2は、低いコストで作製でき、工期の短縮を図ることができる。
なお、外柱1については、中柱2の第4支持面113dおよび第4当接面114dが設けられていないだけなので、中柱2と同様なので本実施の形態では説明を省略したが、外柱1においても同様の効果を得ることができる。
Further, since the projecting portion 117 is provided with through holes 118 and 119 through which the spar direction beam PC steel material 33 and the span direction beam PC steel material 35 are inserted, the first to fourth support surfaces 113a to 113d which are horizontal surfaces are provided. Tensile tension is applied to the beam-direction beam PC steel material 33 or the span-direction beam PC steel material 35 in a state where the butted surface 32 of the mounted beam 3 is abutted against the first to fourth contact surfaces 114a to 114d of the notch 115. , The beam 3 can be fixed in close contact with the column main body 21. Therefore, the middle column 2 can fix the beam 3 closely without placing concrete, so that a formwork for placing concrete is not necessary. Therefore, the middle pillar 2 can be manufactured at a low cost, and the construction period can be shortened.
Note that the outer pillar 1 is not provided with the fourth support surface 113d and the fourth contact surface 114d of the middle pillar 2, and thus is the same as the middle pillar 2 and is not described in the present embodiment. The same effect can be obtained in the pillar 1 as well.

本発明のプレキャストコンクリート製の柱は、低いコストで作製でき、工期の短縮を図ることができるので、立体駐車場だけでなく、マンションや、他の建築物でも適用することが可能である。   Since the precast concrete column of the present invention can be manufactured at low cost and the construction period can be shortened, it can be applied not only to a multi-story parking lot but also to a condominium and other buildings.

本発明の実施の形態に係るプレキャストコンクリート製の柱を用いた立体駐車場の一部拡大した平面図である。1 is a partially enlarged plan view of a multi-story parking lot using precast concrete columns according to an embodiment of the present invention. 図1に示す立体駐車場の正面図である。It is a front view of the multistory parking lot shown in FIG. 本発明の実施の形態に係るプレキャストコンクリート製の柱とプレストレストコンクリート梁との接合構造を示す図である。It is a figure which shows the joining structure of the column made from the precast concrete and prestressed concrete beam which concern on embodiment of this invention. 図1に示す立体駐車場の外柱としてのプレキャストコンクリート製の柱とプレストレストコンクリート梁との接合構造を示すA部を拡大した垂直水平断面図である。It is the vertical horizontal sectional view which expanded the A section which shows the joining structure of the column made from the precast concrete as an outer pillar of the multistory parking lot shown in FIG. 1, and a prestressed concrete beam. 図4に示す外柱としてのプレキャストコンクリート製の柱とプレストレストコンクリート梁との接合構造を示す水平断面図である。It is a horizontal sectional view which shows the joining structure of the column made from the precast concrete as an outer pillar shown in FIG. 4, and a prestressed concrete beam. 図1に示す立体駐車場の中柱としてのプレキャストコンクリート製の柱とプレストレストコンクリート梁との接合構造を示すB部を拡大した垂直水平断面図である。It is the vertical horizontal sectional view which expanded the B section which shows the junction structure of the column made from precast concrete as a center pillar of the multistory parking lot shown in FIG. 1, and a prestressed concrete beam. 図6に示す外柱としてのプレキャストコンクリート製の柱とプレストレストコンクリート梁との接合構造を示す水平断面図である。It is a horizontal sectional view which shows the joining structure of the column made from the precast concrete as an outer pillar shown in FIG. 6, and a prestressed concrete beam.

符号の説明Explanation of symbols

1 外柱
11 柱本体
111 貫通孔
112 上階柱支持面
113a 第1支持面
113b 第2支持面
113c 第3支持面
113d 第4支持面
114a 第1当接面
114b 第2当接面
114c 第3当接面
114d 第4当接面
115 切欠部
116 外側面
117 突出部
118,119 貫通孔
12 PC鋼棒
13 緊張定着具
2 中柱
21 柱本体
3 プレストレストコンクリート梁
31 底面
32 突き合わせ面
33 桁方向梁PC鋼材
34 貫通孔
35 スパン方向梁PC鋼材
36 緊張定着具
4 上階の柱
100 建物
101 床スラブ
102 車両
DESCRIPTION OF SYMBOLS 1 Outer pillar 11 Column main body 111 Through-hole 112 Upper floor column support surface 113a 1st support surface 113b 2nd support surface 113c 3rd support surface 113d 4th support surface 114a 1st contact surface 114b 2nd contact surface 114c 3rd Contact surface 114d Fourth contact surface 115 Notch portion 116 Outer side surface 117 Protruding portion 118,119 Through hole 12 PC steel bar 13 Tension fixing tool 2 Middle column 21 Column body 3 Prestressed concrete beam 31 Bottom surface 32 Abutting surface 33 Girder beam PC steel material 34 Through hole 35 Span direction beam PC steel material 36 Tension anchor 4 Upper floor pillar 100 Building 101 Floor slab 102 Vehicle

Claims (4)

柱本体の上部に、プレストレストコンクリート梁の一端側の底面を支持する水平面と、前記プレストレストコンクリート梁の突き合わせ面に対向して当接する垂直面とを形成する切欠部が設けられ、
前記垂直面と、前記垂直面と反対となる面との間に、前記プレストレストコンクリート梁からの緊張体が挿通する貫通孔が設けられていることを特徴とするプレキャストコンクリート製の柱。
On the upper part of the column body, a notch is provided that forms a horizontal plane that supports the bottom surface on one end side of the prestressed concrete beam and a vertical surface that abuts against the butting surface of the prestressed concrete beam,
A column made of precast concrete, wherein a through hole through which a tension body from the prestressed concrete beam is inserted is provided between the vertical surface and a surface opposite to the vertical surface.
前記柱本体の頭頂面が、上階の柱本体を支持する支持面であり、
前記切欠部は、前記プレストレストコンクリート梁の一端側の高さと、前記プレストレストコンクリート梁が支持する床面の厚みとの合計の高さに調整されていることを特徴とする請求項1記載のプレキャストコンクリート製の柱。
The top surface of the column main body is a support surface that supports the column main body on the upper floor,
2. The precast concrete according to claim 1, wherein the notch is adjusted to a total height of a height of one end side of the prestressed concrete beam and a thickness of a floor surface supported by the prestressed concrete beam. Made of pillars.
柱本体の上部には、他のプレストレストコンクリート梁の一端側の底面を支持する他の水平面と、前記他のプレストレストコンクリート梁の突き合わせ面に対向して当接する他の垂直面とを形成する他の切欠部が設けられ、
前記他の垂直面と反対となる面との間にも、前記他のプレストレストコンクリート梁からの緊張体が挿通する他の貫通孔が設けられ、
前記貫通孔と前記他の貫通孔とは、段違いに配置されていることを特徴とするプレキャストコンクリート製の柱。
In the upper part of the column main body, another horizontal plane that supports the bottom surface of one end side of the other prestressed concrete beam and another vertical surface that abuts against the butting surface of the other prestressed concrete beam are formed. A notch is provided,
Another through hole through which a tension body from the other prestressed concrete beam is inserted is also provided between the surface opposite to the other vertical surface,
The precast concrete column, wherein the through hole and the other through hole are arranged in steps.
柱本体の上部に、プレストレストコンクリート梁の一端側の底面を支持する水平面と、前記プレストレストコンクリート梁の突き合わせ面に対向して当接する垂直面とを形成する切欠部が設けられ、
前記垂直面と、前記垂直面と反対となる面との間に、前記プレストレストコンクリート梁からの緊張体が挿通する貫通孔が設けられているプレキャストコンクリート製の柱と、前記プレストレストコンクリート梁とを接合する接合方法であって、
前記プレキャストコンクリート製の柱を立設する工程と、
前記プレストレストコンクリート梁の一端側の底面を、前記水平面に載置する工程と、
前記プレストレストコンクリート梁から延びる緊張体を前記貫通孔に挿通させる工程と、
前記緊張体に緊張力を付与して、前記前記プレストレストコンクリート梁の突き合わせ面を、前記垂直面に密着させて固定する工程とを含むプレキャストコンクリート製の柱とプレストレストコンクリート梁との接合方法。
On the upper part of the column body, a notch is provided that forms a horizontal plane that supports the bottom surface of one end side of the prestressed concrete beam and a vertical surface that abuts against the butting surface of the prestressed concrete beam,
Joining the prestressed concrete beam and the prestressed concrete beam provided with a through hole through which a tension body from the prestressed concrete beam is inserted between the vertical surface and a surface opposite to the vertical surface A joining method for
Erecting the precast concrete pillar;
Placing the bottom surface of one end side of the prestressed concrete beam on the horizontal surface;
Inserting a tension body extending from the prestressed concrete beam into the through hole;
A method of joining a precast concrete column and a prestressed concrete beam, including a step of applying a tension force to the tension body and fixing a butt surface of the prestressed concrete beam in close contact with the vertical surface.
JP2007116197A 2007-04-25 2007-04-25 Precast concrete column, and method for joining precast concrete column and precast concrete beam together Pending JP2008274570A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007116197A JP2008274570A (en) 2007-04-25 2007-04-25 Precast concrete column, and method for joining precast concrete column and precast concrete beam together

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007116197A JP2008274570A (en) 2007-04-25 2007-04-25 Precast concrete column, and method for joining precast concrete column and precast concrete beam together

Publications (1)

Publication Number Publication Date
JP2008274570A true JP2008274570A (en) 2008-11-13

Family

ID=40052861

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007116197A Pending JP2008274570A (en) 2007-04-25 2007-04-25 Precast concrete column, and method for joining precast concrete column and precast concrete beam together

Country Status (1)

Country Link
JP (1) JP2008274570A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100937745B1 (en) * 2009-04-24 2010-01-20 에스에이치공사 Constructing method using precast concrete column
KR101033693B1 (en) * 2008-06-24 2011-05-12 코비코리아 주식회사 Pipe rack as constructed using precast concrete members
KR101445286B1 (en) 2012-12-13 2014-09-26 삼성물산 주식회사 PC-SF Method for Construction Duration Reduction of Typical Floor
JP2016023414A (en) * 2014-07-16 2016-02-08 株式会社ピーエス三菱 Column-beam structure
CN114108807A (en) * 2021-11-30 2022-03-01 江西理工大学 Beam column connecting node
JP7404603B2 (en) 2019-12-26 2023-12-26 株式会社竹中工務店 Column beam joint structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101033693B1 (en) * 2008-06-24 2011-05-12 코비코리아 주식회사 Pipe rack as constructed using precast concrete members
KR100937745B1 (en) * 2009-04-24 2010-01-20 에스에이치공사 Constructing method using precast concrete column
KR101445286B1 (en) 2012-12-13 2014-09-26 삼성물산 주식회사 PC-SF Method for Construction Duration Reduction of Typical Floor
JP2016023414A (en) * 2014-07-16 2016-02-08 株式会社ピーエス三菱 Column-beam structure
JP7404603B2 (en) 2019-12-26 2023-12-26 株式会社竹中工務店 Column beam joint structure
CN114108807A (en) * 2021-11-30 2022-03-01 江西理工大学 Beam column connecting node

Similar Documents

Publication Publication Date Title
JP4781687B2 (en) Method of joining beam-column joint structure of building and beam-column joint structure of building
JP5946041B2 (en) Column beam connection structure, column beam connection method, and precast concrete stigma member
KR101809687B1 (en) Joining Members of Steel Concrete Column and Steel Beam and Construction Method Thereof
JP2008274570A (en) Precast concrete column, and method for joining precast concrete column and precast concrete beam together
KR100622300B1 (en) Pin connection structure of concrete beam and PC post, and construction method thereof
JP4833591B2 (en) Connection method for precast concrete columns and beams
JP2014055517A (en) Precast beam-column joint structure
JP2012180698A (en) Precast beam joint structure and method
JP5137651B2 (en) Column-beam joint unit and method of beam-column joint construction
JP5860576B2 (en) Precast column beam connection structure
JP2011069195A (en) Column-to-beam joint structure for building, building and joining method
JP2011149265A (en) Beam member and building structure
JP5467881B2 (en) Column beam connection construction method and column beam connection structure
JP2006104854A (en) Column-beam joint structure of building and its joint method
JP2011080358A (en) Column-beam joint structure of building, building, and joining method
JP2004346587A (en) Column-beam joint structure of building, and its joining method
JP2009114742A (en) Beam, joint structure of beam and column, and method of joining beam and column
JP2009114738A (en) Joint structure of precast concrete column
JP2008179944A (en) Construction method of steel beam of beam end rc construction to column
JP2008031838A (en) Column-beam joining structure of building, building and joining method
JP2007154565A (en) Joint structure and construction method of column and beam-less slab
KR101685632B1 (en) Shear connector to increase strength and ductility
JP2006169837A (en) Column-beam joint structure of reinforced concrete construction
JP5973295B2 (en) Column head construction method
JP5640436B2 (en) Precast concrete building method and precast concrete column beam structure

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20081125