JP2006328666A - 杭と柱の一体化施工方法 - Google Patents
杭と柱の一体化施工方法 Download PDFInfo
- Publication number
- JP2006328666A JP2006328666A JP2005150259A JP2005150259A JP2006328666A JP 2006328666 A JP2006328666 A JP 2006328666A JP 2005150259 A JP2005150259 A JP 2005150259A JP 2005150259 A JP2005150259 A JP 2005150259A JP 2006328666 A JP2006328666 A JP 2006328666A
- Authority
- JP
- Japan
- Prior art keywords
- pile
- steel pipe
- concrete
- column
- pipe member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 39
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 126
- 239000010959 steel Substances 0.000 claims abstract description 126
- 239000004567 concrete Substances 0.000 claims abstract description 96
- 238000000034 method Methods 0.000 claims abstract description 16
- 230000003014 reinforcing effect Effects 0.000 claims description 16
- 230000002787 reinforcement Effects 0.000 abstract description 6
- 239000002689 soil Substances 0.000 description 4
- 238000009412 basement excavation Methods 0.000 description 3
- 230000002950 deficient Effects 0.000 description 3
- 238000011065 in-situ storage Methods 0.000 description 3
- 239000011150 reinforced concrete Substances 0.000 description 3
- 238000009415 formwork Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
- Piles And Underground Anchors (AREA)
- Foundations (AREA)
Abstract
【解決手段】強度部材としての鉄筋8や鉄骨などを内部に有する場所打ちコンクリート杭1に鋼管充填コンクリート柱6を一体化する方法であって、場所打ちコンクリート杭を形成する際、杭コンクリート2打設前に予め、地中から地盤面G上方へ突出されて杭頭部3を取り囲みつつその上方へ達する鋼管部材4を配置する第1工程と、杭コンクリートを打設した後、鋼管部材内に場所打ちコンクリート杭の杭頭部位置の鉄筋を露出させる第2工程と、地盤面上方に突出された鋼管部材の突出部分4aを鋼管充填コンクリート柱の下部とするために、鋼管部材内に、柱コンクリート10を打設して杭頭部の鉄筋を埋設する第3工程とを含む。
【選択図】図1
Description
2 杭コンクリート
3 杭頭部
4 鋼管部材
4a 鋼管部材の突出部分
6 鋼管充填コンクリート柱
8 鉄筋
10 柱コンクリート
20 第1フランジ継ぎ手
22 第2フランジ継ぎ手
G 地盤面
Claims (4)
- 鉄筋や鉄骨などの強度部材を内部に有する場所打ちコンクリート杭に鋼管充填コンクリート柱を一体化する方法であって、
上記場所打ちコンクリート杭を形成する際、杭コンクリート打設前に予め、地中から地盤面上方へ突出されて杭頭部を取り囲みつつその上方へ達する鋼管部材を配置する第1工程と、
杭コンクリートを打設した後、上記鋼管部材内に上記場所打ちコンクリート杭の杭頭部位置の杭頭部強度部材を露出させる第2工程と、
地盤面上方に突出された上記鋼管部材の突出部分を上記鋼管充填コンクリート柱の下部とするために、該鋼管部材内に、柱コンクリートを打設して上記杭頭部強度部材を埋設する第3工程とを含むことを特徴とする杭と柱の一体化施工方法。 - 前記鋼管部材の上端に、柱部鋼管部材の下端を接合する工程を含むことを特徴とする請求項1に記載の杭と柱の一体化施工方法。
- 前記鋼管部材および前記柱部鋼管部材は、外向きのフランジ継ぎ手によって互いに接合されることを特徴とする請求項2に記載の杭と柱の一体化施工方法。
- 前記第2工程は、杭コンクリートの未硬化状態で、前記杭頭部の杭コンクリートを吸引除去することにより実行されることを特徴とする請求項1〜3いずれかの項に記載の杭と柱の一体化施工方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005150259A JP4611113B2 (ja) | 2005-05-23 | 2005-05-23 | 杭と柱の一体化施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005150259A JP4611113B2 (ja) | 2005-05-23 | 2005-05-23 | 杭と柱の一体化施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2006328666A true JP2006328666A (ja) | 2006-12-07 |
JP4611113B2 JP4611113B2 (ja) | 2011-01-12 |
Family
ID=37550633
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2005150259A Expired - Fee Related JP4611113B2 (ja) | 2005-05-23 | 2005-05-23 | 杭と柱の一体化施工方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4611113B2 (ja) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013112972A (ja) * | 2011-11-28 | 2013-06-10 | Taisei Corp | 建物構造 |
CN105672314A (zh) * | 2016-01-19 | 2016-06-15 | 中建八局第三建设有限公司 | 一种半逆作法钢管立柱桩施工方法 |
KR101753743B1 (ko) * | 2016-02-26 | 2017-07-06 | (주)나눔시스템 | 매립 거푸집을 이용한 기둥-기초부 일체 결합 시공방법 및 이에 의해 시공된 기둥-기초부 일체 결합 구조물 |
KR101753744B1 (ko) * | 2016-04-12 | 2017-07-06 | (주)나눔시스템 | 기초부 보강 하부지지프레임 및 매립 거푸집을 이용한 기둥-기초부 일체 결합 시공방법 및 이에 의해 시공된 기둥-기초부 일체 결합 구조물 |
CN107063178A (zh) * | 2017-04-21 | 2017-08-18 | 中水北方勘测设计研究有限责任公司 | 一种安装位移传感器的混凝土水准标石及其高程观测与计算方法 |
CN111677285A (zh) * | 2020-06-20 | 2020-09-18 | 中铁十九局集团第一工程有限公司 | 一种桥梁墩柱混凝土导管法浇筑施工工艺 |
CN113756289A (zh) * | 2021-09-02 | 2021-12-07 | 中铁二十局集团第三工程有限公司 | 钢筋笼及围护桩施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09143988A (ja) * | 1995-11-27 | 1997-06-03 | Hirotsugu Hamai | 場所打ち杭の杭頭成形方法 |
JPH09328759A (ja) * | 1996-06-12 | 1997-12-22 | East Japan Railway Co | 柱と杭の接合方法 |
JPH11181791A (ja) * | 1997-12-24 | 1999-07-06 | Nkk Corp | 一柱一杭基礎における柱材と鋼管杭との接合方法および 基礎構造 |
JP2000328651A (ja) * | 1999-05-20 | 2000-11-28 | Shimizu Corp | 建築構造物およびその施工方法 |
JP2001254365A (ja) * | 2000-03-08 | 2001-09-21 | Shimizu Corp | 柱と杭との接合構造 |
JP2003055985A (ja) * | 2001-08-10 | 2003-02-26 | East Japan Railway Co | 柱と杭の接合方法 |
JP2004204605A (ja) * | 2002-12-26 | 2004-07-22 | Taisei Corp | 接合構造 |
-
2005
- 2005-05-23 JP JP2005150259A patent/JP4611113B2/ja not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09143988A (ja) * | 1995-11-27 | 1997-06-03 | Hirotsugu Hamai | 場所打ち杭の杭頭成形方法 |
JPH09328759A (ja) * | 1996-06-12 | 1997-12-22 | East Japan Railway Co | 柱と杭の接合方法 |
JPH11181791A (ja) * | 1997-12-24 | 1999-07-06 | Nkk Corp | 一柱一杭基礎における柱材と鋼管杭との接合方法および 基礎構造 |
JP2000328651A (ja) * | 1999-05-20 | 2000-11-28 | Shimizu Corp | 建築構造物およびその施工方法 |
JP2001254365A (ja) * | 2000-03-08 | 2001-09-21 | Shimizu Corp | 柱と杭との接合構造 |
JP2003055985A (ja) * | 2001-08-10 | 2003-02-26 | East Japan Railway Co | 柱と杭の接合方法 |
JP2004204605A (ja) * | 2002-12-26 | 2004-07-22 | Taisei Corp | 接合構造 |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013112972A (ja) * | 2011-11-28 | 2013-06-10 | Taisei Corp | 建物構造 |
CN105672314A (zh) * | 2016-01-19 | 2016-06-15 | 中建八局第三建设有限公司 | 一种半逆作法钢管立柱桩施工方法 |
CN105672314B (zh) * | 2016-01-19 | 2017-10-10 | 中建八局第三建设有限公司 | 一种半逆作法钢管立柱桩施工方法 |
KR101753743B1 (ko) * | 2016-02-26 | 2017-07-06 | (주)나눔시스템 | 매립 거푸집을 이용한 기둥-기초부 일체 결합 시공방법 및 이에 의해 시공된 기둥-기초부 일체 결합 구조물 |
KR101753744B1 (ko) * | 2016-04-12 | 2017-07-06 | (주)나눔시스템 | 기초부 보강 하부지지프레임 및 매립 거푸집을 이용한 기둥-기초부 일체 결합 시공방법 및 이에 의해 시공된 기둥-기초부 일체 결합 구조물 |
CN107063178A (zh) * | 2017-04-21 | 2017-08-18 | 中水北方勘测设计研究有限责任公司 | 一种安装位移传感器的混凝土水准标石及其高程观测与计算方法 |
CN111677285A (zh) * | 2020-06-20 | 2020-09-18 | 中铁十九局集团第一工程有限公司 | 一种桥梁墩柱混凝土导管法浇筑施工工艺 |
CN113756289A (zh) * | 2021-09-02 | 2021-12-07 | 中铁二十局集团第三工程有限公司 | 钢筋笼及围护桩施工方法 |
CN113756289B (zh) * | 2021-09-02 | 2023-06-02 | 中铁二十局集团第三工程有限公司 | 钢筋笼及围护桩施工方法 |
Also Published As
Publication number | Publication date |
---|---|
JP4611113B2 (ja) | 2011-01-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2837128B2 (ja) | 場所打ちコンクリート杭の構築方法 | |
JP4881555B2 (ja) | 地下構造物の構築方法 | |
JP4611113B2 (ja) | 杭と柱の一体化施工方法 | |
JP4611108B2 (ja) | 杭と柱の一体化施工方法 | |
JP3760304B2 (ja) | 建物の基礎施工方法 | |
KR101534641B1 (ko) | 건축물 지하 시공 방법 | |
JP2009203690A (ja) | アースアンカーおよびその撤去方法 | |
JP5073960B2 (ja) | 地下構造物の構築法および地下構造物 | |
JP2006207265A (ja) | 杭と柱との接合工法とその構造 | |
KR101219451B1 (ko) | 콘크리트구조물 및 그 시공방법, 이를 이용한 건축물의 흙막이벽체 겸용 지중구조벽의 시공방법 | |
KR101077242B1 (ko) | 흙막이 벽체와 철골 기둥을 이용한 지하 구조물 시공 방법 | |
JP5140515B2 (ja) | 地下階柱の設置方法および地中構造物の構築方法 | |
KR100722198B1 (ko) | 지하 합벽의 연속시공을 위한 흙막이벽의 역타 지지구조 및이를 적용한 건축물 지하 합벽의 연속 시공방법 | |
JPH0517955A (ja) | 直接基礎の施工法及び直接基礎用型枠パネル | |
JPH0584773B2 (ja) | ||
JP2004285613A (ja) | 建物基礎の構築方法 | |
JP2996113B2 (ja) | 立坑の構築方法 | |
JPH04185816A (ja) | 地中壁に梁を構築する方法 | |
KR100694762B1 (ko) | 테두리보가 생략된 지하층의 슬래브-외벽 동시 타설구축방법 | |
JPH08291526A (ja) | 地下構築物の構築方法 | |
JP3567387B2 (ja) | 地下躯体の構築方法 | |
JP4555724B2 (ja) | プレキャストコンクリート部材を用いた構造物の構築方法 | |
JPH0337603B2 (ja) | ||
JP2663087B2 (ja) | 地中構造物の構築法 | |
JPH073781A (ja) | 場所打ちコンクリート杭頭上の基礎フーチングの施工法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20070925 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20090528 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20100629 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20100928 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20101013 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131022 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |