JP2006063754A - Mounting structure of modesty panel - Google Patents

Mounting structure of modesty panel Download PDF

Info

Publication number
JP2006063754A
JP2006063754A JP2004250811A JP2004250811A JP2006063754A JP 2006063754 A JP2006063754 A JP 2006063754A JP 2004250811 A JP2004250811 A JP 2004250811A JP 2004250811 A JP2004250811 A JP 2004250811A JP 2006063754 A JP2006063754 A JP 2006063754A
Authority
JP
Japan
Prior art keywords
panel
floor
piece
curtain plate
hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2004250811A
Other languages
Japanese (ja)
Inventor
Hideaki Kuroiwa
秀哲 黒岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Homes Co Ltd
Original Assignee
Panahome Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panahome Corp filed Critical Panahome Corp
Priority to JP2004250811A priority Critical patent/JP2006063754A/en
Publication of JP2006063754A publication Critical patent/JP2006063754A/en
Withdrawn legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide the mounting structure of modesty panels, of which the good finish is assured even if a building frame constructor carries it out. <P>SOLUTION: A hook 7 is constructed by horizontally protruding outward a lateral piece 9 from the lower end of a vertical piece 8 and protruding upward a catch 10 from the outdoor end of the lateral piece 9. The vertical piece 8 of the hook 7 is hung on a lateral frame 3b on top of a lower floor wall panel 1b from indoor side, and the lateral piece 9 of the hook 7 is placed on the top end of a wall panel 5 of the lower floor wall panel 1b. An engaging protrusion 12 protruding downward from the lower end of an end rail 11 is fitted into a clearance S between the catch 10 of the hook 7 and the lateral frame 3b on top of the lower floor wall panel 1b. The upper end of the end rail 11 is put on the outdoor side of a lateral frame 3a at the bottom of an upper floor wall panel 1a, and is fixed with a bolt 13. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

本発明は、幕板の取付構造に関するものである。   The present invention relates to a curtain plate mounting structure.

住宅などの建物の建築にあっては、従来工法であれば、柱や梁の組み付けにて骨組状の建物躯体を形成するまでが上棟業者の仕事であり、その後の壁の形成工事や内装工事などは左官業者や大工業者がそれぞれ担当して行っている。しかしながら、パネル工法によると、壁パネルや屋根パネルなどのパネル材は梁や柱などと同様に重量があるため、パネル材の配設作業は柱の立設や梁の架設などのクレーンを用いて行う上棟工事によって、つまり上棟業者によって行われるのが好ましいのである。   In the construction of buildings such as houses, if it is a conventional method, it is the work of the upper building contractor until the building of the frame-like building is formed by assembling the pillars and beams, and the subsequent wall formation work and interior work These are handled by plasterers and large industrialists. However, according to the panel method, panel materials such as wall panels and roof panels are as heavy as beams and pillars, so panel materials are placed using cranes such as standing columns and laying beams. It is preferable to be carried out by the upper building work to be performed, that is, by the upper building company.

なお、上階と下階との間の外壁部分にはパネル材の1つである幕板が配設される。たとえば図7に示すように、建物の上階と下階との間には梁6が横架され、この梁6の下端と下階の壁パネル1bの上端とが固定されると共にこの梁6の上端と上階の壁パネル1aの下端とが固定されており、この梁6の屋外側を覆うように幕板11が配設されるのであるが、この幕板11にあっては、梁6の屋外側に位置決めして配置し、幕板11の下端を下階の壁パネル1bに屋外側からビスなどの打設具52を打設して固定すると共に幕板11の上端を上階の壁パネル1aに屋外側からビスなどの打設具52を打設して固定する、といった取付構造で配設が行われていた。(たとえば、特許文献1参照)
ところで、一般に柱や梁6の組付けなどを行う上棟業者にあっては、柱や梁6の組付けを行わせるボルトの取扱いには慣れている反面、柱や梁6の組付けに用いることの少ないビスなどの打設具52の取扱いには不慣れなことが多い。したがって、上記図7のような取付構造で上棟業者によって幕板11が配設された場合では、不慣れな打設具52の打設作業によって、幕板11の配設における良好な仕上りが確保されない恐れがあった。なお、この幕板11の配設作業を打設具52の扱いに慣れた大工業者によって担わせることも考えられるが、壁の形成施工が壁パネル1の配設を担当する上棟業者と幕板11の配設を担当する大工業者とで行われて各業者が入り乱れる煩雑なものとなることから好ましくなく、またパネル材の一種である幕板11は重量物であるので大工業者が一般に所有しないクレーンが別途必要となって大工業者に過大な負担を強いることとなるものである。
特開2003−268891号公報
A curtain plate, which is one of panel materials, is disposed on the outer wall portion between the upper floor and the lower floor. For example, as shown in FIG. 7, a beam 6 is installed between the upper floor and the lower floor of the building, and the lower end of the beam 6 and the upper end of the wall panel 1b on the lower floor are fixed and the beam 6 is fixed. Is fixed to the lower end of the wall panel 1a on the upper floor, and a curtain plate 11 is disposed so as to cover the outdoor side of the beam 6. 6, the lower end of the curtain plate 11 is fixed on the wall panel 1b of the lower floor by placing a driving tool 52 such as a screw from the outdoor side and fixing the upper end of the curtain plate 11 on the upper floor. The wall panel 1a is provided with a mounting structure in which a driving tool 52 such as a screw is driven and fixed from the outdoor side. (For example, see Patent Document 1)
By the way, in general, the upper building contractor who assembles the columns and beams 6 is used to assembling the columns and beams 6 while he is used to handling the bolts for assembling the columns and beams 6. It is often unfamiliar with the handling of the driving tool 52 such as a screw having a small number of screws. Therefore, in the case where the curtain plate 11 is installed by the upper building contractor with the mounting structure as shown in FIG. 7, a satisfactory finish in the placement of the curtain plate 11 is not ensured by the placement work of the inexperienced placement tool 52. There was a fear. Although it is conceivable that the installation work of the curtain plate 11 is carried out by a large industrialist accustomed to handling the placing tool 52, the construction of the wall and the curtain are performed by the super building contractor who is responsible for the placement of the wall panel 1. It is not preferable because it is carried out with a large industrial person who is in charge of the arrangement of the plate 11 and becomes complicated and confusing for each contractor, and the curtain plate 11 which is a kind of panel material is heavy, so it is a large industrial person. However, a crane that is not generally owned is required separately, which imposes an excessive burden on large industrialists.
JP 2003-268891 A

本発明は上記の従来の問題点に鑑みて発明したものであって、幕板の配設を上棟業者に担当させても良好な施工性及び仕上りを確保できる幕板の取付構造を提供することを課題とするものである。   The present invention has been invented in view of the above-described conventional problems, and provides a curtain plate mounting structure that can ensure good workability and finish even if the superstructure contractor is in charge of arranging the curtain plates. Is an issue.

上記課題を解決するために本発明に係る幕板の取付構造にあっては、縦枠2と横枠3とを組み付けた枠部4の屋外側に壁面板5を一体に付設した上階の壁パネル1aと下階の壁パネル1bとの間に梁6を横架し、上階の壁パネル1aの下端にある横枠3aを梁6の上端に固定すると共に下階の壁パネル1bの上端にある横枠3bを梁6の下端に固定し、垂直な縦片部8の下端から屋外側に水平に横片部9を突設すると共に横片部9の屋外側先端から上方に引掛爪部10を突設して引掛具7を形成し、引掛具7の縦片部8を下階の壁パネル1bの上端にある横枠3bに屋内側から引掛けると共に引掛具7の横片部9を下階の壁パネル1bの壁面板5の上端に載置し、引掛具7の引掛爪部10と下階の壁パネル1bの上端にある横枠3bとの隙間Sに幕板11の下端に下方に突設した係合突部12を係合し、幕板11の上端を上階の壁パネル1aの下端にある横枠3aの屋外側に添設すると共にボルト13にて固定したことを特徴とする。   In order to solve the above problems, in the curtain plate mounting structure according to the present invention, the upper floor in which the wall surface plate 5 is integrally attached to the outdoor side of the frame portion 4 in which the vertical frame 2 and the horizontal frame 3 are assembled. A beam 6 is horizontally mounted between the wall panel 1a and the lower floor wall panel 1b, and the horizontal frame 3a at the lower end of the upper floor wall panel 1a is fixed to the upper end of the beam 6, and the lower floor wall panel 1b is fixed. The horizontal frame 3b at the upper end is fixed to the lower end of the beam 6, the horizontal piece 9 is projected horizontally from the lower end of the vertical vertical piece 8 to the outdoor side, and hooked upward from the outdoor side tip of the horizontal piece 9 The hook 10 is formed by projecting the claw portion 10, and the vertical piece 8 of the hook 7 is hooked from the indoor side to the horizontal frame 3 b at the upper end of the wall panel 1 b on the lower floor and the horizontal piece of the hook 7. The portion 9 is placed on the upper end of the wall plate 5 of the lower wall panel 1b, and the gap between the hooking claw portion 10 of the hook 7 and the horizontal frame 3b at the upper end of the lower wall panel 1b. The lower end of the curtain plate 11 is engaged with an engaging protrusion 12 projecting downward, the upper end of the curtain plate 11 is attached to the outdoor side of the horizontal frame 3a at the lower end of the upper wall panel 1a, and the bolt 13 is fixed.

これによると、幕板11を配設するには、下階の壁パネル1bの上端にある横枠3bに引掛具7の縦片部8を引掛けて下階の壁パネル1bの壁面板5の上端に引掛具7の横片部9を載置させることで、下階の壁パネル1bの上端にある横枠3bと引掛具7の引掛爪部10との間に隙間Sを形成し、この隙間Sに幕板11の下端に下方に突設した係合突部12を上方から挿入することで、幕板11の下端を引掛具7の横片部9を介して下階の壁パネル1bの壁面板5に載置させつつ下階の壁パネル1bの上端にある横枠3bに係合構造で固定し、このとき幕板11の位置決め配置がなされるのであり、そして幕板11の上端を上階の壁パネル1aの下端にある横枠3aの屋外側に添設してボルト13で固定するといった作業で行われる。つまり、幕板11の位置決め配置は幕板11の下端を引掛具7を介した係合構造によって簡単に行われるのであり、また、位置決め配置した幕板11の固定はボルト13の締結構造で行われているから、ボルトの締結作業を得意とする上棟業者の作業者に良好な仕上りを期して幕板11の配設作業を行わせることができる。   According to this, in order to arrange the curtain plate 11, the vertical piece 8 of the hook 7 is hooked on the horizontal frame 3 b at the upper end of the lower floor wall panel 1 b and the wall surface plate 5 of the lower floor wall panel 1 b. A gap S is formed between the horizontal frame 3b at the upper end of the lower wall panel 1b and the hooking claw portion 10 of the hooking tool 7 by placing the horizontal piece 9 of the hooking tool 7 on the upper edge of the hooking tool. By inserting an engaging protrusion 12 projecting downward from the lower end of the curtain plate 11 into the gap S from above, the lower end of the curtain plate 11 is connected to the wall panel on the lower floor via the lateral piece 9 of the hook 7. The curtain plate 11 is positioned and arranged on the horizontal frame 3b at the upper end of the wall panel 1b on the lower floor while being placed on the wall plate 5b of the lower floor. The upper end is attached to the outdoor side of the horizontal frame 3a at the lower end of the upper floor wall panel 1a and is fixed by bolts 13. In other words, the positioning of the curtain plate 11 is simply performed by the engagement structure of the lower end of the curtain plate 11 via the hook 7, and the fixed positioning of the curtain plate 11 is performed by the fastening structure of the bolt 13. Therefore, it is possible to allow the worker of the super building company, who is good at bolt fastening work, to perform the work of arranging the curtain plate 11 with a good finish.

本発明は、幕板の下端の引掛具を用いた係合構造によって幕板の位置決め配置が簡単に行われ、上記位置決め配置された幕板の固定がビスなどの打設具を使用せずにボルトの締結で行われたことで、打設具に扱いに不慣れな上棟業者の作業者であっても簡単な施工作業で良好な仕上りを期して幕板の配設作業を行わせることが可能になるという利点を有している。したがって、このように壁パネルの配設作業と同様に幕板の配設作業も上棟業者に担当させることで、壁形成にかかる全ての施工作業を上棟業者に担当させることができ、壁形成にかかる施工作業を業者の入り乱れない明快なものにできるといった効果も有するのである。   In the present invention, the positioning and positioning of the curtain plate is easily performed by the engagement structure using the hooking tool at the lower end of the curtain plate, and the positioning and positioning of the curtain plate can be performed without using a driving tool such as a screw. Because it was done by tightening the bolts, it is possible for even a super-building contractor who is unfamiliar with handling to the installation tool to arrange the curtains with a simple construction work for a good finish. Has the advantage of becoming. Therefore, in the same way as the wall panel placement work, the upper building contractor is responsible for the curtain plate placement work, so that all construction work related to the wall formation can be handled by the upper building trader. It also has the effect that such construction work can be made clear and clear to the traders.

図1乃至図6には本発明の実施の形態の例を示す。図1は上階と下階との境目付近の縦断面図であり、図2は壁パネル1の壁面板5及び幕板11を透視した図1の正面図であり、図3は図1のA部分の拡大図であり、図4は図1のB部分の拡大図である。   1 to 6 show examples of embodiments of the present invention. 1 is a longitudinal sectional view near the boundary between the upper floor and the lower floor, FIG. 2 is a front view of FIG. 1 seen through the wall plate 5 and the curtain plate 11 of the wall panel 1, and FIG. FIG. 4 is an enlarged view of a portion A, and FIG. 4 is an enlarged view of a portion B of FIG.

建物の上階と下階との間には、ウェブ6aの上下にフランジ6bを設けた水平方向に長尺のI形鋼から構成された構造材としての梁6が横架されている。この梁6は、その上端で上階の床パネル50を図示しない支持金具によって支持すると共にその下端で下階の天井下地51を支持し、また、建物外壁を形成する壁パネル1(上階の壁パネル1a,下階の壁パネル1b)を固定させている。ここで、この壁パネル1は、底片14の屋内外端部からそれぞれ側片15を突出した断面コ字状の横枠3と縦枠2とを矩形状に組付けて金属製の枠部4を形成し、この枠部4の屋外側にALCパネルなどから構成した壁面板5をビスなどの締結具16によって上記枠部4に貼着したことで形成されている。詳しくは、壁パネル1の上下端部にはそれぞれ横枠3が位置されており、この壁パネル1の上下端の各横枠3における屋外側には壁面板5が重ならないようにされている。換言すると、壁パネル1の上端に位置した横枠3と壁面板5の上端との間、及び壁パネル1の下端に位置した横枠3と壁面板5の下端との間には、それぞれ屋内外方向に貫通する隙間空間s1,s2が形成されているのである。また、壁パネル1の上下端の各横枠3の底片14には上下に貫通する貫通孔17がそれぞれ穿孔されている。   Between the upper floor and the lower floor of the building, a beam 6 as a structural material composed of a long I-shaped steel in the horizontal direction with flanges 6b provided above and below the web 6a is horizontally mounted. The beam 6 supports the upper floor panel 50 at its upper end with a support bracket (not shown), supports the lower floor ceiling foundation 51 at its lower end, and forms a wall panel 1 (upper floor of the upper floor). The wall panel 1a and the lower floor wall panel 1b) are fixed. Here, the wall panel 1 is constructed by assembling a rectangular frame with a U-shaped horizontal frame 3 and a vertical frame 2 each projecting side pieces 15 from the indoor and outdoor ends of the bottom piece 14. And a wall plate 5 made of an ALC panel or the like is attached to the frame portion 4 by a fastener 16 such as a screw on the outdoor side of the frame portion 4. Specifically, the horizontal frames 3 are respectively positioned at the upper and lower ends of the wall panel 1, and the wall plate 5 is not overlapped on the outdoor side of the horizontal frames 3 at the upper and lower ends of the wall panel 1. . In other words, between the horizontal frame 3 positioned at the upper end of the wall panel 1 and the upper end of the wall plate 5, and between the horizontal frame 3 positioned at the lower end of the wall panel 1 and the lower end of the wall plate 5, respectively. Clearance spaces s1, s2 penetrating inward and outward are formed. In addition, through holes 17 penetrating vertically are formed in the bottom pieces 14 of the horizontal frames 3 at the upper and lower ends of the wall panel 1.

梁6の上側のフランジ6bには取付基片18が溶着にて固着されている。取付基片18は水平片部19と垂直片部20とからなる縦断面L字板状の短尺または長尺の金属製部材である。なお、取付基片18の垂直片部20には屋内外方向に貫通する貫通孔21が穿孔されている。この取付基片18は、水平片部19を梁6の上側のフランジ6bの上面に重ねて溶着させることで、梁6から垂直上方に垂直片部20を突設させた状態で梁6に固着されている。また、この取付基片18の長手方向の適所には上階の壁パネル1aを載置固定させる載置取付片22が取付けられる。載置取付片22は、上階の壁パネル1aを載置する水平片部23を有し、この水平片部23の屋内側端部に上方に盛り上がる山型に屈曲されたフック部24及び垂直下方に屈曲された垂直片部25をそれぞれ形成した金属製部材である。なお、載置取付片22の水平片部23には上下に貫通する貫通孔26が穿孔されており、また垂直片部25には屋内外方向に貫通する貫通孔27が穿孔されている。この載置取付片22は、載置取付片22のフック部24を取付基片18の垂直片部20に上方から引掛け、載置取付片22の垂直片部25を取付基片18の垂直片部20の屋外側に沿わせ、取付基片18の垂直片部20及び載置取付片22の垂直片部25の各貫通孔21,27を連通させ、この連通した各貫通孔21,27にボルト28aを挿通してナット28bに締結させることで、取付基片18に取付けられている。そして、上階の壁パネル1aは、下端に位置する横枠3aを載置取付片22の水平片部23に載置させ、この横枠3aの底片14と載置取付片22の水平片部23との各貫通孔17,26を連通させ、この連通した各貫通孔17,26にボルト29aを挿通してナット29bに締結させることで、載置取付片22に取付けられている。このように上階の壁パネル1aは載置取付片22及び取付基片18を介して梁6の上端に固定されている。 A mounting base piece 18 is fixed to the upper flange 6b 1 of the beam 6 by welding. The mounting base piece 18 is a short or long metal member having a L-shaped longitudinal section composed of a horizontal piece portion 19 and a vertical piece portion 20. The vertical piece 20 of the mounting base piece 18 has a through hole 21 penetrating in the indoor / outdoor direction. The mounting base element 18, by welding overlapping horizontal plate portion 19 over an upper surface of the flange 6b 1 of the beam 6, the beam 6 in a state where the beam 6 was projected vertical piece portion 20 vertically upward It is fixed. Further, a mounting mounting piece 22 for mounting and fixing the upper floor wall panel 1a is mounted at an appropriate position in the longitudinal direction of the mounting base piece 18. The mounting attachment piece 22 has a horizontal piece portion 23 on which the wall panel 1a on the upper floor is placed, and a hook portion 24 bent in a mountain shape that rises upward at an indoor side end portion of the horizontal piece portion 23 and a vertical portion. It is the metal member which formed the vertical piece part 25 each bent below. In addition, a through hole 26 penetrating vertically is drilled in the horizontal piece portion 23 of the mounting attachment piece 22, and a through hole 27 penetrating indoors and outdoors is drilled in the vertical piece portion 25. In this mounting attachment piece 22, the hook portion 24 of the mounting attachment piece 22 is hooked on the vertical piece portion 20 of the attachment base piece 18 from above, and the vertical piece portion 25 of the placement attachment piece 22 is perpendicular to the attachment base piece 18. Along the outdoor side of the piece 20, the through holes 21 and 27 of the vertical piece 20 of the attachment base piece 18 and the vertical piece 25 of the mounting attachment piece 22 communicate with each other, and the through holes 21 and 27 communicated with each other. The bolt 28a is inserted into the nut 28b and fastened to the nut 28b. The upper-floor wall panel 1a places the horizontal frame 3a positioned at the lower end on the horizontal piece 23 of the mounting attachment piece 22, and the bottom piece 14 of the horizontal frame 3a and the horizontal piece of the mounting attachment piece 22 The through holes 17 and 26 are communicated with each other, and bolts 29a are inserted into the through holes 17 and 26 communicated with each other and fastened to the nuts 29b to be attached to the mounting attachment piece 22. Thus, the upper floor wall panel 1 a is fixed to the upper end of the beam 6 via the mounting attachment piece 22 and the attachment base piece 18.

下階の壁パネル1bはその上端を梁6の下端の長手方向の適所にクランプ取付具30を介して固定される。クランプ取付具30は、一端を下階の壁パネル1bの上端にある横枠3bに固定すると共に他端を梁6の下側のフランジ6bに引掛ける本体部材30aと、一端を本体部材30aに連結すると共に他端を本体部材30aと協働して梁6の下側のフランジ6bを挟み込むようにこのフランジ6bに引掛ける挟込部材30bとで構成されている。詳しくは、本体部材30aは、下階の壁パネル1bの上端にある横枠3bに載置する水平板状の載置部31と、この載置部31の屋内側から垂直上方に立ち上がる垂直板状の連結部32と、この連結部32の上端から屋内側に水平に突出されてこの突出先端から垂直上方に爪部34を突設させた挟持部33とを有して構成されている。なお、載置部31には上下に貫通する貫通孔35が穿孔され、連結部32には屋内外方向に貫通する貫通孔36が穿孔されている。また、挟込部材30bは、垂直板状の連結部37と、連結部37の上端から屋外側に水平に突出されてこの突出先端から垂直上方に爪部39を突設させた挟持部38とを有して構成されている。なお、連結部37には屋内外方向に貫通する貫通孔40が穿孔されている。本体部材30aは、下階の壁パネル1bの上端にある横枠3bの上面に載置部31を載置し、横枠3aの底片14と載置部31との各貫通孔17,35を連通させ、この連通した各貫通孔17,35にボルト41aを挿通してナット41bに締結させることで、下階の壁パネル1bの上端にある横枠3bに固定されるのであり、その挟持部33の爪部34を梁6の下側のフランジ6bに屋内側から引掛ける。挟込部材30bは、連結部37を本体部材30aの連結部32に屋外側から当接させ、本体部材30aの連結部32と挟込部材30bの連結部37との各連通孔36,40を連通させ、この連通した各貫通孔36,40にボルト42aを挿通してナット42bに締結させることで、本体部材30aに一体に連結されるのであり、その挟持部38の爪部39を梁6の下側のフランジ6bに屋外側から引掛ける。本体部材30aと挟込部材30bとを一体に連結したクランプ取付具30によると、本体部材30aの挟持部33の爪部34と挟込部材30bの挟持部38の爪部39とで梁6の下側のフランジ6bが屋内外方向から挟持されるのであり、下階の壁パネル1bはクランプ取付具30を介して梁6の下端に固定されるのである。 The lower floor wall panel 1 b is fixed at its upper end to an appropriate position in the longitudinal direction of the lower end of the beam 6 via a clamp fixture 30. The clamp fixture 30 has one end fixed to the horizontal frame 3b at the upper end of the lower floor wall panel 1b and the other end hooked to the lower flange 6b 2 of the beam 6, and one end at the main body member 30a. It is composed of a flange 6b 2 to hooked nip member 30b so as to sandwich the lower flange 6b 2 of the beam 6 in cooperation with the body member 30a and the other end with connecting to. Specifically, the main body member 30a includes a horizontal plate-like placement portion 31 placed on the horizontal frame 3b at the upper end of the lower wall panel 1b, and a vertical plate that rises vertically upward from the indoor side of the placement portion 31. And a sandwiching portion 33 that protrudes horizontally indoors from the upper end of the connecting portion 32 and has a claw 34 projecting vertically upward from the protruding tip. The mounting portion 31 has a through-hole 35 penetrating vertically, and the connecting portion 32 has a through-hole 36 penetrating indoors and outdoors. The sandwiching member 30b includes a vertical plate-shaped connecting portion 37, and a sandwiching portion 38 that protrudes horizontally from the upper end of the connecting portion 37 to the outdoor side, and has a claw portion 39 projecting vertically upward from the protruding tip. It is comprised. The connecting portion 37 has a through hole 40 penetrating indoors and outdoors. The main body member 30a mounts the mounting portion 31 on the upper surface of the horizontal frame 3b at the upper end of the wall panel 1b on the lower floor, and the through holes 17 and 35 of the bottom piece 14 and the mounting portion 31 of the horizontal frame 3a are provided. The bolts 41a are inserted into the communicating through holes 17 and 35 and fastened to the nuts 41b so as to be fixed to the horizontal frame 3b at the upper end of the lower wall panel 1b. the claw portions 34 of the 33 hooking the indoor side to the flange 6b 2 of the lower beam 6. The sandwiching member 30b brings the connecting portion 37 into contact with the connecting portion 32 of the main body member 30a from the outdoor side, and the communication holes 36 and 40 between the connecting portion 32 of the main body member 30a and the connecting portion 37 of the sandwiching member 30b are formed. The bolts 42a are inserted into the communicating through holes 36 and 40 and fastened to the nuts 42b so as to be integrally connected to the main body member 30a. The lower flange 6b 2 is hooked from the outdoor side. According to the clamp fixture 30 in which the main body member 30a and the sandwiching member 30b are integrally connected, the claw portion 34 of the sandwiching portion 33 of the main body member 30a and the claw portion 39 of the sandwiching portion 38 of the sandwiching member 30b The lower flange 6b 2 is sandwiched from the indoor and outdoor directions, and the lower floor wall panel 1b is fixed to the lower end of the beam 6 via the clamp fixture 30.

上記のように上階の壁パネル1a及び下階の壁パネル1bは梁6の上下端にそれぞれ固定されるのであるが、この上階の壁パネル1a及び下階の壁パネル1bの各壁面板5の間には梁6を屋外側から覆うように幕板11が配設される。幕板11は、上階の壁パネル1a及び下階の壁パネル1bの各壁面板5間の寸法から後述する引掛具7の引掛爪部10の突出高さを引いた寸法よりも小さい高さ寸法を有すると共に壁パネル1の壁面板5と略同じ厚み寸法を有するALCパネルで構成されており、幕板11の上部には屋外側に大径部43aが開口すると共に屋内側に小径部43bが開口する貫通孔43が穿孔され、この貫通孔43にアンカー部材44が埋設されており、また幕板11の下端には下方に突出する係合突部12が形成されている。詳しくは、アンカー部材44は、図5のように雌ネジ孔45aを穿孔した筒胴部45の一端に周方向に亙って突出するつば部46を形成した金属部材であり、つば部46を幕板11の貫通孔の大径部43aと小径部43bとの段部に当接させて小径部43bに筒胴部45を挿入することで、幕板11の貫通孔43に埋設されている。また、幕板11の下端部位における屋外側端部はコーキング材を充填させるための切欠47が形成されているが、係合突部12は幕板11の下端部位における上記切欠47の残りの部位がこれを構成している。つまり、係合突部12は幕板11の下端部位における屋内側端部から下方に突出する部位である。そして、この幕板11は下階の壁パネル1bの壁面板5と上階の壁パネル1aの壁面板5との間で各壁パネル1の壁面板5と面一状態になるように配設されるのであるが、幕板11の配設にあっては、具体的には、幕板11の下端部位を下階の壁パネル1bに係合構造によって固定させると共に、幕板11の上端部位を上階の壁パネル1aにボルト13によって固定させることで行われるのであり、以下に詳述する。   As described above, the upper-floor wall panel 1a and the lower-floor wall panel 1b are fixed to the upper and lower ends of the beam 6, respectively. The wall panels of the upper-floor wall panel 1a and the lower-floor wall panel 1b. A curtain plate 11 is disposed between 5 and 5 so as to cover the beam 6 from the outdoor side. The curtain plate 11 has a height smaller than the dimension obtained by subtracting the protruding height of the hooking claw portion 10 of the hooking tool 7 described later from the dimension between the wall surface plates 5 of the wall panel 1a on the upper floor and the wall panel 1b on the lower floor. The ALC panel has dimensions and substantially the same thickness as the wall surface plate 5 of the wall panel 1. A large-diameter portion 43a is opened on the outdoor side at the top of the curtain plate 11, and a small-diameter portion 43b is formed on the indoor side. A through hole 43 is opened, an anchor member 44 is embedded in the through hole 43, and an engaging protrusion 12 that protrudes downward is formed at the lower end of the curtain plate 11. Specifically, the anchor member 44 is a metal member in which a flange portion 46 protruding in the circumferential direction is formed at one end of a cylindrical body portion 45 having a female screw hole 45a as shown in FIG. The cylindrical body 45 is inserted into the small diameter portion 43b in contact with the stepped portion of the large diameter portion 43a and the small diameter portion 43b of the through hole of the curtain plate 11, thereby being embedded in the through hole 43 of the curtain plate 11. . Further, a notch 47 for filling the caulking material is formed at the outdoor side end portion at the lower end portion of the curtain plate 11, but the engaging projection 12 is the remaining portion of the notch 47 at the lower end portion of the curtain plate 11. Constitutes this. That is, the engagement protrusion 12 is a portion that protrudes downward from the indoor side end portion of the lower end portion of the curtain plate 11. And this curtain board 11 is arrange | positioned so that it may be flush | planar with the wall surface board 5 of each wall panel 1 between the wall surface board 5 of the wall panel 1b of a lower floor, and the wall surface board 5 of the wall panel 1a of an upper floor. However, in the arrangement of the curtain plate 11, specifically, the lower end portion of the curtain plate 11 is fixed to the wall panel 1b on the lower floor by the engaging structure, and the upper end portion of the curtain plate 11 is fixed. Is fixed to the wall panel 1a on the upper floor with a bolt 13, which will be described in detail below.

幕板11の下端部位を下階の壁パネル1bに固定するには引掛具7を用いて行われている。引掛具7は、垂直な縦片部8の下端から屋外側に水平に横片部9を突設すると共に、横片部9の屋外側先端から上方に引掛爪部10を縦片部8よりも低く突設してなる縦断面J字状の金属製のピース材であり、下階の壁パネル1bの上端にある横枠3bの適所で配置されて使用される。なお、下階の壁パネル1bの上端にある横枠3bは水平な底片14の屋内外側の端部からそれぞれ側片15を垂下してなる下方に開口する断面コ字状に形成されており、この横枠3bの下端と壁面板5の上端との間には引掛具7の縦片部8の上下寸法よりも小さい隙間寸法を有する隙間空間s1が形成されている。下階の壁パネル1bの上端にある横枠3bに引掛具7を配置するには、引掛具7を傾けて縦片部8を略水平にした上でこの縦片部8を上記隙間空間s1を介して枠部4内に挿入し、その後、縦片部8を略垂直にするべく引掛具7を傾けるのであり、略垂直にした縦片部8を横枠3bの屋外側の側片15に屋内側から引掛け、横片部9を壁面板5の上端に載置するようにして行われる。このように引掛具7を下階の壁パネル1bの上端にある横枠3bに配置した状態では、引掛具7の引掛爪部10と下階の壁パネル1bの上端にある横枠3bとが隙間Sを隔てて対向配置される。そして、この隙間Sに幕板11の係合突部12を嵌め込むように係合させることで、引掛爪部10と共に縦片部8が横枠3bに屋外側から強く当接して係止するのである。つまり、幕板11の下端は、下階の壁パネル1bの壁面板5の上端に載置された状態で、且つ、下階の壁パネル1bの上端にある横枠3bの屋外側に添設された状態で、下階の壁パネル1bの横枠3bに係止された引掛具7を介して、下階の壁パネル1bに係合状態でぐらつきなく固定されるのである。このとき、幕板11の下端と下階の壁パネル1bの壁面板5との間の屋外側の部位では幕板11の下端の切欠47による隙間s3が形成されるが、この隙間s3には図示しないコーキング材が充填されるのであり、幕板11の下端と下階の壁パネル1bの壁面板5との間に防水処理が施されるのである。   A hook 7 is used to fix the lower end portion of the curtain 11 to the lower wall panel 1b. The hook 7 has a horizontal piece 9 protruding horizontally from the lower end of the vertical vertical piece 8 to the outdoor side, and a hooking claw portion 10 upward from the outdoor end of the horizontal piece 9 from the vertical piece 8. It is a piece piece made of metal having a J-shaped longitudinal section that protrudes low, and is used by being disposed at an appropriate position on the horizontal frame 3b at the upper end of the wall panel 1b on the lower floor. In addition, the horizontal frame 3b at the upper end of the wall panel 1b on the lower floor is formed in a U-shaped cross-section that opens downward from the end on the indoor side of the horizontal bottom piece 14 respectively. Between the lower end of this horizontal frame 3b and the upper end of the wall surface board 5, the clearance space s1 which has a clearance dimension smaller than the vertical dimension of the vertical piece part 8 of the hook 7 is formed. In order to dispose the hooking tool 7 on the horizontal frame 3b at the upper end of the wall panel 1b on the lower floor, the hooking tool 7 is tilted to make the vertical piece 8 substantially horizontal, and the vertical piece 8 is then placed in the gap space s1. Then, the hook 7 is tilted so as to make the vertical piece 8 substantially vertical, and the vertical piece 8 is set to the side piece 15 on the outdoor side of the horizontal frame 3b. And the horizontal piece 9 is placed on the upper end of the wall plate 5. When the hooking tool 7 is arranged in the horizontal frame 3b at the upper end of the lower floor wall panel 1b as described above, the hooking claw portion 10 of the hooking tool 7 and the horizontal frame 3b at the upper end of the lower floor wall panel 1b are provided. Oppositely arranged with a gap S therebetween. Then, by engaging the engagement projection 12 of the curtain plate 11 in this gap S, the vertical piece 8 together with the hooking claw 10 is brought into strong contact with the horizontal frame 3b from the outdoor side and locked. It is. That is, the lower end of the curtain plate 11 is placed on the upper end of the wall plate 5 of the lower floor wall panel 1b and is attached to the outdoor side of the horizontal frame 3b at the upper end of the lower wall panel 1b. In this state, it is fixed to the lower wall panel 1b in an engaged state without wobbling through the hook 7 locked to the horizontal frame 3b of the lower floor wall panel 1b. At this time, a gap s3 is formed by a notch 47 at the lower end of the curtain plate 11 at a portion on the outdoor side between the lower end of the curtain plate 11 and the wall panel 5 of the wall panel 1b on the lower floor. A caulking material (not shown) is filled, and waterproofing is performed between the lower end of the curtain plate 11 and the wall surface plate 5 of the wall panel 1b on the lower floor.

幕板11の上端部位を上階の壁パネル1aに固定するにはボルト13に加えて補助板具48を用いて行われている。この補助板具48は、図6のように上部域48aを下部域48bに比べて屋外側に微少に屈曲させ、上部域48aには屋内外方向に貫通する貫通孔49を穿孔した矩形板状の金属製のピース材であり、上階の壁パネル1aの下端にある横枠3aに引掛けるようにして使用される。なお、上階の壁パネル1aの下端にある横枠3aは水平な底片14の屋内外側の端部からそれぞれ側片15を垂直に立上げてなる上方に開口する断面コ字状に形成されており、この横枠3aの上端と壁面板5の下端との間には補助板具48の上部域48aの上下長さ寸法よりも大きい隙間寸法を有する隙間空間s2が形成されている。この補助板具48は、上部域48aにある貫通孔49を幕板11の上部に埋設されたアンカー部材44の雌ネジ孔45aに連通させるように、下部域48bを上階の壁パネル1aの下端にある横枠3aの屋外側の側片15に屋内側から添わせて配置される。そして、この補助板具48は貫通孔49に屋内側からボルト13を挿通させ、このボルト13の先端を幕板11に埋設したアンカー部材44の雌ネジ孔45aに締結させることで、その上部域48aが幕板11の屋内側の面に沿って固定されると共にその下部域48bが幕板11の屋内側の面との協働で横枠3aの屋外側の側片15を挟持するのであって、これにより幕板11の上端部位を上階の壁パネル1aに固定させるのである。なお、幕板11の上端と上階の壁パネル1aの壁面板5との間には幕板11の高さ寸法による隙間s4ができるが、この隙間s4には図示しないコーキング材が充填されるのであり、幕板11の上端と上階の壁パネル1aの壁面板5との間に防水処理が施されるのである。また、アンカー部材44が埋設される幕板11の貫通孔43の大径部43aにも防水処理を期して屋外側からコーキング材を充填するのが好ましい。また、補助板具48の上階の壁パネル1aへの配置位置は本例のように引掛具7の下階の壁パネル1bへの取付位置の直上位置に設定するのが好ましく、これにより幕板11の安定した配設が期待できる。また、本例の補助板具48はボルト13を雌ネジ孔45aに締結させるときにボルト13と一緒に回転して施工が煩雑になることもあるので、たとえば補助板具48を上階の壁パネル1aに配置したときに補助板具48の下端を上階の壁パネル1aの下端にある横枠3aの底片14に線接触状態で当接させたり、補助板具48に上階の壁パネル1aの下端にある横枠3aに引掛ける爪などを複数設けたりして、補助板具48に回転規制を施して施工性を高めることも好ましい。   In order to fix the upper end portion of the curtain plate 11 to the upper floor wall panel 1a, an auxiliary plate 48 is used in addition to the bolt 13. As shown in FIG. 6, the auxiliary plate 48 has a rectangular plate shape in which an upper region 48a is slightly bent to the outdoor side compared to the lower region 48b, and a through hole 49 penetrating the indoor region is formed in the upper region 48a. The metal piece material is used so as to be hooked on the horizontal frame 3a at the lower end of the upper floor wall panel 1a. The horizontal frame 3a at the lower end of the wall panel 1a on the upper floor is formed in a U-shaped cross section that opens upward from the indoor bottom end of the horizontal bottom piece 14 with the side pieces 15 rising vertically. A gap space s2 having a gap size larger than the vertical dimension of the upper region 48a of the auxiliary plate 48 is formed between the upper end of the horizontal frame 3a and the lower end of the wall surface plate 5. The auxiliary plate 48 has a lower region 48b connected to an upper floor wall panel 1a so that a through hole 49 in the upper region 48a communicates with a female screw hole 45a of an anchor member 44 embedded in the upper portion of the curtain plate 11. The horizontal frame 3a at the lower end is disposed along the outdoor side piece 15 from the indoor side. The auxiliary plate 48 is inserted into the through hole 49 from the indoor side, and the tip of the bolt 13 is fastened to the female screw hole 45 a of the anchor member 44 embedded in the curtain plate 11, so that the upper region 48a is fixed along the indoor side surface of the curtain plate 11, and its lower region 48b holds the side piece 15 on the outdoor side of the horizontal frame 3a in cooperation with the indoor side surface of the curtain plate 11. Thus, the upper end portion of the curtain plate 11 is fixed to the wall panel 1a on the upper floor. A gap s4 corresponding to the height dimension of the curtain plate 11 is formed between the upper end of the curtain plate 11 and the wall plate 5 of the upper floor wall panel 1a. The gap s4 is filled with a caulking material (not shown). Therefore, waterproofing is performed between the upper end of the curtain plate 11 and the wall surface plate 5 of the upper wall panel 1a. In addition, it is preferable that the large diameter portion 43a of the through hole 43 of the curtain plate 11 in which the anchor member 44 is embedded is filled with a caulking material from the outdoor side for waterproofing. Further, the position of the auxiliary plate 48 on the upper floor wall panel 1a is preferably set to a position directly above the position of the hook 7 attached to the lower wall panel 1b as in this example. A stable arrangement of the plate 11 can be expected. Further, since the auxiliary plate 48 of this example may rotate together with the bolt 13 when the bolt 13 is fastened to the female screw hole 45a, the construction may be complicated. When arranged on the panel 1a, the lower end of the auxiliary plate 48 is brought into contact with the bottom piece 14 of the horizontal frame 3a at the lower end of the upper floor wall panel 1a in a line contact state, or the upper floor wall panel is brought into contact with the auxiliary plate 48. It is also preferable to provide a plurality of claws or the like to be hooked on the horizontal frame 3a at the lower end of 1a, thereby restricting the rotation of the auxiliary plate 48 and improving the workability.

上述のように幕板11の上階の壁パネル1aと下階の壁パネル1bとの間への配設は、幕板11の下端を下階の壁パネル1bに係合構造で固定させると共に、幕板11の上端を上階の壁パネル1aに補助板具48及びボルト13を用いて固定させることで行われている。この幕板11の配設にかかる具体的な作業としては、まず、下階の壁パネル1bの上端にある横枠3bに引掛具7を取付け、次に、幕板11を上階の壁パネル1aの下端にある横枠3aと下階の壁パネル1bの上端にある横枠3bとの間に屋外側から沿わせるように配置し、次に、上記幕板11を垂直下方にスライドさせて引掛具7の引掛爪部10と下階の壁パネル1bの上端にある横枠3bとの隙間Sに幕板11の係合突部12を上方から挿入し、次に、幕板11の上端の雌ネジ孔45aに貫通孔49を連通させるようにして上階の壁パネル1aの下端にある横枠3aに補助板具48を屋内側から沿わせて配置し、そして、ボルト13を補助板具48の貫通孔49に屋内側から挿通させて幕板11の雌ネジ孔45aに締結させることで、補助板具48と幕板11との協働で上階の壁パネル1aの下端にある横枠3aを挟持させ、幕板11の上端部位を上階の壁パネル1aの下端にある横枠3aに固定させるといった作業で行われている。   As described above, the arrangement between the upper floor wall panel 1a and the lower floor wall panel 1b of the curtain plate 11 fixes the lower end of the curtain plate 11 to the lower floor wall panel 1b with an engaging structure. The upper end of the curtain plate 11 is fixed to the upper wall panel 1a by using the auxiliary plate 48 and the bolt 13. As a specific work related to the arrangement of the curtain plate 11, the hook 7 is first attached to the horizontal frame 3b at the upper end of the lower floor wall panel 1b, and then the curtain plate 11 is attached to the upper floor wall panel. 1a is arranged so as to be along from the outdoor side between the horizontal frame 3a at the lower end of 1a and the horizontal frame 3b at the upper end of the lower wall panel 1b, and then the curtain plate 11 is slid vertically downward. The engagement protrusion 12 of the curtain plate 11 is inserted from above into the gap S between the hook claw portion 10 of the hook 7 and the horizontal frame 3b at the upper end of the lower wall panel 1b. The auxiliary plate 48 is disposed along the horizontal frame 3a at the lower end of the upper floor wall panel 1a so that the through hole 49 communicates with the female screw hole 45a from the indoor side, and the bolt 13 is attached to the auxiliary plate. By inserting the through hole 49 of the tool 48 from the indoor side and fastening it to the female screw hole 45a of the curtain plate 11, The horizontal frame 3a at the lower end of the upper floor wall panel 1a is clamped by the cooperation of the plate 48 and the curtain panel 11, and the upper end portion of the curtain panel 11 is connected to the horizontal frame 3a at the lower end of the upper floor wall panel 1a. It is done by the work of fixing.

ここで、下階の壁パネル1bの上端にある横枠3bへの引掛具7の取付けは横枠3bへの引掛具7の係合にて行われ、また幕板11の下端の引掛具7を介した横枠3bへの固定は隙間Sへの幕板11の係合突部12の係合にて行われているから、一連の施工作業を係合といった簡単な作業で行うことができ、施工性の向上が図られているのである。なお、係合によって幕板11の下端を横枠3bに固定した状態では幕板11の下端は壁パネル1bの壁面板5の上に載置されて幕板11の位置決め配置がされるのであり、その後の幕板11の上端の上階の壁パネル1aの下端にある横枠3aへの固定作業の容易化が図られ、この点でも施工性の向上が図られているのである。また、幕板11の上端の横枠3aへの固定にあってはビスなどの打設具52(図7参照)を使用せずにボルト13の締結にて行われているが、これにより、ビスなどの打設具52に扱いに不慣れな上棟業者の作業者であっても良好な仕上りを期して幕板11の配設作業を行わせ得るようにされているのである。ここで、幕板11は壁パネル1と同様にパネル材であり、上記のように壁パネル1の配設作業と同様に幕板11の配設作業も上棟業者に担当させると、壁形成のためのパネル材の配設作業の全てを上棟業者によって担わせることができるのであり、しかして壁形成の施工時に業者が入り乱れる煩雑性を回避でき、たとえば工事納期の短縮化などを図ることができるのである。更に言うと、幕板11の配設にあっては、幕板11の下端での固定は引掛具7を介した係合構造によって行われ、幕板11の上端での固定においてのみボルト13が使用されているから、幕板11を配設するのに使用するボルトの数を極力少なくする配慮がされているのであり、この点でも幕板11の配設にかかる施工性の向上が図られている。   Here, the hook 7 is attached to the horizontal frame 3b at the upper end of the lower wall panel 1b by engaging the hook 7 with the horizontal frame 3b, and the hook 7 at the lower end of the curtain plate 11 is attached. Since the fixing to the horizontal frame 3b through the engagement is performed by the engagement of the engagement protrusion 12 of the curtain plate 11 to the gap S, a series of construction work can be performed by a simple operation such as engagement. The improvement of workability is aimed at. When the lower end of the curtain plate 11 is fixed to the horizontal frame 3b by engagement, the lower end of the curtain plate 11 is placed on the wall surface plate 5 of the wall panel 1b, and the curtain plate 11 is positioned and arranged. Then, the fixing work to the horizontal frame 3a at the lower end of the upper wall panel 1a at the upper end of the curtain 11 is facilitated, and the workability is also improved in this respect. Further, the fixing of the upper end of the curtain plate 11 to the horizontal frame 3a is performed by fastening the bolt 13 without using a driving tool 52 (see FIG. 7) such as a screw. Even an operator of a building contractor who is unfamiliar with handling of the driving tool 52 such as a screw can perform the work of disposing the curtain plate 11 with a good finish. Here, the curtain plate 11 is a panel material similar to the wall panel 1, and if the upper building contractor is in charge of the placement work of the curtain plate 11 as well as the work of placing the wall panel 1 as described above, Therefore, it is possible to allow the upper building contractor to carry out all of the arrangement work of the panel material for this purpose. However, it is possible to avoid the trouble that the contractor is confused when the wall is formed, for example, to shorten the construction delivery time. It can be done. Furthermore, in the arrangement of the curtain plate 11, the lower end of the curtain plate 11 is fixed by the engagement structure via the hook 7, and the bolt 13 is only fixed at the upper end of the curtain plate 11. Since it is used, consideration is given to reducing the number of bolts used to dispose the curtain plate 11 as much as possible. Also in this respect, the workability related to the disposition of the curtain plate 11 is improved. ing.

ところで、本例の幕板11の取付構造にあっては幕板11の下端部位は係合構造のみで下階の壁パネル1bに固定させているが、適宜、添設状態にある幕板11の下端部位と下階の壁パネル1bの上端にある横枠3bとを屋外側からのビスなどの打設具の打設によって固着させても好ましい。この場合には打設具を打設した分だけ幕板11の配設強度を向上できる。なお、この打設具の打設作業は、既に固定状態にある幕板11の下端部位と下階の壁パネル1bの上端にある横枠3bとに対して施すものなので、幕板11の配置位置決めなどを伴わない比較的簡単な作業であり、良好な仕上りが期待できるのは言うまでもない。   By the way, in the attachment structure of the curtain plate 11 of the present example, the lower end portion of the curtain plate 11 is fixed to the lower wall panel 1b only by the engagement structure. It is also preferable to fix the lower end portion and the horizontal frame 3b at the upper end of the wall panel 1b on the lower floor by driving a driving tool such as a screw from the outdoor side. In this case, the placement strength of the curtain plate 11 can be improved by the amount of placement of the placing tool. Since the placing operation of the placing tool is performed on the lower end portion of the curtain plate 11 already fixed and the horizontal frame 3b on the upper end of the wall panel 1b on the lower floor, the placement of the curtain plate 11 is performed. Needless to say, it is a relatively simple operation that does not involve positioning and the like, and a good finish can be expected.

本発明の実施の形態の例の縦断面図である。It is a longitudinal cross-sectional view of the example of embodiment of this invention. 同上の一部を透視した正面図である。It is the front view which saw through a part same as the above. 図1のA部分の拡大図である。It is an enlarged view of the A part of FIG. 図1のB部分の拡大図である。It is an enlarged view of B part of FIG. 同上のアンカー部材の斜視図である。It is a perspective view of an anchor member same as the above. 同上の補助板具であって、(a)は正面図であり、(b)は縦断面図である。It is an auxiliary | assistant board tool same as the above, (a) is a front view, (b) is a longitudinal cross-sectional view. 背景技術の例を示す縦断面図である。It is a longitudinal cross-sectional view which shows the example of background art.

符号の説明Explanation of symbols

1 壁パネル
1a 上階の壁パネル
1b 下階の壁パネル
2 縦枠
3 横枠
3a 上階の壁パネルの下端の横枠
3b 下階の壁パネルの上端の横枠
4 枠部
5 壁面板
6 梁
7 引掛具
8 縦片部
9 横片部
10 引掛爪部
11 幕板
12 係合突部
13 ボルト
S 隙間
DESCRIPTION OF SYMBOLS 1 Wall panel 1a Upper floor wall panel 1b Lower floor wall panel 2 Vertical frame 3 Horizontal frame 3a The lower frame of the upper floor wall panel 3b The upper frame of the lower floor wall panel 4 Frame part 5 Wall plate 6 Beam 7 Hook 8 Vertical piece 9 Horizontal piece 10 Hook claw 11 Curtain plate 12 Engaging projection 13 Bolt S Gap

Claims (1)

縦枠と横枠とを組み付けた枠部の屋外側に壁面板を一体に付設した上階の壁パネルと下階の壁パネルとの間に梁を横架し、上階の壁パネルの下端にある横枠を梁の上端に固定すると共に下階の壁パネルの上端にある横枠を梁の下端に固定し、垂直な縦片部の下端から屋外側に水平に横片部を突設すると共に横片部の屋外側先端から上方に引掛爪部を突設して引掛具を形成し、引掛具の縦片部を下階の壁パネルの上端の横枠に屋内側から引掛けると共に引掛具の横片部を下階の壁パネルの壁面板の上端に載置し、引掛具の引掛爪部と下階の壁パネルの上端の横枠との隙間に幕板の下端に下方に突設した引掛突部を係合し、幕板の上端を上階の壁パネルの下端の横枠の屋外側に添設すると共にボルトにて固定したことを特徴とする幕板の取付構造。   A beam is installed between the upper floor wall panel and the lower floor wall panel, where the wall plate is integrally attached to the outdoor side of the frame section that combines the vertical and horizontal frames, and the lower end of the upper floor wall panel. The horizontal frame at the top is fixed to the top of the beam and the horizontal frame at the top of the lower wall panel is fixed to the bottom of the beam, and the horizontal piece protrudes horizontally from the bottom of the vertical vertical piece to the outdoor side. At the same time, a hooking claw portion is projected upward from the outdoor side tip of the horizontal piece to form a hook, and the vertical piece of the hook is hooked from the indoor side to the horizontal frame at the upper end of the wall panel on the lower floor. Place the horizontal piece of the hook on the upper end of the wall panel of the lower floor wall panel, and lower the lower end of the curtain to the gap between the hook tab of the hook and the upper horizontal frame of the lower wall panel. A curtain mounting structure characterized by engaging the projecting hook projection and attaching the upper end of the curtain to the outdoor side of the horizontal frame at the lower edge of the upper floor wall panel and fixing with a bolt
JP2004250811A 2004-08-30 2004-08-30 Mounting structure of modesty panel Withdrawn JP2006063754A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004250811A JP2006063754A (en) 2004-08-30 2004-08-30 Mounting structure of modesty panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004250811A JP2006063754A (en) 2004-08-30 2004-08-30 Mounting structure of modesty panel

Publications (1)

Publication Number Publication Date
JP2006063754A true JP2006063754A (en) 2006-03-09

Family

ID=36110468

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004250811A Withdrawn JP2006063754A (en) 2004-08-30 2004-08-30 Mounting structure of modesty panel

Country Status (1)

Country Link
JP (1) JP2006063754A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017096011A (en) * 2015-11-26 2017-06-01 株式会社内藤ハウス Frame cover panel installing structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017096011A (en) * 2015-11-26 2017-06-01 株式会社内藤ハウス Frame cover panel installing structure

Similar Documents

Publication Publication Date Title
JP2006063754A (en) Mounting structure of modesty panel
JP5461279B2 (en) building
JP2006214268A (en) Method of connecting foundation members, columns or beams in a wooden building
CN110392760B (en) Mounting fitting and wall structure of building
JP6906344B2 (en) Furnace mounting bracket
JP5427059B2 (en) Corner wall panel mounting method and structure
CN216552742U (en) Assembled ALC board package gutter connected node structure
JPH1122081A (en) Installing method and device for corner panel
JP5393017B2 (en) Connection structure between foundation and wall panel
JPH0734085Y2 (en) Concrete panel mounting structure
JP2019094771A (en) Joint structure between wall member and foundation
JP2005069524A (en) Fixing device for duct joiner, fixing metal fitting for duct joiner, and duct joiner
JPH0738511Y2 (en) Support fittings for roof panels and hut back wall panels
JP2019124005A (en) Outer wall fixing structure
JP4225355B2 (en) Panel mounting bracket
JP4166740B2 (en) Balcony joisting mounting structure
JP2009046949A (en) Seismic reinforcing structure of wooden framework building with wall having column exposed on external surface
JP2557161B2 (en) Roof unit with parapet
JPH102054A (en) Metal fitting composition for panel
JP2006299707A (en) Ceiling panel installing structure and construction method
JP2006177153A (en) Connection structure of column and beam in wooden building, and method of assembling column and beam in wooden building
JP2007284917A (en) Anchor for load-bearing frame, and extension method for load-bearing frame using it
JPH0610407U (en) Bracket for mounting face material
JP2009221689A (en) Double sided panel exterior wall structure
JP2000154598A (en) Excecution method of roof panel in unit building

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20071106