JP2005288667A JP2004111559A JP2004111559A JP2005288667A JP 2005288667 A JP2005288667 A JP 2005288667A JP 2004111559 A JP2004111559 A JP 2004111559A JP 2004111559 A JP2004111559 A JP 2004111559A JP 2005288667 A JP2005288667 A JP 2005288667A
Authority
JP
Japan
Prior art keywords
jig
carriage
rail
welding
buffer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2004111559A
Other languages
Japanese (ja)
Other versions
JP4233481B2 (en
Inventor
Isao Ito
勲 伊藤
Hironobu Takeda
浩宣 武田
Tadashi Hida
正 飛田
Noriyuki Honda
範之 本田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Honda Motor Co Ltd
Original Assignee
Honda Motor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Honda Motor Co Ltd filed Critical Honda Motor Co Ltd
Priority to JP2004111559A priority Critical patent/JP4233481B2/en
Publication of JP2005288667A publication Critical patent/JP2005288667A/en
Application granted granted Critical
Publication of JP4233481B2 publication Critical patent/JP4233481B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

<P>PROBLEM TO BE SOLVED: To facilitate replacement of tools, to simplify the form of an apparatus and provide suitable equipment configuration especially in the case of enough hands in a welding line using a tool supporting a workpiece. <P>SOLUTION: In the welding lines 1, 2, the tool 10 on a tool truck 3 is loaded with a workpiece at a supply position X, the positioned workpiece is conveyed to a welding position Y to be welded. Truck conveying rails 23 are provided parallel to the sides of the welding lines 1, 2, the supply position X and the truck conveying rails 23 are connected to each other by a tool transfer rail 24, and a buffer zone S where the tool 10 is on standby and a buffer rail 25 are provided on the side of the truck conveying rails 23. A conveying path on the tool truck 3, the tool transfer rail 24, the buffer rail 25 and the conveying path 26 on the first to the fourth trucks 22a to 22d are disposed at the same height. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

本発明は、例えば自動車のサイドパネルの溶接作業に用いられる複数のワーク保持用治具を待機位置または治具台車に移載するための治具搬送装置に関する。   The present invention relates to a jig conveying apparatus for transferring a plurality of workpiece holding jigs used for welding work of, for example, a side panel of an automobile to a standby position or a jig carriage.

従来、例えば自動車のサイドパネルを組み立てるサイドパネル組立装置として、例えば、複数の被溶接部材を第1の治具台車により第1溶接ステーションに搬送して溶接した後、この溶接体を第2の治具台車に載せ変えて第2溶接ステーションに搬送し、別の被溶接部材を溶接するとともに、最初の溶接ラインと次の溶接ラインとを一本のラインとして構成したような技術が知られている。(例えば、特許文献1参照。)   2. Description of the Related Art Conventionally, for example, as a side panel assembling apparatus for assembling a side panel of an automobile, for example, a plurality of members to be welded are transported to a first welding station by a first jig carriage and welded. A technique is known in which the first welding line and the next welding line are configured as one line while being transferred to the second welding station and transferred to the second welding station to weld another member to be welded. . (For example, refer to Patent Document 1.)

特開2002−293277号公報JP 2002-293277 A

ところで、上記のような技術では、各溶接ステーションにワーク保持用の治具台車を設けており、この治具台車にワークを位置決め搭載して仮付溶接などを行うようにしているが、取り扱うワークの機種が変更になると、治具台車上のワーク保持治具を交換する必要があった。
また、特開2002−293277号のような装置は、すべてが自動処理されるため便利であるが、例えば人手が多いような場合には設備が大掛かり過ぎるようになり、経済的でなかった。
By the way, in the technique as described above, a jig carriage for holding a workpiece is provided at each welding station, and the workpiece is positioned and mounted on the jig carriage to perform temporary welding or the like. When the model was changed, it was necessary to replace the workpiece holding jig on the jig carriage.
An apparatus such as Japanese Patent Application Laid-Open No. 2002-293277 is convenient because everything is automatically processed. However, for example, when there are a large number of hands, the equipment becomes too large and is not economical.

そこで本発明は、自動車のサイドパネルなどの溶接組立ラインにおいて、機種が変更になっても容易に適用できるようにするとともに、その装置を簡素な形態にし、特に人手が多い場合に好適な設備構成にすることを目的とする。   Therefore, the present invention enables easy application even when the model is changed in a welding assembly line such as a side panel of an automobile, and has a simple configuration of the apparatus, which is particularly suitable for a case where there are many manpower. The purpose is to.

上記目的を達成するため本発明は、ワークを供給位置から溶接加工位置を経由して搬出位置に搬送するような溶接加工ラインが同一直線上に二本設けられ、供給位置と溶接加工位置とを往復動可能な治具台車上にワーク保持用の治具を搬送する治具搬送装置において、少なくとも第1〜第4の四台の台車が走行可能で且つ前記溶接加工ラインとほぼ平行な台車搬送用レールと、この台車搬送用レールの側方に設けられ且つ治具をストックすることのできる複数のバッファゾーンと、前記台車搬送用レールと前記供給位置とを結ぶ治具移載用レールと、前記台車搬送用レールと各バッファゾーンとを結ぶ複数のバッファ用レールを設け、前記治具台車上の搬路と治具移載用レールとバッファ用レールと第1〜第4台車上の搬路の高さを同一高さに配列した。   In order to achieve the above object, the present invention is provided with two welding processing lines on the same straight line for conveying the workpiece from the supply position to the unloading position via the welding processing position. In a jig conveying apparatus that conveys a jig for holding a workpiece onto a reciprocable jig carriage, at least the first to fourth carriages can run and are substantially parallel to the welding line. Rails, a plurality of buffer zones provided on the side of the carriage transport rail and capable of stocking jigs, a jig transfer rail connecting the carriage transport rail and the supply position, A plurality of buffer rails connecting the carriage transport rail and each buffer zone are provided, and a carriage path on the jig carriage, a jig transfer rail, a buffer rail, and a carriage path on the first to fourth carriages. The same height And sequenced.

そして、台車搬送用レールの側方に設けられる複数のバッファゾーンに、機種に応じて形態の異なる複数の治具をストックしておき、供給位置において治具台車上の治具を交換できるようにする。そして、例えば、一方側の加工溶接ラインで第1、第2台車を、他方側の溶接加工ラインで第3、第4台車を使用するようにし、例えば治具を交換するときは、治具台車から降ろした治具を治具移載レールを介して第2、第4台車に移載してバッファゾーンに搬送し、新たに使用する治具を治具台車に載せるときは、第1、第3台車によって搬送した後、治具移載レールを介して治具を治具台車に移載する。
この際、治具台車上の搬路と治具移載用レールとバッファ用レールと第1〜第4台車上の搬路を同一高さにしておくことにより、例えば第1〜第4台車に治具を搭載して搬送した後、治具を手押しで搬送して交換することも可能となり、交換作業が楽に行えるとともに、設備を安価に構成できる。
A plurality of jigs having different forms depending on the model are stocked in a plurality of buffer zones provided on the side of the carriage transportation rail so that the jig on the jig carriage can be replaced at the supply position. To do. And, for example, the first and second carts are used on the processing welding line on one side and the third and fourth carts are used on the welding processing line on the other side. When the jig taken down from the jig is transferred to the second and fourth carts via the jig transfer rail and transported to the buffer zone, and a new jig to be used is placed on the jig cart, After being conveyed by the three carriages, the jig is transferred to the jig carriage via the jig transfer rail.
At this time, by setting the carrying path on the jig carriage, the jig transfer rail, the buffer rail, and the carrying path on the first to fourth carriages to the same height, for example, the first to fourth carriages. After mounting and transporting the jig, the jig can be transported and replaced by hand, so that the replacement work can be performed easily and the equipment can be configured at low cost.

二本の溶接加工ラインの供給位置と溶接加工位置とを往復動可能な治具台車上の治具を搬送する治具搬送装置として、少なくとも第1〜第4の四台の台車が走行可能な台車搬送用レールを設け、この台車搬送用レールの側方に複数の治具をストックすることのできる複数のバッファゾーンを設けるとともに、台車搬送用レールと供給位置とを治具移載用レールで結び、台車搬送用レールとバッファゾーンとを複数のバッファ用レールで結び、また治具台車上の搬路と治具移載用レールとバッファ用レールと第1〜第4台車の高さを同一高さに配列することで、治具を簡単に交換することができ、また、特に人手が十分な場合などには、設備をより経済的に構成することができる。   As a jig conveying device for conveying a jig on a jig carriage that can reciprocate between the supply position of the two welding lines and the welding position, at least four first to fourth carriages can travel. A carriage transport rail is provided, a plurality of buffer zones are provided on the side of the carriage transport rail, and a plurality of jigs can be stocked. The carriage transport rail and the buffer zone are connected by a plurality of buffer rails, and the carrying path on the jig carriage, the jig transfer rail, the buffer rail, and the first to fourth carriages have the same height. By arranging them at a height, the jig can be easily exchanged, and the equipment can be configured more economically, especially when manpower is sufficient.

本発明の実施の形態について添付した図面に基づき説明する。
ここで図1は本発明に係る治具搬送装置の構成概要を示す平面図、図2は一方側の溶接加工ラインの正面図、図3は治具台車の説明図で、(a)は正面図、(b)は側面図、図4は図2のA−A線方向から見た側面図でワークを仮付溶接するときの説明図、図5は図2のA−A線方向から見た側面図でワークを増打溶接するときの説明図、図6は搬送台車の説明図で、(a)は正面図、(b)は側面図、図7は治具の説明図、図8は図1のB−B線方向から見た治具移載用レール部分を説明する側面図、図9は治具移載用レール部分の平面図である。
Embodiments of the present invention will be described with reference to the accompanying drawings.
Here, FIG. 1 is a plan view showing an outline of the configuration of the jig conveying apparatus according to the present invention, FIG. 2 is a front view of a welding line on one side, FIG. 3 is an explanatory view of a jig carriage, and FIG. FIG. 4B is a side view, FIG. 4 is a side view seen from the AA line direction of FIG. 2, and is an explanatory view when the workpiece is tack welded. FIG. 5 is a view taken from the AA line direction of FIG. FIG. 6 is an explanatory view when a workpiece is subjected to additional welding in a side view, FIG. 6 is an explanatory view of a transport carriage, (a) is a front view, (b) is a side view, FIG. 7 is an explanatory view of a jig, FIG. FIG. 9 is a side view for explaining a jig transfer rail portion viewed from the direction of the line BB in FIG. 1, and FIG. 9 is a plan view of the jig transfer rail portion.

本発明に係る治具搬送装置は、例えば自動車のサイドパネルを組み立てる際に使用される組立ラインに適用され、取り扱う機種が変更になっても容易に適用できるようにされるとともに、その装置を簡素な形態にし、特に人手が多い場合に好適な設備構成にされている。   The jig conveying apparatus according to the present invention is applied to an assembly line used when assembling a side panel of an automobile, for example, and can be easily applied even if the model to be handled is changed, and the apparatus is simplified. In particular, the equipment configuration is suitable when there are many people.

すなわち、図1に示すように、サイドパネルの組立ラインは、ワークを供給位置Xから溶接加工位置Yを経由して搬出位置Zに搬送するような溶接加工ラインを直線上に二本(小物取付ライン1とインナ部品取付ライン2)備えており、小物取付ラインでは、アウタパネルにフュエルアダプタや、ドアストライカや、ドア開口の補強材や、リヤガータや、リヤフェンダスティフナーや、ジャッキホルダや、ドアキャッチャーなどの小物部品を溶接してアウタパネルアッセンブリを組み立て、インナ部品取付ライン2では、アウタパネルアッセンブリにフロントピラーインナや、リヤインナなどのインナ部品を溶接し、サイドパネルを組み立てるようにされている。   That is, as shown in FIG. 1, the assembly line of the side panel has two welding processing lines on the straight line (accessory attachment) for transferring the workpiece from the supply position X to the unloading position Z via the welding processing position Y. Line 1 and inner part mounting line 2) are provided, and in the accessory mounting line, the outer panel includes a fuel adapter, door striker, door opening reinforcement, rear gutter, rear fender stiffener, jack holder, door catcher, etc. The outer panel assembly is assembled by welding small parts, and in the inner part mounting line 2, the inner parts such as the front pillar inner and the rear inner are welded to the outer panel assembly to assemble the side panel.

また、このような溶接加工ラインの側方には、後述する治具台車3上の治具10を交換するための治具交換装置が設けられている。すなわち、小物取付ライン1とインナ部品取付ライン2の側方には、第1〜第4台車22a〜22dが走行可能な台車搬送用レール23が前記各取付ライン1、2と平行に設けられ、この台車搬送用レール23と供給位置Xとの間には、治具移載用レール24が設けられ、また、台車搬送用レール23の側方には、複数のバッファゾーンSが設けられている。そしてこれらバッファゾーンSには、治具移載用レール24に連結するバッファ用レール25が設けられている。   Further, a jig exchanging device for exchanging the jig 10 on the jig carriage 3 described later is provided on the side of such a welding line. That is, on the side of the accessory mounting line 1 and the inner part mounting line 2, a carriage transporting rail 23 on which the first to fourth carriages 22a to 22d can travel is provided in parallel with the mounting lines 1 and 2, respectively. A jig transfer rail 24 is provided between the carriage transport rail 23 and the supply position X, and a plurality of buffer zones S are provided on the side of the carriage transport rail 23. . The buffer zones S are provided with buffer rails 25 connected to the jig transfer rails 24.

それでは、まず溶接加工ラインから説明する。
前記小物取付ライン1とインナ部品取付ライン2には、供給位置Xと溶接加工位置Yを往復動可能な治具台車3と、溶接加工位置Yと搬出位置Zの間を往復動可能な搬出台車4が連結自在に設けられるとともに、それぞれの溶接加工位置Yの近傍に、ワーククランプ手段5と溶接装置6が設けられており、また、前記治具台車3や搬出台車4を移動させるため、小物取付ライン1とインナ部品取付ライン2には、供給位置Xと溶接加工位置Yと搬出位置Zとを結ぶガイドレール7が設けられている。
First, the welding process line will be described.
The accessory attachment line 1 and the inner part attachment line 2 include a jig carriage 3 that can reciprocate between the supply position X and the welding position Y, and a carry-out carriage that can reciprocate between the welding position Y and the unload position Z. 4 are provided so as to be connectable, work clamp means 5 and a welding device 6 are provided in the vicinity of the respective welding positions Y, and the jig carriage 3 and the unloading carriage 4 are moved to move small items. A guide rail 7 connecting the supply position X, the welding position Y, and the carry-out position Z is provided on the attachment line 1 and the inner part attachment line 2.

前記治具台車3は、図3に示すように、台車本体8の上部に専用の治具10が着脱自在にされ、この治具10はサイドパネルの種類に応じた専用の治具として、例えば図7に示すような形態で構成されており、取り扱うサイドパネルの種類が変更になると、それに対応した治具10に取り換えることができるようにされている。
そして、小物取付ライン1の治具台車3の治具10は、治具10上に搭載されるアウタパネルと小物部品を所定位置に位置決めクランプできるようにされ、インナ部品取付ライン2の治具台車3の治具10は、治具10上に搭載されるアウタパネルアッセンブリとアウタ部品を所定位置に位置決めクランプできるようにされている。なお、図3(b)において、アウタパネルや組付部品をクランプする治具等の最大張出し位置をPで示している。
As shown in FIG. 3, the jig cart 3 has a dedicated jig 10 detachably attached to the upper portion of the cart body 8, and the jig 10 is a dedicated jig according to the type of the side panel, for example, It is configured in the form as shown in FIG. 7, and when the type of the side panel to be handled is changed, it can be replaced with the jig 10 corresponding thereto.
Then, the jig 10 of the jig carriage 3 on the accessory mounting line 1 is configured so that the outer panel and the accessory parts mounted on the jig 10 can be positioned and clamped at a predetermined position. The jig 10 is configured so that an outer panel assembly and an outer part mounted on the jig 10 can be clamped at predetermined positions. In FIG. 3B, the maximum overhang position of a jig or the like for clamping the outer panel or the assembled part is indicated by P.

そして、この治具台車3は、供給位置Xにおいて所定のワークWを搭載し、位置決めクランプすると、これを溶接加工位置Yに搬送できるようにされている。
また、台車本体8上の治具10は、ガイドレール7の方向に直交する傾斜ガイドレール31に沿って横方向に所定ストローク移動自在にされ、後述するように、ワーククランプ手段5にワークWの受け渡しを行う際は、図3(b)の退避位置(実線)から、シリンダユニット33を伸長作動させて横方向の外方の受渡し位置に移動させ(図3(b)の一点鎖線)、受け渡した後は、シリンダユニット33を縮退作動させて、元の退避位置に退避できるようにされている。
The jig carriage 3 is configured so that a predetermined workpiece W is mounted at the supply position X and can be conveyed to the welding position Y when it is positioned and clamped.
Further, the jig 10 on the carriage main body 8 is movable in a lateral direction along an inclined guide rail 31 orthogonal to the direction of the guide rail 7 and can be moved by a predetermined stroke in the workpiece clamping means 5 as described later. When delivery is performed, the cylinder unit 33 is extended from the retracted position (solid line) in FIG. 3 (b) and moved to the laterally outward delivery position (one-dot chain line in FIG. 3 (b)). After that, the cylinder unit 33 is retracted so that it can be retracted to the original retracted position.

前記搬出台車4は、図6に示すように、アウタパネルの窓の部分を引掛けて保持するための係止部11と、センターピラーの個所を保持する保持部12を備えており、小物取付ライン1では、溶接加工位置Yにおいてワーククランプ手段5からアウタパネルアッセンブリを受取り、インナ部品取付ライン2では、ワーククランプ手段5からサイドパネルを受取った後、それぞれ搬出位置Zに向けて搬送できるようにされている。
そして、この搬出台車4と前記治具台車3は、図1に示す連結手段21により連結されて一体的に移動するようにされ、搬出台車4は、溶接加工位置Yと搬出位置Zの間を往復動自在にされるとともに、治具台車3は、供給位置Xと溶接加工位置Yの間を往復動自在にされている。
As shown in FIG. 6, the carry-out carriage 4 includes a locking portion 11 for hooking and holding a window portion of the outer panel, and a holding portion 12 for holding a center pillar portion, 1, the outer panel assembly is received from the work clamp means 5 at the welding position Y, and the inner part mounting line 2 is configured so that it can be conveyed toward the discharge position Z after receiving the side panel from the work clamp means 5. Yes.
The unloading carriage 4 and the jig carriage 3 are connected by the connecting means 21 shown in FIG. 1 so as to move integrally, and the unloading carriage 4 moves between the welding position Y and the unloading position Z. The jig carriage 3 is reciprocally movable between the supply position X and the welding position Y while being reciprocally movable.

前記ワーククランプ手段5は、図2、図5に示すように、縦向き姿勢のアウタパネルの上縁三ヶ所をクランプする三個のクランプ部材13と、下縁三ヶ所をクランプする三個のクランプ部材14を備えており、上縁側のクランプ部材13は、溶接加工位置Yのガイドレール7側方の基台15上に設けられるとともに、例えばこの基台15の上部には、図5に示すように、縦ガイド16に沿って上下動自在な横ガイド17が設けられ、この横ガイド17に沿って移動自在な支持部材18にクランプ部材13が取り付けられている。このため、クランプ部材13は、図5の左右方向に所定ストローク移動可能にされるとともに、上下方向にも所定ストローク移動可能にされている。また、所定個所のクランプ部材13は、ガイドレール7の方向に沿っても移動可能にされており、異機種のワークにも対応できるようにされている。   As shown in FIGS. 2 and 5, the work clamping means 5 includes three clamp members 13 for clamping the upper edge three places of the outer panel in the vertical orientation, and three clamp members for clamping the lower edge three places. 14 is provided on a base 15 on the side of the guide rail 7 at the welding position Y. For example, an upper portion of the base 15 is provided as shown in FIG. A horizontal guide 17 that is movable up and down along the vertical guide 16 is provided, and a clamp member 13 is attached to a support member 18 that is movable along the horizontal guide 17. For this reason, the clamp member 13 can be moved by a predetermined stroke in the left-right direction in FIG. 5 and can also be moved by a predetermined stroke in the vertical direction. Further, the clamp member 13 at a predetermined location is movable even in the direction of the guide rail 7 so that it can cope with workpieces of different types.

また、ワークWの下縁側を保持するクランプ部材14は、ガイドレール7を挟んで前記基台15とは反対側の床面に設けられ、このクランプ部材14も、図5の左右方向に所定ストローク移動可能にされるとともに、上下方向にも所定ストローク移動可能にされており、また、所定個所のクランプ部材14は、ガイドレール7の方向に沿っても移動可能にされており、異機種のワークにも対応できるようにされている。   Further, the clamp member 14 that holds the lower edge side of the workpiece W is provided on the floor surface opposite to the base 15 with the guide rail 7 interposed therebetween, and this clamp member 14 also has a predetermined stroke in the left-right direction in FIG. In addition to being movable, it is also possible to move in a predetermined stroke in the vertical direction, and the clamp member 14 at a predetermined location is also movable along the direction of the guide rail 7, so It can be adapted to.

前記溶接装置6は、複数の溶接ロボット20を備えており、この溶接ロボット20は多軸ロボットとして構成され、少なくとも3軸方向に移動可能なアームを備えている。   The welding apparatus 6 includes a plurality of welding robots 20, and the welding robot 20 is configured as a multi-axis robot and includes an arm that can move in at least three axial directions.

以上のような溶接加工ラインにおいて、まず、上流側の小物取付ライン1では、治具台車3が供給位置Xに、搬出台車4が溶接加工位置Yに位置した状態で、治具台車3上にアウタパネルが載置されてクランプされるとともに、このアウタパネルに対して、フュエルアダプターや、ドアストライカーや、ドア開口の補強材や、リヤガータや、リヤフェンダスティフナーや、ジャッキホルダや、ドアキャッチャーなどの小物部品が所定位置に位置決めされ、治具10のクランパーでクランプされる。   In the above-described welding process line, first, in the accessory attachment line 1 on the upstream side, the jig carriage 3 is positioned at the supply position X and the unloading carriage 4 is positioned at the welding position Y. The outer panel is placed and clamped, and small parts such as a fuel adapter, door striker, door opening reinforcement, rear garter, rear fender stiffener, jack holder, and door catcher are attached to the outer panel. It is positioned at a predetermined position and clamped by a clamper of the jig 10.

治具台車3上にアウタパネルや小物部品からなるワークWが位置決めクランプされると、搬出台車4と治具台車3は、一体的に前進し、搬出台車4が搬出位置Zに、治具台車3が溶接加工位置Yに同時に移動する。   When the workpiece W made of an outer panel or a small part is positioned and clamped on the jig carriage 3, the unloading carriage 4 and the jig carriage 3 move forward integrally, and the unloading carriage 4 is moved to the unloading position Z. Simultaneously move to the welding position Y.

次いで、溶接加工位置Yでは、図4に示すように、溶接装置6の溶接ロボット20により、治具台車3上のワークWに対して搭載状態のまま仮付溶接を行う。この仮付溶接は、小物部品がアウタパネルと一体となりアウタパネルだけを保持しても小物部品が外れ落ちたりすることのない程度の仮付けである。そして、仮付溶接が終了すると、台車本体8上の治具10が横方向の外方の受渡し位置に移動し、ワーククランプ手段5に仮付溶接体を受け渡す。そしてワーククランプ手段5が仮付溶接体を受取って上下縁をクランプすると、治具10は横方向の内方の退避位置に退避し、この状態で、図5に示すように、溶接ロボット20は仮付溶接体に増打溶接を行い、アウタパネルアッセンブリを組み立てる。この際、ワークWは空中に浮いた状態であるため、増打溶接の邪魔になるような干渉物がなく、十分な増打溶接が可能である。
そしてこの間に、搬出台車4と治具台車3は、一緒に後退し、搬出台車4が溶接加工位置Yに、治具台車3が供給位置Xに戻るようにされている。
Next, at the welding processing position Y, as shown in FIG. 4, the welding robot 20 of the welding apparatus 6 performs temporary welding on the workpiece W on the jig carriage 3 while being mounted. This temporary welding is temporary attachment in which the small parts are not united with the outer panel and the small parts are not detached even if only the outer panel is held. When the temporary welding is completed, the jig 10 on the carriage main body 8 moves to the laterally outward delivery position, and delivers the temporary welded body to the work clamp means 5. When the workpiece clamping means 5 receives the tack welded body and clamps the upper and lower edges, the jig 10 is retracted to the inward retracted position in the lateral direction, and in this state, as shown in FIG. Perform additional welding on the temporary welded body and assemble the outer panel assembly. At this time, since the workpiece W is in a floating state in the air, there is no interfering substance that obstructs the additional welding, and sufficient additional welding is possible.
During this time, the unloading carriage 4 and the jig carriage 3 are moved back together so that the unloading carriage 4 returns to the welding position Y and the jig carriage 3 returns to the supply position X.

増打溶接が完了すると、組み上がったアウタパネルアッセンブリは、ワーククランプ手段5から搬出台車4に自動的に移載される。
また、供給位置Xでは、治具台車3上に前記手順と同様な手順で、アウタパネルと小物部品が搭載される。
When the incremental welding is completed, the assembled outer panel assembly is automatically transferred from the work clamp means 5 to the carry-out carriage 4.
Further, at the supply position X, the outer panel and the small parts are mounted on the jig carriage 3 in the same procedure as described above.

次いで、搬出台車4と治具台車3は共に前進し、搬出台車4が搬出位置Yに移動して組み上がったアウタパネルアッセンブリの払出しが行われるとともに、溶接加工位置Yでは、次のワークの溶接が行われれ、このような作業が繰り返される。   Next, both the unloading carriage 4 and the jig carriage 3 move forward, the unloading carriage 4 moves to the unloading position Y, and the assembled outer panel assembly is discharged. At the welding position Y, the next workpiece is welded. This is repeated.

次に、小物取付ライン1から払い出されたアウタパネルアッセンブリは、インナ部品取付ライン2の供給位置Xに搬送され、インナ部品取付ライン2でインナ部品が取り付けられる。この取付要領は、小物取付ライン1の場合と同じ要領であり、供給位置Xにおいて、アウタパネルアッセンブリを治具台車3上に位置決めクランプすると同時に、アウタパネルアッセンブリに対して、フロントピラーインナや、リヤインナなどのインナ部品を所定位置に位置決めクランプする。   Next, the outer panel assembly paid out from the accessory mounting line 1 is conveyed to the supply position X of the inner component mounting line 2, and the inner component is mounted on the inner component mounting line 2. This mounting procedure is the same as that for the accessory mounting line 1. At the supply position X, the outer panel assembly is positioned and clamped on the jig carriage 3, and at the same time, the front pillar inner, rear inner, etc. Position and clamp the inner part in place.

そして、この治具台車3を溶接加工位置Yに移動させて仮付溶接した後、仮付溶接体をワーククランプ手段5で受取り、増打溶接を行う。そして、増打溶接が終えたサイドパネルは、後退してきた搬出台車4に移載され、その後、搬出位置Zに搬送されて払い出される。   Then, after the jig carriage 3 is moved to the welding position Y and temporarily welded, the temporary welded body is received by the work clamp means 5 and additional welding is performed. Then, the side panel that has been subjected to the increased hit welding is transferred to the carry-out carriage 4 that has moved backward, and then is conveyed to the carry-out position Z and is paid out.

次に、治具台車3上の治具10を交換するための治具交換装置について説明する。
この治具交換装置は、前述のように、溶接加工ライン1、2と平行に設けられる台車搬送用レール23と、この台車搬送用レール23と供給位置Xとを結ぶ治具移載用レール24と、台車搬送用レール23の側方に配置される複数のバッファゾーンSと、各バッファゾーンSから台車搬送用レール23に向けて延出するバッファ用レール25を備えており、台車搬送用レール23には、第1、第2、第3、第4台車22a、22b、22c、22dの四台の台車が走行自在にされている。
Next, a jig exchanging device for exchanging the jig 10 on the jig cart 3 will be described.
As described above, the jig exchanging apparatus includes a carriage transport rail 23 provided in parallel with the welding lines 1 and 2, and a jig transfer rail 24 that connects the carriage transport rail 23 and the supply position X. A plurality of buffer zones S arranged on the side of the carriage transport rail 23, and buffer rails 25 extending from the buffer zones S toward the carriage carriage rail 23, In FIG. 23, four carts of first, second, third, and fourth carts 22a, 22b, 22c, and 22d are made to run freely.

そして、このうち第1、第2台車22a、22bが小物取付ライン1の治具10交換用とされ、第3、第4台車22c、22dがインナ部品取付ライン2の治具10交換用にされるとともに、第2、第4台車22a、22cが使用済みの治具10を治具台車3から受け取ってバッファゾーンSに搬送するようにされ、第1、第3台車22b、22dが新たな治具10を搭載して治具台車3上に移載できるようにされている。   Of these, the first and second carts 22a and 22b are used for replacing the jig 10 of the accessory mounting line 1, and the third and fourth carts 22c and 22d are used for replacing the jig 10 of the inner component mounting line 2. At the same time, the second and fourth carriages 22a and 22c receive the used jig 10 from the jig carriage 3 and transport it to the buffer zone S, so that the first and third carriages 22b and 22d are newly treated. The tool 10 is mounted so that it can be transferred onto the jig carriage 3.

そして、治具台車3が供給位置Xに位置した状態で、台車搬送用レール23上の第2、第4台車22b〜22dが治具移載用レール24の前方に位置決めされると、治具台車3上からそれまで使用していた治具10を切離して、例えば作業員が手押しにより、治具10を治具移載用レール24を介して第2、第4台車22b、22dに移載する。そして、第2、第4台車22b、22dが所定位置のバッファゾーンSに手押しで搬送されると、それまで待機位置で待機していた第1、第3台車22a、22c(既に新たな治具10を搭載した状態)が治具移載用レール24の前方に移動し、そこから手押しにより治具10が治具移載用レール24を介して治具台車3上に移載される。   When the second and fourth carriages 22b to 22d on the carriage transport rail 23 are positioned in front of the jig transfer rail 24 in a state where the jig carriage 3 is located at the supply position X, the jig The jig 10 that has been used up to now is separated from the carriage 3, and the jig 10 is manually transferred to the second and fourth carriages 22b and 22d via the jig transfer rail 24 by hand, for example. To do. Then, when the second and fourth carriages 22b and 22d are manually conveyed to the buffer zone S at a predetermined position, the first and third carriages 22a and 22c that have been waiting at the standby position until then (new jigs already existed). 10) is moved to the front of the jig transfer rail 24, and the jig 10 is transferred onto the jig carriage 3 through the jig transfer rail 24 by hand pressing.

このため、図8、図9に示すように、第1〜第4台車22a〜22d上には、前後方向両端部に断面H型の一対の搬路26が設けられるとともに、この搬路26は、治具移載用レール24と同じ幅間隔にされ、第1〜第4台車22a〜22dが治具移載用レール24の前方に移動して位置決めされると、第1〜第4台車22a〜22d上の搬路26と治具移載用レール24が連通状態になるようにされている。また、この治具移載用レール24も断面H型とされている。そして、治具10の車輪28は、第1〜第4台車22a〜22dで搬送されるときは、搬路26のH型内部に嵌合している(図7)。   For this reason, as shown in FIGS. 8 and 9, a pair of carrying paths 26 having an H-shaped cross section are provided at both ends in the front-rear direction on the first to fourth carriages 22 a to 22 d. When the first to fourth carriages 22a to 22d are moved and positioned in front of the jig transfer rail 24, the first to fourth carriages 22a are positioned at the same width interval as the jig transfer rail 24. The transport path 26 on 22d and the jig transfer rail 24 are in communication with each other. The jig transfer rail 24 is also H-shaped in cross section. And the wheel 28 of the jig | tool 10 is fitted in the H type | mold inside of the conveyance path 26, when conveyed by the 1st-4th carts 22a-22d (FIG. 7).

一方、治具台車3には、治具10を支持する支持板27が設けられ、この支持板27の両端部にも搬路が設けられるとともに、この支持板27上の搬路や、治具移載用レール24や、第1〜第4台車22a〜22d上の搬路26は同一高さにされている。
また、バッファ用レール25についても治具移載用レール24と同じ構成であり、バッファ用レール25の前方位置まで第1〜第4台車22a〜22dが移動してくると、第1〜第4台車22a〜22d上の搬路26とバッファ用レール25が連通状態になるようにされるとともに、バッファ用レール25も断面H型のレール25にされている。
また、バッファ用レール25の高さも、治具搬送用レール24や、第1〜第4台車22a〜22d上の搬路26と同一高さにされている。
On the other hand, the jig carriage 3 is provided with a support plate 27 that supports the jig 10, and a carriage path is provided at both ends of the support plate 27. The transfer rail 24 and the carrying paths 26 on the first to fourth carriages 22a to 22d are set to the same height.
Also, the buffer rail 25 has the same configuration as the jig transfer rail 24, and when the first to fourth carriages 22 a to 22 d move to the front position of the buffer rail 25, the first to fourth carriages are moved. The carrying path 26 on the carriages 22a to 22d and the buffer rail 25 are brought into communication with each other, and the buffer rail 25 is also a rail 25 having an H-shaped cross section.
The height of the buffer rail 25 is also the same as that of the jig transport rail 24 and the transport path 26 on the first to fourth carriages 22a to 22d.

以上のような治具交換装置において、同一機種により生産ロットが終了し、他機種の生産が始まると、常時、供給位置X側方の台車搬送用レール23上で待機している第2、第4台車22b、22dに対して、治具台車3上の治具が移載される。すなわち、治具台車3から治具10が切離されると、作業者が手押しで治具移載用レール24を介して治具10を第2、第4台車22b、22dに移載する。   In the jig exchanging apparatus as described above, when the production lot is finished with the same model and the production of another model is started, the second and second units are always on standby on the carriage transport rail 23 on the side of the supply position X. The jig on the jig carriage 3 is transferred to the four carriages 22b and 22d. That is, when the jig 10 is separated from the jig carriage 3, the operator manually pushes the jig 10 onto the second and fourth carriages 22b and 22d via the jig transfer rail 24.

第2、第4台車22b、22d上に治具10が移載されると、この第2、第4台車22b、22dは空のバッファゾーンSに向けて手押しで搬送され、所望のバッファゾーンSの前までくると、治具10はバッファ用レール25に押し込まれる。これも作業員の手作業で行う。   When the jig 10 is transferred onto the second and fourth carriages 22b and 22d, the second and fourth carriages 22b and 22d are manually conveyed toward the empty buffer zone S, and the desired buffer zone S The jig 10 is pushed into the buffer rail 25. This is also done manually by the workers.

次に、作業員は次の治具10を搭載した第1、第3台車22a、22cを手押しにより治具移載用レール24の前方に移動させ、台車22a、22c上の治具10を治具移載用レール24を介して治具台車3の支持板27上に移載する。
そして、治具台車3上に移載が完了すると、第1、第3台車22a、22cを邪魔にならない場所まで手押しでエスケープさせ、その後、第2、第4台車22b、22dを次の機種用治具10が待機するバッファゾーンSの前方に移動させ、第2、第4台車22b、22d上に次の機種用治具10を搭載する。そしてこの台車22a、22cを待機位置に移動させて待機させる。
Next, the worker moves the first and third carriages 22a and 22c loaded with the next jig 10 to the front of the jig transfer rail 24 by manually pushing the jig 10 on the carriages 22a and 22c. The material is transferred onto the support plate 27 of the jig carriage 3 via the tool transfer rail 24.
When the transfer onto the jig carriage 3 is completed, the first and third carriages 22a and 22c are escaped by hand to an unobstructed place, and then the second and fourth carriages 22b and 22d are used for the next model. The jig 10 is moved to the front of the buffer zone S where it waits, and the next model jig 10 is mounted on the second and fourth carriages 22b and 22d. Then, the carriages 22a and 22c are moved to the standby position to stand by.

以上のような要領により、特に人手を活用した治具交換作業が効率的に行われるが、この際、治具台車3上の搬路と、治具移載用レール24と、バッファ用レール25と、第1〜第4台車22a〜22d上の搬路26が同一高さにあるため、治具10の移動が楽に行える。
また、設備構成を簡素にでき、経済的である。
According to the above-described procedure, the jig exchanging work using manpower is efficiently performed. At this time, the carriage path on the jig carriage 3, the jig transfer rail 24, and the buffer rail 25 are used. Since the carrying paths 26 on the first to fourth carts 22a to 22d are at the same height, the jig 10 can be moved easily.
Moreover, the equipment configuration can be simplified and it is economical.

なお、本発明は以上のような実施形態に限定されるものではない。本発明の特許請求の範囲に記載した事項と実質的に同一の構成を有し、同一の作用効果を奏するものは本発明の技術的範囲に属する。
例えばワークはサイドパネル部品に限られるものではない。
In addition, this invention is not limited to the above embodiments. What has substantially the same configuration as the matters described in the claims of the present invention and exhibits the same operational effects belongs to the technical scope of the present invention.
For example, the workpiece is not limited to the side panel parts.

二本の溶接加工ラインを有する加工設備において、取り扱う機種変更に際して治具台車3上の治具10を変更する際、四台の台車22a〜22dが走行可能な台車搬送用レール23を設け、この台車搬送用レール23と治具台車3を結ぶように治具移載用レール24を設けるとともに、台車搬送用レール23の側方に複数のバッファゾーンSとバッファ用レール25を設けることで、特に人手が十分な場合に経済的な設備構成となり、また、治具台車3上の搬路と、治具移載用レール24と、バッファ用レール25と、第1〜第4台車22a〜22d上の搬路26を同一高さにすることで、搬送を楽に行うことができる。   In a processing facility having two welding processing lines, when changing the jig 10 on the jig carriage 3 when changing the model to be handled, a carriage transport rail 23 on which four carriages 22a to 22d can travel is provided. By providing the jig transfer rail 24 so as to connect the carriage transport rail 23 and the jig carriage 3, and by providing a plurality of buffer zones S and buffer rails 25 on the side of the carriage transport rail 23, When the manpower is sufficient, it becomes an economical facility configuration, and on the jig carriage 3, the jig transfer rail 24, the buffer rail 25, and the first to fourth carriages 22 a to 22 d. By making the carrying path 26 of the same height, the conveyance can be performed easily.

本発明に係る治具搬送装置の構成概要を示す平面図The top view which shows the structure outline | summary of the jig conveyance apparatus which concerns on this invention 一方側の溶接加工ラインの正面図Front view of one side welding line 治具台車の説明図で、(a)は正面図、(b)は側面図It is explanatory drawing of a jig trolley, (a) is a front view, (b) is a side view 図2のA−A線方向から見た側面図でワークを仮付溶接するときの説明図Explanatory drawing when carrying out temporary welding of a workpiece in the side view seen from the AA line direction of FIG. 図2のA−A線方向から見た側面図でワークを増打溶接するときの説明図Explanatory drawing when carrying out incremental welding of a workpiece in a side view seen from the AA line direction of FIG. 搬送台車の説明図で、(a)は正面図、(b)は側面図It is explanatory drawing of a conveyance trolley, (a) is a front view, (b) is a side view. 治具の説明図Illustration of jig 図1のB−B線方向から見た治具移載用レール部分を説明する側面図The side view explaining the rail part for jig transfer seen from the BB line direction of FIG. 治具移載用レール部分の平面図Plan view of the rail for jig transfer

符号の説明Explanation of symbols

1…小物取付ライン、2…インナ部品取付ライン、3…治具台車、10…治具、22a…第1台車、22b…第2台車、22c…第3台車、22d…第4台車、23…台車搬送用レール、24…治具移載用レール、25…バッファ用レール、26…搬路、S…バッファゾーン。 DESCRIPTION OF SYMBOLS 1 ... Small article attachment line, 2 ... Inner component attachment line, 3 ... Jig trolley, 10 ... Jig, 22a ... 1st trolley, 22b ... 2nd trolley, 22c ... 3rd trolley, 22d ... 4th trolley, 23 ... Rail for transporting carriage, 24 ... Rail for transferring jig, 25 ... Rail for buffer, 26 ... Carrying path, S ... Buffer zone.

Claims (1)

ワークを供給位置から溶接加工位置を経由して搬出位置に搬送するような溶接加工ラインが同一直線上に二本設けられ、供給位置と溶接加工位置とを往復動可能な治具台車上にワーク保持用の治具を搬送する治具搬送装置であって、少なくとも第1〜第4の四台の台車が走行可能で且つ前記溶接加工ラインとほぼ平行な台車搬送用レールと、この台車搬送用レールの側方に設けられ且つ治具をストックすることのできる複数のバッファゾーンと、前記台車搬送用レールと前記供給位置とを結ぶ治具移載用レールと、前記台車搬送用レールと各バッファゾーンとを結ぶ複数のバッファ用レールを備え、前記治具台車上の搬路と治具移載用レールとバッファ用レールと第1〜第4台車上の搬路の高さを同一高さに配列したことを特徴とする治具搬送装置。 Two welding lines are provided on the same straight line to transport the workpiece from the supply position to the unloading position via the welding position, and the workpiece is placed on a jig carriage that can reciprocate between the supply position and the welding position. A jig conveying apparatus for conveying a holding jig, wherein at least four first to fourth carriages can run and are substantially parallel to the welding line, and the carriage conveying rail. A plurality of buffer zones provided on the side of the rail and capable of stocking a jig; a jig transfer rail connecting the carriage transport rail and the supply position; the carriage transport rail and each buffer; A plurality of buffer rails connecting the zones, and the height of the carriage path on the jig carriage, the jig transfer rail, the buffer rail, and the carriage path on the first to fourth carriages is the same height. Jig transportation characterized by arrangement Apparatus.
JP2004111559A 2004-04-05 2004-04-05 Jig transport device Expired - Fee Related JP4233481B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004111559A JP4233481B2 (en) 2004-04-05 2004-04-05 Jig transport device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004111559A JP4233481B2 (en) 2004-04-05 2004-04-05 Jig transport device

Publications (2)

Publication Number Publication Date
JP2005288667A true JP2005288667A (en) 2005-10-20
JP4233481B2 JP4233481B2 (en) 2009-03-04

Family

ID=35322189

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004111559A Expired - Fee Related JP4233481B2 (en) 2004-04-05 2004-04-05 Jig transport device

Country Status (1)

Country Link
JP (1) JP4233481B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104259676A (en) * 2014-08-12 2015-01-07 安徽江淮汽车股份有限公司 Flexible production line of automobile side bodies

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103466278B (en) * 2013-09-17 2016-12-07 斯图加特航空自动化(青岛)有限公司 A kind of handling system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104259676A (en) * 2014-08-12 2015-01-07 安徽江淮汽车股份有限公司 Flexible production line of automobile side bodies

Also Published As

Publication number Publication date
JP4233481B2 (en) 2009-03-04

Similar Documents

Publication Publication Date Title
CZ9903164A3 (en) Process and apparatus for feeding, clamping and working parts of vehicle bodies within a single working center, particularly by geometrical welding
CN107598406B (en) Flexible automatic welding production line for electric four-wheeled vehicle frame
US20220371132A1 (en) Machine arrangement and mechanical method for manufacturing sheet metal
CN111230305A (en) Automatic flexible production line for combined welding beam and working method thereof
JPH08294781A (en) Welding line system
JP3364464B2 (en) Automatic processing equipment
JPH06277882A (en) Welding equipment for car body
JP4540897B2 (en) Combined work method by robot
JP4233481B2 (en) Jig transport device
JP4476003B2 (en) Side panel assembly line
JP4799521B2 (en) Body assembly equipment and body production method
JPH06277888A (en) Welding equipment for car body
JP2002239787A (en) Welding method and welding system
JP2005288666A (en) Workpiece transferring device
JP3166429B2 (en) Body assembly method and apparatus
JP3739682B2 (en) Parts supply device
JPH06277885A (en) Welding equipment for car body
JPH0466753B2 (en)
JPH03136734A (en) Gear head exchanging device
CN217496204U (en) Multifunctional tool cart for integrated circuit chip manufacturing plant
JP5830083B2 (en) Assembly system
JPH06320360A (en) Method and device for assembling article
JPH0133292B2 (en)
JPH07267162A (en) Method and device for assembling car body
JPH06285649A (en) Welding equipment for car body

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061130

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080512

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080520

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080709

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080805

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081002

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20081104

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081111

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20081209

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20081209

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111219

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111219

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121219

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131219

Year of fee payment: 5

LAPS Cancellation because of no payment of annual fees