JP2003306928A - Temporary interrupting facility for water channel - Google Patents
Temporary interrupting facility for water channelInfo
- Publication number
- JP2003306928A JP2003306928A JP2002111435A JP2002111435A JP2003306928A JP 2003306928 A JP2003306928 A JP 2003306928A JP 2002111435 A JP2002111435 A JP 2002111435A JP 2002111435 A JP2002111435 A JP 2002111435A JP 2003306928 A JP2003306928 A JP 2003306928A
- Authority
- JP
- Japan
- Prior art keywords
- groove
- section
- water channel
- water
- gutter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Barrages (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は水路の一時的な遮断
設備に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a temporary cutoff facility for a water channel.
【0002】[0002]
【従来の技術】従来、開放面のある水路や断面が各種形
状の管による水路を作業目的に応じて一時的に遮断する
作業がおこなわれている。すなわち、開放面のある水路
などでは土嚢積みなどによる堰止めがなされており、管
による水路の場合は管内に中空のゴム体を挿入し、ゴム
体内に空気を圧入して膨張させたり、環状のゴム体を両
側から板で挟んだ形状のものを管内に挿入し、両側の板
を接近させて環状のゴム体の周囲を盛り上げ管内を遮断
する方法などがとられている。2. Description of the Related Art Conventionally, work has been performed to temporarily cut off a water channel having an open surface or a water channel formed by a pipe having various shapes in cross section according to the purpose of the work. That is, dams such as sandbags are blocked in waterways with open surfaces, and in the case of waterways using pipes, a hollow rubber body is inserted into the rubber body to expand air by pressing air into the rubber body. A method of inserting a rubber body sandwiched by plates from both sides into a pipe and bringing the plates on both sides close to each other to raise the circumference of an annular rubber body and block the inside of the pipe is used.
【0003】しかしながら、これらの方法は作業が煩雑
で、遮断のために場所をとり、しかも遮断が不充分なこ
とが多く、また、各種形状のゴム体を復元して遮断を解
除しようとしても復元が円滑にできないことがあり改善
の必要がある。However, in these methods, the work is complicated, space is taken for blocking, and the blocking is often insufficient, and even if the rubber body of various shapes is restored and the blocking is released, it is restored. There is a case where it cannot be done smoothly and there is a need for improvement.
【0004】[0004]
【発明が解決しようとする課題】本発明は開放面のある
水路や断面が各種形状の管による水路を簡易な方法によ
り一時的に遮断することができる設備を提供しょうとす
るものである。DISCLOSURE OF THE INVENTION The present invention is to provide a facility capable of temporarily blocking a water channel having an open surface or a water channel having a pipe having various cross sections by a simple method.
【0005】[0005]
【課題を解決するための手段】ここにおいて本発明者は
水路の一時的な遮断設備として、本設備の使用時に遮断
すべき水路の周壁1と所定の間隙を保つよう断面コの字
状の溝3を水路の遮断板2と一体に形成してその溝3に
断面が円形をなすゴム体7を嵌入し、溝3になお開口が
あれば密封し、溝3の頂部に空気抜き弁10を、溝3内に
通ずる配管に加圧流体供給弁を、遮断板2の下方位置に
水抜き弁11をそれぞれ設けてあるものを見出すにいたっ
た。The inventor of the present invention uses, as a temporary cutoff facility for a water channel, a groove having a U-shaped cross section so as to maintain a predetermined gap with the peripheral wall 1 of the water channel to be shut off when this facility is used. 3 is integrally formed with the shutoff plate 2 of the water channel, a rubber body 7 having a circular cross section is fitted into the groove 3, and if the groove 3 still has an opening, it is sealed, and an air vent valve 10 is provided at the top of the groove 3. The inventors have found a pipe in which a pressurized fluid supply valve is provided in a pipe communicating with the groove 3 and a water drain valve 11 is provided below the shutoff plate 2.
【0006】この場合、加圧流体供給弁が加圧流体17を
水路の水である圧力水18に切換えることのできる三方切
換弁13であると好都合である。In this case, the pressurized fluid supply valve is preferably a three-way switching valve 13 capable of switching the pressurized fluid 17 to the pressure water 18 which is the water in the water channel.
【0007】また、開放面がある水路の場合は、遮断板
2に直接断面L字型の枠4を固定して断面コの字状の溝
3を形成し、溝3の左右頂部において押圧片8でゴム体
7を溝3内に押圧しその底部に密着してあると溝3の開
口が密封される。Further, in the case of a water channel having an open surface, a frame 4 having an L-shaped cross section is directly fixed to the blocking plate 2 to form a groove 3 having a U-shaped cross section, and pressing pieces are provided at the left and right apex portions of the groove 3. When the rubber body 7 is pressed into the groove 3 by 8 and is in close contact with the bottom of the groove 3, the opening of the groove 3 is sealed.
【0008】さらに、開放面がある水路の場合、遮断板
2の水側の下方位置に水路の底に当接する突出部材25が
固定されていると、水路の片側の水圧に抵抗するため遮
断板2の頂部を適宜固定した場合でも遮断板2の下端が
回動しないので好都合である。Further, in the case of a water channel having an open surface, if a projecting member 25 that abuts the bottom of the water channel is fixed at a lower position on the water side of the water blocking plate 2, the water blocking pressure on one side of the water channel is resisted. Even if the top part of 2 is properly fixed, the lower end of the blocking plate 2 does not rotate, which is convenient.
【0009】一方、断面が円形や角型などの管による水
路の場合、遮断板2に対し断面がT字状となるように固
定した環状板5の片側端部に2枚のフランジ6を固定し
て断面コの字状の溝3を形成してある。On the other hand, in the case of a water channel with a pipe having a circular or rectangular cross section, two flanges 6 are fixed to one end of the annular plate 5 fixed to the blocking plate 2 so that the cross section is T-shaped. Then, a groove 3 having a U-shaped cross section is formed.
【0010】なお、管による水路の場合、環状板5の2
枚のフランジ6を設けていない側の端部に、断面コの字
状の溝3を水路の周壁1に対し所定の間隙で固定するた
めの支持具24を複数個分散して取付けておくと遮断作業
上好都合である。In the case of a water channel using a pipe, 2 of the annular plate 5 is used.
If a plurality of supporting tools 24 for fixing the groove 3 having a U-shaped cross section to the peripheral wall 1 of the water channel at a predetermined gap are dispersedly attached to the end portion on the side where the flanges 6 are not provided, It is convenient for shutting off work.
【0011】[0011]
【発明の実施の形態】本発明による水路を一時的に遮断
するための設備は、当該設備の使用時において遮断すべ
き水路の周壁1と所定の間隙を保つよう断面コの字状の
溝3を水路の遮断板2と一体に形成してその溝3に断面
が円形をなすゴム体7を嵌入し、溝3になお開口があれ
ば密封し、溝3の頂部に空気抜き弁10を、溝3内に通ず
る配管に加圧流体供給弁を、遮断板2の下方位置に水抜
き弁11をそれぞれ設けてあり、亜鉛メッキの鉄などで構
成する。BEST MODE FOR CARRYING OUT THE INVENTION A facility for temporarily shutting off a water channel according to the present invention is a groove 3 having a U-shaped cross section so as to maintain a predetermined gap with a peripheral wall 1 of the water channel to be shut off when the facility is used. Is integrally formed with the waterway shutoff plate 2 and a rubber body 7 having a circular cross section is fitted into the groove 3, and if there is still an opening in the groove 3, the groove 3 is sealed, and an air vent valve 10 is provided at the top of the groove 3. A pressurized fluid supply valve is provided in a pipe communicating with the inside of the valve 3, and a water drain valve 11 is provided below the shutoff plate 2. The valve is made of galvanized iron or the like.
【0012】断面が円形をなすゴム体7は棒状または環
状(Oリング)であり、ニトリルゴム製のものなどが好
適である。Oリングは断面が円形や鈍角からなる角型の
管による水路の場合に使用する。なお、図1に示すごと
き断面がコの字型の開放面のある水路の場合や、直角部
を有する角型の管による水路の場合、ゴム体7が直角に
曲折する部分はゴム体7を45度の傾斜面に切断し相互
に接着して形成する。The rubber body 7 having a circular cross section is rod-shaped or annular (O-ring), and is preferably made of nitrile rubber. The O-ring is used in the case of a water channel with a rectangular pipe having a circular or obtuse cross section. In addition, in the case of a water channel having an open surface with a U-shaped cross section as shown in FIG. 1 or in the case of a water channel using a rectangular pipe having a right angle portion, the rubber body 7 is bent at a right angle. It is formed by cutting into 45 degree inclined surfaces and adhering to each other.
【0013】断面コの字状の溝3に断面が円形をなすゴ
ム体7を嵌入し、溝3になお開口があれば密封してある
ので、溝3の底部に通ずる配管に設けた加圧流体供給弁
を経て水や空気の加圧流体17が圧入されると、図3(加
圧流体供給弁に三方切換弁13を使用)に示すごとく、ゴ
ム体7は溝3の開放側に押出され、溝3との嵌合部分を
残したまま、柔軟性により水路の周壁に押圧され密着し
て水路の遮断が達成される。A rubber body 7 having a circular cross section is fitted in the groove 3 having a U-shaped cross section, and if there is still an opening in the groove 3, the rubber body 7 is sealed. Therefore, the pressure applied to the pipe leading to the bottom of the groove 3 is applied. When the pressurized fluid 17 such as water or air is press-fitted through the fluid supply valve, the rubber body 7 is pushed to the open side of the groove 3 as shown in FIG. 3 (the three-way switching valve 13 is used for the pressurized fluid supply valve). Then, while the fitting portion with the groove 3 is left, the flexibility is pressed against the peripheral wall of the water channel so as to be in close contact therewith, thereby blocking the water channel.
【0014】したがって、断面コの字状の溝3と水路の
周壁1との間隙は、ゴム体7が溝3から押出され、溝3
との嵌合部分を残したまま、柔軟性により水路の周壁に
押圧され密着するにいたるまでの距離に相当する。Therefore, in the gap between the groove 3 having a U-shaped cross section and the peripheral wall 1 of the water channel, the rubber body 7 is extruded from the groove 3 and the groove 3
It corresponds to the distance until it comes into close contact with the peripheral wall of the water channel due to its flexibility while leaving the fitting portion with.
【0015】なお、加圧流体供給弁が図5に示すごとき
加圧流体17を水路の水である圧力水18に切換えることの
できる三方切換弁13であると、圧力水18でゴム体7への
加圧が長時間維持できて好都合である。If the pressurizing fluid supply valve is a three-way switching valve 13 capable of switching the pressurizing fluid 17 to the pressure water 18 which is the water in the water channel as shown in FIG. This is convenient because the pressurization can be maintained for a long time.
【0016】コの字状の溝3を形成するにあたり開放面
がある水路の場合は、図1や図2に示すごとく、水路の
周壁1に対向して遮断板2に直接断面L字型の枠4を、
あるいは随所にリブを配した断面L字型の補強枠を介し
て固定する。また、溝3の左右頂部に開口があるので、
そこのゴム体7を押圧片8で溝3の底部に押圧し密着し
ておけば加圧流体17側の気密性が保たれる。押圧方法は
図4に示すごとく、(f)ゴム体7を押圧した状態の押
圧片8を溶接等で固定しておくか、あるいは(g)溶接
してある固定板にボルトを螺合(ネジ部を有する部材を
そのネジ部を用いてはめあわせるの意)し、ボルトの回
転で押圧片8が進退できるようにしておいてもよい。In the case of a water channel having an open surface for forming the U-shaped groove 3, as shown in FIGS. 1 and 2, the L-shaped cross section is directly opposed to the peripheral wall 1 of the water channel to the blocking plate 2. Frame 4
Alternatively, it is fixed via a reinforcing frame having an L-shaped cross section with ribs arranged everywhere. Also, since there are openings at the left and right apexes of the groove 3,
If the rubber body 7 there is pressed against the bottom of the groove 3 by the pressing piece 8 and brought into close contact with it, the airtightness on the pressurized fluid 17 side is maintained. As for the pressing method, as shown in FIG. 4, (f) the pressing piece 8 in a state where the rubber body 7 is pressed is fixed by welding or the like, or (g) a bolt is screwed (screwed) onto the welded fixing plate. A member having a portion may be fitted using the screw portion) so that the pressing piece 8 can be moved forward and backward by the rotation of the bolt.
【0017】つぎに、開放面がある水路を一時的に遮断
する場合についてさらに具体的に説明する。図1〜図3
に示すごとく、ポンプ15の吐出口に元バルブ12を付け、
配管の途中のT字管にアキュムレータ16を取付けてお
き、加圧流体供給弁(図1〜図3では三方切換弁13を使
用)を経て溝3の底部にいたるよう配管してある。加圧
流体17は水が適当であるが、空気を使用することもでき
る。加圧流体17が水である場合は元バルブ12と加圧流体
供給弁を開けた状態でポンプ15によりゴム体7と断面コ
の字状の溝3間に加圧水を供給してゴム体7を加圧、押
圧し水路を遮断する。Next, the case of temporarily shutting off a water channel having an open surface will be described more specifically. 1 to 3
As shown in, attach the main valve 12 to the discharge port of the pump 15,
An accumulator 16 is attached to a T-shaped pipe in the middle of the pipe, and is piped to the bottom of the groove 3 via a pressurized fluid supply valve (the three-way switching valve 13 is used in FIGS. 1 to 3). Water is suitable for the pressurized fluid 17, but air can also be used. When the pressurized fluid 17 is water, the pressurized water is supplied between the rubber body 7 and the groove 3 having a U-shaped cross section by the pump 15 with the main valve 12 and the pressurized fluid supply valve opened. Pressurize and press to shut off the waterway.
【0018】水路の遮断は水路の一方の水位が上がりだ
すことにより確認することができる。ついで、ポンプ15
とアキュムレータ16間の元バルブ12を閉めポンプ15を停
止しても、アキュムレータ16が蓄圧しているのでゴム体
7への加圧がしばらく維持される。なお、ポンプ15によ
り加圧水を供給する際、断面コの字状の溝3内の既存の
空気が押上げられるので、溝3の頂部にある空気抜き弁
10を水が噴き出るまで一時的に開放し、空気を追い出し
てやる。The blockage of the water channel can be confirmed by raising the water level in one of the water channels. Then pump 15
Even if the main valve 12 between the accumulator 16 and the pump 15 is closed and the pump 15 is stopped, the accumulator 16 accumulates pressure, so that the pressure on the rubber body 7 is maintained for a while. When supplying the pressurized water by the pump 15, the existing air in the groove 3 having a U-shaped cross section is pushed up, so the air vent valve at the top of the groove 3
Temporarily open 10 until water spouts and expels the air.
【0019】アキュムレータ16の蓄圧に依存するかわ
り、図1〜図3に示すごとく、加圧流体供給弁に三方切
換弁13を使用している場合は、水路の水による圧力水18
がゴム体7と断面コの字状の溝3間に通ずるよう三方切
換弁13を配管に支持されている制御桿14の操作で図5
(i)のごとく切換えれば、ゴム体7への加圧が長時間
確実に維持される。したがって、三方切換弁13はあらか
じめ水路の水側に設けてある。Instead of depending on the accumulated pressure of the accumulator 16, as shown in FIGS. 1 to 3, when the three-way switching valve 13 is used as the pressurized fluid supply valve, the pressure water 18 generated by the water in the water channel is used.
By operating the control rod 14 which supports the three-way switching valve 13 by the pipe so that the rubber can be communicated between the rubber body 7 and the groove 3 having a U-shaped cross section, FIG.
By switching as in (i), the pressure applied to the rubber body 7 is reliably maintained for a long time. Therefore, the three-way switching valve 13 is provided in advance on the water side of the water channel.
【0020】なお、水路の水と反対側で遮断板2の下方
位置に水抜き弁11を設けてあり、遮断作業の前後におい
て遮断板2の取付け取外しを容易にする場合や、水路の
水位が次第に上がり、またはそれにより遮断板2が押さ
れるような場合にそれらを緩和するため水抜き弁11を開
放し、必要に応じ水抜き弁11にホースを連結して他の適
当な場所に水を誘導し排除するようにする。A water drain valve 11 is provided below the shutoff plate 2 on the side opposite to the water in the waterway to facilitate installation and removal of the shutoff plate 2 before and after shutting off work, or when the water level in the waterway is high. In order to alleviate them when they gradually rise or the shutoff plate 2 is pushed by it, open the drain valve 11 and connect a hose to the drain valve 11 if necessary to drain water to another suitable place. Try to induce and eliminate.
【0021】遮断板2を取外すには三方切換弁13を加圧
流体17用に切換え、配管に真空ポンプを接続(図示省
略)して減圧すれば、ゴム体7が溝3内へ引き寄せら
れ、水路の周壁1と間隙が生ずるので、遮断板2を引揚
げることができる。To remove the shut-off plate 2, the three-way switching valve 13 is switched to the pressurized fluid 17, the vacuum pump is connected to the pipe (not shown) to reduce the pressure, and the rubber body 7 is drawn into the groove 3. Since the gap is formed with the peripheral wall 1 of the water channel, the blocking plate 2 can be lifted.
【0022】加圧流体17に空気を使用する場合は、加圧
流体供給弁の配管を操作ボックスを介してコンプレッサ
ーと連結し、操作ボックスにおいてコンプレッサーから
の圧力を調節しておき、加圧流体供給弁を開けて溝3内
へ加圧空気を加え、ゴム体7を溝3の側壁に沿い移動さ
せて水路の周壁1に密着させ水路を遮断する。この際、
空気抜き弁10を作動させる必要がない。その他、遮断板
2の状態維持や取外しは加圧流体17が水である場合と同
様にすればよい。When air is used as the pressurized fluid 17, the piping of the pressurized fluid supply valve is connected to the compressor via the operation box, and the pressure from the compressor is adjusted in the operation box to supply the pressurized fluid. The valve is opened and pressurized air is applied into the groove 3, and the rubber body 7 is moved along the side wall of the groove 3 so that the rubber body 7 is brought into close contact with the peripheral wall 1 of the water channel to block the water channel. On this occasion,
It is not necessary to operate the air vent valve 10. In addition, the maintenance and removal of the blocking plate 2 may be performed in the same manner as when the pressurized fluid 17 is water.
【0023】なお、開放面がある水路の場合、遮断板2
の水側の下方位置に、遮断板2を使用時水路の底に当接
する突出部材25が固定されていると、遮断板2に対する
水圧がとくに高い場合、それに抵抗するため遮断板2の
頂部を適宜固定した場合でも遮断板2の下端が回動しな
いので好都合である。突出部材25としては図2に示すも
ののほか、L字型の部材の一方を遮断板2に固定したも
のなど各種のものを使用することができる。In the case of a waterway having an open surface, the blocking plate 2
If a protruding member 25 that abuts the bottom of the water channel when the blocking plate 2 is used is fixed at a lower position on the water side of the blocking plate 2, when the water pressure on the blocking plate 2 is particularly high, the top part of the blocking plate 2 is removed to resist it. Even when properly fixed, the lower end of the blocking plate 2 does not rotate, which is convenient. As the protruding member 25, other than the one shown in FIG. 2, various members such as one having an L-shaped member fixed to the blocking plate 2 can be used.
【0024】一方、断面が円形のヒューム管や角型のボ
クスカルバートなど各種形状の管による水路を一時的に
遮断する場合は、前者を図6および図8、後者を図7お
よび図8に示すごとく、遮断板2に対し断面がT字状と
なるように環状板5を固定し、環状板5の片側端部に遮
断すべき水路の周壁1と所定間隙を有する2枚のフラン
ジ6を固定して断面コの字状の溝3を形成する。On the other hand, in the case of temporarily shutting off the water channel by various shapes of tubes such as a Hume tube having a circular cross section and a box-shaped box culvert, the former is shown in FIGS. 6 and 8 and the latter is shown in FIGS. 7 and 8. As described above, the annular plate 5 is fixed to the blocking plate 2 so as to have a T-shaped cross section, and the peripheral wall 1 of the water channel to be blocked and two flanges 6 having a predetermined gap are fixed to one end of the annular plate 5. Then, the groove 3 having a U-shaped cross section is formed.
【0025】環状板5と2枚のフランジ6がなす環状の
溝3に直角部がなければOリング9を嵌入し、三方切換
弁13の操作上、図8に示すごとく水の存在しないほうの
側に三方切換弁13を設け、これに断面コの字状の溝3を
形成する環状板5の開口から発して遮断板2を貫通する
配管と、遮断板2を貫通し水路の圧力水18を受ける配管
ならびに水のない側にある加圧流体17の配管をそれぞれ
接続しておく。なお、加圧流体17が水の場合は開放面が
ある水路の場合と同様に溝3の頂部に空気抜き弁(図示
省略)を設けておく。If there is no right-angled portion in the annular groove 3 formed by the annular plate 5 and the two flanges 6, the O-ring 9 is inserted, and in operation of the three-way switching valve 13, as shown in FIG. A three-way switching valve 13 is provided on the side, and a pipe that extends from the opening of an annular plate 5 that forms a groove 3 having a U-shaped cross section and penetrates the blocking plate 2, and a pressure water in the water channel that penetrates the blocking plate 2 The pipe for receiving and the pipe for the pressurized fluid 17 on the side without water are connected respectively. When the pressurized fluid 17 is water, an air vent valve (not shown) is provided at the top of the groove 3 as in the case of a water channel having an open surface.
【0026】また、管による水路を一時的に遮断する場
合、環状板5においてフランジ6を設けていない側の端
部に断面コの字状の溝3を水路の周壁1に対し所定の間
隙で固定するための支持具24を複数個(図6、図7では
各5個)分散して取付けておくと、遮断作業を円滑にお
こなうことができる。Further, when temporarily shutting off the water channel by the pipe, a groove 3 having a U-shaped cross section is formed at an end portion of the annular plate 5 on the side where the flange 6 is not provided at a predetermined gap with respect to the peripheral wall 1 of the water channel. If a plurality of supporting members 24 (five in each of FIGS. 6 and 7) for fixing are dispersed and attached, the shutoff work can be performed smoothly.
【0027】支持具24の具体例を図9に示す。断面がコ
の字状の基板19に回転自在に取付けてある回動板20上の
突出体として、たとえばゴム車輪21を使用することがで
きる。この場合、ハンドル22と一体のボルト23を基板19
の上面から挿通して基部を遊嵌(動くことのできる隙間
をもった状態にはめるの意)し、ハンドル22を基板19の
上面から外れないように設け、回動板20の他端にボルト
23を遊嵌し、回動板20の当該部分の下側にボルト23と螺
合しているヨコ置きの丸棒をその両側で遊嵌状態に吊下
げ、ハンドル22を廻して回動板20の傾斜角度を調節し、
ゴム車輪21の先端を水路の周壁1に当接し、複数分散し
た支持具24により断面コの字状の溝3と水路の周壁1と
の間隙が一様になるようにする。A specific example of the support 24 is shown in FIG. A rubber wheel 21, for example, can be used as a protrusion on the rotating plate 20 rotatably attached to the substrate 19 having a U-shaped cross section. In this case, the bolt 23 that is integral with the handle 22 is attached to the board 19
Insert the base from above and loosely fit the base part (meaning that there is a movable gap), install the handle 22 so that it does not come off the top surface of the substrate 19, and attach the bolt to the other end of the rotating plate 20.
23 is loosely fitted, and a horizontal bar that is screwed to the bolt 23 is hung on the lower side of the portion of the rotary plate 20 in a loosely fitted state on both sides thereof, and the handle 22 is turned to rotate the rotary plate 20. Adjust the tilt angle of
The tip of the rubber wheel 21 is brought into contact with the peripheral wall 1 of the water channel, and a plurality of supporting members 24 are provided so that the gap between the groove 3 having a U-shaped cross section and the peripheral wall 1 of the water channel becomes uniform.
【0028】[0028]
【発明の効果】本発明の水路の一時的な遮断設備は取扱
いが容易で、確実に水路を遮断することができる。EFFECTS OF THE INVENTION The temporary water channel shutoff facility of the present invention is easy to handle and can reliably shut off the water channel.
【図1】 開放面がある水路の遮断設備を水側からみた
全体の説明図(a)ならびにその一部を欠く側面図
(b)と平面図(c)FIG. 1 is an overall explanatory view (a) of a waterway shutoff facility having an open surface as seen from the water side, and a side view (b) and a plan view (c) with a part thereof cut away.
【図2】 開放面がある水路の遮断設備において突出部
材を備えた場合を水側からみた全体の説明図(d)なら
びにその一部を欠く側面図(e)FIG. 2 is an overall explanatory view (d) viewed from the water side in the case where a projecting member is provided in a water channel shutoff facility having an open surface, and a side view (e) showing a part thereof.
【図3】 開放面がある水路の遮断設備においてゴム体
を移動させる機構を示す説明図FIG. 3 is an explanatory view showing a mechanism for moving a rubber body in a waterway shutoff facility having an open surface.
【図4】 開放面がある水路の遮断設備におけるゴム体
頂部を押圧する具体例を示す説明図(f)、(g)FIG. 4 is an explanatory view (f), (g) showing a specific example of pressing the top of the rubber body in a waterway shutoff facility having an open surface
【図5】 三方切換弁の説明図、(h)はポンプによる
加圧流体、(i)は水路の圧力水を使用する場合を示
す。FIG. 5 is an explanatory view of a three-way switching valve, (h) shows a case where a fluid pressurized by a pump is used, and (i) shows a case where pressure water in a water channel is used.
【図6】 ヒューム管による水路の遮断設備を水のない
側からみた説明図FIG. 6 is an explanatory view of a water channel shutoff facility using a fume tube as seen from the side without water.
【図7】 ボックスカルバートの管による水路の遮断設
備を水のない側からみた説明図FIG. 7 is an explanatory view of a water channel shutoff facility using a box culvert pipe viewed from the side without water.
【図8】 ヒューム管ならびにボックスカルバートの管
による水路の遮断設備を横からみた説明図FIG. 8 is an explanatory view of a side view of a water channel shutoff facility using a Hume tube and a box culvert tube
【図9】 支持具における回動板の位置を調節する部分
の説明図(j)と回動板によりゴム車輪が当接する機構
を示す説明図(k)FIG. 9 is an explanatory view (j) of a portion for adjusting the position of the rotating plate in the support and an explanatory view (k) showing a mechanism in which the rubber wheel comes into contact with the rotating plate.
1 水路の周壁 2 遮断板 3 溝 4 L字型の枠 5 環状板 6 フランジ 7 ゴム体 8 押圧片 9 Oリング 10 空気抜き弁 11 水抜き弁 12 元バルブ 13 三方切換弁 14 制御桿 15 ポンプ 16 アキュムレータ 17 加圧流体 18 圧力水 19 基板 20 回動板 21 ゴム車輪 22 ハンドル 23 ボルト 24 支持具 25 突出部材 1 Waterway peripheral wall 2 barrier plate 3 grooves 4 L-shaped frame 5 annular plate 6 flange 7 rubber body 8 pressing piece 9 O-ring 10 Air vent valve 11 Drain valve 12 yuan valve 13 Three-way switching valve 14 control rod 15 pumps 16 Accumulator 17 Pressurized fluid 18 pressure water 19 substrate 20 Rotating plate 21 rubber wheels 22 handle 23 bolts 24 Support 25 Projection member
Claims (6)
(1)と所定の間隙を保つよう断面コの字状の溝(3)
を水路の遮断板(2)と一体に形成してその溝(3)に
断面が円形をなすゴム体(7)を嵌入し、溝(3)にな
お開口があれば密封し、溝(3)の頂部に空気抜き弁
(10)を、溝(3)内に通ずる配管に加圧流体供給弁
を、遮断板(2)の下方位置に水抜き弁(11)をそれぞ
れ設けてある水路の一時的な遮断設備。1. A groove (3) having a U-shaped cross section so as to maintain a predetermined gap with a peripheral wall (1) of a water channel to be shut off when this equipment is used.
Is integrally formed with the waterway shutoff plate (2), a rubber body (7) having a circular cross section is fitted into the groove (3), and if the groove (3) still has an opening, the groove (3) is sealed. ) Is equipped with an air vent valve (10), a pressurized fluid supply valve in the pipe leading to the groove (3), and a drain valve (11) below the shutoff plate (2). Blocking equipment.
の水である圧力水(18)に切換えることのできる三方切
換弁(13)である請求項1記載の水路の一時的な遮断設
備。2. The waterway temporary according to claim 1, wherein the pressurized fluid supply valve is a three-way switching valve (13) capable of switching the pressurized fluid (17) to pressure water (18) which is water in the waterway. Shut-off equipment.
(2)に直接断面L字型の枠(4)を固定して断面コの
字状の溝(3)を形成し、溝(3)の左右頂部において
押圧片(8)でゴム体(7)を溝(3)内に押圧しその
底部に密着してある請求項1又は請求項2記載の水路の
一時的な遮断設備。3. A groove (3) having a U-shaped cross section is formed by fixing a frame (4) having an L-shaped cross section directly to a blocking plate (2) for a water channel having an open surface. 3. The temporary cutoff facility for a water channel according to claim 1 or 2, wherein the rubber body (7) is pressed into the groove (3) by the pressing pieces (8) at the right and left apexes of (1) and is in close contact with the bottom thereof.
水側の下方位置に水路の底に当接する突出部材(25)を
固定している請求項3記載の水路の一時的な遮断設備。4. The temporary water channel according to claim 3, wherein when the barrier plate (2) is used, a projecting member (25) that abuts a bottom of the channel is fixed to a lower position on the water side of the barrier plate (2). Blocking equipment.
対し断面がT字状となるように固定した環状板(5)の
片側端部に2枚のフランジ(6)を固定して断面コの字
状の溝(3)を形成してある請求項1又は請求項2記載
の水路の一時的な遮断設備。5. An annular plate (5) fixed to a blocking plate (2) so as to have a T-shaped cross section, for use as a water channel by a pipe, with two flanges (6) fixed to one end thereof. The waterway temporary shutoff facility according to claim 1 or 2, wherein a groove (3) having a U-shaped cross section is formed.
設けていない側の端部に、断面コの字状の溝(3)を水
路の周壁(1)に対し所定の間隙で固定するための支持
具(24)を複数個分散して取付けてある請求項5記載の
水路の一時的な遮断設備。6. A groove (3) having a U-shaped cross section is provided at an end portion of the annular plate (5) where the two flanges (6) are not provided, with a predetermined gap with respect to the peripheral wall (1) of the water channel. 6. The temporary cutoff facility for a waterway according to claim 5, wherein a plurality of support members (24) for fixing by means are attached.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002111435A JP2003306928A (en) | 2002-04-15 | 2002-04-15 | Temporary interrupting facility for water channel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002111435A JP2003306928A (en) | 2002-04-15 | 2002-04-15 | Temporary interrupting facility for water channel |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2003306928A true JP2003306928A (en) | 2003-10-31 |
Family
ID=29394221
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002111435A Pending JP2003306928A (en) | 2002-04-15 | 2002-04-15 | Temporary interrupting facility for water channel |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2003306928A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104153327A (en) * | 2014-08-23 | 2014-11-19 | 安徽水利开发股份有限公司 | Reinforced concrete stop log gate sealing method |
-
2002
- 2002-04-15 JP JP2002111435A patent/JP2003306928A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104153327A (en) * | 2014-08-23 | 2014-11-19 | 安徽水利开发股份有限公司 | Reinforced concrete stop log gate sealing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8186648B2 (en) | Method of shutting off conduit and pipe conduit shutoff apparatus | |
NO20022271L (en) | Improvement in device and methods of repair of damage | |
US10612672B2 (en) | Pipeline control unit | |
KR20110039999A (en) | Piping departure prevention device | |
JP2003306928A (en) | Temporary interrupting facility for water channel | |
AU2019427962B2 (en) | Low-torque water shutoff-type line stopping valve using stepwise pressure point support | |
CN213929707U (en) | Pipeline installation equipment with protection effect | |
CN211398900U (en) | Novel control valve for water supply and drainage | |
US20130180612A1 (en) | Pressure relief/drain valve for concrete pumpers | |
KR100998785B1 (en) | Fluid shutoff device with sliding double stopper | |
KR101935834B1 (en) | Fluid-Crossing apparatus for non water blockage piping work method | |
JP6043144B2 (en) | Desorption device for pipe connecting member | |
KR101309333B1 (en) | Pipe changing method | |
JP5763601B2 (en) | Water stop device | |
JP5271156B2 (en) | Renewal method of fluid pipe and pipe fixing support device for fluid pipe renewal | |
CN211976560U (en) | Steel pipe is responsible for section and steel pipe branch pipe section welding airtight detection device | |
JP6531300B2 (en) | Flow path change method using flow path change connection unit and flow path change connection unit | |
CN210831439U (en) | Water supply switch mechanism for push bench | |
CN217899241U (en) | Quick plugging device of oil gas pipeline | |
CN209587467U (en) | A kind of pressure sealing equipment for natural gas pipeline | |
JP2013124721A (en) | Rust prevention device | |
CN215721244U (en) | Valve body that leakproofness is high | |
KR102405119B1 (en) | Bypass and flow control system for folding square pipelines | |
JP2014084902A (en) | Attaching/detaching device of pipe connection member | |
CN218575123U (en) | Be applied to accurate cutting device of material pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040714 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20060714 |
|
A131 | Notification of reasons for refusal |
Effective date: 20060725 Free format text: JAPANESE INTERMEDIATE CODE: A131 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20061128 |