JP2002294862A - High strength bolt joining structure and joining method - Google Patents

High strength bolt joining structure and joining method

Info

Publication number
JP2002294862A
JP2002294862A JP2001092265A JP2001092265A JP2002294862A JP 2002294862 A JP2002294862 A JP 2002294862A JP 2001092265 A JP2001092265 A JP 2001092265A JP 2001092265 A JP2001092265 A JP 2001092265A JP 2002294862 A JP2002294862 A JP 2002294862A
Authority
JP
Japan
Prior art keywords
shaped
box
column
bolt
strength
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001092265A
Other languages
Japanese (ja)
Other versions
JP4726316B2 (en
Inventor
Nobuyoshi Uno
暢芳 宇野
Masahiro Nagata
匡宏 永田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP2001092265A priority Critical patent/JP4726316B2/en
Publication of JP2002294862A publication Critical patent/JP2002294862A/en
Application granted granted Critical
Publication of JP4726316B2 publication Critical patent/JP4726316B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a high strength bolt joining structure, and a joining method capable of relieving restriction of positioning work of upper and lower split tees and an H-shaped cross-sectional beam at a building site when joining the H-shaped cross-sectional beam to a box-shaped cross-sectional column by a high strength bolt via a pair of upper and lower split tees. SOLUTION: An upper side or lower side split tee side bolt hole of the box- shaped cross-sectional column is formed as an elongate hole by extending upward or downward by 0.5 to 1.5 times a high strength bolt shaft diameter with the final fastening position as a reference. The upper side split tee can be retreated upward from the final fastening position, or the lower side split tee can be retreated downward and either of the upper and lower split tees is put in a retreating state, and the H-shaped cross-sectional beam is positioned between the upper and lower split tees. The elongate hole extended by 0.5 to 1.5 times the high strength bolt shaft diameter is arranged on the upper side or lower side split tee side, and the upper side or lower side split tee may be retreated upward or downward.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、例えば、鋼構造建
築物を構築する際に角形断面または円形断面の箱形断面
材を柱材とし、この箱形断面柱に上下一対のスプリット
ティを介してH形断面梁(圧延成形材や溶接組立材)を
取り付ける箱形断面柱とH形断面梁とのボルト接合構造
において適用される、高力ボルト接合構造および接合方
法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to, for example, a method of constructing a steel structure building by using a box-shaped member having a rectangular or circular cross section as a pillar, and connecting the box-shaped pillar with a pair of upper and lower split tees. TECHNICAL FIELD The present invention relates to a high-strength bolted joint structure and a joining method applied to a bolted joint structure between a box-shaped column and an H-shaped sectional beam to which an H-shaped sectional beam (rolled material or welded assembly material) is attached.

【0002】[0002]

【従来の技術】近年、角形の箱形断面材による柱材とH
形断面梁を用いた両方向ラーメン構造が多用されてお
り、接合構造としては通しダイヤフラム形式の接合構造
が一般的に用いられている。この形式の接合構造では、
箱形断面柱とダイヤフラムの接合、ダイヤフラムとH形
断面梁の取付部の接合は溶接によって行われ、取付部と
H形断面梁の接合は、添板を介してボルト接合によって
行われていた。このような、通しダイヤフラム形式の接
合構造においては、H形断面梁に曲げモーメントが作用
した場合に生じる上下フランジでの圧縮力および引張力
を、接合部の剛性を低下させずに箱形断面柱に伝達させ
ることができるものの、その構造は複雑であり加工工数
が多大となる。また、ダイヤフラムの両面を箱形断面柱
およびコラムコアに溶接する必要があり、溶接量が多く
なるとともに高度の溶接技能が必要になる。
2. Description of the Related Art In recent years, a columnar member having a rectangular box-shaped section and H
A bidirectional rigid frame structure using a cross-sectional beam is often used, and a through-diaphragm type joint structure is generally used as the joint structure. In this type of joint structure,
The joint between the box-shaped column and the diaphragm and the attachment between the diaphragm and the H-shaped section beam are performed by welding, and the connection between the attachment section and the H-shaped section beam is performed by bolting via a side plate. In such a through-diaphragm type joint structure, the compressive force and the tensile force at the upper and lower flanges generated when a bending moment acts on the H-shaped section beam can be reduced without reducing the rigidity of the joint. However, the structure is complicated and the number of processing steps is large. In addition, it is necessary to weld both sides of the diaphragm to the box-shaped column and the column core, so that a large amount of welding is required and a high level of welding skill is required.

【0003】そのため、最近では、図9に示すように、
ダイヤフラムを用いず箱形断面柱1に上下一対のスプリ
ットティ2a、2bを特殊構造で高価なワンサイドボル
ト5(詳細図示省略)で接合し、この上下一対のスプリ
ットティ2a、2bにH形断面梁4を高力ボルト3で接
合することにより、溶接負担を軽減する接合構造が採用
されるようになってきている。このような箱形断面柱と
スプリットティの接合構造においては、一般の高力ボル
ト(例えばJIS B1186に規定される摩擦接合用
高力六角ボルトや日本鋼構造協会規格の構造用トルシア
形高力ボルトなど)を用いた、通常のボルト接合では接
合施工が不可能である。
For this reason, recently, as shown in FIG.
Without a diaphragm, a pair of upper and lower split tees 2a, 2b are joined to the box-shaped section column 1 with a specially constructed expensive one-side bolt 5 (not shown in detail), and an H-shaped cross section is attached to the upper and lower pair of split tees 2a, 2b. By joining the beams 4 with the high-strength bolts 3, a joining structure that reduces the welding load has been adopted. In such a joint structure of a box-shaped column and a split tee, a general high-strength bolt (for example, a high-strength hexagonal bolt for friction welding specified in JIS B1186 or a structural torcia-type high-strength bolt specified by the Japan Steel Structure Association) ), It is impossible to perform joint construction by ordinary bolt joining.

【0004】そのため箱形断面柱の外部側から接合施工
が可能なワンサイドボルトが開発され実用に供されるよ
うになった。また、柱の建て方前に、工場または現場で
事前に箱形断面柱の内部から一般の高力ボルトを特殊な
道具により箱形断面柱に設けられたボルト孔に挿入し、
スプリットティを箱形断面柱に当接して固定する方法も
提案されている。しかし、前者のワンサイドボルトを使
用した接合構造は高価であり接合部の費用が嵩むととも
に、強度に限界があることに加え、ボルトに対する導入
張力のコントロールが容易ではなく、大型構造の柱梁接
合構造において安定したボルト接合構造を実現すること
ができなかった。
For this reason, one-side bolts capable of being joined from the outside of a box-shaped section column have been developed and put into practical use. Also, before building the column, insert a general high-strength bolt from the inside of the box-shaped column in advance into the bolt hole provided in the box-shaped column with a special tool at the factory or site,
A method has also been proposed in which the split tee abuts on a box-shaped column and is fixed. However, the former joint structure using one-side bolts is expensive, which increases the cost of the joints and limits the strength. In addition, it is not easy to control the introduction tension on the bolts, and the beam-column joints of large structures A stable bolt joint structure could not be realized in the structure.

【0005】また、後者の方法は、ワンサイドボルトに
比較してコスト面や強度は改善できるが、上下のスプリ
ットティが梁の取り付け前の柱に固定されていることか
ら、現場での梁を取り付ける際に、上下スプリットティ
間でH形断面梁の位置合わせに手間取り施工性に問題が
あり、結果的に建設コストの上昇につながっている。こ
の場合、現場での梁の取り付け作業時に、スプリットテ
ィを仮締結しているナットを緩めてスプリットティの上
下位置を調整することもあるが、現状ではボルト軸径と
ボルト孔径の差が2〜3mm以内と決められており、スプ
リットティの上下位置の調整幅を十分にとることができ
ず、施工性を十分に改善することができないのが実情で
ある。
[0005] The latter method can improve the cost and strength as compared with the one-side bolt, but since the upper and lower split tees are fixed to the pillar before the beam is attached, the beam at the site can be removed. At the time of installation, there is a problem in the layout workability in positioning the H-shaped cross section beam between the upper and lower split tees, resulting in an increase in construction cost. In this case, at the time of beam installation work at the site, the nut temporarily tightening the split tee may be loosened and the vertical position of the split tee may be adjusted, but at present the difference between the bolt shaft diameter and the bolt hole diameter is 2 to 2. It is determined to be 3 mm or less, and the adjustment width of the vertical position of the split tee cannot be sufficiently adjusted, so that the workability cannot be sufficiently improved.

【0006】[0006]

【発明が解決しようとする課題】本発明は、例えば、箱
形断面柱にH形断面梁を上下一対のスプリットティを介
して高力ボルト接合する際に、建て方現場での上下スプ
リットティに対するH形断面梁の位置決め作業の制約を
緩和できる高力ボルト接合構造および接合方法を提供す
ることを目的とするものである。
SUMMARY OF THE INVENTION The present invention relates to, for example, a method for connecting an H-shaped beam to a box-shaped column with a high-strength bolt through a pair of upper and lower split tees. It is an object of the present invention to provide a high-strength bolt joining structure and a joining method capable of alleviating restrictions on the positioning operation of an H-shaped section beam.

【0007】[0007]

【課題を解決するための手段】本発明は、上記の目的を
達成するために、以下の(1)〜(4)を要旨とするも
のである。 (1) 箱形断面柱にH形断面梁を上下のスプリットテ
ィを介して高力ボルト接合する箱形断面柱とH形断面梁
の接合構造において、箱形断面柱の上側スプリットティ
側のボルト孔が、最終締結位置を基準にして上方にボル
ト軸径の0.5〜1.5倍延長された長孔であることを
特徴とする箱形断面柱とH形断面梁の高力ボルト接合構
造。 (2) 箱形断面柱にH形断面梁を上下のスプリットテ
ィを介して高力ボルト接合する箱形断面柱とH形断面梁
の接合構造において、箱形断面柱の下側スプリットティ
側のボルト孔が、最終締結位置を基準にして下方にボル
ト軸径の0.5〜1.5倍延長された長孔であることを
特徴とする箱形断面柱とH形断面梁の高力ボルト接合構
造。
The present invention has the following features (1) to (4) in order to achieve the above object. (1) In a joint structure of a box-shaped column and an H-shaped beam in which an H-shaped beam is joined to a box-shaped column through a high-strength split tee through upper and lower split tees, a bolt on the upper split tee side of the box-shaped column is used. The high-strength bolted joint between the box-shaped column and the H-shaped beam, wherein the hole is an elongated hole extending upward from the final fastening position by 0.5 to 1.5 times the bolt shaft diameter. Construction. (2) In a joint structure of a box-shaped column and an H-shaped beam in which an H-shaped beam is joined to a box-shaped column through a high-strength bolt via upper and lower split tees, the lower split tee side of the box-shaped column is A high-strength bolt having a box-shaped column and an H-shaped beam, wherein the bolt hole is an elongated hole extending downward from the final fastening position by 0.5 to 1.5 times the bolt shaft diameter. Joint structure.

【0008】(3) 箱形断面柱にH形断面梁を上下の
スプリットティを介して高力ボルト接合する箱形断面柱
とH形断面梁の接合構造において、上側スプリットティ
の箱形断面柱側のボルト孔が、最終締結位置を基準にし
て下方にボルト軸径の0.5〜1.5倍延長された長孔
であることを特徴とする箱形断面柱とH形断面梁の高力
ボルト接合構造。 (4) 箱形断面柱にH形断面梁を上下のスプリットテ
ィを介して高力ボルト接合する箱形断面柱とH形断面梁
の接合構造において、下側スプリットティの箱形断面柱
側のボルト孔が、最終締結位置を基準にして上方にボル
ト軸径の0.5〜1.5倍延長された長孔であることを
特徴とする箱形断面柱とH形断面梁の高力ボルト接合構
造。
(3) In a joint structure of a box-shaped column and an H-shaped beam in which an H-shaped beam is joined to a box-shaped column via a high-strength bolt through upper and lower split tees, a box-shaped column having an upper split tee The height of the box-shaped column and the H-shaped beam is characterized in that the bolt hole on the side is an elongated hole extending downward from the final fastening position by 0.5 to 1.5 times the bolt shaft diameter. Force bolt joint structure. (4) In a joint structure of a box-shaped column and an H-shaped beam in which an H-shaped beam is joined to a box-shaped column by high-strength bolts via upper and lower split tees, A high-strength bolt having a box-shaped column and an H-shaped beam, wherein the bolt hole is an elongated hole extending upward from the final fastening position by 0.5 to 1.5 times the bolt shaft diameter. Joint structure.

【0009】(5) 箱形断面柱にH形断面梁を上下ス
プリットティを介して高力ボルト接合する箱形断面柱と
H形断面梁の高力ボルト接合方法において、箱形断面柱
の上側スプリットティ側のボルト孔を、最終のボルト締
結位置を基準にして上方にボルト軸径の0.5〜1.5
倍延長された長孔にして、上下スプリットティを工場
で、または建て方前に箱形断面柱に高力ボルト接合する
際、上側スプリットティを最終位置からボルト軸径の
0.5〜1.5倍の距離上方に退避状態で仮締結し、上
下スプリットティにH形断面梁を高力ボルト接合する際
には、H形断面梁の下側フランジを下側スプリットティ
に支持させた状態で上側スプリットティを所定の位置ま
で下降させ箱形断面柱への高力ボルト接合を完了させる
とともに、上下のスプリットティにH形断面梁を高力ボ
ルト接合することを特徴とする箱形断面柱とH形断面梁
の高力ボルト接合方法。
(5) In a method of joining a H-shaped section beam to a box-shaped section column with high-strength bolts via upper and lower split tees in a high-strength bolt joining method of the box-shaped section column and the H-shaped section beam, Insert the bolt hole on the split tee side upward by 0.5 to 1.5
When the upper and lower split tees are bolted to a box-shaped section column at the factory or before building by using a double-length elongated hole and the upper split tee is bolted to the bolt shaft diameter from the final position to 0.5 to 1. When the H-shaped section beam is temporarily fastened to the upper and lower split tees by a distance of 5 times in the retracted state, and the H-shaped section beam is joined with high-strength bolts, the lower flange of the H-shaped section beam is supported by the lower split tee. A box-shaped column characterized by lowering the upper split tee to a predetermined position to complete the high-strength bolt connection to the box-shaped cross-section column, and joining the H-shaped beam to the upper and lower split tees with a high-strength bolt. High strength bolt joining method for H-section beams.

【0010】(6) 箱形断面柱にH形断面梁を上下ス
プリットティを介して高力ボルト接合する箱形断面柱と
H形断面梁の高力ボルト接合方法において、箱形断面柱
の下側スプリットティ側のボルト孔を、最終締結位置を
基準にして下方にボルト軸径の0.5〜1.5倍延長さ
れた長孔にして、上下スプリットティを工場で、または
建て方前に箱形断面柱に高力ボルト接合する際、下側ス
プリットティを最終位置からボルト軸径の0.5〜1.
5倍の距離下方に退避状態で仮締結し、上下スプリット
ティ間にH形断面梁を高力ボルト接合する際には、H形
断面梁の上フランジと上側スプリットティを高力ボルト
接合後、下側スプリットティの締結を緩めて下側スプリ
ットティを所定の位置まで上昇させて箱形断面柱との締
結を完了させるとともに、下側スプリットティにH形断
面梁の下フランジを高力ボルト接合することを特徴とす
る箱形断面柱とH形断面梁の高力ボルト接合方法。
(6) In a method of joining a H-shaped section beam to a box-shaped section column with high-strength bolts via upper and lower split tees in a high-strength bolt-joining method of the box-shaped section column and the H-shaped section beam, Bolt holes on the side split tee side are elongated holes extending 0.5 to 1.5 times the bolt shaft diameter downward with reference to the final fastening position, and the upper and lower split tees are factory or before building When joining high-strength bolts to a box-shaped column, the lower split tee must be 0.5 to 1.
When the H-shaped cross-section beam is joined by high-strength bolts between the upper and lower split tees, the upper flange and upper split tee are joined by high-strength bolts. Loosen the lower split tee and raise the lower split tee to a predetermined position to complete the connection with the box-shaped section column. At the same time, connect the lower flange of the H-shaped beam to the lower split tee with high-strength bolts A high-strength bolt joining method for a box-shaped column and an H-shaped beam.

【0011】(7) 箱形断面柱にH形断面梁を上下ス
プリットティを介して高力ボルト接合する箱形断面柱と
H形断面梁の高力ボルト接合方法において、上側スプリ
ットティの箱形断面柱側のボルト孔を、最終締結位置を
基準にして下方にボルト軸径の0.5〜1.5倍延長さ
れた長孔にして、上下スプリットティを工場で、または
建て方前に箱形断面柱に高力ボルト接合する際、上側ス
プリットティを最終位置からボルト軸径の0.5〜1.
5倍の距離上方に退避状態で仮締結し、上下スプリット
ティ間にH形断面梁を高力ボルト接合する際には、H形
断面梁の下フランジを下側スプリットティで支持した状
態で上側スプリットティの締結を緩め上側スプリットテ
ィを所定の位置まで下降させて箱形断面柱との締結を完
了させるとともに、上下のスプリットティにH形断面梁
を高力ボルト接合することを特徴とする箱形断面柱とH
形断面梁の高力ボルト接合方法。
(7) In a method of joining a H-shaped section beam to a box-shaped section column with high-strength bolts through upper and lower split tees in a high-strength bolt joining method of the box-shaped section column and the H-shaped section beam, Make the bolt hole on the column side of the cross section a long hole extending 0.5 to 1.5 times the bolt shaft diameter downward with respect to the final fastening position, and install the upper and lower split tees at the factory or before building. When joining high-strength bolts to a column with a cross-section, the upper split tee must be 0.5 to 1.
Temporarily fasten in the retracted state 5 times above and when connecting the H-shaped section beam with high strength bolts between the upper and lower split tees, the upper flange with the lower flange of the H-shaped section beam supported by the lower split tee A box characterized in that the fastening of the split tee is loosened, the upper split tee is lowered to a predetermined position to complete the fastening with the box-shaped section column, and the H-shaped section beam is joined to the upper and lower split tees with high strength bolts. Column with cross section and H
High-strength bolt joining method for shaped beams.

【0012】(8) 箱形断面柱にH形断面梁を上下ス
プリットティを介して高力ボルト接合する箱形断面柱と
H形断面梁の高力ボルト接合方法において、下側スプリ
ットティの箱形断面柱側のボルト孔を、最終締結位置を
基準にして上方にボルト軸径の0.5〜1.5倍延長さ
れた長孔にして、上下スプリットティを工場で、または
建て方前に箱形断面柱に高力ボルト接合する際、下側ス
プリットティを最終位置からボルト軸径の0.5〜1.
5倍の距離下方に退避状態で仮締結し、上下スプリット
ティ間にH形断面梁を高力ボルト接合する際には、H形
断面梁の上フランジを上側スプリットティで支持した状
態で下側スプリットティの締結を緩め下側スプリットテ
ィを所定の位置まで上昇させて箱形断面柱との締結を完
了させるとともに、上下のスプリットティにH形断面梁
を高力ボルト接合することを特徴とする箱形断面柱とH
形断面梁の高力ボルト接合方法。
(8) A method of joining a H-shaped section beam to a box-shaped section column with high-strength bolts via upper and lower split tees in a high-strength bolt joining method of a box-shaped section column and an H-shaped section beam; The bolt hole on the side of the column is shaped into a long hole extending 0.5 to 1.5 times the bolt shaft diameter upward with respect to the final fastening position, and the upper and lower split tees are set at the factory or before building. When joining high-strength bolts to a box-shaped column, the lower split tee must be 0.5 to 1.
Temporarily tightened in a retracted state 5 times below, and when connecting the H-shaped section beam with high-strength bolts between the upper and lower split tees, the lower side with the upper flange of the H-shaped section beam supported by the upper split tee The fastening of the split tee is loosened and the lower split tee is raised to a predetermined position to complete the fastening with the box-shaped section column, and the H-shaped beam is joined to the upper and lower split tees with high strength bolts. Box-shaped column and H
High-strength bolt joining method for shaped beams.

【0013】[0013]

【発明の実施の形態】本発明は、箱型断面柱にH形断面
梁を上下一対のスプリットティやアングル材などの接合
金物を介して高力ボルトで接合する場合に適用されるも
のであり、基本的には、工場または現場建て方前に、高
力ボルトを予め箱形断面柱の内部側からボルト孔に挿入
して箱形断面柱に当接された上下スプリットティを高力
ボルト接合しておくことを前提とするものである。本発
明では、H形断面梁を、箱形断面柱に高力ボルトで締結
した上下のスプリットティ間に位置決めする際、上側ス
プリットティを上方に退避状態、または下側のスプリッ
トティを下方に退避状態にすることによりH形断面梁の
位置決め作業の制約を緩和して、この作業性を改善する
ものである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention is applied to a case in which an H-shaped beam is joined to a box-shaped column with high-strength bolts via a pair of upper and lower split tees or angle fittings. Basically, before building at the factory or site, high strength bolts are inserted into the bolt holes from the inside of the box-shaped column in advance, and the upper and lower split tees abutted on the box-shaped column are joined with high-strength bolts It is assumed that this is done. In the present invention, when positioning the H-shaped section beam between the upper and lower split tees fastened to the box-shaped section column with high-strength bolts, the upper split tee is retracted upward, or the lower split tee is retracted downward. By setting the state, the restriction on the positioning work of the H-shaped section beam is relaxed, and this workability is improved.

【0014】H形断面梁を取り付ける場合には、取付の
作業の円滑化の観点から、通常、下側のスプリットティ
にH形断面梁の下フランジを支持する機能を持たせてお
り、上部側のスプリットティを上方に退避させるように
する方が有利となる場合が多い。ここで、スプリットテ
ィの退避距離は、最終締結位置から高力ボルトの軸径の
0.5倍〜1.5倍であることが好ましい。高力ボルト
軸径の0.5倍未満では、退避効果が十分ではなく、位
置決め作業性の改善効果が十分でない。高力ボルト軸径
の1.5倍超にしても、改善効果を高めることにはなら
ないので、上限を1.5倍程度にすることが好ましい。
なお、長孔化により箱形断面柱の内部側で座金の接触面
積が低下するため、接合強度が低下する懸念があるが、
この懸念は、座金の強度を1ランク程度大きくすること
により解消可能である。
When the H-shaped beam is mounted, the lower split tee usually has a function of supporting the lower flange of the H-shaped beam from the viewpoint of facilitating the mounting operation. It is often advantageous to retreat the split tee upward. Here, the retreat distance of the split tee is preferably 0.5 to 1.5 times the shaft diameter of the high-strength bolt from the final fastening position. If it is less than 0.5 times the shaft diameter of the high-strength bolt, the retracting effect is not sufficient, and the effect of improving the positioning workability is not sufficient. Even if it exceeds 1.5 times the shaft diameter of the high-strength bolt, the improvement effect does not increase, so the upper limit is preferably set to about 1.5 times.
In addition, since the contact area of the washer decreases on the inner side of the box-shaped column due to the long hole, there is a concern that the joining strength is reduced,
This concern can be solved by increasing the strength of the washer by about one rank.

【0015】従来から、箱形断面柱のボルト孔径は、高
力ボルトの軸径より数mm大きく設定しているが、それ
は、ボルト孔にボルトを円滑に挿入できるようにするた
めで、そのレベルよりボルト孔径を大きくすることは耐
力低下にもつながることから、好ましくないとされてき
た。しかし、本発明者らの実験によれば、箱形断面柱や
ボルトの材料の高強度化、接合構造の改善(例えば損傷
制御構造の採用その他)が進んでいる現状では、上部側
のスプリットティ接合する箱形断面柱のボルト孔を、上
記レベルで長孔化することによる耐力の低下量は概ね無
視できる程度であることが確認されている。
Conventionally, the diameter of the bolt hole of the box-shaped column is set to be several mm larger than the shaft diameter of the high-strength bolt, because the bolt hole can be smoothly inserted into the bolt hole. Increasing the bolt hole diameter has been considered to be unfavorable because it leads to a decrease in proof stress. However, according to the experiments conducted by the present inventors, under the current situation where the strength of the material of the box-shaped column and the bolt is increased and the joint structure is being improved (for example, adoption of a damage control structure and the like), the split tee on the upper side is in progress. It has been confirmed that the amount of reduction in proof stress caused by increasing the length of the bolt holes of the box-shaped column to be joined at the above-mentioned level is negligible.

【0016】本発明では、工場または建て方前に、箱形
断面柱の内部から高力ボルトをボルト孔から挿入して、
箱形断面柱に当接された上下一対のスプリットティのボ
ルト孔から外部に突出させてナットを螺合し箱形断面柱
にスプリットティを高力ボルト接合しておくことを前提
とするものであるが、この際に、例えば本件出願人の出
願になる特開2000−213070号公報に開示され
るような特殊な装置(ボルト搬送装置と引出治具)を用
いることができる。箱形断面柱とスプリットティ(接合
金物)の高力ボルト接合作業は、すべて工場で完了させ
ることが可能であるが、建て方現場での梁材の取り付け
の際の制約を緩和するために、工場側では固定側のスプ
リットティのみの締結を完了させ、退避側になるスプリ
ットティは仮締結する。このとき、スプリットティを退
避状態で仮締結しておいてもよいし、最終締結位置で仮
締結しておき建て方の際に退避状態にしてもよい。
According to the present invention, a high-strength bolt is inserted from the inside of the box-shaped column through the bolt hole before the factory or building method.
It is based on the assumption that the split tee is bolted to the box-shaped column with high strength by projecting it outward from the bolt holes of the pair of upper and lower split tees that are in contact with the box-shaped column. However, at this time, for example, a special device (a bolt conveying device and a drawing jig) as disclosed in Japanese Patent Application Laid-Open No. 2000-213070 filed by the present applicant can be used. All high-strength bolted joints between the box-shaped column and the split tee can be completed at the factory, but in order to ease restrictions on beam installation at the construction site, On the factory side, the fastening of only the split tee on the fixed side is completed, and the split tee on the retreat side is temporarily fastened. At this time, the split tee may be temporarily fastened in the retracted state, or may be temporarily fastened at the final fastening position to be in the retracted state when building.

【0017】例えば、下側スプリットティが固定側で上
側スプリットティが退避側になる場合には、下側スプリ
ットティの締結を完了させ、上側のスプリットティを仮
締結状態で建て方現場に搬送する。建て方現場で梁材を
取り付ける際には、上側スプリットティは、上方に退避
状態にして下側スプリットティで梁材を支持しながら位
置決め後、締結位置に降下させて箱形断面柱との締結を
完了させるとともに梁材を高力ボルト接合するものであ
る。本発明で使用する高力ボルトとしては、ナット螺合
側の先端にトルクコントロール機構を備えたトルシア形
高力ボルトを主に用いるが、接合構造全体としては、一
部にワンサイドボルトや高力六角ボルトを用いることも
できる。
For example, when the lower split tee is fixed and the upper split tee is on the retracted side, the fastening of the lower split tee is completed, and the upper split tee is transported to the construction site in a temporarily fastened state. . When mounting the beam at the construction site, the upper split tee is retracted upward, positioned while supporting the beam with the lower split tee, lowered to the fastening position and fastened to the box-shaped column And the beam members are joined by high-strength bolts. As the high-strength bolt used in the present invention, a torcia-type high-strength bolt having a torque control mechanism at the tip of the nut screw side is mainly used, but as a whole joint structure, a one-side bolt or a high-strength bolt is used. Hex bolts can also be used.

【0018】[0018]

【実施例】(実施例1)以下に、本発明の実施例1を図
1〜図2に基づいて詳細に説明する。この実施例1は、
箱形断面柱1に、上下一対のスプリットティ2a、2b
を介してH形断面梁4を高力ボルト接合する箱形断面柱
とH形断面梁の高力ボルト接合構造において本発明を適
用した場合のものであり、箱形断面柱1の上側スプリッ
トティ2a側のボルト孔1aを長孔にして、上下スプリ
ットティ2a、2b間にH形断面梁4を取り付ける際
に、上側スプリットティ2aを最終締結位置から上方に
退避可能にしたものである。箱形断面柱とH形断面梁の
高力ボルト接合構造においては、箱形断面柱の1〜四側
面に1〜複数段のH形断面梁4を、上下一対のスプリッ
トティ2a、2bを介して取り付けるものであるが、こ
こでは、箱形断面柱の一側面にH形断面梁4を高力ボル
ト接合する場合で代表説明する。図1(a)、(b)、
(c)は、本発明により箱形断面柱1の一側面にH形断
面梁4を上下一対のスプリットティ2a、2bを介して
高力ボルト3により接合(締結完了)した状態を示して
いる。
(Embodiment 1) Embodiment 1 of the present invention will be described below in detail with reference to FIGS. Example 1
A pair of upper and lower split tees 2a, 2b
This is a case where the present invention is applied to a box-shaped column and a high-strength bolted joint structure of an H-shaped beam for joining the H-shaped beam 4 with high-strength bolts through the upper split tee of the box-shaped column 1. The upper split tee 2a can be retracted upward from the final fastening position when the H-shaped cross-section beam 4 is mounted between the upper and lower split tees 2a and 2b by making the bolt hole 1a on the 2a side into an elongated hole. In the high-strength bolted joint structure of the box-shaped section column and the H-shaped section beam, one to a plurality of steps of the H-shaped section beam 4 are provided on one to four sides of the box-shaped section column via a pair of upper and lower split tees 2a and 2b. Here, a case where the H-shaped section beam 4 is joined to one side surface of the box-shaped section column by high-strength bolt will be representatively described. 1 (a), (b),
(C) shows a state in which an H-shaped cross-section beam 4 is joined to one side surface of the box-shaped column 1 by a high-strength bolt 3 via a pair of upper and lower split tees 2a and 2b (completion of fastening) according to the present invention. .

【0019】図1(a)、(b)において、2a、2b
は、上下一対のスプリットティで、それぞれ垂直部ep
が箱形断面柱1の側面に高力ボルト3によって接合さ
れ、上下一対のスプリットティの水平部fp間には、H
形断面梁4の先端部が位置しており、H形断面梁4の上
フランジfaは上側スプリットティ2aの水平部fp
に、また、下フランジfbは下側スプリットティ2bの
水平部fpに、それぞれ、高力ボルト3aにより接合し
てなる本発明の箱形断面柱1とH形断面梁4の高力ボル
ト接合構造例を示している。この高力ボルト接合構造に
おいては、上側スプリットティ2aを高力ボルト接合す
るための箱形断面柱1のボルト孔1aは、図1(c)図
に拡大して示すように、通常のボルト孔1bを距離a
(高力ボルト3の軸径dの0.5〜1.5倍)延長した
長孔であり、高力ボルト3によって上側スプリットティ
2aを仮締結した状態では、上側スプリットティ2a
は、高力ボルト3とともに距離aの範囲で上下位置を調
整可能である。
In FIGS. 1A and 1B, 2a and 2b
Is a pair of upper and lower split tees, each vertical part ep
Is joined to the side surface of the box-shaped column 1 by a high-strength bolt 3, and H is provided between the horizontal portions fp of the pair of upper and lower split tees.
The top end of the H-shaped beam 4 is located at the tip of the H-shaped beam 4 and the horizontal portion fp of the upper split tee 2a.
The lower flange fb is connected to the horizontal portion fp of the lower split tee 2b by a high-strength bolt 3a, respectively. An example is shown. In this high-strength bolt joining structure, the bolt holes 1a of the box-shaped column 1 for joining the upper split tee 2a with high-strength bolts have ordinary bolt holes as shown in FIG. 1b to distance a
(0.5 to 1.5 times the shaft diameter d of the high-strength bolt 3) is an elongated hole, and when the upper split tee 2a is temporarily fastened by the high-strength bolt 3, the upper split tee 2a
Can adjust the vertical position together with the high-strength bolt 3 within the range of the distance a.

【0020】ここでは、工場または建て方現場で建て方
前に、箱形断面柱1に上下スプリットティ2a、2bを
高力ボルト3で接合しておくものであり、その際に上側
スプリットティ2aは、仮締結(容易に締結を緩められ
る状態)して、上下スプリットティ2a、2bの水平部
に、建て方現場でH形断面梁4を取り付ける際には、図
2に示すように、上スプリットティ2aを上方に距離a
退避させ、下側スプリットティ2bの水平部fpでH形
断面梁4の下フランジfbを支持した状態でH形断面梁
4の上フランジfaの上面と上側スプリットティ2aの
水平部fpの下面間に距離aの隙間を形成して、H形断
面梁4の位置合わせ作業の制約を緩和することができ
る。H形断面梁4の位置合せ後、下側スプリットティ2
bの水平部fpにH形断面梁4の下フランジbを高力ボ
ルト3aで接合するとともに、上側スプリットティ2a
を降下させて、水平部fpの下面をH形断面梁4の上フ
ランジfaに当接させ水平部fpに高力ボルト3aで接
合するとともに箱形断面柱1との高力ボルト3による締
結を完了させる。このようにして、図1(a)、(b)
に示すような箱形断面柱1とH形断面梁4の高力ボルト
接合構造を得ることができる。
Here, the upper and lower split tees 2a, 2b are joined to the box-shaped column 1 with high-strength bolts 3 before building at the factory or at the construction site. As shown in FIG. 2, when the H-shaped cross-section beam 4 is temporarily fastened (in a state where the fastening is easily loosened) and the H-shaped section beam 4 is attached to the horizontal portion of the upper and lower split tees 2a and 2b at the construction site, Split tee 2a upwards distance a
With the lower portion of the H-shaped beam 4 supported by the horizontal portion fp of the lower split tee 2b, the upper flange fa and the lower surface of the horizontal portion fp of the upper split tee 2a are retracted. A gap of a distance a is formed at the center of the beam, so that the restriction on the alignment work of the H-shaped section beam 4 can be eased. After alignment of the H-section beam 4, lower split tee 2
The lower flange b of the H-shaped cross-section beam 4 is joined to the horizontal portion fp of the b by a high-strength bolt 3a, and the upper split tee 2a
, The lower surface of the horizontal portion fp is brought into contact with the upper flange fa of the H-shaped section beam 4, joined to the horizontal portion fp with the high-strength bolt 3 a, and fastened to the box-shaped column 1 with the high-strength bolt 3. Let it complete. Thus, FIGS. 1 (a) and 1 (b)
A high-strength bolted joint structure between the box-shaped column 1 and the H-shaped beam 4 as shown in FIG.

【0021】(実施例2)以下に、本発明の実施例2を
図3〜図4に基づいて詳細に説明する。この実施例2
は、実施例1と同様、箱形断面柱1に上下一対のスプリ
ットティ2a、2bを介してH形断面梁4を高力ボルト
接合する箱形断面柱とH形断面梁の高力ボルト接合構造
において本発明を適用した場合のものであるが、箱形断
面柱1の下側スプリットティ2b側のボルト孔1aを長
孔にして、上下スプリットティ2a、2b間にH形断面
梁4を取り付ける際に、下側スプリットティ2bを最終
締結位置から下方に退避可能にした点で、実施例1とは
異なるものである。図3(a)、(b)、(c)は、本
発明により箱形断面柱1の一側面にH形断面梁4を上下
一対のスプリットティ2a、2bを介して高力ボルト3
により接合(締結完了)した状態を示している。
(Embodiment 2) Hereinafter, Embodiment 2 of the present invention will be described in detail with reference to FIGS. Example 2
In the same manner as in the first embodiment, the H-shaped beam 4 is joined to the box-shaped column 1 via a pair of upper and lower split tees 2a and 2b. In the case where the present invention is applied to the structure, the bolt hole 1a on the lower split tee 2b side of the box-shaped column 1 is made to be a long hole, and the H-shaped beam 4 is inserted between the upper and lower split tees 2a and 2b. This embodiment differs from the first embodiment in that the lower split tee 2b can be retracted downward from the final fastening position when it is mounted. 3 (a), 3 (b) and 3 (c) show that an H-shaped beam 4 is provided on one side surface of a box-shaped column 1 via a pair of upper and lower split tees 2a and 2b according to the present invention.
Indicates a joined (fastened) state.

【0022】図3(a)、(b)において、2a、2b
は、上下一対のスプリットティで、それぞれ垂直部ep
が箱形断面柱1の側面に高力ボルト3によって接合さ
れ、上下一対のスプリットティの水平部fp間には、H
形断面梁4の先端部が位置しており、H形断面梁4の上
フランジfaは上側スプリットティ2aの水平部fp
に、また、下フランジfbは下側スプリットティ2bの
水平部fpに、それぞれ、高力ボルト3aにより接合し
てなる本発明の箱形断面柱1とH形断面梁4の高力ボル
ト接合構造例を示している。この高力ボルト接合構造に
おいては、下側スプリットティ2bを高力ボルト接合す
るための箱形断面柱1のボルト孔1aは、図3(c)図
に拡大して示すように、通常のボルト孔1bを距離a
(高力ボルト3の軸径dの0.5〜1.5倍)延長した
長孔であり、高力ボルト3によって下側スプリットティ
2bを仮締結した状態では、下側スプリットティ2b
は、高力ボルト3とともに距離aの範囲で上下位置を調
整可能である。
3 (a) and 3 (b), 2a, 2b
Is a pair of upper and lower split tees, each vertical part ep
Is joined to the side surface of the box-shaped column 1 by a high-strength bolt 3, and H is provided between the horizontal portions fp of the pair of upper and lower split tees.
The top end of the H-shaped beam 4 is located at the tip of the H-shaped beam 4 and the horizontal portion fp of the upper split tee 2a.
The lower flange fb is connected to the horizontal portion fp of the lower split tee 2b by a high-strength bolt 3a, respectively. An example is shown. In this high-strength bolt joining structure, the bolt holes 1a of the box-shaped column 1 for joining the lower split tee 2b with high-strength bolts are formed by ordinary bolts as shown in FIG. Hole 1b at distance a
(0.5 to 1.5 times the shaft diameter d of the high-strength bolt 3) is an elongated hole, and when the lower split tee 2b is temporarily fastened by the high-strength bolt 3, the lower split tee 2b
Can adjust the vertical position together with the high-strength bolt 3 within the range of the distance a.

【0023】ここでは、工場または建て方現場で建て方
前に、箱形断面柱1に上下スプリットティ2a、2bを
高力ボルト3で接合しておくものであり、その際に下側
スプリットティ2bは、仮締結(容易に締結を緩められ
る状態)して、上下スプリットティ2a、2bの水平部
に、建て方現場でH形断面梁4を取り付ける際には、図
4に示すように、下側スプリットティ2bを下方に距離
a退避させ、下側スプリットティ2bの水平部fpの上
面とH形断面梁4の下フランジfbの下面間に距離aの
隙間を形成して、H形断面梁4の位置合せ作業の制約を
緩和することができる。H形断面梁4の位置合せ後、H
形断面梁4の上フランジfaを上側スプリットティ2a
の水平部fpに高力ボルト3aで接合した状態で、下側
スプリットティ2bを上昇させ、水平部fpの上面をH
形断面梁4の下フランジfbの下面に当接させて高力ボ
ルト3aで接合するとともに箱形断面柱1と下側スプリ
ットティ2bの高力ボルト3による締結を完了させる。
このようにして、図3(a)、(b)に示すような箱形
断面柱1とH形断面梁4の高力ボルト接合構造を得るこ
とができる。
In this case, the upper and lower split tees 2a and 2b are joined to the box-shaped column 1 with the high-strength bolts 3 before building at the factory or at the construction site. 2b is temporarily fastened (in a state where the fastening is easily loosened), and when attaching the H-shaped section beam 4 to the horizontal portion of the upper and lower split tees 2a and 2b at the construction site, as shown in FIG. The lower split tee 2b is retracted downward by a distance a, and a gap of a distance a is formed between the upper surface of the horizontal portion fp of the lower split tee 2b and the lower surface of the lower flange fb of the H-shaped cross-section beam 4 to form an H-shaped cross section. Restrictions on the alignment work of the beam 4 can be eased. After the positioning of the H-section beam 4,
The upper flange fa of the cross section beam 4 is connected to the upper split tee 2a.
The lower split tee 2b is raised with the high strength bolt 3a joined to the horizontal portion fp, and the upper surface of the horizontal portion fp is
The lower cross-section beam 4 is brought into contact with the lower surface of the lower flange fb and joined with the high-strength bolt 3a, and the fastening of the box-shaped cross-section column 1 and the lower split tee 2b by the high-strength bolt 3 is completed.
In this way, a high-strength bolted structure of the box-shaped column 1 and the H-shaped beam 4 as shown in FIGS. 3A and 3B can be obtained.

【0024】(実施例3)以下に、本発明の実施例3を
図5〜図6に基づいて詳細に説明する。この実施例3
は、実施例1、2と同様、箱形断面柱1に上下一対のス
プリットティ2a、2bを介してH形断面梁4を高力ボ
ルト接合する箱形断面柱とH形断面梁の高力ボルト接合
構造において本発明を適用した場合のものであるが、上
側スプリットティ2aの箱形断面柱1側のボルト孔2o
を長孔にして、上下スプリットティ2a、2b間にH形
断面梁4を取り付ける際に、上側スプリットティ2aを
最終締結位置から上方に退避可能にした点で、実施例
1、2とは異なるものである。図5(a)、(b)、
(c)は、本発明により箱形断面柱1の一側面にH形断
面梁4を上下一対のスプリットティ2a、2bを介して
高力ボルト3により接合(締結完了)した状態を示して
いる。
(Embodiment 3) Hereinafter, Embodiment 3 of the present invention will be described in detail with reference to FIGS. Example 3
In the same manner as in the first and second embodiments, the H-section beam and the H-section beam are joined by a high-strength bolt to the H-section beam 4 via a pair of upper and lower split tees 2a and 2b. Although the present invention is applied to a bolt joint structure, a bolt hole 2o on the side of the box-shaped column 1 of the upper split tee 2a.
Is different from the first and second embodiments in that the upper split tee 2a can be retracted upward from the final fastening position when the H-shaped cross-section beam 4 is mounted between the upper and lower split tees 2a and 2b. Things. 5 (a), (b),
(C) shows a state in which the H-shaped section beam 4 is joined to one side surface of the box-shaped section column 1 by a high-strength bolt 3 via a pair of upper and lower split tees 2a and 2b according to the present invention (completion of fastening). .

【0025】図5(a)、(b)において、2a、2b
は、上下一対のスプリットティで、それぞれ垂直部ep
が箱形断面柱1の側面に高力ボルト3によって接合さ
れ、上下一対のスプリットティの水平部fp間には、H
形断面梁4の先端部が位置しており、H形断面梁4の上
フランジfaは上側スプリットティ2aの水平部fp
に、また、下フランジfbは下側スプリットティ2bの
水平部fpに、それぞれ、高力ボルト3aにより接合し
てなる本発明の箱形断面柱1とH形断面梁4の高力ボル
ト接合構造例を示している。この高力ボルト接合構造に
おいては、上側スプリットティ2aの箱形断面柱1側の
ボルト孔2oは、図5(c)図に拡大して示すように、
通常のボルト孔を距離a(高力ボルト3の軸径dの0.
5〜1.5倍)延長した長孔であり、高力ボルト3によ
って上側スプリットティ2aを仮締結した状態では、上
側スプリットティ2aは、距離aの範囲で上下位置を調
整可能である。
In FIGS. 5A and 5B, 2a, 2b
Is a pair of upper and lower split tees, each vertical part ep
Is joined to the side surface of the box-shaped column 1 by a high-strength bolt 3, and H is provided between the horizontal portions fp of the pair of upper and lower split tees.
The top end of the H-shaped beam 4 is located at the tip of the H-shaped beam 4 and the horizontal portion fp of the upper split tee 2a.
The lower flange fb is connected to the horizontal portion fp of the lower split tee 2b by a high-strength bolt 3a, respectively. An example is shown. In this high-strength bolt joint structure, the bolt hole 2o on the side of the box-shaped column 1 of the upper split tee 2a is enlarged as shown in FIG.
Insert a normal bolt hole at the distance a (0.
In the state where the upper split tee 2a is temporarily fastened by the high-strength bolt 3, the upper split tee 2a can adjust the vertical position within the range of the distance a.

【0026】ここでは、工場または建て方現場で建て方
前に、箱形断面柱1に上下スプリットティ2a、2bを
高力ボルト3で接合しておくものであり、その際に上側
スプリットティ2aは、仮締結(容易に締結を緩められ
る状態)して、上下スプリットティ2a、2bの水平部
に、建て方現場でH形断面梁4を取り付ける際には、図
6に示すように、上側スプリットティ2aを上方に距離
a退避させ、上側スプリットティ2aの水平部fpの下
面とH形断面梁4の上フランジfaの上面間に距離aの
隙間を形成して、H形断面梁4の位置合せ作業の制約を
緩和することができる。H形断面梁4の位置合せ後、H
形断面梁4の下フランジfbを下側スプリットティ2b
の水平部fpで支持した状態で、上側スプリットティ2
aを降下させ、水平部fpの下面をH形断面梁4の上フ
ランジfaの上面に当接させて高力ボルト3aで接合す
るとともに箱形断面柱1と上側スプリットティ2aの高
力ボルト3による締結を完了させる。このようにして、
図5(a)、(b)に示すような箱形断面柱1とH形断
面梁4の高力ボルト接合構造を得ることができる。
In this case, the upper and lower split tees 2a and 2b are joined to the box-shaped section column 1 with high-strength bolts 3 before building at the factory or at the construction site. When the H-shaped cross-section beam 4 is temporarily attached (in a state where it can be easily loosened) and the H-shaped section beam 4 is attached to the horizontal portion of the upper and lower split tees 2a and 2b at the construction site, as shown in FIG. The split tee 2a is retracted upward by a distance “a”, and a gap of a distance “a” is formed between the lower surface of the horizontal portion fp of the upper split tee 2a and the upper surface of the upper flange fa of the H-shaped cross-section beam 4 so that the H-shaped cross-section beam 4 Restrictions on the alignment work can be relaxed. After the positioning of the H-section beam 4,
The lower flange fb of the beam 4 is connected to the lower split tee 2b.
The upper split tee 2 is supported by the horizontal portion fp of
a, the lower surface of the horizontal portion fp is brought into contact with the upper surface of the upper flange fa of the H-shaped beam 4 and joined with the high-strength bolt 3a, and the high-strength bolt 3 of the box-shaped column 1 and the upper split tee 2a To complete the fastening. In this way,
As shown in FIGS. 5A and 5B, a high-strength bolt joint structure between the box-shaped column 1 and the H-shaped beam 4 can be obtained.

【0027】(実施例4)以下に、本発明の実施例4を
図7〜図8に基づいて詳細に説明する。この実施例4
は、実施例1〜3と同様、箱形断面柱1に上下一対のス
プリットティ2a、2bを介してH形断面梁4を高力ボ
ルト接合する箱形断面柱とH形断面梁の高力ボルト接合
構造において本発明を適用した場合のものであるが、下
側スプリットティ2bの箱形断面柱1側のボルト孔2o
を長孔にして、上下スプリットティ2a、2b間にH形
断面梁4を取り付ける際に、下側スプリットティ2bを
最終締結位置から下方に退避可能にした点で、実施例1
〜3とは異なるものである。図7(a)、(b)、
(c)は、箱形断面柱1の一側面にH形断面梁4を上下
一対のスプリットティ2a、2bを介して高力ボルト3
により接合(締結完了)した状態を示している。
(Embodiment 4) Hereinafter, Embodiment 4 of the present invention will be described in detail with reference to FIGS. Example 4
Is as in Example 1-3, the high forces of the pair of upper and lower split tee 2a, box-shaped cross-section column of high-strength bolts joining the H-shaped cross-section beam 4 through 2b and H-section beam into a box-section column 1 In the case where the present invention is applied to a bolt joint structure, a bolt hole 2o on the box-shaped column 1 side of the lower split tee 2b.
The first embodiment is characterized in that the lower split tee 2b can be retracted downward from the final fastening position when the H-shaped cross-section beam 4 is mounted between the upper and lower split tees 2a and 2b.
-3. 7 (a), (b),
(C) shows an H-shaped beam 4 on one side surface of a box-shaped column 1 via a pair of upper and lower split tees 2a and 2b,
Indicates a joined (fastened) state.

【0028】図7(a)、(b)において、2a、2b
は、上下一対のスプリットティで、それぞれ垂直部ep
が箱形断面柱1の側面に高力ボルト3によって接合さ
れ、上下一対のスプリットティの水平部fp間には、H
形断面梁4の先端部が位置しており、H形断面梁4の上
フランジfaは上側スプリットティ2aの水平部fp
に、また、下フランジfbは下側スプリットティ2bの
水平部fpに、それぞれ、高力ボルト3aにより接合し
てなる本発明の箱形断面柱1とH形断面梁4の高力ボル
ト接合構造例を示している。この高力ボルト接合構造に
おいては、下側スプリットティ2bの箱形断面柱1側の
ボルト孔2oは、図7(c)図に拡大して示すように、
通常のボルト孔を距離a(高力ボルト3の軸径dの0.
5〜1.5倍)延長した長孔であり、高力ボルト3によ
って下側スプリットティ2bを仮締結した状態では、下
側スプリットティ2bは、距離aの範囲で上下位置を調
整可能である。
In FIGS. 7A and 7B, 2a and 2b
Is a pair of upper and lower split tees, each vertical part ep
Is joined to the side surface of the box-shaped column 1 by a high-strength bolt 3, and H is provided between the horizontal portions fp of the pair of upper and lower split tees.
The top end of the H-shaped beam 4 is located at the tip of the H-shaped beam 4 and the horizontal portion fp of the upper split tee 2a.
The lower flange fb is connected to the horizontal portion fp of the lower split tee 2b by a high-strength bolt 3a, respectively. An example is shown. In this high-strength bolt joining structure, the bolt hole 2o of the lower split tee 2b on the side of the box-shaped column 1 is, as shown in an enlarged view in FIG.
Insert a normal bolt hole at the distance a (0.
It is a long hole that is extended (5 to 1.5 times). In a state where the lower split tee 2b is temporarily fastened by the high-strength bolt 3, the lower split tee 2b can adjust the vertical position within the range of the distance a. .

【0029】ここでは、工場または建て方現場で建て方
前に、箱形断面柱1に上下スプリットティ2a、2bを
高力ボルト3で接合して置くものであり、その際に下側
スプリットティ2bは、仮締結(容易に締結を緩められ
る状態)して、上下スプリットティ2a、2bの水平部
に、建て方現場でH形断面梁4を取り付ける際には、図
8に示すように、下側スプリットティ2bを下方に距離
a退避させ、下側スプリットティ2bの水平部fpの上
面とH形断面梁4の下フランジfbの下面間に距離aの
隙間を形成して、H形断面梁4の位置合せ作業の制約を
緩和することができる。H形断面梁4の位置合せ後、H
形断面梁4の上フランジfaを上側スプリットティ2a
の水平部fpに高力ボルト3aで接合した状態で、下側
スプリットティ2bを上昇させ、水平部fpの上面をH
形断面梁4の下フランジfbの下面に当接させて高力ボ
ルト3aで接合するとともに箱形断面柱1と下側スプリ
ットティ2bの高力ボルト3による締結を完了させる。
このようにして、図7(a)、(b)に示すような箱形
断面柱1とH形断面梁4の高力ボルト接合構造を得るこ
とができる。
Here, the upper and lower split tees 2a and 2b are joined to the box-shaped column 1 by means of the high-strength bolts 3 before being built at the factory or at the construction site. As shown in FIG. 8, when the H-shaped cross-section beam 2b is temporarily fastened (in a state where the fastening is easily loosened) and the H-shaped section beam 4 is attached to the horizontal portion of the upper and lower split tees 2a and 2b at the construction site, The lower split tee 2b is retracted downward by a distance a, and a gap of a distance a is formed between the upper surface of the horizontal portion fp of the lower split tee 2b and the lower surface of the lower flange fb of the H-shaped cross-section beam 4 to form an H-shaped cross section. Restrictions on the alignment work of the beam 4 can be eased. After the positioning of the H-section beam 4,
The upper flange fa of the cross section beam 4 is connected to the upper split tee 2a.
The lower split tee 2b is raised with the high strength bolt 3a joined to the horizontal portion fp, and the upper surface of the horizontal portion fp is
The lower cross-section beam 4 is brought into contact with the lower surface of the lower flange fb and joined with the high-strength bolt 3a, and the fastening of the box-shaped cross-section column 1 and the lower split tee 2b by the high-strength bolt 3 is completed.
In this way, a high-strength bolted structure of the box-shaped column 1 and the H-shaped beam 4 as shown in FIGS. 7A and 7B can be obtained.

【0030】上記の各実施例においては、いずれも、箱
形断面柱へのスプリットティの高力ボルト接合を工場ま
たは建て方現場で建て方前に効率的に行うことができ、
また、建て方の際に、上下スプリットティ間へのH形断
面梁の位置合せ作業の制約を緩和することができる。な
お、本発明は、上記の実施例の内容に限定されるもので
はない。例えば、箱形断面柱に対するH形断面梁の取り
付け本数、取り付け位置、高力ボルトの種類、本数、退
避するスプリットティの退避、仮締結、締結のタイミン
グなどについては、対象構造物、接合部位、材料強度、
設計強度などに応じて、上記請求項を満足する範囲内で
変更のあるものである。
In each of the above-described embodiments, the high-strength bolt connection of the split tee to the box-shaped column can be efficiently performed at the factory or at the construction site before the construction.
In addition, when building, it is possible to ease restrictions on the work of positioning the H-shaped section beam between the upper and lower split tees. The present invention is not limited to the contents of the above embodiment. For example, regarding the number of H-shaped cross-section beams to be attached to the box-shaped cross-section column, the mounting position, the type and number of high-strength bolts, the evacuation of the retracting split tee, the temporary fastening, the timing of fastening, etc. Material strength,
Modifications may be made within the range satisfying the claims according to the design strength and the like.

【0031】[0031]

【発明の効果】本発明の箱形断面柱とH形断面梁と接合
構造においては、基本的には、箱形断面柱へのスプリッ
トティの高力ボルト接合を、工場または建て方現場で建
て方前に効率的に行うことができ、この作業を効率化す
ることができる。また、上下スプリットティの一方を仮
締結して、建て方の際に、退避可能にしており、上下ス
プリットティ間へのH形断面梁の位置合せ作業の制約を
緩和することができ、高力ボルト接合の施工性を大幅に
改善することができる。
In the joint structure of the box-shaped column and the H-shaped beam according to the present invention, basically, a high-strength bolted joint of the split tee to the box-shaped column is built at a factory or a construction site. This operation can be performed efficiently, and this operation can be made more efficient. In addition, one of the upper and lower split tees is temporarily fastened so that it can be retracted when the building is to be constructed, so that the restriction on the work of positioning the H-shaped cross-section beam between the upper and lower split tees can be eased. The workability of bolt connection can be greatly improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】(a)図は、本発明の実施例1における箱形断
面柱とH形断面梁の高力ボルト接合構造例を示す一部切
欠断面正面説明図、(b)図は、(a)図の側面説明
図、(c)図は、(a)図における上側スプリットティ
と箱形断面柱の高力ボルト接合部の部分拡大説明図。
FIG. 1A is a partially cutaway front explanatory view showing an example of a high-strength bolted joint structure between a box-shaped column and an H-shaped beam in Example 1 of the present invention, and FIG. (a) is a side view of the figure, and (c) is a partially enlarged view of the high-strength bolt joint between the upper split tee and the box-shaped column in FIG.

【図2】図1の箱形断面柱とH形断面梁の高力ボルト接
合構造例でのH形断面梁の取り付け状態例を示す一部切
欠断面正面説明図。
FIG. 2 is a partially cutaway front explanatory view showing an example of an attachment state of an H-shaped beam in a high-strength bolt joint structure example of a box-shaped column and an H-shaped beam in FIG. 1;

【図3】(a)図は、本発明の実施例2における箱形断
面柱とH形断面梁の高力ボルト接合構造例を示す一部切
欠断面正面説明図、(b)図は、(a)図の側面説明
図、(c)図は、(a)図における上側スプリットティ
と箱形断面柱の高力ボルト接合部の部分拡大説明図。
FIG. 3 (a) is a partially cutaway front explanatory view showing an example of a high-strength bolted joint structure between a box-shaped column and an H-shaped beam in Embodiment 2 of the present invention, and FIG. (a) is a side view of the figure, and (c) is a partially enlarged view of the high-strength bolt joint between the upper split tee and the box-shaped column in FIG.

【図4】図3の箱形断面柱とH形断面梁の高力ボルト接
合構造例でのH形断面梁の取り付け状態例を示す一部切
欠断面正面説明図。
FIG. 4 is a partially cutaway front explanatory view showing an example of a mounting state of an H-shaped section beam in a high-strength bolt joint structure example of a box-shaped section column and an H-shaped section beam in FIG. 3;

【図5】(a)図は、本発明の実施例3における箱形断
面柱とH形断面梁の高力ボルト接合構造例を示す一部切
欠断面正面説明図、(b)図は、(a)図の側面説明
図、(c)図は、(a)図における上側スプリットティ
と箱形断面柱の高力ボルト接合部の部分拡大説明図。
FIG. 5A is a partially cutaway front explanatory view showing an example of a high-strength bolted joint structure between a box-shaped column and an H-shaped beam in Example 3 of the present invention, and FIG. (a) is a side view of the figure, and (c) is a partially enlarged view of the high-strength bolt joint between the upper split tee and the box-shaped column in FIG.

【図6】図5の箱形断面柱とH形断面梁の高力ボルト接
合構造例でのH形断面梁の取り付け状態例を示す一部切
欠断面正面説明図。
FIG. 6 is a partially cutaway front explanatory view showing an example of a mounting state of the H-shaped beam in the high-strength bolted joint structure example of the box-shaped column and the H-shaped beam in FIG. 5;

【図7】(a)図は、本発明の実施例4における箱形断
面柱とH形断面梁の高力ボルト接合構造例を示す一部切
欠断面正面説明図、(b)図は、(a)図の側面説明
図、(c)図は、(a)図における上側スプリットティ
と箱形断面柱の高力ボルト接合部の部分拡大説明図。
FIG. 7A is a partially cutaway front view showing an example of a high-strength bolted joint structure between a box-shaped column and an H-shaped beam in Example 4 of the present invention, and FIG. (a) is a side view of the figure, and (c) is a partially enlarged view of the high-strength bolt joint between the upper split tee and the box-shaped column in FIG.

【図8】図7の箱形断面柱とH形断面梁の高力ボルト接
合構造例でのH形断面梁の取り付け状態例を示す一部切
欠断面正面説明図。
FIG. 8 is a partially cutaway front view showing an example of an attached state of an H-shaped beam in the high-strength bolted structure example of the box-shaped column and the H-shaped beam in FIG. 7;

【図9】従来の箱形断面柱とH形断面梁の高力ボルト接
合構造例を示す立体説明図。
FIG. 9 is a three-dimensional explanatory view showing an example of a conventional high-strength bolt joint structure between a box-shaped column and an H-shaped beam.

【符号の説明】[Explanation of symbols]

1 箱形断面柱 1a ボルト
孔(長孔) 1b ボルト孔 2a 上側ス
プリットティ 2b 下側スプリットティ ep 垂直部 fp 水平部 3、3a 高
力ボルト 2o ボルト孔(長孔) 4 H形断
面梁 fa 上フランジ fb 下フラ
ンジ 5 ワンサイドボルト
DESCRIPTION OF SYMBOLS 1 Box-shaped pillar 1a Bolt hole (long hole) 1b Bolt hole 2a Upper split tee 2b Lower split tee ep Vertical part fp Horizontal part 3, 3a High strength bolt 2o Bolt hole (long hole) 4 H-shaped beam fa Flange fb Lower flange 5 One side bolt

───────────────────────────────────────────────────── フロントページの続き Fターム(参考) 2E125 AA04 AA14 AB01 AB16 AC15 AC16 AG03 AG04 AG12 BB08 BC08 BD01 BE01 BF03 CA06 CA13 CA14 DA01 EA01 EA06 ──────────────────────────────────────────────────続 き Continued on the front page F term (reference) 2E125 AA04 AA14 AB01 AB16 AC15 AC16 AG03 AG04 AG12 BB08 BC08 BD01 BE01 BF03 CA06 CA13 CA14 DA01 EA01 EA06

Claims (8)

【特許請求の範囲】[Claims] 【請求項1】 箱形断面柱にH形断面梁を上下のスプリ
ットティを介して高力ボルト接合する箱形断面柱とH形
断面梁の接合構造において、箱形断面柱の上側スプリッ
トティ側のボルト孔が、最終締結位置を基準にして上方
にボルト軸径の0.5〜1.5倍延長された長孔である
ことを特徴とする箱形断面柱とH形断面梁の高力ボルト
接合構造。
1. An upper split tee side of a box-shaped column in a joint structure of a box-shaped column and an H-shaped beam in which an H-shaped beam is joined to a box-shaped column through high-strength bolts via upper and lower split tees. Wherein the bolt holes are elongated holes extending 0.5 to 1.5 times the bolt shaft diameter upward with respect to the final fastening position. Bolt connection structure.
【請求項2】 箱形断面柱にH形断面梁を上下のスプリ
ットティを介して高力ボルト接合する箱形断面柱とH形
断面梁の接合構造において、箱形断面柱の下側スプリッ
トティ側のボルト孔が、最終締結位置を基準にして下方
にボルト軸径の0.5〜1.5倍延長された長孔である
ことを特徴とする箱形断面柱とH形断面梁の高力ボルト
接合構造。
2. In a joint structure of a box-shaped section column and an H-shaped section beam in which an H-shaped section beam is joined to a box-shaped section column with high-strength bolts via upper and lower split tees, a lower split tee of the box-shaped section column is provided. The height of the box-shaped column and the H-shaped beam is characterized in that the bolt hole on the side is an elongated hole extending downward from the final fastening position by 0.5 to 1.5 times the bolt shaft diameter. Force bolt joint structure.
【請求項3】 箱形断面柱にH形断面梁を上下のスプリ
ットティを介して高力ボルト接合する箱形断面柱とH形
断面梁の接合構造において、上側スプリットティの箱形
断面柱側のボルト孔が、最終締結位置を基準にして下方
にボルト軸径の0.5〜1.5倍延長された長孔である
ことを特徴とする箱形断面柱とH形断面梁の高力ボルト
接合構造。
3. A joint structure of a box-shaped column and an H-shaped beam in which an H-shaped beam is joined to a box-shaped column through a high-strength bolt via upper and lower split tees. Characterized in that the bolt holes are elongated holes extending from 0.5 to 1.5 times the bolt shaft diameter downward with respect to the final fastening position. Bolt connection structure.
【請求項4】 箱形断面柱にH形断面梁を上下のスプリ
ットティを介して高力ボルト接合する箱形断面柱とH形
断面梁の接合構造において、下側スプリットティの箱形
断面柱側のボルト孔が、最終締結位置を基準にして上方
にボルト軸径の0.5〜1.5倍延長された長孔である
ことを特徴とする箱形断面柱とH形断面梁の高力ボルト
接合構造高力ボルト接合構造。
4. In a joint structure of a box-shaped column and an H-shaped beam in which an H-shaped beam is joined to a box-shaped column through a high-strength bolt through upper and lower split tees, a box-shaped column having a lower split tee is provided. The height of the box-shaped column and the H-shaped beam is characterized in that the bolt hole on the side is an elongated hole extending upward from the final fastening position by 0.5 to 1.5 times the bolt shaft diameter. Power bolt joint structure High strength bolt joint structure.
【請求項5】 箱形断面柱にH形断面梁を上下スプリッ
トティを介して高力ボルト接合する箱形断面柱とH形断
面梁の高力ボルト接合方法において、箱形断面柱の上側
スプリットティ側のボルト孔を、最終のボルト締結位置
を基準にして上方にボルト軸径の0.5〜1.5倍延長
された長孔にして、上下スプリットティを工場で、また
は建て方前に箱形断面柱に高力ボルト接合する際、上側
スプリットティを最終位置からボルト軸径の0.5〜
1.5倍の距離上方に退避状態で仮締結し、上下スプリ
ットティにH形断面梁を高力ボルト接合する際には、H
形断面梁の下側フランジを下側スプリットティに支持さ
せた状態で上側スプリットティを所定の位置まで下降さ
せ箱形断面柱への高力ボルト接合を完了させるととも
に、上下のスプリットティにH形断面梁を高力ボルト接
合することを特徴とする箱形断面柱とH形断面梁の高力
ボルト接合方法。
5. A method for joining a H-shaped section beam to a box-shaped section column by high-strength bolts via upper and lower split tees in a high-strength bolt-joining method for a box-shaped section column and an H-shaped section beam. The bolt hole on the tee side is made into an elongated hole that is extended 0.5 to 1.5 times the bolt shaft diameter upward with respect to the final bolt fastening position, and the upper and lower split tees are manufactured at the factory or before building. When joining high-strength bolts to a box-shaped column, adjust the upper split tee from the final position to 0.5 to the bolt shaft diameter.
Temporarily fasten in a retracted state 1.5 times above, and when joining an H-shaped beam to the upper and lower split tees with high strength bolts,
With the lower flange of the beam shaped section supported by the lower split tee, the upper split tee is lowered to a predetermined position to complete the high-strength bolt connection to the box-shaped column, and the upper and lower split tees are H-shaped. A high-strength bolt joining method for a box-shaped section column and an H-shaped section beam, wherein the section beam is joined with a high-strength bolt.
【請求項6】 箱形断面柱にH形断面梁を上下スプリッ
トティを介して高力ボルト接合する箱形断面柱とH形断
面梁の高力ボルト接合方法において、箱形断面柱の下側
スプリットティ側のボルト孔を、最終締結位置を基準に
して下方にボルト軸径の0.5〜1.5倍延長された長
孔にして、上下スプリットティを工場で、または建て方
前に箱形断面柱に高力ボルト接合する際、下側スプリッ
トティを最終位置からボルト軸径の0.5〜1.5倍の
距離下方に退避状態で仮締結し、上下スプリットティ間
にH形断面梁を高力ボルト接合する際には、H形断面梁
の上フランジと上側スプリットティを高力ボルト接合
後、下側スプリットティの締結を緩めて下側スプリット
ティを所定の位置まで上昇させて箱形断面柱との締結を
完了させるとともに、下側スプリットティにH形断面梁
の下フランジを高力ボルト接合することを特徴とする箱
形断面柱とH形断面梁の高力ボルト接合方法。
6. A method of joining a H-shaped section beam to a box-shaped section column with high-strength bolts via upper and lower split tees in a high-strength bolt-joining method for a box-shaped section column and an H-shaped section beam. The bolt holes on the split tee side are elongated holes extending 0.5 to 1.5 times the bolt shaft diameter downward with respect to the final fastening position, and the upper and lower split tees are boxed at the factory or before building. When joining high-strength bolts to a column with a cross section, temporarily tighten the lower split tee in a retracted position 0.5 to 1.5 times the bolt shaft diameter below the final position in a retracted state, and make an H-shaped section between the upper and lower split tees. When joining the beams with high strength bolts, after joining the upper flange and upper split tee with high strength bolts, loosen the fastening of the lower split tee and raise the lower split tee to a predetermined position. While completing the fastening with the box-shaped column, A high-strength bolt joining method for a box-shaped column and an H-shaped section beam, wherein a lower flange of the H-shaped section beam is joined to the lower split tee by a high-strength bolt.
【請求項7】 箱形断面柱にH形断面梁を上下スプリッ
トティを介して高力ボルト接合する箱形断面柱とH形断
面梁の高力ボルト接合方法において、上側スプリットテ
ィの箱形断面柱側のボルト孔を、最終締結位置を基準に
して下方にボルト軸径の0.5〜1.5倍延長された長
孔にして、上下スプリットティを工場で、または建て方
前に箱形断面柱に高力ボルト接合する際、上側スプリッ
トティを最終位置からボルト軸径の0.5〜1.5倍の
距離上方に退避状態で仮締結し、上下スプリットティ間
にH形断面梁を高力ボルト接合する際には、H形断面梁
の下フランジを下側スプリットティで支持した状態で上
側スプリットティの締結を緩め上側スプリットティを所
定の位置まで下降させて箱形断面柱との締結を完了させ
るとともに、上下のスプリットティにH形断面梁を高力
ボルト接合することを特徴とする箱形断面柱とH形断面
梁の高力ボルト接合方法。
7. A method for joining a H-shaped section beam to a box-shaped section column with high-strength bolts via upper and lower split tees in a high-strength bolt joining method for a box-shaped section column and an H-shaped section beam. The bolt holes on the pillar side are elongated holes extending 0.5 to 1.5 times the bolt shaft diameter downward with respect to the final fastening position. When joining high-strength bolts to a cross-section column, temporarily tighten the upper split tee in a retracted state 0.5 to 1.5 times the bolt shaft diameter from the final position and retract the H-shaped cross-section beam between the upper and lower split tees. When joining with high-strength bolts, loosen the fastening of the upper split tee with the lower flange of the H-shaped section beam supported by the lower split tee, lower the upper split tee to a predetermined position, and connect with the box-shaped column. Complete the fastening and A high-strength bolt joining method for a box-shaped column and an H-shaped beam, wherein the H-shaped beam is joined to the split tee with a high-strength bolt.
【請求項8】 箱形断面柱にH形断面梁を上下スプリッ
トティを介して高力ボルト接合する箱形断面柱とH形断
面梁の高力ボルト接合方法において、下側スプリットテ
ィの箱形断面柱側のボルト孔を、最終締結位置を基準に
して上方にボルト軸径の0.5〜1.5倍延長された長
孔にして、上下スプリットティを工場で、または建て方
前に箱形断面柱に高力ボルト接合する際、下側スプリッ
トティを最終位置からボルト軸径の0.5〜1.5倍の
距離下方に退避状態で仮締結し、上下スプリットティ間
にH形断面梁を高力ボルト接合する際には、H形断面梁
の上フランジを上側スプリットティで支持した状態で下
側スプリットティの締結を緩め下側スプリットティを所
定の位置まで上昇させて箱形断面柱との締結を完了させ
るとともに、上下のスプリットティにH形断面梁を高力
ボルト接合することを特徴とする箱形断面柱とH形断面
梁の高力ボルト接合方法。
8. A method of joining a H-shaped section beam to a box-shaped section column with high-strength bolts through upper and lower split tees and a high-strength bolt joining method of the H-section section beam with a lower split tee. The bolt hole on the section column side is made a long hole extending 0.5 to 1.5 times the bolt shaft diameter upward with reference to the final fastening position, and the upper and lower split tees are set at the factory or before building. When joining high-strength bolts to a column with a cross section, temporarily tighten the lower split tee in a retracted position 0.5 to 1.5 times the bolt shaft diameter below the final position in a retracted state, and make an H-shaped section between the upper and lower split tees. When connecting the beam with high-strength bolts, loosen the lower split tee with the upper flange of the H-section beam supported by the upper split tee, raise the lower split tee to a predetermined position, and make a box-shaped section. Complete the fastening with the pillar and A high-strength bolt joining method for a box-shaped column and an H-shaped beam, wherein the H-shaped beam is joined to the split tee with a high-strength bolt.
JP2001092265A 2001-03-28 2001-03-28 High strength bolt joining structure and joining method Expired - Lifetime JP4726316B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001092265A JP4726316B2 (en) 2001-03-28 2001-03-28 High strength bolt joining structure and joining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001092265A JP4726316B2 (en) 2001-03-28 2001-03-28 High strength bolt joining structure and joining method

Publications (2)

Publication Number Publication Date
JP2002294862A true JP2002294862A (en) 2002-10-09
JP4726316B2 JP4726316B2 (en) 2011-07-20

Family

ID=18946759

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001092265A Expired - Lifetime JP4726316B2 (en) 2001-03-28 2001-03-28 High strength bolt joining structure and joining method

Country Status (1)

Country Link
JP (1) JP4726316B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0544258A (en) * 1991-08-08 1993-02-23 Kajima Corp Structure for column/beam jointing section
JPH11269986A (en) * 1998-03-23 1999-10-05 Nippon Steel Corp Method and structure for joining rectangular steel pipe column to beam
JP2001065193A (en) * 1999-08-27 2001-03-13 Shimizu Corp Vibration control wall

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0544258A (en) * 1991-08-08 1993-02-23 Kajima Corp Structure for column/beam jointing section
JPH11269986A (en) * 1998-03-23 1999-10-05 Nippon Steel Corp Method and structure for joining rectangular steel pipe column to beam
JP2001065193A (en) * 1999-08-27 2001-03-13 Shimizu Corp Vibration control wall

Also Published As

Publication number Publication date
JP4726316B2 (en) 2011-07-20

Similar Documents

Publication Publication Date Title
JP2002356910A (en) Beam end part structural body, beam end part joining construction method, and the beam
JP2002294862A (en) High strength bolt joining structure and joining method
JPH10325193A (en) Ground sill of external wall panel and external wall ground sill part construction
JP3124515B2 (en) Building seismic reinforcement structure
JP2000240196A (en) Method for mounting tie-bar of steel-sheet concrete structure, and tie-bar
JP3129685B2 (en) Column / beam joint structure
JP4465256B2 (en) Anchor bolt support device
JP3742590B2 (en) Column / beam joint structure
JPH09189132A (en) Fixing method of column base for steel frame column
JP2002348956A (en) High strength bolt-connection structure between steel column and steel beam, and its construction method
JP4593010B2 (en) Pillar building jig and column building method using the same
JP5439002B2 (en) Expansion unit mounting structure, expansion unit mounting method and unit type building
JP6474575B2 (en) Brace seismic reinforcement structure and seismic reinforcement method for existing buildings
JP4639012B2 (en) High-strength bolt joint structure of box-shaped cross section column and H-shaped cross section beam and its construction method
JPH09228644A (en) Erection device for column
JP3103294B2 (en) Pillar steel frame, jig used for the connection, and steel frame connection method
JP2607596B2 (en) Building unit
JP2536345B2 (en) Joint structure of steel pipe concrete columns
JP7437119B2 (en) Roof base structure
JP7024163B2 (en) Column-beam joint structure and column-beam construction method
JP4072726B2 (en) Precast concrete panel mounting structure and mounting method
JPH0333846Y2 (en)
JP2022089101A (en) Seismic retrofitting structure
JP4174672B2 (en) Building structure
JPH08277575A (en) Stud-section non-welding connecting structure of thickened column

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20061106

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061108

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20061208

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20071101

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100830

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101005

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20101126

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110329

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110412

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140422

Year of fee payment: 3

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140422

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140422

Year of fee payment: 3

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140422

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350