Prior art keywords
unit
notification
use
state
hardware resources
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001067397A
Other languages
Japanese (ja)
Other versions
JP4644377B2 (en )
Inventor
Tsuneshi Matsuo
恒志 松尾
Original Assignee
Daiwa Securities Group Inc
株式会社大和証券グループ本社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date

Links

Abstract

PROBLEM TO BE SOLVED: To provide a load monitoring system to judge a use state of a hardware resource based on a data processing of data to be generated in accordance with acceptance of an order.
SOLUTION: The load monitoring system to monitor the use state of the hardware resource is provided with an acquiring part to acquire information regarding data processing quantity of hardware to be generated in accordance with the acceptance of the order, a judging part to judge the use state of the hardware resource based on the information regarding the data processing quantity acquired by the acquiring part and an informing part to inform a user of the use state of the hardware resource judged by the judging part.
COPYRIGHT: (C)2002,JPO

Description

【発明の詳細な説明】 DETAILED DESCRIPTION OF THE INVENTION

【0001】 [0001]

【発明の属する技術分野】本発明は、負荷監視システム、負荷監視方法、およびプログラムに関する。 TECHNICAL FIELD The present invention relates to a load monitoring system, the load monitoring method, and a program. 特に本発明は、注文の受注処理を行うハードウエアの使用状態を監視する負荷監視システム、負荷監視方法、およびプログラムに関する。 In particular, the present invention, the load monitoring system for monitoring the hardware usage state performing order processing of orders, the load monitoring method, and a program.

【0002】 [0002]

【従来の技術】システムのハードディスク、主記憶装置、CPU、データ伝送路等のキャパシティが十分であるか否かは、システムの平均応答時間を計測することにより評価されていた。 BACKGROUND ART system's hard disk, main memory, CPU, whether the capacity of the data transmission line or the like is sufficient, had been evaluated by measuring the average response time of the system.

【0003】 [0003]

【発明が解決しようとする課題】しかしながら、注文の受注処理を行うシステムの場合、平均応答時間に基づいてシステムを評価する方法によると、システムの応答時間が遅くなり、注文を出す顧客に不都合を感じさせるまで、システムのキャパシティが不足していることに気づかないことがある。 The object of the invention is to be Solved However, in the case of a system which performs the order processing of orders, according to the method of evaluating the system based on the average response time, response time of the system slows down, the inconvenience to the customer places an order to feel, there is that capacity of the system is not aware that you are missing.

【0004】そこで本発明は、上記の課題を解決することのできる負荷監視システム、負荷監視方法、およびプログラムを提供することを目的とする。 [0004] The present invention aims at providing a load monitoring system that can solve the above problems, the load monitoring method, and a program. この目的は特許請求の範囲における独立項に記載の特徴の組み合わせにより達成される。 This object is achieved by combinations described in the independent claims. また従属項は本発明の更なる有利な具体例を規定する。 The dependent claims define further advantageous specific examples of the present invention.

【0005】 [0005]

【課題を解決するための手段】即ち、本発明の形態によると、ハードウエア資源の使用状態を監視する負荷監視システムは、注文の受注に伴って生じるハードウエアのデータ処理量に関する情報を取得する取得部と、取得部が取得したデータ処理量に関する情報に基づいて、ハードウエア資源の使用状態を判断する判断部と、判断部が判断したハードウエア資源の使用状態をユーザに通知する通知部とを備える。 A resolution means for] That is, according to the embodiment of the present invention, the load monitoring system for monitoring the use state of the hardware resource, acquires information related to the data processing amount of hardware caused by the order of the order an acquisition unit, based on information about the amount of data processing acquisition unit has acquired, a determination unit for determining the state of use of hardware resources, a notification unit for notifying the use state of the hardware resources determining unit determines the user equipped with a.

【0006】取得部は、データ処理量に関する情報として、ハードウエアが処理すべきデータのデータ量を取得し、判断部は、データ量を処理してハードウエア資源の使用状態を判断してもよい。 [0006] acquiring unit, as the information about the amount of data processing, acquires the data amount of data hardware to process, decision unit processes the data amount may be determined using state of the hardware resources . 取得部は、データ処理量に関する情報と共に、データを処理した時刻を取得し、取得部が取得したデータ処理量に関する情報および時刻を用いて、データ処理量の経時変化を算出する算出部と、 Acquisition unit, along with information about the amount of data processing, acquires the time of processing the data, using information and time related to the data processing amount acquiring unit has acquired, and a calculation unit for calculating a temporal change of the amount of data processing,
判断部が判断した使用状態と、経時変化とに基づいて、 The use state determining unit determines, on the basis of the temporal change,
ハードウエア資源の未来の使用状態を推定する推定部とをさらに備え、通知部は、ハードウエア資源の使用状態として、推定部が推定した未来の使用状態を通知してもよい。 Further comprising an estimation unit that estimates a state of use of future hardware resources, notification unit as the state used in the hardware resources may be notified of the use state of the future estimator has estimated.

【0007】注文は、価格が変動する取引対象に対するものであり、取引対象の市況を取得する市況取得部と、 [0007] The order is for a transaction subject to price changes, and market conditions acquisition unit to acquire the object of trading market conditions,
判断部が判断した使用状態と、市況取得部が取得した市況とに基づいて、ハードウエア資源の未来の使用状態を推定する推定部とをさらに備え、通知部は、使用状態として、推定部が推定した未来の使用状態を通知してもよい。 The use state determining unit determines, based on the market conditions market acquiring unit has acquired, further comprising a an estimation unit that estimates a state of use of future hardware resources, notification unit, a use state, the estimation unit the use state of the estimated future may be notified.

【0008】通知部は、ユーザに使用状態を電子メールで通知してもよい。 [0008] The notification unit, the use state to the user may be notified by e-mail. 通知部は、電話を用いて、使用状態を示唆する情報をユーザに通知してもよい。 Notification unit uses a telephone, may notify the user of information suggesting use. 通知部は、 Notification unit,
ユーザに使用状態をファクシミリで通知してもよい。 Use the user state may be notified by facsimile to. 通知部は、ユーザが負荷監視システムに接続したときに、 Notification unit, when the user connects to the load monitoring system,
ユーザの端末を用いてユーザに使用状態を通知してもよい。 The user of the terminal may notify the use state to the user using. 通知部は、複数の通知手段の中から、ハードウエア資源の使用状態に応じて通知手段を選択する手段選択部を有し、通知部は、手段選択部が選択した通知手段を用いてユーザに通知してもよい。 Notification unit from the plurality of notifying means includes means selecting unit for selecting a notification means in accordance with the state of use of hardware resources, notification unit to the user using a notification means for means selecting unit selects it may be notified. 通知部は、ユーザに通知できる可能性が異なる複数の通知手段の中から、ハードウエア資源の使用状態および未来の使用状態の少なくとも一方に応じて通知手段を選択する手段選択部を有し、 Notification unit, from a plurality of notification means that may differ to be notified to the user, and means selecting unit for selecting a notification means in accordance with at least one of the use condition of the state and future hardware resources,
通知部は、手段選択部が選択した通知手段を用いてユーザに通知してもよい。 Notification unit may notify the user using a notification means for means selecting section has selected.

【0009】複数のユーザを使用状態に対応付けて格納する通知先格納部と、使用状態に応じて、通知部が通知する通知先としてユーザを選択する通知先選択部とをさらに備え、通知部は、選択部が選択したユーザに使用状態を通知してもよい。 [0009] and communication destination storage unit that stores in association with a plurality of users in use, depending on the use, further comprising a notification destination selector for selecting the user as the notification destination notifying unit notifies the notification section You may notify the use state to the user selection unit selects. 通知部が使用状態を通知するタイミングを、使用状態に対応付けて格納するタイミング格納部と使用状態に応じて、タイミング格納部からタイミングを選択するタイミング選択部とをさらに備え、通知部は、タイミング選択部が選択したタイミングで、使用状態を通知してもよい。 The timing of the notification unit notifies a use state, according to a use state and timing storage unit that stores in association with the use, further comprising a timing selector for selecting timing from the timing storage unit, a notification unit, a timing at the timing when the selection unit selects, it may notify the use state.

【0010】本発明の他の形態によると、ハードウエア資源の使用状態を監視する負荷監視方法は、注文の受注に伴って生じるハードウエアのデータ処理量に関する情報を取得し、取得したデータ処理量に関する情報に基づいて、ハードウエア資源の使用状態を判断し、判断したハードウエア資源の使用状態をユーザに通知する。 [0010] According to another aspect of the present invention, the load monitoring method for monitoring the use state of the hardware resources, obtains information about the data processing amount of hardware caused by the order of the order, the acquired data throughput based on the information about, it determines the usage of hardware resources, and notifies the state of use of the hardware resources determined by the user.

【0011】本発明の他の形態によると、システムがハードウエア資源の使用状態を監視する負荷監視方法は、 [0011] According to another aspect of the present invention, the load monitoring method system for monitoring the use state of the hardware resources,
注文の受注に伴って生じるハードウエアのデータ処理量に関する情報をシステムが取得する工程と、取得したデータ処理量に関する情報に基づいて、ハードウエア資源の使用状態をシステムが判断する工程と、判断したハードウエア資源の使用状態をシステムがユーザに通知する工程とを備える。 A step of the information about the amount of data processing hardware system acquires that occurs with the orders of the order, based on the acquired information on the amount of data processing, a step of the use state system determines the hardware resources, determines a use state of the hardware resource system and a step of notifying the user.

【0012】本発明の他の形態によると、システムのコンピュータでハードウエア資源の使用状態を監視するプログラムは、注文の受注に伴って生じるハードウエアのデータ処理量に関する情報を取得する取得モジュールと、取得モジュールが取得したデータ処理量に関する情報に基づいて、ハードウエア資源の使用状態を判断する判断モジュールと、判断モジュールが判断したハードウエア資源の使用状態をユーザに通知する通知モジュールとを備える。 According to another aspect of the present invention, a program for monitoring the use state of the hardware resources in the system of the computer includes an acquisition module for acquiring information about the amount of data processing hardware that occurs with the orders of the order, comprising acquisition module based on the information about the acquired data throughput, a determination module that determines a state of use of hardware resources, and a notification module for notifying the state of use of hardware resources determining module determines the user.

【0013】なお上記の発明の概要は、本発明の必要な特徴の全てを列挙したものではなく、これらの特徴群のサブコンビネーションも又発明となりうる。 [0013] The summary of the invention does not enumerate all the necessary features of the present invention may also be a sub-combination of these described features.

【0014】 [0014]

【発明の実施の形態】以下、発明の実施形態を通じて本発明を説明するが、実施形態はクレームにかかる発明を限定するものではなく、また実施形態の中で説明されている特徴の組み合わせの全てが発明の解決手段に必須であるとは限らない。 DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, the present invention will be described through embodiments of the invention, embodiments are not intended to limit the scope of the present invention, and all combinations of features described in the embodiments but not necessarily essential to the solving means of the invention.

【0015】図1は、負荷監視ユニット40を含む受注処理システムの概略を示す。 [0015] Figure 1 shows a schematic of the order processing system including a load monitoring unit 40. 受注処理システムは、注文受注ユニット10と、負荷監視ユニット40とを備える。 Order processing system includes an order order unit 10, a load monitoring unit 40. 注文受注ユニット10は、顧客から取引対象の注文を受け、注文に伴い発生した種々の処理を行う。 Order order unit 10, received an order from a customer of the transaction subject, it performs various types of processing that occurred due to the order. 本実施形態では、取引対象の一例として株等の有価証券について記載するが、取引対象は、食料品、日用品等であってもよい。 The present embodiment will be described securities Equity as an example of a transaction target, transactions subject may be a food, daily necessities and the like. 注文受注ユニット10が受ける注文の量は、市況と強い相関関係がある。 The amount of the order the order the order unit 10 is received by, market conditions and the strong correlation.

【0016】負荷監視ユニット40は、注文受注ユニット10のハードウエア資源の使用状態を監視する。 [0016] The load monitoring unit 40 monitors the state of use of the hardware resources of the order order unit 10. 負荷監視ユニット40は、負荷監視システムの一例である。 The load monitoring unit 40 is an example of a load monitoring system.
ハードウエア資源とは、例えば、受注処理を行う際に使用される、ハードディスク、メモリ、CPU、およびデータ伝送路等である。 The hardware resources, for example, used in carrying out the order processing, a hard disk, memory, CPU, and a data transmission path and the like. 負荷監視ユニット40は、例えば、専用線等により注文受注ユニット10に接続する。 The load monitoring unit 40, for example, connected to the order order unit 10 by a dedicated line or the like.
負荷監視ユニット40は、注文受注ユニット10に格納されたプログラム等であってもよい。 The load monitoring unit 40 may be a program and data stored in the order order unit 10.

【0017】負荷監視ユニット40は、さらに、ユーザのコンピュータ端末20、携帯電話25、ファクシミリ30等と接続できる。 The load monitoring unit 40 may further connect the user's computer terminal 20, mobile phone 25, a facsimile 30, or the like. すなわち、受注処理システムのシステムを管理する管理者は、コンピュータ端末20、携帯電話25、およびファクシミリ30を用いて、負荷管理ユニット40からハードウエア資源の使用状態に関する情報を取得する。 That is, administrators managing system of order processing system, the computer terminal 20, mobile phone 25, and by using a facsimile 30, to obtain information about the use status of the hardware resource from the load management unit 40.

【0018】負荷監視ユニット40は、さらにマーケット50と繋がっている。 The load monitoring unit 40 is further connected to the market 50. マーケット50とは、例えば、 The market 50, for example,
株式市場のことであり、負荷監視ユニット40は、マーケット50から市況に関する情報を取得する。 Is that of the stock market, the load monitoring unit 40, to obtain information about market conditions from the market 50. 市況とは、株式を含む取引対象の取引状況のことである。 The market conditions, is that the object of trading trading conditions, including the stock. 負荷監視ユニット40は、市況に関する情報として、例えば、株式の出来高、日経平均、TOPIX等に関する情報を取得する。 The load monitoring unit 40, as information about the market, for example, volume of shares, Nikkei acquires information on TOPIX like.

【0019】図2は、負荷監視ユニット40の機能ブロック図を示す。 [0019] Figure 2 shows a functional block diagram of a load monitoring unit 40. 負荷監視ユニット40は、取得部410 The load monitoring unit 40, acquisition unit 410
と、判断部420と、算出部430と、格納部440 If, a determination unit 420, a calculating unit 430, storage unit 440
と、市況取得部460と、推定部470と、通知先データベース480と、通知部490とを備える。 Comprising the, the market acquisition unit 460, an estimation unit 470, a notification destination database 480, a notification unit 490.

【0020】取得部410は、注文受注ユニット10から、注文の受注に伴って生じる注文受注ユニット10のデータ処理量に関する情報を取得し、判断部420と算出部430に出力する。 The acquisition unit 410, from the order order unit 10, acquires information about the data processing amount of the order order unit 10 that occurs with the orders of the order, and outputs a determination unit 420 to the calculation unit 430. 取得部410は、さらに、注文受注ユニット10がデータを処理する時刻をそのデータ処理量に対応付けて判断部420と算出部430に出力する。 Acquisition unit 410 further outputs the time at which the order order unit 10 to process the data to the calculation unit 430 and the determination unit 420 in association with the data processing amount. 取得部410が取得するデータ処理量に関する情報とは、データ量を示唆する情報であればよい。 The information on the amount of data processing acquisition unit 410 acquires may be an information suggesting the amount of data. 例えば、取得部410は、データ処理量に関する情報として、ハードディスクの空き容量、CPU利用率、LAN For example, the acquisition unit 410, as the information about the amount of data processing, hard disk space, CPU utilization, LAN
のトラフィック量等を取得してもよいし、受注した注文の件数、受注に伴い発生したトランザクションの数を取得してもよい。 Of from a traffic amount and the like may be obtained, it orders the number of orders, may acquire the number of transactions that have occurred with the order.

【0021】判断部420は、取得部410から受け取ったデータ処理量に関する情報に基づいて、注文受注ユニット10のハードウエア資源の使用状態を判断し、推定部470に出力する。 The determination unit 420, based on information about the data processing amount received from the acquisition unit 410 determines the usage of hardware resources of the order order unit 10, and outputs the estimation unit 470. すなわち、判断部420は、受け取った、ハードディスクの空き容量、CPU利用率、 That is, the determination unit 420, received, hard disk space, CPU utilization,
LANのトラフィック量等に基づいて、ハードウエア資源の使用状態を判断する。 Based on the LAN traffic amount and the like, to determine the state of use of hardware resources. また、取得部410から注文件数やトランザクションの数を受け取った場合、判断部420は、注文受注ユニット10で処理されている注文件数やトランザクションの数に基づいて、ハードディスクの空き容量、CPU利用率、LANのトラフィック量等を推定し、ハードウエア資源の使用状態を判断してもよい。 Further, when receiving the number of the number of orders and transactions from the acquisition unit 410, determination unit 420, based on the number of number of orders and transactions being processed by the order order unit 10, hard disk space, CPU utilization, It estimates the LAN traffic amount and the like, may be determined using state of the hardware resources. この場合、判断部420は、注文件数やトランザクションの数と、ハードディスクの空き容量、CPU利用率、およびLANのトラフィック量との相関関数を予め格納してもよい。 In this case, determination unit 420, the number of the number of orders and transactions hard disk space, CPU utilization, and a correlation function between the traffic volume of LAN may be stored in advance.

【0022】算出部430は、取得部410から受け取ったデータ処理量に関する情報および時刻を用いて、データ処理量の経時変化を算出し、格納部440と推定部470に出力する。 The calculation unit 430 uses the information and time related to the data processing amount received from the acquisition unit 410 calculates a temporal change of amount of data processing, and outputs to the storage unit 440 and the estimation unit 470. データ処理量の経時変化とは、時間に伴うデータ処理量の変化を示す情報のことであり、例えば、所定の時間間隔当たりのデータ増加率等である。 The time course of the amount of data processing is that information indicating a change in the amount of data processing with time, for example, a data rate of increase or the like per a predetermined time interval.

【0023】格納部440は、算出部430から、データ処理量、そのデータが処理された時刻、データ処理量の経時変化を受け取り、データ処理量およびデータ処理量の経時変化を時刻に対応付けて格納する。 The storage unit 440, the calculating unit 430, the data processing amount, time that the data has been processed, receives the time course of the data processing amount, in association with time changes in the data throughput and data processing amount at the time Store. また、格納部440は、推定部470が推定したハードウエア資源の未来の使用状態を、時刻に対応付けて格納してもよい。 The storage unit 440, a use state of future hardware resources estimator 470 estimates may be stored in association with time. 格納部440は、例えば、判断部420や推定部4 Storage unit 440, for example, determination section 420 and estimating section 4
70の処理が適当であったかどうかを後に検証するために、これらのデータを格納する。 To process the 70 verifies after whether there was adequate, it stores these data.

【0024】市況取得部460は、マーケット50から、市況に関する情報を取得し、推定部470に出力する。 The market conditions acquisition unit 460, from the market 50, to obtain information about market conditions, and outputs it to the estimation unit 470. 例えば、市況取得部460は、マーケット50から、株式の出来高と平均株価を取得し、推定部470に出力する。 For example, market acquisition unit 460 from the market 50, acquires the volume and average price of the shares, and outputs the estimation unit 470.

【0025】推定部470は、判断部420から受け取った現在の使用状態、算出部430から受け取ったデータ処理量の経時変化、および市況取得部460から受け取った市況に基づいて、ハードウエア資源の未来の使用状態を推定し、格納部440と通知部490に出力する。 The estimating unit 470, based on current usage state received from the determination unit 420, the data processing amount of change over time received from the calculation unit 430, and market conditions received from the market acquisition unit 460, future hardware resources It estimates the state of use of outputs and storing unit 440 to the notification unit 490. 例えば、推定部470は、株式市場の出来高が急増しつつある場合は、ハードウエア資源の未来の残量をさらに少なく見積もる。 For example, the estimation unit 470, if the volume of the stock market is rapidly increasing, estimate further reduce the remaining amount of the future of hardware resources. 推定部470は、未来の使用状態と共に、現在の使用状態を通知部490に出力してもよい。 Estimation unit 470, together with the future use, may output a current use state notifying unit 490.

【0026】通知先データベース480は、手段格納部482と、通知先格納部484と、タイミング格納部4 The notification destination database 480, a means storing unit 482, a communication destination storage unit 484, a timing storing unit 4
86とを有する。 And a 86. 手段格納部482は、複数の通知手段を、ハードウエア資源の使用状態に対応付けて格納する。 It means storing unit 482, a plurality of notifying means, stored in association with the state of use of hardware resources. 例えば、手段格納部482は、コンピュータ端末2 For example, unit storage unit 482, computer terminal 2
0へのポップアップ通知、コンピュータ端末20への電子メールによる通知、携帯電話25への電話による通知、携帯電話25への電子メールによる通知、およびファクシミリ30へのファクシミリ画像による通知を通知手段として、ハードウエア資源の残量に対応付けて格納する。 Pop-up notifications to 0, notification e-mail to the computer terminal 20, notification by telephone to the cellular phone 25, notification e-mail to the mobile phone 25, and the notification by facsimile image to facsimile 30 as the notification means, hard stored in association with the remaining amount of wear resource.

【0027】通知先格納部484は、複数のユーザを、 [0027] The notification destination storage unit 484, a plurality of users,
ハードウエア資源の使用状態に対応付けて格納する。 Stored in association with the state of use of hardware resources. すなわち、通知先格納部484は、複数のシステム管理者を、ハードウエア資源の使用状態に対応付けて格納する。 That is, communication destination storage unit 484, a plurality of system administrator, and stores in association with the state of use of hardware resources. 複数のユーザとは、例えば、注文受注ユニット10 And multiple users, for example, order the order unit 10
の稼働に対する責任が異なる複数のシステム管理者である。 It is responsible for operating a different system administrators. ハードウエア資源の使用状態には、例えば、「ハードウエア資源の残量が多い状態」と「ハードウエア資源の残量が少ない状態」とがある。 The use state of the hardware resources, for example, there is a "balance of hardware resources are often state" and the "remaining amount of hardware resources is less state". この場合、通知先格納部484は、「ハードウエア資源の残量が多い状態」に対応付けて、一人のシステム管理者を格納し、一方、 In this case, communication destination storage unit 484 in association with the "remaining amount of hardware resources are often state" stores one of the system administrator, whereas,
「ハードウエア資源の残量が少ない状態」に対応付けて、より経験が豊富で判断能力の高いシステム管理者を含むの複数のシステム管理者を格納する。 In association with the "remaining amount of hardware resources is less state" stores a plurality of system administrator containing the high system administrator more experienced rich and judgment ability.

【0028】タイミング格納部486は、使用状態を通知するタイミングを、使用状態に対応付けて格納する。 The timing storage unit 486, the timing for notifying the use state, and stores in association with the use state.
例えば、タイミング格納部486は、「ハードウエア資源の残量が多い状態」に対応付けて、緊急度の低い通知のタイミングとして「ユーザが負荷監視ユニット40に接続した時」を格納し、一方、「ハードウエア資源の残量が少ない状態」に対応付けて、より緊急度の高い通知のタイミングとして「ただちに」を格納する。 For example, the timing storage unit 486 stores in association with the "Hardware remaining many state of the resources", "when the user connects to the load monitoring unit 40" as the timing of the low urgency notification, whereas, in association with the "small remaining amount status of the hardware resources" stores "immediately" as the timing of the more urgent notifications. また、タイミング格納部486は、使用状態を通知するタイミングとして、ユーザに通知する頻度を使用状態に対応付けて格納してもよい。 The timing storage unit 486, as a timing for notifying the use state may be stored in association with the frequency to notify the user in use. 例えば、タイミング格納部486 For example, the timing storage unit 486
は、「ハードウエア資源の残量が多い状態」に対応付けて、ユーザに通知する頻度として「一回」を格納し、一方、「ハードウエア資源の残量が少ない状態」に対応付けて、「複数回」を格納する。 In association with the association with the "Hardware remaining many state of the resources", it stores the "single" as the frequency to notify the user, while the "remaining amount of hardware resources is less state", stores "multiple times".

【0029】通知部490は、推定部470から受け取った未来および現在の使用状態をユーザ、すなわち、注文受注ユニット10のシステム管理者に通知する。 The notification unit 490, a future received from estimator 470 and the current usage state the user, i.e., to notify the system administrator of the order order unit 10. 通知部490がユーザに通知する未来または現在の使用状態とは、ハードウエア資源の残量を示唆する情報であってもよい。 The future or current use state notification unit 490 notifies the user, or may be information suggesting the remaining amount of hardware resources. 例えば、通知部490は、ハードウエア資源の残量が少ないことを示す警告を警告音や警告画像等でユーザに通知してもよい。 For example, the notification unit 490 may notify the user with a warning sound or warning image like a warning that the remaining amount of hardware resources is small.

【0030】通知部490は、手段選択部492と、通知先選択部494と、タイミング選択部496とを有する。 The notifying unit 490 includes a unit selector 492, and the notification destination selection unit 494, and a timing selection section 496. 通知部490は、コンピュータ端末20の画面へのポップアップ通知、携帯電話25への電子メールによる通知、携帯電話25への電話による通知、およびファクシミリ30への通知等の複数の通知手段を有し、手段選択部492は、手段格納部482に格納された複数の通知手段の中から、推定部470から受け取ったハードウエア資源の使用状態に応じた通知手段を選択する。 Notification unit 490, a pop-up notification to the screen of the computer terminal 20 has an e-mail notification to a mobile phone 25, notification by telephone to the cellular phone 25, and a plurality of notifying means such as notification of the facsimile 30, means selecting unit 492, from among the plurality of notification means stored in the unit storage unit 482, selects a notification means corresponding to the state of use of hardware resources received from the estimating portion 470. コンピュータ端末20の画面へのポップアップ通知、携帯電話25への電子メールによる通知、携帯電話25への電話による通知、およびファクシミリ30への通知は、ユーザにその場で通知できる可能性が異なる。 Pop-up notifications on the screen of the computer terminal 20, e-mail notification to a mobile phone 25, notification by telephone to the cellular telephone 25, and notifies to the facsimile 30, the possibility of notification on the spot the user is different. また、手段選択部492は、一度に複数の通知手段を選択してもよい。 Further, it means selecting unit 492 may select a plurality of notifying means at a time. 複数の通知手段を選択した場合は、一つの通知手段を選択した場合よりも、ユーザに通知できる可能性が高い。 If you select multiple notification means, than when selecting one of the notification unit, it is likely to be notified to the user. 通知部490は、手段選択部492が選択した通知手段を用いてユーザに使用状態を通知する。 Notification unit 490 notifies the usage state to the user using a notification means for means selecting unit 492 has selected. 従って、通知部490は、ハードウエア資源の残量に関する緊急度に応じた通知手段で、ユーザに通知することができる。 Accordingly, the notification unit 490, the notification means in accordance with the urgency regarding the remaining amount of hardware resources, it is possible to notify the user.

【0031】通知先選択部494は、推定部470から受け取ったハードウエア資源の使用状態に応じて、通知部490が通知する通知先を選択する。 The notification destination selection unit 494, in accordance with the state of use of hardware resources received from the estimating unit 470 selects a notification destination notifying unit 490 notifies. すなわち、通知先選択部494は、通知先格納部484に格納された複数のユーザの中から、使用状態に応じたユーザを通知先として選択する。 That is, the notification destination selection unit 494, from among the plurality of users stored in the communication destination storage unit 484, selects the user corresponding to the use state as the notification destination. 通知先選択部494は、一度に複数のユーザを通知先として選択してもよい。 Notification destination selection unit 494 may select a plurality of users as a notification destination at a time. 通知部490 Notification section 490
は、通知先選択部494が選択したユーザの端末に、使用状態を通知する。 It is the user of the terminal the notification destination selection unit 494 selects and notifies the used state. 通知先選択部494は、例えば、ハードウエア資源の残量が多いとき、すなわち、緊急度の比較的低いときは、一人のシステム管理者のみを選択し、一方、ハードウエア資源の残量が少ないとき、すなわち、緊急度の高いときは、より経験豊富で判断能力の高いシステム管理者を選択する。 Notification destination selection unit 494, for example, when the remaining amount of hardware resources are often, that is, when the urgency of the relatively low, selects only one of the system administrator, while less remaining amount of hardware resources when, that is, when a high degree of urgency, to select a more experienced and highly judgment ability system administrator. 従って、通知部490 Therefore, the notification unit 490
は、緊急度に応じたユーザに通知することができる。 Is, it is possible to notify the user in accordance with the degree of urgency.

【0032】タイミング選択部496は、推定部470 The timing selection unit 496, the estimation unit 470
から受け取ったハードウエア資源の使用状態に応じて、 Depending on the state of use of hardware resources received from,
タイミング格納部486を用いてタイミングを選択する。 Selecting a timing using the timing storage unit 486. すなわち、タイミング選択部496は、使用状態に応じて、通知部490が使用状態をユーザに通知するタイミングを選択する。 That is, the timing selector 496 in accordance with the use state, to select the timing of the notification unit 490 notifies the usage state to the user. 通知部490は、タイミング選択部496が選択したタイミングで使用状態をユーザに通知する。 Notification unit 490 notifies the usage state to the user at the timing when the timing selection section 496 has selected. タイミング選択部496は、例えば、ハードウエア資源の残量が多いとき、すなわち、緊急度の比較的低いときは、ユーザが負荷監視ユニット40に接続した時を通知のタイミングとして選択し、一方、ハードウエア資源の残量が少ないとき、すなわち、緊急度の高くなったときは、ハードウエア資源の残量が少ないと推定部470が判断したすぐその時を通知のタイミングとして選択する。 Timing selection section 496, for example, when the remaining amount of hardware resources are often, that is, when the urgency of the relatively low, select the time the user connects to the load monitoring unit 40 as the timing of the notification, the other hand, hard when the remaining amount of wear resource is small, i.e., when the higher the degree of urgency, the estimation unit 470 remaining amount of hardware resources is less is selected as the timing of the notification when immediately determined. この場合、通知部490は、緊急度の低いときは、ユーザがコンピュータ端末20等を用いて負荷管理ユニット40に接続した時にコンピュータ端末20等に使用状態を表示させる。 In this case, the notification unit 490, when a low urgency, the user displays the used state to the computer terminal 20 or the like when connected to the load management unit 40 using the computer terminal 20 or the like. 一方、緊急度の高くなったとき、通知部490は、コンピュータ端末20等が他の処理を実行中であっても割り込みをして、ただちに、かつ、複数回、コンピュータ端末20等に使用状態を表示させる。 Meanwhile, when the high urgency, the notification unit 490, computer terminal 20 or the like by the interruption even executing another process, immediately and several times, the use state to the computer terminal 20 or the like to be displayed.

【0033】図3は、負荷監視ユニット40の処理のフローチャートを示す。 FIG. 3 shows a flowchart of processing load monitoring unit 40. 注文受注ユニット10は、顧客から株の注文を受ける。 Order order unit 10 receives the order of the stock from the customer. 受けた注文を処理する際には、注文受注ユニット10は、ハードウエア資源を用いて、データの処理を行う。 When processing orders received, the ordered orders unit 10 uses the hardware resources to process the data. 取得部410は、注文ユニット10 Acquisition unit 410, the order unit 10
が処理するデータのデータ処理量とデータを処理する時刻を取得し、判断部420と算出部430に出力する(S100)。 There obtains time to process the amount of data processing and data of the data to be processed, and outputs a determination unit 420 to the calculation unit 430 (S100). 判断部420は、受け取ったデータ処理量と時刻から、その時刻におけるハードウエア資源の現在の残量を判断し、推定部470に出力する(S11 Determination unit 420, the received data processing amount and time, to determine the current remaining amount of hardware resources at that time, and outputs the estimation unit 470 (S11
0)。 0). 算出部430は、受け取ったデータ量と時刻を用いて、データ量の経時変化を算出し、推定部470に出力する(S130)。 Calculating unit 430, using the received data amount and time to calculate the temporal change of the data amount, and outputs the estimation unit 470 (S130). 市況取得部460は、マーケット50から株式の出来高と日経平均を取得し、推定部47 Market conditions acquisition unit 460, to get the volume and the Nikkei average of the stock from the market 50, the estimation unit 47
0に出力する(S140)。 And outputs it to 0 (S140). 推定部470は、受け取った、現在の残量、データ処理量の経時変化、および市況に基づいて、ハードウエア資源の未来の残量を推定し、 Estimation unit 470, received, current remaining amount, time course of data throughput, and based on market conditions, to estimate the remaining amount of future hardware resources,
通知部490に出力する(S150)。 And it outputs the notification unit 490 (S150). 手段選択部49 It means selecting section 49
2は、受け取ったハードウエア資源の未来の残量に応じた通知手段を選択する(S160)。 2, selects a notification means corresponding to the remaining amount of future hardware resources received (S160). 通知先選択部49 Notification destination selection unit 49
4は、受け取ったハードウエア資源の未来の残量に応じた通知先を通知先格納部484の中から選択する(S1 4 selects a notification destination corresponding to the remaining amount of future hardware resources received from the communication destination storage unit 484 (S1
70)。 70). タイミング選択部496は、受け取ったハードウエア資源の未来の残量に応じたタイミングをタイミング格納部486の中から選択する(S180)。 The timing selector 496 selects the timing corresponding to the remaining amount of future hardware resources received from the timing storage unit 486 (S180). 通知部490は、受け取ったハードウエア資源の現在および未来の残量を、選択した通知手段を用いて、選択した通知先の端末に、選択したタイミングで通知する(S19 Notification unit 490, the remaining amount of the current and future hardware resources received, using the notification means selected, the selected notification destination terminal, notified by the timing selected (S19
0)。 0).

【0034】図4は、格納部440が格納するテーブルの一例を示す。 [0034] Figure 4 shows an example of a table storing portion 440 stores. 格納部440は、算出部430から受け取った、データ処理量、データ処理量の経時変化、および受注処理ユニット10がデータを処理した時刻を互いに対応付けて格納する。 Storage unit 440, received from the calculation unit 430, the data throughput, changes over time in the amount of data processing, and order fulfillment unit 10 stores in association with each other the time of processing the data. 本図の一例においては、格納部440は、データ処理量として受注件数を、データ量の経時変化として受注件数増加率を格納する。 In one example of this figure, the storage unit 440, the number of orders as a data processing amount, and stores the number of orders increase as aging of the data amount. このように、データ量は、実際に注文受注ユニット10が処理するデータ量そのものである必要はない。 Thus, the amount of data need not be data amount itself actually apply orders unit 10 is processed. すなわち、データ量は、データ量を示唆する情報であれはよく、注文受注ユニット10が実際に処理するデータ量と強い相関がある情報であることが望ましい。 That is, the data amount is often long in the information suggesting the amount of data, it is desirable that the information that the data amount and the strong correlation that order orders unit 10 is actually processed. また、格納部440が格納する時刻は、図4に例示したように、所定の時間幅を持った時間帯であってもよい。 The time of storage unit 440 stores, as illustrated in FIG. 4, may be a time zone having a predetermined time width.

【0035】図5は、通知先データベース480が格納するテーブルの一例を示す。 [0035] Figure 5 shows an example of a table notification destination database 480 stores. 通知先データベース480 Notification destination database 480
は、ハードウエア資源の使用状態、例えば、残リソースに対応付けて、通知先にする複数のユーザ、通知部49 The use state of the hardware resources, for example, in association with the remaining resource, a plurality of users in the notification destination, the notification unit 49
0が残リソースを通知するタイミング、通知部490が通知する通知手段を格納する。 0 stores timing notification means for notifying unit 490 notifies to notify the remaining resources. 通知部490は、ユーザに使用状態を、コンピュータ端末20にポップアップ表示して通知してもよいし、電子メールで通知してもよい。 Notification unit 490, a usage state to a user may be notified by displaying a pop-up on the computer terminal 20 may be notified by e-mail. また、通知部490は、電話を用いて通知してもよいし、ファクシミリで通知してもよい。 The notification unit 490 may notify via a telephone may be notified by the facsimile. 電話を用いて通知する場合、通知部490は、ユーザに、残リソースが少ないことを示唆する音声を送信してもよい。 To notify using a telephone, the notification unit 490, the user may send a voice suggesting that remaining resource is small.

【0036】図6は、推定部470が未来の使用状態を推定する決定表の一例を示す。 [0036] Figure 6 shows an example of a determination table estimating unit 470 estimates the state of use of the future. 図6(A)は、現在の使用状態とデータ処理量の経時変化に基づいて、未来の使用状態を推定する決定表の一例を示す。 6 (A) it is based on the temporal change of the current use state and data throughput, an example of a determination table for estimating the future use. 本図では、使用状態の一例として残リソースを、データ処理量の経時変化の一例としてデータ増加率を記載する。 In this figure, the remaining resource as an example of the use state, wherein the data rate of increase as an example of temporal changes in the data throughput. 推定部470 Estimation unit 470
は、残リソースとデータ増加率から、決定表に従い未来の残リソースを推定する。 From the remaining resources and data rate of increase, to estimate the future remaining resource according to the determined table. 図6(B)は、さらに市況に基づいて、未来の使用状態を推定する補正表の一例を示す。 FIG. 6 (B) and based on market conditions, an example of a correction table for estimating the future use. 本図では、市況の一例として出来高を記載する。 In this drawing, it describes volume as an example of a market. 市況として平均株価等を用いてもよい。 It may be used average share prices as market conditions. 推定部470は、 Estimation unit 470,
単位時間当たりの出来高の経時変化から、補正表に従い、補正量を決定する。 From volume changes over time per unit time, in accordance with the correction table, to determine the correction amount. 推定部470は、図6(B)で決定した補正量を用いて、図6(A)で推定した未来の残リソースを補正する。 Estimation unit 470, using a correction amount determined in FIG. 6 (B), corrects the remaining resources of future estimated in FIG. 6 (A).

【0037】図7は、負荷監視ユニット40のハードウエア構成の一例を示す。 FIG. 7 shows an example of a hardware configuration of the load monitoring unit 40. 上述した負荷監視ユニット40 Above the load monitoring unit 40
の諸機能は、CPU700と、ROM702、RAM7 The functions of, the CPU700, ROM702, RAM7
04、またはハードディスクドライブ710と、これらの格納装置に格納されたプログラムとの連携により実現される。 04 or a hard disk drive 710, and is realized in cooperation with programs stored in these storage devices.

【0038】プログラムは、取得モジュールと、判断モジュールと、格納モジュールと、通知先格納モジュールと、タイミング格納モジュールと、算出モジュールと、 The program includes an acquisition module, a determination module, a storage module, a communication destination storage module, a timing storage module, a calculation module,
市況取得モジュールと、推定モジュールと、通知モジュールと、手段選択モジュールと、通知先選択モジュールと、タイミング選択モジュールとを備える。 Comprising a market acquisition module, an estimation module, a notification module, a unit selection module, a notification destination selection module, and a timing selection module. 取得モジュール、判断モジュール、格納モジュール、通知先格納モジュール、タイミング格納モジュール、算出モジュール、市況取得モジュール、推定モジュール、通知モジュール、手段選択モジュール、通知先選択モジュール、およびタイミング選択モジュールは、それぞれ、取得部4 Acquisition module, judging module, a storage module, communication destination storage module, the timing storage module, calculation module, market acquisition module, estimating module, the notification module, means selection module, notification destination selection module, and the timing selection module, respectively, acquisition unit 4
10、判断部420、格納部440、通知先格納部48 10, decision unit 420, storage unit 440, communication destination storage unit 48
4、タイミング格納部486、算出部430、市況取得部460、推定部470、通知部490、手段選択部4 4, the timing storage unit 486, calculation unit 430, market conditions acquisition unit 460, estimation unit 470, the notification unit 490, unit selection section 4
92、通知先選択部494、およびタイミング選択部4 92, notification destination selection unit 494, and the timing selection section 4
96の機能を実現するプログラムである。 Is a program that implements the functions of the 96.

【0039】上記モジュールは、外部の記録媒体に格納されてもよい。 [0039] The module may be stored in an external recording medium. 記録媒体としては、フロッピー(登録商標)ディスク714、CD−ROM718の他にも、D As the recording medium, a floppy disk 714, in addition to the CD-ROM 718, D
VD等の光学記録媒体、MD等の磁気記録媒体、PD等の光磁気記録媒体、テープ媒体、磁気記録媒体、ICカードやミニチュアーカードなどの半導体メモリ等を用いることができる。 The optical recording medium of the VD and the like, a magnetic recording medium such as an MD, magneto-optical recording medium such as a PD, tape medium, a magnetic recording medium, semiconductor memory such as an IC card or a miniature card. また、専用通信ネットワークやインターネットに接続されたサーバシステムに設けたハードディスクまたはRAM等の格納装置を記録媒体として使用し、通信網を介してプログラムを負荷監視ユニット40 Also, a private communication network or storage device such as a hard disk or a RAM provided in a server system connected to the Internet may be used as a recording medium, a load monitoring unit programs via the communication network 40
に提供してもよい。 It may be provided to.

【0040】このような記録媒体は、負荷監視ユニット40を製造するためのみに使用されるものであり、そのような記録媒体の業としての製造および販売等が本出願に基づく特許権の侵害を構成することは明らかである。 [0040] Such recording medium is intended to be used only to produce the load monitoring unit 40, the infringement manufacture and sale of patent right based on the present application as the work of such a recording medium it is clear that configuration.

【0041】以上述べたように、受注処理システムに負荷監視ユニット40を設けることにより、受注処理件数の増大に起因する、注文受注ユニット10の応答の遅延、オーバーフローによるシステム停止等を未然に検知することができる。 [0041] As described above, by providing the load monitoring unit 40 to the order processing system, due to the increase of the order processing number, detects a delay in the response of the order order unit 10, a system stop due overflow in advance be able to. また、負荷監視ユニット40は、リアルタイム性の異なる複数の通知手段を備えることにより、緊急度に応じた通知手段で通知することができる。 The load monitoring unit 40 is provided with the plurality of notifying means of different real-time, can be notified by the notification means corresponding to the degree of urgency.

【0042】以上、本発明を実施の形態を用いて説明したが、本発明の技術的範囲は上記実施形態に記載の範囲には限定されない。 [0042] Although the present invention has been described with the embodiment, the technical scope of the present invention is not limited to the scope described in the above embodiment. 上記実施形態に、多様な変更または改良を加えることができる。 The above embodiment, it is possible to add various modifications or improvements. そのような変更または改良を加えた形態も本発明の技術的範囲に含まれ得ることが、特許請求の範囲の記載から明らかである。 It is apparent from the appended claims that embodiments with such modifications also belong to the technical scope of the present invention.

【0043】 [0043]

【発明の効果】上記説明から明らかなように、本発明によれば注文の受注に伴うデータのデータ量に基づいて、 As apparent from the above description, according to the present invention, based on the amount of data associated with orders for the order according to the present invention,
ハードウエア資源の使用状態を判断することができる。 It is possible to determine the state of use of hardware resources.

【図面の簡単な説明】 BRIEF DESCRIPTION OF THE DRAWINGS

【図1】負荷監視ユニット40を含む受注処理システムの概略を示す図である。 1 is a diagram showing an outline of the order processing system including a load monitoring unit 40.

【図2】負荷監視ユニット40の機能ブロック図である。 2 is a functional block diagram of a load monitoring unit 40.

【図3】負荷監視ユニット40の処理のフローチャートである。 3 is a flowchart of processing load monitoring unit 40.

【図4】格納部440が格納するテーブルの一例を示す図である。 [4] storing unit 440 is a diagram showing an example of a table to be stored.

【図5】通知先データベース480が格納するテーブルの一例を示す図である。 5 is a diagram showing an example of a table notification destination database 480 stores.

【図6】推定部470が未来の使用状態を推定する決定表の一例を示す図である。 [6] estimator 470 is a diagram showing an example of a determination table for estimating the state of use of the future.

【図7】負荷監視ユニット40のハードウエア構成の一例を示す図である。 7 is a diagram showing an example of a hardware configuration of the load monitoring unit 40.

【符号の説明】 DESCRIPTION OF SYMBOLS

10 注文受注ユニット 20 コンピュータ端末 25 携帯電話 30 ファクシミリ 40 負荷監視ユニット 50 マーケット 410 取得部 420 判断部 430 算出部 460 市況取得部 470 推定部 480 通知先データベース 484 通知先格納部 486 タイミング格納部 490 通知部 492 手段選択部 494 通知先選択部 496 タイミング選択部 700 CPU 702 ROM 704 RAM 10 Order Order unit 20 computer terminal 25 the mobile phone 30 fax 40 load monitoring unit 50 Market 410 acquiring unit 420 determination unit 430 calculating unit 460 market acquiring unit 470 estimation unit 480 notifies the destination database 484 communication destination storage unit 486 the timing storing unit 490 notifying unit 492 means selecting section 494 notification destination selecting unit 496 timing selection section 700 CPU 702 ROM 704 RAM

Claims (15)

    【特許請求の範囲】 [The claims]
  1. 【請求項1】 ハードウエア資源の使用状態を監視する負荷監視システムであって、 注文の受注に伴って生じる前記ハードウエアのデータ処理量に関する情報を取得する取得部と、 前記取得部が取得した前記データ処理量に関する情報に基づいて、前記ハードウエア資源の使用状態を判断する判断部と、 前記判断部が判断した前記ハードウエア資源の使用状態をユーザに通知する通知部とを備えることを特徴とする負荷監視システム。 1. A load monitoring system for monitoring the use state of the hardware resources, an acquisition unit that acquires information related to the data processing amount of the hardware caused by the order of the order, the acquisition unit has acquired characterized in that it comprises, based on the information about the amount of data processing, a determination unit for determining the use status of the hardware resources, and a notification unit for notifying the use state of the hardware resources the determining unit determines the user load monitoring system to be.
  2. 【請求項2】 前記取得部は、前記データ処理量に関する情報として、前記ハードウエアが処理すべきデータのデータ量を取得し、 前記判断部は、前記データ量を処理して前記ハードウエア資源の使用状態を判断することを特徴とする請求項1 Wherein said acquisition section, as information on the amount of data processing, acquires the amount of data to be processed the hardware, the determining unit, the hardware resources to process the data amount claim 1, characterized in that to determine the use states
    に記載の負荷監視システム。 Load monitoring system according to.
  3. 【請求項3】 前記取得部は、前記データ処理量に関する情報と共に、前記データを処理した時刻を取得し、 前記取得部が取得した前記データ処理量に関する情報および前記時刻を用いて、前記データ処理量の経時変化を算出する算出部と、 前記判断部が判断した前記使用状態と、前記経時変化とに基づいて、前記ハードウエア資源の未来の使用状態を推定する推定部とをさらに備え、 前記通知部は、前記ハードウエア資源の使用状態として、前記推定部が推定した前記未来の使用状態を通知することを特徴とする請求項1に記載の負荷監視システム。 Wherein the acquisition unit is configured with information about the amount of data processing, the data to get the time of processing the using the information and the time relating to the data processing amount acquired by the acquiring unit, said data processing a calculation unit for calculating the temporal change in the amount, the a use state in which the determination unit determines, on the basis of said temporal change, further comprising a an estimation unit that estimates a state of use of the future of the hardware resources, the notification unit load monitoring system of claim 1 wherein the use state of the hardware resources, which is characterized by notifying the use state of the future the estimator has estimated.
  4. 【請求項4】 前記注文は、価格が変動する取引対象に対するものであり、 前記取引対象の市況を取得する市況取得部と、 前記判断部が判断した前記使用状態と、前記市況取得部が取得した前記市況とに基づいて、前記ハードウエア資源の未来の使用状態を推定する推定部とをさらに備え、 前記通知部は、前記使用状態として、前記推定部が推定した前記未来の使用状態を通知することを特徴とする請求項1に記載の負荷監視システム。 Wherein said order is for transactions subject to variable prices, and market acquisition unit that acquires market of the transaction object, the a use state in which the determination unit has determined the market acquisition unit acquires based on the the said market, further comprising a an estimation unit that estimates a state of use of future hardware resources, wherein the notifying unit, as the use state, notifies the state of use of the future the estimator has estimated load monitoring system according to claim 1, characterized in that.
  5. 【請求項5】 前記通知部は、前記ユーザに前記使用状態を電子メールで通知することを特徴とする請求項1に記載の負荷監視システム。 Wherein said notification unit, the load monitoring system of claim 1, wherein the notifying the use state to the user by e-mail.
  6. 【請求項6】 前記通知部は、電話を用いて、前記使用状態を示唆する情報を前記ユーザに通知することを特徴とする請求項1に記載の負荷監視システム。 Wherein said notification unit, by using the telephone, the load monitoring system of claim 1, the information suggesting the use state and notifies the user.
  7. 【請求項7】 前記通知部は、前記ユーザに前記使用状態をファクシミリで通知することを特徴とする請求項1 Wherein said notification unit, according to claim 1, wherein the notifying the use state to the user by facsimile
    に記載の負荷監視システム。 Load monitoring system according to.
  8. 【請求項8】 前記通知部は、前記ユーザが前記負荷監視システムに接続したときに、前記ユーザの端末を用いて前記ユーザに前記使用状態を通知することを特徴とする請求項1に記載の負荷監視システム。 Wherein said notification unit, when the user connects to the load monitoring system of claim 1, wherein the notifying the use state to the user using the terminal of the user load monitoring system.
  9. 【請求項9】 前記通知部は、複数の通知手段の中から、前記ハードウエア資源の使用状態に応じて前記通知手段を選択する手段選択部を有し、 前記通知部は、前記手段選択部が選択した前記通知手段を用いて前記ユーザに通知することを特徴とする請求項1に記載の負荷監視システム。 Wherein said notification unit, from among a plurality of notifying means includes means selecting unit for selecting the notification means in accordance with the use state of the hardware resources, the notification unit, the unit selection unit load monitoring system according to claim 1, characterized in that it notifies the user but with the notification means selected.
  10. 【請求項10】 前記通知部は、前記ユーザに通知できる可能性が異なる複数の前記通知手段の中から、前記ハードウエア資源の前記使用状態および前記未来の使用状態の少なくとも一方に応じて前記通知手段を選択する手段選択部を有し、 前記通知部は、前記手段選択部が選択した前記通知手段を用いて前記ユーザに通知することを特徴とする請求項3または請求項4に記載の負荷監視システム。 Wherein said notification unit is configured from a plurality of said notification means that may differ to notify to the user, according to at least one of the use conditions of the use state and the future of the hardware resource notification and means selecting unit for selecting a unit, the notification unit load according to claim 3 or claim 4, characterized in that notifies the user by using the notification means said means selecting unit selects Monitoring system.
  11. 【請求項11】 複数の前記ユーザを前記使用状態に対応付けて格納する通知先格納部と、 前記使用状態に応じて、前記通知部が通知する通知先として前記ユーザを選択する通知先選択部と をさらに備え、 前記通知部は、前記選択部が選択した前記ユーザに前記使用状態を通知することを特徴とする請求項9または請求項10に記載の負荷監視システム。 11. A communication destination storage unit that stores in association with the plurality of the users to the use state, according to the use condition, the notification destination selection unit for selecting the user as the notification destination the notification unit notifies further comprising, said notification unit, load monitoring system according to claim 9 or claim 10, wherein the notifying the use state to the user that the selection unit selects and.
  12. 【請求項12】 前記通知部が前記使用状態を通知するタイミングを、前記使用状態に対応付けて格納するタイミング格納部と前記使用状態に応じて、前記タイミング格納部から前記タイミングを選択するタイミング選択部とをさらに備え、 前記通知部は、前記タイミング選択部が選択した前記タイミングで、前記使用状態を通知することを特徴とする請求項1に記載の負荷監視システム。 12. A timing at which the notification unit notifies the usage state, in accordance with the use state timing storage unit that stores in association with the use, timing selection for selecting the timing from the timing storage unit anda section, the notification section at the timing at which the timing selection section selects, load monitoring system according to claim 1, wherein the notifying the use state.
  13. 【請求項13】 ハードウエア資源の使用状態を監視する負荷監視方法であって、 注文の受注に伴って生じる前記ハードウエアのデータ処理量に関する情報を取得し、 取得した前記データ処理量に関する情報に基づいて、前記ハードウエア資源の使用状態を判断し、 判断した前記ハードウエア資源の使用状態をユーザに通知することを特徴とする負荷監視方法。 13. A load monitoring method for monitoring the state of use of hardware resources, obtains information about data throughput of the hardware caused by the order of the order, the obtained information about the data processing amount based on the load monitoring method said determining a use state of the hardware resources, and notifies the state of use of the hardware resources determined by the user.
  14. 【請求項14】 システムがハードウエア資源の使用状態を監視する負荷監視方法であって、 注文の受注に伴って生じる前記ハードウエアのデータ処理量に関する情報を前記システムが取得する工程と、 取得した前記データ処理量に関する情報に基づいて、前記ハードウエア資源の使用状態を前記システムが判断する工程と、 判断した前記ハードウエア資源の使用状態を前記システムがユーザに通知する工程とを備えることを特徴とする負荷監視方法。 14. A load monitoring method for a system to monitor the usage of hardware resources, a step of acquiring the information about the data processing amount of the hardware caused by the order of order the system was acquired characterized in that it comprises a step based on the information about the amount of data processing, a step of the use status of the hardware resources the system is determined, the state of use of the hardware resources determined is the system notifies the user load monitoring method to be.
  15. 【請求項15】 システムのコンピュータでハードウエア資源の使用状態を監視するプログラムであって、 注文の受注に伴って生じる前記ハードウエアのデータ処理量に関する情報を取得する取得モジュールと、 前記取得モジュールが取得した前記データ処理量に関する情報に基づいて、前記ハードウエア資源の使用状態を判断する判断モジュールと、 前記判断モジュールが判断した前記ハードウエア資源の使用状態をユーザに通知する通知モジュールとを備えることを特徴とするプログラム。 15. A program for monitoring the use state of the computer hardware resources of the system, an acquisition module for acquiring information related to the data processing amount of the hardware caused by the order of the order, said acquisition module based on the obtained information about the amount of data processing, comprise a determination module that determines a state of use of the hardware resources, and a notification module for notifying the use state of the hardware resources the determination module determines the user program characterized.
JP2001067397A 2001-03-09 2001-03-09 Load monitoring system Active JP4644377B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001067397A JP4644377B2 (en) 2001-03-09 2001-03-09 Load monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001067397A JP4644377B2 (en) 2001-03-09 2001-03-09 Load monitoring system

Publications (2)

Publication Number Publication Date
JP2002268920A true true JP2002268920A (en) 2002-09-20
JP4644377B2 JP4644377B2 (en) 2011-03-02

Family

ID=18925754

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001067397A Active JP4644377B2 (en) 2001-03-09 2001-03-09 Load monitoring system

Country Status (1)

Country Link
JP (1) JP4644377B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007122358A (en) * 2005-10-27 2007-05-17 Fujitsu Ltd Unexpected demand detection system and unexpected demand detection program
JP2008041100A (en) * 2006-08-07 2008-02-21 Internatl Business Mach Corp <Ibm> Method for balancing resource sharing and application latency within data processing system
JP2008158996A (en) * 2006-12-26 2008-07-10 Chugoku Electric Power Co Inc:The Information processor and information processing method
US8028051B2 (en) 2003-04-16 2011-09-27 Fujitsu Limited Apparatus for adjusting use resources of system and method thereof
WO2012070284A1 (en) * 2010-11-25 2012-05-31 株式会社日立製作所 Operation monitoring device, operation monitoring method, and operation monitoring program

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0512043A (en) * 1991-07-08 1993-01-22 Nec Corp Unix system resource monitor system
JPH1083382A (en) * 1996-09-09 1998-03-31 Toshiba Corp Decentralized system operation maintenance support device and operation maintenance supporting method
JPH113248A (en) * 1997-06-11 1999-01-06 Meidensha Corp Abnormality monitoring system
JP2000172620A (en) * 1998-12-07 2000-06-23 Nippon Telegr & Teleph Corp <Ntt> Method and system for controlling relay type application server load and storage medium with relay type application server load control program stored therein

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0512043A (en) * 1991-07-08 1993-01-22 Nec Corp Unix system resource monitor system
JPH1083382A (en) * 1996-09-09 1998-03-31 Toshiba Corp Decentralized system operation maintenance support device and operation maintenance supporting method
JPH113248A (en) * 1997-06-11 1999-01-06 Meidensha Corp Abnormality monitoring system
JP2000172620A (en) * 1998-12-07 2000-06-23 Nippon Telegr & Teleph Corp <Ntt> Method and system for controlling relay type application server load and storage medium with relay type application server load control program stored therein

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8028051B2 (en) 2003-04-16 2011-09-27 Fujitsu Limited Apparatus for adjusting use resources of system and method thereof
JP2007122358A (en) * 2005-10-27 2007-05-17 Fujitsu Ltd Unexpected demand detection system and unexpected demand detection program
JP2008041100A (en) * 2006-08-07 2008-02-21 Internatl Business Mach Corp <Ibm> Method for balancing resource sharing and application latency within data processing system
JP2008158996A (en) * 2006-12-26 2008-07-10 Chugoku Electric Power Co Inc:The Information processor and information processing method
WO2012070284A1 (en) * 2010-11-25 2012-05-31 株式会社日立製作所 Operation monitoring device, operation monitoring method, and operation monitoring program
JP2012113556A (en) * 2010-11-25 2012-06-14 Hitachi Ltd Operation monitoring device, operation monitoring method and operation monitoring program

Also Published As

Publication number Publication date Type
JP4644377B2 (en) 2011-03-02 grant

Similar Documents

Publication Publication Date Title
US6614903B1 (en) Methods and apparatus for service state-based processing of communications in a call center
US6317786B1 (en) Web service
US7107240B1 (en) Order centric tracking system and protocol for communications with handheld trading units
US7353466B2 (en) System and method for generating message notification objects on dynamically scaled timeline
US20080008309A1 (en) Method and apparatus for customer key routing
US20110167112A1 (en) Distributed data processing system
US7587510B1 (en) System and method for transferring data between a user space and a kernel space in a server associated with a distributed network environment
US20120136697A1 (en) Method and system for efficient deployment of web applications in a multi-datacenter system
US6651085B1 (en) Agent status viewing system and method
US20060104218A1 (en) System for analyzing quality of communication sections
US20080016018A1 (en) Crowd Determination
US6654804B1 (en) Method and apparatus for automatic dial-up dial-down web hosting
US20080154837A1 (en) Performance evaluating apparatus, performance evaluating method, and program
US20050132016A1 (en) Event notification based on subscriber profiles
US6272539B1 (en) Methods, systems and computer program products for determining and visually representing a user&#39;s overall network delay in collaborative applications
US20040128263A1 (en) Method for determining pricing
US20110295649A1 (en) Automatic churn prediction
US7085367B1 (en) Call duration alert
US20070027987A1 (en) Computer system polling
US6829583B1 (en) Method and apparatus to determine mean time to service
US20040243679A1 (en) Email management
US7953843B2 (en) System and method for evaluating a heterogeneous cluster for supporting expected workload in compliance with at least one service parameter
US20060265651A1 (en) System and method for display management based on user attention inputs
US20060059072A1 (en) Pattern matcher
US20070083650A1 (en) Prediction of service level compliance in it infrastructures

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080116

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20091216

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100622

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100818

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100907

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20101102

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20101130

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20101206

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131210

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250