JP2002129584A JP2000323613A JP2000323613A JP2002129584A JP 2002129584 A JP2002129584 A JP 2002129584A JP 2000323613 A JP2000323613 A JP 2000323613A JP 2000323613 A JP2000323613 A JP 2000323613A JP 2002129584 A JP2002129584 A JP 2002129584A
Authority
JP
Japan
Prior art keywords
foundation
ground
auxiliary
pile
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000323613A
Other languages
Japanese (ja)
Inventor
Katsuyuki Tamaoki
克之 玉置
Yutaka Katsura
豊 桂
Shin Uchiyama
伸 内山
Miharu Asaka
美治 浅香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP2000323613A priority Critical patent/JP2002129584A/en
Publication of JP2002129584A publication Critical patent/JP2002129584A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a foundation structure which can adopt a combined foundation structure so as to cope with a weak stratum even if the ground includes the weak stratum such as a liquidised stratum, a stratum having a fear of consolidation settlement, etc. SOLUTION: The foundation structure 10 of a building is such as the liquidised stratum, the stratum having a fear of consolidation settlement, etc., near the surface of the ground 7, an intermediate stratum 4 below the weak stratum 6, and a bearing stratum 3 below the intermediate layer 4. The foundation structure 10 is comprised of a direct foundation 11 which is set on the ground 7 and uses subgrade reaction, a plurality of pile foundations 12, 12, etc., which do not reach the bearing stratum 3 but reach the intermediate stratum 4, and are connected to the direct foundation 11, and auxiliary foundation bodies 13 which are positioned between the pile foundations 12 and connected to the direct foundation 11. The auxiliary foundation bodies 13 are arranged so as to reach the intermediate layer 4.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、地盤反力を利用す
る直接基礎と、杭による支持力を利用する杭基礎とを併
用してなる基礎構造に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a foundation structure using both a direct foundation utilizing a ground reaction force and a pile foundation utilizing a supporting force of a pile.

【0002】[0002]

【従来の技術】一般に建築物に採用される基礎構造とし
ては、建築物を多数の杭基礎で支持する杭基礎構造と、
建築物を地盤反力で支持する直接基礎構造とがある。な
お、杭基礎としては、打込み基礎、埋込み基礎、場所打
ちコンクリート杭基礎があり、直接基礎としては、フー
チング基礎やべた基礎、基礎スラブがある。
2. Description of the Related Art Generally, a foundation structure used for a building includes a pile foundation structure for supporting a building with a plurality of pile foundations,
There is a direct foundation structure that supports buildings with ground reaction. The pile foundation includes a driving foundation, an embedded foundation, and a cast-in-place concrete pile foundation, and the direct foundation includes a footing foundation, a solid foundation, and a foundation slab.

【0003】ところが、前記杭基礎を用いた基礎構造で
は、建築物の全重量を杭が支持することを前提に杭の本
数を算定するため、使用する杭の本数が非常に多くなっ
てしまい、その分工期がかかり、コストも高くなってし
まう。また、直接基礎による基礎構造では、地盤(地盤
反力)で建築物の全重量を支持するため、地盤の地耐力
が十分でない場合には採用することができない。
However, in the foundation structure using the pile foundation, since the number of piles is calculated on the assumption that the pile supports the entire weight of the building, the number of piles to be used becomes very large. It takes a lot of construction time and the cost increases. In addition, in a foundation structure based on a direct foundation, since the entire weight of the building is supported by the ground (ground reaction force), it cannot be adopted when the ground strength of the ground is not sufficient.

【0004】このように杭基礎構造にも直接基礎構造に
も短所があることから、これら短所を補うべく、例えば
図4(a)、(b)に示すように杭基礎1…と直接基礎
2とを併用する併用基礎(パイルドラフト)構造が提案
され、一部に実施されている。この図4(a)、(b)
に示した例では、図4(a)に示したように杭基礎1…
と基礎スラブからなる直接基礎2とが併用されることに
よって特に杭基礎1…の負担が軽減され、これにより杭
基礎1…が支持層(例えば、地盤の支持力を表すN値が
50に近い地盤)3にまで到達することなく、中間層4
にまでしか達しない状態で用いられるようになってい
る。
[0004] Since the pile foundation structure and the direct foundation structure have disadvantages as described above, in order to compensate for these disadvantages, for example, as shown in FIGS. A combined foundation (piled-raft) structure that uses both is proposed and partially implemented. FIGS. 4A and 4B
In the example shown in FIG. 4, as shown in FIG.
And the direct foundation 2 composed of a foundation slab are used in combination, thereby reducing the load on the pile foundations 1... In particular, so that the pile foundations 1. Without reaching the ground) 3
It is used in a state that only reaches to.

【0005】ここで、杭基礎1…は、通常図4(b)に
示すように、直接基礎2の底面においてほぼ均等に配置
されている。なお、中間層4は地盤表層部5と前記支持
層3との間に位置するもので、図4中にN値で示すよう
に、支持層3に比べその支持力が小さい地盤である。
[0005] Here, the pile foundations 1 are usually arranged almost uniformly on the bottom surface of the foundation 2 as shown in Fig. 4 (b). The intermediate layer 4 is located between the surface layer portion 5 of the ground and the support layer 3, and has a lower supporting force than the support layer 3, as indicated by an N value in FIG. 4.

【0006】[0006]

【発明が解決しようとする課題】しかしながら、このよ
うな杭基礎1…と直接基礎2とを併用した基礎構造にあ
っても以下に述べる不都合がある。例えば、液状化層や
圧密沈下の可能性のある地層などからなる軟弱層がある
地盤に、前記の併用基礎構造を採用した場合、特にこの
軟弱層が圧密沈下の可能性のある地層である場合には、
直接基礎(基礎スラブ)2が建築物や自身の荷重によっ
て過大に沈下してしまうことから、建築物の荷重をほと
んど杭基礎1…が負担することになり、併用基礎構造の
利点が失われてしまう。また、地震時に中間層4が液状
化してしまった場合にも、同様に杭基礎1…が全ての荷
重を負担することになり、やはり併用基礎構造の利点が
失われてしまう。
However, such a foundation structure using the pile foundations 1... And the direct foundation 2 together has the following disadvantages. For example, when the above-mentioned combined basic structure is adopted on the ground where there is a soft layer composed of a liquefied layer or a layer that is likely to consolidate and settle, particularly when the soft layer is a layer that is likely to consolidate and settle In
Since the foundation (foundation slab) 2 directly sinks excessively due to the building and its own load, the pile foundation 1 bears almost all the load of the building, and the advantage of the combined foundation structure is lost. I will. Also, if the intermediate layer 4 is liquefied during an earthquake, the pile foundations 1 will bear all the loads, and the advantage of the combined foundation structure will be lost.

【0007】したがって、地盤中に液状化層や圧密沈下
の可能性のある地層などからなる軟弱層がある場合に
は、併用基礎構造を採用するのが難しく、そのため杭基
礎構造を採用せざるをえないのが現状である。
Therefore, when there is a soft layer consisting of a liquefied layer or a consolidation-possible subsidence layer in the ground, it is difficult to adopt a combined foundation structure, so that a pile foundation structure has to be adopted. It is not possible at present.

【0008】本発明は前記事情に鑑みてなされたもの
で、その目的とするところは、地盤中に液状化層や圧密
沈下の可能性のある地層などからなる軟弱層がある場合
にも、これに対応して併用基礎構造を採用できるように
した、基礎構造を提供することにある。
The present invention has been made in view of the above-mentioned circumstances, and an object of the present invention is to provide a method for forming a liquefied layer or a soft layer having a possibility of consolidation settlement in the ground. An object of the present invention is to provide a basic structure that can adopt a combined basic structure in response to the above.

【0009】[0009]

【課題を解決するための手段】本発明の基礎構造では、
地盤表面側に液状化層や圧密沈下の可能性のある地層な
どからなる軟弱層があり、この軟弱層の下に中間層があ
り、この中間層の下に支持層がある地盤の上に構築され
る建築物の基礎構造であって、前記地盤上に設置された
地盤反力を利用する直接基礎と、前記支持層にまでは達
することなく前記中間層にまで達した状態で前記直接基
礎に設けられた複数本の杭基礎と、前記杭基礎間に位置
するようにして前記直接基礎に設けられた補助基礎体と
を備え、前記補助基礎体が、前記中間層にまで達した状
態に設けられていることを前記課題の解決手段とした。
According to the basic structure of the present invention,
On the ground surface side, there is a soft layer consisting of a liquefied layer or a layer that may consolidate, there is an intermediate layer under this soft layer, and a support layer under this intermediate layer is built on the ground The foundation structure of the building is to be a direct foundation utilizing the ground reaction force installed on the ground, and the direct foundation in the state reached to the intermediate layer without reaching the support layer It is provided with a plurality of provided pile foundations, and an auxiliary foundation body provided on the direct foundation so as to be located between the pile foundations, wherein the auxiliary foundation body is provided in a state reaching the intermediate layer. That is the solution to the above problem.

【0010】この基礎構造によれば、直接基礎と杭基礎
とからなる併用基礎において、前記杭基礎間に位置する
ようにして前記直接基礎に補助基礎体を設け、かつ該補
助基礎体を地盤の中間層にまで達した状態に設けたの
で、該補助基礎体によって直接基礎とこれの上の建築物
との荷重を中間層にまで伝達することが可能になり、こ
れにより直接基礎が建築物や自身の荷重によって過大に
沈下してしまうことが防止される。また、該補助基礎体
が地震時において水平力に対する抵抗体として作用する
ので、地震時に中間層が液状化してしまった場合にも、
杭基礎とともに補助基礎体が荷重を負担することによ
り、その安全性が確保される。
According to this foundation structure, in a combined foundation consisting of a direct foundation and a pile foundation, an auxiliary foundation is provided on the direct foundation so as to be located between the pile foundations, and the auxiliary foundation is attached to the ground. Since it was provided in the state where it reached the middle layer, it becomes possible to directly transmit the load of the foundation and the building on it to the middle layer by the auxiliary foundation, whereby the direct foundation Excessive sinking due to its own load is prevented. Further, since the auxiliary foundation acts as a resistance to horizontal force during an earthquake, even when the intermediate layer is liquefied during an earthquake,
By supporting the load with the auxiliary foundation together with the pile foundation, its safety is ensured.

【0011】[0011]

【発明の実施の形態】以下、本発明を詳しく説明する。
図1(a)、(b)は本発明の基礎構造の一実施形態例
を示す図であり、図1(a)、(b)中符号10は基礎
構造である。この基礎構造10は、地盤表層部5の下、
すなわち地盤表面側に液状化層や圧密沈下の可能性のあ
る地層などからなる軟弱層6があり、この軟弱層6の下
に中間層4があり、この中間層4の下に支持層3がある
地盤7の上に構築される、建築物(図示せず)を支持す
るためのものである。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below in detail.
FIGS. 1A and 1B are views showing an embodiment of a basic structure of the present invention, and reference numeral 10 in FIGS. 1A and 1B denotes a basic structure. This foundation structure 10 is located under the ground surface layer 5,
That is, there is a soft layer 6 composed of a liquefied layer or a layer that may be consolidated and settled on the ground surface side, an intermediate layer 4 is provided below the soft layer 6, and a support layer 3 is provided below the intermediate layer 4. It is for supporting a building (not shown) built on a certain ground 7.

【0012】すなわち、この基礎構造10は、前記地盤
7上に設置されてこの地盤の反力を利用する基礎スラブ
からなる直接基礎11と、この直接基礎11に設けられ
た複数本の杭基礎12…と、これら杭基礎12…間に位
置するようにして直接基礎11に設けられた補助基礎体
13とを備えて構成されたものである。
That is, the foundation structure 10 comprises a direct foundation 11 consisting of a foundation slab installed on the ground 7 and utilizing the reaction force of the ground, and a plurality of pile foundations 12 provided on the direct foundation 11. , And an auxiliary foundation 13 directly provided on the foundation 11 so as to be located between the pile foundations 12.

【0013】杭基礎12…は、直接基礎11が併用され
ていることにより、支持層3にまでは達することなく中
間層4にまで達した状態で直接基礎11に設けられたも
ので、打込み基礎や埋込み基礎、場所打ちコンクリート
杭基礎などによって形成されたものである。この杭基礎
12…は、図1(b)に示すように矩形状の直接基礎1
1の底面にほぼ均等に、すなわち本例では縦横に3本ず
つ計9本配置されている。なお、これら杭基礎12の直
接基礎11への接続については、各種の相互間結合部材
が用いられてこれらが接続され、その結合力によって相
互間の力の伝達がなされるようになっている。
The pile foundations 12 are provided directly on the foundation 11 in a state where the piles 12 reach the intermediate layer 4 without reaching the support layer 3 because the direct foundation 11 is also used. It is formed by a foundation, an embedded foundation, or a cast-in-place concrete pile foundation. This pile foundation 12 is a rectangular direct foundation 1 as shown in FIG.
In this example, nine pieces are arranged substantially evenly on the bottom surface of the first piece, that is, three pieces in the vertical and horizontal directions. In connection with the connection of the pile foundation 12 directly to the foundation 11, various interconnection members are used to connect the pile foundations 12, and the mutual transmission of the forces is performed by the coupling force.

【0014】前記補助基礎体13は、本例においては地
盤7を改良してなる地盤改良部によって形成されたもの
で、中間層4にまで達した状態に形成されたものであ
り、図1(b)に示したように直接基礎11の底面にお
いて杭基礎12…間に位置した状態(本例では縦横2本
ずつの計4本の杭基礎12…間に位置した状態)に配設
されたものである。
In the present embodiment, the auxiliary foundation 13 is formed by a ground improvement part obtained by improving the ground 7, and is formed so as to reach the intermediate layer 4, and FIG. As shown in b), it is disposed directly between the pile foundations 12 on the bottom surface of the foundation 11 (in this example, a state in which the pile foundations are arranged between four pile foundations 12 each of two rows and columns). Things.

【0015】すなわち、この補助基礎体13を構成する
地盤改良部は、直接基礎11の底面に接した状態で形成
されたもので、中間層4にまで達する深さに施工されて
なるものである。この地盤改良部の施工方法としては、
例えば(深層)セメント系混合固化工法が採用される。
That is, the ground improvement portion constituting the auxiliary foundation 13 is formed in a state of directly contacting the bottom surface of the foundation 11 and is constructed at a depth reaching the intermediate layer 4. . As a construction method of this ground improvement part,
For example, a (deep) cement-based mixed solidification method is employed.

【0016】この工法は、セメントや石灰などのスラリ
ー状にしたセメント系固化材による安定剤と、自然状態
にある現地の地盤7の土とを攪拌装置を有した機械を用
いて原位置で攪拌混合し、柱状となるように化学的に固
化させて改良コラムを形成するもので、この柱状体(改
良コラム)を複数連続させるソイルセメント固化工法と
称されるものである。
According to this method, a stabilizing agent made of a cement-based solidifying material in the form of a slurry such as cement or lime and the soil of the ground 7 in the natural state are stirred in situ using a machine having a stirring device. The improved column is formed by mixing and chemically solidifying into a columnar shape to form an improved column. This is called a soil cement solidification method in which a plurality of the columnar bodies (improved columns) are continuously formed.

【0017】なお、このようにして形成された地盤改良
部からなる補助基礎体13は、基本的にはコンクリート
製の直接基礎11と地盤改良部とが異質体であることに
より、両者間の摩擦抵抗を利用することによって直接基
礎11との間で力を伝達するようになっている。しかし
ながら、地震発生時には剪断力(水平力)が非常に大き
くなることが予想されるため、前記摩擦抵抗力に加えて
各種の相互間結合部材による結合力を利用して、補助基
礎体13と直接基礎11との間の力の伝達をなすように
するのが好ましい。
The auxiliary foundation 13 composed of the ground improvement part formed in this way is basically different from the concrete direct foundation 11 and the ground improvement part. By utilizing the resistance, the force is directly transmitted to the foundation 11. However, when an earthquake occurs, the shearing force (horizontal force) is expected to be very large. Therefore, in addition to the frictional resistance, the auxiliary foundation 13 is directly connected to the auxiliary base 13 using the coupling force of various interconnection members. Preferably, a force transmission with the foundation 11 is provided.

【0018】このような補助基礎体13…を設けた本例
の基礎構造10にあっては、基礎スラブからなる直接基
礎11とこれの上の建築物の荷重を、該補助基礎体13
…によって軟弱層6の下の中間層4にまで伝達すること
ができ、これにより直接基礎11が建築物や自身の荷重
によって過大に沈下してしまうことを防止することがで
きる。
In the foundation structure 10 of the present embodiment provided with such auxiliary foundations 13, the load of the direct foundation 11 composed of the foundation slab and the building thereon is transferred to the auxiliary foundation 13.
.. Can be transmitted to the intermediate layer 4 below the soft layer 6, thereby preventing the foundation 11 from sinking excessively due to the building or its own load.

【0019】また、図2に示すように、地震時に中間層
4が液状化することなどによって直接基礎11が水平力
に対する抵抗体として作用しなくなっても、該補助基礎
体13…が水平力に対する抵抗体として作用するように
なり、これにより杭基礎12とともに荷重を負担するよ
うになることから、地震時にもその安全性を十分に確保
することができる。
As shown in FIG. 2, even when the intermediate layer 4 liquefies during an earthquake and the direct foundation 11 no longer acts as a resistance to the horizontal force, the auxiliary foundations 13. Since it acts as a resistor and bears a load together with the pile foundation 12, its safety can be sufficiently ensured even during an earthquake.

【0020】図3(a)、(b)は本発明の基礎構造の
他の実施形態例を示す図であり、図3(a)、(b)中
符号20は基礎構造である。この基礎構造20が図1
(a)、(b)に示した基礎構造10と異なるところ
は、補助基礎体を、地盤7を改良してなる地盤改良部に
代えて、杭基礎12より短い補助杭によって形成した点
である。
FIGS. 3A and 3B show another embodiment of the basic structure of the present invention. In FIGS. 3A and 3B, reference numeral 20 denotes the basic structure. This basic structure 20 is shown in FIG.
The difference from the foundation structure 10 shown in (a) and (b) is that the auxiliary foundation is formed by an auxiliary pile shorter than the pile foundation 12 instead of the ground improvement part obtained by improving the ground 7. .

【0021】すなわち、本例における補助基礎体21
は、図3(a)に示したように補助杭によって形成され
たもので、前記基礎構造10の場合と同様に中間層4に
まで達した状態に形成されたものである。また、このよ
うな補助杭からなる補助基礎体21は、図3(b)に示
したように直接基礎11の底面において、杭基礎12…
間に位置した状態(本例では縦横2本ずつの計4本の杭
基礎12…間に2本ずつ位置した状態)に配設されたも
のである。なお、これら補助基礎体21の直接基礎11
への接続は、単に相互の間の摩擦力によってもよいもの
の、各種の相互間結合部材を用いてこれらを接続し、そ
の結合力を利用して相互間の力の伝達をなすようにする
のが好ましい。
That is, the auxiliary base body 21 in this embodiment
Is formed by the auxiliary pile as shown in FIG. 3A, and is formed to reach the intermediate layer 4 as in the case of the foundation structure 10. In addition, as shown in FIG. 3 (b), the auxiliary foundation 21 composed of such an auxiliary pile is directly provided on the bottom of the foundation 11 in the pile foundation 12.
It is arranged in a state located between the two (in this example, two piles 12 each in a row and two rows in total). The direct foundation 11 of these auxiliary foundations 21
Although the connection to the connection may be based solely on the frictional force between each other, it is necessary to connect them using various types of connecting members and to use the connecting force to transmit the force between each other. Is preferred.

【0022】このような補助基礎体21…を設けた本例
の基礎構造20にあっても、直接基礎11とこれの上の
建築物の荷重を該補助基礎体21…によって軟弱層6の
下の中間層4にまで伝達することができ、これにより直
接基礎11が建築物や自身の荷重によって過大に沈下し
てしまうことを防止することができる。
Even in the foundation structure 20 of this embodiment provided with such auxiliary foundations 21, the load of the foundation 11 and the building thereon is directly applied to the lower part of the soft layer 6 by the auxiliary foundations 21. Can be transmitted to the intermediate layer 4, whereby it is possible to prevent the foundation 11 from sinking excessively due to the building or its own load.

【0023】また、地震時に中間層4が液状化すること
などによって直接基礎11が水平力に対する抵抗体とし
て作用しなくなっても、該補助基礎体21…が水平力に
対する抵抗体として作用するようになり、これにより杭
基礎12とともに荷重を負担するようになることから、
地震時にもその安全性を十分に確保することができる。
Also, even if the intermediate layer 4 liquefies during an earthquake and the like, the direct foundation 11 no longer acts as a resistance to horizontal forces, the auxiliary foundations 21... Act as resistance to horizontal forces. Because this will bear the load together with the pile foundation 12,
Even in the event of an earthquake, its safety can be sufficiently ensured.

【0024】なお、前記実施形態例では、直接基礎11
として基礎スラブを用いたが、本発明はこれに限定され
ることなく、他に例えばフーチング基礎やべた基礎を用
いることもできる。
In the above embodiment, the direct foundation 11
However, the present invention is not limited to this, and for example, a footing foundation or a solid foundation can be used.

【0025】[0025]

【発明の効果】以上説明したように本発明における基礎
構造は、直接基礎と杭基礎とからなる併用基礎におい
て、前記杭基礎間に位置するようにして前記直接基礎に
補助基礎体を設け、かつ該補助基礎体を地盤の中間層に
まで達した状態に設けたものであるから、該補助基礎体
によって直接基礎とこれの上の建築物の荷重を中間層に
まで伝達することができ、これにより直接基礎が建築物
や自身の荷重によって過大に沈下してしまうことを防止
することができる。
As described above, in the foundation structure according to the present invention, in a combined foundation consisting of a direct foundation and a pile foundation, an auxiliary foundation is provided on the direct foundation so as to be located between the pile foundations; Since the auxiliary foundation is provided so as to reach the intermediate layer of the ground, the load of the foundation and the building thereon can be directly transmitted to the intermediate layer by the auxiliary foundation. Thereby, it is possible to prevent the foundation from directly sinking excessively due to the building or its own load.

【0026】また、地震時に中間層が液状化することな
どによって直接基礎が水平力に対する抵抗体として作用
しなくなっても、補助基礎体が水平力に対する抵抗体と
して作用することにより、これが杭基礎とともに荷重を
負担するようになり、したがって地震時にもその安全性
を十分に確保することができる。よって、補助基礎体の
水平抵抗を考慮することにより、地震時における杭基礎
の水平力に対する設計を容易にすることができる。
Also, even if the intermediate layer liquefies during an earthquake, the foundation does not directly act as a resistance to horizontal force, but the auxiliary foundation acts as a resistance to horizontal force, and this works together with the pile foundation. Since the vehicle bears the load, its safety can be sufficiently ensured even in the event of an earthquake. Therefore, by considering the horizontal resistance of the auxiliary foundation, design for the horizontal force of the pile foundation during an earthquake can be facilitated.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 (a)、(b)は本発明の基礎構造の一実施
形態例の概略構成を示す図であり、(a)は基礎構造の
側断面図、(b)は直接基礎の底面での、杭基礎と補所
基礎との間の接合状態を説明するための図である。
FIGS. 1A and 1B are diagrams showing a schematic configuration of an embodiment of a basic structure of the present invention, wherein FIG. 1A is a side sectional view of the basic structure, and FIG. It is a figure for demonstrating the joining state between a pile foundation and a substation foundation in FIG.

【図2】 図1に示した基礎構造の作用を説明するため
の図である。
FIG. 2 is a diagram for explaining the operation of the basic structure shown in FIG.

【図3】 (a)、(b)は本発明の基礎構造の他の実
施形態例の概略構成を示す図であり、(a)は基礎構造
の側断面図、(b)は直接基礎の底面での、杭基礎と補
所基礎との間の接合状態を説明するための図である。
3A and 3B are diagrams showing a schematic configuration of another embodiment of the basic structure of the present invention, wherein FIG. 3A is a side sectional view of the basic structure, and FIG. It is a figure for explaining the joining state between the pile foundation and the substation foundation at the bottom.

【図4】 (a)、(b)は従来の基礎構造の一例の概
略構成を示す図であり、(a)は基礎構造の側断面図、
(b)は直接基礎の底面での、杭基礎と補所基礎との間
の接合状態を説明するための図である。
4A and 4B are diagrams showing a schematic configuration of an example of a conventional basic structure, FIG. 4A is a side sectional view of the basic structure,
(B) is a figure for demonstrating the joining state between the pile foundation and the substation foundation on the bottom surface of a direct foundation.

【符号の説明】[Explanation of symbols]

3…支持層、4…中間層、5…地盤表層部、6…軟弱
層、7…地盤、10、20…基礎構造、11…直接基
礎、12…杭基礎、13、21…補助基礎体
DESCRIPTION OF SYMBOLS 3 ... Support layer, 4 ... Intermediate layer, 5 ... Soil surface layer, 6 ... Soft layer, 7 ... Soil, 10, 20 ... Foundation structure, 11 ... Direct foundation, 12 ... Pile foundation, 13, 21 ... Auxiliary foundation

───────────────────────────────────────────────────── フロントページの続き (72)発明者 内山 伸 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 (72)発明者 浅香 美治 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 Fターム(参考) 2D046 CA01 DA11  ────────────────────────────────────────────────── ─── Continuing on the front page (72) Inventor Shin Uchiyama 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation (72) Inventor Miharu Asaka 2-3-2 Shibaura, Minato-ku, Tokyo Shimizu Construction Co., Ltd. F-term (reference) 2D046 CA01 DA11

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 地盤表面側に液状化層や圧密沈下の可能
性のある地層などからなる軟弱層があり、この軟弱層の
下に中間層があり、この中間層の下に支持層がある地盤
の上に構築される建築物の基礎構造であって、 前記地盤上に設置された地盤反力を利用する直接基礎
と、 前記支持層にまでは達することなく前記中間層にまで達
した状態で前記直接基礎に設けられた複数本の杭基礎
と、 前記杭基礎間に位置するようにして前記直接基礎に設け
られた補助基礎体とを備え、 前記補助基礎体が、前記中間層にまで達した状態に設け
られていることを特徴とする基礎構造。
1. A soft layer composed of a liquefied layer or a consolidation-possible subsidence layer on the ground surface side, an intermediate layer below this soft layer, and a support layer below this intermediate layer. A foundation structure of a building constructed on the ground, a state in which a direct foundation utilizing a ground reaction force installed on the ground and the intermediate layer are reached without reaching the support layer. A plurality of pile foundations provided on the direct foundation, and an auxiliary foundation body provided on the direct foundation so as to be located between the pile foundations, wherein the auxiliary foundation body extends to the intermediate layer. Basic structure characterized by being provided in the state where it reached.
【請求項2】 前記直接基礎が基礎スラブであり、前記
補助基礎体が、前記杭基礎より短い補助杭かあるいは地
盤を改良してなる地盤改良部であることを特徴とする請
求項1記載の基礎構造。
2. The method according to claim 1, wherein the direct foundation is a foundation slab, and the auxiliary foundation is an auxiliary pile shorter than the pile foundation or a ground improvement part obtained by improving the ground. Foundation structure.
JP2000323613A 2000-10-24 2000-10-24 Foundation structure Pending JP2002129584A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000323613A JP2002129584A (en) 2000-10-24 2000-10-24 Foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000323613A JP2002129584A (en) 2000-10-24 2000-10-24 Foundation structure

Publications (1)

Publication Number Publication Date
JP2002129584A true JP2002129584A (en) 2002-05-09

Family

ID=18801257

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000323613A Pending JP2002129584A (en) 2000-10-24 2000-10-24 Foundation structure

Country Status (1)

Country Link
JP (1) JP2002129584A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005307594A (en) * 2004-04-22 2005-11-04 Shimizu Corp Basic structure of construction
JP2006037633A (en) * 2004-07-29 2006-02-09 Taisei Corp Foundation structure and construction method thereof
JP2006077447A (en) * 2004-09-09 2006-03-23 Taisei Corp Foundation structure of construction
JP2007063915A (en) * 2005-09-01 2007-03-15 Sekkeishitsu Soil:Kk Foundation structure of small-scale building
JP2007113270A (en) * 2005-10-20 2007-05-10 Nippon Steel Corp Foundation structure and construction method of the foundation structure
JP2007262813A (en) * 2006-03-29 2007-10-11 Toda Constr Co Ltd Construction method for foundation for soil improvement and reduction in ground subsidence
JP2008297802A (en) * 2007-05-31 2008-12-11 Shimizu Corp Settlement suppressing structure of structures
JP2009150075A (en) * 2007-12-19 2009-07-09 Shimizu Corp Structure for preventing subsidence of structure
JP2010209605A (en) * 2009-03-11 2010-09-24 Takenaka Komuten Co Ltd Piled-raft foundation
CN106049196A (en) * 2016-06-08 2016-10-26 杭州江润科技有限公司 Construction method of ballastless track subgrade with combined flexible piles and pile rafts at same fracture surfaces

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005307594A (en) * 2004-04-22 2005-11-04 Shimizu Corp Basic structure of construction
JP2006037633A (en) * 2004-07-29 2006-02-09 Taisei Corp Foundation structure and construction method thereof
JP2006077447A (en) * 2004-09-09 2006-03-23 Taisei Corp Foundation structure of construction
JP2007063915A (en) * 2005-09-01 2007-03-15 Sekkeishitsu Soil:Kk Foundation structure of small-scale building
JP2007113270A (en) * 2005-10-20 2007-05-10 Nippon Steel Corp Foundation structure and construction method of the foundation structure
JP4713297B2 (en) * 2005-10-20 2011-06-29 新日本製鐵株式会社 Foundation structure and construction method of foundation structure
JP2007262813A (en) * 2006-03-29 2007-10-11 Toda Constr Co Ltd Construction method for foundation for soil improvement and reduction in ground subsidence
JP2008297802A (en) * 2007-05-31 2008-12-11 Shimizu Corp Settlement suppressing structure of structures
JP2009150075A (en) * 2007-12-19 2009-07-09 Shimizu Corp Structure for preventing subsidence of structure
JP2010209605A (en) * 2009-03-11 2010-09-24 Takenaka Komuten Co Ltd Piled-raft foundation
CN106049196A (en) * 2016-06-08 2016-10-26 杭州江润科技有限公司 Construction method of ballastless track subgrade with combined flexible piles and pile rafts at same fracture surfaces
CN106049196B (en) * 2016-06-08 2018-04-06 杭州江润科技有限公司 Flexible pile combines ballastless track roadbed construction method with stake raft with section

Similar Documents

Publication Publication Date Title
JP2002129584A (en) Foundation structure
JP2645899B2 (en) High horizontal strength foundation method using solidification method
CN110904992B (en) Elevator foundation member for integrally assembling elevator and construction method thereof
JPH11256563A (en) Soil improvement foundation construction method in soft foundation
Collin et al. Geosynthetic reinforced column support embankment design guidelines
Bakr The Impact of the unsupported excavation on the boundary of the active zone in medium, stiff and very stiff clay
JP2002146809A (en) Construction method for structure
JP3401567B2 (en) Direct foundation method
JP3230448B2 (en) Construction method of building foundation on cohesive ground
JP2020090793A (en) Foundation structure of building
JPH0949239A (en) Foundation structure coping with liquefaction
JP3881916B2 (en) Method for reducing settlement of soft ground
JP2003155756A (en) Footing pile construction method and footing pile constructed by the method
JP2601702B2 (en) Soft ground improvement method
JPH06220856A (en) Structure for anchor-reinforced clayey wall
JP4621389B2 (en) Building basic structure
JP4189078B2 (en) Construction method of underground structure in liquefied ground
JP3155456B2 (en) Pile structure to be joined to floor slab connected to foam resin material, and construction method of pile structure
JPH1161849A (en) Base isolation structure foundation on soft ground
JP2009133162A (en) Unequal settling prevention structure of building in soft ground
JPH07279184A (en) Floating underground beam foundation for building
JP3378932B2 (en) Underground structure of a building without internal columns below the basement floor and its construction method
JPH0726569A (en) Pile foundation construction method for structure exposed to partial earth pressure
JP2001254369A (en) Highly earthquake-resistant foundation
JPH10131209A (en) Construction method for preventing displacement of earth structure caused by liquefied ground

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050131

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050215

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050413

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050607