Info

Publication number
JP2000078748A
JP2000078748A JP24819198A JP24819198A JP2000078748A JP 2000078748 A JP2000078748 A JP 2000078748A JP 24819198 A JP24819198 A JP 24819198A JP 24819198 A JP24819198 A JP 24819198A JP 2000078748 A JP2000078748 A JP 2000078748A
Authority
JP
Japan
Prior art keywords
power
operation
limit value
means
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP24819198A
Other languages
Japanese (ja)
Inventor
Masahiro Inoue
Yoshiaki Ito
雅裕 井上
善朗 伊藤
Original Assignee
Mitsubishi Electric Corp
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp, 三菱電機株式会社 filed Critical Mitsubishi Electric Corp
Priority to JP24819198A priority Critical patent/JP2000078748A/en
Publication of JP2000078748A publication Critical patent/JP2000078748A/en
Application status is Pending legal-status Critical

Links

Abstract

PROBLEM TO BE SOLVED: To obtain a power DSM system being requested peak power reduction from a power company in which an appropriate incentive is paid to a consumer cooperated for peak power reduction at the sacrifice of comfortableness, convenience and the like. SOLUTION: The a power DSM system comprises means 13b for determining a power limit value of a consumer unit 13 connected through a communication line with a center terminal 15 (or a WHM 11) of power company when power reduction is requested, and means 13c for controlling the load of consumer according to the limit value wherein an appropriate incentive can be obtained at the center terminal (or a WHM 11) by informing the limit value thereto. Furthermore, the consumer unit 13 is provided with a pattern operation memory means in order to perform load control automatically to a consumer cooperated for power reduction.

Description

【発明の詳細な説明】 DETAILED DESCRIPTION OF THE INVENTION

【0001】 [0001]

【発明の属する技術分野】この発明は、電力会社の負荷平準化策として実施される電力DSM(Demand Side Ma BACKGROUND OF THE INVENTION The present invention, power DSM (Demand Side Ma implemented as a load leveling measures power companies
nagement)に関するものであり、特に負荷制御と、負荷削減に対するインセンティブとを適切に実施する電力D Nagement) relates, in particular, a load control, to properly implement the incentives to load reduction power D
SMシステムに関するものである。 It relates to SM system.

【0002】 [0002]

【従来の技術】図6は例えば、特開平6−197450 BACKGROUND ART FIG. 6, for example, JP-A-6-197450
号公報に示された従来のデマンド制御システムである。 No. a conventional demand control system shown in Japanese.
従来のデマンド制御システムは、需要家と、電力会社との間に設定された契約電力を基準として目標電力を決定してこれを需要家装置に設定し、需要家内の消費電力がこの設定値を超過する恐れのある場合は、需要家内の機器を、あらかじめ需要家装置に設定してある優先順位に従って超過を回避するよう制御するものである。 Conventional demand control system, a customer, it determines the target power based on the contract power set between the power company and set the consumer device, the power consumption demand my wife this setting when it is likely to be exceeded, the equipment demand wife, and controls to avoid excess according to the priority that is set in advance the consumer device.

【0003】図6において、1は需要家装置、2は電力線、3は負荷群(L1〜L3:各機器)、4は電力モニタ部、5は判定部、6は設定部、7は優先順位設定手段、8は目標電力値設定手段、9は領域設定手段、10 [0003] In FIG. 6, 1 is the consumer device, 2 a power line, 3 load group (L1 to L3: each device), 4 a power monitor, 5 determination unit, 6 setting unit, priority 7 setting means, target power value setting means 8, the area setting means 9, 10
は制御信号出力部であり、上記優先順位設定手段7には、図7に示す如く、需要家内負荷群の各機器の優先順位が設定されている。 Is a control signal output section, the said priority setting means 7, as shown in FIG. 7, the priority of each device demand cottage load groups are set.

【0004】次に動作について説明する。 [0004] Next, the operation will be described. 需要家は、電力会社との間に設定された契約電力に基づいて、目標電力値を、需要家装置1の目標電力値設定手段8を利用して設定する。 Customer, based on the contracted power, which is set between the power company, the target power value is set by using the target power value setting means 8 customer device 1. また、優先順位設定手段7により、負荷群3の中から制御対象とする一または複数の負荷L1〜L Further, the priority setting section 7, one or more to be controlled from the load group 3 Load L1~L
3を優先順位を指定して選択設定する。 3 to select settings to prioritize. 図7は、この優先順位を設定した内容を示した表であり、負荷L1をO Figure 7 is a table showing the contents of setting a priority load L1 O
FFすることを第一優先とし、次にL2をOFF、次にL3をOFFするように優先順位を設定している。 To FF as the first priority, then L2 OFF, and then L3 prioritize so turned OFF. それぞれ優先順位優先順位の設定と、目標電力値の設定が行われると、領域設定手段9により目標電力値を優先順位数で按分し、按分された点とデマンド時限経過後の目標電力値とを結ぶことで優先順位数に相当する領域を作成する。 Setting of each priority priority when setting the target power value is performed, the target power value is apportioned priority number by the area setting unit 9, and a target power value of prorated point and the demand after time period has elapsed to create a region corresponding to the priority number by connecting.

【0005】次に、電力モニタ部4で計測された負荷群の総使用電力値が領域設定手段9により設定した領域に入ったことが、判定部5で判定された場合に、優先順位に従って制御信号出力手段10により各負荷への運転状態の制御信号を出力することにより負荷の運転状態を制御する。 [0005] Next, if that total power consumption value of the measured load group by the power monitor 4 has entered the area set by the area setting means 9, it is judged by the judging unit 5, the control according to the priority It controls the operating state of the load by outputting a control signal of the operating condition of each load by a signal output unit 10. その結果、需要家内の総使用電力値は、設定値内に収まるように制御されるため、電力のピークを抑制することが可能となる。 As a result, the total power consumption value of the demand cottage, to be controlled so as to fall within a set value, it is possible to suppress the peak power.

【0006】 [0006]

【発明が解決しようとする課題】従来のデマンド制御システムでは、電力会社との契約電力を超過しないことを目的に目標電力値を決定し、需要家内の負荷を制御することを想定しているため、需要家内に閉じたシステムであった。 [Problems that the Invention is to Solve In the conventional demand control system, since it is assumed that determines a target power value for the purpose of not exceeding the contract power with an electric power company, to control the load demand wife , it was a system that was closed to demand my wife. しかし、近年、電力需要の増加に対し、環境問題の視点からも負荷率の改善が大きく注目され、需要家に対して電力会社からピーク時の使用電力の削減が要求されることが予想される。 However, in recent years, to the increase in power demand, improvement of the load factor also from the point of view of environmental problems is large attention, it is expected that the reduction of power consumption during peak is required from the power company to the consumer . こうしたシステムの場合には、需要家はともすれば快適性、利便性などを犠牲にしてピーク時の電力使用量を削減するため、協力した需要家に対しては何等かの経済的な恩恵が支払われることが必要である。 In the case of such a system, the customer is Tomosureba comfort, for at the expense of such convenience to reduce power consumption during peak, the economic benefits of some kind for consumers in cooperation it is necessary to be paid. これを供給家から需要家に対するインセンティブと呼んでいる。 It is referred to as incentives for customers from a supply house this. しかし、従来のデマンド制御システムは、上記のように構成されているので、需要家内に閉じて負荷制御を実施するため、適切なインセンティブが受けられないという問題点があった。 However, the conventional demand control system, which is configured as described above, to implement the load control to close the demand wife, appropriate incentives there was a problem that received was not.

【0007】この発明は上記のような問題点を解決するためになされたもので、電力ピーク時間帯の使用電力削減要求に対応して需要家内の負荷を抑制し、使用電力の削減に協力した需要家には適切なインセンティブが支払われるような電力DSMシステムを得ることを目的とする。 [0007] The present invention has been made to solve the above problems, reducing the load demand cottage in response to power consumption reduction requirements of the power peak hours, it helped to reduce the power consumption and to obtain a power DSM system such that a suitable incentive is paid to the customer.

【0008】 [0008]

【課題を解決するための手段】この発明に係る電力DS Means for Solving the Problems A power DS according to the present invention
Mシステムは、需要家の使用電力を計量する電力量計と、需要家の負荷群を制御する需要家装置とを備え、上記需要家装置は、使用電力の削減時間帯に使用する電力量の制限値を決定する制限値決定手段と、決定した制限値を上記電力量計に通知する電力量計通信手段と、需要家内の負荷を制限値の範囲に制御する負荷制御手段とを具備し、上記電力量計は、上記需要家装置から通知された制限値を受信する需要家装置通信手段と、当該制限値に対応して削減時間帯における使用電力の計量を調節する調節手段とを具備することを特徴とするものである。 M system comprises a power meter for measuring the power usage of the consumer, a consumer device that controls the load groups of consumers, the consumer device, the amount of power used to reduce the time zone of the power used comprising a limit value determining means for determining a limit value, and the power meter communication means the determined limit value to notify the power meter, and a load control means for controlling a load demand wife in a range of limit values, the energy meter comprises a consumer device communication means for receiving a limit value notified from the customer device, and adjusting means for adjusting the metering of the power used in the reduction time zone corresponding to the limit value it is characterized in.

【0009】また、電力供給側に設置されると共に上記電力量計と通信回線を介して接続されていて、上記電力量計に使用電力の削減要求と削減要求量を送信すると共に上記需要家装置からの制限値を上記電力量計を介して受信する需要家通信手段と、上記使用電力の削減要求量に対する上記制限値に応じて需要家に対するインセンティブを決定するインセンティブ決定手段とを具備したセンター端末をさらに備えると共に、上記電力量計は、上記センター端末からの送信情報を受信すると共に上記需要家装置から通知された制限値を上記センター端末に送信するセンター端末通信手段をさらに具備したことを特徴とするものである。 Further, be connected together are installed in the power supply side via the communication line with the power meter, the customer device sends a reduce request and reduce demand for power used in said power meter Center terminal limits equipped with consumer communication means for receiving via the electricity meter, and incentive determining means for determining an incentive for customers in accordance with the limit value for the reduction demand of the power used from the with further comprising, the energy meter, characterized in that the limit value notified from the customer device further includes a center terminal communication means for transmitting to said center terminal which receives the transmission information from said center terminal it is an.

【0010】また、上記需要家装置は、需要家の1つ以上の運転パターンを設定記憶するパターン運転記憶手段をさらに具備し、上記制限値決定手段は、需要家からの入力に基づいて上記パターン運転記憶手段から運転パターンを選択し、選択された運転パターンに対応して制限値を決定すると共に、上記負荷制御手段は、上記運転パターンに対応して需要家内の負荷を制御することを特徴とするものである。 Further, the consumer device may further include a pattern operation storage means for setting storing one or more operating patterns of customers, the limit value determining means, the pattern on the basis of the input from the customer select a driving pattern from the driver storing means, and determines the limit value in response to the selected operation pattern, the load control means includes a control means controls the load demand cottage in correspondence with the operation pattern it is intended to.

【0011】さらに、上記需要家装置は、需要家の負荷を操作するための負荷操作入力手段と、上記パターン運転記憶手段からの運転パターンの選択運転時に上記負荷操作入力手段により入力された操作に基づき当該運転パターンの運転内容を修正学習するパターン運転学習手段とをさらに具備し、上記負荷制御手段は、上記学習した運転パターンに対応して需要家内の負荷を制御することを特徴とするものである。 Furthermore, the customer device, a load operation input means for operating the load of the customer, the input operation by the load operation input means during selected operation operation pattern from the pattern operation storage means based further comprising a pattern operation learning means for modifying the learning operation contents of the operation pattern, the load control means, characterized in that controlling the load demand cottage in response to the operation pattern the learning is there.

【0012】 [0012]

【発明の実施の形態】実施の形態1. DETAILED DESCRIPTION OF THE INVENTION Embodiment 1. 図1はこの発明の実施の形態1に係る電力DSMシステムを示す構成図である。 Figure 1 is a block diagram showing a power DSM system according to the first embodiment of the present invention. 図1において、図6に示す従来例と同一部分は同一符号を付して示し、その説明は省略する。 In Figure 1, a conventional example of the same portion shown in FIG. 6 are given the identical reference numerals, and a description thereof will be omitted. あらたな符号として、11は需要家の使用電力量を計量する電力量計であり、後述する需要家装置13と通信するための需要家装置通信手段11a、需要家装置13からの制限値によって使用電力の削減時間帯における使用電力の計量を調節する調節手段11bとを内蔵している。 As new numerals, reference numeral 11 denotes a power meter for measuring the electric power consumption of the consumer, the consumer device communication means 11a for communicating with the consumer device 13 to be described later, used by the limit value from the consumer device 13 It incorporates an adjustment means 11b for adjusting the metering of the power used in the reduction time zone power.

【0013】13は通信線12を介して電力量計11と接続されている需要家の負荷群3を制御する需要家装置であり、電力量計と通信するための電力量計通信手段1 [0013] 13 is a consumer device that controls the load groups 3 of customers that are connected to the electricity meter 11 via the communication line 12, the power meter communication means for communicating with the electricity meter 1
3aと、使用電力の削減時間帯に使用する需要家内での使用電力の制限値を決定する制限値決定手段13bと、 And 3a, a limit value determining means 13b for determining a limit value of electric power used in demand cottage used to reduce the time zone of the power used,
制限値の範囲で需要家内の負荷を制御する負荷制御手段13cとを内蔵している。 It incorporates a load control unit 13c for controlling the load demand wife range limits.

【0014】次に動作について説明する。 [0014] Next, the operation will be described. まず、電力会社は、全電力需要のピークの時間帯には各需要家に対し使用電力の削減を要望する。 First, the power company, is in the time zone of the peak of the total power demand to demand a reduction of the power consumption for each consumer. 通常ピークは統計的にその時間帯が明確なため、本実施の形態では、あらかじめ電力量計11、あるいは需要家装置13に、この削減時間帯、さらに当該需要家への削減要求量が設定してあると仮定する。 Since usually peaks statistically that time are clear, in the present embodiment, pre-energy meter 11 or the consumer device 13, this reduction time zone setting is further reduced demand to the consumer suppose there Te. ここでは、電力量計11にこれらが設定してあるものとする。 Here, it is assumed you have these set energy meter 11.

【0015】電力量計11は、削減時間帯になると、通信線12を介して需要家装置13に電力の削減要求を削減量と共に通知する。 The electricity meter 11 is, at the reduced time period, and notifies with reducing the amount of power reduction request to the consumer device 13 via the communication line 12. 需要家装置13では、電力量計通信手段13aによって上記削減要求を受信し、これを制限値決定手段13bに入力する。 In consumer device 13, receiving the reduction required by the energy meter communication means 13a, and inputs it to the limit value determining unit 13b. 制限値決定手段13b Limit value determining unit 13b
では、現在の需要家内の状況により使用電力の制限値を決定する。 In, to determine a limit value of electric power used by the current state of demand wife.

【0016】制限値の決定は、例えば次のような方法で行われる。 [0016] Determination of the limit values ​​is carried out, for example, the following method. まず、第1の方法として、現在の需要家内の稼働負荷、使用電力量、居住人員等から、利便性、快適性をできるだけ損なわないような最低限の負荷の運転にした場合の電力使用量から使用電力量の最大値を算出し、これを制限値とする。 As a first method, the current demand wife operating loads, power usage, the resident personnel, etc., convenience, from the power consumption in the case of the operation of minimum load, such as little as possible to impair the comfort It calculates the maximum value of the power usage, and limit this. あるいは、第2の方法として、現在の需要家内の稼働負荷、使用電力量、居住人員等を考慮し、需要家があらかじめ決められたレベルの利便性、快適性の犠牲を考慮し、使用電力の最大値を算出し、これを制限値とし、犠牲よりも電力会社からのインセンティブを得ることを優先する。 Alternatively, as the second method, the current demand wife operating load, electric power consumption, taking into account the residence personnel, etc., the convenience of the level of customer is predetermined, taking into account the expense of comfort, the power consumption It calculates the maximum value, which was the limiting value, priority to gain incentives from the power company than sacrifice. あるいは、第3の方法として、電力量計11からの削減量をそのまま受け入れ、使用電力の最大値を算出し、制限値とする。 Alternatively, the third method, accept the reduction of the energy meter 11, and calculates the maximum value of the power usage, the limit value.

【0017】これらの方法を実現する上で、各負荷の稼働状況や、使用電力量などの情報は、負荷群3から制御線5を介し、例えば電力線2を利用した電力線搬送通信などにより需要家装置13に収集することが一般的に知られており、情報の収集が可能である。 [0017] In order to realize these methods, and operational status of each load, information such as the used amount of power through the control line 5 from the load group 3, for example, consumers due power line communication using a power line 2 be collected in the apparatus 13 are generally known, it is possible to collect information. よって、ここでは、説明を割愛する。 Thus, here, the description thereof will be omitted.

【0018】さて、需要家装置13は、制限値決定手段13bにて需要家内の使用電力の制限値を決定すると、 [0018] Now, the consumer device 13, and to determine the limits of use power demand my wife with the restriction value determining means 13b,
これを電力量計通信手段13aにより、通信線12を介して電力量計11に通知する。 The energy meter communication means 13a so notifies the power meter 11 via the communication line 12. また、決定した制限値を負荷制御手段13cに入力する。 Also inputs the determined limit value to the load control means 13c. 負荷制御手段13c Load control means 13c
は、需要家内の負荷群3の運転をこの制限値の範囲で実施するように制御する。 The operation of the demand wife of load groups 3 to control to perform a range of the limit value. このときの負荷群3の制御方法については、この制限値を目標電力値として、従来例に示したような、あらかじめ設定された各負荷の優先順位にしたがった運転方法が考えられる。 Method for controlling the load groups 3 at this time, the limit value as the target power value, such as shown in the conventional example, is conceivable driving method according to the priority of each load that is set in advance. これについては、 In this regard,
詳細な説明を割愛する。 It omitted the detailed description.

【0019】次に、制限値の通知を受けた電力量計11 [0019] Next, the amount received a notification of limit the power meter 11
は、需要家装置通信手段11aによってこれを受信し、 Receives this by the consumer device communication unit 11a,
調節手段11bに入力する。 Input to the adjusting means 11b. 調節手段11bでは、需要家が通知した制限値に基づき、ピーク抑制への協力に対するインセンティブとして、需要家の使用電力量の計量カウンタを調節する。 The adjustment means 11b, on the basis of the limit customer is notified, as an incentive for cooperation to peak suppression and adjusts the metering counter power usage of the consumer. すなわち、需要家に要求した削減量と制限値を比較し、その協力度に対する割合に応じて、削減時間帯の期間の電力量の計量を割引くように計量する。 That is, by comparing the limit value and reductions that requested the customer, in accordance with the ratio for the cooperativeness, weighed to discount the metering of electric energy for a period of reduction time zone. 例えば、調整手段11bには電力量計11の計量カウンタのスピード可変装置を備え、削減時間帯の期間は、このスピード可変装置により、計量カウンタを通常スピードよりも遅くする。 For example, with a speed changing device of the metering counter energy meter 11 to adjustment means 11b, a period of reduction time period, by the variable speed device, the metering counter slower than normal speed. よって、この削減時間帯は計量値が少なくなり、これにより電力料金が割引されることになる。 Thus, the band This reduction time is less weight value, which will cause the electric power fee is discounted.

【0020】なお、本構成では、説明を簡素化するために、需要家装置通信手段11aや調節手段11bを、電力量計11を改良し具備させたが、もちろんこれらを電力量計11と別に設け、従来の電力量計を利用することも可能である。 [0020] In this configuration, in order to simplify the description, a consumer device communication unit 11a and adjusting means 11b, but was equipped with improved energy meter 11, of course these an energy meter 11 separately provided, it is possible to use a conventional watt hour meter.

【0021】以上のように、本実施の形態1では、需要家装置13において、電力削減時間帯の需要家内の使用電力の制限値を電力量計11に通知し、電力量計11では、この制限値に基づいて、削減要求への協力度に応じて電力量の計量を割引くように構成したため、需要家が電力ピーク時に削減に協力した割合に応じ、電力量の計量が割引され、ひいては電気料金が安くなるようにしているので、使用電力削減への協力の度合いに応じた適切なインセンティブを受けることができる。 [0021] As described above, in the first embodiment, the consumer device 13, and notifies the limit for use electricity demand wife power reduction time zone energy meter 11, the energy meter 11, the based on the limit values, since in accordance with the cooperativeness to reduce request configured to discount the metering of electric energy, depending on the rate at which customer has helped to reduce the time of peak power, the metering of electric energy is discounted, and thus since electricity prices are set to be cheaper, you can receive the appropriate incentives in accordance with the degree of cooperation to use power reduction.

【0022】実施の形態2. [0022] Embodiment 2. 上述した実施の形態1では、あらかじめ電力量計11、あるいは需要家装置13 In the first embodiment described above, pre-energy meter 11 or the consumer device 13,
に電力の削減時間帯および需要家への削減要求量が設定してあるようにしたものであるが、次にこれらが、電力会社のセンター端末から電力需要にあわせて逐次送られてくるような場合に対応する実施の形態を示す。 To but is intended to reduce the required amount of the reduction time zone and consumers of electric power was so is set, then these, such as sent sequentially to meet the power demand from the center terminal of the power company It shows an embodiment corresponding to the case.

【0023】図2はこのような場合の実施の形態2に係る電力DSMシステムの構成図である。 [0023] FIG. 2 is a configuration diagram of a power DSM system according to a second embodiment of such a case. 図2において、 2,
図1に示す実施の形態1と同一部分は同一符号を付してその説明は省略する。 Embodiment 1 The same parts of the embodiment shown in FIG. 1 and a description thereof will be omitted with the same reference numerals. 新たな符号として、15は電力供給側に設置されると共に需要家の電力量計11とは通信回線14を介して接続されたセンター端末であり、需要家の電力量計11と通信するための需要家通信手段15 As a new code, 15 is a center terminal connected via the communication line 14 from the energy meter 11 of the consumer while being placed on the power supply side, to communicate with the electricity meter 11 of the consumer consumer communication means 15
aと、使用電力の削減要求量に対する制限値に応じて需要家に対するインセンティブを決定するインセンティブ決定手段15bとを具備している。 And a, are provided with the incentive determination unit 15b for determining an incentive for customers in accordance with the limit value for the reduction demand of the power used. また、11cは電力量計11に具備されたセンター端末通信手段である。 Also, 11c is a center terminal communication means which is provided in the electricity meter 11.

【0024】次に動作について説明する。 [0024] Next, the operation will be described. まず、電力会社は、全電力需要のピークの時間帯には各需要家に対し使用電力の削減を要望する。 First, the power company, is in the time zone of the peak of the total power demand to demand a reduction of the power consumption for each consumer. 本実施の形態2では、電力会社は、逐次電力需要を監視し、当日の電力ピークが予想される時間帯には需要家に対し、需要家通信手段15 In Embodiment 2, power companies, monitors the successive power demand, to customers in a time zone where the day of peak power is expected, consumer communication means 15
aによって通信回線14を介して使用電力削減要求と削減要求量を通知する。 Via the communication line 14 by a notifying reduce demand and using power reduction requests. これらの要求の通知頻度は、1日1回、あるいは、複数回、あるいは週や、月、季節単位の頻度で通知されるかもしれない。 Notification frequency of these requests, once a day, or, multiple times or or a week, a month, may be notified at a frequency of seasonal units. また、通信回線14 In addition, the communication line 14
は、一般電話回線などの公衆回線網の他に、衛星放送やCATV等の放送網などが想定される。 Includes, in addition to the general phone line public network, such as, such as satellite broadcasting, CATV or the like of the broadcasting network is assumed.

【0025】電力量計11では、これをセンター端末通信手段11cで受信し、需要家装置通信手段11aによって通信線12を介して需要家装置13に通知する。 [0025] In the power meter 11, which is received by the center terminal communication section 11c, it notifies the customer device 13 through the communication line 12 by the consumer device communication unit 11a. 需要家装置13では、電力量計通信手段13aによって上記削減要求を受信し、これを制限値決定手段13bに入力する。 In consumer device 13, receiving the reduction required by the energy meter communication means 13a, and inputs it to the limit value determining unit 13b. 制限値決定手段13bでは、現在の需要家内の状況により使用電力の制限値を決定する。 In limit value determining means 13b, determines the limit value of electric power used by the current state of demand wife. 制限値の決定は、実施の形態1と同様な方法が考えられ、ここでは説明を割愛する。 Determination of the limit value can be considered the same manner as in the first embodiment, so the explanation thereof is omitted here.

【0026】さて、需要家装置13は、制限値決定手段13bにて需要家内の使用電力の制限値を決定すると、 [0026] Now, the consumer device 13, and to determine the limits of use power demand my wife with the restriction value determining means 13b,
これを電力量計通信手段13aにより、通信線12を介して電力量計11に通知する。 The energy meter communication means 13a so notifies the power meter 11 via the communication line 12. また、決定した制限値を負荷制御手段13cに入力する。 Also inputs the determined limit value to the load control means 13c. 負荷制御手段13c Load control means 13c
は、需要家内の負荷の運転をこの制限値の範囲で実施するように制御する。 The operation of the demand cottage load is controlled so as to implement a range of the limit value. このときの負荷の制御方法については、実施の形態1と同様な方法が考えられ、ここでは説明を割愛する。 Method for controlling the load at this time is considered the same manner as in the first embodiment, so the explanation thereof is omitted here.

【0027】次に、制限値の通知を受けた電力量計11 [0027] Next, the amount received a notification of limit the power meter 11
は、需要家装置通信手段11aによってこれを受信し、 Receives this by the consumer device communication unit 11a,
センター端末通信手段11cに入力する。 Input to the center terminal communication unit 11c. センター端末通信手段11cは、制限値を通信回線14を介してセンター端末15に通知する。 Center terminal communication unit 11c notifies the center terminal 15 through the communication line 14 the limit value. このとき、前述の通信回線1 In this case, the above-mentioned communication line 1
4が衛星放送などの場合には、別途各需要家の情報をセンター端末15に通知する公衆回線などの通信回線14 4 in the case, such as satellite broadcasting, communication line 14 such as a public line to notify the center terminal 15 separate information for each customer
が必要となる。 Is required.

【0028】センター端末15では、需要家通信手段1 [0028] In the center terminal 15, consumer communication means 1
5aによって需要家からの制限値を受信し、これをインセンティブ決定手段15bに入力する。 It receives the limit value from the customers through 5a, and inputs it to the incentive determination unit 15b. インセンティブ決定手段15bでは、需要家が通知した制限値に基づき、ピーク抑制への協力に対するインセンティブを決定する。 The incentive determination unit 15b, based on the limit consumer is notified to determine incentives for cooperation to peak suppression. すなわち、需要家に要求した削減量と制限値を比較し、その協力度に対する割合に応じて、需要家の電力料金を割引く。 That is, by comparing the limit value and reductions that requested the customer, in accordance with the ratio for the cooperativeness, discount electricity price for consumers.

【0029】なお、本構成では、説明を簡素化するために需要家装置通信手段11aや、センター端末通信手段11cを、電力量計11を改良し具備させたが、もちろんこれらを電力量計11と別に設け、供給家装置とし、 [0029] In this configuration, and consumer device communication unit 11a in order to simplify the description, the center terminal communication unit 11c, but were provided to improve the energy meter 11, of course these energy meter 11 When provided separately, a supply house equipment,
電力量計11は従来のものを利用することも可能である。 Electricity meter 11 can also be used conventional ones. また、需要家装置13にセンター端末通信手段11 Also, center customer device 13 terminal communication section 11
cを具備し、直接センター端末と通信回線14を介して接続することも構わない。 Comprising a c, also may be connected through a communication line 14 directly with the center terminal.

【0030】以上のように、実施の形態2では、需要家装置13において、電力削減時間帯の需要家内の使用電力の制限値を通信回線14等を介して電力会社のセンター端末15に通知し、センター端末15では、この制限値に基づいて、削減要求への協力度に応じて電力料金を割引くように構成したため、需要家が電力ピーク時に削減に協力した割合に応じ、電力料金が割引されるようにしているので、使用電力削減への協力の度合いに応じ、 [0030] As described above, in the second embodiment, the consumer device 13, and notifies the center terminal 15 of the power company limits the power used demand wife power reduction time zone via a communication line 14 such as in the center terminal 15, on the basis of the limit value, since configured as discounting power rate in accordance with the cooperation of the to reduce demand, depending on the rate at which customer has helped to reduce the time of the peak power, the power charge discount since as is, depending on the degree of cooperation in use power reduction,
より適切なインセンティブを受けることができる。 It is possible to receive a more appropriate incentives. また、電力会社にとっては、各々の需要家の制限値を把握することができるため、確実なピーク抑制、発電量の調整を実施することができるメリットがある。 Further, for the power companies, it is possible to grasp the respective customer limits, there is a merit that can be implemented reliably peak suppression, the adjustment of the power generation amount. また、センター端末と接続されているため、電力削減が真に必要な場合だけ削減要求が出されるため、特に電力削減の必要のない場合に、必要以上に使用電力を削減することにより、需要家が不要な犠牲を被ったり、電力会社が不必要なインセンティブを支払う事無く電力削減策を講ずることができるというメリットがある。 Moreover, since it is connected to the center terminal, because only reduce request is issued when the power reduction is really needed, especially when there is no need for power reduction, by reducing the power consumption more than necessary, the customer is or suffered unnecessary sacrifice, there is an advantage that the power company is able to take it without power reduction measures to pay the unnecessary incentives.

【0031】実施の形態3. [0031] Embodiment 3. 以上の実施の形態1,2に対し、さらに実施の形態3では、上記需要家装置13における負荷制御の方法に関する実施の形態を示す。 To Embodiments 1 and 2 above embodiment, the further embodiment 3 shows an embodiment related to a method for load control in the consumer device 13. 図3 Figure 3
は実施の形態3に係る電力DSMシステムを示すもので、実施の形態1,2における需要家装置13の別の構成を示す。 Intended to indicate a power DSM system according to the third embodiment, showing another configuration of a customer 13 according the first and second embodiments. 図3において、図1及び図2に示す実施の形態1及び2と同一部分は同一符号を付してその説明は省略する。 3, Embodiment 1 and 2 and the same parts of the embodiment shown in FIGS. 1 and 2 and a description thereof will be omitted with the same reference numerals. 新たな符号として、13dは需要家装置13に具備された、需要家の運転パターンを設定記憶するパターン運転記憶手段であり、制限値決定手段13bは、外部から与えられる需要家からの入力に基づいて上記パターン運転記憶手段13dから運転パターンを選択し、選択された運転パターンに対応して制限値を決定し、負荷制御手段13cは、上記運転パターンに対応して需要家内の負荷群3を制御するようになされている。 As a new code, 13d was provided in the consumer device 13, a pattern operation storage means for setting storing customer driving patterns, limit value determining unit 13b is based on input from the demand externally applied house Te select operation pattern from the pattern operation storage unit 13d, and determines the limit value in response to the selected operation pattern, the load control unit 13c may control the load groups 3 demand cottage in correspondence with the operation pattern It has been made to.

【0032】次に動作について説明する。 [0032] Next, the operation will be described. 電力会社からの何等かの削減要求と削減量が需要家装置13に入力され、これを電力量計通信手段13aで受信するところまでは、実施の形態1、または実施の形態2のいずれかと同様であるので、ここでは説明を割愛する。 What like of reduced demand with reductions from the power company is input to the consumer device 13, is this a far received by the power meter communication means 13a, similar to the one of Embodiment 1 or 2, Embodiment since it is, but a description thereof will be omitted. 制限値決定手段13bは、外部から与えられる需要家からの入力に基づいてパターン運転記憶手段13dから運転パターンを選択し、選択された運転パターンに対応して制限値を決定する。 Limit value determining unit 13b selects a driving pattern from the pattern operation storage unit 13d, based on input from the demand externally applied house, determines a limit value corresponding to the selected operation pattern.

【0033】一方、パターン運転記憶手段13dには、 On the other hand, the pattern operation storage unit 13d,
あらかじめ需要家内の状況に対応したいくつかの需要家内の運転パターンが設定されている。 Some demand wife driving pattern corresponding to the advance demand wife of status is set. ここで、運転パターンについて説明する。 Here, a description is given of the operational pattern. 運転パターンとは、需要家の状況に合わせてあらかじめ需要家が設定しておく需要家内の負荷運転のパターンで、例えば図4のような例を示す。 The operation pattern, the pattern of the load operation demand cottage set in advance customer is to match the status of the customer, an example shown in FIG. 4, for example. 図4において、まず、節約パターンは、電力会社からの削減要求に対し最大限協力し、できるだけインセンティブを得ようとするパターンで、例えば、空調機や、 4, first, savings pattern, in a pattern to maximize cooperation to reduce demand from the power company, to be obtained as much as possible incentives, for example, air conditioners,
照明などの運転を停止し、最低限必要な冷蔵庫等の運転のみを実施するようなものである。 To stop the operation of the lighting, it is such as to implement only the operation of such minimum required refrigerator. 次に、節約快適パターンは、最低限の快適性、利便性を確保した上で、使用電力削減に協力するもので、例えば、空調機であれば、 Then, saving comfort pattern, minimum comfort, while securing convenience, intended to cooperate in use power reduction, for example, if the air conditioner,
温度設定を冷房時に2℃上げたり、照明を50%の調光で運転するものである。 Raising 2 ℃ the temperature setting during cooling, which illuminate the one that operated at 50% dimming. さらに、快適パターンでは、例えば来客などにより、快適性、利便性を最優先にし、使用電力の削減には協力しないもので、需要家装置からの負荷制御は実施しない。 Furthermore, the comfort patterns, for example, by visitors, and comfort, convenience to the highest priority, is to reduce the power consumption as it does not cooperate, load control from the consumer device is not performed.

【0034】図4の例では、現在は節約快適パターンが需要家によって選択されている。 [0034] In the example of FIG. 4, the current savings comfortable pattern being selected by the customer. よって、制限値決定手段13bは、制限値を最大にとりうる電力使用量制限値の50%として決定し、電力量計通信手段13aを介して電力量計11に通知する。 Therefore, limit value determining means 13b determines a limiting value of 50% of the power consumption limit value that can be taken to the maximum, and notifies the power meter 11 via a power meter communication means 13a. もし、需要家により節約パターンが選択されている場合は、同様に、制限値を最大にとりうる電力使用量制限値の100%として決定し、 If, when the savings pattern is selected by the customer, as well, to determine the limit value of 100% of the power consumption limit value that can be taken to the maximum,
電力量計通信手段13aを介して電力量計11に通知する。 And it notifies the power meter 11 via a power meter communication means 13a.

【0035】需要家装置13から制限値の通知を受けた電力量計11の以降の動作は、実施の形態1、または実施の形態2のいずれかの動作と同様となるため、ここでは説明を割愛する。 The consumer device 13 for subsequent energy meter 11 has received the notification of the limit value from the operation, since the same manner as any of the operation of Embodiment 1 or Embodiment 2, the implementation, the description here Omit. また、負荷制御手段13cは、パターン運転記憶手段13d内で選択されている運転パターンに記憶された負荷制御内容にしたがって負荷群3を制御する。 The load control means 13c controls the load group 3 according to the load control contents stored in the operation pattern selected in the pattern operation storage means 13d.

【0036】以上のように、本実施の形態3では、需要家装置13において、電力削減時間帯の需要家内の使用電力の制限値を、あらかじめ需要家が選択設定した運転パターンにしたがって決定されるため、例えば通常時は節約を優先するが、来客時など、非通常の状況においては快適性、利便性を優先するなどの選択が可能になり、 [0036] As described above, in the third embodiment, the customer device 13, the limit value of power consumption demand wife power reduction time zone is determined according to the operation pattern in advance customer has selected set Therefore, for example, usually at the time of priority to save, such as when visitors in the non-normal circumstances allows the selection of such priority comfort, convenience,
需要家は適切なインセンティブを受けることができると同時に、より使い勝手の良い電力DSMシステムを得ることが可能となる。 Customers at the same time can receive the appropriate incentives, it is possible to obtain a more user-friendly power DSM system.

【0037】実施の形態4. [0037] Embodiment 4. 以上の実施の形態3に対し、さらに実施の形態4では、上記需要家装置13における負荷制御の方法に関する他の実施の形態を示す。 To form 3 or more embodiments, the 4 further embodiment, showing another embodiment relates to a method for load control in the consumer device 13. 図5は実施の形態3に係る電力DSMシステムを示すもので、需要家装置13の別の構成を示す。 5 shows a power DSM system according to the third embodiment, showing another configuration of a customer 13. 図5において、 In FIG. 5,
図3に示す実施の形態3と同一部分は同一符号を付して示し、その説明は省略する。 Embodiment 3 the same parts of the embodiment shown in FIG. 3 are given the identical reference numerals, and a description thereof will be omitted. 新たな符号として、13e As a new sign, 13e
と13fは需要家装置13に具備された、需要家装置1 And 13f has been provided to the consumer device 13, customer device 1
3によって制御された負荷を需要家が操作するための負荷操作入力手段と、負荷操作入力手段13eによって入力された需要家の操作に基づきパターン運転の内容を学習、変更するパターン運転学習手段であり、負荷制御手段13cは、学習した運転パターンに対応して需要家内の負荷群3を制御するようになされている。 A load operation input means for operating the consumer a controlled load by 3, learning the content of the pattern operation based on a load operation input means 13e of customer input by the operation, be pattern operation learning means for changing , the load control unit 13c is adapted to control the load groups 3 demand cottage in response to the operation pattern learned.

【0038】次に動作について説明する。 [0038] Next, the operation will be described. 電力会社からの電力の削減要求と削減量が需要家装置13に入力され、これを電力量計通信手段13aで受信するところまでは、実施の形態3と同様であるので、ここでは説明を割愛する。 Reduction demand and reductions of power from the power company is input to the consumer device 13, is so far received by the power meter communication means 13a, are the same as in the third embodiment, not described again here to.

【0039】また、パターン運転記憶手段13dにおける設定内容や、選択内容等の説明も実施の形態3と同様であるため、説明を割愛する。 Further, and settings in the pattern operation storing means 13d, for an explanation of such selection is similar to that of the third embodiment, description thereof will be omitted. さて、現在、需要家によって、図4に示すように節約快適パターンが選択されているとする。 Now, now, the customer, the savings comfortably pattern as shown in FIG. 4 is selected. しかし、需要家にとって、節約度50%の負荷制御運転では、快適性が著しく損なわれたり(例えば特に外気が高く、湿度が高いため、暑く感じ、不快である)、あるいは利便性が損なわれたり(曇天のため暗い)する場合には、需要家は負荷操作入力手段13eによって負荷を操作(空調機の温度設定を下げる、照明の照度を上げるなど)することで、不快感を解消することを可能とする。 But for consumers, the savings of 50% of the load control operation, comfort is significantly impaired or (e.g. particularly high outside air, because the humidity is high, feeling hot, uncomfortable), or or convenience is impaired when (dark for cloudy), the customer is operating the load by the load operation input means 13e (lower the temperature setting of the air conditioner, such as increasing the intensity of illumination) doing, to eliminate discomfort possible to be.

【0040】需要家装置13は、これらの入力をパターン運転学習手段13fによって記憶し、例えば図4に示すような節約度50%では需要家の不快感が大きいことが連続する場合には、節約快適パターンの節約度を例えば40%に下げるなどにより需要家に最適な節約快適パターンを生成しパターン運転記憶手段13dに再記憶する。 The consumer device 13, these inputs were stored by the pattern operation learning means 13f, for example, when it is greater discomfort savings of 50% in consumer as shown in Figure 4 consecutive savings re stored in generating the best savings comfortable pattern consumers due lowering the savings of comfort pattern example 40% pattern operation storage unit 13d. また、負荷の運転内容についても、同様に修正(設定温度のアップを1℃にする、照度を70%にするなど)する。 As for the operation content of the load, (to 1 ℃ the set temperature up, such as the illumination intensity of 70%) Similarly Modify.

【0041】また、パターン運転学習手段13fは、需要家の負荷操作の内容以外に、当日の外気温や、照度などの環境条件を加味し、自動的に最適な運転パターンの内容を生成することにより、需要家の負荷操作入力という煩わしさを無くすことも可能である。 [0041] In addition, the pattern operation learning means 13f, in addition to the contents of the load operation of the customer, and an outside air temperature of the day, that in consideration of the environmental conditions such as illumination, to generate the contents of automatically optimal operation pattern by, it is also possible to eliminate the hassle of consumers of the load operation input.

【0042】なお、本実施の形態4では負荷操作入力手段13eを需要家装置13に設けたが、例えば空調機のリモコンなど通常の負荷操作手段を用い、負荷操作結果情報を制御線5を介し各負荷から伝送により得ることも可能である。 [0042] Note that Embodiment 4 In the load operation input means 13e of the present embodiment is provided on the consumer device 13, for example using a normal load operating means such as a remote controller of the air conditioner, via a control line 5 the load operation result information it is also possible to obtain by the transmission from each load.

【0043】また、制限値決定手段13bは、こうして再設定された節約度に基づいて制限値を決定し、電力量計通信手段13aを介して電力量計11に通知する。 [0043] Also, limit value determining unit 13b is thus a limit value determined on the basis of the reconfigured saved degree, notifies the power meter 11 via a power meter communication means 13a. 需要家装置13から制限値の通知を受けた電力量計11の以降の動作は、実施の形態1、または実施の形態2のいずれかの動作と同様となるため、ここでは説明を割愛する。 The subsequent operation of the energy meter 11 which has received the notification of the limit value from the consumer device 13 to become similar to the operation of any of Embodiment 1 or Embodiment 2, Embodiment, description thereof is omitted. また、負荷制御手段13cは、パターン運転記憶手段13d内で選択されている運転パターンに記憶された負荷制御内容にしたがって負荷群3を制御することも同様である。 The load control means 13c, it is also the same for controlling the load group 3 according to the load control contents stored in the operation pattern selected in the pattern operation storage means 13d.

【0044】以上のように、本実施の形態4では、需要家装置13において、電力削減時間帯の需要家内の使用電力の制限値を、あらかじめ需要家が選択設定した運転パターンにしたがって決定する以外に、負荷操作入力手段13eや、パターン運転学習手段13fによって運転パターンの内容を学習し、修正することが自動的になされるため、快適性、利便性を著しく損なうことなく需要家の意志に沿った適切な制限値を決定、通知することにより、需要家は適切なインセンティブを受けることができると同時に、より使い勝手の良い電力DSMシステムを得ることが可能となる。 [0044] As described above, in the fourth embodiment, the consumer device 13, a limit value of the power usage demand wife power reduction time zone other than that determined according to the operation pattern in advance customer has selected set in, and a load operation input means 13e, learn the contents of the operation pattern by the pattern operation learning means 13f, since it is done automatically for modifying, along the customer's will without significantly impairing comfort, convenience determine the appropriate restriction value, by notifying, consumers at the same time can receive the appropriate incentives, it is possible to obtain a more user-friendly power DSM system.

【0045】 [0045]

【発明の効果】以上のように、この発明に係る電力DS As in the above, according to the present invention, power DS according to the present invention
Mシステムによれば、需要家における使用電力の制限値を電力量計、あるいは電力会社のセンター端末に通知することにより、需要家は、負荷の使用を制限することにより被る犠牲に対応した適切なインセンティブを得ることが可能となる効果がある。 According to M system, by notifying the limit for electric power used in consumer electricity meter, or to the center terminal of the power company, customer, a suitable corresponding sacrificed incurred by limiting the use of the load there is an effect that it is possible to obtain an incentive.

【0046】また、センター端末と需要家を接続することにより、よりきめ細かな電力削減要求が可能となり、 [0046] In addition, by connecting the center terminal and the consumers, it is possible to more fine-grained power reduction request,
さらに適切なインセンティブを得る事が可能となる。 It is possible further to obtain an appropriate incentive. つまり、電力会社のセンター端末から電力削減が真に必要な場合だけ削減要求が出されるため、特に電力削減の必要のない場合に、必要以上に使用電力を削減することにより、需要家が不要な犠牲を被ったり、電力会社が不必要なインセンティブを支払う事無く電力削減策を講ずることができるという効果がある。 In other words, since only the reduction request is issued when the center terminal of the power company power reduction is really needed, especially when there is no need for power reduction, by reducing the power consumption more than necessary, the customer is not required or suffered a sacrifice, there is an effect that the power company is able to take it without power reduction measures to pay the unnecessary incentives. さらに、電力会社にとっては、各々の需要家の制限値を把握することができるため、確実なピーク抑制、発電量の調整を実施することができるという効果がある。 Furthermore, for the power companies, it is possible to grasp the respective customer limits, there is an effect that reliable peak suppression, the adjustment of the amount of power generation can be performed.

【0047】また、電力削減時間帯の需要家内の使用電力の制限値を、あらかじめ需要家が選択設定した運転パターンにしたがって決定するため、例えば通常時は節約を優先するが、来客時など、非通常の状況においては快適性、利便性を優先するなどの選択が可能になり、需要家は適切なインセンティブを受けることができると同時に、より使い勝手の良い電力DSMシステムを得ることが可能となる効果がある。 Further, the limit value of power consumption demand wife power reduction time zone, to determine in accordance with the operation pattern beforehand customer has selected set, for example normal time priority to save, such as when visitors, not comfort in normal circumstances, allows the selection of such priority convenience, consumers at the same time can receive the appropriate incentives, it is possible to obtain a more user-friendly power DSM system effects there is.

【0048】さらに、電力使用の制限値をあらかじめ需要家が選択設定した運転パターンにしたがって決定する以外に、需要家の負荷操作を学習し、パターン運転の内容を修正することが自動的になされるため、快適性、利便性を著しく損なうことなく需要家の意志に沿った適切な制限値を決定、通知することにより、需要家は適切なインセンティブを受けることができると同時に、より使い勝手の良い電力DSMシステムを得ることが可能となる効果がある。 [0048] Further, in addition to determining according to the operation pattern in advance customer limit value of the power used is selected and set to learn the load operation of the customer, are automatically made to modify the contents of the pattern operation Therefore, comfort, determine the appropriate limits along the customer's will without significantly impairing the convenience by notifying, at the same time the customer can receive the appropriate incentives, good more convenient power there is an effect that it is possible to obtain a DSM system.

【図面の簡単な説明】 BRIEF DESCRIPTION OF THE DRAWINGS

【図1】 この発明の実施の形態1における電力DSM [1] Power DSM in the first embodiment of the present invention
システムを示す構成図である。 It is a block diagram showing a system.

【図2】 この発明の実施の形態2における電力DSM [2] Power DSM in the second embodiment of the present invention
システムを示す構成図である。 It is a block diagram showing a system.

【図3】 この発明の実施の形態3における電力DSM [3] Power DSM in the third embodiment of the present invention
システムを示す構成図である。 It is a block diagram showing a system.

【図4】 この発明における電力DSMシステムの運転パターンの内容を示す図である。 4 is a diagram showing the contents of operation pattern of the power DSM system in the present invention.

【図5】 この発明の実施の形態4における電力DSM [5] Power DSM in the fourth embodiment of the present invention
システムを示す構成図である。 It is a block diagram showing a system.

【図6】 従来の電力DSMシステムを示す構成図である。 6 is a block diagram showing a conventional power DSM system.

【図7】 図6の優先順位設定手段7に設定された需要家内負荷群の各機器の優先順位の説明図である。 7 is an explanatory diagram of the priority of each device demand cottage load group set in the priority setting means 7 in FIG.

【符号の説明】 DESCRIPTION OF SYMBOLS

11 電力量計、3 負荷群、13 需要家装置、13 11 power meter, 3 load groups, 13 consumer device, 13
b 制限値決定手段、13a 電力量計通信手段、13 b limit value determining means 13a electricity meter communication means, 13
c 負荷制御手段、11a 需要家装置通信手段、11 c load control means 11a consumer device communication means, 11
b 調節手段、15 センター端末、15a 需要家通信手段、15bインセンティブ決定手段、11c センター端末通信手段、13d パターン運転記憶手段、1 b adjusting means 15 center terminal, 15a consumer communication means, 15b incentive determination unit, 11c center terminal communication means, 13d pattern operation storage means, 1
3e 負荷操作入力手段、13f パターン運転学習手段。 3e load operation input means, 13f pattern operation learning means.

───────────────────────────────────────────────────── フロントページの続き Fターム(参考) 5G064 AC06 AC08 CB11 DA01 5G066 KA01 KA11 KD04 KD10 5K048 BA32 DC03 EB02 EB10 HA01 HA02 5K101 KK11 ────────────────────────────────────────────────── ─── front page of continued F-term (reference) 5G064 AC06 AC08 CB11 DA01 5G066 KA01 KA11 KD04 KD10 5K048 BA32 DC03 EB02 EB10 HA01 HA02 5K101 KK11

Claims (4)

    【特許請求の範囲】 [The claims]
  1. 【請求項1】 需要家の使用電力を計量する電力量計と、 需要家の負荷群を制御する需要家装置とを備え、 上記需要家装置は、使用電力の削減時間帯に使用する電力量の制限値を決定する制限値決定手段と、決定した制限値を上記電力量計に通知する電力量計通信手段と、需要家内の負荷を制限値の範囲に制御する負荷制御手段とを具備し、 上記電力量計は、上記需要家装置から通知された制限値を受信する需要家装置通信手段と、当該制限値に対応して削減時間帯における使用電力の計量を調節する調節手段とを具備することを特徴とする電力DSMシステム。 1. A comprising a watt-hour meter for measuring the power usage of the consumer, a consumer device that controls the load groups of consumers, the consumer device, the amount of power used to reduce the time zone of the power used a limit value determining means for determining a limit value, the determined limit value comprises a power meter communication means for notifying the power meter, and a load control means for controlling a load demand wife in a range of limit values the energy meter, comprising: a consumer device communication means for receiving a limit value notified from the customer device, and adjusting means for adjusting the metering of the power used in the reduction time zone corresponding to the limit value power DSM system, characterized by.
  2. 【請求項2】 請求項1に記載の電力DSMシステムにおいて、電力供給側に設置されると共に上記電力量計と通信回線を介して接続されていて、上記電力量計に使用電力の削減要求と削減要求量を送信すると共に上記需要家装置からの制限値を上記電力量計を介して受信する需要家通信手段と、上記使用電力の削減要求量に対する上記制限値に応じて需要家に対するインセンティブを決定するインセンティブ決定手段とを具備したセンター端末をさらに備えると共に、上記電力量計は、上記センター端末からの送信情報を受信すると共に上記需要家装置から通知された制限値を上記センター端末に送信するセンター端末通信手段をさらに具備したことを特徴とする電力DSMシステム。 2. A power DSM system according to claim 1, which is connected with is installed on the power supply side via the communication line with the electricity meters, reducing demand and electric power used in said power meter and consumer communication means a limit value from the customer device sends a reduced demand received through the electricity meter, an incentive for customers in accordance with the limit value for the reduction demand of the electric power used determine further provided with a center terminal equipped and incentive determination unit that, the energy meter, transmits the limit value notified from the customer device which receives the transmission information from the center terminal to the center terminal power DSM system being characterized in that further comprising a center terminal communication means.
  3. 【請求項3】 請求項1または2に記載の電力DSMシステムにおいて、上記需要家装置は、需要家の1つ以上の運転パターンを設定記憶するパターン運転記憶手段をさらに具備し、上記制限値決定手段は、需要家からの入力に基づいて上記パターン運転記憶手段から運転パターンを選択し、選択された運転パターンに対応して制限値を決定すると共に、上記負荷制御手段は、上記運転パターンに対応して需要家内の負荷を制御することを特徴とする電力DSMシステム。 3. The power DSM system according to claim 1 or 2, the customer apparatus further comprises a pattern operation storage means for setting storing one or more operating patterns of customers, the limit value determining means selects the operation pattern from the pattern operation storage means based on input from the customer, and determines the limit value in response to the selected operation pattern, the load control means, corresponding to the operation pattern power DSM system characterized by controlling the load demand cottage with.
  4. 【請求項4】 請求項3に記載の電力DSMシステムにおいて、上記需要家装置は、需要家の負荷を操作するための負荷操作入力手段と、上記パターン運転記憶手段からの運転パターンの選択運転時に上記負荷操作入力手段により入力された操作に基づき当該運転パターンの運転内容を修正学習するパターン運転学習手段とをさらに具備し、上記負荷制御手段は、上記学習した運転パターンに対応して需要家内の負荷を制御することを特徴とする電力DSMシステム。 4. The power DSM system according to claim 3, said customer device, a load operation input means for operating the load of the customer, upon selection operation of the operation pattern from the pattern operation storage means the load operation input means operation contents of the operation pattern based on the input operation further comprising a pattern operation learning means for correcting learned by, the load control means, demand cottage in response to the operation pattern the learning power DSM system characterized by controlling the load.
JP24819198A 1998-09-02 1998-09-02 Power dsm system Pending JP2000078748A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24819198A JP2000078748A (en) 1998-09-02 1998-09-02 Power dsm system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24819198A JP2000078748A (en) 1998-09-02 1998-09-02 Power dsm system

Publications (1)

Publication Number Publication Date
JP2000078748A true JP2000078748A (en) 2000-03-14

Family

ID=17174567

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24819198A Pending JP2000078748A (en) 1998-09-02 1998-09-02 Power dsm system

Country Status (1)

Country Link
JP (1) JP2000078748A (en)

Cited By (61)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002010532A (en) * 2000-06-19 2002-01-11 Daikin Ind Ltd Demand control system, demand control method, demand control management device, and demand control management method for electric apparatus
US7197378B2 (en) 2002-08-23 2007-03-27 Hitachi, Ltd. Coordinating controller for electric power equipment
WO2007041788A1 (en) * 2005-10-14 2007-04-19 Rheem Australia Pty Limited A load switching arrangement
JP2007134997A (en) * 2005-11-10 2007-05-31 Matsushita Electric Works Ltd Power monitoring system
JP2009124885A (en) * 2007-11-15 2009-06-04 Chugoku Electric Power Co Inc:The System for supporting adjustment of electric power supply and demand
JP2009240054A (en) * 2008-03-26 2009-10-15 Panasonic Electric Works Co Ltd Demand control system, demand control method
WO2011030472A1 (en) 2009-09-08 2011-03-17 株式会社 東芝 Comprehensive monitoring and control system for smart grid and microgrid
WO2011030200A1 (en) * 2009-09-09 2011-03-17 パナソニック電工株式会社 Power control system
WO2011039585A1 (en) * 2009-09-29 2011-04-07 パナソニック電工株式会社 Electric power management system
WO2011039586A1 (en) * 2009-09-29 2011-04-07 パナソニック電工株式会社 Electric power management system
US8010812B2 (en) 2007-08-28 2011-08-30 Forbes Jr Joseph W Method and apparatus for actively managing consumption of electric power supplied by one or more electric utilities
JP2011253509A (en) * 2010-06-04 2011-12-15 Daikin Ind Ltd Energy management system and controller
US8131403B2 (en) 2007-08-28 2012-03-06 Consert, Inc. System and method for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same
US8145361B2 (en) 2007-08-28 2012-03-27 Consert, Inc. System and method for manipulating controlled energy using devices to manage customer bills
JP2012065407A (en) * 2010-09-14 2012-03-29 Toshiba Corp Power control device, power control system and method
JP2012130176A (en) * 2010-12-16 2012-07-05 Shimizu Corp Equipment control system, equipment control method, and equipment control program
US8260470B2 (en) 2007-08-28 2012-09-04 Consert, Inc. System and method for selective disconnection of electrical service to end customers
JP2012244665A (en) * 2011-05-16 2012-12-10 Panasonic Corp Energy management system
WO2013008767A1 (en) * 2011-07-08 2013-01-17 Sharp Kabushiki Kaisha System, graphical user interface, and method for the multi-dimensional representation of energy control
JP2013024471A (en) * 2011-07-20 2013-02-04 Daikin Industries Ltd Controller for facility equipment
WO2013018380A1 (en) * 2011-08-03 2013-02-07 ダイキン工業株式会社 Control apparatus and control method for electrical apparatuses
WO2013027312A1 (en) * 2011-08-24 2013-02-28 パナソニック株式会社 Heating system control method and heating system
US8396606B2 (en) 2007-08-28 2013-03-12 Consert Inc. System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management
JP2013066268A (en) * 2011-09-15 2013-04-11 Toshiba Corp Household energy management apparatus and household energy management system
JP2013091293A (en) * 2011-10-27 2013-05-16 Sharp Corp Image forming apparatus
JP2013102610A (en) * 2011-11-08 2013-05-23 Nippon Telegr & Teleph Corp <Ntt> Wide-area power failure prevention method and wide-area power failure prevention system
JP2013106381A (en) * 2011-11-10 2013-05-30 Sony Corp Power management device, power management method, and demand notifying device
WO2013105567A1 (en) * 2012-01-13 2013-07-18 ダイキン工業株式会社 Energy control device
JP2013162560A (en) * 2012-02-02 2013-08-19 Hitachi Ltd Demand and supply adjusting system
JP2013164232A (en) * 2012-02-13 2013-08-22 Mitsubishi Electric Corp Heating cooker
JP2013169104A (en) * 2012-02-16 2013-08-29 Sharp Corp Communication equipment, household electric appliance, controller, communication system, household electric appliance control method, power consumption control method, and program
US8527107B2 (en) 2007-08-28 2013-09-03 Consert Inc. Method and apparatus for effecting controlled restart of electrical servcie with a utility service area
US8542685B2 (en) 2007-08-28 2013-09-24 Consert, Inc. System and method for priority delivery of load management messages on IP-based networks
JP2013247719A (en) * 2012-05-23 2013-12-09 Toshiba Corp Power controller, power control method and power control program
US8700187B2 (en) 2007-08-28 2014-04-15 Consert Inc. Method and apparatus for actively managing consumption of electric power supplied by one or more electric utilities
JP2014072911A (en) * 2012-09-27 2014-04-21 Daikin Ind Ltd Controller
JP2014075935A (en) * 2012-10-05 2014-04-24 Mitsubishi Electric Corp Home power instruction device and home power control system
JP2014093898A (en) * 2012-11-06 2014-05-19 Nippon Telegr & Teleph Corp <Ntt> Power demand control system and method
JP2014096877A (en) * 2012-11-08 2014-05-22 Mitsubishi Electric Corp Home power control device and home power control system
JP2014099985A (en) * 2012-11-14 2014-05-29 Nippon Telegr & Teleph Corp <Ntt> Power demand control system and method
EP2743790A2 (en) 2012-12-11 2014-06-18 Fujitsu Limited Information processing device, information processing method, and storage medium
JP2014119218A (en) * 2012-12-18 2014-06-30 Daikin Ind Ltd Control device of air conditioner
US8805552B2 (en) 2007-08-28 2014-08-12 Causam Energy, Inc. Method and apparatus for actively managing consumption of electric power over an electric power grid
US8806239B2 (en) 2007-08-28 2014-08-12 Causam Energy, Inc. System, method, and apparatus for actively managing consumption of electric power supplied by one or more electric power grid operators
US8855279B2 (en) 2007-08-28 2014-10-07 Consert Inc. Apparatus and method for controlling communications to and from utility service points
US8890505B2 (en) 2007-08-28 2014-11-18 Causam Energy, Inc. System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management
JP2014226036A (en) * 2011-03-24 2014-12-04 住友電気工業株式会社 Server device, and program
US8996183B2 (en) 2007-08-28 2015-03-31 Consert Inc. System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management
US9130402B2 (en) 2007-08-28 2015-09-08 Causam Energy, Inc. System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management
US9177323B2 (en) 2007-08-28 2015-11-03 Causam Energy, Inc. Systems and methods for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same
JP2015195726A (en) * 2011-07-01 2015-11-05 パナソニックIpマネジメント株式会社 Power managing device, power managing system, power storage battery and power managing method
US9207698B2 (en) 2012-06-20 2015-12-08 Causam Energy, Inc. Method and apparatus for actively managing electric power over an electric power grid
JP2015223213A (en) * 2014-05-26 2015-12-14 三菱電機株式会社 rice cooker
JP2016019426A (en) * 2014-07-10 2016-02-01 パナソニックIpマネジメント株式会社 Power managing device
JP2016161215A (en) * 2015-03-02 2016-09-05 ダイキン工業株式会社 Air conditioning system
US9513648B2 (en) 2012-07-31 2016-12-06 Causam Energy, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US9563215B2 (en) 2012-07-14 2017-02-07 Causam Energy, Inc. Method and apparatus for actively managing electric power supply for an electric power grid
US10048711B2 (en) 2012-05-31 2018-08-14 Nihon Techno Co., Ltd. System, method, and program for conserving energy
US10295969B2 (en) 2007-08-28 2019-05-21 Causam Energy, Inc. System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management
US10310534B2 (en) 2012-07-31 2019-06-04 Causam Energy, Inc. System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network
US10381870B2 (en) 2017-08-07 2019-08-13 Causam Energy, Inc. System, method, and apparatus for electric power grid and network management of grid elements

Cited By (100)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4547776B2 (en) * 2000-06-19 2010-09-22 ダイキン工業株式会社 Electrical equipment demand control system, demand control method, the demand control management device and demand control management method
JP2002010532A (en) * 2000-06-19 2002-01-11 Daikin Ind Ltd Demand control system, demand control method, demand control management device, and demand control management method for electric apparatus
US7197378B2 (en) 2002-08-23 2007-03-27 Hitachi, Ltd. Coordinating controller for electric power equipment
WO2007041788A1 (en) * 2005-10-14 2007-04-19 Rheem Australia Pty Limited A load switching arrangement
JP2007134997A (en) * 2005-11-10 2007-05-31 Matsushita Electric Works Ltd Power monitoring system
JP4720447B2 (en) * 2005-11-10 2011-07-13 パナソニック電工株式会社 Power monitoring system
US9651973B2 (en) 2007-08-28 2017-05-16 Causam Energy, Inc. System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management
US8527107B2 (en) 2007-08-28 2013-09-03 Consert Inc. Method and apparatus for effecting controlled restart of electrical servcie with a utility service area
US8542685B2 (en) 2007-08-28 2013-09-24 Consert, Inc. System and method for priority delivery of load management messages on IP-based networks
US9130402B2 (en) 2007-08-28 2015-09-08 Causam Energy, Inc. System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management
US9177323B2 (en) 2007-08-28 2015-11-03 Causam Energy, Inc. Systems and methods for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same
US8996183B2 (en) 2007-08-28 2015-03-31 Consert Inc. System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management
US10116134B2 (en) 2007-08-28 2018-10-30 Causam Energy, Inc. Systems and methods for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same
US8010812B2 (en) 2007-08-28 2011-08-30 Forbes Jr Joseph W Method and apparatus for actively managing consumption of electric power supplied by one or more electric utilities
US8032233B2 (en) 2007-08-28 2011-10-04 Consert Inc. Method and apparatus for actively managing consumption of electric power supplied by an electric utility
US10303194B2 (en) 2007-08-28 2019-05-28 Causam Energy, Inc System, method, and apparatus for actively managing consumption of electric power supplied by one or more electric power grid operators
US8131403B2 (en) 2007-08-28 2012-03-06 Consert, Inc. System and method for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same
US8145361B2 (en) 2007-08-28 2012-03-27 Consert, Inc. System and method for manipulating controlled energy using devices to manage customer bills
US8890505B2 (en) 2007-08-28 2014-11-18 Causam Energy, Inc. System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management
US8855279B2 (en) 2007-08-28 2014-10-07 Consert Inc. Apparatus and method for controlling communications to and from utility service points
US8700187B2 (en) 2007-08-28 2014-04-15 Consert Inc. Method and apparatus for actively managing consumption of electric power supplied by one or more electric utilities
US8805552B2 (en) 2007-08-28 2014-08-12 Causam Energy, Inc. Method and apparatus for actively managing consumption of electric power over an electric power grid
US8260470B2 (en) 2007-08-28 2012-09-04 Consert, Inc. System and method for selective disconnection of electrical service to end customers
US8806239B2 (en) 2007-08-28 2014-08-12 Causam Energy, Inc. System, method, and apparatus for actively managing consumption of electric power supplied by one or more electric power grid operators
US8307225B2 (en) 2007-08-28 2012-11-06 Consert Inc. Method and apparatus for actively managing consumption of electric power supplied by one or more electric utilities
US8315717B2 (en) 2007-08-28 2012-11-20 Consert Inc. Method and apparatus for actively managing consumption of electric power supplied by an electric utility
US9881259B2 (en) 2007-08-28 2018-01-30 Landis+Gyr Innovations, Inc. System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management
US8396606B2 (en) 2007-08-28 2013-03-12 Consert Inc. System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management
US9899836B2 (en) 2007-08-28 2018-02-20 Causam Energy, Inc. Systems and methods for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same
US9305454B2 (en) 2007-08-28 2016-04-05 Consert Inc. Apparatus and method for controlling communications to and from fixed position communication devices over a fixed bandwidth communication link
US9069337B2 (en) 2007-08-28 2015-06-30 Consert Inc. System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management
US10295969B2 (en) 2007-08-28 2019-05-21 Causam Energy, Inc. System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management
JP2009124885A (en) * 2007-11-15 2009-06-04 Chugoku Electric Power Co Inc:The System for supporting adjustment of electric power supply and demand
JP2009240054A (en) * 2008-03-26 2009-10-15 Panasonic Electric Works Co Ltd Demand control system, demand control method
US8774979B2 (en) 2009-09-08 2014-07-08 Kabushiki Kaisha Toshiba Executive monitoring and control system for smart grid and micro grid
WO2011030472A1 (en) 2009-09-08 2011-03-17 株式会社 東芝 Comprehensive monitoring and control system for smart grid and microgrid
US8706266B2 (en) 2009-09-09 2014-04-22 Panasonic Corporation Power control system
EP2800223A3 (en) * 2009-09-09 2014-12-03 Panasonic Corporation Power control system
EP2477308A4 (en) * 2009-09-09 2013-12-04 Panasonic Corp Power control system
WO2011030200A1 (en) * 2009-09-09 2011-03-17 パナソニック電工株式会社 Power control system
EP2477308A1 (en) * 2009-09-09 2012-07-18 Panasonic Corporation Power control system
JP2016021865A (en) * 2009-09-09 2016-02-04 パナソニックIpマネジメント株式会社 Power control system
JPWO2011030200A1 (en) * 2009-09-09 2013-02-04 パナソニック株式会社 Power control system
WO2011039585A1 (en) * 2009-09-29 2011-04-07 パナソニック電工株式会社 Electric power management system
US9088182B2 (en) 2009-09-29 2015-07-21 Panasonic Intellectual Property Management Co., Ltd. Electric power management system
WO2011039586A1 (en) * 2009-09-29 2011-04-07 パナソニック電工株式会社 Electric power management system
JP2011078169A (en) * 2009-09-29 2011-04-14 Panasonic Electric Works Co Ltd Power management system
CN102598459A (en) * 2009-09-29 2012-07-18 松下电器产业株式会社 Electric power management system
CN102668300A (en) * 2009-09-29 2012-09-12 松下电器产业株式会社 Electric power management system
JP2011253509A (en) * 2010-06-04 2011-12-15 Daikin Ind Ltd Energy management system and controller
US8744639B2 (en) 2010-09-14 2014-06-03 Kabushiki Kaisha Toshiba Method and apparatus for power control
JP2012065407A (en) * 2010-09-14 2012-03-29 Toshiba Corp Power control device, power control system and method
US9866031B2 (en) 2010-09-14 2018-01-09 Kabushiki Kaisha Toshiba Method and apparatus for power control
JP2012130176A (en) * 2010-12-16 2012-07-05 Shimizu Corp Equipment control system, equipment control method, and equipment control program
JP2014226036A (en) * 2011-03-24 2014-12-04 住友電気工業株式会社 Server device, and program
JP2012244665A (en) * 2011-05-16 2012-12-10 Panasonic Corp Energy management system
JP2015195726A (en) * 2011-07-01 2015-11-05 パナソニックIpマネジメント株式会社 Power managing device, power managing system, power storage battery and power managing method
US8725303B2 (en) 2011-07-08 2014-05-13 Sharp Laboratories Of America, Inc. System and method for the multi-dimensional representation of energy control
JP2014518496A (en) * 2011-07-08 2014-07-28 シャープ株式会社 System, multi-dimensional display method of the graphical user interface, and energy control
WO2013008767A1 (en) * 2011-07-08 2013-01-17 Sharp Kabushiki Kaisha System, graphical user interface, and method for the multi-dimensional representation of energy control
JP2013024471A (en) * 2011-07-20 2013-02-04 Daikin Industries Ltd Controller for facility equipment
AU2012291465B2 (en) * 2011-08-03 2015-04-30 Daikin Industries, Ltd. Control device and control system for electrical equipment
WO2013018380A1 (en) * 2011-08-03 2013-02-07 ダイキン工業株式会社 Control apparatus and control method for electrical apparatuses
JP2013038470A (en) * 2011-08-03 2013-02-21 Daikin Ind Ltd Control device and control system of electrical apparatus
US9851110B2 (en) 2011-08-24 2017-12-26 Panasonic Intellectual Property Management Co., Ltd. Heating system control method and heating system
WO2013027312A1 (en) * 2011-08-24 2013-02-28 パナソニック株式会社 Heating system control method and heating system
JPWO2013027312A1 (en) * 2011-08-24 2015-03-05 パナソニック株式会社 Control method and heating system of the heating system
JP2013066268A (en) * 2011-09-15 2013-04-11 Toshiba Corp Household energy management apparatus and household energy management system
JP2013091293A (en) * 2011-10-27 2013-05-16 Sharp Corp Image forming apparatus
US8830497B2 (en) 2011-10-27 2014-09-09 Sharp Kabushiki Kaisha Image forming apparatus realizing electricity conservation by reducing power consumption
JP2013102610A (en) * 2011-11-08 2013-05-23 Nippon Telegr & Teleph Corp <Ntt> Wide-area power failure prevention method and wide-area power failure prevention system
JP2013106381A (en) * 2011-11-10 2013-05-30 Sony Corp Power management device, power management method, and demand notifying device
US9459644B2 (en) 2012-01-13 2016-10-04 Daikin Industries, Ltd. Energy control device
JP2013142529A (en) * 2012-01-13 2013-07-22 Daikin Industries Ltd Energy control device
WO2013105567A1 (en) * 2012-01-13 2013-07-18 ダイキン工業株式会社 Energy control device
JP2013162560A (en) * 2012-02-02 2013-08-19 Hitachi Ltd Demand and supply adjusting system
JP2013164232A (en) * 2012-02-13 2013-08-22 Mitsubishi Electric Corp Heating cooker
JP2013169104A (en) * 2012-02-16 2013-08-29 Sharp Corp Communication equipment, household electric appliance, controller, communication system, household electric appliance control method, power consumption control method, and program
JP2013247719A (en) * 2012-05-23 2013-12-09 Toshiba Corp Power controller, power control method and power control program
US10048711B2 (en) 2012-05-31 2018-08-14 Nihon Techno Co., Ltd. System, method, and program for conserving energy
US9207698B2 (en) 2012-06-20 2015-12-08 Causam Energy, Inc. Method and apparatus for actively managing electric power over an electric power grid
US10088859B2 (en) 2012-06-20 2018-10-02 Causam Energy, Inc. Method and apparatus for actively managing electric power over an electric power grid
US9563215B2 (en) 2012-07-14 2017-02-07 Causam Energy, Inc. Method and apparatus for actively managing electric power supply for an electric power grid
US9513648B2 (en) 2012-07-31 2016-12-06 Causam Energy, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US10310534B2 (en) 2012-07-31 2019-06-04 Causam Energy, Inc. System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network
US10320227B2 (en) 2012-07-31 2019-06-11 Causam Energy, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US9806563B2 (en) 2012-07-31 2017-10-31 Causam Energy, Inc. System, method, and apparatus for electric power grid and network management of grid elements
JP2014072911A (en) * 2012-09-27 2014-04-21 Daikin Ind Ltd Controller
JP2014075935A (en) * 2012-10-05 2014-04-24 Mitsubishi Electric Corp Home power instruction device and home power control system
JP2014093898A (en) * 2012-11-06 2014-05-19 Nippon Telegr & Teleph Corp <Ntt> Power demand control system and method
JP2014096877A (en) * 2012-11-08 2014-05-22 Mitsubishi Electric Corp Home power control device and home power control system
JP2014099985A (en) * 2012-11-14 2014-05-29 Nippon Telegr & Teleph Corp <Ntt> Power demand control system and method
US9547317B2 (en) 2012-12-11 2017-01-17 Fujitsu Limited Information processing device, information processing method, and storage medium
EP2743790A2 (en) 2012-12-11 2014-06-18 Fujitsu Limited Information processing device, information processing method, and storage medium
JP2014119218A (en) * 2012-12-18 2014-06-30 Daikin Ind Ltd Control device of air conditioner
JP2015223213A (en) * 2014-05-26 2015-12-14 三菱電機株式会社 rice cooker
JP2016019426A (en) * 2014-07-10 2016-02-01 パナソニックIpマネジメント株式会社 Power managing device
US10389115B2 (en) 2014-12-12 2019-08-20 Causam Energy, Inc. Systems and methods for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same
JP2016161215A (en) * 2015-03-02 2016-09-05 ダイキン工業株式会社 Air conditioning system
US10381870B2 (en) 2017-08-07 2019-08-13 Causam Energy, Inc. System, method, and apparatus for electric power grid and network management of grid elements

Similar Documents

Publication Publication Date Title
AU2004305625B2 (en) Grid stabilising system
Hammerstrom et al. Pacific Northwest GridWise™ Testbed Demonstration Projects; Part I. Olympic Peninsula Project
US5684710A (en) System for measuring electrical power interruptions
ES2702368T3 (en) Central station of corrugators
Piccolo et al. Evaluating the impact of network investment deferral on distributed generation expansion
Mohsenian-Rad et al. Optimal residential load control with price prediction in real-time electricity pricing environments
US9406094B2 (en) Method and apparatus for delivering power using external data
JP4945077B2 (en) Storage equipment management system
US7627401B2 (en) System and method for remotely regulating the power consumption of an electric appliance
US6047274A (en) Bidding for energy supply
US6680547B1 (en) Power sharing system including rechargeable power source
US20060036350A1 (en) Profile based method for deriving a temperature setpoint using a &#39;delta&#39; based on cross-indexing a received price-point level signal
US20010010032A1 (en) Energy management and building automation system
US10320227B2 (en) System, method, and apparatus for electric power grid and network management of grid elements
US5644173A (en) Real time and/shed load based on received tier pricing and direct load control with processors for each load
US20100092625A1 (en) Energy management of household appliances
EP1330007B1 (en) Demand control apparatus and power distribution control system
US20030182023A1 (en) Load controller and method to enhance effective capacity of a photovoltaic power supply using a dynamically determined expected peak loading
Joskow et al. Reliability and competitive electricity markets
US9881259B2 (en) System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management
US8321064B2 (en) Grid interconnection device, grid interconnection system, and power control system
JP5524910B2 (en) Rechargeable device and the charge-discharge method
JP5981313B2 (en) Power suppression power storage heat storage optimizing device, optimization methods and optimization program
US8178997B2 (en) Supplying grid ancillary services using controllable loads
US8369998B2 (en) Updating demand response settings