GB2522958A - Slug mitigation system for subsea pipelines and risers - Google Patents

Slug mitigation system for subsea pipelines and risers Download PDF

Info

Publication number
GB2522958A
GB2522958A GB1419947.5A GB201419947A GB2522958A GB 2522958 A GB2522958 A GB 2522958A GB 201419947 A GB201419947 A GB 201419947A GB 2522958 A GB2522958 A GB 2522958A
Authority
GB
United Kingdom
Prior art keywords
separator
mitigation system
upstream
slug
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB1419947.5A
Other versions
GB2522958B (en
GB201419947D0 (en
Inventor
Mirza Najam Ali Beg
Syed Mahmood Peeran
Mir Mahmood Sarshar
Rhodri John Jones
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Caltec Ltd
Original Assignee
Caltec Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Caltec Ltd filed Critical Caltec Ltd
Priority to GB1511844.1A priority Critical patent/GB2525779B/en
Publication of GB201419947D0 publication Critical patent/GB201419947D0/en
Publication of GB2522958A publication Critical patent/GB2522958A/en
Application granted granted Critical
Publication of GB2522958B publication Critical patent/GB2522958B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D19/00Degasification of liquids
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/06Arrangements for treating drilling fluids outside the borehole
    • E21B21/063Arrangements for treating drilling fluids outside the borehole by separating components
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D19/00Degasification of liquids
    • B01D19/0042Degasification of liquids modifying the liquid flow
    • B01D19/0052Degasification of liquids modifying the liquid flow in rotating vessels, vessels containing movable parts or in which centrifugal movement is caused
    • B01D19/0057Degasification of liquids modifying the liquid flow in rotating vessels, vessels containing movable parts or in which centrifugal movement is caused the centrifugal movement being caused by a vortex, e.g. using a cyclone, or by a tangential inlet
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/01Risers
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/06Arrangements for treating drilling fluids outside the borehole
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/06Arrangements for treating drilling fluids outside the borehole
    • E21B21/063Arrangements for treating drilling fluids outside the borehole by separating components
    • E21B21/067Separating gases from drilling fluids
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells

Abstract

A slug mitigation system for subsea pipelines includes a riser (11) located between a low level and an upper (above sea-) level of a pipeline, where an inline separator (14), e.g. an ISEP, is located upstream of a first stage separator (12). Preferably a throttling valve (15) or fixed restriction is located downstream or upstream in series with the inline separator (14). The slug mitigation system may also include a surface jet pump (21, Fig 10) upstream of the in-line separator (14) and/or a cyclonic separator (17, Fig 9) downstream of the in-line separator (14). The system may reduce the effect of slugging on a pipeline riser/pipeline system for offshore oil and gas use.

Description

Slug Mitigation System for Subsea Pipelines and Risers The present invention relates to improved arrangements for slug mitigation in subsea pipelines, such as risers, as used in the oil and gas industry and particularly, according to the S invention, utilising an in line separator apparatus in such arrangements.
Background to the Invention
In-line separator devices are known in the art. For example, W02008/020155 and W02009/047484 each describe improved in-line separator arrangements; also known as cyclonic and/or uniaxial separators. Figure 1 illustrates an in-line separator according to W02008/020155 which is referred to commercially as an "I-SEP". Furthermore, embodiments described by W02009/047484 are known commercially as "Hi-SEP", illustrated by Figure 2.
Likewise, jet pumps (a.k.a. surface jet pumps. SiPs, eductors or ejecters) are known. For example, [P0717818 relates to a surface jet pump where flow from a high pressure oil well is used to reduce the back pressure on low pressure wells. According to this document the source of motive flow is a high pressure well and the low pressure well is not gas lifted. This jet pump also incorporates an in-line separator, as illustrated by Figure 3.
It has been recognised by the present inventors that: * An I-SEP has been shown to absorb slug energy and calm the fluid flow down stream * By making use of I-SEP technology it is possible to mitigate slug flow in pipelines and severe slugging in pipeline/riser systems * An I-SEP has also been seen to influence flow regimes upstream in the piping and risers * By making use of the I-SEP technology it is possible to mitigate slug flow at a higher production rate, i.e. less back pressure is required to mitigate the slug flow * It is also possible to mitigate slug flow while producing a complete gas-liquid separation, thus debottlenecking the main stage separator using this technology * This system is applicable for any slugging type/situation
Summary of the Invention
The present invention seeks to find a system that mitigates a severe slugging regime in a passive way without the need of active control whilst imposing a smaller back pressure on the base of the riser (resulting in changing of the flow regime in the riser and increasing the stable flow region) this will result in a higher production for the operator.
In one broad aspect of the invention there is provided a pipeline system including a riser located between a low level and an upper level of a pipeline, wherein an inline separator is located at the upper level of the pipeline, upstream of a first stage separator. Preferably a first control valve is located adjacent the inline separator, this may be either upstream or downstream thereof. Preferably, in one embodiment, a gas line from the I-SEP is arranged to bypass the throttling valve.
Brief Description of the Drawings
Figure 1 illustrates a section view of a prior art in-line separator; Figure 2 illustrates a section orthographic view of another prior art in-line separator;
Figure 3 illustrates a prior art surface jet pump;
Figure 4 illustrates a general pipeline/riser system known in the art; FigureS illustrates four cyclical stages of severe slugging, known in the art;
Detailed Description of the Invention
The invention has been designed to specifically reduce the effect of slugging on a pipeline riser/pipeline system for offshore oil and gas use. Figure 4 shows a general pipeline/riser system where the flow from the wellhead flows along the seabed and enters a typical riser configuration 11 which connects the seabed pipeline to the topside processing/separation equipment. e.g. a first stage separator 12. The systems described herein can be used for severe slugging or any terrain induced slug flow that may be generated from the profile of a pipeline. A typical severe slugging regime has been used as an example to describe a solution but the invention is equally as effective for any slug flow regime.
One of the major issues associated with the type of system illustrated by Figure 4 is a flow S regime described as severe slugging (mentioned above). Severe slugging occurs generally in four cyclical stages, as can be seen in Figure 5. Severe slugging is the occurrence of a liquid slug that is at least one riser height in length and can be hundreds of metres in length. It is also known as terrain induced slugging because it usually occurs due to low points in a pipeline.
The most common four stages shown in Figure 5 represent the cyclic nature of severe slugging, namely: Stage 1: Liquid fall back -From the end of the previous cycle there is some liquid fall back down to the low point of the riser. Along with constant inflow of new liquids this causes a blockage at the base of the riser and starts the next cycle.
Stage 2: Slug formation -the liquid continues to build up in the riser as a liquid slug.
Pressure builds up behind this liquid slug as gas continues to flow into the pipeline.
Stage 3: Slug Production -once the liquid reaches the top of the riser the hydrostatic head can no longer increase and therefore gas pressure overcomes the liquid head and a liquid slug starts to be produced.
Stage 4: Blowout -Once the tail of the slug reaches the base of the riser the gas breaks through and into the riser, expanding to cause a violent acceleration of the liquid slug; after which some liquid falls back down the riser and blocks the riser base thus commencing the next cycle (stage 1).
The main issues associated with production whilst in the severe slugging regime occur due to flooding of the separation systems during the slug production phase of the cycle resulting in poor separation and over pressurisation during the slug blow out stage which can cause the platform to shut down completely. For example, export compressors go into surge mode due to significant variation in the gas flowrates, imposing stress on the shaft/bearings and operational control issues. Sometimes this leads to unwanted flaring of the gas.
Furthermore, cyclic surges introduce vibration to the process piping system and mechanical fatigue to the riser, leading to possible earlier failure. Accordingly, it is important that this flow regime can be controlled or mitigated.
S
Severe slugging can be managed by making use of slug catchers on the topside facilities but these are generally large vessels designed to hold the full liquid slug, thus mitigating any issues of flooding the separation trains. Slug catchers are typically very large and heavy as they have to be designed to withstand the high pressures observed during blowout. As footprint and weight are very important parameters for an offshore platform, there is generally not sufficient space or capability to carry the weight associated with the need for slug catchers. Accordingly, a more compact system is required.
Figure 6 shows a system that is recognised as a simple fix in the field, namely a control/choke valve 13 situated at the top of the riser 11 that, by throttling the control/choke valve actively imposes a back pressure on the riser which slows down incoming flow, hence restricts the production rate. During the blowout stage of a severe slugging cycle, the higher back pressure acts to decelerate the liquid slug forcing it to mix with the gas in the riser, ultimately stabilising the flow. This method forces the operator to accept a reduction in production to achieve stable flow and may cause some wells to be abandoned. In some cases, the flow is sheared going to downstream processes and makes separation of phases difficult.
If a system can be found that mitigates the severe slugging regime whilst imposing a smaller back pressure on the base of the riser (resulting in changing of the flow regime in the riser and increasing the stable flow region) this will result in a higher production for the operator in a stable manner with minimum operational upsets.
Slug mitigation is possible by an I-SEP alone, but from experimental testing, it has become apparent that by making use of an I-SEP and control valve at the top of the riser, the system could act in a improved way to the use of the throttling valve. Such a system is illustrated by Figure 7 where an I-SEP 14 is located downstream of the riser 11 (above sea level) and upstream of a throttling valve 15. However, as illustrated, gas separated at the I-SEP 14 is shown to be able to bypass the throttling valve in a bypass line 16 before re-joining the main pipeline prior to connection with the first stage separator 12.
S The valve 15 could be substituted by a fixed restriction to add a minor pressure loss, such as a smaller outlet of the I-SEP or a built in orifice plate. This would allow partially separated gas to be reintroduced and mixed before entering the main separator. The mixing point could be a commingler (not illustrated).
Testing has shown that by making use of this system it is possible to mitigate the severe slugging regime with a lower back pressure compared to a control/choke valve (13) only.
Early test results and computer simulations have shown that a 10-20% saving in pressure loss can be observed by making use of an I-SEP 14 rather than the control valve; this would result in a higher production rate by making use of the I-SEP rather than the control valve alone.
A further advantage of making use of an I-SEP device is its ability to separate gas and liquid that could be beneficial for pipeline riser systems where the first stage separator needs de-bottlenecking. Figure 8 shows an example of how an I-SEP/Hi-SEP 14/17 combination could be used to mitigate severe slugging and perform a pre-separation on the fluids prior to entering the main separation train. The Hi-SEP component 17 (as described by W02009/047484) is located downstream of the I-SEP 14, where dense fluid separated therein is piped via a control valve to the first stage separator 12. Gas separated in the Hi-SEP 17 can be piped via a control valve 18 to a compressor.
Figure 9 shows a similar design to that of Figure 8 that can be used to mitigate severe slugging and perform a gas-liquid separation. This embodiment includes a pipeline 19, bypassing the I-SEP/Hi-SEP componentsl4/17, directly to the first stage 12 controlled by a control valve 20, such that the pre-separation stage is bypassed. The I-SEP/Hi-SEP arrangement can take part of the flow to debottleneck the main separator and also provide slug mitigation.
S
Figure 10 shows an example of making use of the I-SEP 14 for slug mitigation and a jet pump (SiP) 21, located at the top of the riser 11, upstream of the I-SEP 14, that can be used to re- inject the separated gas flow 16 from the I-SEP 14 and re-inject this back into the main riser-pipeline this also enables mixing of the flow hence changing the flow regime. The outlet S valves can be controlled by a slug detection system thus allowing flow diversion based on incoming slug style (part of which is described in our patent application W02014006371).
As illustrated, a bypass line is installed to bypass the I-SEP. Control valves are provided in the bypass line and upstream/downstream of the I-SEP.
It is noteworthy that, for a slug mitigation application as required by the present invention, an I-SEP does not require control valves as no active control is needed, whereas the need for active control is needed in some prior art relating to slug mitigation. Furthermore, the I-SEP does not require a production separator immediately downstream in order to perform.

Claims (8)

  1. Claims: 1. A slug mitigation system for subsea pipelines including a riser located between a low level and an upper level of a pipeline; wherein an inline separator is located at the S upper level of the pipeline, upstream of a first stage separator.
  2. 2. The slug mitigation system of claim 1 including a first throttling valve or fixed restriction located downstream or upstream in series with the inline separator.
  3. 3. The slug mitigation system of claim 2 wherein a gas line from the inline separator is arranged to bypass the throttling valve or fixed restriction.
  4. 4. The slug mitigation system of claim 2 including a supplementary cyclonic separator, in combination with the inline separator, upstream of the first throttling valve or fixed restriction, and wherein a gas output line from the supplementary cyclonic separator is directed to a compressor.
  5. 5. The slug mitigation system of claim 1 or 2 including a jet pump located at the upper level of the pipeline, configured to utilise high pressure fluid output from the inline separator.
  6. 6. The slug mitigation system of claim 4 including a valve controlled bypass pipeline, connecting to a location upstream of the inline separator and downstream of the first throttling valve or fixed restriction.
  7. 7. The slug mitigation system of claim 6 including a second control valve located between the bypass pipeline and the inline separator.
  8. 8. The slug mitigation system of any preceding claim wherein a commingler is located upstream of the first stage separator.Amendment to Claims have been filed as follows Claims: 1. A slug mitigation system for subsea pipelines including: a riser located between a low level and an upper level of a pipeline; a first stage separator; an inline separator located at the upper level of the pipeline, upstream of the first stage separator; a first throttling valve or fixed restriction located downstream of, or upstream in series with, the inline separator; a supplementary cyclonic separator, in combination with the inline separator, upstream of the first throttling valve or fixed restriction, and wherein a gas output line from the supplementary cyclonic separator is directed to a compressor.2. The slug mitigation system of claim 1 including a valve controlled bypass pipeline, LI") 15 connecting to a location upstream of the inline separator and downstream of the first throttling valve orfixed restriction.3. The slug mitigation system of claim 2 including a second control valve located between 0 the bypass pipeline and the inline separator.4. The slug mitigation system of any preceding claim wherein a commingler is located upstream of the first stage separator.
GB1419947.5A 2013-11-15 2014-11-10 Slug mitigation system for subsea pipelines and risers Active GB2522958B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
GB1511844.1A GB2525779B (en) 2013-11-15 2014-11-10 Slug mitigation system for subsea pipelines and risers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GBGB1320205.6A GB201320205D0 (en) 2013-11-15 2013-11-15 Slug mitigation system for subsea pipelines

Publications (3)

Publication Number Publication Date
GB201419947D0 GB201419947D0 (en) 2014-12-24
GB2522958A true GB2522958A (en) 2015-08-12
GB2522958B GB2522958B (en) 2016-03-30

Family

ID=49883679

Family Applications (3)

Application Number Title Priority Date Filing Date
GBGB1320205.6A Ceased GB201320205D0 (en) 2013-11-15 2013-11-15 Slug mitigation system for subsea pipelines
GB1511844.1A Active GB2525779B (en) 2013-11-15 2014-11-10 Slug mitigation system for subsea pipelines and risers
GB1419947.5A Active GB2522958B (en) 2013-11-15 2014-11-10 Slug mitigation system for subsea pipelines and risers

Family Applications Before (2)

Application Number Title Priority Date Filing Date
GBGB1320205.6A Ceased GB201320205D0 (en) 2013-11-15 2013-11-15 Slug mitigation system for subsea pipelines
GB1511844.1A Active GB2525779B (en) 2013-11-15 2014-11-10 Slug mitigation system for subsea pipelines and risers

Country Status (3)

Country Link
US (1) US9347284B2 (en)
GB (3) GB201320205D0 (en)
NO (1) NO20141339A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11486243B2 (en) * 2016-08-04 2022-11-01 Baker Hughes Esp, Inc. ESP gas slug avoidance system
CN109505585B (en) * 2018-11-15 2022-04-26 西安建筑科技大学 Marine riser coupling vibration response simulation device and method caused by slug flow

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1993018279A1 (en) * 1992-03-13 1993-09-16 Merpro Tortek Limited Well uplift system
WO2002063135A1 (en) * 2001-02-05 2002-08-15 Navion Asa A method and a sea-based installation for hydrocarbon processing
WO2004057153A1 (en) * 2002-12-23 2004-07-08 Norsk Hydro Asa A system and a method for prediction and treatment of slugs being formed in a flow line or wellbore tubing
GB2468973A (en) * 2009-03-28 2010-09-29 Univ Cranfield Controlling the slug flow of a multiphase fluid
GB2478231A (en) * 2009-03-28 2011-08-31 Univ Cranfield Controlling the slug flow of a multiphase fluid

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3500943A (en) * 1968-06-20 1970-03-17 Shell Oil Co Pressurized well drilling system
US5570744A (en) * 1994-11-28 1996-11-05 Atlantic Richfield Company Separator systems for well production fluids
US6197095B1 (en) * 1999-02-16 2001-03-06 John C. Ditria Subsea multiphase fluid separating system and method
US8801938B2 (en) * 2010-07-03 2014-08-12 Dana R. Allen Method and device for underwater recovery of products or pollutants

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1993018279A1 (en) * 1992-03-13 1993-09-16 Merpro Tortek Limited Well uplift system
WO2002063135A1 (en) * 2001-02-05 2002-08-15 Navion Asa A method and a sea-based installation for hydrocarbon processing
WO2004057153A1 (en) * 2002-12-23 2004-07-08 Norsk Hydro Asa A system and a method for prediction and treatment of slugs being formed in a flow line or wellbore tubing
GB2468973A (en) * 2009-03-28 2010-09-29 Univ Cranfield Controlling the slug flow of a multiphase fluid
GB2478231A (en) * 2009-03-28 2011-08-31 Univ Cranfield Controlling the slug flow of a multiphase fluid

Also Published As

Publication number Publication date
GB2522958B (en) 2016-03-30
GB2525779A (en) 2015-11-04
GB201419947D0 (en) 2014-12-24
GB2525779B (en) 2016-03-30
NO20141339A1 (en) 2015-05-18
GB201320205D0 (en) 2014-01-01
US20150136411A1 (en) 2015-05-21
US9347284B2 (en) 2016-05-24
GB201511844D0 (en) 2015-08-19

Similar Documents

Publication Publication Date Title
US10648314B2 (en) Systems and methods for subsea fluid phase separation
RU2673054C2 (en) Apparatus and method for gas and liquid separation
DK179274B1 (en) Split flow pipe separator
CA2878608C (en) Multiphase separation system
US10112848B2 (en) Emulsion extraction and processing from an oil/water separator
EP2877264B1 (en) Multiphase separation system
WO2014006371A3 (en) A system to boost the pressure of multiphase well fluids to handle slugs
US9371724B2 (en) Multiphase separation system
US20160138372A1 (en) Method of using a surface jet pump to mitigate severe slugging in pipes and risers
AU2007270185A1 (en) Method of cooling a multiphase well effluent stream
US9347284B2 (en) Slug mitigation system for subsea pipelines and risers
US9328856B2 (en) Use of pressure reduction devices for improving downstream oil-and-water separation
Wang et al. Solutions to the Problems After Marginal Oilfield Joins to Complicated Pipe Network
Rampersad et al. Field improvement of water handling offshore Trinidad
Tengku-Bazli et al. Experimental Analyses on T-junction Geometry in Two Phase Flow
Carpenter Subsea Processing and Boosting in Brazil: Future Vision