GB2481000A GB1009299.7A GB201009299A GB2481000A GB 2481000 A GB2481000 A GB 2481000A GB 201009299 A GB201009299 A GB 201009299A GB 2481000 A GB2481000 A GB 2481000A
Authority
GB
United Kingdom
Prior art keywords
metal workpiece
predetermined position
recess
workpiece
metal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB1009299.7A
Other versions
GB2481000B (en
GB201009299D0 (en
Inventor
Richard Gordon Milburn
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rolls Royce PLC
Original Assignee
Rolls Royce PLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rolls Royce PLC filed Critical Rolls Royce PLC
Priority to GB1009299.7A priority Critical patent/GB2481000B/en
Publication of GB201009299D0 publication Critical patent/GB201009299D0/en
Priority to US13/102,483 priority patent/US8162202B2/en
Priority to EP11165114.7A priority patent/EP2392423B1/en
Priority to SG2011039062A priority patent/SG176412A1/en
Publication of GB2481000A publication Critical patent/GB2481000A/en
Application granted granted Critical
Publication of GB2481000B publication Critical patent/GB2481000B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B21D26/021Deforming sheet bodies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B21D26/053Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure characterised by the material of the blanks
    • B21D26/055Blanks having super-plastic properties
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B21D26/053Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure characterised by the material of the blanks
    • B21D26/059Layered blanks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D53/00Making other particular articles
    • B21D53/78Making other particular articles propeller blades; turbine blades
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K20/00Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating
    • B23K20/02Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating by means of a press ; Diffusion bonding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K20/00Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating
    • B23K20/18Zonal welding by interposing weld-preventing substances between zones not to be welded
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • B23P15/04Making specific metal objects by operations not covered by a single other subclass or a group in this subclass turbine or like blades from several pieces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2101/00Articles made by soldering, welding or cutting
    • B23K2101/001Turbines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Shaping Metal By Deep-Drawing, Or The Like (AREA)
  • Pressure Welding/Diffusion-Bonding (AREA)

Abstract

In a method of manufacturing an article (28) e.g. fan blade or guide by diffusion bonding and superplastic forming stop off material (122) is applied to prevent diffusion bonding in a predetermined pattern on a first surface (106) of a first metal workpiece (100) and the predetermined pattern is spaced from the edges of the first surface (106) of the first metal workpiece (100) . Stop off material (124) to prevent diffusion bonding is applied in a predetermined position on the first surface (106) of t6he first workpiece (100) and the predetermined position extends from the predetermined pattern of stop off material (122) on the first surface (106) of the first metal workpiece (100) towards one edge of the first surface (106) of the first metal workpiece (100). A recess (130, 132) is provided in a second predetermined position on the second surface (108) of the first metal workpiece (100) or a fourth surface (112) of a second metal workpiece (102), the recess (130,132) extends towards the same edge of the first metal workpiece (100) or a corresponding edge of the second metal workpiece (102) and is aligned with the stopoff material (124) . The first and second metal workpieces (100, 102) are diffusion bonded together. During superplastic forming the recess (130, 132) and the stop off material (124) in the predetermined position define an inflation passage (148) for superplastic forming of the metal workpieces (100, 102) to a hollow article (28).

Description

A METHOD OF MANUFACTURING AN ARTICLE BY DIFFUSION BONDING
AND SUPERPLASTIC FORMING
The present invention relates to a method of manufacturing an article by diffusion bonding and superplastic forming and in particular to a method of manufacturing gas turbine engine fan blades, or fan outlet guides, by diffusion bonding and superplastic forming.
It is known to manufacture gas turbine engine fan blades, or fan outlet guide vanes, by diffusion bonding and superplastic forming. A stop off material is provided in a predetermined pattern on one of the abutting surfaces of the diffusion bondable and superplastically formable metal workpieces to prevent diffusion bonding. The diffusion bondable and superplastically formable metal workpieces are superplastically formed in those regions where the stop off material was applied in the predetermined pattern.
A problem with this method is that the cross-sectional area of an inflation slot, provided on an interior surface of one of the workpieces, to provide an inflation gas to the predetermined pattern of stop off material to superplastically form the workpieces is reduced in size during the diffusion bonding of the workpieces. After completion of the superplastic forming process it is necessary to ensure that all of the inflation gas has escaped from within the interior of the superplastically formed workpieces and the reduced cross-sectional area of the inflation slot increases the superplastic forming time and reduces the manufacturing rate of components. In addition after the superplastically formed workpieces have been removed from the superplastic forming dies the inflation gas within the interior of the superplastically formed workpieces contracts and draws air into the interior of the superplastically formed workpieces. If the air entry is restricted due to the reduced cross-sectional area of the inflation slot then a pressure differential is generated, which sucks in the faces of the superplastically formed workpieces to produce a component with an under formed profile. The effects of an inflation slot with a reduced cross-sectional area increase with increasing size and internal volume of a fan blade, or fan outlet guide vane.
Accordingly the present invention seeks to provide a novel method of manufacturing an article by diffusion bonding and superplastic forming which reduces, preferably overcomes, the above mentioned problem.
Accordingly the present invention provides a method of manufacturing an article by diffusion bonding and superplastic forming comprising the steps of:-a) providing at least a first metal workpiece and a second metal workpiece, the first metal workpiece having a first surface and a second surface, the second metal workpiece having a third surface and a forth surface, b) applying stop off material to prevent diffusion bonding in a predetermined pattern on the first surface of the first metal workpiece, the predetermined pattern being spaced from the edges of the first surface of the first metal workpiece, c) applying stop off material to prevent diffusion bonding in a predetermined position on the first surface of the first metal workpiece or the third surface of the second metal workpiece, the predetermined position extending from the predetermined pattern of stop off material on the first surface of the first metal workpiece towards one edge of the first surface of the first metal d) providing a recess in a second predetermined position on the first surface of the first metal workpiece, the second surface of the first metal workpiece, the third surface of the second metal workpiece or the fourth surface of the second metal workpiece, the recess extending towards the same edge of the first metal workpiece or a corresponding edge of the second metal e) assembling at least the first metal workpiece and the second metal workpiece in a stack such that the first surface of the first metal workpiece faces the third surface of the second metal workpiece and the recess in the second predetermined position on the first surface of the first metal workpiece, the second surface of the first metal workpiece, the third surface of the second metal workpiece or the fourth surface of the second metal workpiece is aligned with the stop off material arranged in the predetermined position on the first surface of the first metal workpiece, f) sealing the edges of the first metal workpiece to the edges of the second metal workpiece to form a sealed assembly, g) evacuating the sealed assembly, h) heating and externally pressurising the sealed assembly to diffusion bond the first and second metal workpieces together except in areas other than the predetermined pattern and predetermined position to form a sealed integral structure, i) connecting an inflation pipe to the stop off material in the first predetermined position on the first surface of the first metal workpiece of the sealed integral structure, j) heating and internally pressurising the sealed integral structure to cause the first metal workpiece, or the second metal workpiece, where the stop off material was arranged in the predetermined position and the recess was arranged in the second predetermined position, to be hot formed to create an inflation passage within the sealed integral structure, k) heating and internally pressurising the sealed integral structure to cause the first metal workpiece and/or the second metal workpiece where the stop off material was arranged in the predetermined pattern to be superplastically formed to create a hollow metal article.
Step d) may comprise providing a first recess in a second predetermined position on the second surface of the first metal workpiece and a second recess in a third predetermined position on the fourth surface of the second metal workpiece, the first recess extending towards the same edge of the first metal workpiece and the second recess extending towards a corresponding edge of the second metal workpiece, step e) comprises assembling at least the first metal workpiece and the second metal workpiece in stack such that the first recess in the second predetermined position on the second surface of the first metal workpiece and the second recess in fourth surface of the second metal workpiece are aligned with the stop off material arranged in the predetermined position on the first surface of the first metal workpiece and step j) comprises heating and internally pressurising the sealed integral structure to cause the first metal workpiece and the second metal workpiece, where the stop off material was arranged in the predetermined position, the first recess was arranged in the second predetermined position and the second recess was arranged in the third predetermined position, to be hot formed to create an inflation passage within the sealed integral structure.
Step d) may comprise providing a first recess in a second predetermined position on the first surface of the first metal workpiece and a second recess in a third predetermined position on the third surface of the second metal workpiece, the first recess extending towards the same edge of the first metal workpiece and the second recess extending towards a corresponding edge of the second metal workpiece, step e) comprises assembling at least the first metal workpiece and the second metal workpiece in stack such that the first recess in the second predetermined position on the first surface of the first metal workpiece and the second recess in third surface of the second metal workpiece are aligned with the stop off material arranged in the predetermined position on the first surface of the first metal workpiece and step j) comprises heating and internally pressurising the sealed integral structure to cause the first metal workpiece and the second metal workpiece, where the stop off material was arranged in the predetermined position, the first recess was arranged in the second predetermined position and the second recess was arranged in the third predetermined position, to be hot formed to create an inflation passage within the sealed integral structure.
Step a) may comprise providing a third metal workpiece, the third metal workpiece having a fifth surface and a sixth surface, step b) may comprise applying stop off material to prevent diffusion bonding in a predetermined pattern on the third surface of the second metal workpiece, the predetermined pattern being spaced from the edges of the third surface of the second metal workpiece, step e) may comprise assembling the first metal workpiece, the second metal workpiece and the third metal workpiece in a stack such that the first surface of the first metal workpiece faces the fifth surface of the third metal workpiece, the sixth surface of the third metal workpiece faces the third surface of the second metal workpiece and the recess in the second predetermined position on the first surface of the first metal workpiece, the second surface of the first metal workpiece, the third surface of the second metal workpiece or the fourth surface of the second metal workpiece is aligned with the stop off material arranged in the predetermined position on the first surface of the first metal workpiece.
The article may be a fan blade or a fan outlet guide vane.
The article may be a heat exchanger, a compressor blade or a compressor vane.
The first metal workpiece and/or the second metal workpiece may comprise a titanium alloy. The titanium alloy may consist of 6wt% vanadium, 4wt% aluminium and the balance titanium, minor elemental additions and incidental impurities.
Step d) may comprise providing a recess in a second predetermined position on the first surface of the first metal workpiece, the recess extending towards the same edge of the first metal workpiece.
Step d) may comprise providing a recess in a second predetermined position on the second surface of the first metal workpiece, the recess extending towards the same edge of the first metal workpiece.
Step h) may comprise heating to a temperature greater than 85000 and applying a pressure greater than 20.26 x 1O5Nm2. Step h) may comprise heating to a temperature between 900°C and 9500C and applying a pressure between 20.26 x 1 O5Nm2 and 30.39 x 1 O5Nm2.
Step j) and step k) may comprise heating to a temperature greater than 850°C. Step j) and step k) may comprise heating to a temperature between 900°C and 950°C.
Step d) may comprise providing a recess in a second predetermined position which extends to the same edge of the first metal workpiece.
The method may comprise providing an inflation slot on the first surface or the third surface, the inflation slot extending from the edge of the first metal workpiece or third metal workpiece to interconnect with the stop off material in the predetermined pattern on the first surface of the first metal workpiece.
Alternatively the present invention provides a method of manufacturing an article by diffusion bonding and superplastic forming comprising the steps of:-a) providing at least a first metal workpiece and a second metal workpiece, the first metal workpiece having a first surface and a second surface, the second metal workpiece having a third surface and a fourth surface, b) providing a recess in the first surface or the second surface of the first metal workpiece, the recess extending from a first predetermined position on the first surface or the second surface of the first metal workpiece towards an edge of the first metal workpiece, c) applying stop off material to prevent diffusion bonding in a predetermined pattern on the first surface of the first metal workpiece, the predetermined pattern being spaced from the edges of the first surface of the first metal workpiece, d) applying stop off material to prevent diffusion bonding on the first surface of the first metal workpiece, the stop off material extending from a second predetermined position on the first surface of the first metal workpiece towards the edge of the first metal workpiece, the second predetermined position contacts the predetermined pattern of stop off material, e) assembling at least the first metal workpiece and the second metal workpiece in a stack such that the first surface of the first metal workpiece faces the third surface of the second metal workpiece and the recess in the first surface or the second surface of the first metal workpiece is aligned with the stop off material on the first surface of the first metal workpiece extending from the second position towards the edge of the first metal workpiece, f) sealing the edges of the first metal workpiece to the edges of the second metal workpiece to form a sealed assembly, g) evacuating the sealed assembly, h) heating and externally pressurising the sealed assembly to diffusion bond the first and second metal workpieces together except in areas other than the preselected areas to form a sealed integral structure, i) connecting an inflation pipe to the stop off material in the first predetermined position on the first surface of the first metal workpiece of the sealed integral structure, j) heating and internally pressurising the sealed integral structure to cause the first metal workpiece, or the second metal workpiece, where the stop off material was arranged in the predetermined position and the recess was arranged in the second predetermined position, to be hot formed to create an inflation passage within the sealed integral structure, k) heating and internally pressurising the sealed integral structure to cause the first metal workpiece and/or the second metal workpiece where the stop off material was arranged in the predetermined pattern to be superplastically formed to create a hollow metal article.
The present invention will be more fully described by way of example with reference to the accompanying drawings, in which:-Figure 1 is a partially cut away view of a turbofan gas turbine engine having an article manufactured by diffusion bonding and superplastic forming according to the present invention.
Figure 2 is an enlarged view of an article manufactured by diffusion bonding and superplastic forming according to the present invention.
Figure 3 is an exploded view of a stack of two metal workpieces which are to be diffusion bonded and superplastically formed to form an article according to the present invention.
Figure 4 is a perspective view of a sealed assembly comprising the stack of two metal workpieces which are to be diffusion bonded and superplastically formed to form an article according to the present invention.
Figure 5 is a perspective view of the two metal workpieces shown in figure 4 showing a sealed integral structure after a diffusion bonding step has been performed.
Figure 6 is a cross-sectional view of the sealed integral structure shown in figure 5 in a superplastic forming die before a superplastic forming step.
Figure 7 is a cross-sectional view along line X-X of the sealed integral structure in a superplastic forming die shown in figure 6.
Figure 8 is a cross-sectional view of the sealed integral structure shown in figure 5 in a superplastic forming die at the start of a superplastic forming step.
Figure 9 is a cross-sectional view of the sealed integral structure shown in figure 5 in a superplastic forming die at the end of a superplastic forming step.
Figure 10 is a cross-sectional view along line Y-Y of the sealed integral structure in a superplastic forming die shown in figure 9.
Figure 11 is an enlarged view of another article manufactured by diffusion bonding and superplastic forming according to the present invention.
Figure 12 is an enlarged view of a further article manufactured by diffusion bonding and superplastic forming according to the present invention.
Figure 13 illustrates an exploded view of a stack of three metal workpieces which are diffusion bonded and superplastically formed to form an article according to the present invention.
Figure 14 is an alternative cross-sectional view along line X-X of the sealed integral structure in a superplastic forming die shown in figure 6.
Figure 15 is an alternative cross-sectional view along line Y-Y of the sealed integral structure in a superplastic forming die shown in figure 9.
Figure 16 is a cross-sectional view through an alternative sealed assembly.
Figure 17 is a cross-sectional view through a sealed integral structure in a superplastic forming die after diffusion bonding of the sealed assembly shown in figure 16.
Figure 18 is a cross-sectional view through the sealed integral structure in a superplastic forming die shown in figure 17 after superplastic forming.
Figure 19 is an exploded view of an alternative stack of two metal workpieces which are to be diffusion bonded and superplastically formed to form an article according to the present invention.
Figure 20 is a cross-sectional view through a sealed assembly formed from the stack of metal workpieces shown in figure 19.
Figure 21 is a cross-sectional view through a sealed integral structure in a superplastic forming die formed from the sealed assembly shown in figure 20 after diffusion bonding and superplastic forming.
A turbofan gas turbine engine 10, as shown in figure 1, comprises in flow series an inlet 12, a fan section 14, a compressor section 16, a combustion section 18, a turbine section 20 and an exhaust 22. The fan section 14 includes a fan 24, which comprises a fan rotor 25 and a plurality of circumferentially spaced and radially outwardly extending fan blades 26. The fan section 14 also includes a plurality of fan outlet guide vanes 28 which extend radially between a core engine casing 30 and a fan casing 32. The compressor section 16 comprises an intermediate pressure compressor 34 and a high pressure compressor 36. The combustion section 16 comprises an annular combustion chamber 38 or a plurality of tubular combustion chambers arranged in an annular arrangement. The turbine section 18 comprises a high pressure turbine 40, an intermediate pressure turbine 42 and a low pressure turbine 44. The low pressure turbine 44 is arranged to drive the fan 24 via a shaft 46, the intermediate pressure turbine 42 is arranged to drive the intermediate pressure compressor 34 via a shaft 48 and the high pressure turbine 40 is arranged to drive the high pressure compressor 36 via a shaft 50. The turbofan gas turbine engine 10 operates quite conventionally and its operation will not be discussed further.
A fan outlet guide vane 28, as shown in figure 2, comprises an aerofoil shaped body 60 which has a leading edge 62, a trailing edge 64, a concave surface 66, a convex surface 68, a radially inner end 70 and a radially outer end 72. The fan outlet guide vane 28 has an internal cavity 74 and the internal cavity 74 may be hollow or may be filled with a vibration damping medium. The fan outlet guide vane 28 has been manufactured using the diffusion bonding and superplastic forming process according to the present invention.
In figure 3 two titanium alloy workpieces 100 and 102 are assembled into a stack 104. The titanium alloy workpiece 100 has a first surface 106 and a second surface 108 and the titanium alloy workpiece 102 has a third surface 110 and a fourth surface 112. The first surface 106 is a flat surface and the third surface 110 is a flat surface. The first surface 106 of the titanium alloy workpiece 100 is arranged to abut the third surface 110 of the titanium alloy workpiece 102. The titanium alloy workpieces 100 and 102 taper, increase in thickness, from end 116 to end 114.
The titanium alloy workpieces 100 and 102 are produced by cutting an original parallelepiped block of titanium alloy long an inclined plane to form the two longitudinally tapering titanium alloy workpieces 100 and 102 as described more fully in our UK patent GB2306353B. Alternatively the titanium alloy workpieces 100 and 102 may be separate blocks of titanium alloy.
Prior to assembling the titanium alloy workpieces 100 and 102 into the stack 104, the titanium alloy workpiece 100 is machined in a region 118, centrally of the second surface 108 of the titanium alloy workpiece 100 and the titanium alloy workpiece 102 is machined in a region 120, centrally of the fourth surface 112 of the titanium alloy workpiece 102. The regions 118 and 120 are contoured to produce a variation in the mass distribution of the fan outlet guide vane 28 from leading edge 62 to trailing edge 64 and from radially inner end 70 to radially outer end 72 by varying the depth of machining. The machining of the regions 118 and 120 of the titanium alloy workpieces 100 and 102 respectively is by milling, electrochemical machining, chemical machining, electro-discharge machining or any other suitable machining process.
The abutting surfaces, the first surface 106 and the third surface 110 of the titanium alloy workpieces 100 and 102 respectively are prepared for diffusion bonding by chemical cleaning.
A stop off material 122 to prevent diffusion bonding is applied in a predetermined pattern on one of the abutting surfaces 106 and 110, in this example the first surface 106 of the titanium alloy workpiece 100, the predetermined pattern of stop off material 122 is spaced from the edges of the first surface 106 of the titanium alloy workpiece 100. In addition a stop off material 124 to prevent diffusion bonding is applied in a predetermined position on one of the abutting surfaces 106 and 110, in this example the first surface 106 of the titanium alloy workpiece 100, the predetermined position extends from the predetermined pattern of stop of material 122 on the first surface 106 of the titanium alloy workpiece 100 towards one edge 128 of the first surface 106 of the titanium alloy workpiece 100. The edge 128 in this example is at the end 114.
The stop off material 122 and 124 may comprise powdered yttria in a binder and solvent e.g. the stop off known as "Stopyt 62A". The predetermined pattern of stop off material 122 is provided to define the internal cavity 74 in the finished fan outlet guide vane 28. The stop off material 124 is provided to define a flow path, an inflation passage, for a fluid to flow to the predetermined pattern of stop off material 122 in order to allow the fluid to superplastically inflate the titanium alloy workpieces 100 and 102 away from each other.
A first recess 130 is machined in a second predetermined position on the second surface 108 of the titanium alloy workpiece 100 and the recess 130 extends towards the edge 128 of the titanium alloy workpiece 100. A second recess 132 is machined in a third predetermined position on the fourth surface 112 of the titanium alloy workpiece 102 and the second recess extends towards a corresponding edge 134 of the third surface 110 of the titanium alloy workpiece 102. The edge 134 in this example is at the end 114. The first and second recesses 130 and 132 may be any suitable shape in cross-section, but it is preferred that they are a sector of a circle and that the depth of the first and second recesses 130 and 132 are the same such that an inflation passage with a lenticular cross-section is formed after diffusion bonding and superplastic forming, as shown in figure 9.
The titanium alloy workpiece 100 and the titanium alloy workpiece 102 are assembled into the stack 104 such that the first surface 106 of the titanium alloy workpiece 100 faces the third surface 110 of the titanium alloy workpiece 102 and such that the first recess 130 in the second predetermined position on the second surface 108 of the titanium alloy workpiece 100 and the second recess 132 in the third predetermined position on the fourth surface 112 of the titanium alloy workpiece 102 are aligned with the stop off material 124 arranged in the predetermined position on the first surface 106 of the titanium alloy workpiece 100. Thus, the stop off material 124, the first recess 130 and the second recess 132 are arranged in a plane P extending perpendicularly to the planes of the titanium alloy workpieces 100 and 102.
The edges of the titanium alloy workpiece 100 and the edges of the titanium alloy workpiece 102 are sealed together to form a sealed assembly 140 as shown in figure 4. The edges of the titanium alloy workpiece 100 and the edges of the titanium alloy workpiece 102 are welded together to form a sealed assembly 140 except for an evacuation pipe 143 which is connected to the sealed assembly 140 and the pipe 143 is welded around its periphery to the titanium alloy workpieces 100 and 102. The evacuation pipe 143 locates in part circular slots 131 in the edges 128 and 134 of the first and second titanium alloy workpieces 100 and 102 respectively. One end of the pipe 143 interconnects with the stop off material 124 and 122 between the titanium alloy workpieces 100 and 102, in other words the stop off material 124 extends towards the edge 128 as far as the part circular slot 131. The pipe 143 is connected to the end 114 at what will be the radially outer end of the fan outlet guide vane 28. The pipe 143 is connected to a vacuum pump, which is used to evacuate the interior of the sealed assembly 140. In some instance inert gas, for example argon, may be supplied to the interior of the sealed assembly 140 and the evacuating and supplying of inert gas to the interior of the sealed assembly 140 may be repeated several times to ensure that most, or substantially all, traces of oxygen are removed from the interior of the sealed assembly 140 and the sealed assembly 140 is finally evacuated.
The evacuated sealed assembly 140 is then placed in an oven. The sealed assembly 140 is then heated at a temperature of 250°C to 350°C to evaporate the binder from the stop off material 122 and 124. During the baking out of the binder the interior of the sealed assembly 140 is continuously evacuated to remove the binder from between the titanium alloy workpieces 100 and 102. After all the binder has been removed from the interior of the sealed assembly 140, the pipe 143 is sealed so that there is a vacuum in the sealed assembly 140.
The sealed assembly 140 is transferred to an autoclave, or a HIP vessel, and the sealed assembly 140 is heated and externally pressurised to diffusion bond the titanium alloy workpieces 100 and 102 together in areas other than the predetermined areas, e.g. the stop off material 122 and 124 in the predetermined pattern and the predetermined position, to form a sealed integral structure 142 as shown in figure 5. The sealed assembly 140 is heated to a temperature greater than 850°C and the pressure is greater than 20 atmospheres, 2941bs per square inch (20.26 x 105Nm2) and held at that temperature and pressure for a predetermined time. Preferably the temperature is between 900°C and 950°C and the pressure is between 2941bs per square inch (20.26 x 105Nm2) and 441 lbs per square inch (30.39 x 1 05Nm2).
The sealed integral structure 142 may then be placed in a hot creep forming die and hot creep formed, or twisted, to produce an aerofoil shape.
During the hot creep forming process the sealed integral structure 142 is heated to a temperature of 740°C.
Then the sealed integral structure 142 is placed in a superplastic forming die 146, as shown in figures 6 and 7, and an inflation pipe 144 is connected to the stop off material 124 in the first predetermined position on the first surface 106 of the titanium alloy workpiece 100 of the sealed integral structure 142. The inflation pipe 144 may be positioned in an aperture drilled in the appropriate end of the sealed integral structure 142. The sealed integral structure 142 is heated and a fluid, an inert gas for example argon, is supplied through the inflation pipe 144 to internally pressurise the sealed integral structure 142 to cause the titanium alloy workpiece 100 and/or the titanium alloy workpiece 102, where the stop off material 124 was arranged in the predetermined pattern and the first recess 130 was arranged in the second predetermined position and the second recess 132 in the third predetermined position, to be hot formed onto, to abut, the surfaces of the superplastic forming die 146 to create an inflation passage 148 within the sealed integral structure 142 as shown in figures 8, 9 and 10. The sealed integral structure 142 is heated and internally pressurised to cause the titanium alloy workpiece 100 and/or the titanium alloy workpiece 102 where the stop off material 122 was arranged in the predetermined pattern to be superplastically formed onto the surfaces of the superplastic forming die 146 to create a hollow fan outlet guide vane 28 as shown in figure 2. The sealed integral structure 142 is heated to a temperature greater than 850°C, preferably the temperature is between 900°C and 950°C. The inflation passage 148 is formed during the supply of high pressure inflation gas to the interior of the sealed integral structure 142.
In an alternative method of manufacturing the fan outlet guide vane 28 instead of machining a first recess 130 in a second predetermined position on the second surface 108 of the titanium alloy workpiece 100 and the recess 130 extends towards the edge 128 of the titanium alloy workpiece 100 it is equally possible to machine the first recess 130 in a second predetermined position on the first surface 106 of the titanium alloy workpiece 100. Instead of machining a second recess 132 in a third predetermined position on the fourth surface 112 of the titanium alloy workpiece 102 and the second recess extends towards a corresponding edge 134 of the third surface 110 of the titanium alloy workpiece 102 it is equally possible to machine the second recess 132 in a third predetermined position on the third surface 110 of the titanium alloy workpiece 102. In this method the stop off material 124 in the first predetermined position is located on the first surface 106 in the first recess 130 or is located on the third surface 110 in the second recess 132. In this method the titanium alloy workpiece 100 and the titanium alloy workpiece 102 in the region of the first and second recesses 130 and 132 are superplastically formed towards each other, but are prevented from diffusion bonding due to the stop off material 124, such that a first recess 130' and a second recess 132' are formed in the second surface 108 and fourth surface 112 of the titanium alloy workpieces 100 and 102 respectively during the diffusion bonding of the titanium alloy workpieces 100 and 102. Thereafter during superplastic forming the first recess 130 and the second recess 132 are reformed to form the inflation passage.
In a further alternative method of manufacturing the fan outlet guide vane 28 the first recess 130 may be machined in a second predetermined position on the first surface 106 of the titanium alloy workpiece 100 and the second recess 132 may be machined in a third predetermined position on the fourth surface 112 of the titanium alloy workpiece 102.
A fan blade 26, as shown in figure 11, comprises an aerofoil shaped body which has a leading edge 82, a trailing edge 84, a concave surface 86, a convex surface 88, a root 90 at a radially inner end and a tip 92 at a radially outer end. The fan blade 26 has an internal cavity 94 and the internal cavity 94 may be hollow or may be filled with a vibration damping medium. The fan blade 26 has been manufactured using two titanium alloy workpieces and using the diffusion bonding and superplastic forming process according to the present invention as described with reference to figures 2 to 5. However, in the case of a fan blade 26, the titanium alloy workpieces 100 and 102 taper, increase in thickness, from end 114 to end 116 and the pipe 143 is connected to the end 114 at what will be the radially outer end of the fan blade 26.
A fan blade 26B, as shown in figure 12, comprises an aerofoil shaped body 80B which has a leading edge 82B, a trailing edge 84B, a concave surface 86B, a convex surface 88B, a root 90B at a radially inner end and a tip 92B at a radially outer end. The fan blade 26B has a warren girder structure 96B which defines a plurality of internal cavities 94B and the internal cavities 94B may be hollow or may be filled with a vibration damping medium. The fan blade 26B has been manufactured using three titanium alloy workpieces 1 OOB, 101 B and 1 02B, as shown in figure 13, and using the diffusion bonding and superplastic forming process according to the present invention. However, in the case of three titanium alloy workpieces bOB, bUlB and 102B it is necessary to provide stop off material 122B in a predetermined pattern between the facing surfaces of a first titanium alloy workpiece 100B and a second titanium alloy workpiece 1O1B and to provide stop off material in a further predetermined pattern between the facing surfaces of the second titanium alloy workpiece 101 B and a third titanium alloy workpiece 1 02B. It is also necessary to provide stop off material 1 24B in a predetermined position between the facing surfaces of the first titanium alloy workpiece 100B and the second titanium alloy workpiece 1O1B and to provide a first recess 1 30B in a second predetermined position on the outer surface of the first titanium alloy workpiece bOB. Alternatively it is possible to provide stop off material 124B in a predetermined position between the facing surfaces of the first titanium alloy workpiece 1 OOB and the second titanium alloy workpiece 101 B and to provide a first recess in a second predetermined position on the inner surface of the first titanium alloy workpiece bOB. It may also be necessary to provide stop off material in a predetermined position between the facing surfaces of the second titanium alloy workpiece 1O1B and the third titanium alloy workpiece 102B and to provide a second recess 132B in a third predetermined position on the outer surface of the third titanium alloy workpiece 102B.
Alternatively it is possible to provide stop off material in a predetermined position between the facing surfaces of the second titanium alloy workpiece 101 B and the third titanium alloy workpiece 102B and to provide a second recess in a third predetermined position on the inner surface of the third titanium alloy workpiece 102B. Again, in the case of fan blade 26B, the titanium alloy workpieces 100B and 102B taper, increase in thickness, from end 114B to end 116B and the pipe is connected to the end 114B at what will be the radially outer end of the fan blade 26B.
Figure 14 illustrates an alternative embodiment of the present invention after the diffusion bonding step, in which a first recess 130 is provided on the second surface of the first titanium alloy workpiece 100 but a second recess is not provided on the fourth surface of the second titanium alloy workpiece 102.
Figure 15 illustrates this embodiment after the superplastic forming step and shows the resulting inflation passage 148.
Figure 16 illustrates a further embodiment of the present invention before the diffusion bonding step, in which a first recess 130 is provided on the first surface 106 of the first titanium alloy workpiece 100 and a second recess 132 is provided on the third surface 110 of the second titanium alloy workpiece 102 and the stop off material 124 is provided on the surface of the first and/or the second recesses 130 and 132. Figure 17 illustrates this embodiment after the diffusion bonding step and shows that the first recess 130 has moved to the second surface 108 of the first titanium alloy workpiece 100 and the second recess 132 has moved to the fourth surface 112 of the second titanium alloy workpiece 102.
Figure 18 illustrates this embodiment after the superplastic forming step and shows the resulting inflation passage 148.
Figure 19 illustrates another embodiment of the present invention and shows two titanium alloy workpieces 100C and 1020 are assembled into a stack 104C. The titanium alloy workpiece IOOC has a first surface 106C and a second surface 1080 and the titanium alloy workpiece 102C has a third surface hOC and a fourth surface 1 12C. The first surface 1 06C is a flat surface and the third surface 1100 is a flat surface. The first surface 1060 of the titanium alloy workpiece 1000 is arranged to abut the third surface 1100 of the titanium alloy workpiece 1020. The titanium alloy workpieces 1000 and 1020 taper, increase in thickness, from end 1160 to end 1140. In this example a stop off material 1220 in a predetermined pattern between the facing surfaces of a first titanium alloy workpiece 100C and a second titanium alloy workpiece 1020. It is also necessary to provide stop off material 1 24C in a predetermined position between the facing surfaces of the first titanium alloy workpiece 100C and the second titanium alloy workpiece 102C and to provide a first recess 1300 in a second predetermined position on the second surface 108C of the first titanium alloy workpiece 1000. It is to be noted that the first recess 1300 extends along the second surface 1080 of the first titanium alloy workpiece 1000 towards the edge at the end 1140 of the first titanium alloy workpiece 100C from a position in the second surface 1080 corresponding to a position on the first surface 1060 of the first titanium alloy workpiece 1000 having stop off material 1220. It is also to be noted that an inflation slot 1310 extends along the third surface 1100 of the second titanium alloy workpiece 102C towards the edge at the end 114C of the second titanium alloy workpiece 102C from a position in the third surface hOC corresponding to a position on the first surface 106C of the first titanium alloy workpiece 100C having stop off material 122C. The inflation slot 131C has a very small cross-sectional area and has a depth of about 1.5mm and a width of about 1.5mm. The first surface 106C of the first titanium alloy workpiece 1000 and the third surface hOC of the second titanium alloy workpiece 102C are provided with part circular slots 132C and 1330 respectively at the edges at the end 11 4C of the first titanium alloy workpieces 1 OOC and 1020. The part circular slots 1320 and 1330 are arranged to receive an end of a pipe used to evacuate the sealed assembly 1040 before diffusion bonding. The inflation slot 1310 and the stop off material 1240 extend along the third surface 1100 of the second titanium alloy workpiece 1020 and the first surface 1060 of the first titanium alloy workpiece 1000 respectively towards the edge at the end 1140 of the first titanium alloy workpiece 1000 to reach the part circular slots 1330 and 1320 respectively. Figure 20 shows a cross-sectional view through the sealed assembly 1400 showing the arrangement of the first recess 1300, the inflation slot 1310 and the stop off material 1240. Figure 21 shows a cross-sectional view through the sealed integral structure 14620 after diffusion bonding and superplastic forming and shows the resulting inflation passage 1480.
Alternatively it is possible to provide stop off material 1240 in a predetermined position between the facing surfaces of the first titanium alloy workpiece 1000 and the second titanium alloy workpiece 1020 and to provide a first recess in a second predetermined position on the first surface 1060 of the first titanium alloy workpiece 1000.
It may be equally possible to provide an inflation slot on either the first surface of the first titanium alloy workpiece or the third surface of the second titanium alloy workpiece in the embodiment in figures 3 to 10 and also in the embodiments in figures 13 to 18.
The advantage of the present invention is that it provides an increased cross-sectional area inflation passage to supply inflation gas to the interior of the sealed integral assembly for superplastic forming of the sealed integral assembly. The present invention also has the advantage that it provides an increased cross-sectional area inflation passage to allow inflation gas to exit the interior of the sealed integral assembly after superplastic forming of the sealed integral assembly. The present invention also has the advantage that it provides an increased cross-sectional area inflation passage to allow gas to enter the interior of the sealed integral assembly during cooling after superplastic forming of the sealed integral assembly to prevent an under formed profile. Thus, the present invention reduces non-conformance of diffusion bonded and superplastically formed components, reduces the forming time of diffusion bonded and superplastically formed components, increases the process capability and minimises implementation costs.
A further advantage of providing a recess on an internal surface of a titanium alloy workpiece is that it provides an increased cross-sectional area passage for removal of the binder during bake out of the binder from the stop off material. However, a disadvantage of providing a recess on an internal surface of the titanium alloy workpiece is that it increases the risk of damaging the surface of the titanium alloy workpiece that is to be diffusion bonded.
Although the present invention has been described with reference to manufacturing fan outlet guide vanes, or fan blades, it is equally applicable to the production of other articles, for example compressor blades, compressor vanes, other gas turbine engine components, heat exchangers etc. Although the present invention has been described with reference to manufacturing components using titanium alloy workpieces it is equally applicable to the use of other suitable diffusion bondable and superplastically formable metal workpieces or alloy workpieces.
Although the present invention has been described with reference to providing a first recess in a first diffusion bondable and superplastically formable workpiece and a second recess in a second diffusion bondable and superplastically formable workpiece it is possible to provide a single recess in only one of the diffusion bondable and superplastically formable workpieces.

Claims (15)

  1. CLAIMS1. A method of manufacturing an article by diffusion bonding and superplastic forming comprising the steps of:-a) providing at least a first metal workpiece and a second metal workpiece, the first metal workpiece having a first surface and a second surface, the second metal workpiece having a third surface and a forth surface, b) applying stop off material to prevent diffusion bonding in a predetermined pattern on the first surface of the first metal workpiece, the predetermined pattern being spaced from the edges of the first surface of the first metal workpiece, C) applying stop off material to prevent diffusion bonding in a predetermined position on the first surface of the first metal workpiece or the third surface of the second metal workpiece, the predetermined position extending from the predetermined pattern of stop of material on the first surface of the first metal workpiece towards one edge of the first surface of the first metal d) providing a recess in a second predetermined position on the first surface of the first metal workpiece, the second surface of the first metal workpiece, the third surface of the second metal workpiece or the fourth surface of the second metal workpiece, the recess extending towards the same edge of the first metal workpiece or a corresponding edge of the second metal e) assembling at least the first metal workpiece and the second metal workpiece in a stack such that the first surface of the first metal workpiece faces the third surface of the second metal workpiece and the recess in the second predetermined position on the first surface of the first metal workpiece, the second surface of the first metal workpiece, the third surface of the second metal workpiece or the fourth surface of the second metal workpiece is aligned with the stop off material arranged in the predetermined position on the first surface of the first metal workpiece, f) sealing the edges of the first metal workpiece to the edges of the second metal workpiece to form a sealed assembly, g) evacuating the sealed assembly, h) heating and externally pressurising the sealed assembly to diffusion bond the first and second metal workpieces together in areas other than the predetermined pattern and predetermined position to form a sealed integral structure, i) connecting an inflation pipe to the stop off material in the first predetermined position on the first surface of the first metal workpiece of the sealed integral structure, j) heating and internally pressurising the sealed integral structure to cause the first metal workpiece, or the second metal workpiece, where the stop off material was arranged in the predetermined position and the recess was arranged in the second predetermined position, to be hot formed to create an inflation passage within the sealed integral structure, k) heating and internally pressurising the sealed integral structure to cause the first metal workpiece and/or the second metal workpiece where the stop off material was arranged in the predetermined pattern to be superplastically formed to create a hollow metal article.
  2. 2. A method as claimed in claim 1 wherein step d) comprises providing a first recess in a second predetermined position on the second surface of the first metal workpiece and a second recess in a third predetermined position on the fourth surface of the second metal workpiece, the first recess extending towards the same edge of the first metal workpiece and the second recess extending towards a corresponding edge of the second metal workpiece, step e) comprises assembling at least the first metal workpiece and the second metal workpiece in stack such that the first recess in the second predetermined position on the second surface of the first metal workpiece and the second recess in fourth surface of the second metal workpiece are aligned with the stop off material arranged in the predetermined position on the first surface of the first metal workpiece and step j) comprises heating and internally pressurising the sealed integral structure to cause the first metal workpiece and the second metal workpiece, where the stop off material was arranged in the predetermined position, the first recess was arranged in the second predetermined position and the second recess was arranged in the third predetermined position, to be hot formed to create an inflation passage within the sealed integral structure.
  3. 3. A method as claimed in claim 1 wherein step d) comprises providing a first recess in a second predetermined position on the first surface of the first metal workpiece and a second recess in a third predetermined position on the third surface of the second metal workpiece, the first recess extending towards the same edge of the first metal workpiece and the second recess extending towards a corresponding edge of the second metal workpiece, step e) comprises assembling at least the first metal workpiece and the second metal workpiece in stack such that the first recess in the second predetermined position on the first surface of the first metal workpiece and the second recess in third surface of the second metal workpiece are aligned with the stop off material arranged in the predetermined position on the first surface of the first metal workpiece and step j) comprises heating and internally pressurising the sealed integral structure to cause the first metal workpiece and the second metal workpiece, where the stop off material was arranged in the predetermined position, the first recess was arranged in the second predetermined position and the second recess was arranged in the third predetermined position, to be hot formed to create an inflation passage within the sealed integral structure.
  4. 4. A method as claimed in any of claims 1 to 3 wherein step a) comprises providing a third metal workpiece, the third metal workpiece having a fifth surface and a sixth surface, step b) may comprise applying stop off material to prevent diffusion bonding in a predetermined pattern on the third surface of the second metal workpiece, the predetermined pattern being spaced from the edges of the third surface of the second metal workpiece, step e) may comprise assembling the first metal workpiece, the second metal workpiece and the third metal workpiece in a stack such that the first surface of the first metal workpiece faces the fifth surface of the third metal workpiece, the sixth surface of the third metal workpiece faces the third surface of the second metal workpiece and the recess in the second predetermined position on the first surface of the first metal workpiece, the second surface of the first metal workpiece, the third surface of the second metal workpiece or the fourth surface of the second metal workpiece is aligned with the stop off material arranged in the predetermined position on the first surface of the first metal workpiece.
  5. 5. A method as claimed in any of claims 1 to 4 wherein the article is a fan blade or a fan outlet guide vane.
  6. 6. A method as claimed in any of claims 1 to 4 wherein the article is a heat exchanger, a compressor blade or a compressor vane.
  7. 7. A method as claimed in any of claims 1 to 6 wherein the first metal workpiece, the second metal workpiece or the third metal workpiece comprises a titanium alloy.
  8. 8. A method as claimed in claim 7 wherein the titanium alloy consists of 6wt% vanadium, 4wt% aluminium and the balance titanium, minor elemental additions and incidental impurities.
  9. 9. A method as claimed in claim 1 wherein step d) comprises providing a recess in a second predetermined position on the first surface of the first metal workpiece, the recess extending towards the same edge of the first metal
  10. 10. A method as claimed in claim 1 wherein step d) comprises providing a recess in a second predetermined position on the second surface of the first metal workpiece, the recess extending towards the same edge of the first metal workpiece.
  11. 11. A method as claimed in any of claims 1 to 10 wherein step h) comprises heating to a temperature greater than 850°C and applying a pressure greater than 20.26 x 105Nm2.
  12. 12. A method as claimed in claim 11 wherein step h) comprises heating to a temperature between 900°C and 950°C and applying a pressure between 20.26 x 105Nm2 and 30.39 x 105Nm2.
  13. 13. A method as claimed in any of claims 1 to 12 wherein step j) and step k) comprise heating to a temperature greater than 850°C
  14. 14. A method as claimed in claim 13 wherein step j) and step k) comprise heating to a temperature between 900°C and 950°C.
  15. 15. A method of manufacturing an article by diffusion bonding and superplastic forming substantially as hereinbefore described with reference to the accompanying drawings.
GB1009299.7A 2010-06-03 2010-06-03 A method of manufacturing an article by diffusion bonding and superplastic forming Expired - Fee Related GB2481000B (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
GB1009299.7A GB2481000B (en) 2010-06-03 2010-06-03 A method of manufacturing an article by diffusion bonding and superplastic forming
US13/102,483 US8162202B2 (en) 2010-06-03 2011-05-06 Method of manufacturing an article by diffusion bonding and superplastic forming
EP11165114.7A EP2392423B1 (en) 2010-06-03 2011-05-06 A method of manufacturing an article by diffusion bonding and superplastic forming
SG2011039062A SG176412A1 (en) 2010-06-03 2011-05-30 A method of manufacturing an article by diffusion bonding and superplastic forming

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB1009299.7A GB2481000B (en) 2010-06-03 2010-06-03 A method of manufacturing an article by diffusion bonding and superplastic forming

Publications (3)

Publication Number Publication Date
GB201009299D0 GB201009299D0 (en) 2010-07-21
GB2481000A true GB2481000A (en) 2011-12-14
GB2481000B GB2481000B (en) 2012-08-08

Family

ID=42471101

Family Applications (1)

Application Number Title Priority Date Filing Date
GB1009299.7A Expired - Fee Related GB2481000B (en) 2010-06-03 2010-06-03 A method of manufacturing an article by diffusion bonding and superplastic forming

Country Status (4)

Country Link
US (1) US8162202B2 (en)
EP (1) EP2392423B1 (en)
GB (1) GB2481000B (en)
SG (1) SG176412A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106078112A (en) * 2016-07-21 2016-11-09 滁州南钢盛达实业有限公司 A kind of production technology of H profile steel
CN114346396A (en) * 2021-12-28 2022-04-15 北京航星机器制造有限公司 Double-layer opening cover wall plate superplastic forming diffusion connection mold and method

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0412915D0 (en) * 2004-06-10 2004-07-14 Rolls Royce Plc Method of making and joining an aerofoil and root
GB201414497D0 (en) * 2014-08-15 2014-10-01 Rolls Royce Plc A method of forming an inflated aerofoil
CN107283008A (en) 2016-03-30 2017-10-24 通用电气公司 Electric discharge machining apparatus and the method being processed using electrode assemblie to workpiece
EP3281718A1 (en) * 2016-08-10 2018-02-14 Rolls-Royce plc Superplastic forming
GB201710651D0 (en) * 2017-07-03 2017-08-16 Rolls Royce Plc Manufacturing assembly and method
DE102021213010B4 (en) * 2021-11-18 2023-06-15 Ipu Ingenieurgesellschaft Braunschweig Mbh Process for the mold-free production of a component with relief and component with relief

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4304350A (en) * 1980-01-07 1981-12-08 Grumman Aerospace Corporation Method of pressurization system for superplastic forming and diffusion bonding
US5275325A (en) * 1992-12-10 1994-01-04 Grumman Aerospace Corporation Pressurization system inlet assembly for superplastic forming and diffusion bonding
GB2289429A (en) * 1994-05-10 1995-11-22 Rolls Royce Plc Hollow component manufacture
US5692406A (en) * 1996-09-27 1997-12-02 Mcdonnell Douglas Corporation Gas inlet for a superplastic forming die and method of use
EP1508400A1 (en) * 2003-08-13 2005-02-23 ROLLS-ROYCE plc A method of manufacturing an article by diffusion bonding and superplastic forming

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4526312A (en) * 1979-12-10 1985-07-02 Rockwell International Corporation Low cost method of making superplastically formed and diffusion bonded structures
US5479705A (en) * 1992-05-01 1996-01-02 Rolls-Royce Plc Method of manufacturing an article by superplastic forming and diffusion bonding
GB2306353B (en) 1995-10-28 1998-10-07 Rolls Royce Plc A method of manufacturing a blade
GB2360236B (en) * 2000-03-18 2003-05-14 Rolls Royce Plc A method of manufacturing an article by diffusion bonding and superplastic forming

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4304350A (en) * 1980-01-07 1981-12-08 Grumman Aerospace Corporation Method of pressurization system for superplastic forming and diffusion bonding
US5275325A (en) * 1992-12-10 1994-01-04 Grumman Aerospace Corporation Pressurization system inlet assembly for superplastic forming and diffusion bonding
GB2289429A (en) * 1994-05-10 1995-11-22 Rolls Royce Plc Hollow component manufacture
US5692406A (en) * 1996-09-27 1997-12-02 Mcdonnell Douglas Corporation Gas inlet for a superplastic forming die and method of use
EP1508400A1 (en) * 2003-08-13 2005-02-23 ROLLS-ROYCE plc A method of manufacturing an article by diffusion bonding and superplastic forming

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106078112A (en) * 2016-07-21 2016-11-09 滁州南钢盛达实业有限公司 A kind of production technology of H profile steel
CN106078112B (en) * 2016-07-21 2018-07-20 滁州南钢盛达实业有限公司 A kind of production technology of H profile steel
CN114346396A (en) * 2021-12-28 2022-04-15 北京航星机器制造有限公司 Double-layer opening cover wall plate superplastic forming diffusion connection mold and method

Also Published As

Publication number Publication date
GB2481000B (en) 2012-08-08
SG176412A1 (en) 2011-12-29
GB201009299D0 (en) 2010-07-21
EP2392423A3 (en) 2013-06-12
US8162202B2 (en) 2012-04-24
EP2392423B1 (en) 2015-02-25
EP2392423A2 (en) 2011-12-07
US20110297734A1 (en) 2011-12-08

Similar Documents

Publication Publication Date Title
EP2392423B1 (en) A method of manufacturing an article by diffusion bonding and superplastic forming
EP1669144B1 (en) A method of manufacturing a metal article by powder metallurgy
EP1508400B1 (en) A method of manufacturing an article by diffusion bonding and superplastic forming
US6467168B2 (en) Method of manufacturing an article by diffusion bonding and superplastic forming
US7025568B2 (en) Turbomachine aerofoil
US7594325B2 (en) Aerofoil and a method of manufacturing an aerofoil
EP1338353B1 (en) A method of manufacturing an article by diffusion bonding and superplastic forming
CN107027298B (en) Manufacture of a turbine wheel by assembling a plurality of turbine components
US5323536A (en) Method of manufacturing an article by superplastic forming and diffusion bonding
JP6240388B2 (en) Thin reinforced grid structure for hollow CMC bucket
EP1092485B1 (en) A method of manufacturing an article by superplastic forming and diffusion bonding
US6871398B2 (en) Method of manufacturing an article by diffusion bonding
US6802122B2 (en) Method of manufacturing an article
EP3084138A1 (en) Gas turbine engine blade with ceramic tip and cooling arrangement
EP1844885B1 (en) A method of manufacturing a hollow article
US20190055849A1 (en) Laminated airfoil for a gas turbine
EP3000546B1 (en) Method of manufacturing gas turbine engine component from a molybdenum-rich alloy

Legal Events

Date Code Title Description
PCNP Patent ceased through non-payment of renewal fee

Effective date: 20210603