GB2414756A - Subsea logging using alternative conduit in well communicating with floating instrument pod - Google Patents

Subsea logging using alternative conduit in well communicating with floating instrument pod Download PDF

Info

Publication number
GB2414756A
GB2414756A GB0517372A GB0517372A GB2414756A GB 2414756 A GB2414756 A GB 2414756A GB 0517372 A GB0517372 A GB 0517372A GB 0517372 A GB0517372 A GB 0517372A GB 2414756 A GB2414756 A GB 2414756A
Authority
GB
United Kingdom
Prior art keywords
alternative path
well
conduit
path conduit
subsea
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB0517372A
Other versions
GB2414756B (en
GB0517372D0 (en
Inventor
David Randolph Smith
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sensor Highway Ltd
Original Assignee
Sensor Highway Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sensor Highway Ltd filed Critical Sensor Highway Ltd
Publication of GB0517372D0 publication Critical patent/GB0517372D0/en
Publication of GB2414756A publication Critical patent/GB2414756A/en
Application granted granted Critical
Publication of GB2414756B publication Critical patent/GB2414756B/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/12Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/001Survey of boreholes or wells for underwater installation
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/12Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
    • E21B47/13Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling by electromagnetic energy, e.g. radio frequency
    • E21B47/135Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling by electromagnetic energy, e.g. radio frequency using light waves, e.g. infrared or ultraviolet waves

Abstract

An apparatus for logging or controlling a subsea well comprises an alternative path conduit (11, fig 3) disposed in a subsea well W, proximate a casing string (13, fig 3). The conduit is connected with a floating pod 17 at the ocean surface. A wet connector (12, fig 3) may be used. A logging tool or a cable may be deployed through the conduit. Temperature, pressure or chemical properties may be monitored through the conduit. Downhole devices may be actuated through the conduit. The conduit allows rigless intervention to monitor well variables without interrupting the production tubing fluid flow stream. The pod may house processors and telecom equipment for transmitting data to a remote location.

Description

241 4756 METHOD AND APPARATUS TO MONITOR, CONTROL AND LOG
SUBSEA WELLS
BACKGROUND OF INVENTION
The present invention is directed to methods and apparatus for logging and permanently monitoring subsea oil, gas, and injection wells; specifically to deploying photonic, electromagnetic or hydraulic conduits in an alternative path adjacent the production tubing in said wells.
Subsea wells are broadly defined as wells that do not provide fixed access from the surface of the sea. Subsea wells have weliheads located at or very near the sea floor and produce into subsea pipelines or provide access only through long subsea umbilical cables to distant locations.
Traditional offshore wells located on offshore plaffomms have weliheads located on the platform at or above the sea surface.
Fluid flowing from subsea wells proceeds out of the wellbore from one or more producing zones, through a system of continuous conduits, subsea weliheads, subsea flow lines, subsea pipelines and to a surface production and storage facilities often many miles from the location of the subsea well head.
As oil and gas becomes more and more difficult to find on land or in shallow coastal waters, the oil and gas industry has commenced exploration and development in deeper waters, miles from production and storage facilities. Prior to oil and gas being discovered in deep waters, the preferred method of producing the wells was to place the weliheads and the subsequent control devices for the wells at the sea surface on a platform. The access to these wells for the purpose of placing monitoring devices or performing intervention logging services was easily performed from the off-shore platform with the many well known methods of wireline logging, continuous coiled tubing, or even hydraulically pump down logging and monitoring systems.
Obtaining access to subsea wells for logging, monitoring or control purposes generally requires a costly submersible connection from the sea surface to the welihead. Current methods, for example, to repair permanently disposed monitoring equipment, or to insert a suite of well logging tools into sub-sea wells, require the mobilization of a surface vessel which contains an off shore rig known to those in the industry as a semi-submersible rig or a drill ship. In all cases, the entry into the subsea well of the logging tools or tools to replace and dispose permanent monitoring equipment is performed through the production tubing. Since these wells are very expensive to drill and bring on line, most oil and gas producers prefer to not reenter the well unless absolutely necessary.
Hence, subsea wells are difficult to log or access for the placement of monitoring equipment. Further, visual inspections of these subsea wells are impossible because of the depths and distances of the welihead from the nearest maintenance and production platform facility. Abnormal subsea well conditions cannot be observed in the manner of offshore platform wells or land wells, where u gauges and visual leak detection may be maintained.
Monitoring of the subsea wells for safety, reservoir evaluation, and environmental reasons requires the instrumentation monitoring of the subsea well be done remotely. This requires the transmission of the data from subterranean sensors in the well and subsea monitoring sensors over large distances to a receiving and processing node. This transmission of data is normally done over copper or optic fiber transmission umbilicals connecting the sub-sea wells back to surface data receiving stations. Owing to the long distances and depths, considerable expense must be incurred to utilize these subsea umbilicals.
The current monitoring methods that are used for subsea wells is further compromised by the frequent failure of subterranean gauges and instruments used to monitor oil and gas wells. Owing to the remoteness of subsea wells from the surface of the sea and the need for rig interventions to access the subsea and subterranean monitoring devices requires well maintenance be performed from intervention rigs which are not always readily available to perform such maintenance. The result of these failures and the difficulty of quickly repairing them generally results in the decision to continue producing deep-water wells without any subsea monitoring information for leaks and pressure anomalies and without subterranean monitoring of reservoir parameters. These shortcuts are undesirable because they can lead to catastrophic failures of wells, hydrocarbon releases into the sea, and less than optimal reserve recovery.
The logging of wells has traditionally been done from platforms and on land wells to obtain additional information about a well's reservoir condition and the integrity of the well's structure. In subsea wells, logging is rarely done, as it requires the mobilization of very large and expensive semi- submersible rigs or drill ships. Furthermore, these subsea logging interventions introduce the possibility of losing wireline equipment in the well and compromising the well's ability to produce. Also, sub-sea logging operations normally require the production of the well be reduced or curtailed during process of rigging up of the logging equipment.
Owing to the above-mentioned difficulties of logging and maintaining unreliable subterranean monitoring equipment and very long umbilical transmission lines, many sub-sea wells are produced while monitoring the produced fluid back at the process or storage facility many miles away. This method of monitoring does not yield any indication of where the fluids are coming from in the well (by. which portion of the formation may be producing) desired where production may be resulting from large perforated intervals in the well. Additionally, flow rate information monitored at the surface does not identify possible cross flow of fluids between reservoir intervals, changes in water, oil, and gas quantities as function of the depth of the well, the presence of leaks in well tubular conduits, and whether the reservoir is depleting in pressure.
It is desirable from both a reservoir engineering perspective as well as from a safety and environmental perspective to obtain realtime information from subsea wells relating to dynamic subterranean environment, fluid production parameters, and subsea well equipment integrity. Examples of parameters which are desirable to monitor on a realtime basis are fluid flow rates, water cut, resistivity of subterranean formations, spontaneous potential of subterranean reservoirs, pressure, temperature, sand production, steel wall thickness of tubulars, seismic energy from the reservoir or other sources, and other variables known to those familiar with oil and gas production. This information is currently gathered from either permanently disposed monitoring devices attached to the production tubing or from well intervention methods that insert the devices concentrically through the production tubing in the subsea well.
The commonly disposed permanent monitoring devices include pressure sensors, flow meters, temperature sensors, geophones, accelerometers, seismic source broadcasters, and other sensors and instruments. These devices are inserted in subsea wells concentrically through the well's production tubing either using wireline, coiled tubing, and slickline, from a rig placed at the surface of the sea and connecting to the subsea well through the water by risers. Alternatively, these permanently disposed devices are inserted in a well with the production tubing. The production tubing is also inserted into the well via the use a rig on the surface of the sea where again a large riser is run from the sub-sea welihead at the sea floor up through the water to the rig. Therefore, when permanently disposed monitoring equipment is inserted in a well either with production tubing or the other forms of insertion of the devices concentrically through the production tubing, a surface rig is required.
All of these parameters are obtained traditionally on land or offshore platform wells using offshore platform wells via the art of well logging.
However, in the case of sub-sea wells the methods have to date not been developed to allow for safe, simple, and rapid log intervention into wells.
Likewise, the retrieval of down hole pressure gauges or other instruments on land or off-shore platform wells is often achieved by a well intervention with commonly known methods of wire line operations thereby not requiring a rig to be mobilized to the land or off-shore platform location. Failure and need for retrieval of subterranean pressure gauges or other subterranean instruments in sub-sea wells can not be performed by wire line or logging interventions unless a semi-submersible rig or drill ship is deployed to the sub-sea well location. The present invention provides a rigless intervention method to access subsea wells.
Several subterranean data gathering systems are currently used to obtain data from the wells. This is commonly done using down hole permanent pressure gauges, and flow meters, that have long umbilical from the subsea well to a platform or floating production facility. The umbilical have electrical or optical cable to transmit data from the different permanently deployed instruments and devices in the well. The current method of gathering data from subsea wells practiced by the oil and gas industry requires the pressure gauges and pressure gauge electrical or optical data transmission line be disposed in the subsea well during the initial well construction, known to those familiar with the art as the well completions. It also requires that all down hole instruments be connected to data transmission lines, either electrical or optical lines, by a subsea wet connection. This connection then connects the subterranean data transmission lines to the subsea umbilical transmission lines. These connections are difficult to do at deep-water depths, which often have large currents, high hydrostatic pressures, and are at depths where only a very limited number of Remotely Operated Vehicles (ROVs) can operate and make such wet connections.
The deep-water wells are being placed further from land, platforms, or floating process facilities to which the umbilicals are connected. This results in very long umbilicals with large weights and costs. Therefore, each additional instrument data transmission requirement from the sub-sea well requires an additional line in the umbilical going from the sub-sea welihead back to the host facility at the sea surface often many miles away.
When the pressure gauge fails or when the data transmission line fails, or when the data transmission's wet-mateable connection fails, the only recourse for repair of the data gathering system is an intervention into the well, using either a drill ship or a semi-submersible drilling rig resulting in the pulling of the well completion, and a significant number of days of lost production during the recompletion of the well, all as previously described.
The present invention provides a method and apparatus to intervene into these deepwater sub-sea wells without deploying a deepwater rig to hydraulically connect to the sub-sea welihead and thereafter deploy logging instruments into the well has long been sought by the oil and gas industry.
Another feature of the present invention permits the entry of sub-sea wells for the purpose of obtaining data without placing logging tools and wire line cable into the production tubing fluid flow stream of these subsea wells. The intrusion of logging tools into the flow stream of such wells presents a significant risk of losing the logging equipment in the well and obstructing fluid production. The present invention obviates the need for such interventions.
SUMMARY OF THE INVENTION
According to one aspect of the invention, there is provided anapparatus for logging, controlling, or monitoring a subsea well, the apparatus comprising: a casing string disposed in a subsea well; an alternative path conduit permanently disposed proximate the casing string and passing through a subsea welihead, the alternative path conduit being connected to a hydraulic wet connector; a production tubing located within the casing string; and a flotation pod connected to the alternative path conduit through the hydraulic wet connector.
According to another aspect of the invention, there is provided a method of monitoring a sub sea well, the method comprising: deploying a floating instrument pod proximate to the well; connecting the pod to an alternative path conduit; deploying the alternative path conduit proximate to a casing string within the well; and communicating through the alternative path conduit between the instrument pod and the well.
DETAILED DESCRIPTION OF THE DRAWINGS
Fig. 1 is a partial schematic representation of the invention as disposed in several subsea wells.
Fig. 2 is a cross-sectional schematic view of the invention showing the apparatus of the present invention disposed into a subsea well.
Fig. 3 is a partial schematic view of a U-connection in a producing well.
DETAILED DESCRIPTION
The Alternative Path Conduit Referring now to Fig. 1 of the drawings, a plurality of wells W are shown located on the sea floor 5. The well is drilled from the surface of the sea 7 using a semi-submersible 100 or drillship drilling rig (not shown). One or more wells W are bored by the action of rotating a drill bit on the end of a drill pipe from the surface rig where the drill bit is inserted inside of risers pipes and the drill cuttings are flushed out of the well bore with a drilling fluid using method and apparatus well known to those in the oil and gas industry.
As more clearly shown in Fig. 2, a subsea well is constructed by drilling a borehole 1 down into the earth to intersect subterranean fluid production intervals 2 located in the earth. The well is constructed with at least one diameter of casing 3 disposed into the annulus of the borehole 1 and grouted into place from the surface rig, using cement 4 placed between the annular space formed between the bore hole 1 and casing 3. This process can be repeated with at least one additional casing 13. The final casing, in this figure casing 13, is explosively penetrated using explosive charges forming perforation tunnels 10 connecting the borehole hydraulically with the subterranean fluids in the earth. A production tubing string 8 is inserted inside the casing 13 and deployed from a surface rig. The production tubing 8 can provide adjacent its lower end, a sealing element known as a packer 6. The packer 6 is inserted in the annulus of casing 13 with the production tubing and set in the casing 13 above the perforation tunnels 10 to form a seal between the production tubing 8 and the casing 13 using any of the methods known to those familiar with oil and gas well completion technology. The upper end of the production tubing 8 is terminated and retained in a welihead 9 forming a sealed hydraulic conduit between the production tubing and the casing with hydraulic communication with the reservoir or production zone 2 through the perforations 10.
The present invention teaches the insertion of at least one parallel tubing string 11 of a smaller diameter disposed parallel, but exterior, to the production string 8, forming an alternative path through the well head and into the well.
In one preferred embodiment, the parallel tubing string 11 is connected to the outer diameter of casing 13 and inserted in the well from the surface rig while the casing 13 is deployed into the annulus of the wellbore 1. In another embodiment, a parallel tubing string (not shown) may be attached to the production tubing 8 and inserted into the well as the production tubing 8 is deployed from the surface rig. In either embodiment, the parallel tubing string 11 is connected through the welihead 9 and sealed therein forming a sealed alternative path conduit into the sub-sea well without communication with the production fluid from the production interval 2. In both embodiments, at least one parallel path-tubing conduit 14 is connected above the welihead 9 to a hydraulic quick connection 12. This connection can be made either at the welihead or several hundred feet away from the welihead to avoid the possibility of ROV collisions with the welihead structure.
In yet another embodiment more fully shown schematically in Fig. 3., the well is constructed with a parallel alternative conduit path formed by inserting in the well two parallel conduits attached at the bottom in the well with a U-tube connection. These parallel conduits form an alternative path to the production tubing 8 that goes down the well and then back through the sub-sea welihead 9, with each end hydraulically connected above the well head with a hydraulic disconnect device 12. Each parallel conduit string 11 in each embodiment can provide a fluid control safety valve 15 disposed either above or below the welihead 9. As may be readily seen from Fig. 3, the return conduit need not be of the same internal diameter as the ingress conduit. The continuous path of 14 to 11 through the welihead 9 communicates through the egress side 11' and conduit 16'. In each manner of installation, the fluid control safety valve 15 is used to control the unwanted escape of fluids through the alternative path conduit system. Other hydraulic check valves may be placed at 12' as need to prevent escape of fluids upon disconnection of the conduit during operations.
This invention further teaches the construction of at least one continuous hydraulic conduit path from below the sub-sea floor 5 into and through the subsea welihead 9 to the surface of the sea 7 by connecting alternative path conduit 14 above the well head proceeding from the well to a submersible conduit 16, such that one end of the continuous path has one end at the surface of the sea 7. Referring back to Fig. 1, conduit 16 can be partially supported by subsurface buoys 51.
Referring again back to Fig. 1, the present invention further teaches the connection of the submersible conduit 16 from the subsea welihead 9 to a surface instrument pod 17. This surface instrument pod can be moored to the sea floor by a system of cables and anchors 18 to keep instrument pod 17 on station above the subsea wells. Alternatively, instrument pod 17 can be tethered by a single line providing resilient means to hold the pod in a set position while permitting the pod to move with the movement of the waves.
So far as is known to applicant, no alternative path subsea conduit path has ever been used to provide a means of communicating with or controlling a subsea producing well.
Installation of the Alternative Path Pod and Lines The present invention requires that the alternative path conduit be installed during completion of the well. Consequently, the installation of the alternative path conduit must be coordinated with the setting and grouting of the well structure. Accordingly, the well profile must be planned with the alternative path conduit. If the alternative path conduit is to provide a path for optic fiber cabling only, a '/. inch tubing or similar can be installed and strapped to the final casing upon setting of the casing string from the drilling platform or ship. If the alternative path conduit is to provide a means for wireline logging tools, chemical injection lines or hydraulic control lines, larger diameter conduit can be used to permit subsequent use as a combination pathway for one or more of these methods. If the preferred U-shaped alternative path conduit is set in the completed well, a memory-tool (ie. one having a means of sensing and preserve the information as it passes through the pipe at a fixed velocity) may also be pumped into and out of the well to log the well without any wireline connection. Since the alternative path conduit is set in the welihead of each subsea well, the welihead must be designed for the alternative path conduit as well. Once set in the welihead, the alternative path conduit provides a useful and easy diagnostic tool for monitoring, controlling and logging the well. The casing and welihead are set in a manner well known to those in the industry. The connection of the alternative path conduit to the wetmate connection may be made either at the surface and installed with the welihead or installed later. It is anticipated that most installations will be made after the installation of the welihead is accomplished and flanged up on the sea floor.
For installation, instrument pod 17 is connected to conduit 16 aboard a surface vessel, like a semi-submersible drilling rig, or other vessel that allows for the connection of the conduit 16 aboard the vessel having the same relative motion as the instrument pod 17 and the conduit 16 proceeding up from the sub sea well. The preferred embodiment disposes one or more instrument packages within the instrument pod 17 that permit the gathering of data coming various data transmission lines disposed inside the alternative path conduit 16 proceeding up from the well. These data lines are any of the well-known lines that are used for data transmission including but not limited to optical fiber, electrical conductors, and hydraulic fluids. The optical fiber can be connected to a light source. The electrical conductor can be connected to a logging system. In the case of hydraulic fluids, a pressure monitoring system can be connected to the conduit.
Optical Fiber in the Alternative Path Conduit Optical fibers may be inserted in the alternative path conduit by connecting a pump to the provided port on the instrument pod 17. Silicon gel or another fluid can be pumped into the annulus of the alternative path conduit and fiber optic cabling is fed into the pumping silicon gel (or other fluid) which carries the line into the well bore due to the frictional force of the silicon (or other fluid) against the fiber optic line. Upon reaching total depth, the pumped fiber is fully deployed in the wellbore. Fluids that may be used for deployment include liquids such as water as well as gases such as air or nitrogen.
If the alternative path conduit has been connected with a U-connection within the wellbore, the fiber optic cabling will be transported through the tubing and either egress the well at the welihead or be transported back to the instrument pod by the pumping. The disposition of the optic fiber in the wellbore permits the instrument pod 17 to sense with the use of the optical time domain reflectometry apparatus described in United States Patent No. 5,592,282 to Hartog which is incorporated herein by reference and made a part hereof for all purposes, the thermal profile (distributed temperature measurement) of each well into which the line is disposed providing inflow conformance. The disposed fiber optic line also permits monitoring of production or well conduit integrity thereby permitting detection of leaks in the casing or production string. The fiber optic line also permits the monitoring of gas lift valves from the thermal profile of the well.
In other embodiments, the fiber optic line may include one or multiple sensors or sensor locations. The sensors or sensor locations are adapted to measure a parameter of interest, such as temperature, distributed temperature, pressure, acoustic energy, electric current, magnetic field, electric field, flow, chemical properties, or a combination thereof. The sensors may be fiber optic sensors, electrical sensors, or other types.
Further, the alternative path conduit can be used to pump both multi- mode and single mode optic fiber into the same well bore thereby permitting calibration and correlation of backscattering signals to improve the resolution of the optical time domain refractometry analysis of deep subsea wells.
In an alternative embodiment, an electrical cable can be disposed in the alternative path conduit instead of the optical fiber. The electrical cable may include one or more sensors or sensor locations, as in the case of the optical fiber. The optical fiber and the electrical cable are generally referred to herein as a "cable." Electrical Conductor in the Alternative Path Conduit Well logging is often accomplished by disposing a tool down a wellbore with a variety of tools located thereon. These tools may be inserted into the well bore, adjacent the production flow line, and therefore never risk causing obstruction or damage to these very expensive deep water well projects. Any cased hole logging tool can be disposed and run from a tubular member adjacent the production tubing. These include, without limitation, neutron decay detector scanning, gamma ray logging, magnetic resonance logging, seismic sensing, and the like. For example, referring now to Fig. 3, if conduit 16 was 2 inches in diameter, normal well logging tools could be easily inserted in the well bore to the full extent of the well bore. These tools could be easily pumped down the annulus of conduit 16 through welihead 9 and into the larger diameter side of the U-shaped subsea conduit 11. The logging techniques could be accomplished from the buoy, or the tools could be permanently deployed to allow all varieties of common logging techniques to be accomplished with the deployed tools. These tools could be inserted to the total well depth either from the moon pool of the drilling rig as it completes the well or from the instrument pod 17 after placement on the deck of a service vessel.
Operation of the Alternative Path Pod and Lines The alternative path conduit and instrument pod allows an extension of the welihead to the sea surface for control, logging and sampling lines. The instrument buoy would be deployed after connection with the submersible conduit from a regular buoy tender vessel. Since the buoy is much closer to the subsea welihead than the remote production platform, control lines may be easily used to log well inflow conformance by real-time temperature profiles. If more than one well in a field is provided with the alternative path conduit and buoy system, a real time reservoir profile may be developed by combining the information received from each alternative path instrument pod.
This information may be transferred from each instrument pod to either a production platform or land based radio station and processed and provided over modern communication channels to knowledge workers interested in well production and characteristics.
The instrument pod may also be used as a staging area for remotely activated well shutoff controls which would shut-in a well as required by reservoir engineers for the reasons well known to those having skill in this industry. A command could be issued to the instrument pod which would thereafter executed either an acoustic, electrical, or photonic signal to a subsurface valve to shut in the well.
Service and Repair of the Alternative Path Pod and Lines Service of the alternative path pod and lines can be readily accomplished from regular surface vessels and remotely operated subsea vehicles (ROVs) presently used to service subsea wells. As required, the service vessel would be called to service each buoy with fuel (if required to run generators), glycol or other chemicals (if need to pump into the well zone), or replace or service cabling or conduit run into the alternative path. The pod would be lifted onto the work vessel by crane or other lifting means. The rise and fall of the vessel would not prevent the servicing of the conduit. A pump would be connected to the conduit and the optic fiber line could be washed from the conduit. Alternatively, new lines may be inserted into the alternative path conduit by pumping in a manner well known to those providing current well service.
Since the conduit is continuous from the surface into the well bore and back to the surface in the preferred embodiment. The introduction of cabling, or conductors into the well bore can be enhanced by filing the conduit with a low-denisity hydraulic medium, such as nitrogen gas, and then pumping in the lines one side while bleeding off the gas from the other side of the continuous looped circuit. It is noted that the alternative path conduit, through its different
methods of communication as previously disclosed (such as optical fiber, electrical cable, and hydraulic fluid) can act as a means to send commands from the pod to devices located in the wellbore. For instance, a command to set the packer 6 may be sent from a remote location to the pod and from the pod down the alternative path conduit to the packer. Provided the command sent is the "set packer" command, the packer is then set. Besides a packer, devices that can be controlled include but are not limited to valves (such as flow control valves), perforating guns, and tubing hangers.
The proceeding are examples of deploying permanent or temporary monitoring devices D within the alternative path conduit, including the deployment of cables, logging tools, memory tools, seismic arrays, and sensors. Figure 3 schematically illustrates a device D being deployed within the alternative path conduit.
While particular embodiments of the invention have been described herein, this application is not limited thereto. It is intended that the invention be as broad in scope as the art may allow and that the specification and claims be interpreted accordingly.

Claims (22)

1. An apparatus for logging, controlling, or monitoring a subsea well, the apparatus comprising: a casing string disposed in a subsea well; an alternative path conduit permanently disposed proximate the casing string and passing through a subsea welihead, the alternative path conduit being connected to a hydraulic wet connector; a production tubing located within the casing string; and a flotation pod connected to the alternative path conduit through the hydraulic wet connector.
2. The apparatus of claim 1, wherein the alternative path conduit is Ushaped and provides an ingress and an egress on the welihead.
3. The apparatus of claim 1, wherein the alternative path conduit is located between an exterior surface of the casing string and the wellbore.
4. The apparatus of claim 1, wherein a cable is deployed within the alternative path conduit.
5. The apparatus of claim 4, wherein the cable comprises an optical fiber.
6. The apparatus of claim 4, wherein the cable comprises an electrical cable.
7. The apparatus of claim 4, wherein the cable is deployed by fluid drag.
8. The apparatus of claim 1, wherein the alternative path conduit provides a path for data transmission.
9. The apparatus of claim 1, wherein a device is deployed within the alternative path conduit to measure a parameter of interest.
10. The apparatus of claim 9, wherein the parameter of interest is temperature, distributed temperature, pressure, acoustic energy, electric current, magnetic field, electric field, flow, chemical properties, or a combination thereof.
11. The apparatus of claim 1, further comprising a memory recording device adapted to be deployed through the alternative path conduit.
12. The apparatus of claim 1, further comprising a logging tool adapted to be deployed through the alternative path conduit.
13. The apparatus of claim 1, wherein the alternative path conduit is cemented in place.
14. The apparatus of claim 13, wherein the alternative path conduit is cemented in place between an exterior surface of the casing string and the wellbore.
15. The apparatus of claim 1, wherein a monitoring device is deployed permanently in the alternative path conduit.
16. The apparatus of claim 1, wherein a monitoring device is deployed nonpermanently in the alternative path conduit.
17. The apparatus of claim 1, wherein a command is transmitted through the alternative path conduit to control a device located in the well.
18. The apparatus of claim 1, further comprising additional alternative path conduits disposed proximate the casing string and passing through a subsea welihead.
19. A method of monitoring a sub sea well, the method comprising: deploying a floating instrument pod proximate to the well; connecting the pod to an alternative path conduit; deploying the alternative path conduit proximate to a casing string within the well; and communicating through the alternative path conduit between the instrument pod and the well.
20. The method of claim 19, further comprising partially supporting the alternative path conduit by a submerged flotation device.
21. The method of claim 19, further comprising attaching a sub sea anchor to a sub sea pile to maintain the instrument pod proximate the well.
22. The method of claim 19, further comprising: receiving data at the instrument pod from the well through the alternative path conduit; processing the data; and transmiting the data from the instrument pod to a remote location.
GB0517372A 2001-07-12 2002-07-10 Method and apparatus to monitor, control and log subsea wells Expired - Fee Related GB2414756B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US30502001P 2001-07-12 2001-07-12
GB0400275A GB2395965B (en) 2001-07-12 2002-07-10 Method and apparatus to monitor,control and log subsea oil and gas wells

Publications (3)

Publication Number Publication Date
GB0517372D0 GB0517372D0 (en) 2005-10-05
GB2414756A true GB2414756A (en) 2005-12-07
GB2414756B GB2414756B (en) 2006-05-10

Family

ID=23178959

Family Applications (3)

Application Number Title Priority Date Filing Date
GB0517457A Expired - Fee Related GB2414258B (en) 2001-07-12 2002-07-10 Method and apparatus to monitor, control and log subsea wells
GB0400275A Expired - Fee Related GB2395965B (en) 2001-07-12 2002-07-10 Method and apparatus to monitor,control and log subsea oil and gas wells
GB0517372A Expired - Fee Related GB2414756B (en) 2001-07-12 2002-07-10 Method and apparatus to monitor, control and log subsea wells

Family Applications Before (2)

Application Number Title Priority Date Filing Date
GB0517457A Expired - Fee Related GB2414258B (en) 2001-07-12 2002-07-10 Method and apparatus to monitor, control and log subsea wells
GB0400275A Expired - Fee Related GB2395965B (en) 2001-07-12 2002-07-10 Method and apparatus to monitor,control and log subsea oil and gas wells

Country Status (5)

Country Link
US (2) US6640900B2 (en)
AU (1) AU2002324484B2 (en)
GB (3) GB2414258B (en)
NO (1) NO20040099L (en)
WO (1) WO2003006779A2 (en)

Families Citing this family (81)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003006779A2 (en) * 2001-07-12 2003-01-23 Sensor Highway Limited Method and apparatus to monitor, control and log subsea oil and gas wells
EP1319800B1 (en) * 2001-12-12 2006-02-22 Cooper Cameron Corporation Borehole equipment position detection system
GB0216259D0 (en) * 2002-07-12 2002-08-21 Sensor Highway Ltd Subsea and landing string distributed sensor system
DE60315304D1 (en) * 2002-08-14 2007-09-13 Baker Hughes Inc UNDERWATER INJECTION UNIT FOR INJECTION OF CHEMICAL ADDITIVES AND MONITORING SYSTEM FOR OIL CONVEYORS
US6758271B1 (en) * 2002-08-15 2004-07-06 Sensor Highway Limited System and technique to improve a well stimulation process
US6955218B2 (en) * 2003-08-15 2005-10-18 Weatherford/Lamb, Inc. Placing fiber optic sensor line
US20050199391A1 (en) * 2004-02-03 2005-09-15 Cudmore Julian R. System and method for optimizing production in an artificially lifted well
US7832500B2 (en) * 2004-03-01 2010-11-16 Schlumberger Technology Corporation Wellbore drilling method
US7440876B2 (en) * 2004-03-11 2008-10-21 M-I Llc Method and apparatus for drilling waste disposal engineering and operations using a probabilistic approach
US7914266B2 (en) * 2004-03-31 2011-03-29 Schlumberger Technology Corporation Submersible pumping system and method for boosting subsea production flow
RU2330154C1 (en) 2004-05-03 2008-07-27 Эксонмобил Апстрим Рисерч Компани , System and vessel for technical servicing of offshore deposits
US7777643B2 (en) * 2004-05-06 2010-08-17 Halliburton Energy Services, Inc. Optical communications with a bottom hole assembly
US8522869B2 (en) * 2004-05-28 2013-09-03 Schlumberger Technology Corporation Optical coiled tubing log assembly
US7617873B2 (en) 2004-05-28 2009-11-17 Schlumberger Technology Corporation System and methods using fiber optics in coiled tubing
US20060004593A1 (en) * 2004-06-30 2006-01-05 Devon Energy Corporation Method and system for gathering, transporting and marketing offshore oil and gas
US7420475B2 (en) * 2004-08-26 2008-09-02 Schlumberger Technology Corporation Well site communication system
GB2434863B (en) * 2004-11-03 2010-02-03 Shell Int Research Apparatus and method for retroactively installing sensors on marine elements
US7493962B2 (en) * 2004-12-14 2009-02-24 Schlumberger Technology Corporation Control line telemetry
WO2006102259A2 (en) * 2005-03-23 2006-09-28 Shell Internationale Research Maatschappij B.V. Underwater structure monitoring systems and methods
US7554458B2 (en) * 2005-11-17 2009-06-30 Expro North Sea Limited Downhole communication
GB2433112B (en) * 2005-12-06 2008-07-09 Schlumberger Holdings Borehole telemetry system
US7712524B2 (en) 2006-03-30 2010-05-11 Schlumberger Technology Corporation Measuring a characteristic of a well proximate a region to be gravel packed
US7735555B2 (en) * 2006-03-30 2010-06-15 Schlumberger Technology Corporation Completion system having a sand control assembly, an inductive coupler, and a sensor proximate to the sand control assembly
US7793718B2 (en) 2006-03-30 2010-09-14 Schlumberger Technology Corporation Communicating electrical energy with an electrical device in a well
US8056619B2 (en) 2006-03-30 2011-11-15 Schlumberger Technology Corporation Aligning inductive couplers in a well
US20070234789A1 (en) * 2006-04-05 2007-10-11 Gerard Glasbergen Fluid distribution determination and optimization with real time temperature measurement
GB0616330D0 (en) * 2006-08-17 2006-09-27 Schlumberger Holdings A method of deriving reservoir layer pressures and measuring gravel pack effectiveness in a flowing well using permanently installed distributed temperature
WO2008092100A2 (en) * 2007-01-25 2008-07-31 David Randolph Smith Chemically enhanced gas-lift for oil and gas wells
US7586617B2 (en) * 2007-06-22 2009-09-08 Schlumberger Technology Corporation Controlling a dynamic signal range in an optical time domain reflectometry
MX2010001555A (en) * 2007-08-10 2010-03-11 Schlumberger Technology Bv Methods and systems of installing cable for measurement of a physical parameter.
US8423397B2 (en) * 2008-08-08 2013-04-16 Pinnacleais, Llc Asset management systems and methods
US20100036866A1 (en) * 2008-08-11 2010-02-11 Pinnacleais, Llc Piping Circuitization System and Method
US9534453B2 (en) * 2008-08-13 2017-01-03 Onesubsea Ip Uk Limited Umbilical management system and method for subsea well intervention
GB2464481B (en) * 2008-10-16 2011-11-02 Dynamic Dinosaurs Bv Method for installing sensors in a borehole
EP2196621B1 (en) * 2008-12-15 2017-03-08 Services Pétroliers Schlumberger A micro-logging system and method
EP2196620B1 (en) 2008-12-15 2012-06-27 Services Pétroliers Schlumberger A micro-logging system and method
US20100193186A1 (en) * 2009-02-03 2010-08-05 Smith David R Method and apparatus to construct and log a well
US20100252269A1 (en) * 2009-04-01 2010-10-07 Baker Hughes Incorporated System and method for monitoring subsea wells
CA3175447A1 (en) * 2009-05-27 2010-12-02 Silixa Ltd Method and apparatus for optical sensing
GB2471108B (en) * 2009-06-17 2013-08-07 Vetco Gray Controls Ltd Monitoring of undesirable fluid ingress into subsea control modules
WO2010151661A2 (en) * 2009-06-25 2010-12-29 Cameron International Corporation Sampling skid for subsea wells
US20140290374A1 (en) * 2013-03-28 2014-10-02 David V. Brower Apparatus to Monitor Flow Assurance Properties in Conduits
US8839850B2 (en) 2009-10-07 2014-09-23 Schlumberger Technology Corporation Active integrated completion installation system and method
US9388686B2 (en) 2010-01-13 2016-07-12 Halliburton Energy Services, Inc. Maximizing hydrocarbon production while controlling phase behavior or precipitation of reservoir impairing liquids or solids
US8505625B2 (en) 2010-06-16 2013-08-13 Halliburton Energy Services, Inc. Controlling well operations based on monitored parameters of cement health
WO2012027476A1 (en) * 2010-08-24 2012-03-01 Stanley Hale Leak detection and early warning system for capped or abandoned subsea wellheads
EP2423429A1 (en) * 2010-08-31 2012-02-29 Vetco Gray Controls Limited Valve condition monitoring
US9772608B2 (en) * 2010-12-20 2017-09-26 Joe Spacek Oil well improvement system—well monitor and control subsystem
US8636063B2 (en) 2011-02-16 2014-01-28 Halliburton Energy Services, Inc. Cement slurry monitoring
WO2012135103A2 (en) * 2011-03-25 2012-10-04 Ohio University Security system for underground conduit
US9075155B2 (en) 2011-04-08 2015-07-07 Halliburton Energy Services, Inc. Optical fiber based downhole seismic sensor systems and methods
US9127532B2 (en) 2011-09-07 2015-09-08 Halliburton Energy Services, Inc. Optical casing collar locator systems and methods
US9127531B2 (en) 2011-09-07 2015-09-08 Halliburton Energy Services, Inc. Optical casing collar locator systems and methods
US9249559B2 (en) 2011-10-04 2016-02-02 Schlumberger Technology Corporation Providing equipment in lateral branches of a well
US9297767B2 (en) 2011-10-05 2016-03-29 Halliburton Energy Services, Inc. Downhole species selective optical fiber sensor systems and methods
US8725302B2 (en) * 2011-10-21 2014-05-13 Schlumberger Technology Corporation Control systems and methods for subsea activities
US20130105109A1 (en) * 2011-10-31 2013-05-02 Velma Jean Richards Energy Thermostatic Thermos System (Heating and Cooling Containment)
RU2488691C1 (en) * 2012-01-13 2013-07-27 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Development method of oil deposit at late stage
US20130188168A1 (en) * 2012-01-20 2013-07-25 Arthur H. Hartog Fiber optic formation dimensional change monitoring
US9644476B2 (en) 2012-01-23 2017-05-09 Schlumberger Technology Corporation Structures having cavities containing coupler portions
US9175560B2 (en) 2012-01-26 2015-11-03 Schlumberger Technology Corporation Providing coupler portions along a structure
US9938823B2 (en) 2012-02-15 2018-04-10 Schlumberger Technology Corporation Communicating power and data to a component in a well
US10060250B2 (en) 2012-03-13 2018-08-28 Halliburton Energy Services, Inc. Downhole systems and methods for water source determination
US10036234B2 (en) 2012-06-08 2018-07-31 Schlumberger Technology Corporation Lateral wellbore completion apparatus and method
GB2503498B (en) * 2012-06-29 2017-06-14 Optasense Holdings Ltd Fibre optic sensing
GB201212701D0 (en) * 2012-07-17 2012-08-29 Silixa Ltd Structure monitoring
US8649909B1 (en) * 2012-12-07 2014-02-11 Amplisine Labs, LLC Remote control of fluid-handling devices
US9927263B2 (en) 2013-07-02 2018-03-27 The Penn State Research Foundation Intrusion detection system for an undersea environment
US9885848B2 (en) 2013-07-02 2018-02-06 The Penn State Research Foundation Composite cable assembly with neutral buoyancy
MX2016002920A (en) * 2013-09-25 2016-11-07 Halliburton Energy Services Inc Workflow adjustment methods and systems for logging operations.
WO2016014317A1 (en) * 2014-07-24 2016-01-28 Conocophillips Company Completion with subsea feedthrough
US20160024868A1 (en) * 2014-07-24 2016-01-28 Conocophillips Company Completion with subsea feedthrough
US9595884B2 (en) * 2014-12-18 2017-03-14 General Electric Company Sub-sea power supply and method of use
GB2553708B (en) * 2015-05-15 2020-12-23 Halliburton Energy Services Inc Cement plug tracking with fiber optics
US20180087372A1 (en) * 2015-05-29 2018-03-29 Halliburton Energy Services, Inc. Methods and systems employing a controlled acoustic source and distributed acoustic sensors to identify acoustic impedance boundary anomalies along a conduit
WO2017062584A1 (en) * 2015-10-06 2017-04-13 The Penn State Research Foundation Intrusion detection system for an undersea environment
US10655455B2 (en) 2016-09-20 2020-05-19 Cameron International Corporation Fluid analysis monitoring system
US10472949B2 (en) 2017-01-30 2019-11-12 Cameron International Corporation Gas-in-solution detection system and method
US11415553B2 (en) * 2019-07-23 2022-08-16 The United States Of America, As Represented By The Secretary Of The Navy Mobile automated non-destructive inspection system
EP4056803A1 (en) * 2021-03-12 2022-09-14 Nexans Remote communication downline system
US20230296002A1 (en) * 2022-03-17 2023-09-21 China University Of Petroleum-Beijing Deep-water drilling gas kick pilot-scale apparatus

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4052703A (en) * 1975-05-05 1977-10-04 Automatic Terminal Information Systems, Inc. Intelligent multiplex system for subsurface wells
US4191250A (en) * 1978-08-18 1980-03-04 Mobil Oil Corporation Technique for cementing casing in an offshore well to seafloor
WO1988003596A1 (en) * 1986-11-11 1988-05-19 Myrmidon Subsea Controls Ltd Subsea systems and devices
WO2002004785A1 (en) * 2000-07-11 2002-01-17 Halliburton Energy Services, Inc. Well management system

Family Cites Families (47)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3026940A (en) * 1958-05-19 1962-03-27 Electronic Oil Well Heater Inc Oil well temperature indicator and control
US3347319A (en) * 1965-03-15 1967-10-17 Fenix & Scisson Inc Large diameter casing
US3489219A (en) * 1966-03-10 1970-01-13 Halliburton Co Method of locating tops of fluids in an annulus
US3517110A (en) 1968-04-01 1970-06-23 North American Rockwell Flexible underwater riser containing electrical conductors and material conduits
US3612177A (en) * 1969-10-29 1971-10-12 Gulf Oil Corp Deep water production system
US3675713A (en) * 1970-03-30 1972-07-11 Regan Forge & Eng Co Method and apparatus for separating subsea well conduit couplings from a remote floating vessel
USRE27745E (en) * 1971-04-09 1973-08-28 Subsea production system
FR2421272A1 (en) 1978-03-28 1979-10-26 Europ Propulsion SYSTEM FOR REMOTE CONTROL AND MAINTENANCE OF A SUBMERSIBLE WELL HEAD
US4480690A (en) * 1981-02-17 1984-11-06 Geo Vann, Inc. Accelerated downhole pressure testing
GB2178717B (en) 1985-07-19 1988-06-08 Ferranti Subsea Systems Communication arrangement between a sub-sea structure and floating vessel
FR2600172B1 (en) * 1986-01-17 1988-08-26 Inst Francais Du Petrole DEVICE FOR INSTALLING SEISMIC SENSORS IN A PETROLEUM PRODUCTION WELL
FR2621646B1 (en) * 1987-08-19 1995-08-25 Inst Francais Du Petrole PROCESS FOR MANEUVERING AT LEAST ONE DEVICE WITHIN A TUBING AND ASSEMBLY FOR IMPLEMENTING THE PROCESS
US5163321A (en) * 1989-10-17 1992-11-17 Baroid Technology, Inc. Borehole pressure and temperature measurement system
US5166677A (en) 1990-06-08 1992-11-24 Schoenberg Robert G Electric and electro-hydraulic control systems for subsea and remote wellheads and pipelines
DK0470883T3 (en) 1990-08-10 1995-11-27 Inst Francais Du Petrole Method and device for utilizing small oil fields in the seabed
US5381865A (en) * 1990-12-13 1995-01-17 Blandford; Joseph W. Method and apparatus for production of subsea hydrocarbon formations
FR2673672B1 (en) * 1991-03-08 1993-06-04 Inst Francais Du Petrole METHOD AND DEVICE FOR PLACING PROBES AGAINST THE WALL OF A WELL.
FR2681373B1 (en) * 1991-09-17 1993-10-29 Institut Francais Petrole IMPROVED DEVICE FOR MONITORING A DEPOSIT FOR PRODUCTION WELLS.
GB9315231D0 (en) 1993-07-22 1993-09-08 York Ltd Optical time domain reflextometry
US5517024A (en) * 1994-05-26 1996-05-14 Schlumberger Technology Corporation Logging-while-drilling optical apparatus
US5732776A (en) 1995-02-09 1998-03-31 Baker Hughes Incorporated Downhole production well control system and method
US5706896A (en) 1995-02-09 1998-01-13 Baker Hughes Incorporated Method and apparatus for the remote control and monitoring of production wells
US5503225A (en) * 1995-04-21 1996-04-02 Atlantic Richfield Company System and method for monitoring the location of fractures in earth formations
US5524709A (en) * 1995-05-04 1996-06-11 Atlantic Richfield Company Method for acoustically coupling sensors in a wellbore
GB9519880D0 (en) * 1995-09-29 1995-11-29 Sensor Dynamics Ltd Apparatus for measuring pressure
US5626192A (en) * 1996-02-20 1997-05-06 Halliburton Energy Services, Inc. Coiled tubing joint locator and methods
US6125935A (en) * 1996-03-28 2000-10-03 Shell Oil Company Method for monitoring well cementing operations
US6532839B1 (en) * 1996-03-29 2003-03-18 Sensor Dynamics Ltd. Apparatus for the remote measurement of physical parameters
GB9606673D0 (en) * 1996-03-29 1996-06-05 Sensor Dynamics Ltd Apparatus for the remote measurement of physical parameters
CA2270236C (en) * 1996-11-14 2003-09-23 Ronald E. Pringle Communication conduit in a well tool
NO310890B1 (en) 1997-04-29 2001-09-10 Kvaerner Oilfield Prod As Dynamic control cable for use between a floating structure and a connection point on the seabed
US6281489B1 (en) * 1997-05-02 2001-08-28 Baker Hughes Incorporated Monitoring of downhole parameters and tools utilizing fiber optics
DE69841500D1 (en) * 1997-05-02 2010-03-25 Baker Hughes Inc Method and device for controlling a chemical injection of a surface treatment system
US6070663A (en) * 1997-06-16 2000-06-06 Shell Oil Company Multi-zone profile control
US5884715A (en) * 1997-08-01 1999-03-23 Reddoch; Jeffrey Method and apparatus for injecting drilling waste into a well while drilling
US6173788B1 (en) * 1998-04-07 2001-01-16 Baker Hughes Incorporated Wellpacker and a method of running an I-wire or control line past a packer
US6026900A (en) * 1998-06-15 2000-02-22 Keller; Carl E. Multiple liner method for borehole access
NO315725B1 (en) * 1998-06-18 2003-10-13 Norges Geotekniske Inst Device for measuring and monitoring resistivity outside a well pipe in a petroleum reservoir
FR2780442B1 (en) 1998-06-30 2000-07-28 Inst Francais Du Petrole POLYPHASIC PRODUCTION SYSTEM SUITABLE FOR LARGE WATER DEPTHS
US6443228B1 (en) * 1999-05-28 2002-09-03 Baker Hughes Incorporated Method of utilizing flowable devices in wellbores
US6223675B1 (en) 1999-09-20 2001-05-01 Coflexip, S.A. Underwater power and data relay
US6360820B1 (en) * 2000-06-16 2002-03-26 Schlumberger Technology Corporation Method and apparatus for communicating with downhole devices in a wellbore
US6437326B1 (en) * 2000-06-27 2002-08-20 Schlumberger Technology Corporation Permanent optical sensor downhole fluid analysis systems
WO2003006779A2 (en) * 2001-07-12 2003-01-23 Sensor Highway Limited Method and apparatus to monitor, control and log subsea oil and gas wells
US6772840B2 (en) * 2001-09-21 2004-08-10 Halliburton Energy Services, Inc. Methods and apparatus for a subsea tie back
US20030234921A1 (en) * 2002-06-21 2003-12-25 Tsutomu Yamate Method for measuring and calibrating measurements using optical fiber distributed sensor
US6758271B1 (en) * 2002-08-15 2004-07-06 Sensor Highway Limited System and technique to improve a well stimulation process

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4052703A (en) * 1975-05-05 1977-10-04 Automatic Terminal Information Systems, Inc. Intelligent multiplex system for subsurface wells
US4191250A (en) * 1978-08-18 1980-03-04 Mobil Oil Corporation Technique for cementing casing in an offshore well to seafloor
WO1988003596A1 (en) * 1986-11-11 1988-05-19 Myrmidon Subsea Controls Ltd Subsea systems and devices
WO2002004785A1 (en) * 2000-07-11 2002-01-17 Halliburton Energy Services, Inc. Well management system

Also Published As

Publication number Publication date
GB2395965B (en) 2006-01-11
US20040020653A1 (en) 2004-02-05
GB2395965A (en) 2004-06-09
WO2003006779A2 (en) 2003-01-23
NO20040099L (en) 2004-03-08
GB2414756B (en) 2006-05-10
GB0517372D0 (en) 2005-10-05
GB0400275D0 (en) 2004-02-11
GB2414258A (en) 2005-11-23
GB2414258B (en) 2006-02-08
US20030010500A1 (en) 2003-01-16
AU2002324484B2 (en) 2007-09-20
WO2003006779A3 (en) 2003-12-11
GB0517457D0 (en) 2005-10-05
US6640900B2 (en) 2003-11-04
US6913083B2 (en) 2005-07-05

Similar Documents

Publication Publication Date Title
US6640900B2 (en) Method and apparatus to monitor, control and log subsea oil and gas wells
AU2002324484A1 (en) Method and apparatus to monitor, control and log subsea oil and gas wells
US7255173B2 (en) Instrumentation for a downhole deployment valve
US9187957B2 (en) Method for motion compensation using wired drill pipe
US5667023A (en) Method and apparatus for drilling and completing wells
CN103097656B (en) Well
EP1335106A2 (en) Casing data relay
US9074436B2 (en) Methods for installing sensors in a borehole
US7273105B2 (en) Monitoring of a reservoir
WO2013045882A2 (en) Fibre optic cable deployment, particularly for downhole distributed sensing
US11513247B2 (en) Data acquisition systems
WO1997008424A1 (en) Downhole tool system
US11208885B2 (en) Method and system to conduct measurement while cementing
US20210238979A1 (en) Method and system to conduct measurement while cementing
US9404347B1 (en) Apparatus and method for connecting a riser from an offshore rig to a subsea structure
Stalford et al. Intelligent Casing-Intelligent Formation (ICIF) Design
CA2483527C (en) Instrumentation for a downhole deployment valve
WO2017052511A1 (en) Downhole tool with assembly for determining seal integrity
WO2005005770A1 (en) Systems and methods for constructing subsea production wells
GB2443374A (en) Instrumentation for downhole deployment valve
GB2584450A (en) Telemetry safety & life of well monitoring system
WO1999007975A1 (en) Method and apparatus for drilling and completing wells
GB2444194A (en) Instrumentation for downhole deployment valve

Legal Events

Date Code Title Description
PCNP Patent ceased through non-payment of renewal fee

Effective date: 20150710