Process and device for loading tubular elements or drill rods on a drilling mast Download PDFInfo
- Publication number
- FR2552488A1 FR2552488A1 FR8315129A FR8315129A FR2552488A1 FR 2552488 A1 FR2552488 A1 FR 2552488A1 FR 8315129 A FR8315129 A FR 8315129A FR 8315129 A FR8315129 A FR 8315129A FR 2552488 A1 FR2552488 A1 FR 2552488A1
- Authority
- FR
- France
- Prior art keywords
- mast
- drilling
- rod
- new
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
- E21B15/04—Supports for the drilling machine, e.g. derricks or masts specially adapted for directional drilling, e.g. slant hole rigs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
- E21B15/003—Supports for the drilling machine, e.g. derricks or masts adapted to be moved on their substructure, e.g. with skidding means; adapted to drill a plurality of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/14—Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
Abstract
Description
Procédé et dispositif de chargement des éléments tubulaires ou des tiges de
forage sur un mât de forage
L'invention concerne un procédé et un dispositif de chargement et de fixation des éléments tubulaires ou des tiges de forage sur un mât de forage.Method and device for loading tubular elements or rods
drilling on a drilling mast
The invention relates to a method and a device for loading and fixing tubular elements or drill pipes on a drill mast.
Les mâts de forage sont généralement constitués de structures métalliques fixes et le forage se fait au moyen d'un outil fixé à l'extrémité inférieure d'un train de tiges supporté par la structure métallique. Une fois que le train de tiges est complètement enfoncé dans le sol, il convient de le rallonger en lui ajoutant une tige supplémentaire. Drill masts are generally made up of fixed metal structures and drilling is done using a tool attached to the lower end of a drill string supported by the metal structure. Once the drill string is fully sunk into the ground, it should be extended by adding an additional rod.
Pour cette opération, il faut tout d'abord présenter la nouvelle tige dans un ratelier de stockage situé à l'intérieur ou à la base du mât, puis procéder à l'accrochage de l'extrémité de la nouvelle tige au palan et pour réaliser cet accrochage, on fait coincider 11 extrémité supérieure de la tige avec le palan, en jouant sur l'élasticité de ladite tige et des câbles de suspension du palan. Ensuite, il faut relever la tige pour qu'elle vienne d'elle même s'aligner, sous l'effet de son propre poids, avec le train de tiges déjà en place et la visser sur le train de tiges pour la poursuite des opérations. For this operation, you must first present the new rod in a storage rack located inside or at the base of the mast, then proceed to hook the end of the new rod to the hoist and to carry out this attachment, the upper end of the rod is made to coincide with the hoist, by playing on the elasticity of said rod and of the hoist suspension cables. Then, it is necessary to raise the rod so that it comes to align itself, under the effect of its own weight, with the string of rods already in place and screw it on the string of rods for further operations .
Ce système de chargement et de fixation des éléments tubulaires les uns à la suite des autres est assez rudimentaire, et il fait appel à la force physique des opérateurs pour le positionnement. De plus, ces différentes opérations doivent être recommencées au moment de la fixation de chaque nouvelle tige. Par ailleurs, la tige se positionnant sous l'effet de son propre poids, c'est-à-dire en position verticale, l'application de ce procédé de chargement et de fixation est difficilement envisageable pour les mâts de forage inclinés. This system of loading and fixing the tubular elements one after the other is quite rudimentary, and it calls upon the physical force of the operators for positioning. In addition, these different operations must be repeated when attaching each new rod. Furthermore, the rod being positioned under the effect of its own weight, that is to say in a vertical position, the application of this loading and fixing method is difficult to envisage for inclined drilling masts.
L'invention a pour objet un procédé et un dispositif permettant d'éviter ces inconvénients. The invention relates to a method and a device for avoiding these drawbacks.
Conformément à l'invention, le procédé consiste - à stocker sous le plancher de la plateforme une nouvelle tige de forage, - à déplacer le mât entre la position de forage et la position de stockage de la nouvelle tige, - à remonter la nouvelle tige à l'intérieur du mat, - puis à ramener le mât avec la nouvelle tige sur la position de forage pour la jonction de cette nouvelle tige avec le train de tiges déjà enfoncé dans le sol. According to the invention, the method consists of - storing under the platform floor a new drill rod, - moving the mast between the drilling position and the storage position of the new rod, - reassembling the new rod inside the mast, - then bring the mast with the new rod to the drilling position for the junction of this new rod with the drill string already sunk into the ground.
Selon l'invention le mât de forage comporte des moyens de déplace~ ment entre la position de forage et la position de stockage de la nouvelle tige et des moyens pour faire varier son inclinaison. According to the invention the drilling mast comprises means for moving ~ ment between the drilling position and the storage position of the new rod and means for varying its inclination.
L'invention va maintenant être décrite avec plus de détails en se référant à un mode de réalisation donné à titre d'exemple et représenté par les dessins annexés. The invention will now be described in more detail with reference to an embodiment given by way of example and represented by the accompanying drawings.
La figure 1 représente une vue générale de l'ensemble du mât de forage muni du dispositif de chargement des éléments tubulaires conforme à l'invention. FIG. 1 represents a general view of the whole of the drilling mast provided with the device for loading the tubular elements according to the invention.
Les figures 2 à 5 représentent des schémas montrant les différentes phases du procédé de chargement. Figures 2 to 5 show diagrams showing the different phases of the loading process.
-A la figure 1, on a représenté une plateforme de forage 1 sur laquelle est monté un mât de forage 2 constitué par une structure métallique. - In Figure 1, there is shown a drilling platform 1 on which is mounted a drilling mast 2 constituted by a metal structure.
Le mât de forage 2, représenté en position inclinée, est supporté par des supports ou vérins 3 dont les extrémités sont articulées d'une part sur la structure métallique du mât 2 et d'autre part sur le plancher de la plateforme 1. Par ailleurs, le pied 4 du mât de forage est également articulé en 6 par exemple sur un chariot 5 qui glisse sur le plancher de la plateforme 1 de telle manière que la structure métallique puisse pivoter entre une position verticale et une position inclinée et que l'ensemble du mât puisse se déplacer latéralement. Les déplacements longitudinaux du chariot 5 et par conséquent du pied 4 du mât sont commandés par un vérin horizontal 7 ou par tout autre dispositif.The drilling mast 2, shown in an inclined position, is supported by supports or jacks 3 the ends of which are articulated on the one hand on the metal structure of the mast 2 and on the other hand on the floor of the platform 1. Furthermore , the foot 4 of the drilling mast is also articulated at 6 for example on a carriage 5 which slides on the floor of the platform 1 so that the metal structure can pivot between a vertical position and an inclined position and that the assembly mast can move laterally. The longitudinal movements of the carriage 5 and therefore of the foot 4 of the mast are controlled by a horizontal cylinder 7 or by any other device.
Le mât de forage 2 comporte un palan 8 qui supporte un train de tiges 9 à l'extrémité inférieure duquel, un outil non représenté, assure le forage dans le sol 10. The drilling mast 2 comprises a hoist 8 which supports a drill string 9 at the lower end of which, a tool not shown, provides drilling in the ground 10.
A proximité du point de forage, un fourreau de stockage 11 pour une nouvelle tige de forage 12 est monté au dessous du plancher de la plateforme 1 de telle sorte que son orifice supérieur soit situé au niveau dudit plancher. Un mât de chargement 13 est également prévu sur le plancher de la plateforme pour l'introduction d'une nouvelle tige dans le fourreau 11. Near the drilling point, a storage sheath 11 for a new drilling rod 12 is mounted below the floor of the platform 1 so that its upper orifice is located at said floor. A loading mast 13 is also provided on the floor of the platform for the introduction of a new rod into the sheath 11.
En se reportant aux schémas 2 à 5, on va maintenant décrire les différentes phases du procédé de chargement des tiges de forage. Referring to diagrams 2 to 5, we will now describe the different phases of the process of loading the drill pipe.
Le train de tiges 9 étant complètement enfoncé, c'est-à-dire que le sommet de la tige supérieure est au niveau du plancher de la plateforme 1, on le désolidarise du palan 8, et à ce momemt le train de tiges 9 est supporté, au moyen de coins de fixation, par le plancher de forage. Une nouvelle tige 12 est stockée, en attente dans le fourreau 11 (figure 2). The drill string 9 being fully inserted, that is to say that the top of the upper rod is at the level of the floor of the platform 1, it is detached from the hoist 8, and at this time the drill string 9 is supported, by means of fixing corners, by the drilling floor. A new rod 12 is stored, waiting in the sheath 11 (Figure 2).
On actionne le verin horizontal 7, ce qui provoque le glissement du chariot 5 sur le plancher, afin que le pied 4 du mât 2 vienne se positionner au-dessus du fourreau de stockage 11. L'inclinaison du mât 2 est commandée par les verins 3 pour que, dans cette nouvelle position, son axe soit dans le prolongement de l'axe du fourreau de stockage 11 (figure 3). The horizontal cylinder 7 is actuated, which causes the carriage 5 to slide on the floor, so that the foot 4 of the mast 2 is positioned above the storage sheath 11. The inclination of the mast 2 is controlled by the cylinders 3 so that, in this new position, its axis is in the extension of the axis of the storage sheath 11 (Figure 3).
Ensuite, il suffit d'accrocher la nouvelle tige 12 au palan 8 et de la faire remonter à l'intérieur du mât 2 où, elle est convenablement supportée et guidée dans l'axe dudit mât par un système de guidage escamotable approprié, non représenté.Then, it suffices to hook the new rod 12 to the hoist 8 and to bring it up inside the mast 2 where, it is suitably supported and guided in the axis of said mast by a suitable retractable guide system, not shown. .
Le pied 4 du mât est alors ramené par l'intermédiaire du vérin horizontal 7 et du chariot 5, à sa position initiale et l'axe de la nouvelle tige 12, commun avec l'axe du mat, revient en colncidence avec l'axe du train de tiges 9 (figure 4). The foot 4 of the mast is then brought back via the horizontal jack 7 and the carriage 5, to its initial position and the axis of the new rod 12, common with the axis of the mast, returns in coincidence with the axis of the drill string 9 (FIG. 4).
Enfin, on procéde à la jonction de la nouvelle tige 12 sur le train de tiges 9 déjà en place, et on poursuit les opérations de forage. Finally, the new rod 12 is joined to the rod train 9 already in place, and drilling operations are continued.
Dès que le mât 2 est revenu au-dessus du point de forage, une nouvelle tige 12 est introduite dans le fourreau de stockage 11 par le mât de chargement 13 (figure 5).As soon as the mast 2 has returned above the drilling point, a new rod 12 is introduced into the storage sheath 11 by the loading mast 13 (FIG. 5).
Ce procédé de chargement des éléments tubulaires sur un mat de forage, permet d'assister mécaniquement ou hydrauliquement toutes les phases de l'opération, ce qui facilite considérablement la tâche des opérateurs, la tige de forage étant continuellement en appui, si bien qu'aucun mouvement parasite n'est à craindre. D'autre part, il permet également le chargement et la fixation des tiges de forage sur un mât travaillant aussi bien en position inclinée qu'en position verticale, et il est compatible avec les différents systèmes d'entrainement des tiges (table de rotation ou moteur hydraulique) ainsi qu'avec tous les systèmes d'automatisation en service sur les appareils de forage. This method of loading the tubular elements on a drilling mast makes it possible to mechanically or hydraulically assist all the phases of the operation, which considerably facilitates the task of the operators, the drilling rod being continuously in support, so that no parasitic movement is to be feared. On the other hand, it also allows the loading and fixing of drilling rods on a mast working both in an inclined position and in a vertical position, and it is compatible with the various rod drive systems (rotation table or hydraulic motor) as well as with all the automation systems in service on the drilling rigs.
Cette disposition présente un autre avantage important, notamment dans le cas de faisceaux de puits, à partir d'une plateforme. En effet, les puits peuvent êtr forés dans un ordre prédéterminé; dans ces conditions, le forage d'un puits quelconque peut être fait à partir des tiges du puits précédent, remontées une à une et immédiatement réemployées, par simple manoeuvre du mât. Cela permet donc de forer un faisceau de puits sans stockage intermédiaire des éléments tubulaires, ce qui consititue un gain de temps considérable. This arrangement has another important advantage, in particular in the case of well bundles, from a platform. Indeed, the wells can be drilled in a predetermined order; under these conditions, the drilling of any well can be done from the rods of the previous well, raised one by one and immediately re-used, by simple maneuvering of the mast. This therefore makes it possible to drill a well bundle without intermediate storage of the tubular elements, which constitutes a considerable time saving.
Bien entendu l'invention n'est pas strictement limitée au mode de réalisation qui a été décrit à titre d'exemple, mais elle couvre également les réalisations qui n'en différeraient que par des détails, par des variantes d'exécution ou par l'utilisation de moyens équivalents, notassent en ce qui concerne les moyens utilisés pour la translation et l'inclinaison du mat de forage. Of course, the invention is not strictly limited to the embodiment which has been described by way of example, but it also covers the embodiments which would differ from it only in details, in variant embodiments or by use of equivalent means, noting with regard to the means used for the translation and the inclination of the drilling mast.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR8315129A FR2552488B1 (en) | 1983-09-23 | 1983-09-23 | METHOD AND DEVICE FOR LOADING TUBULAR ELEMENTS OR DRILL RODS ONTO A DRILL PILL |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR8315129A FR2552488B1 (en) | 1983-09-23 | 1983-09-23 | METHOD AND DEVICE FOR LOADING TUBULAR ELEMENTS OR DRILL RODS ONTO A DRILL PILL |
Publications (2)
Publication Number | Publication Date |
---|---|
FR2552488A1 true FR2552488A1 (en) | 1985-03-29 |
FR2552488B1 FR2552488B1 (en) | 1985-12-13 |
Family
ID=9292470
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR8315129A Expired FR2552488B1 (en) | 1983-09-23 | 1983-09-23 | METHOD AND DEVICE FOR LOADING TUBULAR ELEMENTS OR DRILL RODS ONTO A DRILL PILL |
Country Status (1)
Country | Link |
---|---|
FR (1) | FR2552488B1 (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3143220A (en) * | 1961-01-03 | 1964-08-04 | Shell Oil Co | Apparatus for handling pipe |
US3244242A (en) * | 1960-09-19 | 1966-04-05 | Kerr Mc Gee Oil Ind Inc | Drilling equipment |
FR2012016A1 (en) * | 1968-07-01 | 1970-03-13 | Moore Corp Lee C | |
FR1595166A (en) * | 1968-01-30 | 1970-06-08 | ||
US3539024A (en) * | 1968-08-09 | 1970-11-10 | Brown & Root | Apparatus for drilling inclined boreholes with drill bit support |
US3650339A (en) * | 1969-09-15 | 1972-03-21 | Richard J Selfe | Slant hole drilling rig |
US3802137A (en) * | 1972-04-03 | 1974-04-09 | Gulf Offshore Co | Offshore well rig |
US3895677A (en) * | 1974-01-18 | 1975-07-22 | Dolphin International | Riser pipe stacking method |
US4061233A (en) * | 1975-07-04 | 1977-12-06 | Joseph Reginald Benjamin | Drilling rigs |
US4348920A (en) * | 1980-07-31 | 1982-09-14 | Varco International, Inc. | Well pipe connecting and disconnecting apparatus |
-
1983
- 1983-09-23 FR FR8315129A patent/FR2552488B1/en not_active Expired
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3244242A (en) * | 1960-09-19 | 1966-04-05 | Kerr Mc Gee Oil Ind Inc | Drilling equipment |
US3143220A (en) * | 1961-01-03 | 1964-08-04 | Shell Oil Co | Apparatus for handling pipe |
FR1595166A (en) * | 1968-01-30 | 1970-06-08 | ||
FR2012016A1 (en) * | 1968-07-01 | 1970-03-13 | Moore Corp Lee C | |
US3539024A (en) * | 1968-08-09 | 1970-11-10 | Brown & Root | Apparatus for drilling inclined boreholes with drill bit support |
US3650339A (en) * | 1969-09-15 | 1972-03-21 | Richard J Selfe | Slant hole drilling rig |
US3802137A (en) * | 1972-04-03 | 1974-04-09 | Gulf Offshore Co | Offshore well rig |
US3895677A (en) * | 1974-01-18 | 1975-07-22 | Dolphin International | Riser pipe stacking method |
US4061233A (en) * | 1975-07-04 | 1977-12-06 | Joseph Reginald Benjamin | Drilling rigs |
US4348920A (en) * | 1980-07-31 | 1982-09-14 | Varco International, Inc. | Well pipe connecting and disconnecting apparatus |
Also Published As
Publication number | Publication date |
---|---|
FR2552488B1 (en) | 1985-12-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2029896C (en) | Blowout preventer for wild well | |
CA1136390A (en) | Mobile toolholder for working a tubular shaped plate | |
FR2556042A1 (en) | APPARATUS FOR DRILLING A WELL | |
EP0733584B1 (en) | Automatic erection for a crane with a foldable boom | |
FR2543611A1 (en) | TELESCOPIC JOINT FOR UPRIGHT FOR OIL SEARCHES UNDERWATER | |
EP0122839A1 (en) | Method and apparatus for conducting logging and/or work-over operations in a borehole | |
EP0223666A1 (en) | Apparatus and method for installing and for remotely connecting the end of an elongated member to a connector | |
FR2591756A1 (en) | SEISMIC PROBE PARTICULARLY USABLE IN A NON-TUBE DRILLING WELL | |
FR2605619A1 (en) | REPLIABLE MACHINE FOR HANDLING AND LIFTING LOADS | |
FR2612986A1 (en) | METHOD AND DEVICE FOR CONTROLLING ROCK DRILLING | |
FR2552488A1 (en) | Process and device for loading tubular elements or drill rods on a drilling mast | |
EP0006786B1 (en) | Device for boring a stepped hole for receiving a post or the like | |
FR2495816A1 (en) | MACHINE FOR THE CONTROL ON THE STORAGE STATION OF THE INTERNAL EQUIPMENT OF A NUCLEAR REACTOR | |
CA2084718A1 (en) | Stabilization leg used to support a movable structure such as a technical shelter | |
FR2663676A1 (en) | IMPROVED METHOD AND DEVICE FOR CONDUCTING MEASUREMENT OPERATIONS OR INTERVENTIONS IN A WELL. | |
FR2780441A3 (en) | Earth drilling equipment with drill rod magazine | |
FR2529253A1 (en) | DEVICE AND METHOD FOR DESCENDING AND CONNECTING THE FOUR GUIDE LINES ON POLE GUIDES OF AN UNDERWATER STATION | |
FR2977271A1 (en) | DRILLING MACHINE WITH DOUBLE TRACTION CAPACITY. | |
EP0114146B1 (en) | Universal drilling apparatus equipped with means for rapid raising of the drill string | |
FR2528490A1 (en) | APPARATUS FOR HANDLING DRILL TRAIN ELEMENTS | |
FR2469551A1 (en) | Machine allowing drill rotation head to be pivoted - enables fitting of additional drilling tube without lifting train, used in mineral and geothermal investigations | |
JPS6355293A (en) | Pipe connection apparatus relating to ocean drilling apparatus | |
FR2597460A1 (en) | Mobile machinery for transporting and handling objects, more particularly for a cemetery | |
EP0696806B1 (en) | Installation for the positioning of nuclear fuel assemblies | |
FR2633602A1 (en) | Device with a telescopic crane, particularly for lifting and installing telegraph poles or the like |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ST | Notification of lapse |