FR2543190A1 - Method for erecting and assembling a timber roof frame - Google Patents
Method for erecting and assembling a timber roof frame Download PDFInfo
- Publication number
- FR2543190A1 FR2543190A1 FR8305169A FR8305169A FR2543190A1 FR 2543190 A1 FR2543190 A1 FR 2543190A1 FR 8305169 A FR8305169 A FR 8305169A FR 8305169 A FR8305169 A FR 8305169A FR 2543190 A1 FR2543190 A1 FR 2543190A1
- Authority
- FR
- France
- Prior art keywords
- frame
- ties
- upturned
- joists
- rafters
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/02—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
- E04B7/022—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs consisting of a plurality of parallel similar trusses or portal frames
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
Description
La présente invention se rapporte à la construction des charpentes en bois pour édifices à un ou plusieurs étages, ou maisons de plain-pied. The present invention relates to the construction of wooden frames for buildings with one or more floors, or single storey houses.
Actuellement les différentes pièces composant une charpente en bois pour une maison sont montées et assemblées les unes après les autres sur les murs porteurs. Cette mise en place est rendue encore plus complexe par les difficultés de se mouvoir en hauteur sur des poutres en bois, dont il résulte bien souvent une mauvaise répartition des charges et poussées. Currently the different parts of a wooden frame for a house are mounted and assembled one after the other on the load-bearing walls. This implementation is made even more complex by the difficulties of moving in height on wooden beams, which often results in poor distribution of loads and thrusts.
Le procédé de charpente objet de l'invention permet d'obvier à ces inconvénients, en effet, la répartition des charges se fait très facilement ainsi que celles des poussées. De plus, la réduction d'un grand-nombre de pièces facilite la manutention et réduit le risque d'accident. The framework method of the invention overcomes these drawbacks, in fact, the distribution of loads is done very easily as well as those of the thrusts. In addition, the reduction of a large number of parts facilitates handling and reduces the risk of accident.
Le procédé objet de l'invention consiste dans le partage en deux parties de la charpente, une partie inférieure constituée des pieds de ferme jusqu'au niveau des entraits retroussés ou sous les faux entraits et une partie supérieure constituée du niveau des entraits retroussés jusqu'au faîtage. Les différentes pièces composant chaque partie sont coupées et assemblées en atelier. Le positionnement de la partie supérieure sur la partie inférieure de la charpente s'effectue à hauteur des entraits retroussés par l'entremise des moises. The process which is the subject of the invention consists in dividing the frame into two parts, a lower part consisting of the farm feet up to the level of the turned-up ties or under the false ties and an upper part consisting of the level of the turned-up ties at the ridge. The different parts making up each part are cut and assembled in the workshop. The positioning of the upper part on the lower part of the frame is carried out at the height of the ties rolled up through the molds.
Ce procédé de construction s'adapte sur toutes les pentes de toitures ainsi que sur les maisons neuves ou à restaurer.This construction process fits on all roof slopes as well as on new or restored houses.
Ce procédé permet la suppression des pannes intermédiaires et de la panne de faîtage, les voliges et le plafond rampant font l'écartement jusqu'au faîtage. Egalement les coyaux peuvent être éventuellement supprimés. This process allows the elimination of intermediate breakdowns and ridge failure, the battens and the creeping ceiling make the spacing up to the ridge. Also the cores can possibly be removed.
Ce procédé autorise l'emploi d'une trame pe;cmettant les prédécoupages en atelier des différentes pièces, selon des tracés rectilignes pour une même pente à l'exception des moises qui varient selon la largeur des édifices,
Ledit procédé autorise également des saillies de toiture variées telles qu'en corniche, saillie queue de vache, saillie horizontale classique, etc...This process authorizes the use of a pe weft; putting the precut in the workshop of the different parts, according to straight lines for the same slope with the exception of the months which vary according to the width of the buildings,
Said method also allows various roof projections, such as cornices, cow-tail projections, conventional horizontal projections, etc.
Les dessins annexés illustrent à titre d'exemple non limitatif un mode de réalisation du procédé conjointement avec la description ci-après. The accompanying drawings illustrate by way of nonlimiting example an embodiment of the method together with the description below.
La figure 1 représente une vue de profil, en élévation de la charpente en bois. Figure 1 shows a side view, in elevation of the wooden frame.
La figure 2 représente succintement la partie supérieure de la charpente, selon le profil de la figure 1, à une plus grande échelle. Figure 2 shows briefly the upper part of the frame, according to the profile of Figure 1, on a larger scale.
La figure 3 représente à une autre échelle, en coupe, l'assemblage de la partie supérieure d'un arbalétrier sur sa partie inférieure au niveau de ltentrait retroussé. Figure 3 shows on another scale, in section, the assembly of the upper part of a crossbowman on its lower part at the level of ltentrait upturned.
La figure 4 représente succintement la partie inférieure de la charpente. Figure 4 briefly shows the lower part of the frame.
La figure 5 représente partiellement un côté de la charpente selon la fléche A portée sur la figure 2. FIG. 5 partially represents one side of the frame according to the arrow A shown in FIG.
La figure 6 représente schématiquement une trame de construction de plancher. Figure 6 schematically shows a floor construction frame.
Tel que représenté par l'association des figures susmentionnées, le procédé consiste à positionner d'abord manuellement la partie inférieure de la charpente ( représentée plus particulièrement en figures 4 et 5 ), avant laquelle sont placées les solives 1 reposant sur les murs 2 porteurs et portant un plancher 3, lesquelles solives 1 sont espacées selon un entraxe identique aux parties inférieures des arbalétriers 5 pour permettre le port de ce-s derniers, lesquels arbalétriers 5 sont soutenus par des jambettes 4 dont leurs écartements sont assurés par des semelles de renfort 7 sous pieds de fermes, et, sur l'extérieur sont ajoutés des coyaux 8, puis les extrémités supérieures des arbalétriers 5 sont assemblées deux par deux avec des moises 9, ensuite la partie supérieure de la charpente est posée en faisant correspondre les parties supérieures des arbalétriers 10 dans le prolongement des parties inférieures des arbalétriers 5, et les parties supérieures des arbalétriers 10 ont des entraits retroussés 11 qui se positionnent respectivement dans une moise 9, cette dernière est fixée par des chevilles 6 ou par tout autre moyen approprié
La partie supéri-eure de. la charpente comporte également des poinçons 12 pouvant être dotés de contre-fiches non représentées.As represented by the association of the aforementioned figures, the method consists in first manually positioning the lower part of the frame (shown more particularly in Figures 4 and 5), before which are placed the joists 1 resting on the walls 2 load-bearing and carrying a floor 3, which joists 1 are spaced at a center distance identical to the lower parts of the rafters 5 to allow the port of the latter, which rafters 5 are supported by legs 4 whose spacings are provided by reinforcing flanges 7 under firm trusses, and on the outside are added cores 8, then the upper ends of the rafters 5 are assembled two by two with molds 9, then the upper part of the frame is laid by matching the upper parts crossbowmen 10 in the extension of the lower parts of the crossbowmen 5, and the upper parts of the crossbowmen 10 have ent upturned straps 11 which are positioned respectively in a handle 9, the latter is fixed by dowels 6 or by any other suitable means
The upper part of. the frame also includes punches 12 which can be provided with not shown struts.
Ensuite, la charpente reçoit un plafond rampant 17 sur lequel est placé un contre-chevronnage 13, puis une isolation 14 avec un voligeage 15 non jointif et enfin la couverture 16. Then, the frame receives a creeping ceiling 17 on which is placed a counter-rafting 13, then an insulation 14 with a non-contiguous flight 15 and finally the covering 16.
L'isolation 14 en comble haut peut être étendue direct:ement sur un plafond horizontal 18, bien sûr, le plafond peut être remplacé par un plancher pour utilisation cles combles. The insulation 14 in the top attic can be directly extended: ement on a horizontal ceiling 18, of course, the ceiling can be replaced by a floor for use in the attic.
La figure 6 représente une variante de conception de la construction pour permettre l'accès aux pièces mansardées, la cloison 19 repose sur un plancher 3 soutenu par des solives 1, laquelle cloison 19 délimite avec la cloison 20 un espace pourvu pour un escalier, ladite cloison 20 passe dans la trémie, comme les deux autres cloisons 20. FIG. 6 represents a variant design of the construction to allow access to the attic rooms, the partition 19 rests on a floor 3 supported by joists 1, which partition 19 delimits with the partition 20 a space provided for a staircase, said partition 20 passes through the hopper, like the other two partitions 20.
L'espacement entre les solives 1 est régulier et correspond à l'écartement des fermes entre elles, perrm;iettant aux pieds des arbalétriers 5 de venir reposer sur les extrémités desdites solives 1. The spacing between the joists 1 is regular and corresponds to the spacing of the trusses between them, perrm; iitting at the feet of the rafters 5 to come to rest on the ends of said joists 1.
L'entraxe recommandé de 0,97 mètres entre chaque solive 1 permet l'emploi de panneaux d'agglomérés bois ou autres vendus couramment dans le commerce, dont il résulte peu de chutes. The recommended center distance of 0.97 meters between each joist 1 allows the use of wood chipboard or other panels commonly sold commercially, which results in little falls.
Le présent procédé de montage de charpente autorise l'implantation de lucarne 21 capucine, et la réalisation de croupes, dans le cas de constructions à quatre pentes, est d'autant plus simple que ce sont toujours les mômes éléments. The present framework mounting method allows the installation of nasturtium skylight 21, and the production of croups, in the case of constructions with four slopes, is all the more simple since these are always the same elements.
Des applications particulièrement intéressantes du procédé peuvent-résider dans le montage et la restauration de charpentes bois situées dans des endroits difficiles d'accés ainsi que dans les entreprises artisanales possédant peu de moyens à consacrer à leur mécanisation. Dans tous les cas il peut être particulièrement apprécié pour son aspect des poutres apparentes. Particularly interesting applications of the process may lie in the assembly and restoration of wooden frames located in difficult to access places as well as in craft businesses with little means to devote to their mechanization. In all cases it can be particularly appreciated for its appearance of exposed beams.
Claims (5)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR8305169A FR2543190B1 (en) | 1983-03-24 | 1983-03-24 | PROCED |
FR8310004A FR2547333B2 (en) | 1983-03-24 | 1983-06-10 | METHOD FOR ASSEMBLING AND ASSEMBLING A WOODEN FRAME |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR8305169A FR2543190B1 (en) | 1983-03-24 | 1983-03-24 | PROCED |
Publications (2)
Publication Number | Publication Date |
---|---|
FR2543190A1 true FR2543190A1 (en) | 1984-09-28 |
FR2543190B1 FR2543190B1 (en) | 1985-10-11 |
Family
ID=9287349
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR8305169A Expired FR2543190B1 (en) | 1983-03-24 | 1983-03-24 | PROCED |
Country Status (1)
Country | Link |
---|---|
FR (1) | FR2543190B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1211362A2 (en) * | 2000-11-30 | 2002-06-05 | Bernt E. Ohna | System of roof supports for providing a dormer and a roof support as part of the system |
GB2584912A (en) * | 2018-06-22 | 2020-12-23 | Keystone Lintels Ltd | A modular pitched roof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH344208A (en) * | 1958-06-14 | 1960-01-31 | Savoy Andre | Removable frame |
FR1493051A (en) * | 1966-07-13 | 1967-08-25 | Improvement of the structures | |
FR2194218A5 (en) * | 1972-07-26 | 1974-02-22 | Colomb Guy | |
FR2197103A1 (en) * | 1972-08-25 | 1974-03-22 | Archaimbault Albert | |
FR2305561A1 (en) * | 1975-03-26 | 1976-10-22 | Carlo Hubert | Roof frame with trusses - each having bottom section formed of vertically spaced tie beams joined by two principal rafter sections |
US4207714A (en) * | 1978-12-22 | 1980-06-17 | Mehls William L | Building construction |
FR2467931A1 (en) * | 1979-10-25 | 1981-04-30 | Gorget Jacques | Triangular timber roof truss for house - includes two rafters with ridge tie and angle posts and is tied by ceiling joists member |
-
1983
- 1983-03-24 FR FR8305169A patent/FR2543190B1/en not_active Expired
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH344208A (en) * | 1958-06-14 | 1960-01-31 | Savoy Andre | Removable frame |
FR1493051A (en) * | 1966-07-13 | 1967-08-25 | Improvement of the structures | |
FR2194218A5 (en) * | 1972-07-26 | 1974-02-22 | Colomb Guy | |
FR2197103A1 (en) * | 1972-08-25 | 1974-03-22 | Archaimbault Albert | |
FR2305561A1 (en) * | 1975-03-26 | 1976-10-22 | Carlo Hubert | Roof frame with trusses - each having bottom section formed of vertically spaced tie beams joined by two principal rafter sections |
US4207714A (en) * | 1978-12-22 | 1980-06-17 | Mehls William L | Building construction |
FR2467931A1 (en) * | 1979-10-25 | 1981-04-30 | Gorget Jacques | Triangular timber roof truss for house - includes two rafters with ridge tie and angle posts and is tied by ceiling joists member |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1211362A2 (en) * | 2000-11-30 | 2002-06-05 | Bernt E. Ohna | System of roof supports for providing a dormer and a roof support as part of the system |
EP1211362A3 (en) * | 2000-11-30 | 2003-07-23 | Bernt E. Ohna | System of roof supports for providing a dormer and a roof support as part of the system |
GB2584912A (en) * | 2018-06-22 | 2020-12-23 | Keystone Lintels Ltd | A modular pitched roof |
GB2584912B (en) * | 2018-06-22 | 2023-04-26 | Keystone Lintels Ltd | A modular pitched roof |
IE20190123A3 (en) * | 2018-06-22 | 2024-01-03 | Keystone Lintels Ltd | A modular pitched roof |
Also Published As
Publication number | Publication date |
---|---|
FR2543190B1 (en) | 1985-10-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0063662B1 (en) | Prefabricated unit for the realization of a construction frame | |
FR2551789A2 (en) | Method for converting lofts of houses. | |
EP0440594A1 (en) | Framework for multistory building and building comprising such a framework | |
FR2543190A1 (en) | Method for erecting and assembling a timber roof frame | |
FR2464339A1 (en) | Multi-storey building frame made of precast units - uses columns between doubled rectangular floor slabs with cavity connected by ties in column ducts | |
US5826399A (en) | Noise-reducing barrier construction | |
FR2542791A1 (en) | Method for converting roof spaces and equipment for the implementation of this method | |
FR2564882A1 (en) | Method for converting initially unconvertible lofts and structure resulting therefrom | |
FR2622617A1 (en) | Prefabricated panel with timber frame for a house wall | |
FR2880370A1 (en) | Antiseismic, anticyclonic and heat insulating wall mounting method for building, involves placing trellis, channel bar and lattice stanchion in space between two rows of panels and filling concrete in space until to height of rows | |
FR2562581A1 (en) | Structures and construction elements of a transportable modular house | |
FR2610022A1 (en) | CONSTRUCTIVE SYSTEM, BY MODULAR WOOD FRAMES, FORMING STRUCTURES, AND METHOD OF MOUNTING | |
FR2515233A1 (en) | Prefabricated element for constructing arches - forms two intersecting archways when positioned in fours and covered in concrete | |
FR2753468A1 (en) | Prefabricated hurricane resistant house or building | |
FR2479880A1 (en) | Chalet having polygonal shape in plan - uses frame made of precast concrete units with cladding on angled joists extending from floor corners to centre head post | |
FR2491112A1 (en) | Shingle for tiled roof - has metal channel with hooked end to engage tile edge | |
FR2585749A1 (en) | Timber truss for houses with habitable roof spaces | |
FR2809754A1 (en) | Wooden upright for building frame has posts with vertical grooves to receive panels to surround reinforced concrete pillar | |
FR2501265A1 (en) | MULTI-LANDING STAIRCASE ASSEMBLY IN PREFABRICATED CELLS | |
CH345730A (en) | Wall formed of planks for the construction of a chalet | |
FR2656355A1 (en) | Pillar and constructions, particularly with a wooden framework, using such a pillar | |
FR2465847A2 (en) | House floor is supported by beams - with intermediate joists, positioned at junction between modular wall panels | |
FR2936262A1 (en) | Building i.e. single-family dwelling-house, construction method, involves establishing bearing walls using elements i.e. pre-walls, before forming bottom floor of building, where pre-walls cover single holder for maintaining building height | |
FR2651011A1 (en) | METHOD FOR CONSTRUCTING INDIVIDUAL ANTISISMIC AND ANTICYCLONIC HOUSING | |
FR2545136A1 (en) | Building made of prefabricated elements and more precisely tomb |