ES2334629B1 - Procedure for the transportation, handling, positioning and fixing of prefabricated roof construction elements to conform walls or interior fire resistant tabiques in any kind of constructions, including naval construction. - Google Patents

Procedure for the transportation, handling, positioning and fixing of prefabricated roof construction elements to conform walls or interior fire resistant tabiques in any kind of constructions, including naval construction. Download PDF

Info

Publication number
ES2334629B1
ES2334629B1 ES200802598A ES200802598A ES2334629B1 ES 2334629 B1 ES2334629 B1 ES 2334629B1 ES 200802598 A ES200802598 A ES 200802598A ES 200802598 A ES200802598 A ES 200802598A ES 2334629 B1 ES2334629 B1 ES 2334629B1
Authority
ES
Spain
Prior art keywords
ceiling
positioning
procedure
floor
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
ES200802598A
Other languages
Spanish (es)
Other versions
ES2334629A1 (en
Inventor
Salvador Mateu Climent
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Thertim SL
Original Assignee
Thertim SL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Thertim SL filed Critical Thertim SL
Priority to ES200802598A priority Critical patent/ES2334629B1/en
Publication of ES2334629A1 publication Critical patent/ES2334629A1/en
Application granted granted Critical
Publication of ES2334629B1 publication Critical patent/ES2334629B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge modular coordination
    • E04B2/7407Removable non-load-bearing partitions; Partitions with a free upper edge modular coordination assembled using frames with infill panels or coverings only; made-up of panels and a support structure incorporating posts
    • E04B2/7409Removable non-load-bearing partitions; Partitions with a free upper edge modular coordination assembled using frames with infill panels or coverings only; made-up of panels and a support structure incorporating posts special measures for sound or thermal insulation, including fire protection
    • E04B2/7411Details for fire protection
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B3/00Hulls characterised by their structure or component parts
    • B63B3/14Hull parts
    • B63B3/56Bulkheads; Bulkhead reinforcements
    • B63B3/58Bulkheads; Bulkhead reinforcements with flat plating
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/94Protection against other undesired influences or dangers against fire
    • E04B1/941Building elements specially adapted therefor
    • E04B1/942Building elements specially adapted therefor slab-shaped
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus

Abstract

Procedure for transport, handling, positioning and fixing of prefabricated building elements of floor to ceiling to form interior walls or partitions Fire resistant in all kinds of constructions, including shipbuilding, including the transfer and positioning of each board (10) by translation carriage (1), optionally equipped, for panels (10) of more than 50 kilos, with crane (3) extendable and swivel that holds them; the placement of a bolt (11) fixed to the roof and a sleeve (13) with internal thread, and, on the floor (S), a plinth (12), of concrete, fixed by screws (18); incorporating, on the upper edge of the board (10) a clamp metal (20) of inverted U section, which fits the sleeve (13) and filling in concrete the space (14) between the board (10) and the roof.

Description

Procedure for transport, handling, positioning and fixing of prefabricated building elements of floor to ceiling to form interior walls or partitions Fire resistant in all kinds of constructions, including naval building.

Object of the invention

The invention, as expressed in the statement of This specification refers to a procedure for transport, handling, positioning and fixing of elements prefabricated floor to ceiling construction to form walls or fireproof interior partitions in all kinds of constructions, including shipbuilding.

Specifically, the object of the invention is focuses on a procedure intended to transport, handle, position and fix building elements from floor to ceiling, the which can be of two types:

-
a) of up to 45/50 kilos and,

-
b) of more than 50 kilos,

considering that type a), due to its reduced weight can be manipulated, positioned and fixed manually, and that those of type b), due to their greater weight, have been manipulated, position and fix with the help of mechanical means.

To do this, the recommended procedure essentially includes the use of a metal structure or translation car that has a configuration approximately prismatic, with a front support base for the incorporation of the elements to be transported, which is inferiorly equipped with manually operated wheels, by human thrust or by a combination of both systems, and that for the manipulation, positioning and fixing of elements of more than 50 kilos foresees the incorporation on the mentioned structure of a small crane, with dimensions and weights such that allow work on the floor or floor of any work and go through the quicio of any door of standardized measures, which they are usually approximately 2100 mm high and about 900 width, being the measure of the boards, preferably, of about 3400 mm in length, or height (from floor to ceiling), and can be noticeably longer in special circumstances, and wide from 300 to 450 mm the lightest and about 500 mm or more from more than 50 kilos of weight.

The process also includes fixing to floor and ceiling of prefabricated elements so that It has intumescent joints that make them more resistant to fire.

Field of application of the invention

The field of application of the present invention It is within the construction industry sector in general.

Background of the invention

As is known, in the construction sector the installation of modular elements is increasingly common forming walls, partitions or other similar elements, made with various materials, alone or in combination, the which increasingly have ducts factory incorporated necessary to make connections to the different services conventional, as well as to accommodate new and changing connection needs due to technological advances.

The small dimensions that such materials construction usually present, especially adobe or brick ceramic, with great waste in its coupling, handling, placement and fixation, once the work has begun and through it to compartmentalize, close and divide the different spaces of the same creating enclosures or habitats, they represent a factor important to keep in mind, being the solution to that problematic the realization of modular elements prefabricated

However, transport and handling within the work of said elements, for its elevation, positioning and fixing, both for the volume they occupy, and for the weight they may have and because of the fragility they present some of them, generally, is a laborious and delicate work, as well as the investment of a significant amount of time and labor, being the objective of the present invention provide a practical, versatile, economical and effective solution to carry out said transport, handling, lifting, positioning, placement and / or fixation of said elements within the work.

On the other hand, it should be noted that, in the actuality and as a reference to the state of the art, by the applicant is unknown the existence of any other invention that has technical, structural and similar configuration, to those presented here advocates

Explanation of the invention.

Thus, the procedure for transport, handling, positioning and fixing of construction elements Prefabricated floor to ceiling to form walls or partitions Fire resistant interiors in all kinds of constructions, including shipbuilding that the invention proposes is configured as a remarkable novelty within its field of application, successfully achieving the objectives previously indicated as suitable, since, according to their creation, is achieved in a taxable way, a system that allows convenient, fast and simple way, move, manipulate, lift and place the prefabricated modular boards or elements that will form the walls or partitions of the work to which it is intended, being the characterizing details that make it possible properly set out in the final claims that accompany the Present descriptive report.

Specifically, the recommended procedure essentially includes the use of a metal structure or translation car, which presents a configuration approximately prismatic, with a front support base for the incorporation of the elements to be transported, which is inferiorly equipped with manually operated wheels by human, mechanical or by a combination of both systems when the car incorporates a crane, which will be explained later, counting, in addition, with an articulated mechanism that allows, deploy and retract a few feet of support that increase, for a increased safety against overturning, the contact surface with the ground, being able to fix the equipment in a certain place when work circumstances so require.

It is important to note that above structure or carriage for handling, positioned and fixed of prefabricated elements weighing more than 50 kilos, it incorporates a small crane, and that said structure, together with the said crane, will have dimensions and weight that allow work on the floor or floor of any work and go through any standard size door opening, which usually be approximately 2100 mm high and 900 mm high width.

In this regard, it should be noted that the overall dimensions of the translation structure plus the Crane, where appropriate, will preferably be equal to or less than 1950 mm high and 900 mm wide, being the measurements of the boards, panels or construction elements to which it is mainly intended, 3400 mm long (can be significantly higher in special circumstances), 600/900 mm width and 60/70 mm thick.

Also, it will be taken into account that the sum of the constructive elements to be transported, plus the structure and, in If applicable, the crane will not exceed each trip, the maximum weight allowed by the floors or floors of the building.

For its part, the aforementioned crane is extensible and rotating, counting at its end with a hanging hook and a pin or retaining bolt intended to allow clamping, elevation and rotation of the elements to be handled, being said manipulation, after the logical transfer of the element to its place of placement, the first step of the procedure that advocates

For its part, for fixing the element, it It provides, first, the placement of a screw or bolt fixed to the roof, to which it is incorporated, on the part of it that will remain externally to the ceiling, a sleeve with internal thread.

In parallel, the placement of a plinth, preferably concrete, on the ground, which will be fixed to the ground by using corresponding screws and tacos, it should be noted that inside said socket is provides for the passage of the electrical installation, for which said socket is provided with through holes that run through it longitudinally as well as at least one mouth recordable in its Middle area.

Once the aforementioned ceiling screw is placed and the floor base, we proceed to position the board or building element, operation performed manually or by actuating the crane through the corresponding controls incorporated in the structure or carriage of translation.

It is important to note that, on the edge top of the board incorporates a metal clamp of inverted U-section, which will hold and lock the gaskets of the board at the top, adjusting, by pressure, to aforementioned sleeve covering the roof bolt.

Also, on the vertical sides of the boards hooks will be placed, pressure and hang that, in addition to this function, they will make up the joints.

Next, the space is filled with concrete existing between the board and the ceiling, and that corresponds to the space Busy cuff.

In this way, the board is properly placed, with intumescent joints on the floor and roof of the same that make it more resistant to fire.

The described procedure for transport, handling, positioning and fixing of construction elements Prefabricated floor to ceiling to form walls or partitions Fire resistant interiors in all kinds of constructions, including shipbuilding, therefore, represents an innovation of structural and constitutive characteristics unknown up to now for that purpose, reasons that together with its practical utility, the provide sufficient grounds to obtain the privilege of exclusivity requested.

Description of the drawings

To complement the description that is being performing and in order to help a better understanding of the characteristics of the invention, is attached herein descriptive, as an integral part of it, of a game of planes, in which with an illustrative and non-limiting nature, represented the following:

Figures number 1 and 2.- Show respectively, a perspective view of the structure or car of translation with crane whose use contemplates the procedure object of the invention, and a view thereof in position of use, holding a prefabricated building board or element to which This procedure is intended.

Figures number 3 to 7.- Show in respective section views of the different assembly phases and fixing of the prefabricated board or building element, according to the method of the invention

Figure number 8. Shows a view in Socket perspective whose use provides for the procedure recommended.

Preferred Embodiment of the Invention

In view of the aforementioned figures, and of according to the numbering adopted in them, you can see how the procedure for transport, handling, positioning and fixing prefabricated building elements from floor to ceiling to form fire-resistant interior walls or partitions in all kinds of constructions, including shipbuilding that the present invention proposes essentially comprises the use of a translation structure or carriage (1), properly equipped with a front support base for the incorporation of boards (10) or elements to be transported, which is inferiorly equipped with wheels (21) that can be manually operated by human, mechanical thrust or by a combination of both systems, as well as an articulated mechanism that allows, deploy and fold some additional support feet (5) that increase the contact surface with the ground, as see in figure 1.

Continuing with said figure 1, as well as with the Figure 2, can be seen as on the aforementioned structure or car translation (1), optionally, especially for the handling, positioning, and fixing of elements of more than 50 kilos of weight, incorporates a small crane (3), extensible and rotating, for which it is equipped with telescopic extensions (8), and that It has a hanging hook (6) and a pin or bolt retention (7) intended for clamping the board (10) to allow their elevation and rotation, being said manipulation, after the logical transfer of the element to its place of placement, the first step of the procedure that advocates

It should also be mentioned that the structure or translation carriage (1) has a helm (2), in the that the crane drive controls (4) are provided (3).

For fixing the element (10), as observe in figures 3 to 7, the recommended procedure provides, first, the placement of a screw or bolt (11) fixed to the roof (T), to which it is incorporated, on the part of it that will be externally to the ceiling, a sleeve (13) with thread inside.

In parallel, on the ground (S) the placement of a socket (12), preferably of concrete, which is fixed by screws (18) inserted through holes vertical (15) provided for this purpose, it should be noted that in the interior of said socket is expected to pass the installation electric, for which said socket, as seen in the Figure 8, is provided with through holes (16) that run longitudinally as well as at least one mouth Recordable (17) in its middle zone.

Once the aforementioned screw (11) of the roof and baseboard (12) of the floor, we proceed to position between they the board (10) or constructive element, operation that, for In the case of elements weighing more than 50 kilos, it is carried out by actuating the crane (3) through the corresponding controls (4) incorporated in the structure or carriage of translation (1).

It is important to note that, on the edge top of the board (10) a metal clamp (20) is incorporated U-section inverted, which will hold and lock the gaskets of the board (10) at the top, adjusting, by pressure, to the sleeve (13), mentioned above, which covers the bolt (11)  located on the roof.

Finally, the space is filled with concrete (14) existing between the board (10) and the ceiling, and corresponding to the space occupied by the sleeve (13).

In summary, then, the recommended procedure includes the use of a translation structure or carriage (1), optionally provided with an extendable and rotating crane (3) and equipped with means for clamping the boards (10) or elements constructive to manipulate, by means of which it is carried out, as the first procedure step, the transfer and positioning of each board (10); in which, for fixing the element (10), the placement of a screw or bolt (11) fixed to the ceiling (T), to which is incorporated, on the part of it that is externally to the ceiling, a sleeve (13) with internal thread, and, on the floor (S) the placement of a socket (12), preferably concrete, fixed by screws (18) inserted through vertical holes (15) provided for that purpose; in which, once placed the aforementioned screw (11) of the ceiling and the socket (12) of the floor, proceed to position between them the board (10) or building element, in whose upper edge incorporates a metal clamp (20) of inverted U section, adjusting, by pressure, to the sleeve (13) covering the bolt (11) located on the ceiling; and in what, for Finally, the space (14) existing between the concrete is filled with concrete board (10) and the ceiling, and corresponding to the space occupied by the sleeve (13).

Describe sufficiently the nature of the present invention, as well as the way of putting it into practice, not it is considered necessary to extend its explanation so that any subject matter expert understands its scope and advantages that derive from it, stating that, within its essentiality, may be implemented in other forms of embodiment that differ in detail from that indicated by way of example, and which will also achieve the protection that collects as long as it does not alter, change or modify its principle fundamental.

Claims (4)

1. Procedure for the transport, handling, positioning and fixing of prefabricated building elements from floor to ceiling to form fire-resistant interior walls or partitions in all types of constructions, including shipbuilding, characterized by understanding the use of a structure or translation carriage (1), optionally provided with an extendable and rotating crane (3) (in the case that the boards (10) or elements to be handled have a high weight, for example more than 50 kilos) and equipped of means for fastening the boards (10) or construction elements to be handled, by means of which, as a first step of the procedure, the transfer and positioning of each board (10) is carried out; in which, for the fixing of the element (10), it is foreseen, the placement of a screw or bolt (11) fixed to the ceiling (T), to which a sleeve is incorporated on the part thereof that is externally to the ceiling (13) with internal thread, and, on the floor (S), the placement of a socket (12), preferably of concrete, fixed by screws (18) inserted through vertical holes (15) provided for this purpose; in which, once the screw (11) of the ceiling and the socket (12) of the floor are placed, the board (10) or construction element is positioned between them, on whose upper edge a metal clamp (20) of inverted U-section, said clamp (20) being adjusted, by pressure, to the sleeve (13) covering the bolt (11) located on the ceiling; and in that, finally, the space (14) between the board (10) and the ceiling is filled with concrete, and corresponding to the space occupied by the sleeve (13).
2. Procedure for the transport, handling, positioning and fixing of prefabricated building elements from floor to ceiling to form fire-resistant interior walls or partitions in all types of constructions, including shipbuilding, according to claim 1, characterized by the fact of that the structure or translation carriage (1) is provided with a front support base for the incorporation of the boards (10) or elements to be transported, and wheels (21) that can be manually operated by human, mechanical or mechanical thrust. a combination of both systems, as well as an articulated mechanism that allows, to deploy and retract some additional support feet (5).
3. Procedure for the transport, handling, positioning and fixing of prefabricated building elements from floor to ceiling to form fire-resistant interior walls or partitions in all kinds of constructions, including shipbuilding, according to claim 1, characterized by the fact of that the crane (3), provided on the structure or translation carriage (1) in the event that the boards (10) or elements to be handled have a high weight, for example more than 50 kilos, is extensible and rotatable, for which it is equipped with telescopic extensions (8); and because it has a hanging hook (6) and a pin or retaining bolt (7) intended to hold the board (10).
4. Procedure for the transport, handling, positioning and fixing of prefabricated building elements from floor to ceiling to form fire-resistant interior walls or partitions in all kinds of constructions, including shipbuilding, according to claim 1, characterized by the fact of that the socket (12) is provided with through holes (16) that run it longitudinally, intended for the electrical installation; and because it has at least one recordable mouth (17) in its middle zone.
ES200802598A 2008-09-11 2008-09-11 Procedure for the transportation, handling, positioning and fixing of prefabricated roof construction elements to conform walls or interior fire resistant tabiques in any kind of constructions, including naval construction. Active ES2334629B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
ES200802598A ES2334629B1 (en) 2008-09-11 2008-09-11 Procedure for the transportation, handling, positioning and fixing of prefabricated roof construction elements to conform walls or interior fire resistant tabiques in any kind of constructions, including naval construction.

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
ES200802598A ES2334629B1 (en) 2008-09-11 2008-09-11 Procedure for the transportation, handling, positioning and fixing of prefabricated roof construction elements to conform walls or interior fire resistant tabiques in any kind of constructions, including naval construction.
PCT/ES2009/070380 WO2010029209A1 (en) 2008-09-11 2009-09-10 Procedure for the transport, manipulation, positioning and affixing of floor-to-ceiling prefabricated constructional elements to form fire-resistant internal walls or partitions in all classes of construction, including naval construction
US13/063,702 US20110239583A1 (en) 2008-09-11 2009-09-10 Method for the transport, handling, positioning and fixing of floor-to-ceiling prefabricated construction element's to form fire-resistant internal walls or partiitions in constructions of any type, including naval construction

Publications (2)

Publication Number Publication Date
ES2334629A1 ES2334629A1 (en) 2010-03-12
ES2334629B1 true ES2334629B1 (en) 2011-04-18

Family

ID=41720475

Family Applications (1)

Application Number Title Priority Date Filing Date
ES200802598A Active ES2334629B1 (en) 2008-09-11 2008-09-11 Procedure for the transportation, handling, positioning and fixing of prefabricated roof construction elements to conform walls or interior fire resistant tabiques in any kind of constructions, including naval construction.

Country Status (3)

Country Link
US (1) US20110239583A1 (en)
ES (1) ES2334629B1 (en)
WO (1) WO2010029209A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20190242144A1 (en) * 2016-09-23 2019-08-08 Sh Technologies Pte Ltd Construction system and method
CN108867280A (en) * 2018-07-26 2018-11-23 李�荣 A kind of municipal administration ditch flase floor group material equipment

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB776718A (en) * 1954-08-17 1957-06-12 Fritz Schindler Improvements in or relating to building blocks
US3233759A (en) * 1962-02-09 1966-02-08 Michael A Turturro House loading trailer
US3236400A (en) * 1963-05-27 1966-02-22 Michael A Turturro House loading trailer
US3494091A (en) * 1966-02-04 1970-02-10 Michael A Turturro Method of constructing houses
DE1904938B1 (en) * 1969-02-01 1970-10-22 Fries Gmbh Heinrich De Transport device for Grossbehaelter
US3604166A (en) * 1969-07-23 1971-09-14 Gichner Mobile Systems Inc Deployment system for shelter units
US3834111A (en) * 1971-10-07 1974-09-10 Reliance Trailer Mfg Inc Method for transporting building modules
US3986702A (en) * 1975-09-22 1976-10-19 Barber Alan T Building jack apparatus
DE19537139A1 (en) * 1995-10-05 1997-04-10 Heinrich Schaper Hoch Beton Un Prefabricated solid house in modular construction
ES2268910B1 (en) * 2002-10-21 2007-11-16 Thertim, S.L. Procedure for the construction and decoration of exterior fire resistant closures during a default time.
CN100432239C (en) * 2004-03-17 2008-11-12 技术资源有限公司 Method of building a direct smelting plant
US8176690B2 (en) * 2007-02-01 2012-05-15 Newman Stanley High-strength structure

Also Published As

Publication number Publication date
ES2334629A1 (en) 2010-03-12
US20110239583A1 (en) 2011-10-06
WO2010029209A1 (en) 2010-03-18

Similar Documents

Publication Publication Date Title
JP5097118B2 (en) Foldable modular shelter for container transport
US9228394B2 (en) Modular drilling rig system
US7308953B2 (en) Mobile drilling rig
RU2459058C2 (en) Rail system of self-rising formwork equipped with elements of lifting rails extension
US20150267396A1 (en) Expandable iso shelters
US7748193B2 (en) Pumping tower support system and method of use
ES2385427T3 (en) Apparatus for installing an elevator during the construction of a building
JP2764891B2 (en) Lifting device and method of transporting construction materials using the device
ES2362535T3 (en) Protection and access device.
CA3088885A1 (en) Modular building
US8646576B2 (en) Foldable hoistway work deck
US8590666B2 (en) Array element rigging component, system and method
SI9420070A (en) Earthquake, wind resistant and fire resistant pre-fabricated building panels and structures formed therefrom
US8646224B2 (en) Construction apparatus
CA2800886C (en) Base for supporting an upstanding mast
US8556112B2 (en) Storage module adapter assembly for modular container
DE2907630C2 (en)
US20030213765A1 (en) Tower crane with raising platform
CA2838259A1 (en) Scaffold system
JP4792798B2 (en) Elevator control panel
BRPI0820273B1 (en) Heavy portable shelter, and a shelter construction method
KR101389791B1 (en) Connector for vertical type cable tray
US20080308317A1 (en) Ceiling raceway
US4382488A (en) Pump jack poles
US8109291B2 (en) Arrangement for conveying concrete with a height-adjustable concrete distributing mast

Legal Events

Date Code Title Description
EC2A Search report published

Date of ref document: 20100312

Kind code of ref document: A1

FG2A Definitive protection

Ref document number: 2334629

Country of ref document: ES

Kind code of ref document: B1

Effective date: 20110418