EP4791676A1 - Offshore pile driving - Google Patents

Offshore pile driving

Info

Publication number
EP4791676A1
EP4791676A1 EP24790392.5A EP24790392A EP4791676A1 EP 4791676 A1 EP4791676 A1 EP 4791676A1 EP 24790392 A EP24790392 A EP 24790392A EP 4791676 A1 EP4791676 A1 EP 4791676A1
Authority
EP
European Patent Office
Prior art keywords
crane
counter
pile
vessel
counter ballast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
EP24790392.5A
Other languages
German (de)
French (fr)
Inventor
Hendrikus Jacobus Weterings
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huisman Equipment BV
Original Assignee
Itrec BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Itrec BV filed Critical Itrec BV
Publication of EP4791676A1 publication Critical patent/EP4791676A1/en
Pending legal-status Critical Current

Links

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/36—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
    • B66C23/52—Floating cranes
    • B66C23/53—Floating cranes including counterweight or means to compensate for list, trim, or skew of the vessel or platform
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62—Constructional features or details
    • B66C23/72—Counterweights or supports for balancing lifting couples
    • B66C23/74—Counterweights or supports for balancing lifting couples separate from jib
    • B66C23/76—Counterweights or supports for balancing lifting couples separate from jib and movable to take account of variations of load or of variations of length of jib
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00—Foundations as substructures
    • E02D27/32—Foundations for special purposes
    • E02D27/42—Foundations for poles, masts or chimneys
    • E02D27/425—Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00—Foundations as substructures
    • E02D27/32—Foundations for special purposes
    • E02D27/52—Submerged foundations, i.e. submerged in open water
    • E02D27/525—Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02B—HYDRAULIC ENGINEERING
    • E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039—Methods for placing the offshore structure
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02B—HYDRAULIC ENGINEERING
    • E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056—Platforms with supporting legs
    • E02B2017/0065—Monopile structures
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02B—HYDRAULIC ENGINEERING
    • E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0091—Offshore structures for wind turbines
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04—Guide devices; Guide frames
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00—Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
    • E02D35/005—Lowering or lifting of foundation structures
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02—Placing by driving
    • E02D7/06—Power-driven drivers
    • E02D7/08—Drop drivers with free-falling hammer

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

Method for performing an offshore pile driving operation, wherein the vessel comprises a hull, a crane mounted to the hull, a counter ballast device comprising a mobile counter ballast member, and a control unit, wherein the counter ballast device is configured and operated such that – upon detection of a pile run event – the mobile counter ballast member is made to move so as to counter at least in part heel of the hull of the vessel induced by the weight of the pile or the pile hammer device, as it suddenly becomes suspended from the crane.

Description

OFFSHORE PILE DRIVING
A first aspect of the present invention relates to performing an offshore pile driving operation, wherein a pile is driven into the seabed, e.g. a large diameter pile having an outer diameter of at least 5 meter, e.g. a monopile configured to support an offshore wind turbine thereon, wherein use is made of a vessel comprising:
- a hull,
- a crane comprising a hoisting assembly comprising a hoisting winch and a hoisting winch driven cable from which a load connector is suspended, and wherein use is made of a pile hammer device suspended from the load connector and configured and operated for driving the pile into the seabed.
As commonly known, the trend in offshore wind energy is towards larger offshore wind turbines and larger monopiles on which such wind turbines are to be mounted. The mass of a monopiles may be more than 1000 mt, e.g. more than 1500 mt, e.g. more than 2000 mt. In the Arcadis Ost 1 windfarm, monopiles of 2000 mt have recently been installed. Even larger and heavier monopiles, e.g. of 3000 mt or more, are expected in the near future. In the monopile installation process, the monopile is upended and brought in its installation position by means of a crane of a vessel and subsequently lowered until its foot end rests on the seabed. The monopile is commonly held by a pile gripper of the vessel to maintain position and verticality. For driving the pile into the seabed it is known to use a pile hammer device. Due to the increasing size of the monopiles, the pile hammer is often very heavy. Also new developments envisage even heavier/larger pile hammers. For example, the pile hammers disclosed in W02020153838 and W02020263096 are specified to have a mass of more than 500 mt, e.g. up to 3000 mt and 5000 mt.
When driving a pile into the seabed a sudden free fall of the pile may occur, which phenomenon is known as pile run, pile drop fall, or pile free fall.
A pile run may occur firstly whilst the monopile is suspended from the crane of the vessel, during the transfer of its weight to the seabed, when the pile bottom has reached the seabed and is increasingly supported by the seabed and correspondingly decreasingly supported by the crane. A pile run may also occur at a later stage of the installation process , in particular during the pile driving stage, e.g. when the pile driving hammer is being placed on the monopile or during the actual pile driving with the pile hammer device. In practice, the pile hammer remains connected to the crane of the vessel, yet with some slack or lightly tensioned hoisting cable(s), throughout the pile driving process.
The occurrence of a pile run event typically arises when the bearing capacity of the soil is insufficient to counteract the weight of the pile, e.g. combined with the hammer device, and possibly also the inertia generated by the hammer device. Once the pile starts to drop, gravity accelerates its descent. Whilst this occurs only rarely, the phenomenon is a concern. The advent of very heavy and large diameter piles, in particular of monopiles configured to support an offshore wind turbine thereon, is cause for increased concern, further emphasized by the advent of very heavy pile hammer devices. A large (mono-)pile, possibly along with a heavy pile hammer device, has a lot of inertia when set in motion, making it more challenging to halt the self-penetration process once initiated.
In the case of a pile run which takes place during landing of the pile on the seabed by means of the crane, the loss of support by the seabed has the consequence that at least a part of the weight of the pile, e.g. its full weight, is suddenly suspended from the crane again.
In the case of a pile run which takes place in the situation that the pile hammer device is connected to the crane and at least partly supported by the pile, the loss of this support has the consequence that at least a part of the weight of the pile hammer device, e.g. the full weight thereof, is suddenly suspended from the crane again.
An effect caused by pile run is a snap load on the hoisting cable and the crane, e.g. as the pile and/or the pile hammer device suddenly becomes fully suspended from the crane. This snap load becomes more prominent as the piles become heavier, as explained even over 3000 mt. . As the hammering of large piles generally requires a large hammering device, this snap load also becomes more prominent.
In order to deal with the snap load, it is known to provide a shock absorber assembly between the pile hammer device and the load connector, e.g. the crane hook of the crane. Commercial shock absorber products are offered by the Cranemaster company.
The first aspect of the present invention aims to provide an enhanced response to a pile run event.
According to the first aspect of the invention a method for performing an offshore pile driving operation is provided, wherein a pile is driven into the seabed, e.g. a large diameter pile having an outer diameter of at least 5 meter, e.g. a monopile configured to support an offshore wind turbine thereon, wherein use is made of a vessel comprising:
- a hull,
- a crane comprising a hoisting assembly comprising a hoisting winch and a hoisting winch driven cable from which a load connector is suspended,
- a counter ballast device comprising a mobile counter ballast member, and wherein use is made of a pile hammer device suspended from the load connector and configured and operated for driving the pile into the seabed, wherein the counter ballast device is configured and operated such that - upon detection of a pile run event - the mobile counter ballast member is made to move so as to counter at least in part heel of the hull of the vessel induced by the weight of the pile and/or the pile hammer device becoming suddenly suspended from the crane.
For example, a hammer device may weigh several hundreds of tonnes, e.g. more than 400 tonnes, e.g. more than 1000 tonnes. For example, a (mono-)pile may weigh more than 1000 tonnes, e.g. more than 2000 tonnes. This weigh not only induces a snap load, but also induces a sudden heel of the vessel as the pile and/or hammer device suddenly becomes suspended from the crane instead of resting on the seabed, e.g. via the pile. It is noted that the heel of the vessel is not only governed by the static load considerations, but also by the inertia of the vessel once set in motion by the pile run event.
To prevent static heel in normal crane operation of a crane on a vessel, it is known to make use of a water ballast system. Such a system is not capable of responding sufficiently fast to sudden heel of the vessel.
It is noted that the heel caused by a pile run event may, of course, depend on the design of the hull of the vessel. A (large) semi-submersible vessel is likely less affected by such heel than a monohull vessel. In case of a monohull vessel, often, the pile gripper (and thus the pile installation process) is mounted at a port or starboard side of the hull. As the hull may be rather slender (in relative terms) an important heel may be quickly induced in absence of mitigating measures, such as the present invention. If, as is also known, the pipe gripper is mounted at the stern, e.g. on a centreline of the hull, the issue of induced heel may be a lesser concern. The first aspect of the invention avoids the induced heel from becoming excessive, by countering the heel through making the mobile counter ballast member move so as to counter at least in part heel of the hull of the vessel induced by the weight of the pile hammer device becoming suddenly suspended from the crane. The pile run event may thus still cause heel, yet avoids excessive heel.
As known in the art, the installation of large diameters piles, such as monopiles, commonly involves the use of a pile gripper which mounted to the hull of the vessel and configured to maintain the pile in vertical orientation during a pile driving operation. Examples of pile grippers are disclosed in WO201912572, WO2018117846, WO2022129246, WO2023072635, WO2023285199. Generally, the pile gripper is a large and fairly complex device designed to keep the pile horizontal during installation into the seabed. For example, the pile gripper is motion compensated, having an X-Y motion mechanism integrated in the support of the pile gripper. Excessive heel of the hull of the vessel triggered by a pile run event, would place undue loads on the pile gripper, such as excessive bending loads to which the pile gripper is normally not subjected. Therefore excessive heel could damage the pile gripper. The first aspect of the invention allows to avoid excessive heel and thus avoid (significant) damage to the pile gripper.
It will be appreciated that the mobile counter ballast member is to be brought into motion rapidly upon detection of a pile run event. In this respect, it is advantageous that use is made of a pile run detector which is configured and operated to detect the occurrence of a pile run event. This is considered more reliable and effective than a human being used to detect pile run. For example, a pile run detector monitors the vertical pile motion or the motion of the pile hammer device, and/or the displacement, and is configured to detect whether the vertical pile motion becomes excessive and/or is unduly accelerating. In another embodiment, or additionally, the pile run detection is based on a detector device which detects a (sudden) upwards acceleration of the boom and/or the load connector. Pile run detection could also, or alternatively, involve monitoring tension in the hoisting wire and/or in the luffing wire of the crane, etc.
Preferably, the pile run detector is linked to a controller of a drive of the counter ballast device so as to automatically trigger the motion of the mobile counter ballast member.
The weight of the mobile counter ballast member may be more than 100 tonnes, e.g. more than 400 tonnes, e.g. more than 1000 tonnes, e.g. depending on the weight of the pile and/or the hammer device. The motion of the mobile counter ballast member could be caused by gravity. For example, the ballast member is suspended via a cable from an offset point and - upon occurrence of the pile run event - released so that the ballast member swings away.
In a preferred embodiment, the counter ballast device comprises a drive associated with the mobile counter ballast member, which drive is operated to move the mobile counter ballast member upon detection of a pile run event. The drive may comprise one or more winches, hydraulic cylinder(s), linear motor(s), explosive drive(s), etc.
In an embodiment, the vessel is provided with a pile gripper, e.g. mounted to the hull.
For example, the pile gripper comprises:
- a pile holder with a base structure, a first jaw and a second jaw, the first jaw and the second jaw each extending between an inner end and an outer end, wherein the first and the second yaw are pivotable connected at the inner end thereof to a respective pivot part of the base structure to pivot about a yaw pivot axis between a closed position, in which the pile holder defines a pile passage for the pile held in the pile holder, and an open position, to allow the pile to be received in, or to be removed from, the pile holder in a lateral direction
- a plurality of pile engaging devices, wherein the base structure, the first jaw and the second jaw each support at least one pile engaging device, the engaging devices each comprising one or more pile engaging elements, e.g. each comprising one or more pile guiding rollers for engaging the pile in the pile passage; and
- a pile holder support assembly to be mounted on the deck of the vessel, wherein the support assembly moveably supports the pile holder at the base structure. For example, the support assembly comprises a track, preferably a track to be mounted on the deck of the vessel, the track extending in the first direction, and a base carriage for movement along the track, wherein the base carriage is configured to support the base structure, and wherein the base structure is moveable, preferably in a second direction perpendicular to the first direction, between a first outer position and a second outer position, to allow the support system to position the pile holder in a horizontal plane relative to the vessel. For example, the pile support mechanism further comprises a control system, which control system is configured to provide active motion compensation in the horizontal plane while the pile holder supports the pile in the upright position at the installation location next to the vessel to compensate for movement of the vessel relative to the pile installation location. In embodiments, the counter ballast device is mounted to the hull of the vessel, e.g. on a deck, e.g. removable when not required, or within the hull.
In embodiments, the crane comprises the counter ballast device, preferably mounted to a slewable superstructure thereof. This provides the advantage that the load paths between the counter ballast device and the load connector are short. An advantage of the preferred mounting of the counter ballast device to the slewable superstructure is that the counter ballast device is always in optimal position to perform its effect, independent of the actual slewing position.
In embodiments, the counter ballast device is retrofitted, or temporarily mounted, on an existing crane of a vessel, e.g. mounted to the slewable superstructure thereof.
In a preferred embodiment, the crane comprises:
- a crane base secured to the hull,
- a slewable superstructure mounted on the crane base and slewable about a vertical slew axis relative to the crane base,
- a slew drive configured to cause slew motion of the superstructure about the slew axis,
- a primary boom structure comprising a boom that is pivotally connected to the superstructure about an inner pivot axis,
- a luffing mechanism configured to cause luffing motion of the boom structure, wherein the counter ballast device is mounted to the slewable superstructure.
Compared to the embodiment wherein the ballast device is mounted to the hull, this embodiment has the benefit that the counter ballast device slews along with the superstructure, so is always in optimum position to perform its action, and of short load paths between the counter ballast device and the load connector.
Preferably, the slew drive is configured to lock the superstructure in a desired slew orientation of the superstructure and/or additional locking/braking device(s) is/are provided for such purpose. In case of a sudden heel of the hull occurring, e.g. due to a pipe run event, this will avoid uncontrolled motion of the superstructure about the slew axis, which might impair the stability of the vessel.
In a practical embodiment, the slewable superstructure is provided with a secondary boom structure comprising a boom which is pivotally connected to the superstructure about an inner pivot axis, wherein a secondary luffing mechanism comprising a secondary luffing drive and is configured and operated to cause a luffing motion of the secondary boom structure. The secondary boom structure is located in a common vertical plane with the primary boom structure and the booms of the primary and secondary boom structure are diverging from one another. The mobile counter ballast member is suspended from the secondary boom structure.
In embodiments, - upon detection of a pile run event - the mobile counter ballast member is made to move by one or more of:
- causing of motion of the secondary boom structure,
- causing a swing motion of the mobile counter ballast member relative to the secondary boom structure,
- operating a horizontal motion device engaging on the mobile counter ballast member suspended from the secondary boom structure, e.g. a horizontal motion device arranged between the mobile counter ballast member and a main boom of the secondary boom structure.
In embodiments, the counter ballast drive is configured to controllably vary a distance between the mobile counter ballast member and the slew axis of the crane. For example, the crane further comprises a horizontal motion device which engages on the mobile counter ballast member suspended from the secondary boom structure, e.g. a horizontal motion device arranged between the mobile counter ballast member and the boom of the secondary boom structure, and is configured to controllably move the mobile counter ballast member away from and towards the slew axis of the crane.
In embodiments, the first aspect of the invention is applied in combination with one or more other measures to mitigate, reduce, the effect of a pile run event, e.g. to reduce the snap load and/or to further reduce or delay or decelerate the heel of the vessel, or prevent heel from becoming excessive, due to the sudden loading of the crane. Means to delay or decelerate heel are particularly useful in view of the power which may be required for a rapid displacement of the counter ballast member, and the material capability of the parts to withstand the forces involved with the peak loads during said rapid displacement. A delay or deceleration would correspondingly facilitate an effective response, e.g. reducing (somewhat) the velocity at which such a displacement is to take place to counter the heel, e.g. thereby reducing the required power and mechanical loads.
For sudden loading of the crane in a pile run event, it is envisaged to additionally provide the discussed shock absorber assembly between the pile (during landing on the seabed) and the load connector or between the hammer device and the load connector, e.g. the crane hook of the crane, not only to reduce the magnitude of the snap load but also to delay the induced heel.
For example, the pile or pile hammer device may be connected to temporary mounted braking means, such as a parachute, e.g. a pile run parachute creating a damper inside a (mono-)pile, or protrusions, e.g. ribs, formed at the outer and/or inner surface of the pile to create resistance to the downward movement through the water/seabed.
For example, and particularly envisaged for the phase of the pile driving when the pile is already entirely supported by the seabed, the pile hammer device may be rapidly disconnected from the crane upon detection of a pile run event, e.g. by explosion bolt connector(s) or the like being provided.
For sudden unloading of the crane, e.g. a loss of load as in a pile run, it is envisaged that one or more auxiliary devices are additionally applied to counteract an undue upward pivoting acceleration of the boom of the crane. This may prevent the boom from pivoting beyond the vertical and the damage resulting therefrom due to a pile run event. In particular, such an auxiliary device may be in the form of a boom restrainer which is operative to keep the boom in a desired pivot angle during a part of the pile installation process, e.g. during pile driving. A boom restrainer may be arranged on an upper part of the crane superstructure above the boom pivot axis and engage the boom when in a rather upright pivoting angle, e.g. as could be the case when the pile is landed on the seabed and/or during the actual hammering phase, etc. The boom restrainer may serve to restrain or avoid the occurrence of an undue sudden upward pivoting of the boom. It is particularly envisaged that the boom restrainer is embodied according to co-pending application NL2038232. For example, reference is also made to W02022037960.
The first aspect of the invention also relates to a system for performing an offshore pile driving operation, wherein a pile is driven into the seabed, e.g. a large diameter pile having an outer diameter of at least 5 meter, e.g. a monopile configured to support an offshore wind turbine thereon, wherein the system comprises a vessel comprising:
- a hull,
- a crane comprising a hoisting assembly comprising a hoisting winch and a hoisting winch driven cable from which a load connector is suspended, - a counter ballast device comprising a mobile counter ballast member, and wherein the system comprises a pile hammer device suspended or to be suspended from the load connector and configured and operable for driving the pile into the seabed, wherein the counter ballast device is configured and operable such that - upon detection of a pile run event - the mobile counter ballast member is made to move so as to counter at least in part heel of the hull of the vessel induced by the weight of the pile and/or the pile hammer device becoming suddenly suspended from the crane.
The vessel may be provided with one or more of the features discussed herein with reference to the method of the first aspect of the invention.
The pile hammer device is, for example, embodied as described in W02020153838 or WO2024126844 or W02020263097.
In practical embodiments, the pile hammer device is configured to be arranged on a top end of the pile.
In an embodiment, e.g. in line with W02020153838, the pile hammer device comprises: a drive head member arranged on a top end of the pile; a weight, having a total mass of more than 500 tonnes, and being vertically mobile above the drive head member; a lift system arranged between the drive head member and the weight; the lift system being configured to bring the weight into an initial height position relative to the drive head member; a quick release system adapted to effect quick release of the lift system, so that the weight falls down from said initial height position; and an energy transfer assembly configured for transfer of energy from the falling weight to the drive head member,
The weight may be in the form of a solid mass drop weight assembly comprising a support structure and comprising solid drop weight elements supported by said support structure, preferably solid steel drop weight elements being composed of steel elements, e.g. stackable steel elements, which drop weight elements have a total mass of more than 500 tonnes, e.g. more than 1000 tonnes, e.g. more than 2000 tonnes, e.g. up to 3000 tonnes. The weight may also be in the form of a liquid fillable drop tank that has a capacity to hold more than 500m3, e.g. more than 1000m3, of a liquid therein, e.g. water, e.g. sea water. The drop tank is vertically mobile relative to, e.g. above, the drive head member.
A method wherein use is made of this pile hammer device comprises a repeated cycle, comprising the steps of: lifting the weight with the lift system into a desired initial height position; operating the quick release mechanism to effect quick release of the lift system, so that the weight falls down from said initial height position towards the drive head member; and transferring energy from the falling weight by said energy transfer assembly to the drive head member and thereby to the top end of the pile, so that the pile is driven deeper into the seabed.
In an embodiment, e.g. in line with WO2024126844, the pile hammer device comprises:
- a drive head assembly having an annular contact face configured for resting on the top end of the pile, and an annular anvil face above the annular contact face,
- a steel impact weight which has a mass of at least 100 tonnes, e.g. more than 200 tonnes, which impact weight is vertically mobile above the annular anvil face of the drive head assembly,
- a vertical guide structure configured to vertically guide the impact weight, wherein the drive head assembly is configured for energy transfer between the anvil face and the contact face for the transfer of energy from the falling impact weight to the contact face and thereby to the pile top,
- a lift system configured to bring the impact weight into an initial height position relative to the anvil face of the drive head assembly,
- a quick release system adapted to effect quick release of the lift system so that the impact weight falls down from said initial height position onto the anvil face of the drive head assembly, wherein the pile driving device is operable in a repeated cycle wherein:
- the impact weight is lifted by means of the lift system into the initial height position,
- the quick release mechanism is operated to effect a quick release of the lift system so that the impact weight falls down from said initial height position onto the anvil face of the drive head assembly, wherein energy from the falling impact weight is transferred to the contact face of drive head assembly and thereby to the top end of the pile, so that the pile is driven deeper into the soil, wherein the impact weight comprises, preferably is embodied as, a tubular impact weight which is made of steel, e.g. having a wall thickness between 10 and 20 centimeters. The first aspect of the invention also relates to a crane configured to be mounted on a vessel as described herein.
A second aspect of the invention relates to a crane for performing an offshore operation, e.g. an offshore hoisting operation, wherein an object is supported, e.g. displaced in horizontal direction and/or a vertical direction. The object may in particular be a pile or a pile hammer device as discussed in relation to the first aspect of the invention. The crane is mounted or mountable to the hull of a vessel and comprises:
- a crane base secured or to be secured to the hull,
- a slewable superstructure mounted on the crane base and slewable about a vertical slew axis relative to the crane base,
- a slew drive configured to cause slew motion of the superstructure about the slew axis,
- a primary boom structure comprising a boom that is pivotally connected to the superstructure about an inner pivot axis,
- a luffing mechanism configured to cause luffing motion of the primary boom structure,
- a hoisting assembly comprising a hoisting winch with a hoisting winch driven cable and a load connector suspended from the primary boom structure.
For example, the operation is a hoisting operation, e.g. a hoisting operation wherein a pile, e.g. a large diameter pile, e.g. a monopile, is hoisted in the course of the installation of the pile into the seabed. As explained in relation to the first aspect of the invention, this may in particular concern the movement of the pile from the storage position thereof on the hull of the vessel, e.g. in horizontal orientation, to outboard of the vessel at the side thereof to above the installation location in the seabed., which involves slewing of the crane around the slew axis between positions of the boom tip inboard of the vessel to positions thereof outboard of the vessel.
In the prior art, slewing motion - with or without an object being suspended from the crane - may induce heel of the vessel. This applies, in particular, when the crane is large and heavy, e.g. as in cranes nowadays used or planned for offshore wind turbine related activities, e.g. for the installation of very tall and heavy monopiles. Commonly, as mentioned in relation to the first aspect of the invention, offshore crane vessels are equipped with a water ballast system including ballast tanks and ballast pump(s) that allow to keep the hull in a desired orientation, e.g. substantially level with limited or no heel.
In the prior art, the slewing of the crane is often accompanied by operation of the water ballast system to keep the vessel in the desired orientation.
The second aspect of the invention aims to provide an enhanced approach, which may in addition be useful to counter heel resulting from a change in the weight supported by the crane, e.g. a sudden change as discussed in relation to the first aspect of the invention.
The second aspect of the invention furthermore aims to provide an enhanced reliability of the crane and vessel in case of a sudden change in the weight supported by the crane, e.g. in a loss of load event or a pile run.
In the second aspect of the invention, a counter ballast device of the crane comprises a mobile counter ballast member and an associated counter ballast drive configured to controllably vary a distance between the mobile counter ballast member and the slew axis. Therein the counter ballast device is preferably mounted to the slewable superstructure of the crane.
The counter ballast device is configured and operated such that - e.g. during operation of the slew drive to cause the slew motion of the superstructure, or e.g. upon occurrence of a change in the weight supported by the crane, e.g. a sudden change, e.g. in a pile run event or loss of load - the mobile counter ballast member is made to move by the counter ballast drive so as to counter at least in part heel of the hull of the vessel, e.g. induced by slewing of the superstructure or the (sudden) supported weight change.
The variation of the distance of the counter ballast member to the vertically oriented, slew axis may provide a particularly efficient countering of the vessel heel, as it by definition provides a horizontal motion component. This leads to an effective horizontal displacement of the center of gravity of the vessel so as to reduce the tilt angle thereof. Furthermore it yields short load paths between the ballast member and the load connector device from which the object is (suddenly or suddenly no longer) supported.
In case of a heel induced by at least slewing of the superstructure, involving a horizontal displacement of the supported weight, the provision of the counter ballast device mounted to the slewable superstructure allows for increased slewing speed as the counter balance effect can be created faster than by sole operation of the water ballast system as in the prior art. Increased slewing speed may increase the overall efficiency of the operation, e.g. allowing to perform a complex task like pile installation within a limited time frame.
In embodiments, the vessel is also (as is common) provided with a water ballast system including ballast tanks and ballast pump(s). This water ballast system may also be used during slewing, so that the counter ballasting is achieved by the combined action of the inventive counter ballast device mounted to the slewable superstructure and the water ballast system.
In embodiments, the slewing of the superstructure includes positions wherein the counter ballast device is outboard of the hull of the vessel. This may, for example, occur when the object (e.g. pile/monopile) is hoisted and then lowered at the stern of the hull, with the crane being mounted along the portside or starboard side of the hull.
Preferably, use is made of the control unit to automatically control the motion of the counter ballast member, e.g. based on data from an inclination sensor sensing hull inclination and/or from one or more sensors detecting the slew angle of the superstructure, the distance between the load connector and the slew axis, etc., e.g. in addition to the detector device configured to detect an anomalous situation involving a sudden change in the weight supported by the crane as discussed in relation to the first aspect of the invention. The detector device may comprise similar sensors, or the same sensors being configured to detect a change in the weight supported by the crane that is not anomalous or sudden.
The weight of the mobile counter ballast member may be more than 100 tonnes, e.g. more than 400 tonnes, e.g. more than 1000 tonnes, e.g. depending on the weight of the object to the handled by the crane.
The counter ballast drive for the mobile counter ballast member may comprise one or more winches, hydraulic cylinder(s), rack and pinion drive(s), linear motor(s), etc.
In a practical embodiment, the slewable superstructure is provided with a secondary boom structure comprising a boom that is pivotally connected to the superstructure about an inner pivot axis, and with a secondary luffing mechanism comprising a secondary luffing drive and configured to cause luffing motion of the secondary boom structure, wherein the secondary boom structure located in a common vertical plane with the primary boom structure and the booms of the primary and secondary boom structure are diverging from one another, wherein the mobile counter ballast member is suspended from the secondary boom structure.
In embodiments, - e.g. during slewing or a (e.g. sudden) change in the weight supported by the crane - the mobile counter ballast member is made to move by one or more of:
- causing of motion of the secondary boom structure,
- causing a swing motion of the mobile counter ballast member relative to the secondary boom structure,
- if present, operating the horizontal motion device engaging on the mobile counter ballast member suspended from the secondary boom structure, e.g. a horizontal motion device arranged between the mobile counter ballast member and a main boom of the secondary boom structure.
The second aspect of the invention also relates to a vessel for performing an offshore operation, e.g. an offshore hoisting operation, wherein the vessel comprises the crane according to the second aspect and a hull, wherein the crane is mounted to the hull with its crane base secured to the hull. It further comprises a control unit, by means of which the counter ballast device is operable such that - e.g. during operation of the slew drive to cause the slew motion of the superstructure, or e.g. upon occurrence of a change in the weight supported by the crane, e.g. a sudden change, e.g. in a pile run event or loss of load - the mobile counter ballast member is made to move by the counter ballast drive so as to counter at least in part heel of the hull of the vessel, e.g. induced by slewing of the superstructure or the (sudden) supported weight change.
The counter ballast device is preferably mounted to the slewable superstructure, and comprises a mobile counter ballast member and an associated counter ballast drive configured to controllably vary a distance between the mobile counter ballast member and the slew axis.
The vessel further comprises a control unit. The counter ballast device is configured and operable by the control unit such that the mobile counter ballast member is made to move by the counter ballast drive so as to counter at least in part heel of the hull of the vessel, e.g. induced by slewing of the superstructure and/or e.g. upon occurrence of a change in the weight supported by the crane, e.g. a sudden change therein, e.g. in a pile run event or loss of load wherein the object that is supported becomes separated from the crane. A mounting the counter ballast device to the slewable superstructure is preferred. An advantage thereof is that the counter ballast device is always in optimal position to perform its effect, independent of the actual slewing position in which the loss of load event occurred.
In an embodiment, the control unit is configured to operate the counter ballast device such that the counter ballast member is made to move during operation of the slew drive to cause the slew motion of the superstructure around the slew axis, so as to counter at least in part heel of the hull induced by the slewing of the superstructure.
In an embodiment, the control unit is configured to operate the counter ballast device such that the counter ballast member is made to move upon occurrence of a sudden change in the weight supported by the crane, e.g. a loss of load event wherein the object to be hoisted becomes separated from the crane, so as to counter at least in part heel of the hull induced by the sudden change, e.g. wherein the vessel comprises a detector device for detecting the occurrence of an anomalous situation involving a sudden change in the weight supported by the crane, e.g. a loss of load event, and the counter ballast device is operable by the control unit based on this detection.
The second aspect of the invention furthermore relates to a method for performing an offshore operation, e.g. an offshore hoisting operation, wherein use is made of a crane or a vessel according to the second aspect, and wherein the counter ballast drive of the mobile counter ballast member is operated such that the mobile counter ballast member is made to move so as to counter at least in part heel of the hull of the vessel, e.g. during operation of the slew drive so as to counter at least in part heel of the hull, e.g. induced by the slewing, and/or e.g. upon occurrence of a change in the weight supported by the crane, e.g. upon a loss of load event wherein the object to be hoisted becomes separated from the crane, so as to counter at least in part heel of the hull induced thereby.
In an embodiment, during operation of the slew drive and/or e.g. upon detection of the anomalous situation, the mobile counter ballast member is made to move by one or more of:
- causing of motion of the secondary boom structure,
- causing a swing motion of the mobile counter ballast member relative to the secondary boom structure,
- if present, operating a horizontal motion device engaging on the mobile counter ballast member suspended from the secondary boom structure, e.g. a horizontal motion device arranged between the mobile counter ballast member and the boom of the secondary boom structure. The second aspect of the invention relates to performing an offshore hoisting operation wherein an object is supported, specifically aimed at heel as a consequence of a loss of load.
A crane for this purpose is mountable to the hull of a vessel and configured for offshore operations as precedingly specified, therein comprises:
- a crane base secured or configured to be secured to the hull,
- a slewable superstructure mounted on the crane base and slewable about a vertical slew axis relative to the crane base,
- a slew drive configured to cause slew motion of the superstructure about the slew axis,
- a primary boom structure comprising a boom that is pivotally connected to the superstructure about an inner pivot axis,
- a luffing mechanism configured to cause luffing motion of the primary boom structure,
- a hoisting assembly comprising a hoisting winch with a hoisting winch driven cable and a load connector suspended from the primary boom structure.
A counter ballast device is provided and is preferably mounted to the slewable superstructure. The counter ballast device comprises a mobile counter ballast member and an associated counter ballast drive configured to controllably vary a distance between the mobile counter ballast member and the slew axis.
The counter ballast device is configured and operated such that - upon occurrence of a loss of load event wherein the object that is supported becomes separated from the crane - the mobile counter ballast member is made to move by the counter ballast drive so as to counter at least in part heel of the hull of the vessel induced by the loss of load event.
A vessel according to the second aspect comprises a hull and the above crane mounted thereto with its crane base secured to the hull. The vessel further comprises a control unit, by means of which the counter ballast device is operable such that - upon occurrence of a loss of load event wherein the object that is supported becomes separated from the crane - the mobile counter ballast member is made to move so as to counter at least in part heel of the hull of the vessel induced by the loss of load event. A method wherein use is made of the crane or the vessel is also provided, wherein the counter ballast drive of the mobile counter ballast member is operated as described. An advantage of the of the preferred mounting of the counter ballast device to the slewable superstructure of the crane, is that the counter ballast device is always in optimal position to perform its effect, independent of the actual slewing position in which the loss of load event occurred.
The second aspect of the invention furthermore relates to performing an offshore hoisting operation wherein an object is supported, specifically aimed at heel as a consequence of slewing whilst the object is supported.
A crane for this purpose is mountable to the hull of a vessel and configured for offshore operations as precedingly specified, therein comprises:
- a crane base secured or configured to be secured to the hull,
- a slewable superstructure mounted on the crane base and slewable about a vertical slew axis relative to the crane base,
- a slew drive configured to cause slew motion of the superstructure about the slew axis,
- a primary boom structure comprising a boom that is pivotally connected to the superstructure about an inner pivot axis,
- a luffing mechanism configured to cause luffing motion of the primary boom structure,
- a hoisting assembly comprising a hoisting winch with a hoisting winch driven cable and a load connector suspended from the primary boom structure for connecting the object to the crane.
A counter ballast device is provided and is preferably mounted to the slewable superstructure. The counter ballast device comprises a mobile counter ballast member and an associated counter ballast drive configured to controllably vary a distance between the mobile counter ballast member and the slew axis.
The counter ballast device is configured and operated such that - during operation of the slew drive to cause the slew motion of the superstructure - the mobile counter ballast member is made to move by the counter ballast drive so as to counter at least in part heel of the hull of the vessel induced by the slewing of the superstructure.
An advantage of the preferred mounting of the counter ballast device to the slewable superstructure of the crane, is that the counter ballast device is always in optimal position to perform its effect, independent of the actual slewing position. A vessel according to the second aspect of the invention comprises a hull and the above crane mounted thereto with its crane base secured to the hull. The counter ballast device is operable by a control unit of the vessel such that - during operation of the slew drive so as to cause the slew motion of the superstructure - the mobile counter ballast member is made to move so as to counter at least in part heel of the hull of the vessel induced by the slewing of the superstructure. A method wherein use is made of the crane or the vessel is also provided, wherein the counter ballast drive of the mobile counter ballast member is operated as described.
The second aspect of the invention furthermore relates to a system of a crane, or of a vessel comprising the crane mounted to the hull of the vessel with its crane base secured to the hull, and the pile hammer device.
Embodiments are also envisaged wherein the counter ballast device is configured and operated such that both during operation of the slew drive to cause the slew motion of the superstructure and upon occurrence of a loss of load event wherein the object that is supported becomes separated from the crane, the mobile counter ballast member is made to move by the counter ballast drive so as to counter at least in part heel of the hull of the vessel induced by the slewing of the superstructure and the loss of load.
In embodiments of the second aspect, the vessel is also (as is common) provided with a water ballast system including ballast tanks and ballast pump(s).
In embodiments of the second aspect, a slewing of the superstructure includes positions wherein the counter ballast device is outboard of the hull of the vessel. This may, for example, occur when the object (e.g. pile/monopile) is hoisted and then lowered at the stern of the hull, with the crane being mounted along the portside or starboard side of the hull.
Preferably, use is made of a detector device configured and operate to detect the occurrence of a loss of load event, preferably the detector device being linked to a controller to automatically control the motion of the counter ballast member, e.g. based on data a load sensor in the crane, a camera, an inertial measurement unit on the object and/or on the load connector, etc.
The weight of the mobile counter ballast member may be more than 100 tonnes, e.g. more than 400 tonnes, e.g. more than 1000 tonnes, e.g. depending on the weight of the object to the handled by the crane. The counter ballast drive for the mobile counter ballast member may comprise one or more winches, hydraulic cylinder(s), rack and pinion drive(s), linear motor(s), etc.
In a practical embodiment, the slewable superstructure is provided with a secondary boom structure comprising a boom that is pivotally connected to the superstructure about an inner pivot axis, and with a secondary luffing mechanism comprising a luffing drive and configured to cause luffing motion of the secondary boom structure, wherein the secondary boom structure located in a common vertical plane with the primary boom structure and the booms of the primary and secondary boom structure are diverging from one another, wherein the mobile counter ballast member is suspended from the secondary boom structure.
In embodiments, - e.g. during slewing - the mobile counter ballast member is made to move by one or more of:
- causing of motion of the secondary boom structure,
- causing a swing motion of the mobile counter ballast member relative to the secondary boom structure,
- operating a horizontal motion device engaging on the mobile counter ballast member suspended from the secondary boom structure, e.g. a horizontal motion device arranged between the mobile counter ballast member and a main boom of the secondary boom structure.
As will be appreciated the crane, vessel, system and method according to the second aspect of the invention may be used in the first aspect of the invention.
A third aspect of the present invention relates to a crane for performing an offshore operation wherein an object is supported. The object may in particular be a pile or a pile hammer device as discussed in relation to the preceding aspects of the invention.
The crane comprises:
- a crane base, secured or configured to be secured to the hull of a vessel,
- a slewable superstructure mounted on the crane base and slewable about a vertical slew axis relative to the crane base,
- a slew drive configured to cause slew motion of the superstructure about the slew axis,
- a primary boom structure comprising a boom that is pivotally connected to the superstructure about an inner pivot axis,
- a luffing mechanism configured to cause luffing motion of the primary boom structure, - a hoisting assembly comprising a hoisting winch with a hoisting winch driven cable and a load connector suspended from the primary boom structure for connecting the object to the crane, and
- a counter ballast device fixed to the slewable superstructure, which counter ballast device comprises a mobile counter ballast member and an associated counter ballast drive e.g. configured to controllably vary a distance between the mobile counter ballast member and the slew axis.
The counter ballast device is configured and operable such that - e.g. during operation of the slew drive to cause the slew motion of the superstructure or (sudden) change of the weight supported by the crane as described herein before - the mobile counter ballast member is made to move by the counter ballast drive so as to counter at least in part heel of the hull of the vessel, e.g. induced by the slewing of the superstructure or the (sudden) change.
As will be appreciated the crane, vessel, system and method of the third aspect of the invention may be used in the first, and/or second aspects of the invention.
An advantage of the third aspect of the invention is that the counter ballast device is always in optimal position to perform its effect, independent of the actual slewing position, and furthermore, that the load paths between the ballast device and the load connector are short. A further advantage is the ability to provide existing vessels with the counter ballast device by mounting the crane thereto, e.g. without adjusting the vessel.
In embodiments, the vessel is also (as is common) provided with a water ballast system including ballast tanks and ballast pump(s).
The weight of the mobile counter ballast member may be more than 100 tonnes, e.g. more than 400 tonnes, e.g. more than 1000 tonnes, e.g. depending on the weight of the object to the handled by the crane.
The counter ballast drive for the mobile counter ballast member may comprise one or more winches, hydraulic cylinder(s), rack and pinion drive(s), linear motor(s), etc.
In a practical embodiment, the slewable superstructure is provided with a secondary boom structure comprising a boom that is pivotally connected to the superstructure about an inner pivot axis, and with a secondary luffing mechanism comprising a luffing drive and configured to cause luffing motion of the secondary boom structure, wherein the secondary boom structure located in a common vertical plane with the primary boom structure and the booms of the primary and secondary boom structure are diverging from one another, wherein the mobile counter ballast member is suspended from the secondary boom structure.
In embodiments, - during slewing - the mobile counter ballast member is made to move by one or more of:
- causing of motion of the secondary boom structure,
- causing a swing motion of the mobile counter ballast member relative to the secondary boom structure,
- operating a horizontal motion device engaging on the mobile counter ballast member suspended from the secondary boom structure, e.g. a horizontal motion device arranged between the mobile counter ballast member and a main boom of the secondary boom structure.
A vessel according to the third aspect of the invention comprises a hull and the above crane mounted thereto with its crane base secured to the hull. The counter ballast device is operable by a control unit of the vessel such that - e.g. during operation of the slew drive so as to cause the slew motion of the superstructure - the mobile counter ballast member is made to move so as to counter at least in part heel of the hull e.g. induced by the slewing of the superstructure. A method wherein use is made of the crane or the vessel is also provided, wherein the counter ballast drive of the mobile counter ballast member is operated as described.
The third aspect of the invention furthermore relates to a system of a crane, or of a vessel comprising the crane mounted to the hull of the vessel with its crane base secured to the hull, and the pile hammer device.
It furthermore relates to a method for performing an offshore operation as discussed herein before, in particular in relation to the second aspect, wherein use is made of the crane, system, or vessel according to the third aspect to counter at least in part heel of the vessel.
As will be appreciated the crane, vessel, system and method according to the third aspect of the invention may be used in the first and/or second aspect of the invention.
Embodiments having optional features discussed in relation to preceding aspects may be applied to the crane, vessel, method, and system of the third aspect as well in as far as these are not conflicting. The invention furthermore relates to a system of a crane according to the first, second, and/or third aspect of the invention and a control unit which is configured to operate the counter ballast device such that the mobile counter ballast member is made to move by the counter ballast drive such as to counter at least in part heel of the hull of the vessel induced by slewing of the crane and/or by a change in the weight supported by the crane, e.g. a loss of load or pile run event.
The invention furthermore envisages that in either aspect, the crane or the counter ballast device may also comprise the control unit.
The invention furthermore relates to a system of a vessel according to the first, second, and/or third aspect of the invention and a pile gripper as described in relation to the first aspect of the invention.
In a fourth aspect thereof, the present invention relates to performing an offshore operation wherein an object is supported, e.g. lifted, horizontally moved, and/or lowered, by a crane mounted on the hull of a vessel. Herein objects are envisaged with masses in the range of several hundreds to multiple thousands of metric tonnes, e.g. 400 mt or more, e.g. 1000 mt or more, e.g. 2000 mt or more, e.g. 3000 mt or more. For example, the object is a (mono-)pile and the operation is a hoisting operation of the pile. Or, for example, the object is a pile hammer device, and the operation is an offshore pile driving operation, wherein a (mono-)pile is driven into the seabed by means of the pile hammer device. For example, the pile may be a large diameter pile having an outer diameter of at least 5 meter, e.g. a monopile configured to support an offshore wind turbine thereon.
In the fourth aspect use is made of a vessel comprising a hull and a crane mounted to the hull.
The crane comprises a crane base mounted or mountable to the hull of the vessel to secure it thereto, and a slewable superstructure mounted on the crane base and slewable about a vertical slew axis relative to the crane base. A slew drive of the crane is configured to cause slew motion of the superstructure about the slew axis. The crane further comprises a primary boom structure comprising a boom that is pivotally connected to the superstructure about an inner pivot axis, and a luffing mechanism configured to cause luffing motion of the primary boom structure. A primary hoisting assembly is provided with a hoisting winch and a hoisting winch driven cable from which a load connector is suspended. The cable depends from the primary boom structure. The slewable superstructure is also provided with a secondary boom structure, which comprises a secondary boom which is pivotally connected to the superstructure about an inner pivot axis. A secondary luffing mechanism is provided, which is configured to cause luffing motion of the secondary boom structure. The secondary boom structure is located in a common vertical plane with the primary boom structure, and the booms of the primary and secondary boom structure are diverging from one another. The crane comprises a secondary hoisting assembly associated with the secondary boom structure and comprising a secondary hoisting winch and a secondary hoisting winch driven cable from which a secondary load connector is suspended.
The fourth aspect of the invention aims to counter at least in part heel of the vessel due to changes in the crane load, e.g. caused by anomalous situations involving sudden changes, e.g. increase, in the weight supported by the crane, e.g. a pile run event, and/or to prevent an emerged slope from becoming excessive, as discussed in relation to the previous aspects.
The fourth aspect provides a solution alternative to the counter ballast device described in relation to the other aspects.
The fourth aspect provides a counter force member, which is configured to be connected or is connected to the secondary boom of the crane. The counter force member is connectable via the secondary load connector. In use, the counter force member is suspended in the water from the secondary boom, and may preferably rest on the seabed, at the side of the vessel opposite the side where an object is connected to the primary boom structure of the crane, e.g. the object being handled by the crane on one lateral side of the hull, e.g. a monohull, and the counter force member being submerged, e.g. resting on the seabed, at the other lateral side of the hull..
In case of a change in load on the primary boom structure, e.g. a sudden change, e.g. by a pile run event causing a heel of the vessel towards the side thereof where the object is connected from the primary boom structure, the counter force member will be pulled or lifted upwards. In case of actual lifting, the counter force member moving upward through the water may cause a drag resistance there against, which results in a downward pull on the secondary boom via the secondary hoisting cable, thereby providing a resistance against the induced heel.
Preferably, the counter force member is rested on the seabed, e.g. remaining resting thereon even in the event of sudden heel of the vessel. In an embodiment, the counter force member is actually pulled upwards from the seabed upon heel of the vessel. As the counter force member rests on the seabed initially in embodiments, the weight thereof is not applied to the secondary boom unless the sudden heel occurs. If desired, the cable involved can be set at a desired pretension, e.g. to avoid slack in said cable between the counter force member and the secondary boom.
The fourth aspect envisages an embodiment, wherein the secondary boom structure of the crane is initially connected to the counter force member, but not loaded by the resistance of the counter force member, as the member is placed onto the seabed and supported thereby. The secondary hoisting cable is initially not, or only slightly, tensioned. When the vessel encounters a sudden heel or, relative to the initial state, increased heel, towards the vessel side where the object is connected, the height of secondary boom structure increases relative to the seabed. This results in the counter force member being pulled upwards via the secondary hoisting cable and load connector. The counter force member then will exert a downward reaction force to the secondary boom structure via the secondary hoisting cable and load connector by its resistance to the upward movement, so that the secondary boom is effectively loaded downwards. Because of the common vertical plane of the primary and secondary boom structure, with the booms of the primary and secondary boom structure diverging from one another, this counterbalances the load of the object connected to the primary boom, which is the cause of the (increased) heel. Thereby, the (increased) heel is countered.
Thus, advantageously, the crane is merely loaded by the resistance of the counter force member in case of heel to be countered. Furthermore, the heel is countered directly in the same vertical plane as the loading by the object causing the heel, resulting in a short moment arm and a balanced mechanical loading of the crane superstructure and slew bearing.
The fourth aspect allows, in particular, to counter an increase of the force moment on the hull caused by an increase, e.g. a sudden increase of the load on the primary boom structure, which situation may cause undue heel of the vessel. This may include an increase in the weight supported by the primary boom structure, e.g. a sudden increase due to a pile run event as discussed herein, which may in particular occur in a pile installation operation during the transfer of the support of the pile to the seabed or during pile driving, wherein the weight of the pile and/or pile hammer device suddenly becomes suspended from the crane via the primary boom. Another advantage provided by the fourth aspect is that it may respond to the mentioned causes of heel without separate detection of these causes or the heel itself by sensors and/or human detection. It may, in embodiments, furthermore be applied without control by a control unit of the vessel, in contrast to the counter ballast device according to the preceding aspects of which the movement by the counter ballast member does need to be controlled.
Alike the invention according to the preceding aspects, the fourth aspect is envisaged to be applied in conjunction with a ballast system of the vessel, e.g. a water ballast system, as discussed, to counter heel towards the vessel side of the connected object.
It is envisaged that the secondary winch is configured and controllable such as to limit, e.g. prevent by locking, the unwinding therefrom and hauling in thereon of the secondary hoisting cable, so that the loading by the counter force member indeed results in a force pulling on the secondary boom structure in downward direction. Furthermore, the secondary luffing system is, preferably, configured and controllable to maintain the secondary boom angle during such a situation. It is also envisaged that these may purposely be controlled to (further) tension the hoisting cable and load the crane by the counter force member, e.g. to increase reaction time, e.g. by hauling in the hoisting cable and/or luffing cable. Furthermore, the secondary luffing system may be controlled to vary the magnitude of the force moment exerted by the counter force member by shortening or lengthening the moment arm through luffing or lowering of the secondary boom.
For the fourth aspect it is envisaged that the secondary winch is configured and controllable such as to limit, e.g. prevent by locking, the unwinding therefrom and hauling in thereon of the secondary hoisting cable, so that the loading by the counter force member indeed results in pulling the secondary boom downwards. Furthermore, the secondary luffing system is preferably configured and controllable to maintain the secondary boom angle. It is also envisaged that these may purposely be controlled to (further) tension the hoisting cable and load the crane by the counter force member, e.g. to increase reaction time, e.g. by hauling in the hoisting cable and/or luffing cable. Furthermore, the secondary luffing system may be controlled to vary the magnitude of the force moment exerted by the counter force member by shortening or lengthening the moment arm through luffing or lowering of the secondary boom.
The secondary boom is envisaged to have a length such that it extends overboard the vessel opposite to the primary boom. The crane should furthermore be able to absorb the loading by the counter force member. The resistance against upward movement of the counter force member may in embodiments be provided in the form of one or more of: a weight of the counter force member being at least in the range of magnitude of the weight of the supported object via the primary boom, an embodiment of the counter force member which results in a resultant drag force being exerted thereon by the sea water in the downward direction upon the upwards movement of the counter force member, the drag force being at least in the range of magnitude of the weight of the supported object via the primary boom, and and embodiment of the counter force member which results in an engagement with the seabed, such that the seabed exerts a resultant frictional force and/or resultant pulling force on the counter force member in the downward direction in reaction to the upwards movement of the counter force member, the frictional and/or pulling force being at least in the range of magnitude of the weight of the supported object via the primary boom.
In examples employing the first form, the weight is in particular envisaged to be in the range of magnitude of a pile hammer and/or pile, that is, in the range of magnitude of 100 mt or 1000 mt. For example, the weight is more than 400 mt, e.g. more than 1000 mt. For example, the counter force member is in the form of a dead weight, e.g. made out of concrete and/or steel. It is envisaged that the crane of the vessel lowers the counter force member on the seabed first, e.g. via the primary boom, operating the primary hoisting system, is then connected to the crane via the secondary hoisting system and boom by connecting it to the secondary load connector, after which the handling of the object by means of the primary boom commences. This may involve a slight shifting of the vessel such that the counter force member is at the side of the vessel opposite to the side where the object is to be handled. In embodiments the secondary hoisting system may also be employed to lower the counter force member, with the additional advantage that it does not have to be connected to the secondary load connector far subsea.
In examples employing the second form, drag forces may be increased for example by shaping the counter force such that the water flow resistance thereof increases, e.g. by increasing the surface area of vertical walls, decreasing the size of spaces therebetween, adding curves, bends or corners in water flow paths between the walls, increasing surface roughness of wall surfaces, and/or providing surface profiles such as ribs, indentations and/or protrusions. A horizontal or slanted wall, in particular at the bottom side, may be provided as well - for example, the counter force member is in the form of an open-topped water tank, e.g. provided with additional internal vertical walls and/or channels for creating additional drag force. For example the bottom wall tapers downwardly, e.g. forms an inverted cone or pyramid, to facilitate the downward movement but resist the upward movement. The bottom wall may be embodied to permit water flow therethrough in the upward direction, so as to facilitate the downward movement, but block or impede water flow therethrough in the downward direction, e.g. through one way valves.
In an embodiment, the counter force member is in the form of a tank which is lowered into the sea and filled with a liquid, for example sea water or a heavier liquid, e.g. drilling mud or the like. For example, the heavier liquid is stored in one or more tanks onboard the vessel and pumped into the tank, e.g. before the tank is lowered into the sea, e.g. onto the seabed, by means of the crane, preferably using the secondary boom structure. For example, the tanks if filled whilst on deck and then lowered into the sea. In another design, the tank is filled with sea water as the tanks is submerged, e.g. via valves which are closed after filling. The tank may hold water or other liquid in the range of magnitude of a pile hammer and/or the pile, that is, e.g., in the range of magnitude of 100 mt or 1000 mt or more. The tank may be lowered onto the seabed so as to rest thereon during the pile installation operation. After completion of the operation, the tank can be hoisted, e.g. whilst allowing the water to stream out of the tank, e.g. via the valves which are now opened. The empty tank can be readily stored and handled onboard of the vessel. The tank can be rigid but could also be embodied as one or more bags holding the liquid.
In an example of the third case, the counter force member may comprise hooks or latches, e.g. at the bottom surface thereof, e.g. temporary anchors, e.g. pyramid or mushroom anchors, or similar, which hook into the seabed to a certain depth. Upon upwards movement of the counter force member, the seabed provides resistance thereto in the form of a pulling force. Additionally or alternatively, the counter force member may for example be embodied such that the weight thereof pushes it into the seabed to some extent, wherein the seabed provides resistance to pulling it out again. It may for example be provided with a downwardly narrowing shape to facilitate the embedding and/or e.g. be provided with measures that increase the surface area, be provided with protrusions or indentations of any kind, e.g. ribs, upstanding wall portions, bumps and dents, for increased grip on and friction with the seabed.
The fourth aspect provides a system of a crane and a counter force member as described, as well as a vessel comprising a hull with the crane mounted thereto. Therein, the vessel comprises a control unit which is configured to control the secondary winch and the secondary luffing system such that the crane is loaded by the counter force member, e.g. locking or hauling in the hoisting cable and/or maintaining or increasing the secondary boom angle as discussed.
Furthermore, the fourth aspect provides a method for performing an offshore operation, wherein use is made of the described vessel and counter force member. The method may comprise: connecting the counter force member to the crane, via the primary or secondary load connector of the crane, operating the crane, that is, the primary or secondary hoisting winch, respectively, to lower the counter force member into the sea water, e.g. to the seabed to be supported thereby,
- when the counter force member is connected to the primary load connector, disconnecting it therefrom, and connecting the secondary load connector to the counter force member, connecting the object to be supported to the primary load connector and performing the offshore operation at one side of the vessel, whilst the counter force member is held submerged and connected to the crane via the secondary load connector at the other side of the vessel.
With this method, upon heel of the vessel towards the object, the counter force member exerts a downward force on the secondary boom so as to counterbalance the weight of the object, and thereby at least partly counters the heel.
In an embodiment wherein the counter force member is embodied as a tank, the method comprises filling the tank with water, preferably sea water. The filling may in particular take place after submerging of the tank via openings in outer walls thereof, for example provided by the opening of valves which are closed after the filling.
It is envisaged that the tank is configured to hold an amount of water having a mass in the range of magnitude of the object, e.g. wherein the object is a pile hammer and/or pile, and the mass of the water is in the range of magnitude of 100 mt or 1000 mt.
The method may further comprise, after completion of the offshore operation, lifting the tank by operation of the crane whilst allowing the water to stream out of the tank, e.g. via the openings, e.g. provided by valves being opened. A combination of the fourth aspect with the second and/or third aspect is envisaged for example in a counter ballast device for counteracting heel due to slewing of the crane and the counter force member for counteracting heel due to pile run.
It will be appreciated that the one or more aspects discussed herein can be combined with one another and/or each be provided with one or more features discussed herein with reference to either aspect of the invention, providing the same or similar advantages.
The invention is primarily discussed herein in relation to the application of pile installation. However, it is envisaged to be useful in other applications as well - e.g. the installation of wind turbines or parts thereof on an offshore foundation, e.g. a monopile, for example the placement of a wind turbine mast onto the foundation and/or of a rotor onto the mast. Another application may be the displacement of parts with masses in the same range of magnitude from and to a feeder vessel, or another offshore structure. Examples are displacement of wind turbine parts from or onto another vessel, e.g. a feeder vessel or onto a floating structure for subsequent installation by a crane that is also supported onto the foundation. These may involve horizontal displacements of the heavy objects, inducing heel, and/or changes in the weight supported by the crane, for example during load transfer to the other vessel, and/or risks of a loss of load. Another example is a displacement of a crane or parts thereof into engagement with a wind turbine mast or its foundation for installation or maintenance of parts thereof. Similar uses involving the support of heavy objects by a vessel crane which may induce heel of the vessel either by operation of the crane, when horizontally displacing these objects, or by controlled or uncontrolled changes in the weight supported by the crane, may be envisaged by the skilled person.
The aspects of the invention will now be discussed with reference to the drawings. In the drawings:
- fig. 1 shows a vessel with a crane according to the invention during a pile driving operation wherein a monopile is driven by a hammer device into the seabed,
- fig. 2a shows a vessel with a crane according to the prior art during a pile driving operation wherein a monopile is driven by a hammer device into the seabed,
- fig. 2b illustrates a pile run event with the vessel of figure 2a and the resulting excessive heel of the vessel,
- fig. 2c illustrates a pile run event with the vessel of figure 1 and the resulting limited heel of the vessel,
- fig. 3 shows the vessel of figure 1 to illustrate either of the aspects of the invention,
- fig. 4 shows a variant of the vessel of figure 1 , - fig. 5a shows another variant of the vessel according to the invention,
- fig. 5b shows a pile run event with the vessel of figure 5a and the resulting limited heel of the vessel,
- fig. 6a shows another variant of the vessel according to the invention, and
- fig. 6b shows a pile being connected to the crane of the vessel of figure 6a after load transfer to the seabed.
Figure 1 shows a system for performing an offshore pile driving operation, wherein a pile is driven into the seabed, e.g. a large diameter pile having an outer diameter of at least 5 meter, here a monopile 1 configured to support an offshore wind turbine thereon.
Briefly, the system comprises a vessel 10 comprising:
- a hull 11, here a monohull, which is in floating condition during pile driving,
- a crane 20 comprising a hoisting assembly comprising a hoisting winch and a hoisting winch driven cable 69 from which a load connector 70 is suspended, e.g. a crane hook,
- a pile gripper 100,
- a counter ballast device 50 comprising a mobile counter ballast member 51.
As preferred, the vessel 10 also has a water ballast system with one or more ballast tanks and one or more pump. Such an arrangement is known in the art.
The system further comprises a pile hammer device 60 suspended from the load connector 70 and configured and operated for driving the pile 1 into the seabed.
In practical embodiments, the pile hammer device may be a drop hammer device, e.g. with an accelerated drop hammer, and/or a vibratory hammer device, or some other hammer device, e.g. as disclosed in W02020153838, WO2023175182, W02015190919, WO2014204307, WO20 14204308.
The counter ballast device 50 is configured and operable such that - upon detection of an anomalous situation involving a sudden change in the weight supported by the crane, e.g. a pile run event or a loss of load, e.g. an automatic detection by one or more sensors (not shown) - the mobile counter ballast member 51 is made to move from the initial position A to the position B so as to counter at least in part heel of the hull 11 of the vessel induced by the sudden change. The figures 1-2 illustrate a sudden change due to pile run, wherein the weight of the pile hammer device 60 becomes suddenly suspended from the crane 20.
The crane 20 comprises:
- a crane base 21 secured to the hull 11 ,
- a slewable superstructure 22 mounted on the crane base and slewable about a vertical slew axis 23 relative to the crane base 21,
- a slew drive configured to cause slew motion of the superstructure about the slew axis,
- a primary boom structure 30 comprising a boom 31 that is pivotally connected to the superstructure 22 about an inner pivot axis,
- a luffing mechanism 35 configured to cause luffing motion of the primary boom structure 30. Here, the luffing mechanism includes one or more luffing cables and one or more luffing winches.
Though not shown in the drawings, the vessel further comprises a control unit, by means of which the counter ballast device is operable as described, e.g. the control unit being linked to a pile run detector to automatically cause the response to a pile run event.
As shown, the counter ballast device 50 is mounted to the slewable superstructure 22, as is according to the third aspect of the invention and preferred in the first and second aspect of the invention. When the superstructure 22 performs a slewing motion, the device 50 moves along with the slewing motion.
As shown, the slewable superstructure 22 is provided with a secondary boom structure 55 as part of the device 50. The structure 55 comprises a secondary boom 56 that is pivotally connected to the superstructure 22 about an inner pivot axis. A secondary luffing mechanism is provided which is configured to cause luffing motion of the secondary boom structure 55.
As preferred, at the tip end of the boom 56 a jib member 57 is pivotally mounted. The jib member 57 has a tip end from which the ballast member 51 is suspended, here via one or more cables 58, e.g. via a hoisting assembly associated with the secondary boom structure 55.
As shown and preferred, the jib member 57 is embodied to form a so-called level luffing secondary boom structure, wherein the tip of the jib member 57 moves substantially horizontal when the boom 56 is pivoted to move the ballast member 51 from the initial position A to the position B. This approach reduces energy required to perform said motion, which allows for performing said motion rapidly.
The secondary boom structure 55 is located in a common vertical plane with the primary boom structure 30 and the booms 31, 56 of the primary and secondary boom structures are diverging from one another.
As shown, the mobile counter ballast member 51 is suspended from the secondary boom structure 55.
As explained, the hammer device 60 may well weigh several hundreds of tonnes, e.g. 400 tonnes or even more. During pile driving, the device 60 effectively is supported on the top end of the pile 1 , yet the hammer device 60 remains connected to the load connector 70 of the crane 20. For example, a shock absorber is present between the device 60 and the load connector to avoid undue snap load on the cable during a pile run event.
As explained, upon detection of the pile run event, the mobile counter ballast member 51 is made to move from its initial position to the position B by one or more of:
- causing of motion of the secondary boom structure 55,
- causing a swing motion of the mobile counter ballast member 51 relative to the secondary boom structure,
- operating a horizontal motion device engaging on the mobile counter ballast member suspended from the secondary boom structure, e.g. a horizontal motion device arranged between the mobile counter ballast member and a main boom of the secondary boom structure.
In the figure 1 it is illustrated that the mobile counter ballast member 51 is made to move from its initial position A to the position B by causing of motion of the secondary boom structure 55. This is done by allowing rapid outward/downward luffing of the secondary boom 56, e.g. (controlled) releasing a luffing winch 58a operating luffing cables 58b associated with the boom 56. Gravity will then rapidly cause motion of the secondary boom structure 55 to the situation wherein position B is reached by the ballast member 51.
For example, use is made of a pile run detector device configured and operated to detect the occurrence of a pile run event during the pile driving operation. The detector device may be the detector device as described herein before, configured to detect an anomalous situation involving any sudden change in the weight supported by the crane including a pile run event, e.g. also a loss of load.
The effect of the inventive approach of the first aspect is illustrated in figures 2a, b, c. In these figures “wl” indicates the (design) waterline of the vessel and “rp” a horizontal reference plane.
In figure 2a and 2b a prior art vessel is shown. In figure 2a normal pile driving takes place. Figure 2b shows what happens during a pile run event. The heavy hammer device 60 now becomes suddenly suspended from the crane, which results in excessive heel of the hull. As can be appreciated, this excessive heel is also problematic for the pile gripper of the vessel.
In figure 2c the vessel of figure 1 is shown when a pile run event takes place. The heel of the hull 11 is now limited due to the operation of the counter ballast device 40. This also reduces and/or avoid undue loads on the pile gripper.
For example, the pile gripper 100 comprises:
- a pile holder 101 with a base structure, a first jaw and a second jaw, the first jaw and the second jaw each extending between an inner end and an outer end, wherein the first and the second yaw are pivotable connected at the inner end thereof to a respective pivot part of the base structure to pivot about a yaw pivot axis between a closed position, in which the pile holder defines a pile passage for the pile held in the pile holder, and an open position, to allow the pile to be received in, or to be removed from, the pile holder in a lateral direction
- a plurality of pile engaging devices, wherein the base structure, the first jaw and the second jaw each support at least one pile engaging device, the engaging devices each comprising one or more pile engaging elements, e.g. each comprising one or more pile guiding rollers for engaging the pile in the pile passage; and
- a pile holder support assembly 102 to be mounted on the deck of the vessel, wherein the support assembly moveably supports the pile holder at the base structure. For example, the support assembly comprises a track, preferably a track to be mounted on the deck of the vessel, the track extending in the first direction, and a base carriage for movement along the track, wherein the base carriage is configured to support the base structure, and wherein the base structure is moveable, preferably in a second direction perpendicular to the first direction, between a first outer position and a second outer position, to allow the support system to position the pile holder in a horizontal plane relative to the vessel. For example, the pile support mechanism further comprises a control system, which control system is configured to provide active motion compensation in the horizontal plane while the pile holder supports the pile in the upright position at the installation location next to the vessel to compensate for movement of the vessel relative to the pile installation location.
The second and third aspect of the invention will now be discussed with reference to figure 3.
In figure 3 the vessel 1 of figure 1 with crane 20 and counter ballast device 50 is shown.
On deck of the vessel a number of monopiles 1 are stored horizontally. Here, the monopiles 1 are oriented along the length of the hull of the vessel. The figure 3 (and figures 1 - 2a,b,c) is looking onto the stern of the vessel.
During a monopile installation process, a monopile is upended using the crane 1 into vertical orientation. Then, including a slew motion of the superstructure 22, the monopile 1 is advanced towards the pile gripper 100 and engaged with the pile gripper 100.
As the monopile 1 is commonly very heavy, e.g. more than 1000 tonnes, e.g. several thousands of tonnes, the slewing of the crane with the monopile 1 impacts the heel of the vessel 10, here about the longitudinal axis of the hull 11.
In prior art vessels, the heel of the vessel due to slewing as discussed, is only compensated for by operating a water ballast system of the vessel. Water is pumped into selected ballast tanks to keep the hull horizontal. Such water ballast systems have a limited rate at which the ballast water can be moved between tanks. In practice, this affects the speed at which slewing can be performed.
According to the third aspect of the invention, and in the second aspect optionally, the counter ballast device 50 is configured and operated such that - during operation of the slew drive to cause the slew motion of the superstructure 22 - the mobile counter ballast member 51 is made to move by the counter ballast drive so as to counter at least in part heel of the hull 11 of the vessel 10 induced by slewing of the superstructure 22.
As a result, slewing can be performed faster than in the prior art. It is noted that during slewing also use can be made of a water ballast system of the vessel. It will be appreciated that, in contrast to the first aspect of the invention, the motion of the ballast member 51 outward from the slew axis, so from initial position A to position B, may be fairly slow and even planned ahead, e.g. programmed into the control unit.
The same figure 3 is now used to discuss the second aspect of the invention.
When, for example, the monopile 1 is suspended from the crane 1 and possibly engaged by the pile gripper, a so-called loss of load event could occur. This is extremely unlikely, yet if the monopile 1 would become separated from the crane 20, e.g. due to the load connector or a cable failing, the balance of the vessel suddenly changes. Also the boom 31 may tilt upward as the boom and the associated luffing assembly 35 is now suddenly unloaded.
The second aspect envisages that in this loss of load event, the mobile counter ballast member 51 is made to move from position B closer towards the slew axis 23, e.g. to position A, so as to counter at least in part heel of the hull of the vessel induced by the loss of load event. It will be appreciated that this motion has to be triggered quickly, e.g. automatically based upon one or more sensors detecting the loss of load event, and has to be performed rather quickly so that no excessive heel of the vessel occurs.
It will be appreciated that the vessel with crane 20 as shown in figures 1, 2c, and 3 represents an embodiment, example, of either aspect of the invention.
The counter ballast device 50 is mounted to the slewable superstructure 22. The counter ballast device comprises a mobile counter ballast member 51 and an associated drive, here embodied by the secondary boom structure, which is configured to controllably vary a distance between the mobile counter ballast member and the slew axis.
Figure 4 shows a variant of the vessel of figure 1. Herein the same components are denoted with the same reference numerals.
Instead of providing the secondary boom structure 55 as discussed above another design for the counter ballast device 50 is shown.
A secondary boom 56 extends rearward of the crane 20. The mobile counter ballast member 51 is suspended via one or more cables 53 from the tip of the boom 56. Possibly, as shown, the boom 56 is a luffable boom. The cables 58 from which the member 51 is suspended may form part of a hoisting assembly. This, for example, allows for the secondary boom structure 55 to be used as a regular crane. The same is possible with the embodiments shown in the other figures.
As shown, this embodiment provides for a horizontal motion device 90 which engages on the mobile counter ballast member 51 which is suspended from the secondary boom structure. For example, the horizontal motion device 90 comprises an arm 91 that can be extended and retracted by an actuator 92 so that the member 51 is controllably movable away and towards the slew axis of the crane 20. The arm 91 here is a multi-segmented arm having one or more hinges to allow for controlled folding and unfolding of the arm. In another embodiment, the arm is telescopic. In yet another design, the arm has a scissor-type mechanism to allow for extension and retraction of the arm 91.
When the cable 53 is sufficiently long, movement between the innermost and outermost positions of the member 51 does not involve substantial vertical displacement of the heavy ballast member 51 which reduces the requirements for the device 90.
Figures 5a and 5b show another variant of the vessel 10, which is according to the fourth aspect of the invention. The waterline sb is again indicated. Crane 20 is shown with its crane base 21 secured to the hull 11 of the vessel 10. The slewable superstructure 22 is mounted on the crane base 21 and slewable about a vertical slew axis 23 relative to the crane base 21 , and the slew drive is configured to cause slew motion of the superstructure 22 about the slew axis 23. Primary boom structure 30 comprises boom 31 that is pivotally connected to the superstructure 22 about an inner pivot axis, and luffing mechanism 35 configured to cause luffing motion of the primary boom structure 30.
The slewable superstructure 22 is provided with a secondary boom 56 that is pivotally connected to the superstructure 22 about an inner pivot axis. A secondary luffing mechanism is provided which is configured to cause luffing motion of the secondary boom 56, and the secondary boom is located in a common vertical plane with the primary boom structure 30. The booms 31 , 56 of the primary and secondary boom structure 30, 55 are diverging from one another. A counter force member 59 is connected to the secondary boom 56 via the secondary hoisting cable 58 and a secondary load connector. In this case, the counter force member 59 is a dead weight, with a mass of at least 400 mt, and the object is a monopile 1 . From the figure it may be envisaged that a similar application is possible during pile driving, wherein the object is a pile hammer device 60 on top of the pile 1 as shown in preceding figures. The counter force member 59 is shown being supported on the seabed sb, wherein the cable 58 is suspended substantially without tension - e.g. loosely. The pile 100 is shown at the end of the load transfer thereof from the crane to the seabed sb, wherein it has embedded into the seabed sb to some extent due to its own weight. It is now supported by the seabed, and no longer by the crane 20, though it is still connected to the crane. In this situation there is a risk of pile run, e.g. due to the pile unexpectedly reaching a zone of the soil which has an insufficient bearing capacity to counteract the weight of the pile 100.
Figure 5b schematically illustrates a pile run event. When the pile 1 and/or the pile hammer device 60 (the figure shows the landing of the pile onto the seabed which may involve some self-penetration as known in the art) becomes suddenly suspended from the crane 20, e.g. the seabed giving way under the load of the pile 1 itself and/or when the pile hammer is placed thereon or during pile driving, a force moment around the hull 11 results due to the sudden loading of the primary boom 31 by the enormous weight of the pile 1 and/or pile hammer device 60. This force moment leads to a rolling motion of the vessel 10 as the pile installation process is performed along one lateral side of the hull of the vessel.
The figure 5b shows that this rolling motion results in a lowering of the end of the primary boom 31 and a rise of the end of the secondary boom 56 so that the cable 58 pulls upwardly on the counter force member 59, e.g. tending to lift it, or actually lifting it, from the seabed sb so that it becomes suspended from the secondary boom 56 thereby loading the secondary boom 56 with its weight.
In addition, possibly, the secondary boom 56 is loaded by the drag forces of the water providing resistance to the (fast) upward movement of the counter force member 59.
The weight of the counter force member 59, and the length and boom angle of the secondary boom 56 is such that it exerts a force moment on the crane opposite to that resulting from the suspension of the pile from primary boom 31, so as to counterbalance the latter and counter at least in part heel of the vessel, e.g. at least prevent the heel from becoming excessive. The load path is through the crane structure, so not through the hull of the vessel, which is beneficial from the loads on the hull and for the design thereof, e.g. obviating the need for high strength structural hull parts to deal with the loads involved in such an event.
In embodiments, the dimensions and weight(s) of the crane components and the counter force member are chosen such that the counter force moment by the counter force member 59 at the secondary boom 56 exceeds the force moment resulting from the suspension of the pile from the primary boom 31 and even reduces the heel by rolling the vessel back in the other direction. For example, this process may continue until the counter force member reaches the seabed sb again.
Figures 6a and 6b illustrate a variant of the vessel 10 and system according to the fourth aspect of the invention. The counterweight member 59 is embodied as a tank fillable with a liquid, e.g. with sea water or with a heavier liquid, e.g. drilling mud.
Figure 6a shows the tank while being lowered. For example, the tank is filled with water upon the submerging through one or more valves being opened to provide openings to the interior of the tank. In another embodiment, the heavier liquid is stored onboard the vessel and then pumped into the tank, and after completion of the operation pumped back out of the tank for storage onboard the vessel.
Figure 6b illustrates that the tank 59 has been placed to rest on the seabed sb, possibly penetrating it to some extent as facilitated by the shape of its bottom. The tank may be provided with seabed anchoring means, e.g. operable once the tank has landed on the seabed.
The pile 1 has been connected to the primary load connector, lowered to the seabed whilst being guided by the pile gripper 100, e.g. self-penetrating some distance into the seabed as known in the art, and is at the end of the load transfer to the seabed so that the pile is no longer supported by the crane.
As shown, the pile installation takes place at one side, e.g. lateral side, of the hull of the vessel and the tank is lowered at the opposing, e.g. lateral, side of the hull of the vessel.
Upon sudden heel of the vessel caused by sudden suspension of the pile and/or pile hammer device from the primary boom structure of the crane as a consequence of a pile run event, with the liquid held inside the tank, the tank will provide resistance to an upward movement of the secondary boom structure of the crane caused by the heel, through the weight of the liquid it holds and possibly also drag forces of the water. In addition the seabed may provide some resistance to the bottom part of the tank being pulled upward. In the same manner as discussed for the dead weight, a counterbalancing force moment on the crane results to at least partly counter the sudden vessel heel.

Claims

C L A I M S
1. Method for performing an offshore pile driving operation wherein a pile (1) is driven into the seabed by means of a pile hammer device (60), e.g. the pile being a large diameter pile having an outer diameter of at least 5 meter, e.g. a monopile (1) configured to support an offshore wind turbine thereon, wherein the vessel (10) comprises:
- a hull (11),
- a crane (20) mounted to the hull (11) and comprising a hoisting assembly with a hoisting winch and a hoisting winch driven cable (69) from which a load connector (70) is suspended,
- a counter ballast device (50) comprising a mobile counter ballast member (51), wherein the counter ballast device (50) is configured and operated such that - upon detection of a pile run event - the mobile counter ballast member (51) is made to move so as to counter at least in part heel of the hull (11) of the vessel (10) induced by the weight of the pile (1) and/or the pile hammer device (60) suddenly becoming suspended from the crane (20).
2. Method according to claim 1, wherein use is made of a pile run detector device configured and operated to detect the occurrence of a pile run event, e.g. an acceleration of the pile (1) exceeding a predetermined value and/or a sudden change in the weight supported by the crane (20), during the pile driving operation.
3. Method according to claim 1 or 2, wherein the counter ballast device (50) comprises a counter ballast drive associated with the mobile counter ballast member (51), which counter ballast drive is operated to move the mobile counter ballast member (51) upon detection of a pile run event.
4. Method according to any one or more of claims 1 - 3, wherein the crane comprises:
- a crane base (21) mounted or mountable to the hull (11) of the vessel so as to secure the crane (20) to the hull (11), - a slewable superstructure (22) mounted on the crane base (21) and slewable about a vertical slew axis (23) relative to the crane base (21),
- a slew drive configured to cause slew motion of the superstructure (22) about the slew axis (23),
- a primary boom structure (30) comprising a boom (31) that is pivotally connected to the superstructure (22) about an inner pivot axis,
- a luffing mechanism (35) configured to cause luffing motion of the primary boom structure (30), wherein the counter ballast device (50) is mounted to the slewable superstructure (22).
5. System for performing in the method according to any one or more of claims 1 - 4, wherein the system comprises a vessel (10) and a pile hammer device (60), wherein the vessel (10) comprises:
- a hull (11),
- a crane (20) mounted to the hull (11) and comprising a hoisting assembly with a hoisting winch and a hoisting winch driven cable (69) from which a load connector (70) is suspended,
- a counter ballast device (50) comprising a mobile counter ballast member (51), and wherein the counter ballast device (50) is configured and operable such that - upon detection of a pile run event - the mobile counter ballast member (51) is made to move so as to counter at least in part heel of the hull (11) of the vessel (10) induced by the suddenly being loaded by the weight of the pile and/or the pile hammer device becoming suddenly suspended from the crane (20).
6. System according to claim 5, further comprising a pile run detector device configured and operable to detect the occurrence of a pile run event during the pile driving operation.
7. System according to claim 5 or 6, wherein the counter ballast device (50) comprises a counter ballast drive associated with the mobile counter ballast member (51), which counter ballast drive is operable by a control unit, e.g. linked to the pile run detector device, to move the mobile counter ballast member (51) upon detection of a pile run event.
8. Vessel or crane (20) for use in the method or system according to any one or more of claims 1 - 7, wherein the crane (20) is mounted or configured to be mounted on the hull (11) of a vessel (10) so as to form a vessel (10) according to any one or more of claims 5 - 7, wherein the crane (20) comprises the hoisting assembly with the hoisting winch and the hoisting winch driven cable (69) from which the load connector (70) is suspended, and comprises the counter ballast device (50) of the vessel (10), e.g. further comprises the control unit.
9. Vessel or crane (20) according to claim 8, wherein the crane (20) further comprises:
- a crane base (21) mounted or mountable to the hull (11) of the vessel so as to secure the crane (20) to the hull (11),
- a slewable superstructure (22) mounted on the crane base (21) and slewable about a vertical slew axis (23) relative to the crane base (21),
- a slew drive configured to cause slew motion of the superstructure (22) about the slew axis (23),
- a primary boom structure (30) comprising a boom (31) that is pivotally connected to the superstructure (22) about an inner pivot axis,
- a luffing mechanism (35) configured to cause luffing motion of the primary boom structure (30), wherein the counter ballast device (50) is mounted to the slewable superstructure (22).
10. Vessel or crane (20) according to claim 9, wherein the slewable superstructure (22) is provided with a secondary boom structure (55) as part of the counter ballast device (50), which secondary boom structure (55) comprises a boom (56) that is pivotally connected to the superstructure (22) about an inner pivot axis, wherein a secondary luffing mechanism is provided which is configured to cause luffing motion of the secondary boom structure (55), and wherein the secondary boom structure (55) is located in a common vertical plane with the primary boom structure (30) and the booms (31, 56) of the primary and secondary boom structure (30, 55) are diverging from one another, wherein the mobile counter ballast member (51) is suspended from the secondary boom structure (55).
11. Vessel or crane (20) according to claim 10, further comprising a horizontal motion device (90) which engages on the mobile counter ballast member (51) suspended from the secondary boom structure (55), e.g. a horizontal motion device arranged between the mobile counter ballast member (51) and the boom (56) of the secondary boom structure (55), and is configured to controllably move the mobile counter ballast member (51) away from and towards the slew axis (23) of the crane (20).
12. Use of the vessel according to claim 11 , wherein the mobile counter ballast member (51) is - upon detection of a pile run event - made to move by:
- causing of motion of the secondary boom structure (55),
- causing a swing motion of the mobile counter ballast member (51) relative to the secondary boom structure (55),
- operating a horizontal motion device (90) engaging on the mobile counter ballast member (51) suspended from a secondary boom structure (55), e.g. a horizontal motion device arranged between the mobile counter ballast member (51) and the boom (56) of the secondary boom structure (55).
13. Vessel (10) according to any one or more of claims 4 - 7 comprising a crane (20) according to any one or more of claims 8 - 10.
14. Vessel (10) according to claim 13, wherein the crane (20) is according to claim 11 and the control unit is configured to - upon detection, e.g. by a detector device, of the occurrence of a pile run event - make the mobile counter ballast member (51) move by one or more of:
- causing motion of the secondary boom structure (55),
- causing a swing motion of the mobile counter ballast member (51) relative to the secondary boom structure (55) away from or towards the slew axis (23) of the crane (20),
- operating a horizontal motion device (90) to move the mobile counter ballast member (51) away from or towards the slew axis (23) of the crane (20).
15. System of a vessel (10) and a pile hammer device (60) according to any one or more of claims 4 - 14, the pile hammer device (60) being connected or connectable to the load connector (70) and configured and operable for driving the pile (1) into the seabed.
16. Crane (20) for performing an offshore operation, e.g. an offshore hoisting operation, wherein an object (1,60) is supported from the crane, e.g. a pile hammer device (60) or a pile (1), e.g. a large diameter pile having an outer diameter of at least 5 meter, e.g. a monopile (1) configured to support an offshore wind turbine thereon, wherein the crane (20) is mounted or mountable to the hull (11) of a vessel (10) and comprises:
- a crane base (21) secured or configured to be secured to a hull (11) of a vessel (10),
- a slewable superstructure (22) mounted on the crane base (21) and slewable about a vertical slew axis (23) relative to the crane base (21),
- a slew drive configured to cause slew motion of the superstructure (22) about the slew axis (23),
- a primary boom structure (30) comprising a boom (31) that is pivotally connected to the superstructure (22) about an inner pivot axis,
- a luffing mechanism (35) configured to cause luffing motion of the primary boom structure (30),
- a hoisting assembly comprising a hoisting winch with a hoisting winch driven cable (69) and a load connector (70) suspended from the primary boom structure (30), configured to connect the object (1,60) to the crane (20),
- a counter ballast device (50), e.g. fixed to the slewable superstructure (22), which counter ballast device (50) comprises a mobile counter ballast member (51) and an associated counter ballast drive configured to controllably vary a distance between the mobile counter ballast member (51) and the slew axis (23), wherein the counter ballast device (50) is configured and operable such that the mobile counter ballast member (51) is made to move by the counter ballast drive so as to counter at least in part heel of the hull (11) of the vessel (10).
17. Crane (20) according to claim 16, wherein the counter ballast device (50) is configured and operable such that the counter ballast member is made to move during operation of the slew drive to cause the slew motion of the superstructure (22) around the slew axis, so as to counter at least in part heel of the hull (11) induced by the slewing of the superstructure (22).
18. Crane (20) according to claim 16 or 17, wherein the counter ballast device (50) is furthermore configured and operable such that the counter ballast member (51) is made to move upon occurrence of a change in the weight supported by the crane (20), e.g. a sudden change thereof, e.g. a loss of load event wherein the object that is supported becomes separated from the crane, or a pile run event wherein the object is a pile (1) or pile hammer device (60) that suddenly becomes suspended from the crane, so as to counter at least in part heel of the hull (11) induced by the sudden change, e.g. wherein the crane (20) comprises a detector device for detecting the occurrence of a loss of load event and the counter ballast device (50) is operable based on this detection.
19. Crane (20) according to any one or more of claims 16 - 18, wherein the slewable superstructure (22) is provided with a secondary boom structure (55) as part of the counter ballast device (50), which secondary boom structure (55) comprises a boom (56) that is pivotally connected to the superstructure (22) about an inner pivot axis, wherein a secondary luffing mechanism is provided which is configured to cause luffing motion of the secondary boom structure (55), and wherein the secondary boom structure (55) is located in a common vertical plane with the primary boom structure (30) and the booms (31, 56) of the primary and secondary boom structure (30, 55) are diverging from one another, wherein the mobile counter ballast member (51) is suspended from the secondary boom structure (55).
20. Crane (20) according to claim 19, further comprising a horizontal motion device (90) which engages on the mobile counter ballast member (51) suspended from the secondary boom structure (55), e.g. a horizontal motion device arranged between the mobile counter ballast member (51) and the boom (56) of the secondary boom structure (55), and is configured to controllably move the mobile counter ballast member (51) away from and towards the slew axis (23) of the crane (20).
21. Vessel (10) for performing an offshore operation, e.g. an offshore hoisting operation, wherein an object (1,60) is supported from a crane, e.g. a pile hammer device (60) or a pile (1), e.g. a large diameter pile having an outer diameter of at least 5 meter, e.g. a monopile (1) configured to support an offshore wind turbine thereon, the vessel (10) comprising:
- a hull (11),
- a control unit, and
- a crane (20) according to one or more of claims 16 -20 mounted to the hull (11), wherein the counter ballast device is configured such that, and the control unit is configured to operate the counter ballast drive of the mobile counter ballast member (51) such that the mobile counter ballast member (51) is made to move by the counter ballast drive so as to counter at least in part the heel of the hull (11) of the vessel.
22. Vessel (10) according to claim 21 , wherein the control unit is configured to operate the counter ballast device (50) such that the counter ballast member (51) is made to move during operation of the slew drive to cause the slew motion of the superstructure (22) around the slew axis, so as to counter at least in part heel of the hull (11) induced by the slewing of the superstructure (22).
23. Vessel (10) according to claim 21 or 22, wherein the control unit is configured to operate the counter ballast device (50) such that the counter ballast member (51) is made to move upon occurrence of a sudden change in the weight supported by the crane, e.g. a loss of load event wherein the object to be hoisted becomes separated from the crane (20), so as to counter at least in part heel of the hull (11) induced by the sudden change, e.g. wherein the vessel (20) comprises a detector device for detecting the occurrence of an anomalous situation involving a sudden change in the weight supported by the crane, e.g. a loss of load event, and the counter ballast device (50) is operable by the control unit based on this detection.
24. Method for performing an offshore operation, e.g. an offshore hoisting operation, wherein use is made of a crane (20) according to any one or more of claims 16 - 20 on a vessel (10) comprising a hull (11), e.g. a vessel (10) according to any one or more of claims 21-23, and wherein the counter ballast drive of the mobile counter ballast member (51) is operated such that the mobile counter ballast member (51) is made to move so as to counter at least in part heel of the hull (11) of the vessel, e.g. during operation of the slew drive so as to counter at least in part heel of the hull (11), e.g. induced by the slewing, and/or e.g. upon occurrence of a change in the weight supported by the crane, e.g. upon a loss of load event wherein the object that is supported becomes separated from the crane (20), so as to counter at least in part heel of the hull (11) induced thereby.
25. Method according to claim 24, wherein the crane (20) is according to claim 19 or 20, and - during operation of the slew drive and/or e.g. upon detection of the anomalous situation
- the mobile counter ballast member (51) is made to move by one or more of:
- causing of motion of the secondary boom structure (55),
- causing a swing motion of the mobile counter ballast member (51) relative to the secondary boom structure (55),
- operating a horizontal motion device (90) engaging on the mobile counter ballast member (51) suspended from the secondary boom structure (55), e.g. a horizontal motion device arranged between the mobile counter ballast member (51) and the boom (56) of the secondary boom structure (55).
26. Crane (20) for performing an offshore operation, e.g. an offshore hoisting operation wherein an object (1,60) is supported, e.g. a pile hammer device (60) or a pile (1), e.g. a large diameter pile having an outer diameter of at least 5 meter, e.g. a monopile (1) configured to support an offshore wind turbine thereon, wherein the crane (20) is mounted or mountable to the hull (11) of a vessel (10) and comprises:
- a crane base (21) secured or configured to be secured to a hull (11) of a vessel (10),
- a slewable superstructure (22) mounted on the crane base (21) and slewable about a vertical slew axis (23) relative to the crane base (21),
- a slew drive configured to cause slew motion of the superstructure (22) about the slew axis (23),
- a primary boom structure (30) comprising a boom (31) that is pivotally connected to the superstructure (22) about an inner pivot axis,
- a luffing mechanism (35) configured to cause luffing motion of the primary boom structure (30), - a hoisting assembly comprising a hoisting winch with a hoisting winch driven cable (69) and a load connector (70) suspended from the primary boom structure (30), configured to connect the object (1,60) to the crane (20),
- a counter ballast device (50) fixed to the slewable superstructure, which counter ballast device (50) comprises a mobile counter ballast member (51) and an associated counter ballast drive e.g. configured to controllably vary a distance between the mobile counter ballast member (51) and the slew axis (23), wherein the counter ballast device (50) is configured and operable such that the mobile counter ballast member (51) is made to move by the counter ballast drive so as to counter at least in part heel of the hull (11) of the vessel (10).
27. Crane (20) according to claim 26, wherein the counter ballast device (50) is configured and operable such that the counter ballast member is made to move during operation of the slew drive to cause the slew motion of the superstructure (22) around the slew axis, so as to counter at least in part heel of the hull (11) induced by the slewing of the superstructure (22).
28. Crane (20) according to claim 26 or 27, wherein the counter ballast device (50) is furthermore configured and operable such that the counter ballast member (51) is made to move upon occurrence of a change in the weight supported by the crane (20), e.g. a sudden change thereof, e.g. a loss of load event wherein the object that is supported becomes separated from the crane, or a pile run event wherein the object is a pile (1) or pile hammer device (60) that suddenly becomes suspended from the crane, so as to counter at least in part heel of the hull (11) induced by the sudden change, e.g. wherein the crane (20) comprises a detector device for detecting the occurrence of a loss of load event and the counter ballast device (50) is operable based on this detection.
29. Crane (20) according to any one or more of claims 26 - 28, wherein the slewable superstructure (22) is provided with a secondary boom structure (55) as part of the counter ballast device (50), which secondary boom structure (55) comprises a boom (56) that is pivotally connected to the superstructure (22) about an inner pivot axis, wherein a secondary luffing mechanism is provided which is configured to cause luffing motion of the secondary boom structure (55), and wherein the secondary boom structure (55) is located in a common vertical plane with the primary boom structure (30) and the booms (31, 56) of the primary and secondary boom structure (30, 55) are diverging from one another, wherein the mobile counter ballast member (51) is suspended from the secondary boom structure (55).
30. Crane (20) according to claim 29, further comprising a horizontal motion device (90) which engages on the mobile counter ballast member (51) suspended from the secondary boom structure (55), e.g. a horizontal motion device arranged between the mobile counter ballast member (51) and the boom (56) of the secondary boom structure (55), and is configured to controllably move the mobile counter ballast member (51) away from and towards the slew axis (23) of the crane (20).
31. Vessel (10) for performing an offshore operation, e.g. an offshore hoisting operation, wherein an object (1,60) is supported from a crane, e.g. a pile hammer device (60) or a pile (1), e.g. a large diameter pile having an outer diameter of at least 5 meter, e.g. a monopile (1) configured to support an offshore wind turbine thereon, the vessel (10) comprising:
- a hull (11),
- a control unit, and
- a crane (20) according to one or more of claims 26 - 28 mounted to the hull (11), wherein the counter ballast device (50) is configured such that, and the control unit is configured to operate the counter ballast drive of the mobile counter ballast member (51) such that, the mobile counter ballast member (51) is made to move by the counter ballast drive so as to counter at least in part the heel of the hull (11) of the vessel.
32. Vessel (10) according to claim 31 , wherein the control unit is configured to operate the counter ballast device (50) such that the counter ballast member (51) is made to move during operation of the slew drive to cause the slew motion of the superstructure (22) around the slew axis, so as to counter at least in part heel of the hull (11) induced by the slewing of the superstructure (22).
33. Vessel (10) according to claim 31 or 32, wherein the control unit is configured to operate the counter ballast device (50) such that the counter ballast member (51) is made to move upon occurrence of a sudden change in the weight supported by the crane (20), e.g. a loss of load event wherein the object (1,60) to be hoisted becomes separated from the crane (20), so as to counter at least in part heel of the hull (11) induced by the sudden change, e.g. wherein the vessel (20) comprises a detector device for detecting the occurrence of an anomalous situation involving a sudden change in the weight supported by the crane, e.g. a loss of load event, and the counter ballast device (50) is operable by the control unit based on this detection.
34. Method for performing an offshore operation, e.g. an offshore hoisting operation, wherein use is made of a crane (20) according to any one or more of claims 26 - 30 on a vessel (10) comprising a hull (11), e.g. a vessel (10) according to any one or more of claims 31 - 33, and wherein the counter ballast drive of the mobile counter ballast member (51) is operated such that the mobile counter ballast member (51) is made to move so as to counter at least in part heel of the hull (11) of the vessel, e.g. during operation of the slew drive so as to counter at least in part heel of the hull (11), e.g. induced by the slewing, and/or e.g. upon occurrence of a change in the weight supported by the crane, e.g. upon a loss of load event wherein the object that is supported becomes separated from the crane (20), so as to counter at least in part heel of the hull (11) induced thereby.
35. Method according to claim 34, wherein - during operation of the slew drive and/or e.g. upon detection of the anomalous situation - the mobile counter ballast member (51) is made to move by one or more of:
- causing of motion of the secondary boom structure (55),
- causing a swing motion of the mobile counter ballast member (51) relative to the secondary boom structure (55),
- operating a horizontal motion device (90) engaging on the mobile counter ballast member (51) suspended from the secondary boom structure (55), e.g. a horizontal motion device arranged between the mobile counter ballast member (51) and the boom (56) of the secondary boom structure (55).
36. Method for performing an offshore operation, e.g. an offshore hoisting operation wherein an object (1,60) is supported from a crane, e.g. a pile hammer device (60) or a pile (1), e.g. a large diameter pile having an outer diameter of at least 5 meter, e.g. a monopile (1) configured to support an offshore wind turbine thereon, wherein use is made of a counter force member (59) and a crane (20), wherein the crane (20) is mounted or mountable to the hull (11) of a vessel (10) and comprises:
- a crane base (21) secured or configured to be secured to a hull (11) of a vessel (10), - a slewable superstructure (22) mounted on the crane base (21) and slewable about a vertical slew axis (23) relative to the crane base (21),
- a slew drive configured to cause slew motion of the superstructure (22) about the slew axis (23),
- a primary boom structure (30) comprising a boom (31) that is pivotally connected to the slewable superstructure (22) about an inner pivot axis,
- a primary luffing mechanism (35) configured to cause luffing motion of the primary boom structure (30),
- a primary hoisting assembly comprising a primary hoisting winch with a primary hoisting winch driven cable (69) and a primary load connector (70) suspended from the primary boom structure (30), a secondary boom structure (55) comprising a boom (56) that is pivotally connected to the slewable superstructure (22) about an inner pivot axis, and is located in a common vertical plane with the primary boom structure (30) so that the booms (31, 56) of the primary and secondary boom structure (30, 55) are diverging from one another, a secondary hoisting assembly comprising a secondary hoisting winch with a secondary hoisting winch driven cable (58) and a secondary load connector suspended from the secondary boom structure (55), a secondary luffing mechanism configured to cause luffing motion of the secondary boom structure (55), wherein the counter force member (59) is connected to the secondary boom (56) of the crane (20) via the secondary load connector, and whilst the object (1,60) is connected to the crane (20) via the primary load connector, submerged in the sea water at the side of the vessel (10) opposite to the side at which the object (1 ,60) extends, wherein upon heel of the vessel (1) towards the side of the object (1,60), the counter force member (59) is moved upwards through the sea water, therein providing resistance to upward movement so as to counter at least in part the vessel heel.
37. Method according to claim 36, comprising: connecting the counter force member (59) to the crane (20), operating the crane, that is, the primary or secondary hoisting winch, respectively, to lower the counter force member (59) into the sea, e.g. onto the seabed (sb) to be supported thereby, connecting the object (1 ,60) to be supported to the primary load connector and, with the counter force member (59) connected to the crane via the secondary load connector, performing the offshore operation at one side of the vessel (10), wherein the counter force member (59) is submerged below the waterline (wl) at the other side of the vessel (10), e.g. resting on the seabed.
38. Method according to claim 36 or 37, wherein the counter force member (59) is supported on the seabed (sb) when the vessel (10) does not encounter heel, and is moved upwards to be supported by the crane (20) upon heel of the vessel.
39. Method according to any one or more of claims 36 - 38, wherein the counter force member (59) is embodied as a dead weight, with a mass that is at least in the range of magnitude of that of the object (1,60), e.g. wherein the object is a pile hammer (60) and/or pile (1) and the mass of the dead weight is in the range of magnitude of 100 mt or 1000 mt.
40. Method according to any one or more of claims 36 - 38, wherein the counter force member (59) is embodied as a tank, the method comprising filling the tank, e.g. with sea water or a heavier liquid, e.g. drilling mud, e.g. wherein the filling takes place upon submerging of the tank via one or openings, e.g. by the opening of one or more valves which are closed after the filling, e.g. wherein the tank is configured hold an amount of liquid having a mass in the range of magnitude of the object, e.g. wherein the object is a pile hammer (60) and/or pile (1).
RECTIFIED SHEET (RULE 91) ISA/EP
EP24790392.5A 2023-10-13 2024-10-11 Offshore pile driving Pending EP4791676A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL2036024A NL2036024B1 (en) 2023-10-13 2023-10-13 Offshore pile driving
PCT/EP2024/078728 WO2025078625A1 (en) 2023-10-13 2024-10-11 Offshore pile driving

Publications (1)

Publication Number Publication Date
EP4791676A1 true EP4791676A1 (en) 2026-08-19

Family

ID=90810348

Family Applications (1)

Application Number Title Priority Date Filing Date
EP24790392.5A Pending EP4791676A1 (en) 2023-10-13 2024-10-11 Offshore pile driving

Country Status (3)

Country Link
EP (1) EP4791676A1 (en)
NL (1) NL2036024B1 (en)
WO (1) WO2025078625A1 (en)

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2011001C2 (en) 2013-06-18 2014-12-22 Ihc Hydrohammer B V Method of and driver for installing foundation elements in a ground formation.
NL2011003C2 (en) 2013-06-18 2014-12-22 Ihc Hydrohammer B V Pile driving methods and systems.
PT3985174T (en) 2014-06-10 2026-05-28 Cape Holland Holding B V Vibrating device and method for inserting a foundation element into the ground
NL2018066B1 (en) 2016-12-23 2018-07-02 Itrec Bv A method for installation of a pile adapted to support an offshore wind turbine, wave-induced motion compensated pile holding system, vessel, and pile holder.
JP6714160B2 (en) 2017-07-10 2020-06-24 株式会社日立製作所 DATA LINEAGE DETECTION DEVICE, DATA LINEAGE DETECTION METHOD, AND DATA LINEAGE DETECTION PROGRAM
KR102809597B1 (en) 2019-01-21 2025-05-20 아이티알이씨 비. 브이. Pile driving method and pile driving system
NL2025191B1 (en) 2019-06-28 2021-05-31 Ihc Holland Ie Bv Pile-driver and method
BE1028547B1 (en) 2020-08-17 2022-03-14 Deme Offshore Be Nv HOISTING DEVICE FITTED WITH AN AUXILIARY DEVICE TO REDUCE BOOM SKIP IN THE EVENT OF SUDDEN LOAD LOSS
US12529198B2 (en) 2020-12-17 2026-01-20 Itrec B.V. Recirculating cylindrical rollers assembly for supporting an object on a rail, e.g. in a pile holding system
NL2028729B1 (en) 2021-07-15 2023-01-20 Itrec Bv Pile holder, vessel and pile installation method
EP4596792A3 (en) 2021-10-28 2025-10-29 Itrec B.V. Method for installation of a monopile and installation vessel
US12612754B2 (en) 2022-03-17 2026-04-28 Itrec B.V. Pile installation
EP4359297B1 (en) * 2022-03-18 2025-01-29 TotalEnergies OneTech A method of installing a monopile in a seabed using a transportation barge or vessel
KR20250139814A (en) 2022-12-16 2025-09-23 아이티알이씨 비. 브이. Large-diameter pile construction method and system

Also Published As

Publication number Publication date
WO2025078625A1 (en) 2025-04-17
NL2036024B1 (en) 2025-04-30

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE