EP4677224A1 - Monitoring the operation of a wind turbine - Google Patents
Monitoring the operation of a wind turbineInfo
- Publication number
- EP4677224A1 EP4677224A1 EP24727305.5A EP24727305A EP4677224A1 EP 4677224 A1 EP4677224 A1 EP 4677224A1 EP 24727305 A EP24727305 A EP 24727305A EP 4677224 A1 EP4677224 A1 EP 4677224A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- wind turbine
- upgraded
- power output
- upgrade
- torque
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D17/00—Monitoring or testing of wind motors, e.g. diagnostics
- F03D17/009—Monitoring or testing of wind motors, e.g. diagnostics characterised by the purpose
- F03D17/026—Monitoring or testing of wind motors, e.g. diagnostics characterised by the purpose for assessing power production capabilities
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D17/00—Monitoring or testing of wind motors, e.g. diagnostics
- F03D17/005—Monitoring or testing of wind motors, e.g. diagnostics using computation methods, e.g. neural networks
- F03D17/006—Estimation methods
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D17/00—Monitoring or testing of wind motors, e.g. diagnostics
- F03D17/009—Monitoring or testing of wind motors, e.g. diagnostics characterised by the purpose
- F03D17/021—Monitoring or testing of wind motors, e.g. diagnostics characterised by the purpose for monitoring power or current
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2230/00—Manufacture
- F05B2230/80—Repairing, retrofitting or upgrading methods
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2260/00—Function
- F05B2260/82—Forecasts
- F05B2260/821—Parameter estimation or prediction
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2260/00—Function
- F05B2260/84—Modelling or simulation
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2270/00—Control
- F05B2270/30—Control parameters, e.g. input parameters
- F05B2270/327—Rotor or generator speeds
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2270/00—Control
- F05B2270/30—Control parameters, e.g. input parameters
- F05B2270/335—Output power or torque
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Definitions
- the present invention relates to a method of monitoring an operation of a wind turbine, wherein the wind turbine is an upgraded wind turbine that comprises at least one performance-enhancing upgrade. It further relates to a respective monitoring system, to a wind turbine and to a computer program.
- wind turbines When operating wind turbines, it is desirable to increase the energy production. It is known to provide wind turbines with performance-enhancing upgrades to increase the electrical power generation. Examples are hardware upgrades, such as modifications of the aerodynamics of the wind turbine blades, or software upgrades that change the way in which the wind turbine is controlled, for example by overrating the wind turbine or by generating power in areas of the operating characteristic in which the wind turbine would normally not generate power.
- the wind turbine operational range may for example be extended or a curtailment may be removed by a respective performanceenhancing upgrade.
- a wind turbine comprising such upgrade is referred herein as an upgraded wind turbine.
- the document CN 114 912 807 A describes a method and system for evaluating the effect of improving power generation after a technical transformation of a wind turbine generator.
- the method determines the annual energy production (AEP) of the wind turbine in a time period before the technical transformation and further determines the AEP of the wind turbine in a time period after the technical transformation.
- the increase in power generation after the technical transformation is determined based on the difference between the determined AEP values.
- a method of monitoring an operation of a wind turbine wherein the wind turbine is an upgraded wind turbine that comprises at least one performance-enhancing upgrade that increases the energy production of the wind turbine compared to the wind turbine without the upgrade.
- an additional active power output of the upgraded wind turbine that is caused by the performanceenhancing upgrade is monitored.
- the monitoring compares an active power output of the upgraded wind turbine to an estimated active power output of a reference wind turbine that corresponds to the upgraded wind turbine without the at least one performance-enhancing upgrade.
- the monitoring comprises obtaining at least two operating parameters (in particular actual or current operating parameters) of the upgraded wind turbine during operation, wherein the at least two operating parameters include at least the active power output of the upgraded wind turbine.
- an estimate of the active power output of the reference wind turbine is derived.
- the method further includes estimating the additional active power output caused by the performance-enhancing upgrade from the active power output of the upgraded wind turbine and the estimated active power output of the reference wind turbine, for example by taking a difference between the respective parameters.
- the method makes the estimate of the active electrical power output of the reference wind turbine on the basis of the at least two operating parameters, which are acquired during the actual wind turbine operation, the current operating conditions and the (physical) conditions of the wind turbine are reflected in the estimate. Accordingly, the estimate may be rather precise and may as a result deliver a quite precise estimation of the additional active power output that is achieved by the performanceenhancing upgrade.
- the current operating parameters that are obtained may depend on current ambient conditions, such as turbulence, yaw misalignment and the like. They may further depend on specific turbine properties, such as a degraded performance due to worn rotor blade surfaces, ice and the like. Deriving the estimate from such operating parameters obtained during operation may thus take such operational states and conditions into account.
- the additional active power output due to the upgrade can be estimated relatively precisely over most of the operational range of the wind turbine, including a partial load range and full load range. Further, such method may account for energy production above the cut-out wind speed of the reference wind turbine. Even further, by using operating parameters obtained during operation, fluctuations in the power output of the wind turbine may be taken into account and may not result in an erroneous estimation of the additional active power output. As an example, for the reference wind turbine without the upgrade, such fluctuations may result in a power output above the nominal power output of the reference wind turbine; a method that evaluates power production above the nominal output power would attribute such power fluctuations to the performance enhancing upgrade, which is incorrect. By obtaining the actual operating parameters during operation, such errors may be avoided and the precision may be increased.
- the reference wind turbine may be the same as, in particular identical to, the wind turbine without the upgrade.
- the method may thus estimate how this wind turbine would produce power without the upgrade, based on operating parameters obtained during operation of the upgraded wind turbine that includes the upgrade.
- Obtaining the operating parameters may in particular comprise acquiring actual or current operating parameters (in particular respective values or data) during the operation of the upgraded wind turbine.
- a real-time data acquisition may for example be performed.
- Deriving the estimate of the active power output and the estimating of the additional active power output may likewise be performed in real-time based on the acquired operating parameters.
- the deriving of the estimate comprises considering dynamic fluctuations of the active power output of the reference wind turbine.
- Such dynamic fluctuations may for example be due to fluctuations of the operating parameters and may accordingly be considered by considering respective fluctuations of the operating parameters.
- Dynamic fluctuations may be caused by changes in wind speed. Considering such fluctuations may improve the accuracy of the estimation, in particular compared to a comparison to a fixed limit.
- the dynamic fluctuations may for example be considered by deriving dynamic fluctuations of one or more operating parameters of the upgraded wind turbine from the at least two obtained operating parameters.
- fluctuations of such operating parameter may be derived by comparing the obtained values of the operating parameter (i.e. current values obtained during operation) to a reference, e.g. a mean value or a set-point, for the respective operating parameter.
- the dynamic fluctuations of corresponding one or more operating parameters of the reference wind turbine may be estimated so as to correspond (e.g., be the same as, or be equal to) the dynamic fluctuations derived for the upgraded wind turbine.
- Such method may facilitate the estimation while considering actual fluctuations occurring during operation. It has been found that the fluctuations that occur during real operation of the upgraded wind turbine are a surprisingly good estimate of the fluctuations that would occur without the upgrade, i.e. for the reference wind turbine. Such estimation of the dynamic fluctuations for the reference wind turbine thus delivers quite accurate results.
- the at least two operating parameters further comprise (besides the active power output) a measured operating parameter measured during operation of the upgraded wind turbine and a set-point for an operating parameter of the upgraded wind turbine, in particular for the same operating parameter.
- a measured operating parameter measured during operation of the upgraded wind turbine and a set-point for an operating parameter of the upgraded wind turbine, in particular for the same operating parameter.
- the performance-enhancing upgrade may also be termed performance-enhancing feature; it may refer to a modification made to the wind turbine, e.g. by adding a hardware feature and/or a control feature and/or a parameter optimization, which increases the energy production of the wind turbine.
- the performance-enhancing upgrade may for example comprise a hardware upgrade and/or a control upgrade (e.g. a software upgrade or parameter upgrade), which increases the energy production of the wind turbine.
- a software upgrade or parameter upgrade may for example change the control method of the wind turbine such that the power production is increased, e.g. by changing an operating characteristic according to which the wind turbine is controlled.
- Examples are power boost, in which the wind turbine is overrated in certain operating ranges, a speed boost in which the rotational speed of the wind turbine rotor is increased in predetermined operational ranges, or a soft cut-out (SCO) upgrade, in which the wind turbine continues operation at wind speeds exceeding a cut-out wind speed of the reference wind turbine.
- a hardware upgrade may for example be an addon for a rotor blade, such as a lift-enhancing device that is attached to the rotor blade, and the like.
- the at least one performance-enhancing upgrade comprises at least an upgrade that increases a nominal rotational speed of a wind turbine rotor of the wind turbine and/or an upgrade that increases a nominal torque of a wind turbine rotor of the wind turbine.
- Such upgrades may essentially overrate the wind turbine and may provide an increased power output.
- a nominal value refers to a value at which the wind turbine is to be operated in accordance with its specifications (e.g., as prescribed by the manufacturer), which generally poses a limit to the operation of the wind turbine without upgrades.
- a nominal value may in particular be a rated value of the respective wind turbine.
- the at least one performance-enhancing upgrade may comprise one or a combination of an upgrade that increases the nominal output power of the wind turbine, an upgrade that modifies the power curve of the wind turbine to increase the power output during partial load and/or nominal load operation, an upgrade that extends an operational range of the wind turbine, in particular a wind speed range in which the wind turbine generates electrical power, an upgrade that removes a curtailment of the operation of the wind turbine, such as a sector curtailment (which may occur when performing wind sector management in a wind farm) or a sound curtailment, and/or a hardware upgrade, such as a rotor blade add-on.
- an upgrade that increases the nominal output power of the wind turbine an upgrade that modifies the power curve of the wind turbine to increase the power output during partial load and/or nominal load operation
- an upgrade that extends an operational range of the wind turbine in particular a wind speed range in which the wind turbine generates electrical power
- an upgrade that removes a curtailment of the operation of the wind turbine such as a sector curtailment (which
- An exemplary upgrade is for example a power boost feature that increases the power output of the wind turbine by increasing the power limit of the wind turbine under predetermined wind conditions.
- deriving the estimate is performed so as to consider differences in the active power output of the upgraded wind turbine and the active power output of the reference wind turbine in an operating range below a nominal active power output of the reference wind turbine.
- differences in the active power output between the upgraded wind turbine and the reference wind turbine in a partial load operating range of the reference wind turbine may be considered when deriving the estimate.
- the estimate may be more precise, as it does not only consider additional power production on top of the nominal active power output of the reference wind turbine due to the upgrade, but may also consider changes to the active power output due to the upgrade during partial load operation.
- Deriving the estimate may be performed by employing a model of the reference wind turbine and/or of the upgraded wind turbine and estimating the active power output of the reference wind turbine from the model.
- the model may for example be a mathematical model, a physical model and/or a statistical model. By acquiring the current operating parameters of the upgraded wind turbine, such model may allow a precise estimation of the active power output of the reference wind turbine.
- the model of the reference wind turbine may in particular be a model of the upgraded wind turbine without the performance enhancing upgrade.
- the reference wind turbine may be the same as (e.g. may be identical to) the upgraded wind turbine without the performance enhancing upgrade, and may be modelled by the respective model.
- Deriving the estimate may for example comprise back-calculating from the at least two obtained operating parameters one or more corresponding operating parameters of the reference wind turbine. Such back-calculating may be based on a respective model. Using such back-calculating may facilitate deriving a precise estimation of the reference wind turbine’s active power output.
- the at least two obtained operating parameters may further comprise a rotational speed of a wind turbine rotor of the upgraded wind turbine and/or a torque of the wind turbine rotor of the upgraded wind turbine and/or a wind speed obtained for the upgraded wind turbine.
- a rotational speed of a wind turbine rotor of the upgraded wind turbine may be used in the estimation.
- a respective back-calculation may be performed for such one or more obtained operating parameters.
- rotational speed refers herein to the rotational speed of the wind turbine rotor of the respective wind turbine (reference wind turbine or upgraded wind turbine).
- the back-calculation may for example comprise the estimation of rotational speed and/or torque of the wind turbine rotor of the reference wind turbine for currently obtained values of rotational speed and/or torque of the wind turbine rotor of the upgraded wind turbine, respectively.
- the operating parameters may be obtained by measuring, receiving and/or deriving the respective operating parameters.
- at least rotor speed and one of torque and wind speed are obtained.
- the rotor speed may be measured, and the torque may be derived from the obtained active power output and the measured rotor speed.
- Wind speed may for example be measured, or may be obtained, for example from an estimator of a wind turbine controller or the like.
- a monitoring system that performs the monitoring may for example receive the respective parameter values via a data connection, e.g. from a controller of the wind turbine, from a wind farm controller or the like.
- Deriving of the estimate may further consider one or more nominal operating parameters of the reference wind turbine.
- a nominal rotational speed of the wind turbine rotor of the reference wind turbine and/or a nominal torque of the wind turbine rotor of the reference wind turbine and/or a nominal active power output of the reference wind turbine may be considered for deriving the estimate.
- the use of such nominal operating parameters may facilitate deriving the additional power generation due to the upgrade and may make the estimation more precise.
- the method may include obtaining the respective one or more nominal operating parameters, e.g. by retrieving from a memory or receiving via a data connection.
- deriving the estimate may comprise estimating a power coefficient Cp of the reference wind turbine and estimating the active power output of the reference wind turbine based on the estimated power coefficient.
- the power coefficient generally refers to the ratio of the actual active electric power produced by a wind turbine divided by the total wind power flowing into the turbine blades at a particular wind speed, i.e. flowing through the rotor disk. It has been found that by using such relatively simple physical model, a rather precise estimation of the active power output of the reference wind turbine becomes possible. Deriving the estimation may limit the estimated active power output of the reference wind turbine to a sum of a nominal power output of the reference wind turbine and dynamic power output fluctuations. A minimum function may be used for such limitation.
- Estimating the active power output of the reference wind turbine may for example comprise estimating, from a wind speed estimated for the reference wind turbine, a wind power for a rotor disk of a wind turbine rotor of the wind turbine and multiplying the wind power by the estimated power coefficient.
- the rotor disk may in particular be the area swept by the blades of the wind turbine rotor of the reference wind turbine.
- an estimated power loss is further subtracted.
- Such power loss which may e.g. be due to power conversion efficiency within the wind turbine and the like, may be obtained by a calibration.
- the wind speed for the reference wind turbine may be estimated as described further below; it may not necessarily correspond to a measured wind speed. By such method, the precision of the estimation may further be improved.
- the estimating of the power coefficient of the reference wind turbine may comprise estimating a rotational speed of the wind turbine rotor of the reference wind turbine, obtaining a wind speed for the reference wind turbine, and estimating a tip speed ratio of the reference wind turbine based on the estimated rotational speed and the obtained wind speed.
- the estimated power coefficient may then be determined from the estimated tip speed ratio.
- the estimation of the rotational speed of the wind turbine rotor may again be based on a rotational speed obtained for the upgraded wind turbine and a respective back-calculation.
- a function fcp.max that represents the C P -map of the reference wind turbine may for example be used.
- Such C P -map may provide the relationship between tip speed ratio, C P , and pitch-angle for the particular wind turbine, the pitch angle generally being known (e.g. obtained from a wind turbine controller) and generally corresponding to a maximum aerodynamic efficiency during part load operation.
- the at least two operating parameters may comprise a wind speed obtained for the upgraded wind turbine (e.g. an estimated or measured wind speed) and a rotational speed of the wind turbine rotor of the upgraded wind turbine. Estimating the rotational speed may be based on the rotational speed obtained for the upgraded wind turbine.
- the wind speed for the reference wind turbine may be obtained from the wind speed that has been obtained for the upgraded wind turbine.
- the estimated wind speed may be limited to a sum of a nominal wind speed of the reference wind turbine and optionally an estimated wind speed offset, which may for example account for respective conversion losses.
- the nominal wind speed may be the wind speed at which the reference wind turbine achieves a nominal power output.
- the estimated wind speed for the reference wind turbine may thus correspond to the wind speed obtained for the upgraded wind turbine limited by the respective sum.
- the wind speed obtained for the upgraded wind turbine may be a measured wind speed or may be an estimated wind speed derived by an estimator of the upgraded wind turbine.
- a measured wind speed may not accurately reflect the wind speed that is experienced by the wind turbine rotor of the upgraded wind turbine, for example if the wind hits the rotor at an angle, e.g. due to yaw angle misalignment, wake effects, and other factors. Further, measured wind speed suffers from large fluctuations. It may accordingly be more precise to estimate the wind speed from the operating parameters of the upgraded wind turbine, which may for example continuously be performed by a wind turbine controller. Such estimate may thus be received by the monitoring from a respective controller.
- the wind speed may be estimated from the active power output, the rotational speed, and the C P -map of the upgraded wind turbine.
- the rotational speed may be provided in different units which are easily converted, such as in revolutions per second (n) or in radians per second (co).
- deriving the estimate may comprise estimating a rotational speed and a torque for a wind turbine rotor of the reference wind turbine and calculating the estimate of the active power output of the reference wind turbine from the estimated rotational speed and the estimated torque.
- the derivation of the estimate may be facilitated while still achieving a sufficient accuracy of the estimate.
- one or both of the rotational speed and the torque may consider dynamic fluctuations.
- the estimate of the rotational speed and/or the torque may be limited by a sum of a nominal value of the speed and/or torque for the reference wind turbine and dynamic fluctuations of the rotational speed and/or torque, respectively.
- dynamic fluctuations may be derived from the operational parameters obtained during operation of the upgraded wind turbine.
- the estimated rotational speed and/or torque for the reference wind turbine may be set to correspond to the rotational speed and/or torque, respectively, obtained for the upgraded wind turbine.
- the obtained at least two operating parameters may comprise an obtained (e.g. measured or derived) torque of the upgraded wind turbine.
- the estimated torque estimated for the reference wind turbine may be determined by or limited by a (linearly) interpolated torque value that corresponds to the obtained torque multiplied by a (linear) correction factor. In such way, a power increase in a partial load region due to the upgrade may be considered, and the accuracy of the estimate of the additional active power output may further be improved.
- such way of estimating the torque for the reference wind turbine and thus the output power of the reference wind turbine may consider an increased efficiency of the rotor that is due to the increase in the rotational speed of the rotor (besides considering the additional power production that is due to the increased rotational speed itself).
- the correction factor may be determined empirically, in particular by choosing the factor so that the estimate corresponds to the active power output of the reference wind turbine without the upgrade, for example by employing a simulation.
- the interpolated torque value may in particular be linearly interpolated between the obtained torque at the first value and the nominal operational torque of the upgraded wind turbine multiplied by the correction factor at the second value.
- the correction factor may be proportional to a ratio between the nominal output power of the reference wind turbine and the (external) power set-point of the upgraded wind turbine. Linearly interpolating between these two torque values and applying the correction factor may result in a precise estimation.
- the power set-point of the upgraded wind turbine may in particular correspond to or may be equal to the nominal output power of the upgraded wind turbine at the nominal torque of the upgraded wind turbine.
- the monitoring may comprise monitoring the additional active power output for a period of time and determining from the monitored active power output an energy production of the wind turbine during the period of time which is caused by the performance-enhancing upgrade. A precise estimation of the additionally produced energy may thus be obtained.
- the at least two operating parameters may comprise a wind speed obtained for the upgraded wind turbine, and the deriving of the estimate may comprise equating the estimated active power output of the reference wind turbine to a value of zero if the obtained wind speed is above a cut-out wind speed of the reference wind turbine.
- This may be employed additionally or alternatively to the above-described estimations.
- an upgrade that allows the wind turbine to produce electrical power at wind speeds above the cut-out wind speed may be considered in the estimation.
- any of the other estimation methods may be employed. Accordingly, even if multiple upgrades are provided on the wind turbine that have power-increasing effects for different parts of the operating range, a precise estimation of the additional power production may be achieved.
- a method of operating a wind turbine wherein the wind turbine is an upgraded wind turbine that comprises at least one performanceenhancing upgrade that increases the energy production of the wind turbine compared to the wind turbine without the upgrade, and wherein the method includes generating electrical power by the wind turbine and performing during the generating of electrical power a method of monitoring the operation of the wind turbine according to any of the aspects and embodiments described herein to detect an additional active power output of the upgraded wind turbine that results from the performance-enhancing upgrade.
- a monitoring system configured to monitor a wind turbine
- the wind turbine is an upgraded wind turbine that comprises at least one performance-enhancing upgrade that increases the energy production of the wind turbine compared to the wind turbine without the upgrade.
- the monitoring system is coupled to the upgraded wind turbine to obtain at least two operating parameters of the upgraded wind turbine during operation of the upgraded wind turbine.
- the monitoring system is configured to perform any of the methods described herein. By means of such monitoring system, advantages similar to the ones outlined further above may be achieved.
- a wind turbine comprising a respective monitoring system is provided.
- the monitoring system may be provided within the wind turbine, for example in a nacelle thereof.
- the monitoring system may for example be integrated with a wind turbine controller, or may be provided separate therefrom.
- a computer program for monitoring the operation of a wind turbine wherein the wind turbine is an upgraded wind turbine that comprises at least one performance-enhancing upgrade that is configured to increase the energy production of the wind turbine compared to the wind turbine without the upgrade.
- the computer program comprises control instructions which, when executed by a processing unit of a monitoring system that monitors the operation of the wind turbine, cause the processing unit to perform any of the methods described herein.
- Such computer program in particular the instructions, may be provided on a volatile or non-volatile data carrier or storage device.
- a further aspect is disclosed, and/or in particular as an embodiment of one of a precedingly described aspect(s) and/or embodiment(s), namely, a method for operating a wind turbine, in particular an offshore wind turbine, further in particular a floating offshore wind turbine, and/or for feeding electrical and/or chemical energy to an electricity and/or chemical grid, the method comprising the following steps: executing steps of an embodiment or of a combination of embodiments of a method as disclosed supra; generating, by the wind turbine, electrical power and/or electrical energy, and in particular generating at least partially from the electrical energy, further in particular, by transforming electrical energy into hydrogen by electrolysis, chemical energy in form of a gas or liquid, in particular in the form of hydrogen; transmitting, at least partially, the electrical power, the electrical energy, and/or the chemical energy to an energy receiving arrangement, in particular wherein the receiving arrangement is not positioned in international waters, is positioned onshore, and/or is positioned within a 12-miles-zone of a respective sovereign national state over which
- chemical energy includes means for storing energy in a chemical substance such as in hydrogen.
- a chemical energy grid could for example be a gas (hydrogen) grid and/or storage device.
- the monitoring system or the wind turbine may in particular be configured to carry out any of the method steps described herein, and the method may be carried out by a monitoring system or wind turbine having any of the configurations described herein.
- the method may include any of the steps described with respect to other components of the wind turbine, such as the measuring of any operating parameter by a wind turbine controller and the like.
- the monitoring system may comprise any other components of the wind turbine, such as one or more respective sensors for measuring one or more of the operating parameters disclosed herein or a wind turbine controller that provides such operating parameters; the monitoring system may form part of a respective wind turbine controller.
- Fig. 1 is schematic drawing showing a wind turbine including a monitoring system according to an embodiment.
- FIG. 2 is schematic drawing showing a monitoring system according to an embodiment.
- Fig. 3 is a flow diagram illustrating a method according to an embodiment.
- Fig. 4 is a flow diagram illustrating a particular implementation of a step of the method of Fig. 3 according to an embodiment.
- Fig. 5 is a flow diagram illustrating a further implementation of a step of the method of Fig. 3 according to an embodiment.
- Fig. 6 shows schematic diagrams illustrating an additional active power output of an upgraded wind turbine estimated according to the method of Fig. 4.
- Fig. 7 shows schematic diagrams illustrating an additional active power output of an upgraded wind turbine estimated according to the method of Fig. 5.
- Fig. 8 shows schematic diagrams illustrating different parameters of the estimation of the additional active power output of the upgraded wind turbine when using the method of Fig. 5.
- Fig. 1 schematically illustrates a wind turbine 100 that comprises a wind turbine tower 105, on which nacelle 101 is mounted.
- Wind turbine 100 comprises a rotor 110 including rotor blades 111 and a hub 112.
- Wind turbine 100 further comprises an electric power generating system 120, which may include a generator 121 coupled to rotor 110, a converter 122, and optionally a transformer 123.
- Power generating system 120 may have any known configuration, it may for example implement a full converter topology or a doubly-fed induction generator (DFIG) topology.
- Wind turbine 100 may operate in any known manner and may be an onshore or offshore wind turbine.
- DFIG doubly-fed induction generator
- Wind turbine 100 includes one or more performance enhancing upgrades 90.
- a performance enhancing upgrade 90 in form of an add-on for rotor blades 111 is illustrated.
- An example are lift-enhancing flaps, trailing edge add-ons, and the like.
- Performance-enhancing upgrade 90 may additionally or alternatively include a software upgrade, such as an upgrade that modifies the control of wind turbine 100.
- Wind turbine 100 may include a wind turbine controller that controls the wind turbine in accordance with an operating characteristic and with certain operating limits. The performance-enhancing upgrade may modify such characteristic and/or limits.
- the upgrade may increase a nominal rotor speed of rotor 110 and/or increase a nominal torque of the wind turbine and/or increase a nominal power output of the wind turbine and/or modify parameters of the operating characteristic to increase the power output during partial load operation and/or nominal load operation, and/or extend an operational range of wind turbine 100.
- the wind turbine 100 without the upgrade is referred to herein as reference wind turbine.
- the upgrade may increase the nominal power output to 2.1 MW and thus may overrate the wind turbine (e.g., at the expense of lifetime).
- the wind turbine may further be controlled with limits in the form of curtailments, such as a sound curtailment (to reduce a sound generation) or a sector curtailment.
- the performance-enhancing upgrade may comprise the removal of such curtailment. Accordingly, by the one or more performanceenhancing upgrades 90, the output power of wind turbine 100 may be increased. Wind turbine 100 is thus an upgraded wind turbine.
- Wind turbine 100 comprises a monitoring system 10 for monitoring the increase in active power output due to the one or more performance-enhancing upgrades 90.
- Monitoring system 10 obtains two or more operating parameters of upgraded wind turbine 100 during operation. Values for the two or more operating parameters may be acquired in real-time during operation.
- the operating parameters include at least an active power P that is output by wind turbine 100. They may further include a rotational speed n of wind turbine rotor 110, a wind speed v for the wind turbine 100, and/or a torque M of rotor 110.
- the operating parameters may be obtained by receiving them, e.g. from a controller of the power generation system 120 as illustrated in Fig. 1 , such as from a wind turbine controller, by measuring them, e.g.
- a measuring unit 15 e.g., a sensor illustrated exemplarily for the wind speed v, or by deriving them.
- the torque M may be derived from a measured or received power P and rotational speed n.
- the active power P may for example be measured by measuring a voltage and current before or behind the transformer 123.
- Monitoring system 10 estimates the additional active power output of the wind turbine 100 that is due to the performance-enhancing upgrade 90.
- Monitoring system 10 may comprise a processing unit 11 and a memory 12 that stores control instructions which, when executed by processing unit 11 , perform any of the methods disclosed herein, and may in particular employ any of the disclosed estimating methods for the additional active power output.
- the processing unit 11 may be any type of processor, such as a microprocessor, an application specific integrated circuit, a digital signal processor or the like.
- Memory 12 may include volatile and non-volatile memory, in particular RAM, ROM, EEPROM, FLASH-memory, hard disc drives and the like.
- Monitoring system 10 may further include respective input/output interfaces for receiving signals to obtain the operating parameters and for communicating with sensors and/or external data sources, via which further operating parameters, such as wind speed, may be obtained.
- Monitoring system 10 may further include a user interface and other communication interfaces, e.g. to provide the result of the monitoring to an operator or to further processing. Monitoring system 10 may also be provided outside the wind turbine 100 and may be coupled to the wind turbine 100 to perform data communication, e.g. to obtain the operating parameters.
- Monitoring system 10 may in particular estimate the active power of the reference turbine, i.e. the active power that would be output by the wind turbine 100 without the one or more upgrades 90.
- monitoring system 10 may employ a model of the reference wind turbine, which may be a mathematical and/or a physical model, or a statistical model, or any combination thereof.
- the active power output of the reference wind turbine may in particular be calculated by a backward calculation method that employs the current obtained two or more operating parameters of the upgraded wind turbine 100.
- the obtained operating parameters may be employed by the model to provide the estimation of the active power output of the reference wind turbine.
- Fig. 2 illustrates a particular implementation of the monitoring system 10 of Fig. 1.
- Estimation unit 21 of the monitoring system 10 estimates the active power output Pest, ref of the reference wind turbine from the at least two operating parameters 20. These may include measured rotational speed nmeas, measured wind speed Vwind.meas, torque Mmeas, and active power output of the upgraded wind turbine Pmeas. As mentioned above, some of these parameters are optional and the parameters may be derived one from the others; only estimated wind speed and no torque measurement may for example be obtained.
- the obtained operating parameters 20 may further include one or more operating set-points SP, which may for example be obtained from the wind turbine controller, a converter controller, or other control units of wind turbine 100. It should be clear that figure 2 schematically illustrates different possibilities for obtaining operating parameters and set-points. The operating parameters and set-points that are actually obtained for the estimation will depend on the particular implementation. Exemplary implementations are described in detail below; only the operating parameters and setpoints used by the respective estimation may be obtained by estimation unit 21 in the respective example.
- a method that may be performed by the monitoring system 10 is exemplarily illustrated in the flow diagram of Fig. 3.
- the operating parameters 20 of the upgraded wind turbine are obtained during operation, including the active power out Pmeas. Parameter values may be acquired, e.g. by measurement, may be received (digitally or as an analog signal), and/or may be derived (essentially) in real-time.
- Operating set-points SP may optionally be obtained from the upgraded wind turbine in step 32.
- nominal operating parameters of the reference wind turbine may be obtained. These may for example be retrieved from a memory of monitoring unit 10 or of a control system of the wind turbine.
- Nominal operating parameters will preferably include at least a nominal rotational speed of rotor 110 of the reference wind turbine, and may further include a nominal wind speed for the reference wind turbine, a nominal active power output of the reference wind turbine, a nominal torque of the reference wind turbine and any combination thereof, depending on the estimation method.
- step 34 the estimation unit 21 estimates from the obtained operating parameters and optionally the nominal operating parameters of the reference wind turbine the active power output Pest, ref of the reference wind turbine as described in more detail herein below.
- step 35 the additional active power output dP of the upgraded wind turbine that is due to the performance-enhancing upgrade is determined on the basis of the measured active power output Pmeas of the upgraded wind turbine and the estimated active power output Pest, ref of the reference wind turbine. In Fig. 2, this may occur at summation node 22 where the estimated active power output Pest, ref is subtracted from the measured active power output Pmeas.
- a precise estimation of the additional active power output dP of the upgraded wind turbine that results from the performanceenhancing upgrade and that depends on the current operating conditions as well as the current state of the wind turbine is thereby obtained.
- the additional active power output dP may further be integrated or summed for a certain period of time at unit 23 in order to obtain the additional energy production dE of the upgraded wind turbine that results from the performance-enhancing upgrade. Consequently, it becomes possible to evaluate precisely how much additional energy is produced by providing the one or more performance-enhancing upgrades 90 on the wind turbine 100.
- Unit 23 is optional.
- control system 10 may be implemented as control instructions that are stored in memory 12 and that are executed by processing unit 11 of control system 10. Implementations as dedicated digital signal processors or application specific integrated circuits are likewise conceivable.
- Fig. 4 illustrates a particular implementation of the estimation step 34 of Fig. 3 in which the estimate for the active power output of the reference wind turbine is derived.
- a rotational speed is estimated for the reference wind turbine under consideration of dynamic fluctuations. This may occur by obtaining the rotational speed of the wind turbine rotor of the upgraded wind turbine and further obtaining a set point for the rotational speed for the upgraded wind turbine and subtracting these quantities to obtain the dynamic fluctuations for the upgraded wind turbine.
- the rotational speed n es t(t) of the reference wind turbine may then be set to the minimum of the sum of the nominal rotational speed of the wind turbine and the dynamic fluctuations, and the measured rotational speed.
- n m eas(t) is the measured rotational speed of the upgraded wind turbine
- n re f is the nominal rotational speed of the reference wind turbine
- ndyn(t) are the dynamic rotational speed fluctuations of the upgraded wind turbine
- n S et,controi(t) is the set point of the rotational speed of the upgraded wind turbine
- ‘min’ is the minimum function that returns the smaller of the two quantities in the bracket.
- the torque of the reference wind turbine may be estimated in step 42 under consideration of dynamic torque fluctuations, based on the torque fluctuations of the upgraded wind turbine.
- the estimated torque for the reference wind turbine can in particular be determined by the following equations: wherein
- Mmeas(t) is the measured torque of the upgraded wind turbine
- Mref is the nominal torque of the reference wind turbine
- Mdyn(t) are the dynamic torque fluctuations of the upgraded wind turbine
- Mset,controi(t) is the set point of the torque of the upgraded wind turbine.
- the active power output of the reference wind turbine can be estimated in step 44 according to the following equation:
- Fig. 6 illustrates diagrams that have been obtained by operating a reference wind turbine and the corresponding upgraded wind turbine under realistic conditions using a simulation with respective wind speed distributions. The upper diagram of Fig.
- curve 61 illustrates the power output of the reference wind turbine (without the upgrade) and curve 62 illustrates the power output of the upgraded wind turbine.
- curve 62 illustrates the power output of the upgraded wind turbine.
- the additional power output due to the upgrade has been estimated and has been added to curve 61 , thus resulting in the estimated curve 63 for the total power output of the reference wind turbine plus the additional power output estimated for the upgrade.
- curve 63 substantially corresponds to curve 62.
- the lower diagram of Fig. 6 illustrates the additional active power output dP that is due to the performance-enhancing upgrade.
- Curve 65 illustrates the actual difference between the two simulated curves 61 and 62.
- Curve 66 shows the estimation in accordance with the method of Fig. 4 based on the current operating parameters of the upgraded wind turbine. As can be seen, the estimate is quite precise and corresponds to the actual additional active power output for most of the wind speeds. Although the estimation explained above is relatively simple, good results are already achieved.
- the estimation may be modified by the optional step 43.
- the reference wind turbine without the upgrade may reach a certain torque at a nominal rotational speed of the reference wind turbine, wherein this characteristic torque is termed Mswitch herein. Since the performance upgrade may result in higher rotational speeds, the operational states are modified, and the rotor efficiency may further be increased. This is not considered in the above explained method.
- a more precise estimation may thus be made by interpolating the estimated torque value above this characteristic torque Mswitch between this torque value and a torque value that is corrected by a linear correction factor, which may be determined empirically.
- the estimation of the torque of the reference wind turbine may thus be modified to: wherein Mestjin(t) is the estimated torque of the reference wind turbine that considers the correction factor. It may for example be determined as follows:
- the method corresponds to a linear correction of the estimated active power output of the reference wind turbine to account for the efficiency increase of the wind turbine rotor at the upgraded rotational speed.
- the interpolation for the linear correction occurs between a value of the measured torque that corresponds to Mswitch, and a value for the measured torque that corresponds to Mnom.
- the estimated torque for the reference wind turbine Mest in is scaled by the correction factor, the scaled torque being also termed adjusted torque herein. It should be clear that step 43 is optional and may be used to further increase the accuracy.
- Fig. 5 illustrates a further possible implementation of the estimation of the active power output of the reference wind turbine in step 34 of Fig. 3.
- the wind speed and the rotational speed for the reference wind turbine are obtained in steps 51 and 52.
- an estimated wind speed is obtained. This may include the obtaining of an estimated wind speed for the upgraded wind turbine (e.g. from an estimator of the wind turbine controller) and the deriving of an estimated wind speed for the reference wind turbine therefrom, e.g. by limiting the wind speed to a nominal wind speed of the reference wind turbine and/or by switching between different estimators.
- the estimated wind speed for the reference wind turbine may be obtained according to the following equation:
- Vwind.nom is the nominal wind speed of the reference wind turbine
- Avwind, offset is a wind speed offset for v w ind,nom
- v w ind,est control is an estimated wind speed of the upgraded wind turbine that may be estimated by, e.g., a wind turbine controller based on the current operating parameters
- v w md PAE is an estimated wind speed of the upgraded wind turbine that may be estimated by, e.g., a Power Available Estimator of the upgraded wind turbine (which may provide an improved estimate that employs a more complex Cp-map, which considers the pitch angle)
- Avwind, PAE is a wind speed offset for
- the estimate by equation 9 is limited by the nominal wind speed of the reference wind turbine. Further, below that, it switches between two different estimators, wherein these estimates are generally available in the wind turbine, e.g. from the respective wind turbine controller.
- the PAE estimator may for example estimate the wind speed from the power production by the wind turbine and its operational settings, wherein such estimate may be more accurate than a measured wind speed, since it considers the operational state of the wind turbine, such as a yaw misalignment between the wind direction and the wind turbine rotor 1 10. A higher consistency may thus be achieved, but it is certainly also possible to use measured wind speed values or to employ only the estimated wind speed obtained from a (single) estimator.
- step 52 the rotational speed is estimated for the reference wind turbine, which may occur as described above with respect to equations 1 and 2. From the wind speed estimated for the reference wind turbine in step 51 and the rotational speed estimated for the reference wind turbine in step 52, the tip speed ratio of the reference wind turbine may be estimated in step 53 according to the following equation:
- step 54 the deriving of an estimated power coefficient for the reference wind turbine according to the equation wherein Fcp.max is a function that represents the C P map of the reference wind turbine.
- Fcp.max is a function that represents the C P map of the reference wind turbine.
- Such map may map a power factor to the tip speed ratio and may be provided for a particular pitch angle of the rotor blades, or may depend on such pitch angle.
- Such maps are commonly employed in wind turbine control and are for example used to estimate the rotor effective wind speed.
- the power factor estimated in such way may be used to calculate a power factor estimate for the active power output of the reference wind turbine to: wherein Arotor is the area of the wind turbine rotor, p(t) is the density of the air, and Pioss is a power loss of the reference wind turbine.
- the first term corresponds to the wind power through the rotor disc multiplied by the power coefficient, and the second term considers losses that occur during the conversion to electrical power. Pioss may again be obtained from simulation or calibrated. It is essentially an equivalent to the wind speed offset mentioned above.
- the estimated active power output of the reference wind turbine may be limited by the sum of the nominal active power output Pref of the reference wind turbine and the dynamic fluctuations of the active power output, which may again be derived from the dynamic power output fluctuations of the upgraded wind turbine that can be measured, as explained above with respect to rotational speed and torque: wherein Pset,controi(t) is the power setpoint of the upgraded wind turbine, which may be received or determined by multiplying the setpoint values of the torque and rotational speed setpoints of the upgraded wind turbine:
- step 55 the final estimated power output of the reference wind turbine may now be determined to:
- Such estimation method thus considers a physical model of the wind turbine rotor and the conversion of the wind energy passing through the rotor disk into electrical energy.
- An intuitive and rather precise estimation of the active power output of the reference wind turbine may thus be achieved in step 55 of the method of Fig. 5.
- Fig. 7 illustrates diagrams that have been obtained when applying the method of Fig. 5.
- curve 71 illustrates the simulated power output of the reference wind turbine
- curve 72 shows the power output of the upgraded wind turbine.
- Curve 73 corresponds to the sum of the power output of the reference wind turbine and the estimated additional active power output due to the upgrade. As can be seen, it almost coincides with curve 72.
- curve 75 illustrates the actual difference between the power output of the reference wind turbine and the upgraded wind turbine (i.e., a difference between curves 71 and 72).
- Curve 76 illustrates the estimated additional active power output caused by the upgrade, as estimated in accordance with the method of Fig. 5. Again, only minor differences exist between the actual increase in active power output due to the upgrade and the estimate.
- Fig. 8 shows further diagrams that illustrate the estimation explained with respect to Fig. 5.
- curve 82 shows an actually measured active power output P of the upgraded wind turbine.
- Curve 81 shows the active power output of the reference wind turbine as estimated in accordance with the method of Fig. 5. As can be seen, the estimation not only considers differences above the nominal wind speed, but also during partial load operation.
- the middle diagram of Fig. 8 shows the rotational speed of the rotor, wherein curve 84 illustrates the actually measured rotational speed of the upgraded wind turbine, and curve 83 shows the estimated rotational speed for the reference wind turbine.
- the upgrade provides for an increased rotational speed of the upgraded wind turbine, whereas the rotational speed of the reference wind turbine is limited to the nominal value (1 p.u.).
- the lower diagram of Fig. 8 finally shows the estimated additional active output power that is due to the upgrade, i.e. the additional power produced by the upgraded wind turbine that can be attributed to the upgrade.
- Curve 86 shows that the estimation method considers the increase in power output over most of the operational range, and in particular also during partial load operation. Since in the present example, the upgrade allows an increase of the rotational speed and torque beyond the nominal rotational speed and nominal torque of the reference wind turbine, a particularly high increase in additional power production is seen at higher wind speeds.
- the reference wind turbine may conventionally stop operation above a certain wind speed, generally termed "cut-out wind speed".
- the upgrade may allow continued operation at higher wind speeds, however with a lower power output (e.g., soft cut-out, SCO, operation).
- SCO soft cut-out
- any of the methods described above may be used for estimating the active power output of the reference wind turbine, or, if no further upgrades are provided, the power output of the reference wind turbine may be set to the active power output measured for the upgraded wind turbine. If the obtained wind speed is above the cut-out wind speed, the estimated power output for the reference wind turbine may be set to zero (as without the upgrade, the reference wind turbine would not have produced any power in this wind speed range).
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Artificial Intelligence (AREA)
- Evolutionary Computation (AREA)
- Theoretical Computer Science (AREA)
- Wind Motors (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP23173822.0A EP4464891A1 (en) | 2023-05-17 | 2023-05-17 | Monitoring the operation of a wind turbine |
| PCT/EP2024/063512 WO2024236105A1 (en) | 2023-05-17 | 2024-05-16 | Monitoring the operation of a wind turbine |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP4677224A1 true EP4677224A1 (en) | 2026-01-14 |
Family
ID=86386685
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP23173822.0A Withdrawn EP4464891A1 (en) | 2023-05-17 | 2023-05-17 | Monitoring the operation of a wind turbine |
| EP24727305.5A Pending EP4677224A1 (en) | 2023-05-17 | 2024-05-16 | Monitoring the operation of a wind turbine |
Family Applications Before (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP23173822.0A Withdrawn EP4464891A1 (en) | 2023-05-17 | 2023-05-17 | Monitoring the operation of a wind turbine |
Country Status (3)
| Country | Link |
|---|---|
| EP (2) | EP4464891A1 (en) |
| AU (1) | AU2024270787A1 (en) |
| WO (1) | WO2024236105A1 (en) |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| ES2826173T3 (en) * | 2013-11-21 | 2021-05-17 | Gen Electric | System and procedure for evaluating the performance impact of wind turbine upgrades |
| US9644612B2 (en) * | 2014-09-23 | 2017-05-09 | General Electric Company | Systems and methods for validating wind farm performance measurements |
| CN111164304A (en) * | 2017-09-27 | 2020-05-15 | 维斯塔斯风力系统集团公司 | Method of evaluating a wind turbine software upgrade |
| CN114912807A (en) * | 2022-05-20 | 2022-08-16 | 中国华能集团清洁能源技术研究院有限公司 | Method and system for evaluating generated energy improving effect of technically improved wind turbine generator |
-
2023
- 2023-05-17 EP EP23173822.0A patent/EP4464891A1/en not_active Withdrawn
-
2024
- 2024-05-16 AU AU2024270787A patent/AU2024270787A1/en active Pending
- 2024-05-16 EP EP24727305.5A patent/EP4677224A1/en active Pending
- 2024-05-16 WO PCT/EP2024/063512 patent/WO2024236105A1/en not_active Ceased
Also Published As
| Publication number | Publication date |
|---|---|
| AU2024270787A1 (en) | 2025-10-23 |
| EP4464891A1 (en) | 2024-11-20 |
| WO2024236105A1 (en) | 2024-11-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9189755B2 (en) | Available power estimator | |
| US8269361B2 (en) | Adaptive adjustment of the blade pitch angle of a wind turbine | |
| US9822764B2 (en) | System for automatic power estimation adjustment | |
| CN110520621B (en) | Turbine operation dependent on air density | |
| CN111801493A (en) | Determining control settings for a wind turbine | |
| CN103206344B (en) | Method for operating wind turbine | |
| EP2581600A2 (en) | Method and system for control of wind turbines | |
| CN110023619A (en) | The control method of wind turbine | |
| AU2005287572A1 (en) | Method for controlling a wind power plant and corresponding wind power plant | |
| US11136961B2 (en) | System and method for optimizing power output of a wind turbine during an operational constraint | |
| CN115370533A (en) | A wind turbine tower clearance control method and system based on the inclination angle of the nacelle | |
| WO2019218574A1 (en) | Noise control method and device for wind power generator set | |
| CN110809672B (en) | Determine the wind speed value | |
| EP4115079B1 (en) | Control method and device of a wind park | |
| KR101032930B1 (en) | Optimal Control System and Method for Optimal Control of Wind Power Generator Using Digital Wind Speed Estimation Module and Variable Speed Control Module | |
| EP4464891A1 (en) | Monitoring the operation of a wind turbine | |
| EP3712430A1 (en) | Detecting wind turbine performance change | |
| US20240209834A1 (en) | Controlling a wind turbine with an updated power coefficient adjusted by a degradation function | |
| CN117993542A (en) | Method, system and device for correcting starting wind speed of fan | |
| EP3961845B1 (en) | System and method for managing output flicker generated by a wind farm | |
| DK201970630A1 (en) | A wind speed estimator for a wind turbine | |
| CN121782095A (en) | Wind turbine generator control method and system based on instability risk analysis and electronic equipment | |
| WO2024099527A1 (en) | Determining wind speed at a wind turbine | |
| WO2026057136A1 (en) | Wind turbine control in accordance with a maximum allowable noise level | |
| Redondo et al. | Influence of yaw control on flicker produced by wind turbines |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20251008 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
| 17Q | First examination report despatched |
Effective date: 20260319 |