EP4645152A1 - Elasticity matrix determination method and vibration analysis method for laminated iron core of transformer, and elasticity matrix determination program and vibration analysis program - Google Patents
Elasticity matrix determination method and vibration analysis method for laminated iron core of transformer, and elasticity matrix determination program and vibration analysis programInfo
- Publication number
- EP4645152A1 EP4645152A1 EP24796502.3A EP24796502A EP4645152A1 EP 4645152 A1 EP4645152 A1 EP 4645152A1 EP 24796502 A EP24796502 A EP 24796502A EP 4645152 A1 EP4645152 A1 EP 4645152A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- iron core
- transformer
- stacked iron
- coincidence
- degree
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
- G06F30/23—Design optimisation, verification or simulation using finite element methods [FEM] or finite difference methods [FDM]
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N3/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N3/32—Investigating strength properties of solid materials by application of mechanical stress by applying repeated or pulsating forces
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01F—MAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
- H01F27/00—Details of transformers or inductances, in general
- H01F27/24—Magnetic cores
- H01F27/245—Magnetic cores made from sheets, e.g. grain-oriented
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01F—MAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
- H01F27/00—Details of transformers or inductances, in general
- H01F27/33—Arrangements for noise damping
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01F—MAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
- H01F41/00—Apparatus or processes specially adapted for manufacturing or assembling magnets, inductances or transformers; Apparatus or processes specially adapted for manufacturing materials characterised by their magnetic properties
- H01F41/02—Apparatus or processes specially adapted for manufacturing or assembling magnets, inductances or transformers; Apparatus or processes specially adapted for manufacturing materials characterised by their magnetic properties for manufacturing cores, coils, or magnets
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B06—GENERATING OR TRANSMITTING MECHANICAL VIBRATIONS IN GENERAL
- B06B—METHODS OR APPARATUS FOR GENERATING OR TRANSMITTING MECHANICAL VIBRATIONS OF INFRASONIC, SONIC, OR ULTRASONIC FREQUENCY, e.g. FOR PERFORMING MECHANICAL WORK IN GENERAL
- B06B1/00—Methods or apparatus for generating mechanical vibrations of infrasonic, sonic, or ultrasonic frequency
- B06B1/02—Methods or apparatus for generating mechanical vibrations of infrasonic, sonic, or ultrasonic frequency making use of electrical energy
- B06B1/08—Methods or apparatus for generating mechanical vibrations of infrasonic, sonic, or ultrasonic frequency making use of electrical energy operating with magnetostriction
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01H—MEASUREMENT OF MECHANICAL VIBRATIONS OR ULTRASONIC, SONIC OR INFRASONIC WAVES
- G01H13/00—Measuring resonant frequency
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01H—MEASUREMENT OF MECHANICAL VIBRATIONS OR ULTRASONIC, SONIC OR INFRASONIC WAVES
- G01H17/00—Measuring mechanical vibrations or ultrasonic, sonic or infrasonic waves, not provided for in the other groups of this subclass
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N2291/00—Indexing codes associated with group G01N29/00
- G01N2291/02—Indexing codes associated with the analysed material
- G01N2291/028—Material parameters
- G01N2291/02827—Elastic parameters, strength or force
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/06—Multi-objective optimisation, e.g. Pareto optimisation using simulated annealing [SA], ant colony algorithms or genetic algorithms [GA]
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2119/00—Details relating to the type or aim of the analysis or the optimisation
- G06F2119/10—Noise analysis or noise optimisation
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2119/00—Details relating to the type or aim of the analysis or the optimisation
- G06F2119/14—Force analysis or force optimisation, e.g. static or dynamic forces
Definitions
- the present disclosure relates to a transformer stacked iron core elasticity matrix determination method and a vibration analysis method, and an elasticity matrix determination program and a vibration analysis program. Further, the present disclosure relates to a method using a computer to calculate mechanical vibration properties of a transformer iron core produced by stacking electrical steel sheets.
- Analyzers are known that calculate for each finite element a nodal force equivalent to the strain at each node or each finite element in accordance with magnetic flux density, based on a numerical analysis model that represents, by a combination of multiple finite elements in a finite element method analysis, an electromagnetic component containing magnetic material in which magnetostriction is generated (see, for example, Patent Literature (PTL) 1).
- PTL Patent Literature
- the transformer stacked iron core elasticity matrix determination method comprises:
- the sixth step comprises:
- a transformer such as a distribution transformer, is constructed by winding a coil around a stacked iron core of stacked electrical steel sheets.
- Important transformer performance properties include, for example, iron loss (no-load loss) properties, excitation current properties, noise properties, and the like.
- Distribution transformers are installed in various locations. Especially for transformers installed in urban areas, there is a strong demand for low noise. Thus, in recent years, taking into consideration the impact on surrounding environment where transformers are installed, noise reduction has become increasingly important as a performance metric of transformers.
- Grain-oriented electrical steel sheets that are widely employed as iron core material of transformers vibrate due to material expansion and contraction caused by excitation. Material expansion and contraction due to excitation is also referred to as magnetostriction. Vibration due to magnetostriction is also referred to as magnetostrictive vibration. Magnetostrictive vibration is one of the main causes of noise in transformers. Therefore, noise performance of a transformer may strongly depend on magnetostriction properties of electrical steel sheets employed as iron core material. To reduce transformer noise, electrical steel sheets having low magnetostriction properties may be employed as the transformer iron core material.
- finite element method to analyze mechanical vibration properties of electromagnetic components containing magnetic material that generates magnetostriction, such as the iron core of a transformer, may be considered.
- a numerical analysis model that represents an electromagnetic component by a combination of multiple finite elements in a finite element analysis
- nodal force equivalent to the strain at each node or each finite element may be calculated for each finite element according to magnetic flux density applied to the electromagnetic component.
- a quasi-static structural analysis is executed using a governing equation for structural analysis consisting of an equilibrium equation, a constitutive equation indicating the relationship between stress and strain, and a relational equation between displacement and strain.
- Equation (1) ⁇ D ⁇ is represented by 81 components. ⁇ and ⁇ are represented by 9 components, respectively.
- a tensor as a physical quantity is a symmetric tensor.
- the number of independent components of ⁇ and ⁇ is six each.
- [D] is also referred to as the elasticity matrix. [Math.
- iron cores used in transformers such as distribution transformers are also stacked structures composed of stacked steel sheets. Therefore, even when noise was predicted based on the results of structural analysis by a structural analysis program, prediction accuracy was low. The low accuracy of noise prediction sometimes caused actual manufactured transformers to be noisier. When transformers are noisy, problems arise such as extra costs for soundproofing measures such as soundproof walls. In order to reduce noise of a transformer and to suppress the incurring of extra costs, the design of a transformer iron core may be modified. However, when there is a large difference between the calculated and measured results of machine vibration, how design changes may be made to reduce noise is not clear. In order to establish a policy for transformer design changes, the accuracy of noise prediction using structural analysis programs needs to be improved.
- the transformer iron core is a stacked structure composed of stacked steel sheets
- the elasticity matrix [D] of the stacked structure is inherently different from the elasticity matrix [D] of the components themselves, such as the electrical steel sheets that constitute the stacked iron core of the transformer.
- structural analysis is conducted by substituting the value of the elasticity matrix [D] of the components themselves, such as electrical steel sheets, as is, this may also cause a large discrepancy between the calculated value and the measured value.
- transformer stacked iron core elasticity matrix determination method that is able to determine with high accuracy the transverse elastic moduli in two planes including the stacking direction of the stacked iron core of the transformer in the elasticity matrix in the constitutive equation representing the relationship between stress and strain in a matrix representation. Further, it would be helpful to provide a vibration analysis method able to improve the accuracy of vibration analysis results by analyzing vibration of the stacked iron core of stacked steel sheets using a constitutive equation including the elasticity matrices determined.
- Embodiments of an elasticity matrix determination method and a vibration analysis method for a stacked iron core according to the present disclosure are described below, with reference to the drawings. Each drawing is schematic and may differ from actual implementation. Further, the following embodiments are examples of devices or methods for embodying the technical concept of the present disclosure, and are not limiting. That is, various changes may be made to the technical concept of the present disclosure within the technical scope described in the claims.
- a stacked iron core 21 to be analyzed according to the present embodiment is a stacked iron core of a three-phase three-leg transformer used as a distribution transformer, for example.
- the stacked iron core 21 may be composed of a plurality of grain-oriented electrical steel sheets 22 having a defined thickness, with three legs 22c connecting between an upper yoke 22a and a lower yoke 22b.
- the thickness of each of the grain-oriented electrical steel sheets 22 is 0.23 mm.
- the number of layers in the stack of the grain-oriented electrical steel sheets 22 is 333.
- the stacked grain-oriented electrical steel sheets 22 are secured by wrapping with glass tape.
- the dimensions of the upper yoke 22a and the lower yoke 22b are set to be 100 mm wide by 500 mm long.
- the dimensions of the three legs 22c are set to be 100 mm wide by 300 mm long.
- the three legs 22c are connected between the upper yoke 22a and the lower yoke 22b at intervals of 100 mm.
- the stacked iron core 21 to be analyzed according to the present embodiment is not limited to the stacked iron core of a three-phase three-leg transformer illustrated in FIG. 1 .
- each of the grain-oriented electrical steel sheets 22, the number of layers of the stack of the grain-oriented electrical steel sheets 22, the dimensions of the upper yoke 22a and the lower yoke 22b, and the dimensions of the three legs 22c are not limited to the above examples.
- Equation (3) C ⁇ [ ⁇ ] is a stress matrix.
- [C] is an elasticity matrix (stiffness matrix) as a response function. [C] is assumed to be identical to [D], described above.
- [ ⁇ ] is a strain matrix.
- each direction of the stacked iron core 21 is represented by X, Y, and Z axes of an XYZ Cartesian coordinate system.
- the grain-oriented electrical steel sheets 22 extend along the XY plane and are stacked along the Z axis direction.
- Stress acting on the stacked iron core 21 includes normal components acting in directions normal to the stacked iron core 21 (compressive or tensile directions) and shear components acting in shear directions of the stacked iron core 21.
- FIG. 2A , FIG. 2B , and FIG. 2C each illustrate normal stresses acting in the Z, X, and Y axis directions, respectively.
- the normal stresses acting in the Z, X, and Y axis directions are represented by ⁇ z, ⁇ x, and ⁇ y, respectively.
- FIG. 2D , FIG. 2E , and FIG. 2F each illustrate shear stresses acting in the ZX, XY, and YZ planes, respectively.
- the shear stresses acting in the ZX, XY and YZ planes are represented by ⁇ zx, ⁇ xy, and ⁇ yz, respectively.
- the stress matrix [ ⁇ ] has normal stresses and shear stresses as components.
- the strain of the stacked iron core 21 includes components that strain the stacked iron core 21 in normal directions (compressive or tensile) and components that strain the stacked iron core 21 in shear directions.
- Normal strains in the Z, X, and Y axis directions are represented by ⁇ z, ⁇ x, and ⁇ y, respectively.
- Shear strains in the ZX, XY, and YZ planes are represented by ⁇ zx, ⁇ xy, and ⁇ yz, respectively.
- the relationship between stress and strain is expressed by the elasticity matrix as in Equation (4) below.
- the stacked iron core 21 is composed of the stacked grain-oriented electrical steel sheets 22, and therefore the stacked iron core 21 has mechanical symmetry and also has 180-degree symmetry in the longitudinal direction of the stacked grain-oriented electrical steel sheets 22 and a direction orthogonal thereto. Therefore, the stacked iron core 21 may be said to be orthotropic as an anisotropy classification.
- the elasticity matrix of an orthotropic object is basically represented by a total of nine elastic moduli, C11, C12, C13, C22, C23, C33, C44, C55 and C66, as in Equation (5) below. [Math.
- the elastic moduli C11, C12, C13, C22, C23, and C33 are calculated by each of the following Equations (6) through (12), based on the longitudinal elastic moduli Ex, Ey, and Ez and the Poisson's ratios vxy, vyx, vyz, vzy, vzx, and vxz.
- the elastic modulus C44 corresponds to the transverse elastic modulus Gyz in the YZ plane, as indicated below as Equations (13), (14), and (15).
- the elastic modulus C55 corresponds to the transverse elastic modulus Gzx in the ZX plane.
- the elastic modulus C66 corresponds to the transverse elastic modulus Gxy in the XY plane.
- C 44 G yz 13
- C 55 G zx 14
- C 66 G xy 15
- Ex, Ey, and Ez are the longitudinal elastic modulus in the X direction (Young's modulus), Y direction (Young's modulus) and Z direction (Young's modulus), respectively.
- vxy, vyx, vyz, vzy, vzx, and vxz represent Poisson's ratio in the XY plane (ratio of longitudinal strain in the X direction to transverse strain in the Y direction), Poisson's ratio in the YX plane, Poisson's ratio in the YZ plane, Poisson's ratio in the ZY plane, Poisson's ratio in the ZX plane, and Poisson's ratio in the XZ plane, respectively.
- Poisson's ratio vyx in the YX plane is represented using Ex, Ey, and vxy.
- Poisson's ratio vzy in the ZY plane is represented using Ez, Ey, and vyz.
- Poisson's ratio vxz in the XZ plane is represented using Ez, Ex, and vzx.
- a total of nine elastic moduli C11, C12, C13, C22, C23, C33, C44, C55, and C66, representing the elasticity matrix of an orthotropic object are represented by the longitudinal elastic moduli Ex, Ey, and Ez, the transverse elastic moduli Gyz, Gzx, and Gxy, and the Poisson's ratios vxy, vyz, and vzx, expressed using a total of nine mechanical properties. Therefore, determining the nine mechanical properties is equivalent to determining the nine elastic moduli that represent the elasticity matrix. Methods for determining the longitudinal elastic moduli, the transverse elastic moduli, and the Poisson's ratios are explained below.
- the longitudinal moduli Ex and Ey may be set equal to the longitudinal moduli Ex0 and Ey0 of a single steel sheet.
- Poisson's ratio vxy in the XY plane may be set equal to Poisson's ratio vxy0 of a single steel sheet.
- Poisson's ratio vyz in the YZ plane and Poisson's ratio vzx in the ZX plane cannot be set as the Poisson's ratios vyz0 and vzx0 of a single steel sheet. This is because the mechanical coupling between the strain in the stacking direction and the strain normal to the stacking direction in a stacked iron core is considered to be extremely weak.
- actually measuring vyz and vzx is extremely difficult.
- vyz and vzx are expected to be extremely small. Therefore, according to the present embodiment, both vyz and vzx are assumed to be zero.
- the transverse elastic modulus Gxy in the XY plane may be set equal to the transverse elastic modulus Gxy0 of a single steel sheet.
- the transverse elastic moduli in two planes including the stacking direction that is, Gzx in the ZX plane and Gyz in the YZ plane, cannot be set as the transverse elastic moduli Gxz0 and Gyz0 of a single steel sheet. This is because the transverse elastic moduli Gzx and Gyz need to reflect the effect of slippage between steel sheets that occurs in the X and Y directions perpendicular to the stacking direction at interfaces between stacked steel sheets.
- measuring the natural frequency of the stacked iron core and estimating the transverse elastic moduli from the natural frequency may be considered.
- measuring the natural frequency of the stacked iron core of the transformer may still be difficult due to high vibration attenuation. Especially when an iron core is large, measuring the natural frequency is particularly difficult.
- the transverse elastic moduli Gzx and Gyz in two planes including the stacking direction are determined by executing the procedures illustrated in FIG. 3 .
- the stacked iron core 21 for a three-phase three-leg transformer, illustrated as an example in FIG. 1 is the subject of the analysis.
- the transverse elastic modulus of the upper yoke 22a and the transverse elastic modulus of the lower yoke 22b that constitute the stacked iron core 21 are the same value.
- the transverse elastic moduli of the upper yoke 22a and the lower yoke 22b that constitute the stacked iron core 21 are different from that of the legs 22c.
- the transverse elastic moduli Gyz and Gzx in two planes including the stacking direction of the stacked iron core 21 of the transformer included in the elasticity matrix in the constitutive equation are different for the upper yoke 22a and the lower yoke 22b that constitute the stacked iron core 21 and the legs 22c. Therefore, in the elasticity matrix determination method according to the present embodiment, the transverse elastic moduli Gyz and Gzx in two planes including a plurality of different stacking directions are determined. By executing the elasticity matrix determination method according to the present embodiment, the transverse elastic moduli Gyz and Gzx of the upper yoke 22a and the lower yoke 22b, and the transverse elastic moduli Gyz and Gzx of the legs 22c are respectively determined.
- the upper yoke 22a and the lower yoke 22b are also collectively referred to as a first portion.
- the legs 22c are also referred to as a second portion.
- the stacked iron core 21 includes the first portion and the second portion.
- the transverse elastic moduli Gyz and Gzx of the first portion and the transverse elastic moduli Gyz and Gzx of the second portion are different from each other.
- the transverse elastic moduli Gyz and Gzx of the first portion and the transverse elastic moduli Gyz and Gzx of the second portion that are different from each other are determined.
- Each procedure of the elasticity matrix determination method according to the present embodiment may be executed by a vibration analyzer 40 illustrated in FIG. 4 .
- the vibration analyzer 40 includes a controller 42, a memory 44, and an interface 46.
- the controller 42 controls and manages each functional part constituting the vibration analyzer 40 and the vibration analyzer 40 as a whole.
- the controller 42 may include at least one processor, such as a central processing unit (CPU), to control and manage various functions.
- the controller 42 may include a single processor or a plurality of processors.
- the controller 42 including at least one processor may realize the functions of the vibration analyzer 40 by reading and executing a program stored in the memory 44.
- the memory 44 may function as a memory for storing various types of information.
- the memory 44 may store, for example, a program to be executed in the controller 42, data used in processing executed in the controller 42, a result of processing, or the like. Further, the memory 44 may function as the working memory of the controller 42.
- the memory 44 may be configured as semiconductor memory, for example, but is not limited to this, and may include any storage device.
- the memory 44 may be configured as the internal memory of a processor used as the controller 42 or as a hard disk drive (HDD) accessible from the controller 42.
- HDD hard disk drive
- the interface 46 may include a communication interface for communicating with other devices by wired or wireless means.
- the interface 46 may include input/output ports that input and output data to and from other devices.
- the interface 46 sends and receives required data and signals to and from a process computer or higher-level system.
- the interface 46 may communicate based on wired communication standards and may communicate based on wireless communication standards.
- Example wireless communication standards may include cellular phone communication standards such as 3G, 4G, 5G, and the like. Further, example wireless communication standards may include IEEE 802.11 and Bluetooth ® (Bluetooth is a registered trademark in Japan, other countries, or both).
- the interface 46 may support one or more of these communication standards.
- the interface 46 is not limited to these examples and may communicate with other devices and input/output data based on various standards.
- each procedure of the elasticity matrix determination method is executed by the controller 42 of the vibration analyzer 40.
- Each procedure of the elasticity matrix determination method may be executed by another device and may be executed by a human.
- step S1 the controller 42 acquires results of measurement of a frequency spectrum of noise determined by measuring excitation noise of the stacked iron core 21 of the transformer subject to vibration analysis illustrated in FIG. 1 .
- the excitation noise is measured by setting excitation frequency to 50 Hz for the stacked iron core 21.
- the frequency spectrum of transformer excitation noise consists of frequency components that are integer multiples of twice the excitation frequency, that is, even multiples of the excitation frequency, and therefore the spectrum of the excitation noise at each frequency of 100 Hz pitch in a range from 100 Hz to 1000 Hz is acquired as the frequency spectrum of the noise.
- the excitation noise properties of transformers are widely measured as a quality control item of shipped products.
- the excitation frequency may be set to 60 Hz.
- a spectrum of the excitation noise at a pitch of 120 Hz is acquired from a frequency of 120 Hz to 1200 Hz.
- the following describes a case where the excitation frequency is set to 50 Hz.
- An example of the frequency spectrum of noise acquired when the excitation frequency is set to 50 Hz is illustrated as a graph in FIG. 5 .
- the horizontal axis represents frequency.
- the vertical axis represents magnitude of excitation noise.
- step S2 the controller 42 acquires frequency spectrum data of excitation magnetostriction of an electrical steel sheet that is the same as the grain-oriented electrical steel sheets 22 that constitute the stacked iron core 21 of the transformer subject to vibration analysis illustrated in FIG. 1 .
- the frequency spectrum data of the excitation magnetostriction excitation magnetostriction amplitude spectrum data at each frequency a pitch of 100 Hz in the range from 100 Hz to 1000 Hz is acquired.
- the frequency spectrum data of the excitation magnetostriction may be acquired by measuring the excitation magnetostriction of the electrical steel sheet or by acquiring data from the manufacturer of the electrical steel sheet.
- FIG. 6 An example of the frequency spectrum data of the excitation magnetostriction acquired is illustrated as a graph in FIG. 6 .
- the horizontal axis represents frequency.
- the vertical axis represents magnitude of magnetostriction amplitude.
- the magnitude of magnetostriction amplitude at each frequency is expressed in dB as a value normalized by dividing by the value of the magnetostriction amplitude when the frequency is 100 Hz.
- the dB indication corresponds to a value obtained by taking the common logarithm of the value to be displayed and multiplying by 10.
- step S3 the controller 42 provisionally sets the transverse elastic moduli Gyz and Gzx and calculates a frequency spectrum of vibration response function for the provisionally set transverse elastic moduli.
- the controller 42 executes a vibration response analysis on the stacked iron core 21 of the transformer subject to vibration analysis using structural analysis software.
- the nine mechanical property values of the stacked iron core 21, which are the longitudinal elastic moduli Ex, Ey, and Ez, the transverse elastic moduli Gyz, Gzx, and Gxy, and the Poisson's ratios vxy, vyz, and vzx seven are set as follows, except the transverse elastic moduli Gyz and Gzx, as described above.
- Ex Ex 0
- Ey Ey 0
- Ez 10 GPa
- the transverse elastic moduli Gyz and Gzx in the two planes including the stacking direction are different for each of the plurality of portions (two) of the stacked iron core 21. Specifically, the transverse elastic moduli Gyz and Gzx of the upper yoke 22a and the lower yoke 22b are different from those of the legs 22c.
- Each of G1 and G2 is a value provisionally selected and set from a defined range as the transverse elastic modulus, and may also be referred to as a provisional value of the transverse elastic modulus.
- G1 corresponds to the transverse elastic moduli Gyz and Gzx in the first portion, and is also referred to as a first provisional value.
- G2 corresponds to the transverse elastic moduli Gyz and Gzx in the second portion, and is also referred to as a second provisional value.
- the controller 42 changes the combination of provisional values (G1, G2) and calculates the frequency spectrum of the vibration response function of the stacked iron core 21 of the transformer for each combination.
- FIG. 7 An example of the frequency spectrum of the vibration response function of the stacked iron core 21 of the transformer calculated for a particular combination of values (G1, G2) is illustrated as a graph in FIG. 7 .
- the horizontal axis represents frequency.
- the vertical axis represents magnitude of response function.
- the magnitude of the response function is normalized and displayed so that the vibration response value is 0 dB when the frequency is 100 Hz.
- each of the provisional values (G1, G2) is actually selected from a range of transverse elastic modulus expected from the structure of the stacked iron core 21 of the transformer.
- each of G1 and G2 is selected from a range of 0.05 GPa to 0.5 GPa.
- step S4 the controller 42 calculates a frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer, based on the frequency spectrum data of the excitation magnetostriction of the electrical steel sheets acquired in step S2 (second step) and the frequency spectrum of the vibration response function of the stacked iron core 21 of the transformer calculated in step S3 (third step). Specifically, the controller 42 calculates the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer as the product of the frequency spectrum data of the excitation magnetostriction of the electrical steel sheets and the frequency spectrum of the vibration response function of the stacked iron core 21 of the transformer. When the frequency spectrum is displayed in dB, the controller 42 calculates the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer as a sum.
- FIG. 8 An example of the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer calculated in this way is illustrated as a graph in FIG. 8 .
- the horizontal axis represents frequency.
- the vertical axis represents calculated magnitude of excitation vibration.
- the magnitude of the excitation vibration is indicated in dB.
- step S5 the controller 42 calculates the degree of coincidence between measured results of the frequency spectrum of the noise of the stacked iron core 21 of the transformer acquired in step S1 (first step) and the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer calculated in step S4 (fourth step).
- the frequency spectrum data of the noise is measured for each frequency from 100 Hz to 1000 Hz with a 100 Hz pitch. Therefore, the number of frequency spectrum data points for the noise is 10.
- Each frequency component of the noise frequency spectrum data is denoted as (S100, S200, S300, ..., S1000).
- the frequency spectrum data of the excitation vibration is calculated for each frequency from 100 Hz to 1000 Hz with a 100 Hz pitch. Therefore, the number of frequency spectrum data points for the excitation vibration is 10.
- Each frequency component of the frequency spectrum data of excitation vibration is denoted as (V100, V200, V300, ..., V1000). The following is an explanation of how the degree of coincidence is calculated based on these notations.
- the controller 42 may typically calculate the degree of coincidence between the frequency spectrum data of the noise and the frequency spectral data of the excitation vibration as the Euclidean distance of the data points in multidimensional space.
- the degree of coincidence is calculated as a Euclidean distance
- the accuracy of calculation of the degree of coincidence is known to decrease due to offsets in the data.
- the frequency spectrum data of the excitation noise and the excitation vibration are expressed in dB values, there is a concern that the degree of freedom in determining the reference value may cause an offset in the data, which may deteriorate the accuracy of the calculation of the degree of coincidence.
- the controller 42 calculates cosine similarity as the degree of coincidence according to the present embodiment.
- the cosine similarity is calculated as the cosine value of the angle between two vectors when (S100, S200, S300, ..., S1000) and (V100, V200, V300, ..., V1000) are considered as multidimensional vectors S and V (here, 10-dimensional space vectors), respectively.
- the multidimensional vector S is also referred to as a first vector.
- the multidimensional vector V is also referred to as a second vector.
- the cosine similarity is calculated by the following Equation (17).
- cos ⁇ represents the cosine similarity.
- step S6 the controller 42 determines whether the mapping of the degree of coincidence in a defined range by changing the provisional values in steps S3 through S5 has been completed. Specifically, the controller 42 repeatedly executes the procedures from step S3 to step S5 while changing the combination of provisional values (G1, G2) and calculates the degree of coincidence for each combination of provisional values (G1, G2). The controller 42 maps the calculated degree of coincidence for each combination of provisional values onto a two-dimensional map. Specifically, an example of the results of the calculation of the degree of coincidence between the frequency spectrum of the excitation vibration and the frequency spectrum of the excitation noise of the stacked iron core 21 of the transformer is illustrated in FIG. 9 as a two-dimensional map. In the two-dimensional map in FIG.
- the vertical and horizontal axes represent G1 and G2, respectively.
- isovalue lines representing equal degrees of coincidence are noted.
- closed isovalue lines that are closed curves having smaller diameters correspond to isovalue lines having higher degrees of coincidence.
- the combination of G1 and G2 for which the degree of coincidence is a local maximum value corresponds to the vicinity of the center of a closed curve.
- the controller 42 may map the degree of coincidence for each combination of provisional values to a two-dimensional map and determine that mapping has been completed when a defined range is filled. Further, the controller 42 may determine that mapping has been completed when the presence of a local maximum value is detectable in the two-dimensional map mapping the degree of coincidence.
- the controller 42 while repeatedly executing the procedures from step S3 to S6, the controller 42 changes the two parameters G1 and G2 to complete mapping of the degree of coincidence and detect a local maximum value of the degree of coincidence.
- the controller 42 needs to execute a numerical search in two dimensions.
- the two-dimensional search results in a very large number of search points. Further, two-dimensional searches require a large computational load. Therefore, according to the present embodiment, an optimization search method using a genetic algorithm (GA) is used, utilizing artificial intelligence (AI) technology.
- GA genetic algorithm
- AI artificial intelligence
- the degree of coincidence between the frequency spectrum of the noise of the stacked iron core 21 of the transformer acquired in step S1 and the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer calculated in step S4 is employed.
- Commercially available search software may be used as a GA optimization search tool. Further, a self-created GA optimization search tool may be used, as the inventors have done.
- the transverse elastic moduli are calculated by assuming that the transverse elastic moduli of the stacked iron core, Gyz and Gzx, are equal.
- the values of Gyz and Gzx may be different from each other.
- the inventors confirmed that the value of Gyz and the value of Gzx may be considered equal in a stacked iron core of grain-oriented electrical steel sheets, not only for the stacked iron core illustrated in FIG. 1 , but also for stacked iron cores having various dimensions. Therefore, the values of the transverse elastic moduli Gyz and Gzx are considered equal to each other according to the present embodiment.
- the values of (G1, G2) indicating local maximum values may be adopted as the transverse elastic moduli Gyz and Gzx in two planes including the stacking direction of the transformer. It was confirmed that the accuracy of the vibration analysis is improved by implementing the vibration analysis in the seventh step by incorporating Gyz and Gzx adopted based on the two-dimensional map in FIG. 9 into the constitutive equation. Therefore, by carrying out the first to seventh steps mentioned above to determine the elasticity matrix of the stacked iron core 21 of the transformer, the accuracy of vibration analysis of the transformer is improved.
- a search using a GA optimization search tool executed to obtain the two-dimensional map of FIG. 9 indicating the degree of coincidence between the frequency spectrum of the excitation vibration and the frequency spectrum of the excitation noise, is executed along the path illustrated in the graph of FIG. 10 .
- the vertical and horizontal axes in FIG. 10 correspond to G1 and G2.
- Each circle plotted on the graph in FIG. 10 corresponds to one search point.
- the number of search points plotted in FIG. 10 is about 800.
- the calculation of the degree of coincidence at each search point is repeated.
- the degree of coincidence at each search point is calculated by executing the procedures from the third step to the fifth step.
- the vibration response analysis executed as the third step of the procedure for calculating the degree of coincidence is carried out using, for example, structural analysis software.
- the time required to carry out vibration response analysis using structural analysis software depends on the performance of the computer used, but even when using a high-performance computer typically used for numerical calculations, it takes approximately two hours per search point.
- at least approximately 800 search points are required.
- the inventors have investigated ways of shortening the time required to calculate the two-dimensional map of the degree of coincidence in the sixth step described above. As a result, the inventors found that the time required to calculate the two-dimensional map of the degree of coincidence can be reduced by including the following procedure in the sixth step of the elasticity matrix determination method according to the present disclosure.
- the controller 42 of the vibration analyzer 40 executes the step 6-A in which, when each combination of the first provisional value G1 and the second provisional value G2 for which the degree of coincidence is to be calculated is expressed as a trial point for trial searching, points distributed in a two-dimensional space with the first provisional value G1 as the first axis and the second provisional value G2 as the second axis are sequentially selected as trial points, and the selected trial points are subjected to processing from the third step to the fifth step to repeatedly calculate the degree of coincidence.
- the controller 42 executes the step 6-B in which, based on the degree of coincidence calculated in the step 6-A, a limited sub-region is set as a target for a more detailed search within the region in which the trial points distributed in the two-dimensional space exist.
- the controller 42 sets search points between trial points within the limited sub-region set in the step 6-B and executes a search, and executes processing from the third step to the fifth step at each search point to repeatedly calculate the degree of coincidence, and then executes the step 6-C in which the combination (G1, G2) in which the degree of coincidence is a local maximum value within the limited sub-region is calculated.
- a search method may be used that utilizes artificial intelligence (AI) technology and employs an optimization search method using a genetic algorithm (GA), with the degree of coincidence between the frequency spectrum of the noise of the stacked iron core 21 of the transformer acquired in the first step and the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer calculated in the fourth step as an evaluation function.
- AI artificial intelligence
- GA genetic algorithm
- the total number of trial points and search points required to calculate the combination (G1, G2) at which the degree of coincidence is a local maximum value is greatly decreased.
- a two-dimensional map of the degree of coincidence is calculated, and the time required to calculate the combination of (G1, G2) when the degree of coincidence is a local maximum value is greatly decreased, thereby achieving high speed.
- the transverse elastic moduli Gyz and Gzx of the stacked iron core 21 of the transformer for the plurality (two) of different stacking directions in the elasticity matrices in the constitutive equation is optimally determined. As a result, a discrepancy between measured and calculated vibration properties is suppressed.
- Verification of the effect of implementing the transformer stacked iron core elasticity matrix determination method according to the present embodiment and the vibration analysis method is described below via Examples.
- grain-oriented electrical steel sheets each having a thickness of 0.23 mm were prepared. Then, by stacking the prepared grain-oriented electrical steel sheets, the stacked iron core 21 of a three-phase three-leg transformer for vibration analysis was produced, as illustrated in FIG. 1 .
- the steel sheet stacked thickness of the stacked iron core 21 was 100 mm. Further, dimensions of the upper yoke 22a and the lower yoke 22b were made to be 100 mm wide by 500 mm long. Further, dimensions of the three legs 22c were made to be 100 mm wide with an iron core window length of 300 mm.
- the legs 22c connected the upper yoke 22a and the lower yoke 22b with a spacing of 100 mm between the legs 22c. Excitation coils were then formed by winding indoor PVC (IV) wires around each of the three legs 22c of the stacked iron core 21.
- FIG. 11 illustrates an example of a result of noise frequency spectrum measurement.
- the vertical and horizontal axes of the graph in FIG. 11 are the same as in the graph in FIG. 5 .
- FIG. 12 illustrates an example of a result of frequency spectrum of magnetostriction measurement.
- the horizontal axis represents frequency.
- the vertical axis represents magnitude of magnetostriction.
- x corresponds to the steel sheet rolling direction.
- y corresponds to a direction perpendicular to x.
- z corresponds to the steel sheet stacking direction.
- the transverse elastic moduli Gyz and Gzx of the upper yoke 22a and the lower yoke 22b that constitute the stacked iron core 21, and the transverse elastic moduli Gyz and Gzx of the legs 22c are different from each other.
- G1 and G2 are each provisional values selected from a defined range.
- the frequency spectrum of the vibration response function of the stacked iron core 21 of the transformer for the combination of the provisional values (G1, G2) was then calculated.
- the defined range in which each of the provisional values (G1, G2) is selected is actually the range of transverse elastic moduli expected from the structure of the stacked iron core 21 of the transformer, ranging from 0.05 GPa to 0.4 GPa according to the present embodiment.
- the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer was calculated, based on the frequency spectrum data of the excitation magnetostriction of the electrical steel sheets acquired in step S2 of FIG. 3 and the frequency spectrum of the vibration response function of the stacked iron core 21 of the transformer calculated in step S3 of FIG. 3 .
- step S5 of FIG. 3 the degree of coincidence between the frequency spectrum of the noise of the stacked iron core 21 of the transformer acquired in step S1 of FIG. 3 and the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer calculated in step S4 of FIG. 3 was calculated.
- the cosine similarity was calculated as the degree of coincidence between the frequency spectrum of the noise of the stacked iron core 21 of the transformer and the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer.
- Cosine similarity is also referred to as Cos similarity.
- FIG. 15 illustrates an example of the two-dimensional map created according to the present Example. The vertical and horizontal axes of the graph in FIG. 15 correspond to G1 and G2.
- step S6 of FIG. 3 there are two parameters (G1, G2), and therefore the numerical search needs to be executed in two dimensions. Therefore, the number of search points becomes very large and requires a great deal of work. Therefore, in the present Example, by utilizing artificial intelligence (AI) technology, an optimization search method using a genetic algorithm (GA) was adopted as a search method in which the degree of coincidence between the frequency spectrum of the noise of the stacked iron core 21 of the transformer acquired in step S1 of FIG. 3 and the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer calculated in step S4 of FIG. 3 was used as an evaluation function.
- AI artificial intelligence
- the combination of the specific values (G1, G2) determined is adopted as the transverse elastic moduli Gzx and Gyz of the upper yoke 22a and the lower yoke 22b, and the transverse elastic moduli Gzx and Gyz of the legs 22c, respectively.
- a graph comparing the calculated values of the frequency spectrum of the excitation vibration of the stacked iron core of the transformer with the measured values of the frequency spectrum of the noise obtained by measuring the excitation noise of the stacked iron core of the transformer is illustrated in FIG. 16 .
- the trends of the calculated and measured frequency spectra match very well.
- the Example confirms that the transverse elastic moduli Gzx and Gyz in two planes including the stacking direction for the upper yoke 22a and the lower yoke 22b of the stacked iron core 21 of the transformer and the transverse elastic moduli Gzx and Gyz in two planes including the stacking direction for the legs 22c of the stacked iron core 21 of the transformer, which are included in the elasticity matrices in the constitutive equation, were calculated with high accuracy.
- FIG. 17 indicates the path of search points that was searched for by an optimization search method using a genetic algorithm (GA) to obtain the two-dimensional map of the degree of coincidence illustrated in FIG. 15 .
- the total number of search points illustrated in FIG. 17 is 832. In this case, the search took 2 months (8 weeks) to complete.
- FIG. 18A points distributed at equal intervals of 0.1 GPa for each of G1 and G2 on a two-dimensional map were set as trial points, and were selected in sequence.
- the processing in steps 3 to 5 was carried out for the selected trial points to repeatedly calculate the degree of coincidence.
- a two-dimensional map of the degree of coincidence obtained by carrying out the step 6-A on the trial points illustrated in FIG. 18A is illustrated in FIG. 18B .
- the correct point where G1 is 0.25 GPa and G2 is 0.15 GPa is not included in the region where the degree of coincidence is 0.9 or more. Therefore, even when 0.1 GPa is set as the interval between trial points, it is clear that the interval is too coarse.
- FIG. 19A points equally distributed at intervals of 0.075 GPa for each of G1 and G2 on a two-dimensional map were set as trial points, and were selected in sequence.
- the processing in steps 3 to 5 was carried out for the selected trial points to repeatedly calculate the degree of coincidence.
- a two-dimensional map of the degree of coincidence obtained by carrying out the step 6-A on the trial points illustrated in FIG. 19A is illustrated in FIG. 19B .
- the correct point where G1 is 0.25 GPa and G2 is 0.15 GPa is not included in the region where the degree of coincidence is 0.9 or more. Therefore, even when 0.075 GPa is set as the interval between trial points, it is clear that the interval is too coarse.
- FIG. 20A points equally distributed at intervals of 0.05 GPa for each of G1 and G2 on a two-dimensional map were set as trial points, and were selected in sequence.
- the processing in steps 3 to 5 was carried out for the selected trial points to repeatedly calculate the degree of coincidence.
- a two-dimensional map of the degree of coincidence obtained by carrying out the step 6-A on the trial points illustrated in FIG. 20A is illustrated in FIG. 20B .
- the correct point where G1 is 0.25 GPa and G2 is 0.15 GPa is included in the region where the degree of coincidence is 0.9 or more.
- step 6-B When the correct point is contained in a region where the degree of coincidence is 0.9 or more, in step 6-B, the region in Figure 20B where the degree of coincidence is 0.9 or more is designated as a limited sub-region to be searched using an optimization search method using a genetic algorithm (GA).
- GA genetic algorithm
- step 6-C an optimization search method using a genetic algorithm (GA) is used within the limited sub-region to execute a search using the degree of coincidence between the frequency spectrum of the noise of the stacked iron core of the transformer obtained in the first step and the frequency spectrum of the excitation vibration of the stacked iron core of the transformer calculated in the fourth step as an evaluation function, and the local maximum point of the degree of coincidence is calculated.
- G1, G2 when the degree of coincidence reached a local maximum value were (0.25 GPa, 0.15 GPa).
- FIG. 21A points equally distributed at intervals of 0.025 GPa for each of G1 and G2 on a two-dimensional map were set as trial points, and were and selected in sequence.
- the processing in steps 3 to 5 was carried out for the selected trial points to repeatedly calculate the degree of coincidence.
- a two-dimensional map of the degree of coincidence obtained by carrying out the step 6-A on the trial points illustrated in FIG. 21A is illustrated in FIG. 21B .
- the correct point where G1 is 0.25 GPa and G2 is 0.15 GPa is included in the region where the degree of coincidence is 0.9 or more.
- the region in Figure 21B where the degree of coincidence is 0.9 or more is designated as a limited sub-region to be searched using an optimization search method using a genetic algorithm (GA).
- an optimization search method using a genetic algorithm (GA) is used within the limited sub-region to execute a search using the degree of coincidence between the frequency spectrum of the noise of the stacked iron core of the transformer obtained in the first step and the frequency spectrum of the excitation vibration of the stacked iron core of the transformer calculated in the fourth step as an evaluation function, and the local maximum point of the degree of coincidence is calculated.
- G1, G2 when the degree of coincidence reached a local maximum value were (0.25 GPa, 0.15 GPa).
- the trial points need to be set at fine intervals, for example, 0.05 GPa or less.
- the accuracy of calculating the value of (G1, G2) when the degree of coincidence is at a local maximum value does not improve.
- the time required for the step 6-A is increased, which does not connect to a decrease in the time required for the entire sixth step.
- the reason why the calculation accuracy does not improve when the range is too fine is thought to be that, within the specified range in which G1 and G2 are selected, many trial points are set in a range that is far from the correct answer for G1 and G2, which is wasteful. Therefore, in the Example when the distribution interval was set to 0.05 GPa, it was optimal for realizing both an improvement in the calculation accuracy of G1 and G2 and an increase in speed for a decrease in the time required for the entire sixth step.
- the method of evaluating the degree of coincidence between the frequency spectrum of the noise of the stacked iron core 21 of the transformer and the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer is not limited to calculation of cosine similarity.
- Euclidean distance may be employed as a method of evaluating the degree of coincidence, for example by taking a dB display reference so as not to include an offset.
- another method of evaluating the degree of coincidence may be employed, as long as the method essentially quantitatively indicates the degree of coincidence between the frequency spectrum data of the excitation noise and the frequency spectrum date of the excitation vibration.
- vibration analysis of a three-phase three-leg transformer was described for the embodiments, but this is not a limitation, and the present disclosure is also applicable to vibration analysis of the stacked iron core in a three-phase five-leg transformer or other transformers.
- the elasticity matrix determination method according to the present embodiment has been described as being applicable when the transverse elastic moduli of the multiple (two) parts constituting the stacked iron core 21 are different, and as a specific example, the transverse elastic moduli of the first portion including the upper yoke 22a and the lower yoke 22b constituting the stacked iron core 21 is different from the transverse elastic moduli of the second portion including the legs 22c.
- the elasticity matrix determination method according to the present embodiment may be applied when the transverse elastic moduli of the first portion including the upper yoke 22a and the lower yoke 22b constituting the stacked iron core 21 is identical to the transverse elastic moduli of the second portion including the legs 22c.
- the stacked iron core 21 may include three or more portions.
- the stacked iron core 21 includes at least the first portion and the second portion.
- three or more provisional values for the transverse elastic moduli are set, such as a third provisional value in addition to the first provisional value and the second provisional value.
- a local maximum value of the degree of coincidence is then detected in a map of three or more dimensions.
- the trial points are distributed at equal intervals within a defined range, but may be distributed at irregular intervals. Further, in the embodiment described above, the trial points are distributed so that the interval of the first provisional value G1 and the interval of the second provisional value G2 are the same, but the trial points may be distributed so that the interval of the first provisional value G1 is different from the interval of the second provisional value G2.
- the positions at which the trial points are set may be determined based on the results of analyzing other transformers using the elasticity matrix determination method or vibration analysis method according to the present embodiment.
- the positions at which trial points are set may be determined based on a trend of distribution of the degree of coincidence that is understood by statistically processing the analysis results of other transformers in advance. In this way, the trial points can be set so that the correct point at which the degree of coincidence is a local maximum value can be found with a small number of trial points.
- the analysis results of the other transformers have been previously processed, and therefore the time required to set trial points based on the analysis results of the other transformers is not lengthened.
- the elasticity matrix determination method for the stacked iron core 21 of the transformer may be realized as an elasticity matrix determination program executed by a computer or processor constituting the controller 42 of the vibration analyzer 40.
- the vibration analysis method for the stacked iron core 21 of the transformer may be realized as a vibration analysis program executed by a computer or processor constituting the controller 42 of the vibration analyzer 40.
- the elasticity matrix determination program or the vibration analysis program may be stored on a non-transitory computer-readable storage medium.
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Power Engineering (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Biochemistry (AREA)
- General Health & Medical Sciences (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Measurement Of Mechanical Vibrations Or Ultrasonic Waves (AREA)
- Manufacturing Cores, Coils, And Magnets (AREA)
Abstract
Description
- The present disclosure relates to a transformer stacked iron core elasticity matrix determination method and a vibration analysis method, and an elasticity matrix determination program and a vibration analysis program. Further, the present disclosure relates to a method using a computer to calculate mechanical vibration properties of a transformer iron core produced by stacking electrical steel sheets.
- Analyzers are known that calculate for each finite element a nodal force equivalent to the strain at each node or each finite element in accordance with magnetic flux density, based on a numerical analysis model that represents, by a combination of multiple finite elements in a finite element method analysis, an electromagnetic component containing magnetic material in which magnetostriction is generated (see, for example, Patent Literature (PTL) 1).
- PTL 1:
JP 2014-071689 A - In a transformer configured by winding a coil around a stacked iron core of electrical steel sheets, vibration of the iron core caused by magnetostriction generates noise. Structural analysis is required to contribute to a design that reduces transformer noise.
- It would be helpful to provide a transformer stacked iron core elasticity matrix determination method and a vibration analysis method, and an elasticity matrix determination program and a vibration analysis program, to contribute to a design that reduces transformer noise.
-
- (1) A transformer stacked iron core elasticity matrix determination method according to an embodiment of the present disclosure determines elasticity matrices of a stacked iron core of a transformer. The stacked iron core is configured as a plurality of electrical steel sheets and includes at least a first portion and a second portion. A constitutive equation represents a relationship between stress and strain in the first portion and the second portion, respectively, and includes elasticity matrices that are different from each other. Each of the elasticity matrices includes, as elements of the elasticity matrix, transverse elastic moduli in two planes including the stacking direction of the stacked iron core.
- The transformer stacked iron core elasticity matrix determination method comprises:
- a first step of acquiring a frequency spectrum of excitation noise of the stacked iron core of the transformer;
- a second step of acquiring a frequency spectrum of excitation magnetostriction of the electrical steel sheets;
- a third step of determining, for the stacked iron core of the transformer, a first provisional value of the transverse elastic moduli in two planes including the stacking direction of the first portion and a second provisional value of the transverse elastic moduli in two planes including the stacking direction of the second portion, and calculating a frequency spectrum of a vibration response function of the stacked iron core of the transformer when the first provisional value and the second provisional value are applied to the elasticity matrices;
- a fourth step of calculating a frequency spectrum of excitation vibration of the stacked iron core of the transformer, based on frequency spectrum data of the excitation magnetostriction of the electrical steel sheets acquired in the second step and the frequency spectrum of the vibration response function of the stacked iron core of the transformer calculated in the third step;
- a fifth step of calculating a degree of coincidence between the frequency spectrum of the excitation noise of the stacked iron core of the transformer acquired in the first step and the frequency spectrum of the excitation vibration of the stacked iron core of the transformer calculated in the fourth step;
- a sixth step of calculating the degree of coincidence for each combination of the first provisional value and the second provisional value by changing the first provisional value and the second provisional value respectively and repeating the third step to the fifth step; and
- a seventh step of detecting a local maximum value of the degree of coincidence calculated for each combination of the first provisional value and the second provisional value in the sixth step, adopting the first provisional value when the degree of coincidence is a local maximum value as the transverse elastic moduli in two planes including the stacking direction of the stacked iron core of the first portion, and adopting the second provisional value when the degree of coincidence is a local maximum value as the transverse elastic moduli in two planes including the stacking direction of the stacked iron core of the second portion.
- The sixth step comprises:
- a step 6-A of, when each combination of the first provisional value and the second provisional value corresponding to the degree of coincidence is expressed as a trial point plotted in a two-dimensional space with the first provisional value as a first axis and the second provisional value as a second axis, sequentially selecting points distributed within a defined range of the two-dimensional space as the trial points and calculating the degree of coincidence for each combination of the first provisional value and the second provisional value corresponding to the trial points;
- a step 6-B of setting a limited sub-region in the two-dimensional space based on the degree of coincidence calculated for each combination of the first provisional value and the second provisional value corresponding to the trial points; and
- a step 6-C of setting search points in the limited sub-region at intervals narrower than intervals between the trial points and calculating the degree of coincidence for each combination of the first provisional value and the second provisional value corresponding to the search points.
- (2) The transformer stacked iron core elasticity matrix determination method according to (1), above, wherein, in the fifth step, a cosine value of the angle formed between a first vector whose elements are each frequency component of the frequency spectrum of the noise of the stacked iron core of the transformer and a second vector whose elements are each frequency component of the frequency spectrum of the excitation vibration of the stacked iron core of the transformer is calculated as the degree of coincidence.
- (3) A vibration analysis method according to an embodiment of the present disclosure comprises a step of executing vibration analysis of the stacked iron core of the transformer based on a constitutive equation representing the relationship between stress and strain in each of the first portion and the second portion, incorporating the transverse elastic moduli determined by the transformer stacked iron core elasticity matrix determination method according to (1) or (2), above.
- (4) An elasticity matrix determination program according to an embodiment of the present disclosure causes a computer to execute the elasticity matrix determination method according to (1) or (2), above.
- (5) A vibration analysis program according to an embodiment of the present disclosure causes a computer to execute the vibration analysis method according to (3), above.
- According to the transformer stacked iron core elasticity matrix determination method and elasticity matrix determination program according to the present disclosure, a discrepancy between measured and calculated values of vibration properties may be reduced. Further, the vibration analysis method and vibration analysis program for a stacked iron core of a transformer according to the present disclosure are able to improve the accuracy of vibration analysis.
- In the accompanying drawings:
-
FIG. 1 illustrates an example structure of a stacked iron core of a transformer to be analyzed by a vibration analysis method according to an embodiment; -
FIG. 2A is a diagram for explaining normal stress acting in a stacking direction on a stacked iron core, that is, in a Z-axis direction; -
FIG. 2B is a diagram for explaining normal stress acting in a direction perpendicular to the stacking direction on the stacked iron core, that is, in an X-axis direction; -
FIG. 2C is a diagram for explaining normal stress acting in a direction perpendicular to the stacking direction on the stacked iron core, that is, in a Y-axis direction; -
FIG. 2D is a diagram for explaining shear stress in the ZX plane acting on the stacked iron core; -
FIG. 2E is a diagram for explaining shear stress in the XY plane acting on the stacked iron core; -
FIG. 2F is a diagram for explaining shear stress in the YZ plane acting on the stacked iron core; -
FIG. 3 is a flowchart illustrating example procedures of an elasticity matrix determination method according to an embodiment; -
FIG. 4 is a block diagram illustrating an example structure of a vibration analyzer according to an embodiment; -
FIG. 5 is a graph illustrating an example frequency spectrum of transformer noise; -
FIG. 6 is a graph illustrating example frequency spectrum data of excitation magnetostriction of electrical steel sheets constituting a stacked iron core of a transformer; -
FIG. 7 is a graph illustrating an example frequency spectrum of a vibration response function of a stacked iron core of a transformer; -
FIG. 8 is a graph illustrating an example frequency spectrum of excitation vibration of a stacked iron core of a transformer; -
FIG. 9 is a graph illustrating an example of a two-dimensional map of the degree of coincidence between a frequency spectrum of excitation vibration and a frequency spectrum of excitation noise of a stacked iron core of a transformer; -
FIG. 10 is a diagram illustrating an example of a search path executed to obtain the two-dimensional map ofFIG. 9 ; -
FIG. 11 is a graph illustrating an example frequency spectrum of transformer noise according to an Example; -
FIG. 12 is a graph illustrating example frequency spectrum data of excitation magnetostriction of electrical steel sheets constituting a stacked iron core of a transformer according to an Example; -
FIG. 13 is a graph illustrating an example frequency spectrum of a vibration response function of a stacked iron core of a transformer according to an Example; -
FIG. 14 is a graph illustrating an example frequency spectrum of excitation vibration of a stacked iron core of a transformer according to an Example; -
FIG. 15 is a graph illustrating an example of a two-dimensional map of the degree of coincidence between a frequency spectrum of excitation vibration and a frequency spectrum of excitation noise of a stacked iron core of a transformer according to an Example; -
FIG. 16 is a graph comparing a calculated frequency spectrum of excitation vibration of a stacked iron core of a transformer according to an Example with a measured frequency spectrum of noise obtained by measuring excitation noise of the stacked iron core of the transformer; -
FIG. 17 is a diagram illustrating a search path using a genetic algorithm (GA); -
FIG. 18A is a graph illustrating an example of trial points distributed at 0.1 GPa intervals on a two-dimensional map; -
FIG. 18B is a graph illustrating an example of results of calculating the degree of coincidence by the trial points inFIG. 18A ; -
FIG. 19A is a graph illustrating an example of trial points distributed at 0.075 GPa intervals on a two-dimensional map; -
FIG. 19B is a graph illustrating an example of results of calculating the degree of coincidence by the trial points inFIG. 19A ; -
FIG. 20A is a graph illustrating an example of trial points distributed at 0.05 GPa intervals on a two-dimensional map; -
FIG. 20B is a graph illustrating an example of results of calculating the degree of coincidence by the trial points inFIG. 20A ; -
FIG. 21A is a graph illustrating an example of trial points distributed at 0.025 GPa intervals on a two-dimensional map; and -
FIG. 21B is a graph illustrating an example of results of calculating the degree of coincidence by the trial points inFIG. 21A . - A transformer, such as a distribution transformer, is constructed by winding a coil around a stacked iron core of stacked electrical steel sheets. Important transformer performance properties include, for example, iron loss (no-load loss) properties, excitation current properties, noise properties, and the like.
- Distribution transformers are installed in various locations. Especially for transformers installed in urban areas, there is a strong demand for low noise. Thus, in recent years, taking into consideration the impact on surrounding environment where transformers are installed, noise reduction has become increasingly important as a performance metric of transformers.
- Grain-oriented electrical steel sheets that are widely employed as iron core material of transformers vibrate due to material expansion and contraction caused by excitation. Material expansion and contraction due to excitation is also referred to as magnetostriction. Vibration due to magnetostriction is also referred to as magnetostrictive vibration. Magnetostrictive vibration is one of the main causes of noise in transformers. Therefore, noise performance of a transformer may strongly depend on magnetostriction properties of electrical steel sheets employed as iron core material. To reduce transformer noise, electrical steel sheets having low magnetostriction properties may be employed as the transformer iron core material.
- However, transformer noise is often not sufficiently reduced even when electrical steel sheets having excellent magnetostriction performance are employed as the iron core material. One possible cause of insufficient noise reduction is the occurrence of resonance phenomena due to close proximity between the natural frequency of a transformer iron core and the frequency of magnetostrictive vibration of electrical steel sheets. Therefore, advance calculation of mechanical vibration properties, such as the natural frequency of a transformer iron core, is extremely important when designing and manufacturing transformers.
- Here, use of the finite element method to analyze mechanical vibration properties of electromagnetic components containing magnetic material that generates magnetostriction, such as the iron core of a transformer, may be considered. For example, based on a numerical analysis model that represents an electromagnetic component by a combination of multiple finite elements in a finite element analysis, nodal force equivalent to the strain at each node or each finite element may be calculated for each finite element according to magnetic flux density applied to the electromagnetic component. In such a case, a quasi-static structural analysis is executed using a governing equation for structural analysis consisting of an equilibrium equation, a constitutive equation indicating the relationship between stress and strain, and a relational equation between displacement and strain.
- In the quasi-static structural analysis mentioned above, the relationship between stress tensor {σ} and strain tensor {ε} is expressed by the equation {σ} = {D}{ε}. Here, {•} represents a tensor. {D} is a tensor representing the relationship between strain and stress.
- Here, the component representation of the above equation is expressed as in Equation (1).
[Math. 1] - In Equation (1), {D} is represented by 81 components. {σ} and {ε} are represented by 9 components, respectively. Here, a tensor as a physical quantity is a symmetric tensor. By considering symmetric components, the number of independent components of {σ} and {ε} is six each. As a result, the relational equation of the tensor is expressed in matrix form as [σ] = [D] [ε], using the symbol [•] to denote the matrix, and further expressed in component form as in Equation (2). Here, [D] is also referred to as the elasticity matrix.
[Math. 2] - Further, the relationship between normal stress σi and normal strain εi, and the relationship between shear strain τij and shear strain yij are expressed using the elasticity matrix [D].
- Here, as the elasticity matrix [D], the elastic modulus of a member itself, such as electrical steel sheets that constitute the electromagnetic component subject to structural analysis, may be applied as is. However, it is known that when the elastic modulus of a member itself is applied as the elasticity matrix [D], the difference between the calculated results of mechanical vibration of the electromagnetic component subject to structural analysis and the actual measured results of mechanical vibration may be large. Such a large difference between calculated and measured results has made it difficult to reflect the results of structural analysis using structural analysis programs in the design of electromagnetic components that are stacked structures composed of stacked steel sheets.
- Further, iron cores used in transformers such as distribution transformers are also stacked structures composed of stacked steel sheets. Therefore, even when noise was predicted based on the results of structural analysis by a structural analysis program, prediction accuracy was low. The low accuracy of noise prediction sometimes caused actual manufactured transformers to be noisier. When transformers are noisy, problems arise such as extra costs for soundproofing measures such as soundproof walls. In order to reduce noise of a transformer and to suppress the incurring of extra costs, the design of a transformer iron core may be modified. However, when there is a large difference between the calculated and measured results of machine vibration, how design changes may be made to reduce noise is not clear. In order to establish a policy for transformer design changes, the accuracy of noise prediction using structural analysis programs needs to be improved.
- When the results of mechanical vibration calculations of the iron core of a transformer subject to structural analysis are compared with the results of actual mechanical vibration measurements, the following are possible causes of large discrepancies between the calculated values and the actual measured values. When the transformer iron core is a stacked structure composed of stacked steel sheets, the elasticity matrix [D] of the stacked structure is inherently different from the elasticity matrix [D] of the components themselves, such as the electrical steel sheets that constitute the stacked iron core of the transformer. Nevertheless, when structural analysis is conducted by substituting the value of the elasticity matrix [D] of the components themselves, such as electrical steel sheets, as is, this may also cause a large discrepancy between the calculated value and the measured value.
- Therefore, the elasticity matrix [D] of the stacked structure needs to be determined with high accuracy so that the difference between the calculated and measured results may be reduced. In particular, when conducting vibration analysis of a stacked iron core of stacked steel sheets using a constitutive equation that expresses the relationship between stress and strain in matrix representation, the transverse elastic moduli in two planes including the stacking direction of the transformer stacked iron core in the elasticity matrix [D] in the constitutive equation need to be determined with high accuracy.
- It would be helpful to provide a transformer stacked iron core elasticity matrix determination method that is able to determine with high accuracy the transverse elastic moduli in two planes including the stacking direction of the stacked iron core of the transformer in the elasticity matrix in the constitutive equation representing the relationship between stress and strain in a matrix representation. Further, it would be helpful to provide a vibration analysis method able to improve the accuracy of vibration analysis results by analyzing vibration of the stacked iron core of stacked steel sheets using a constitutive equation including the elasticity matrices determined.
- Embodiments of an elasticity matrix determination method and a vibration analysis method for a stacked iron core according to the present disclosure are described below, with reference to the drawings. Each drawing is schematic and may differ from actual implementation. Further, the following embodiments are examples of devices or methods for embodying the technical concept of the present disclosure, and are not limiting. That is, various changes may be made to the technical concept of the present disclosure within the technical scope described in the claims.
- A stacked iron core 21 to be analyzed according to the present embodiment is a stacked iron core of a three-phase three-leg transformer used as a distribution transformer, for example. As illustrated in
FIG. 1 , the stacked iron core 21 may be composed of a plurality of grain-oriented electrical steel sheets 22 having a defined thickness, with three legs 22c connecting between an upper yoke 22a and a lower yoke 22b. As an example, the thickness of each of the grain-oriented electrical steel sheets 22 is 0.23 mm. As an example, the number of layers in the stack of the grain-oriented electrical steel sheets 22 is 333. The stacked grain-oriented electrical steel sheets 22 are secured by wrapping with glass tape. As an example, the dimensions of the upper yoke 22a and the lower yoke 22b are set to be 100 mm wide by 500 mm long. As an example, the dimensions of the three legs 22c are set to be 100 mm wide by 300 mm long. The three legs 22c are connected between the upper yoke 22a and the lower yoke 22b at intervals of 100 mm. The stacked iron core 21 to be analyzed according to the present embodiment is not limited to the stacked iron core of a three-phase three-leg transformer illustrated inFIG. 1 . The thickness of each of the grain-oriented electrical steel sheets 22, the number of layers of the stack of the grain-oriented electrical steel sheets 22, the dimensions of the upper yoke 22a and the lower yoke 22b, and the dimensions of the three legs 22c are not limited to the above examples. - To numerically analyze vibration of the stacked iron core 21 of a three-phase three-leg transformer, a constitutive equation indicating the relationship between stress and strain is used as the governing equation for elastic structural analysis. The constitutive equation is expressed as in Equation (3) below by substituting the stack with an equivalent homogeneous body and by expressing the effect of stacking in terms of matrix properties.
[σ] is a stress matrix. [C] is an elasticity matrix (stiffness matrix) as a response function. [C] is assumed to be identical to [D], described above. [ε] is a strain matrix. - As illustrated in
FIG. 1 , each direction of the stacked iron core 21 is represented by X, Y, and Z axes of an XYZ Cartesian coordinate system. The grain-oriented electrical steel sheets 22 extend along the XY plane and are stacked along the Z axis direction. - Stress acting on the stacked iron core 21 includes normal components acting in directions normal to the stacked iron core 21 (compressive or tensile directions) and shear components acting in shear directions of the stacked iron core 21.
FIG. 2A ,FIG. 2B , andFIG. 2C each illustrate normal stresses acting in the Z, X, and Y axis directions, respectively. The normal stresses acting in the Z, X, and Y axis directions are represented by σz, σx, and σy, respectively.FIG. 2D ,FIG. 2E , andFIG. 2F each illustrate shear stresses acting in the ZX, XY, and YZ planes, respectively. The shear stresses acting in the ZX, XY and YZ planes are represented by τzx, τxy, and τyz, respectively. The stress matrix [σ] has normal stresses and shear stresses as components. - The strain of the stacked iron core 21 includes components that strain the stacked iron core 21 in normal directions (compressive or tensile) and components that strain the stacked iron core 21 in shear directions. Normal strains in the Z, X, and Y axis directions are represented by εz, εx, and εy, respectively. Shear strains in the ZX, XY, and YZ planes are represented by γzx, γxy, and γyz, respectively.
- The elasticity matrix [C] has 6 × 6 = 36 elements that specify the relationship between the six components of stress and the six components of strain. The 36 elements are represented by elastic moduli Cij (i = 1-6, j = 1-6). The relationship between stress and strain is expressed by the elasticity matrix as in Equation (4) below.
[Math. 3] - The stacked iron core 21 is composed of the stacked grain-oriented electrical steel sheets 22, and therefore the stacked iron core 21 has mechanical symmetry and also has 180-degree symmetry in the longitudinal direction of the stacked grain-oriented electrical steel sheets 22 and a direction orthogonal thereto. Therefore, the stacked iron core 21 may be said to be orthotropic as an anisotropy classification. The elasticity matrix of an orthotropic object is basically represented by a total of nine elastic moduli, C11, C12, C13, C22, C23, C33, C44, C55 and C66, as in Equation (5) below.
[Math. 4] - Of these nine elastic moduli, the elastic moduli C11, C12, C13, C22, C23, and C33 are calculated by each of the following Equations (6) through (12), based on the longitudinal elastic moduli Ex, Ey, and Ez and the Poisson's ratios vxy, vyx, vyz, vzy, vzx, and vxz.
- The elastic modulus C44 corresponds to the transverse elastic modulus Gyz in the YZ plane, as indicated below as Equations (13), (14), and (15). The elastic modulus C55 corresponds to the transverse elastic modulus Gzx in the ZX plane. The elastic modulus C66 corresponds to the transverse elastic modulus Gxy in the XY plane.
- Here, Ex, Ey, and Ez are the longitudinal elastic modulus in the X direction (Young's modulus), Y direction (Young's modulus) and Z direction (Young's modulus), respectively. vxy, vyx, vyz, vzy, vzx, and vxz represent Poisson's ratio in the XY plane (ratio of longitudinal strain in the X direction to transverse strain in the Y direction), Poisson's ratio in the YX plane, Poisson's ratio in the YZ plane, Poisson's ratio in the ZY plane, Poisson's ratio in the ZX plane, and Poisson's ratio in the XZ plane, respectively. The relationship between longitudinal elastic modulus and Poisson's ratio is expressed by the following Equation (16), which is called the reciprocal theorem.
[Math. 7] - According to the reciprocal theorem, Poisson's ratio vyx in the YX plane is represented using Ex, Ey, and vxy. Poisson's ratio vzy in the ZY plane is represented using Ez, Ey, and vyz. Poisson's ratio vxz in the XZ plane is represented using Ez, Ex, and vzx.
- Accordingly, a total of nine elastic moduli C11, C12, C13, C22, C23, C33, C44, C55, and C66, representing the elasticity matrix of an orthotropic object, are represented by the longitudinal elastic moduli Ex, Ey, and Ez, the transverse elastic moduli Gyz, Gzx, and Gxy, and the Poisson's ratios vxy, vyz, and vzx, expressed using a total of nine mechanical properties. Therefore, determining the nine mechanical properties is equivalent to determining the nine elastic moduli that represent the elasticity matrix. Methods for determining the longitudinal elastic moduli, the transverse elastic moduli, and the Poisson's ratios are explained below.
- First, for the longitudinal elastic modulus of an orthotropic stacked iron core, the longitudinal moduli Ex and Ey may be set equal to the longitudinal moduli Ex0 and Ey0 of a single steel sheet. However, the longitudinal elastic modulus Ez cannot be set equal to the longitudinal elastic modulus Ez0 of a single steel sheet, because a slight gap exists between the stacked steel sheets. Therefore, according to the present embodiment, experiments are conducted to determine the relationship between load and displacement in the stacking direction of stacked steel sheets, and the longitudinal elastic modulus Ez is set based on the experimental results. According to the present embodiment, Ez = 10 GPa is set based on the experimental results. The effect of a large or small value of the longitudinal elastic modulus in the stacking direction on the vibration calculation results is small. Therefore, even when Ez is set equal to the longitudinal elastic modulus Ez0 of one steel sheet, an error in the vibration calculation results is not large.
- Further, for the Poisson's ratio of an orthotropic stacked iron core, Poisson's ratio vxy in the XY plane may be set equal to Poisson's ratio vxy0 of a single steel sheet. However, Poisson's ratio vyz in the YZ plane and Poisson's ratio vzx in the ZX plane cannot be set as the Poisson's ratios vyz0 and vzx0 of a single steel sheet. This is because the mechanical coupling between the strain in the stacking direction and the strain normal to the stacking direction in a stacked iron core is considered to be extremely weak. Here, actually measuring vyz and vzx is extremely difficult. However, based on the above, vyz and vzx are expected to be extremely small. Therefore, according to the present embodiment, both vyz and vzx are assumed to be zero.
- Further, for the transverse elastic moduli of the stacked iron core, the transverse elastic modulus Gxy in the XY plane may be set equal to the transverse elastic modulus Gxy0 of a single steel sheet. However, the transverse elastic moduli in two planes including the stacking direction, that is, Gzx in the ZX plane and Gyz in the YZ plane, cannot be set as the transverse elastic moduli Gxz0 and Gyz0 of a single steel sheet. This is because the transverse elastic moduli Gzx and Gyz need to reflect the effect of slippage between steel sheets that occurs in the X and Y directions perpendicular to the stacking direction at interfaces between stacked steel sheets. Therefore, in order to improve the analysis accuracy of the vibration analysis using the constitutive equation that expresses the relationship between stress and strain in a stacked iron core in matrix representation, highly accurate determination of the transverse elastic moduli in two planes that include the stacking direction of the stacked iron core of the transformer in the elasticity matrix in the constitutive equation, namely the transverse elastic modulus Gzx in the ZX plane and the transverse elastic modulus Gyz in the YZ plane, is required as an important matter.
- Here, as a method for determining the transverse elastic modulus Gzx in the ZX plane and the transverse elastic modulus Gyz in the YZ plane as values reflecting the effect of slippage between steel sheets, actually fabricating a stacked iron core for a three-phase three-leg transformer and measuring accurate transverse elastic moduli Gzx and Gyz may be considered. However, no method has been established to measure the transverse elastic modulus of a stacked iron core. This is because, while ultrasonic waves may be used to measure mechanical constants including transverse elastic modulus in the case of metal materials, accurate measurements in the case of a stacked iron core are likely to be difficult because slippage between steel sheets greatly attenuates vibrations.
- As another possible method for determining the transverse elastic moduli in two planes of a stacked iron core including the stacking direction, measuring the natural frequency of the stacked iron core and estimating the transverse elastic moduli from the natural frequency may be considered. However, measuring the natural frequency of the stacked iron core of the transformer may still be difficult due to high vibration attenuation. Especially when an iron core is large, measuring the natural frequency is particularly difficult.
- Therefore, in the elasticity matrix determination method according to the present embodiment, the transverse elastic moduli Gzx and Gyz in two planes including the stacking direction are determined by executing the procedures illustrated in
FIG. 3 . According to the present embodiment, the stacked iron core 21 for a three-phase three-leg transformer, illustrated as an example inFIG. 1 , is the subject of the analysis. According to the present embodiment, the transverse elastic modulus of the upper yoke 22a and the transverse elastic modulus of the lower yoke 22b that constitute the stacked iron core 21 are the same value. The transverse elastic moduli of the upper yoke 22a and the lower yoke 22b that constitute the stacked iron core 21 are different from that of the legs 22c. In other words, the transverse elastic moduli Gyz and Gzx in two planes including the stacking direction of the stacked iron core 21 of the transformer included in the elasticity matrix in the constitutive equation are different for the upper yoke 22a and the lower yoke 22b that constitute the stacked iron core 21 and the legs 22c. Therefore, in the elasticity matrix determination method according to the present embodiment, the transverse elastic moduli Gyz and Gzx in two planes including a plurality of different stacking directions are determined. By executing the elasticity matrix determination method according to the present embodiment, the transverse elastic moduli Gyz and Gzx of the upper yoke 22a and the lower yoke 22b, and the transverse elastic moduli Gyz and Gzx of the legs 22c are respectively determined. - The upper yoke 22a and the lower yoke 22b are also collectively referred to as a first portion. The legs 22c are also referred to as a second portion. In other words, the stacked iron core 21 includes the first portion and the second portion. The transverse elastic moduli Gyz and Gzx of the first portion and the transverse elastic moduli Gyz and Gzx of the second portion are different from each other. By executing the elasticity matrix determination method according to the present embodiment, the transverse elastic moduli Gyz and Gzx of the first portion and the transverse elastic moduli Gyz and Gzx of the second portion that are different from each other are determined.
- Each procedure of the elasticity matrix determination method according to the present embodiment may be executed by a vibration analyzer 40 illustrated in
FIG. 4 . The vibration analyzer 40 includes a controller 42, a memory 44, and an interface 46. - The controller 42 controls and manages each functional part constituting the vibration analyzer 40 and the vibration analyzer 40 as a whole. The controller 42 may include at least one processor, such as a central processing unit (CPU), to control and manage various functions. The controller 42 may include a single processor or a plurality of processors. The controller 42 including at least one processor may realize the functions of the vibration analyzer 40 by reading and executing a program stored in the memory 44.
- The memory 44 may function as a memory for storing various types of information. The memory 44 may store, for example, a program to be executed in the controller 42, data used in processing executed in the controller 42, a result of processing, or the like. Further, the memory 44 may function as the working memory of the controller 42. The memory 44 may be configured as semiconductor memory, for example, but is not limited to this, and may include any storage device. For example, the memory 44 may be configured as the internal memory of a processor used as the controller 42 or as a hard disk drive (HDD) accessible from the controller 42.
- The interface 46 may include a communication interface for communicating with other devices by wired or wireless means. The interface 46 may include input/output ports that input and output data to and from other devices. The interface 46 sends and receives required data and signals to and from a process computer or higher-level system. The interface 46 may communicate based on wired communication standards and may communicate based on wireless communication standards. Example wireless communication standards may include cellular phone communication standards such as 3G, 4G, 5G, and the like. Further, example wireless communication standards may include IEEE 802.11 and Bluetooth® (Bluetooth is a registered trademark in Japan, other countries, or both). The interface 46 may support one or more of these communication standards. The interface 46 is not limited to these examples and may communicate with other devices and input/output data based on various standards.
- The following describes each procedure of the elasticity matrix determination method according to the present embodiment as being executed by the controller 42 of the vibration analyzer 40. Each procedure of the elasticity matrix determination method may be executed by another device and may be executed by a human.
- First, in step S1 (first step) of
FIG. 3 , the controller 42 acquires results of measurement of a frequency spectrum of noise determined by measuring excitation noise of the stacked iron core 21 of the transformer subject to vibration analysis illustrated inFIG. 1 . Specifically, the excitation noise is measured by setting excitation frequency to 50 Hz for the stacked iron core 21. The frequency spectrum of transformer excitation noise consists of frequency components that are integer multiples of twice the excitation frequency, that is, even multiples of the excitation frequency, and therefore the spectrum of the excitation noise at each frequency of 100 Hz pitch in a range from 100 Hz to 1000 Hz is acquired as the frequency spectrum of the noise. In the field of transformer manufacturing, the excitation noise properties of transformers are widely measured as a quality control item of shipped products. Accordingly, there is no particular difficulty in such measurement. The excitation frequency may be set to 60 Hz. When the excitation frequency is set to 60 Hz, a spectrum of the excitation noise at a pitch of 120 Hz is acquired from a frequency of 120 Hz to 1200 Hz. - The following describes a case where the excitation frequency is set to 50 Hz. An example of the frequency spectrum of noise acquired when the excitation frequency is set to 50 Hz is illustrated as a graph in
FIG. 5 . In the graph inFIG. 5 , the horizontal axis represents frequency. The vertical axis represents magnitude of excitation noise. - Next, in step S2 (second step) of
FIG. 3 , the controller 42 acquires frequency spectrum data of excitation magnetostriction of an electrical steel sheet that is the same as the grain-oriented electrical steel sheets 22 that constitute the stacked iron core 21 of the transformer subject to vibration analysis illustrated inFIG. 1 . As the frequency spectrum data of the excitation magnetostriction, excitation magnetostriction amplitude spectrum data at each frequency a pitch of 100 Hz in the range from 100 Hz to 1000 Hz is acquired. The frequency spectrum data of the excitation magnetostriction may be acquired by measuring the excitation magnetostriction of the electrical steel sheet or by acquiring data from the manufacturer of the electrical steel sheet. An example of the frequency spectrum data of the excitation magnetostriction acquired is illustrated as a graph inFIG. 6 . In the graph inFIG. 6 , the horizontal axis represents frequency. The vertical axis represents magnitude of magnetostriction amplitude. The magnitude of magnetostriction amplitude at each frequency is expressed in dB as a value normalized by dividing by the value of the magnetostriction amplitude when the frequency is 100 Hz. The dB indication corresponds to a value obtained by taking the common logarithm of the value to be displayed and multiplying by 10. - Next, in step S3 (third step), the controller 42 provisionally sets the transverse elastic moduli Gyz and Gzx and calculates a frequency spectrum of vibration response function for the provisionally set transverse elastic moduli. Specifically, the controller 42 executes a vibration response analysis on the stacked iron core 21 of the transformer subject to vibration analysis using structural analysis software. Of the nine mechanical property values of the stacked iron core 21, which are the longitudinal elastic moduli Ex, Ey, and Ez, the transverse elastic moduli Gyz, Gzx, and Gxy, and the Poisson's ratios vxy, vyz, and vzx, seven are set as follows, except the transverse elastic moduli Gyz and Gzx, as described above.
- The transverse elastic moduli Gyz and Gzx in the two planes including the stacking direction are different for each of the plurality of portions (two) of the stacked iron core 21. Specifically, the transverse elastic moduli Gyz and Gzx of the upper yoke 22a and the lower yoke 22b are different from those of the legs 22c. Gyz = Gzx = G1 is provisionally set for the transverse elastic modulus of the upper yoke 22a and the lower yoke 22b. Gyz = Gzx = G2 is provisionally set for the transverse elastic modulus of the legs 22c. Each of G1 and G2 is a value provisionally selected and set from a defined range as the transverse elastic modulus, and may also be referred to as a provisional value of the transverse elastic modulus. G1 corresponds to the transverse elastic moduli Gyz and Gzx in the first portion, and is also referred to as a first provisional value. G2 corresponds to the transverse elastic moduli Gyz and Gzx in the second portion, and is also referred to as a second provisional value. The controller 42 changes the combination of provisional values (G1, G2) and calculates the frequency spectrum of the vibration response function of the stacked iron core 21 of the transformer for each combination.
- An example of the frequency spectrum of the vibration response function of the stacked iron core 21 of the transformer calculated for a particular combination of values (G1, G2) is illustrated as a graph in
FIG. 7 . In the graph inFIG. 7 , the horizontal axis represents frequency. The vertical axis represents magnitude of response function. The magnitude of the response function is normalized and displayed so that the vibration response value is 0 dB when the frequency is 100 Hz. Here, each of the provisional values (G1, G2) is actually selected from a range of transverse elastic modulus expected from the structure of the stacked iron core 21 of the transformer. According to the present embodiment, each of G1 and G2 is selected from a range of 0.05 GPa to 0.5 GPa. - Next, in step S4 (fourth step), the controller 42 calculates a frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer, based on the frequency spectrum data of the excitation magnetostriction of the electrical steel sheets acquired in step S2 (second step) and the frequency spectrum of the vibration response function of the stacked iron core 21 of the transformer calculated in step S3 (third step). Specifically, the controller 42 calculates the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer as the product of the frequency spectrum data of the excitation magnetostriction of the electrical steel sheets and the frequency spectrum of the vibration response function of the stacked iron core 21 of the transformer. When the frequency spectrum is displayed in dB, the controller 42 calculates the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer as a sum.
- An example of the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer calculated in this way is illustrated as a graph in
FIG. 8 . In the graph inFIG. 8 , the horizontal axis represents frequency. The vertical axis represents calculated magnitude of excitation vibration. The magnitude of the excitation vibration is indicated in dB. - Next, in step S5 (fifth step), the controller 42 calculates the degree of coincidence between measured results of the frequency spectrum of the noise of the stacked iron core 21 of the transformer acquired in step S1 (first step) and the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer calculated in step S4 (fourth step).
- The frequency spectrum data of the noise is measured for each frequency from 100 Hz to 1000 Hz with a 100 Hz pitch. Therefore, the number of frequency spectrum data points for the noise is 10. Each frequency component of the noise frequency spectrum data is denoted as (S100, S200, S300, ..., S1000). Further, the frequency spectrum data of the excitation vibration is calculated for each frequency from 100 Hz to 1000 Hz with a 100 Hz pitch. Therefore, the number of frequency spectrum data points for the excitation vibration is 10. Each frequency component of the frequency spectrum data of excitation vibration is denoted as (V100, V200, V300, ..., V1000). The following is an explanation of how the degree of coincidence is calculated based on these notations.
- (S100, S200, S300, ..., S1000) representing each frequency component of the frequency spectrum data of the noise and (V100, V200, V300, ..., V1000) representing each frequency component of the frequency spectrum data of the excitation vibration are respectively considered as data points in multidimensional space. In this case, these data points are considered as data points in 10-dimensional space.
- Here, the controller 42 may typically calculate the degree of coincidence between the frequency spectrum data of the noise and the frequency spectral data of the excitation vibration as the Euclidean distance of the data points in multidimensional space. However, when the degree of coincidence is calculated as a Euclidean distance, the accuracy of calculation of the degree of coincidence is known to decrease due to offsets in the data. When the frequency spectrum data of the excitation noise and the excitation vibration are expressed in dB values, there is a concern that the degree of freedom in determining the reference value may cause an offset in the data, which may deteriorate the accuracy of the calculation of the degree of coincidence.
- Therefore, to avoid the concern that the calculation accuracy may deteriorate due to data offset, the controller 42 calculates cosine similarity as the degree of coincidence according to the present embodiment. The cosine similarity is calculated as the cosine value of the angle between two vectors when (S100, S200, S300, ..., S1000) and (V100, V200, V300, ..., V1000) are considered as multidimensional vectors S and V (here, 10-dimensional space vectors), respectively. The multidimensional vector S is also referred to as a first vector. The multidimensional vector V is also referred to as a second vector. The cosine similarity is calculated by the following Equation (17). In Equation (17), cosθ represents the cosine similarity. The symbols of "→" above "S" and "V" represent multidimensional vectors S and V.
[Math. 8] - The cosine similarity is calculated as a value obtained by dividing the inner product of the multidimensional vectors S and V by the product of the length of the multidimensional vector S and the length of the multidimensional vector V. When the multidimensional vector S and the multidimensional vector V coincide, the cosine similarity is calculated as 1. When the multidimensional vector S and the multidimensional vector V are orthogonal, the cosine similarity is calculated as 0. When the multidimensional vector S and the multidimensional vector V are in opposite directions, the cosine similarity is calculated as -1.
- Next, in step S6 (sixth step), the controller 42 determines whether the mapping of the degree of coincidence in a defined range by changing the provisional values in steps S3 through S5 has been completed. Specifically, the controller 42 repeatedly executes the procedures from step S3 to step S5 while changing the combination of provisional values (G1, G2) and calculates the degree of coincidence for each combination of provisional values (G1, G2). The controller 42 maps the calculated degree of coincidence for each combination of provisional values onto a two-dimensional map. Specifically, an example of the results of the calculation of the degree of coincidence between the frequency spectrum of the excitation vibration and the frequency spectrum of the excitation noise of the stacked iron core 21 of the transformer is illustrated in
FIG. 9 as a two-dimensional map. In the two-dimensional map inFIG. 9 , the vertical and horizontal axes represent G1 and G2, respectively. InFIG. 9 , isovalue lines representing equal degrees of coincidence are noted. InFIG. 9 , closed isovalue lines that are closed curves having smaller diameters correspond to isovalue lines having higher degrees of coincidence. The combination of G1 and G2 for which the degree of coincidence is a local maximum value corresponds to the vicinity of the center of a closed curve. The controller 42 may map the degree of coincidence for each combination of provisional values to a two-dimensional map and determine that mapping has been completed when a defined range is filled. Further, the controller 42 may determine that mapping has been completed when the presence of a local maximum value is detectable in the two-dimensional map mapping the degree of coincidence. - When the controller 42 does not determine that mapping has been completed (step S6: NO), processing returns to the procedure in step S3 and repeats steps S3 through S6 until the controller 42 is able to determine that mapping has been completed. When the controller 42 determines that mapping has been completed (step S6: YES), processing proceeds to step S7.
- In step S7 (seventh step), the controller 42 detects a point where the degree of coincidence is a local maximum value from the two-dimensional map. Then, the controller 42 adopts the combination of provisional values (G1, G2) when the degree of coincidence is a local maximum value as the transverse elastic moduli Gzx and Gyz in two planes including the stacking direction, for each of the plurality (two) of portions that constitute the stacked iron core 21. Specifically, the controller 42 adopts G1 as the transverse elastic moduli Gzx and Gyz of the upper yoke 22a and the lower yoke 22b. In other words, the controller 42 sets Gzx = Gyz = G1 for the upper yoke 22a and the lower yoke 22b. Further, the controller 42 adopts G2 as the transverse elastic moduli Gzx and Gyz of the legs 22c. In other words, the controller 42 sets Gzx = Gyz = G2 for the legs 22c. After execution of the procedure of step S7, the controller 42 ends execution of the procedures of the flowchart in
FIG. 3 . - According to the present embodiment, while repeatedly executing the procedures from step S3 to S6, the controller 42 changes the two parameters G1 and G2 to complete mapping of the degree of coincidence and detect a local maximum value of the degree of coincidence. In other words, the controller 42 needs to execute a numerical search in two dimensions. The two-dimensional search results in a very large number of search points. Further, two-dimensional searches require a large computational load. Therefore, according to the present embodiment, an optimization search method using a genetic algorithm (GA) is used, utilizing artificial intelligence (AI) technology. Specifically, as an evaluation function in the optimization search method, the degree of coincidence between the frequency spectrum of the noise of the stacked iron core 21 of the transformer acquired in step S1 and the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer calculated in step S4 is employed. Commercially available search software may be used as a GA optimization search tool. Further, a self-created GA optimization search tool may be used, as the inventors have done.
- According to the present embodiment, a case is illustrated in which the transverse elastic moduli are calculated by assuming that the transverse elastic moduli of the stacked iron core, Gyz and Gzx, are equal. The values of Gyz and Gzx may be different from each other. However, the inventors confirmed that the value of Gyz and the value of Gzx may be considered equal in a stacked iron core of grain-oriented electrical steel sheets, not only for the stacked iron core illustrated in
FIG. 1 , but also for stacked iron cores having various dimensions. Therefore, the values of the transverse elastic moduli Gyz and Gzx are considered equal to each other according to the present embodiment. - In the two-dimensional map of
FIG. 9 illustrating an example of the degree of coincidence between the frequency spectrum of the excitation vibration and the frequency spectrum of the excitation noise of the stacked iron core 21 of the transformer calculated in the sixth step of the method of determining the elasticity matrix of the stacked iron core 21 of the transformer described above, the values of (G1, G2) indicating local maximum values may be adopted as the transverse elastic moduli Gyz and Gzx in two planes including the stacking direction of the transformer. It was confirmed that the accuracy of the vibration analysis is improved by implementing the vibration analysis in the seventh step by incorporating Gyz and Gzx adopted based on the two-dimensional map inFIG. 9 into the constitutive equation. Therefore, by carrying out the first to seventh steps mentioned above to determine the elasticity matrix of the stacked iron core 21 of the transformer, the accuracy of vibration analysis of the transformer is improved. - Here, a search using a GA optimization search tool, executed to obtain the two-dimensional map of
FIG. 9 indicating the degree of coincidence between the frequency spectrum of the excitation vibration and the frequency spectrum of the excitation noise, is executed along the path illustrated in the graph ofFIG. 10 . The vertical and horizontal axes inFIG. 10 correspond to G1 and G2. Each circle plotted on the graph inFIG. 10 corresponds to one search point. The number of search points plotted inFIG. 10 is about 800. - In the sixth step, the calculation of the degree of coincidence at each search point is repeated. The degree of coincidence at each search point is calculated by executing the procedures from the third step to the fifth step. The vibration response analysis executed as the third step of the procedure for calculating the degree of coincidence is carried out using, for example, structural analysis software. The time required to carry out vibration response analysis using structural analysis software depends on the performance of the computer used, but even when using a high-performance computer typically used for numerical calculations, it takes approximately two hours per search point. As illustrated in the two-dimensional map of
FIG. 9 , in order to obtain a two-dimensional map with a data density sufficient to determine a local maximum point of the degree of coincidence between the frequency spectrum of the excitation vibration and the frequency spectrum of the excitation noise, at least approximately 800 search points are required. Therefore, the time required for vibration response analysis to obtain the results illustrated inFIG. 9 is 2 hours × 800 (points) = 1600 hours = about 67 days. That is, if a search were simply carried out using a GA optimization search tool, it would take more than two months to obtain the results illustrated inFIG. 9 . - Therefore, the inventors have investigated ways of shortening the time required to calculate the two-dimensional map of the degree of coincidence in the sixth step described above. As a result, the inventors found that the time required to calculate the two-dimensional map of the degree of coincidence can be reduced by including the following procedure in the sixth step of the elasticity matrix determination method according to the present disclosure.
- Specifically, in the sixth step, the controller 42 of the vibration analyzer 40 executes the step 6-A in which, when each combination of the first provisional value G1 and the second provisional value G2 for which the degree of coincidence is to be calculated is expressed as a trial point for trial searching, points distributed in a two-dimensional space with the first provisional value G1 as the first axis and the second provisional value G2 as the second axis are sequentially selected as trial points, and the selected trial points are subjected to processing from the third step to the fifth step to repeatedly calculate the degree of coincidence.
- The controller 42 executes the step 6-B in which, based on the degree of coincidence calculated in the step 6-A, a limited sub-region is set as a target for a more detailed search within the region in which the trial points distributed in the two-dimensional space exist.
- The controller 42 sets search points between trial points within the limited sub-region set in the step 6-B and executes a search, and executes processing from the third step to the fifth step at each search point to repeatedly calculate the degree of coincidence, and then executes the step 6-C in which the combination (G1, G2) in which the degree of coincidence is a local maximum value within the limited sub-region is calculated.
- As a method of setting a search point within a limited sub-region and executing a search in the step 6-C, a search method may be used that utilizes artificial intelligence (AI) technology and employs an optimization search method using a genetic algorithm (GA), with the degree of coincidence between the frequency spectrum of the noise of the stacked iron core 21 of the transformer acquired in the first step and the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer calculated in the fourth step as an evaluation function.
- As described above, by setting search points within a limited sub-region, the total number of trial points and search points required to calculate the combination (G1, G2) at which the degree of coincidence is a local maximum value is greatly decreased. As a result, a two-dimensional map of the degree of coincidence is calculated, and the time required to calculate the combination of (G1, G2) when the degree of coincidence is a local maximum value is greatly decreased, thereby achieving high speed.
- Finally, the values of (G1, G2) when the degree of coincidence is a local maximum value are incorporated into the constitutive equation as the transverse elastic moduli Gyz and Gzx in the two planes including the stacking direction of the transformer, and the vibration analysis in the seventh step is carried out. This not only improves vibration analysis accuracy, but also speeds up the analysis by greatly shortening the required time.
- As described above, according to the elasticity matrix determination method for the stacked iron core 21 of the transformer according to the present embodiment, when executing the vibration analysis of the stacked iron core 21 of stacked steel sheets using a constitutive equation that expresses the relationship between stress and strain in a matrix representation, the transverse elastic moduli Gyz and Gzx of the stacked iron core 21 of the transformer for the plurality (two) of different stacking directions in the elasticity matrices in the constitutive equation is optimally determined. As a result, a discrepancy between measured and calculated vibration properties is suppressed.
- Verification of the effect of implementing the transformer stacked iron core elasticity matrix determination method according to the present embodiment and the vibration analysis method is described below via Examples.
- First, grain-oriented electrical steel sheets each having a thickness of 0.23 mm were prepared. Then, by stacking the prepared grain-oriented electrical steel sheets, the stacked iron core 21 of a three-phase three-leg transformer for vibration analysis was produced, as illustrated in
FIG. 1 . The steel sheet stacked thickness of the stacked iron core 21 was 100 mm. Further, dimensions of the upper yoke 22a and the lower yoke 22b were made to be 100 mm wide by 500 mm long. Further, dimensions of the three legs 22c were made to be 100 mm wide with an iron core window length of 300 mm. The legs 22c connected the upper yoke 22a and the lower yoke 22b with a spacing of 100 mm between the legs 22c. Excitation coils were then formed by winding indoor PVC (IV) wires around each of the three legs 22c of the stacked iron core 21. - Supply voltage was adjusted so that iron core magnetic flux density was exactly 1.7 T by energizing coils with a 50 Hz three-phase current. In this state, the frequency spectrum of noise was acquired by measuring excitation noise using a sound level meter, as in the procedure of step S1 in
FIG. 3 .FIG. 11 illustrates an example of a result of noise frequency spectrum measurement. The vertical and horizontal axes of the graph inFIG. 11 are the same as in the graph inFIG. 5 . - Next, the frequency spectrum of magnetostriction was acquired by measuring the excitation magnetostriction of the prepared grain-oriented electrical steel sheets when the excitation frequency was 50 Hz and the magnetic flux density was 1.5 T, 1.6 T, and 1.7 T, using a magnetostriction measuring device.
FIG. 12 illustrates an example of a result of frequency spectrum of magnetostriction measurement. In the graph inFIG. 12 , the horizontal axis represents frequency. The vertical axis represents magnitude of magnetostriction. - Next, a vibration response analysis was performed on the stacked iron core 21 of the transformer subject to vibration analysis using structural analysis software. Here, seven of the nine mechanical properties of the stacked iron core 21, which are the longitudinal elastic moduli Ex, Ey, and Ez, the transverse elastic moduli Gyz, Gzx, and Gxy, and the Poisson's ratios vxy, vyz, and vzx, were set as follows.
- Here, x corresponds to the steel sheet rolling direction. y corresponds to a direction perpendicular to x. z corresponds to the steel sheet stacking direction.
- Regarding the transverse elastic moduli Gyz and Gzx in the two planes including the stacking direction, the transverse elastic moduli Gyz and Gzx of the upper yoke 22a and the lower yoke 22b that constitute the stacked iron core 21, and the transverse elastic moduli Gyz and Gzx of the legs 22c are different from each other. In this case, the transverse elastic moduli of the upper yoke 22a and the lower yoke 22b that constitute the stacked iron core 21 is set so that Gyz = Gzx = G1. The transverse elastic moduli of the legs 22c is set so that Gyz = Gzx = G2. Here, G1 and G2 are each provisional values selected from a defined range. The frequency spectrum of the vibration response function of the stacked iron core 21 of the transformer for the combination of the provisional values (G1, G2) was then calculated. The defined range in which each of the provisional values (G1, G2) is selected is actually the range of transverse elastic moduli expected from the structure of the stacked iron core 21 of the transformer, ranging from 0.05 GPa to 0.4 GPa according to the present embodiment.
- For example, when the transverse elastic moduli of the upper yoke 22a and the lower yoke 22b, which constitute the stacked iron core 21, were Gyz = Gzx = G1 = 0.2 GPa and that of the legs 22c were Gyz = Gzx = G2 = 0.2 GPa, the calculated results of the frequency spectrum of the vibration response function of the stacked iron core 21 are illustrated in
FIG. 13 . The vertical and horizontal axes of the graph inFIG. 13 are the same as in the graph inFIG. 7 . - Next, as in the procedure in step S4 of
FIG. 3 , the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer was calculated, based on the frequency spectrum data of the excitation magnetostriction of the electrical steel sheets acquired in step S2 ofFIG. 3 and the frequency spectrum of the vibration response function of the stacked iron core 21 of the transformer calculated in step S3 ofFIG. 3 . For example, when the transverse elastic moduli of the upper yoke 22a and the lower yoke 22b, which constitute the stacked iron core 21, were Gyz = Gzx = G1 = 0.2 GPa and that of the legs 22c were Gyz = Gzx = G2 = 0.2 GPa, the calculated results of the frequency spectrum of the excitation vibration of the stacked iron core 21 are illustrated inFIG. 14 . The vertical and horizontal axes of the graph inFIG. 14 are the same as in the graph inFIG. 8 . - Next, as in the procedure in step S5 of
FIG. 3 , the degree of coincidence between the frequency spectrum of the noise of the stacked iron core 21 of the transformer acquired in step S1 ofFIG. 3 and the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer calculated in step S4 ofFIG. 3 was calculated. Here, the cosine similarity was calculated as the degree of coincidence between the frequency spectrum of the noise of the stacked iron core 21 of the transformer and the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer. Cosine similarity is also referred to as Cos similarity. - Next, as in the procedure of step S6 in
FIG. 3 , the values of the transverse elastic moduli Gyz = Gzx = G1 for the upper yoke 22a and the lower yoke 22b and the transverse elastic moduli Gyz = Gzx = G2 for the legs 22c were changed in the mentioned defined range, respectively, to change the combination of the provisional values (G1, G2). By repeating the procedure from step S3 through S5 inFIG. 3 , a two-dimensional map indicating the degree of coincidence between the frequency spectrum of excitation vibration and the frequency spectrum of excitation noise was created.FIG. 15 illustrates an example of the two-dimensional map created according to the present Example. The vertical and horizontal axes of the graph inFIG. 15 correspond to G1 and G2. - In step S6 of
FIG. 3 , there are two parameters (G1, G2), and therefore the numerical search needs to be executed in two dimensions. Therefore, the number of search points becomes very large and requires a great deal of work. Therefore, in the present Example, by utilizing artificial intelligence (AI) technology, an optimization search method using a genetic algorithm (GA) was adopted as a search method in which the degree of coincidence between the frequency spectrum of the noise of the stacked iron core 21 of the transformer acquired in step S1 ofFIG. 3 and the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer calculated in step S4 ofFIG. 3 was used as an evaluation function. - The point where the degree of coincidence is indicated to be a local maximum value in the two-dimensional map of
FIG. 15 is where the transverse elastic moduli Gyz = Gzx = G1 of the upper yoke 22a and the lower yoke 22b that constitute the stacked iron core 21 is 0.25 GPa, and the transverse elastic moduli Gyz = Gzx = G2 of the legs 22c is 0.15 GPa. In this way, the combination of (G1, G2) where the degree of coincidence is a local maximum value is determined. The combination of the specific values (G1, G2) determined is adopted as the transverse elastic moduli Gzx and Gyz of the upper yoke 22a and the lower yoke 22b, and the transverse elastic moduli Gzx and Gyz of the legs 22c, respectively. - The frequency spectrum of the excitation vibration of the stacked iron core 21 calculated for the combination (G1, G2) where the transverse elastic moduli Gyz = Gzx = G1 = 0.25 GPa of the upper yoke 22a and the lower yoke 22b constituting the stacked iron core 21 and the transverse elastic moduli Gyz = Gzx = G2 = 0.15 GPa of the legs 22c was determined as the final calculated value of the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer.
- According to the Example, a graph comparing the calculated values of the frequency spectrum of the excitation vibration of the stacked iron core of the transformer with the measured values of the frequency spectrum of the noise obtained by measuring the excitation noise of the stacked iron core of the transformer is illustrated in
FIG. 16 . The trends of the calculated and measured frequency spectra match very well. Accordingly, the Example confirms that the transverse elastic moduli Gzx and Gyz in two planes including the stacking direction for the upper yoke 22a and the lower yoke 22b of the stacked iron core 21 of the transformer and the transverse elastic moduli Gzx and Gyz in two planes including the stacking direction for the legs 22c of the stacked iron core 21 of the transformer, which are included in the elasticity matrices in the constitutive equation, were calculated with high accuracy. -
FIG. 17 indicates the path of search points that was searched for by an optimization search method using a genetic algorithm (GA) to obtain the two-dimensional map of the degree of coincidence illustrated inFIG. 15 . The total number of search points illustrated inFIG. 17 is 832. In this case, the search took 2 months (8 weeks) to complete. - Therefore, the inventors considered decreasing the total number of search points to increase the speed. First, as illustrated in
FIG. 18A , points distributed at equal intervals of 0.1 GPa for each of G1 and G2 on a two-dimensional map were set as trial points, and were selected in sequence. In the step 6-A, the processing in steps 3 to 5 was carried out for the selected trial points to repeatedly calculate the degree of coincidence. A two-dimensional map of the degree of coincidence obtained by carrying out the step 6-A on the trial points illustrated inFIG. 18A is illustrated inFIG. 18B . In the two-dimensional map ofFIG. 18B , the correct point where G1 is 0.25 GPa and G2 is 0.15 GPa is not included in the region where the degree of coincidence is 0.9 or more. Therefore, even when 0.1 GPa is set as the interval between trial points, it is clear that the interval is too coarse. - Next, as illustrated in
FIG. 19A , points equally distributed at intervals of 0.075 GPa for each of G1 and G2 on a two-dimensional map were set as trial points, and were selected in sequence. In the step 6-A, the processing in steps 3 to 5 was carried out for the selected trial points to repeatedly calculate the degree of coincidence. A two-dimensional map of the degree of coincidence obtained by carrying out the step 6-A on the trial points illustrated inFIG. 19A is illustrated inFIG. 19B . In the two-dimensional map ofFIG. 19B , the correct point where G1 is 0.25 GPa and G2 is 0.15 GPa is not included in the region where the degree of coincidence is 0.9 or more. Therefore, even when 0.075 GPa is set as the interval between trial points, it is clear that the interval is too coarse. - Next, as illustrated in
FIG. 20A , points equally distributed at intervals of 0.05 GPa for each of G1 and G2 on a two-dimensional map were set as trial points, and were selected in sequence. In the step 6-A, the processing in steps 3 to 5 was carried out for the selected trial points to repeatedly calculate the degree of coincidence. A two-dimensional map of the degree of coincidence obtained by carrying out the step 6-A on the trial points illustrated inFIG. 20A is illustrated inFIG. 20B . In the two-dimensional map ofFIG. 20B , the correct point where G1 is 0.25 GPa and G2 is 0.15 GPa is included in the region where the degree of coincidence is 0.9 or more. - When the correct point is contained in a region where the degree of coincidence is 0.9 or more, in step 6-B, the region in
Figure 20B where the degree of coincidence is 0.9 or more is designated as a limited sub-region to be searched using an optimization search method using a genetic algorithm (GA). In the step 6-C, an optimization search method using a genetic algorithm (GA) is used within the limited sub-region to execute a search using the degree of coincidence between the frequency spectrum of the noise of the stacked iron core of the transformer obtained in the first step and the frequency spectrum of the excitation vibration of the stacked iron core of the transformer calculated in the fourth step as an evaluation function, and the local maximum point of the degree of coincidence is calculated. As a result of executing steps up to the step 6-C, it was confirmed that the values of (G1, G2) when the degree of coincidence reached a local maximum value were (0.25 GPa, 0.15 GPa). - The number of trial points for which the degree of coincidence was calculated in the step 6-A by distributing the points at equal intervals of 0.05 GPa was 8 × 8 = 64. Further, the number of search points when an optimization search using a genetic algorithm (GA) was executed on the limited sub-region in the step 6-C was 100 points. Therefore, the total number of trial points and search points was 164 points. As a result, the time required to execute the search was decreased to approximately two weeks, approximately one-quarter of the time required for the 832 search points illustrated in
FIG. 17 . - Further, as illustrated in
FIG. 21A , points equally distributed at intervals of 0.025 GPa for each of G1 and G2 on a two-dimensional map were set as trial points, and were and selected in sequence. In the step 6-A, the processing in steps 3 to 5 was carried out for the selected trial points to repeatedly calculate the degree of coincidence. A two-dimensional map of the degree of coincidence obtained by carrying out the step 6-A on the trial points illustrated inFIG. 21A is illustrated inFIG. 21B . In the two-dimensional map ofFIG. 21B , the correct point where G1 is 0.25 GPa and G2 is 0.15 GPa is included in the region where the degree of coincidence is 0.9 or more. - When the correct point is contained in a region where the degree of coincidence is 0.9 or more, in the step 6-B, the region in
Figure 21B where the degree of coincidence is 0.9 or more is designated as a limited sub-region to be searched using an optimization search method using a genetic algorithm (GA). In the step 6-C, an optimization search method using a genetic algorithm (GA) is used within the limited sub-region to execute a search using the degree of coincidence between the frequency spectrum of the noise of the stacked iron core of the transformer obtained in the first step and the frequency spectrum of the excitation vibration of the stacked iron core of the transformer calculated in the fourth step as an evaluation function, and the local maximum point of the degree of coincidence is calculated. As a result of executing steps up to the step 6-C, it was confirmed that the values of (G1, G2) when the degree of coincidence reached a local maximum value were (0.25 GPa, 0.15 GPa). - The number of trial points for which the degree of coincidence was calculated in the step 6-A by distributing the points at equal intervals of 0.025 GPa was 15 × 15 = 225. Further, the number of search points when an optimization search using a genetic algorithm (GA) was executed on the limited sub-region in the step 6-C was 50 points. Therefore, the total number of trial points and search points was 275 points. As a result, the time required to execute the search was decreased to approximately three weeks, approximately one-third of the time required for the 832 search points illustrated in
FIG. 17 . - From the above results, it was found that in order to greatly decrease the time required to calculate the degree of coincidence of each search point in the sixth step and calculate a two-dimensional map of the degree of coincidence, it is extremely effective to change the sixth step to a process including the steps 6-A, 6-B, and 6-C.
- However, in the step 6-A, when the values of G1 and G2 corresponding to the trial points were set as points equally spaced at coarse intervals, for example 0.075 GPa or more, within a defined range, which is the range of the transverse elastic moduli expected from the actual structure of the stacked iron core 21 of the transformer, as illustrated in
FIG. 18B andFIG. 19B , the correct point where G1 is 0.25 GPa and G2 is 0.15 GPa was not included in the region where the degree of coincidence is 0.9 or more, and the correct result was not obtained. Accordingly, the trial points need to be set at fine intervals, for example, 0.05 GPa or less. - On the other hand, even when the trial points are set at smaller intervals, such as 0.025 GPa, the accuracy of calculating the value of (G1, G2) when the degree of coincidence is at a local maximum value does not improve. On the contrary, the time required for the step 6-A is increased, which does not connect to a decrease in the time required for the entire sixth step. The reason why the calculation accuracy does not improve when the range is too fine is thought to be that, within the specified range in which G1 and G2 are selected, many trial points are set in a range that is far from the correct answer for G1 and G2, which is wasteful. Therefore, in the Example when the distribution interval was set to 0.05 GPa, it was optimal for realizing both an improvement in the calculation accuracy of G1 and G2 and an increase in speed for a decrease in the time required for the entire sixth step.
- Although embodiments of the present disclosure have been described based on the drawings and Examples, it should be noted that a person skilled in the art may make variations and modifications based on the present disclosure. Therefore, it should be noted that such variations and modifications are included within the scope of the present disclosure. For example, functions and the like included in each component and step may be rearranged, and multiple components and steps may be combined into one or divided, as long as no logical inconsistency results. An embodiment according to the present disclosure may be realized as a program executed by a processor provided to a device or as a storage medium on which the program is stored. The scope of the present disclosure should be understood to include these examples.
- For example, the method of evaluating the degree of coincidence between the frequency spectrum of the noise of the stacked iron core 21 of the transformer and the frequency spectrum of the excitation vibration of the stacked iron core 21 of the transformer is not limited to calculation of cosine similarity. Euclidean distance may be employed as a method of evaluating the degree of coincidence, for example by taking a dB display reference so as not to include an offset. Further, another method of evaluating the degree of coincidence may be employed, as long as the method essentially quantitatively indicates the degree of coincidence between the frequency spectrum data of the excitation noise and the frequency spectrum date of the excitation vibration.
- Further, vibration analysis of a three-phase three-leg transformer was described for the embodiments, but this is not a limitation, and the present disclosure is also applicable to vibration analysis of the stacked iron core in a three-phase five-leg transformer or other transformers.
- Further, the elasticity matrix determination method according to the present embodiment has been described as being applicable when the transverse elastic moduli of the multiple (two) parts constituting the stacked iron core 21 are different, and as a specific example, the transverse elastic moduli of the first portion including the upper yoke 22a and the lower yoke 22b constituting the stacked iron core 21 is different from the transverse elastic moduli of the second portion including the legs 22c. The elasticity matrix determination method according to the present embodiment may be applied when the transverse elastic moduli of the first portion including the upper yoke 22a and the lower yoke 22b constituting the stacked iron core 21 is identical to the transverse elastic moduli of the second portion including the legs 22c.
- Further, according to the present embodiment, a structure in which the stacked iron core 21 including the first portion and the second portion is described as subject to analysis. The stacked iron core 21 may include three or more portions. In other words, the stacked iron core 21 includes at least the first portion and the second portion. When the stacked iron core 21 includes three portions or more, three or more provisional values for the transverse elastic moduli are set, such as a third provisional value in addition to the first provisional value and the second provisional value. A local maximum value of the degree of coincidence is then detected in a map of three or more dimensions.
- In the embodiment described above, the trial points are distributed at equal intervals within a defined range, but may be distributed at irregular intervals. Further, in the embodiment described above, the trial points are distributed so that the interval of the first provisional value G1 and the interval of the second provisional value G2 are the same, but the trial points may be distributed so that the interval of the first provisional value G1 is different from the interval of the second provisional value G2.
- The positions at which the trial points are set may be determined based on the results of analyzing other transformers using the elasticity matrix determination method or vibration analysis method according to the present embodiment. For example, the positions at which trial points are set may be determined based on a trend of distribution of the degree of coincidence that is understood by statistically processing the analysis results of other transformers in advance. In this way, the trial points can be set so that the correct point at which the degree of coincidence is a local maximum value can be found with a small number of trial points. The analysis results of the other transformers have been previously processed, and therefore the time required to set trial points based on the analysis results of the other transformers is not lengthened.
- Search points are set between the trial points. The search points may be at a smaller interval than the trial points. The search points may be set at locations outside the grid of trial points. The search points may be set at locations independent of the grid of trial points.
- The elasticity matrix determination method for the stacked iron core 21 of the transformer may be realized as an elasticity matrix determination program executed by a computer or processor constituting the controller 42 of the vibration analyzer 40. The vibration analysis method for the stacked iron core 21 of the transformer may be realized as a vibration analysis program executed by a computer or processor constituting the controller 42 of the vibration analyzer 40. The elasticity matrix determination program or the vibration analysis program may be stored on a non-transitory computer-readable storage medium.
-
- 21 stacked iron core
- 22 grain-oriented electrical steel sheet (22a: upper yoke, 22b: lower yoke, 22c: legs)
- 40 vibration analyzer (42: controller, 44: memory, 46: interface)
Claims (5)
- A transformer stacked iron core elasticity matrix determination method, whereinthe stacked iron core is configured as a plurality of electrical steel sheets and includes at least a first portion and a second portion,a constitutive equation represents a relationship between stress and strain in the first portion and the second portion, respectively, and includes elasticity matrices that are different from each other,each of the elasticity matrices includes, as elements of the elasticity matrix, transverse elastic moduli in two planes including the stacking direction of the stacked iron core, the transformer stacked iron core elasticity matrix determination method comprising:a first step of acquiring a frequency spectrum of excitation noise of the stacked iron core of the transformer;a second step of acquiring a frequency spectrum of excitation magnetostriction of the electrical steel sheets;a third step of determining, for the stacked iron core of the transformer, a first provisional value of the transverse elastic moduli in two planes including the stacking direction of the first portion and a second provisional value of the transverse elastic moduli in two planes including the stacking direction of the second portion, and calculating a frequency spectrum of a vibration response function of the stacked iron core of the transformer when the first provisional value and the second provisional value are applied to the elasticity matrices;a fourth step of calculating a frequency spectrum of excitation vibration of the stacked iron core of the transformer, based on frequency spectrum data of the excitation magnetostriction of the electrical steel sheets acquired in the second step and the frequency spectrum of the vibration response function of the stacked iron core of the transformer calculated in the third step;a fifth step of calculating a degree of coincidence between the frequency spectrum of the excitation noise of the stacked iron core of the transformer acquired in the first step and the frequency spectrum of the excitation vibration of the stacked iron core of the transformer calculated in the fourth step;a sixth step of calculating the degree of coincidence for each combination of the first provisional value and the second provisional value by changing the first provisional value and the second provisional value respectively and repeating the third step to the fifth step; anda seventh step of detecting a local maximum value of the degree of coincidence calculated for each combination of the first provisional value and the second provisional value in the sixth step, adopting the first provisional value when the degree of coincidence is a local maximum value as the transverse elastic moduli in two planes including the stacking direction of the stacked iron core of the first portion, and adopting the second provisional value when the degree of coincidence is a local maximum value as the transverse elastic moduli in two planes including the stacking direction of the stacked iron core of the second portion, andthe sixth step comprising:a step 6-A of, when each combination of the first provisional value and the second provisional value corresponding to the degree of coincidence is expressed as a trial point plotted in a two-dimensional space with the first provisional value as a first axis and the second provisional value as a second axis, sequentially selecting points distributed within a defined range of the two-dimensional space as the trial points and calculating the degree of coincidence for each combination of the first provisional value and the second provisional value corresponding to the trial points;a step 6-B of setting a limited sub-region in the two-dimensional space based on the degree of coincidence calculated for each combination of the first provisional value and the second provisional value corresponding to the trial points; anda step 6-C of setting search points in the limited sub-region at positions between the trial points and calculating the degree of coincidence for each combination of the first provisional value and the second provisional value corresponding to the search points.
- The transformer stacked iron core elasticity matrix determination method according to claim 1, wherein, in the fifth step, a cosine value of the angle formed between a first vector whose elements are each frequency component of the frequency spectrum of the noise of the stacked iron core of the transformer and a second vector whose elements are each frequency component of the frequency spectrum of the excitation vibration of the stacked iron core of the transformer is calculated as the degree of coincidence.
- A vibration analysis method comprising a step of executing vibration analysis of the stacked iron core of the transformer based on a constitutive equation representing the relationship between stress and strain in each of the first portion and the second portion, incorporating the transverse elastic moduli determined by the transformer stacked iron core elasticity matrix determination method according to claim 1 or 2.
- An elasticity matrix determination program that causes a computer to execute the elasticity matrix determination method according to claim 1 or 2.
- A vibration analysis program that causes a computer to execute the vibration analysis method according to claim 3.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2023073860A JP7563522B1 (en) | 2023-04-27 | 2023-04-27 | Elastic matrix determination method and vibration analysis method for laminated iron core of transformer, and elastic matrix determination program and vibration analysis program |
| PCT/JP2024/004208 WO2024224743A1 (en) | 2023-04-27 | 2024-02-07 | Elasticity matrix determination method and vibration analysis method for laminated iron core of transformer, and elasticity matrix determination program and vibration analysis program |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP4645152A1 true EP4645152A1 (en) | 2025-11-05 |
| EP4645152A4 EP4645152A4 (en) | 2026-04-22 |
Family
ID=92969808
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP24796502.3A Pending EP4645152A4 (en) | 2023-04-27 | 2024-02-07 | Elasticity matrix determination method and vibration analysis method for laminated iron core of a transformer and elasticity matrix determination program and vibration analysis program |
Country Status (6)
| Country | Link |
|---|---|
| EP (1) | EP4645152A4 (en) |
| JP (1) | JP7563522B1 (en) |
| KR (1) | KR20250121425A (en) |
| CN (1) | CN120958456A (en) |
| MX (1) | MX2025012770A (en) |
| WO (1) | WO2024224743A1 (en) |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2014071689A (en) | 2012-09-28 | 2014-04-21 | Jsol Corp | Analyzer, analysis method, and computer program |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7147831B2 (en) | 2020-02-21 | 2022-10-05 | Jfeスチール株式会社 | Elastic matrix determination method and vibration analysis method for laminated core of transformer |
| JP7218839B1 (en) | 2021-08-05 | 2023-02-07 | Jfeスチール株式会社 | Elastic matrix determination method and vibration analysis method for laminated core of transformer |
-
2023
- 2023-04-27 JP JP2023073860A patent/JP7563522B1/en active Active
-
2024
- 2024-02-07 CN CN202480019454.5A patent/CN120958456A/en active Pending
- 2024-02-07 MX MX2025012770A patent/MX2025012770A/en unknown
- 2024-02-07 EP EP24796502.3A patent/EP4645152A4/en active Pending
- 2024-02-07 WO PCT/JP2024/004208 patent/WO2024224743A1/en not_active Ceased
- 2024-02-07 KR KR1020257023641A patent/KR20250121425A/en active Pending
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2014071689A (en) | 2012-09-28 | 2014-04-21 | Jsol Corp | Analyzer, analysis method, and computer program |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2024158560A (en) | 2024-11-08 |
| MX2025012770A (en) | 2025-11-03 |
| KR20250121425A (en) | 2025-08-12 |
| WO2024224743A1 (en) | 2024-10-31 |
| CN120958456A (en) | 2025-11-14 |
| JP7563522B1 (en) | 2024-10-08 |
| EP4645152A4 (en) | 2026-04-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP4383289A1 (en) | Elastic matrix determination method and vibration analysis method for laminate core of transformer | |
| JP7147831B2 (en) | Elastic matrix determination method and vibration analysis method for laminated core of transformer | |
| US11513101B2 (en) | Elastic matrix determination method and vibration analysis method for laminated iron core | |
| EP3862904B1 (en) | Vibration analysis of a laminated iron core | |
| US20240295615A1 (en) | Transformer noise performance diagnosis method and noise reduction method | |
| US7574338B1 (en) | Finite-difference simulation and visualization of elastodynamics in time-evolving generalized curvilinear coordinates | |
| EP4645152A1 (en) | Elasticity matrix determination method and vibration analysis method for laminated iron core of transformer, and elasticity matrix determination program and vibration analysis program | |
| EP4645153A1 (en) | Elasticity matrix determination method and vibration analysis method for layered iron core of transformer, and elasticity matrix determination program and vibration analysis program | |
| JP7563411B2 (en) | Apparatus for determining elasticity matrix of laminated iron core, method for determining elasticity matrix of laminated iron core, and computer program | |
| JP7563412B2 (en) | Apparatus for determining elasticity matrix of laminated iron core, method for determining elasticity matrix of laminated iron core, and computer program | |
| WO2024224744A1 (en) | Elasticity matrix determination method and vibration analysis method for layered iron core of transformer, and elasticity matrix determination program and vibration analysis program | |
| El‐Raheb | Transient elastic waves in finite layered media: One‐dimensional analysis | |
| JP4410541B2 (en) | Magnetostriction analyzer, magnetostriction analysis method, computer program, and computer-readable recording medium | |
| CN119918367B (en) | Automobile lamp vibration test method and device | |
| CN119666996B (en) | A method for detecting damping loss factor of transmission pipeline | |
| CN121542598A (en) | A method, system, equipment, and dielectric for predicting the modal characteristics of a converter transformer. | |
| CN118839120A (en) | Vibration signal processing method and related device of saturation reactor | |
| WO2023234013A1 (en) | Data set generation method, electromagnetic field analysis method, and computer program | |
| Torres et al. | ON THE USE OF A CONTINUOUS STRONG”“FORM RESIDUUM FIELD FOR ERROR ESTIMATION IN SMOOTH GFEM APPROXIMATIONS |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20250729 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| A4 | Supplementary search report drawn up and despatched |
Effective date: 20260324 |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: G06F 30/23 20200101AFI20260318BHEP Ipc: G01H 17/00 20060101ALI20260318BHEP Ipc: H01F 41/00 20060101ALI20260318BHEP Ipc: H01F 41/02 20060101ALI20260318BHEP Ipc: G01N 3/32 20060101ALI20260318BHEP Ipc: B06B 1/08 20060101ALI20260318BHEP Ipc: G01H 13/00 20060101ALI20260318BHEP Ipc: H01F 27/245 20060101ALI20260318BHEP Ipc: H01F 27/33 20060101ALI20260318BHEP |