EP4627180A1 - Method for installing a subsea tubing hanger and orientate a subsea tree on a subsea wellhead - Google Patents
Method for installing a subsea tubing hanger and orientate a subsea tree on a subsea wellheadInfo
- Publication number
- EP4627180A1 EP4627180A1 EP22835874.3A EP22835874A EP4627180A1 EP 4627180 A1 EP4627180 A1 EP 4627180A1 EP 22835874 A EP22835874 A EP 22835874A EP 4627180 A1 EP4627180 A1 EP 4627180A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- interface
- tubing hanger
- tree
- alignment
- port
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/04—Casing heads; Suspending casings or tubings in well heads
- E21B33/043—Casing heads; Suspending casings or tubings in well heads specially adapted for underwater well heads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/10—Setting of casings, screens, liners or the like in wells
- E21B43/101—Setting of casings, screens, liners or the like in wells for underwater installations
Definitions
- the present invention relates to the field of subsea oil or gas production wells and injection wells, and more specifically to a method for installing a tubing hanger and tree on a wellhead of a subsea oil or gas production well or a subsea injection well.
- the invention also relates to an alignment sleeve, an assembly for installing a tubing hanger and tree on a wellhead of a subsea oil or gas production well or a subsea injection well and a subsea wellhead installation for a subsea oil or gas production well or a subsea injection well.
- Installing a tubing hanger and tree on a subsea wellhead are steps of well completion that take place once drilling of a well has ended, the steps generally comprising orienting the tubing hanger and subsequently the tree to have the same heading as a production guide base (PGB), the production guide base being a foundation for all well completion orientation components that will be installed on the well at the beginning of the construction of the well during the open water drilling stage and before a blow out preventor (BOP) is installed on the wellhead.
- the PGB has a controlled heading to suit the subsea field architecture/layout while optimizing the well jumper design and manufacture between well/PGB and subsea manifold. In this way, the well jumper can consequently be designed as simply as possible, for example, with a conventional L-shape design.
- the typical steps taken to complete the well are more specifically achieved as follows.
- the BOP is installed on the wellhead (for example on the wellhead high pressure housing using a sealing connector such as a VXT H4 connector) and aligned to the PGB, the BOP has a wellhead capture funnel with an alignment feature that aligns with a corresponding alignment feature on the PGB to enable alignment when the BOP is mated to the PGB.
- the BOP gives a method of controlling the well during through BOP drilling, preventing a leak or contamination.
- the landing string moves the tubing hanger down towards the wellhead and past an alignment pin belonging to the BOP, the alignment pin being configured to move in and out relative to the BOP bore to make contact with the outer diameter of the landing string helical profile.
- the landing string then moves back up in a direction towards the surface, the pin interfacing with a helical slot (tubing hanger orientation joint, or THOJ) of the landing string thus causing rotation of the string and orientating the tubing hanger into the desired orientation.
- THOJ tubing hanger orientation joint
- the BOP is recovered back to the drilling rig.
- the tree can be installed onto the PGB and wellhead, with the correct heading to suit the construction of the well jumper, with ‘rough alignment’ provided by the interface between the tree funnel and PGB and ‘fine alignment’ of the tree provided by the interface to the already installed tubing hanger.
- This fine alignment shall be prior to coupler (also referred to as connection, port) engagement, by an Alignment Sleeve orientation feature (e.g. key) and mating feature inside the tubing hanger.
- the tree is lowered and is then roughly guided and orientated by a remotely operated underwater vehicle (ROV).
- ROV remotely operated underwater vehicle
- the tubing hanger also comprises a key slot or castellations to facilitate alignment with the tree. Alignment of the tree to tubing hanger facilitates the correct alignment of the tree stabs to the tubing hanger bores.
- Tree stabs can consist of Production and Annulus Stabs, Hydraulic, Electrical and Optical stabs for operation of downhole functions. These connections (tree stabs) are traditionally straight, rigid, vertical and parallel to the well vertical axis.
- the jumper is then connected between the tree and manifold or inline tree, the PGB comprising a jumper cradle to facilitate the connection.
- the jumper connection may have a tolerance ranging from, for example, +/- 1 to 2 degrees.
- the ROV does a last tolerance check before landing the tree onto the tubing hanger and wellhead.
- the preparation of such a rig to provide this method of orientation control of the tubing hanger is very time consuming.
- the rig needs to be surveyed, measured and bespoke equipment needs to be manufactured to suit the individual rig. Such preparation can take as long 12 months, or more.
- each BOP is different, it often needs to be surveyed and modified so as to have a bespoke BOP Pin, THOJ and funnel with the appropriate keys for mating with the PGB, the PGB itself not having a universal interface.
- Document WO 2019/079041 A1 relates to systems and methods for landing a tubing hanger in a wellhead and then orienting a tree (or spool, or flowline connection body) relative to the tubing hanger while landing the tree on the wellhead are provided.
- This alignment is accomplished without the use of either a tubing spool or a BOP stack with an orientation pin.
- the tubing hanger alignment devices may be used to orientate the tree as the tree is landed so that the couplings and stabs between the tree and the tubing hanger line up with each other just at the moment of landing.
- Document US 2021/0340831 A1 relates to systems and methods for landing a tubing hanger in a wellhead, landing a tree on the wellhead, and making electrical and hydraulic couplings between the tree and the tubing hanger without having to orient the tree or the tubing hanger relative to each other. This is accomplished using a seal sub that is coupled to the tree and lowered with the tree into contact with the tubing hanger located in the wellhead.
- the seal sub features an electrical conductor that facilitates electrical coupling of the tree to the tubing hanger.
- the tubing hanger and seal sub may include a metal-to-metal and elastomeric seal arrangement designed to seal off electrical and hydraulic connections between these components when, the tree is positioned within the wellhead.
- VXTe Deepwater Tree Development - Cost and Risk Reduction Through Newand Advanced Technology relates to a VXTe system featuring several pieces of technology that work together to eliminate a tubing head.
- Tubing hanger alignment is solved with a stab sub design, and stack-up tolerances of a landing shoulder are addressed by an automatic space out mechanism.
- a compact, metal sealing gate valve packaged in the tubing hanger provides the annulus control previously configured on the tubing head.
- VXT vertical tree
- the alignment sleeve provides hydraulic, electrical and/or optical connections between the tree and the tubing hanger.
- the method comprises installing a reference unit on the wellhead, wherein the determination of the orientation of the tubing hanger relative to the alignment feature comprises taking measurements of the orientation of the tubing hanger relative to the reference unit.
- the reference unit is a production guide base (PGB) and the determination of the orientation of the tubing hanger relative to the alignment feature further comprises checking and if necessary adjusting the orientation of a heading of the PGB relative to the alignment feature.
- PGB production guide base
- the reference unit is a reference jig and the determination of the orientation of the tubing hanger relative to the alignment feature further comprises taking measurements of the orientation of the reference jig relative to the alignment feature.
- the method comprises, after taking measurements of the orientation of the tubing hanger relative to the reference jig:
- the method comprises, before taking the measurements of the reference jig relative to the alignment feature, rotationally locking the reference jig to the housing using a jig alignment feature.
- the taking of measurements of the orientation of the tubing hanger relative to the reference unit comprises using a remotely operated underwater vehicle (ROV) to deploy an orientation check tool to the reference unit and tubing hanger and using the ROV to obtain the measurements.
- ROV remotely operated underwater vehicle
- the orientation check tool is a laser tool that fires a laser at a reference target point located on the reference unit.
- the method comprises BOP (Blowout Preventer) removal before deploying the orientation check tool.
- the one or more conduits comprise angularly connected segments.
- the first interface and the lower end of tree comprise respective sleeve-tree alignment features for alignment with the lower end of the tree.
- At least one of the conduits connecting a port of the first interface with a respective port of the second interface is an electrical conduit, the port of the first interface being an electrical dry/splash mate connection and the respective port of the second interface being an electrical wet mate connection.
- At least one of the conduits connecting a port of the first interface with a respective port of the second interface is an optical conduit, the port of the first interface being an optical dry mate connection and the respective port of the second interface being an optical wet mate connection.
- manufacturing the alignment sleeve comprises constructing the one or more conduits along the alignment sleeve, preferably by milling.
- the manufacturing comprises constructing the alignment sleeve partially by additive manufacturing.
- the manufacturing comprises constructing the alignment sleeve entirely by additive manufacturing. In some variations, the method comprises constructing the one or more conduits on an exterior surface of the alignment sleeve.
- the method comprises constructing the one or more conduits within a wall of the alignment sleeve.
- manufacturing at least one of the one or more conduits comprises induction bending, forming, additive manufacturing and/or cold bending.
- the alignment sleeve has a central through hole and is fitted around a concentric production stab of the tree.
- the installing of the tree on the tubing hanger takes place on a wire or drill pipe.
- installing the tree on the tubing hanger comprises orienting the tree to be in line with a PGB heading.
- the invention further relates to an alignment sleeve comprising a first interface for connection with a lower end of a tree, the first interface comprising a plurality of first ports, a second interface for connection with a tubing hanger installed on a wellhead, the second interface comprising a plurality of second ports, and a plurality of conduits, each of them connecting a port of the first interface with a respective corresponding port of the second interface, wherein each port of the first interface is angularly offset relative to the corresponding port of the second interface.
- the one or more conduits have a helical or partially helical shape.
- the one or more conduits comprise angularly connected segments.
- the first interface comprises a sleeve-tree alignment feature for mating with a corresponding sleeve-tree alignment feature on the lower end of tree, for alignment with the lower end of the tree.
- At least one conduit connecting a port of the first interface with a respective port of the second interface is an electrical conduit, the port of the first interface being an electrical dry/splash mate connection and the respective port of the second interface being an electrical or optical wet mate connection.
- at least conduit connecting a port of the first interface with a respective port of the second interface is a hydraulic conduit, the port of the first interface being a hydraulic dry mate connection and the respective port of the second interface being a hydraulic wet mate connection.
- At least one conduit connecting a port of the first interface with a respective port of the second interface is an optical conduit, the port of the first interface being an optical dry mate connection and the respective port of the second interface being an optical wet mate connection.
- At least one conduit connecting a port of the first interface with a respective port of the second interface is an annulus stab conduit, the port of the first interface being an annulus stab connection and the respective port of the second interface also being an annulus stab connection.
- the one or more conduits are on an exterior surface of the alignment sleeve.
- the one or more conduits are within a wall of the alignment sleeve.
- the alignment sleeve comprises a central through hole for fitting around a concentric production stab connected to the tree.
- orientation steps such as alignment of the BOP to the PGB, use of a BOP pin and THOJ to align the tubing hanger, can be removed from the installation process, reducing the overall amount of time taken to prepare the drilling rig for Tubing Hanger installation.
- landing the tubing hanger into the wellhead i.e. without having a specific predetermined Tubing Hanger orientation, also referred to as “freely” landing the tubing hanger, provides a more straightforward and rapid installment time than when controlled orientation is required. This in turn simplifies the landing string, as the THOJ can be removed from the landing string design.
- determining the orientation of the tubing hanger relative to the alignment feature and using this determination to manufacture a customized alignment sleeve removes the need for an early rig contract allowing the designing of any rig-specific equipment. This also removes the need to survey and modify the BOP to install an alignment system, simplifies the PGB design and also removes any need for having rig-specific subsea production system tooling i.e. THOJ, BOP Pin, Alignment Funnel. This therefore also provides for a much faster and resource-efficient installment process.
- the method can be suited to a diverse range of orientation criteria. Further, the method has no need for an orientationless interface of the tree with the tubing hanger.
- FIG. 2A and FIG. 2B show the step of landing the tubing hanger in the prior art versus according to an embodiment of the invention.
- FIG. 3 shows an illustration of an example of the VXT Alignment Sleeve according to an embodiment.
- FIG. 4 shows illustrations of examples of the alignment sleeve according to an embodiment.
- FIG. 5 shows an illustration of an example of the alignment sleeve according to an embodiment.
- FIG. 6 shows illustrations of examples of the examples of the alignment sleeves of FIG. 4.
- FIG. 7 shows a perspective view of the illustrations of FIG. 6.
- FIG. 11 shows an illustration of another example of the alignment sleeve according to an embodiment.
- FIG. 12 is another view of the same example.
- FIG. 13A shows a side view of an example of the jig according to an embodiment.
- FIG. 13B shows a perspective view of an example of the jig of FIG. 13A.
- FIG. 14A shows a plan view of an example of the jig of FIG. 13A.
- FIG. 14B shows a perspective view of an example of a conductor housing according to an embodiment.
- the method of the present invention is for installing a subsea tubing hanger and vertical tree on a wellhead of a subsea oil or gas production well or a subsea injection well.
- the method is implemented by landing the tubing hanger in the wellhead without any orientation control, determining the orientation of the tubing hanger relative to an alignment feature located on a housing on the wellhead, and using this determination to manufacture a customized vertical tree (VXT) Alignment Sleeve.
- VXT vertical tree
- a “tubing hanger” refers to a component used in the completion of oil and gas production wells. It suspends production tubing inside the wellhead.
- a tubing hanger 202 can be seen in FIG. 1 , comprising ports such as electric and/or hydraulic and/or optical ports 210, an annulus stab port 214.
- the tubing hanger may also comprise an alignment key or key slot and/or a production stab connection.
- the tubing hanger may comprise mating bores (for example, Production and Annulus mating bores) and/or wet mate connections (for example, Hydraulic, Electrical and/or Optical wet mate connections) for mating with corresponding stabs of the tree.
- the “determining" the orientation of the tubing hanger relative to an alignment feature located on a housing on the wellhead refers to a deduction or calculation of the orientation by use of at least one measurement.
- a “tree” refers to a vertical subsea Christmas tree comprising a system of valves, flow paths, piping and connectors to contain and control the flow of fluid from a reservoir or from the surface by injection.
- An example of a perspective view of a connection end of a vertical tree 200 can be seen in FIG. 1 , comprising connections such as electric and/or hydraulic and/or optical connections 204, an annulus stab connection 208.
- each respective connection of the tubing hanger is configured for mating with each respective connection of the tree.
- a “wellhead” refers to a component at the surface of an oil or gas well that provides the structural and pressure-containing interface for the drilling and production equipment.
- “landing” it is meant a docking or mating of the tubing hanger in the wellhead without necessarily aligning the tubing hanger with a pre-defined heading relative to an alignment feature.
- An “alignment feature located on a housing on the wellhead” is a feature located on the housing on the wellhead that acts as an ultimate reference point for the measurements of the orientation of the tubing hanger.
- the feature may be for example a key slot or blind slot or blind hole or OD slot on the housing.
- the housing may be a Wellhead Low Pressure Housing, or a conductor housing.
- a “reference unit’ is a unit of a known orientation or heading relative to a subsea manifold.
- the reference unit may be a production guide base, or a conductor housing comprising a jig, or a Conductor Housing external alignment feature.
- VXT vertical tree
- a “lower end of the tree” refers to the portion of the tree that conventionally connects with the tubing hanger.
- Hydraulic and/or electrical and/or optical “connections” refers to means for communication between the tubing hanger and the tree.
- Landing the tubing hanger in the wellhead may comprise a landing string guiding the tubing hanger down to the wellhead through the bore of a BOP which is already positioned on the wellhead, the orientation or heading of the BOP being in the direction of the orientation/heading of a production guide base or PGB.
- a “production guide base” or PGB relates to a structure positioned on the wellhead. This can be seen, for example, in FIG. 1 which shows an example of a PGB 120 on a wellhead 122.
- An ROV Remotely Operated Underwater Vehicle
- the PGB points towards a preferred direction for jumper connection between the well and manifold) that generally provides a foundation for the orientation for the tree and an interface for connection with a Well Jumper Hub.
- the manifold may be on the seabed and may be connected to two or more wells via respective well jumpers.
- the cradle 121 can support the end of the well jumper prior to connection of the jumper to the tree.
- the method may comprise, before landing the tubing hanger, landing the BOP on the wellhead without any particular orientation with respect to the PGB heading.
- the tubing hanger may lock into position to prevent vertical and rotational movement.
- the tubing hanger may lock into position hydraulically.
- the landing string and BOP may then retreat back to the drilling rig.
- the landing of the tubing hanger 202 into the wellhead 122 may comprise nestling and locking the tubing hanger 202 into the wellhead 122, the PGB 120 being positioned on and around the wellhead 122.
- the tubing hanger 202 lands without the guidance of such devices, the tubing hanger 202 having a random orientation that, in this case, is different to that of the PGB (i.e. it is not tied or defined by the alignment feature heading and in turn the PGB heading), as can be seen from the arrangement of the connections of FIG. 2B a. varying from the arrangement of the aligned ports of FIG. 2A a.
- FIG. 1 further explains such an arrangement, as it can be seen that the tree 200 may connect to the alignment sleeve 128, which may connect to the tubing hanger 202.
- the method may implement a check using, for example an ROV, to take measurements to verify the heading of the alignment feature (also referred to as the heading of the installed conductor) located on the housing on the wellhead, for example relative to true north, using one or more gyro tools, such as for example, standard gyro tools used today for a standard PGB heading check.
- gyro tools such as for example, standard gyro tools used today for a standard PGB heading check.
- blind holes on the outside of a LP housing (conductor housing) and/or PGB key positions may give an adjustment, for example of +/-5 degrees, on the PGB heading, should the heading of the installed PGB or conductor need to be adjusted to suit the subsea layout.
- the method may comprise removing the reference jig before the installation of other completion orientation components.
- the conductor housing 182 comprises a jig alignment feature 194, such as for example a slot or blind hole.
- the reference jig may rotationally lock to the conductor housing 182 via the jig alignment feature.
- FIGs 13A, 13B and 14A show an example of the jig 190.
- the reference jig 190 may fit around the conductor housing 182.
- the reference jig 190 may comprise ROV docking receptacles 184a, 184b for receiving the ROV (for example in accordance with ISO 13628-8).
- the reference jig may comprise a bullseye plate 186.
- the reference jig may comprise markings 192 in the form of 360° granulations.
- the markings 192 may be on the top of the jig along its circumference, as seen from the plan view of FIG. 14A.
- the markings may vary in length so as to indicate a certain increment in degrees, for example shorter markings 192 indicating every 1 °, larger markings 192 indicating every 5°, and larger markings 192 again indicating every 10°.
- the reference jig 190 may comprise a total of 360 markings to represent 360°. Alternatively, the reference jig 190 may comprise a number of markings 192 less than 360 markings to represent 360°.
- the reference jig 190 may comprise a number of markings 192 greater than 360 markings to represent 360°, such as, for example markings to indicate every 0.5°, for example, depending on the diameter of the area (of the reference jig i.e. reference unit) upon which the markings are placed.
- the taking of the orientation measurements of the tubing hanger relative to the reference unit may comprise using an ROV to deploy an orientation check tool to the reference unit and tubing hanger.
- the ROV may use the orientation check tool to check the heading of the installed Tubing Hanger relative to the reference unit (in the case that the reference unit is a reference jig, the ROV may attach to the docking receptacles of the jig).
- the method may comprise using the ROV to obtain the measurements.
- the ROV may take the measurements using an ROV deployed laser, or mechanical tool, or by any method.
- the mechanical tool may for example be a physical pointer which spans from the top of the wellhead or tubing hanger down to the markings on the reference unit (for example, the 360° granulated markings).
- the ROV may record the measurements.
- an ROV may be used to check the heading of the reference unit relative to the alignment feature.
- the ROV may carry out the adjusting of the orientation of a heading of the PGB relative to the alignment feature.
- the ROV may guide the PGB to the correct position relative to the alignment feature.
- the measurements may be measurements of the heading of the installed Tubing Hanger relative to the alignment feature directly.
- the measurements may be measurements of the heading of the installed Tubing Hanger relative to the PGB, and indirectly relative to the alignment feature on the housing on the wellhead.
- the orientation check tool may be a laser tool that fires a laser at a reference target point, i.e. a compass, located on the reference unit. The compass may be zeroed to the alignment feature. As can be seen for example in FIG.
- the ROV may fire a laser at a point 188 on the reference unit, in this example the reference unit being a jig, the ROV firing the laser at point 188 on the markings of the jig 190.
- ROV may record the point 188 hitting the markings.
- the reference unit is a PGB
- the target point or compass may be located on the PGB, for example in the form of markings on the PGB.
- the method may comprise converting the marking measurements to values in degrees describing the orientation of the tubing hanger relative to the reference unit and/or to the alignment feature.
- the method may comprise sending the measurements onshore, for example to a manufacturing site.
- the method may comprise sending the measurements and orientation of the tubing hanger relative to the alignment feature.
- the method may comprise sending only the measurements.
- the method may comprise determining the orientation measurements of the tubing hanger relative to the alignment feature onshore, or at a later stage from when the measurements are taken.
- the transferring of the measurements can enable the manufacturer to have all sufficient information for manufacturing the Tree Alignment Sleeve and, according to some embodiments, the PGB.
- the measurements may be used for subsequent manufacturing of the customized Tree Alignment Sleeve.
- the method may comprise removing the BOP before deploying the orientation check tool.
- the method may comprise recovering the jig from the wellhead before installing the PGB and vertical tree (VXT) on a wire from a vessel for subsequent installation on the wellhead.
- VXT vertical tree
- Using the jig and/or ROV can allow for more time for the manufacturing of the PGB.
- the jig and/or ROV can allow for use of a standard PGB or a simplified PGB, for example, a PGB without an ROV docking platform or adjustable well jumper cradle.
- the alignment sleeve 128 may have a generally tubular shape and may extend along a main (longitudinal) axis. It may comprise a first interface 142 at one axial end and a second interface at the opposite axial end, with an extending portion 150 axially extending between the two interfaces.
- the first interface 142 may be in the form of a disc or any other shape suitable for fitting the first interface 142 with a connection area of the tree (underside of main valve block) 200.
- the first interface 142 may be flat so as to facilitate connection with the tree 200.
- the first interface 142 may have a transverse cross-sectional surface area greater than that of the extending portion 150 of the alignment sleeve 128 perpendicular to the main axis, i.e. the disc edges extend outwardly beyond the edges of the extending portion 150 of the alignment sleeve 128.
- Bolt holes 146 may be provided on the periphery of the first interface 142 for fixing the sleeve 128 to the tree 200, for example to a vertical tree main valve block.
- the first interface 142 may comprise a first plurality of ports 104, for example in a substantially circular pattern.
- the first plurality of ports 104 may be at a distance from the extending edges of the first interface 142 and may be aligned with the extending portion 150.
- the first plurality of ports 104 may be adapted to mate with a plurality of corresponding ports located in the underside of the tree main valve block 200.
- the first interface may further comprise one or more sleeve-tree alignment features 148 to assist connecting the sleeve to the tree.
- the sleeve-tree alignment features 148 may be in the form of pins for connection with corresponding holes, grooves or slots of the tree 200 or vice versa.
- two sleeve-tree alignment features 148 may be provided and located at 180° degrees from one another, and/or for example at a predetermined distance between the ports 104 and bolt holes 146.
- a central through hole 162 may be provided through the entire alignment sleeve 128 for fitting around a production stab 140 connected to the tree 200 (see for example FIG. 3).
- the Alignment Sleeve may retain and fix the Production Stab in position vertically.
- the second interface 156 at the other extremity of the alignment sleeve 128a, 128b, 128c, 128d is adapted for connection with the “free landed” tubing hanger 202.
- the second interface 156 may comprise a second plurality of ports 103.
- the second interface 156 may be in the form of a disc or any other shape suitable for fitting the second interface 156 with a connection area of the tubing hanger 202.
- the second interface 156 may be flat so as to facilitate connection with the tubing hanger 202.
- the second interface 156 may have a transverse cross- sectional surface area greater than that of the extending portion 150 of the sleeve but less than that of the first interface 142.
- the second interface 156 may comprise a diameter which is the same as or approximate to an inner diameter of the wellhead 122 and/or the inner diameter of the tubing hanger 202. As can be seen for example in FIG. 3 and FIG.
- the extending portion 150 may comprise a sleeve-tubing hanger alignment feature 152, such as an alignment key, to engage the Alignment Sleeve into the Tubing Hanger before coupler (also referred to as connections, ports) engagement (i.e. engagement of the respective sleeve ports to the respective tubing hanger ports).
- the sleeve-tubing hanger alignment feature 152 may comprise castellations.
- the sleeve-tubing hanger alignment feature may be another type of alignment feature to one comprise keys or castellations.
- the sleeve-tubing hanger alignment feature 152 can facilitate mating of the alignment sleeve 128a, 128b, 128c, 128d with the tubing hanger 202.
- Each port in the second plurality of ports 103 is adapted to establish a connection to a respective port 207 of the tubing hanger 202, for example an electrical, optical, hydraulic, and/or annulus stab port.
- a respective port 207 of the tubing hanger 202 for example an electrical, optical, hydraulic, and/or annulus stab port.
- the ports 104 of the first interface 142 are shown to correspond to the positioning of a plurality of ports 205 located in the tree 200
- the ports 103 of the second interface 156 are shown to correspond to the positioning of a plurality of ports 210 located in the tubing hanger 202.
- the second plurality of ports 103 may be arranged e.g. in a circular pattern on the second interface 156, at a distance from the circumference of the second interface 156, and may be aligned with the extending portion 150.
- the 104 of the first interface 142 with a respective port 103 of the second interface 156 may be an annulus stab conduit.
- the port 104 of the first interface 142 may be an annulus stab connection (for example, port 104c of FIG. 3).
- the respective connector 103 of the second interface 156 may also be an annulus stab connection.
- the Annulus stab i.e. annulus stab conduit
- the Annulus stab may provide hydraulic access to the well annulus between inner diameter of the Production Casing and outer diameter of the Production Tubing.
- the Annulus stab may be concentric and external to Production Stab outer diameter. Alternatively, the Annulus stab may be offset and separate to Production Stab outer diameter.
- FIG. 6 provides an example of the shape of the conduits 158 for the different offsets presented in FIG. 4.
- the pitch of the helix of the conduits 158a may be larger than that for an offset of a larger angle, such as that of the alignment sleeve 128c with conduits 158b corresponding to a 180° offset.
- the alignment sleeve 128a may comprise a cover 164 surrounding the conduits 158.
- the conduits 158 may be positioned along an exterior surface of the wall of the extending portion 150 of the alignment sleeve 174, as illustrated, for example, in FIG.’s 12 to 14. As shown in FIG. 10, the conduits 158 may comprise a tubular form and may run along and optionally wind around the extending portion 150 of the sleeve, on the outside of the sleeve. Additionally or alternatively, the one or more conduits 158 may be formed within the tubular wall 174 of the extending portion 150 of the alignment sleeve 128. As also illustrated in FIG. 10, some or all of the conduits 158 may have the same diameter. Additionally or alternatively, some or all of the conduits 158 may have different diameters.
- the conduits 158 have an internal cross section that is curved, e.g. circular, or rectilinear, e.g. rectangular or square.
- the conduits 158 of FIG. 10 are illustrated as being tubular with a circular or elliptical internal shape or cross- section 170.
- the conduits 158 may all have the same shape, or some of them at least may have different shapes.
- the conduits 158 may be for example spaced equally apart from one another.
- the alignment sleeve 128 is manufactured taking into account the measurements described above.
- the angular offset between the ports 104 of the first interface 142 and the ports 103 of the second interface 156 is based on the measured orientation.
- the manufacturing of the conduits 158 can facilitate overcoming any connection difficulties presented by any offset of the tubing hanger relative to the alignment feature.
- the manufacturing may comprise constructing the conduits 158 to overcome any variations of the positioning of the tubing hanger relative to the alignment feature.
- Manufacturing the alignment sleeve 128 may comprise constructing the extending portion 150 of the sleeve 128 and separately manufacturing the first and second interfaces 142, 156 before adding them to the extending portion 150 of the sleeve 128.
- the manufacturing may comprise constructing the extending portion, first interface and second interface together as one component.
- the manufacturing may comprise manufacturing the ports. The manufacturing may vary the positioning of the ports 103 in circumferential position to suit the Alignment Sleeve engagement with the free landed Tubing Hanger.
- Part or all of the alignment sleeve may be manufactured prior to the measurements.
- the extending portion 150, the first interface 142 and second interface 156 may all be fully or partly manufactured prior to the measurements, and assembled in a certain manner based on the measurements.
- the conduits 158 may then be formed within the extending portion 150 or around the extending portion 150, based on the measurements.
- Manufacturing the alignment sleeve 128 may comprise constructing the one or more conduits 158 along the alignment sleeve 128, preferably by milling, for example as grooves. As illustrated in FIG. 6 for alignment sleeve 128a, and in FIG. 7 and FIG. 8, the method may comprise sealing the conduits 158 from any communication other than that via each respective port 103, 104.
- the constructing, for example the milling, of the conduit 158 may comprise removing material from the extending portion 150 of the alignment sleeve 128.
- the method may comprise constructing the conduit 158 so that it extends only a predetermined distance into the wall of the extending portion 150 of the alignment sleeve 128.
- the constructing may comprise ensuring that a predetermined wall thickness remains in the extending portion 150 of the alignment sleeve 128 after the constructing of the conduit 158.
- the manufacturing may comprise capping the one or more conduits 158 after the constructing, preferably by additive manufacturing. This may be to achieve the sealing referred to with regard to the alignment sleeve 128a of FIG. 6 and the alignment sleeve 128 of FIG. 9A.
- the manufacturing may comprise constructing the alignment sleeve 128 partially by additive manufacturing.
- the method may comprise manufacturing the extending portion 150, the first interface 142, and/or the second interface 156 by additive manufacturing, while the manufacturing of the one or more conduits 158 may be entirely or partially by another method.
- the manufacturing may comprise constructing the alignment sleeve 128 entirely by additive manufacturing.
- the manufacturing may comprise constructing the first interface 142, the second interface 156, the extending portion 150, the first plurality of ports 104, the second plurality of ports 103 and the conduits 158 by additive manufacturing. This approach may for example be preferable for meeting stricter time constraints, as it allows for a “one-step” process.
- a period of time ranging from 1 to 6 months, preferably 2 to 3 months, may pass between the landing of the tubing hanger 202 into the wellhead 120 and the installing of the tree onto the tubing hanger 202.
- the manufactured sleeve 128 may have a total weight of less than 500 kg, making it suitable for air freighting for connection with the tree main valve block 200 if the tree 200 is not in the same location as the finished sleeve upon completion of the manufacturing.
- the installing of the tree 200 on the tubing hanger 202 may comprise the second plurality of ports 103 of the second interface 156 of the alignment sleeve 128 connecting with the connections 207 of the tubing hanger 202.
- the installing of the tree 200 on the tubing hanger may comprise aligning the Tree 200 to the Tubing Hanger 202 to ensure the stabs between the tree and Tubing Hanger 202 engage.
- Such an alignment of the tree may be a rough alignment to PGB, followed by a fine alignment to the Tubing Hanger.
- the method may comprise connecting the tree 200 to the wellhead high pressure housing by means of a wellhead connector or sealing connector, such as a VXT H4 connector 132 of FIG. 1 (this VXT H4 connector may for example be the same connector used for connecting the BOP to the wellhead).
- a wellhead connector or sealing connector such as a VXT H4 connector 132 of FIG. 1 (this VXT H4 connector may for example be the same connector used for connecting the BOP to the wellhead).
- the tree 200 is shown to be placed on top of the tubing hanger 202 using ports 205 of the same orientation at the top of tree 200, (the figure displaying a plan view of the tree ports) as the connections 207 of the tubing hanger 202 in FIG. 2A a.
- the alignment with the cradle 121 (and hence, the heading and jumper 123) is shown to be consistent for all components.
- the tree 200 is shown to connect with the tubing hanger 202 while the connections 205 starting at the top of the tree (the figure displaying a plan view of the tree ports) have a different orientation to those of the tubing hanger 202.
- the alignment with the cradle 121 (and hence, the heading and jumper 123) is shown as not having to be consistent for all components.
- the method may control the orientation of a subsea vertical tree onto an “un-orientated” tubing hanger installed in a subsea wellhead
- the installing of the tree 200 on the tubing hanger 202 may take place on a wire or drill pipe.
- Installing the tree 200 on the tubing hanger 202 may comprise orienting the tree 200 to be in line with a PGB heading (i.e. so as to have a correct tree heading).
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
Description
Claims
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP26150178.7A EP4715163A3 (en) | 2022-11-30 | 2022-11-30 | Method for installing a subsea tubing hanger and orientate a subsea tree on a subsea wellhead |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/IB2022/000691 WO2024115936A1 (en) | 2022-11-30 | 2022-11-30 | Method for installing a subsea tubing hanger and orientate a subsea tree on a subsea wellhead |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP26150178.7A Division EP4715163A3 (en) | 2022-11-30 | 2022-11-30 | Method for installing a subsea tubing hanger and orientate a subsea tree on a subsea wellhead |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP4627180A1 true EP4627180A1 (en) | 2025-10-08 |
Family
ID=84799820
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP26150178.7A Pending EP4715163A3 (en) | 2022-11-30 | 2022-11-30 | Method for installing a subsea tubing hanger and orientate a subsea tree on a subsea wellhead |
| EP22835874.3A Pending EP4627180A1 (en) | 2022-11-30 | 2022-11-30 | Method for installing a subsea tubing hanger and orientate a subsea tree on a subsea wellhead |
Family Applications Before (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP26150178.7A Pending EP4715163A3 (en) | 2022-11-30 | 2022-11-30 | Method for installing a subsea tubing hanger and orientate a subsea tree on a subsea wellhead |
Country Status (2)
| Country | Link |
|---|---|
| EP (2) | EP4715163A3 (en) |
| WO (1) | WO2024115936A1 (en) |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7770650B2 (en) * | 2006-10-02 | 2010-08-10 | Vetco Gray Inc. | Integral orientation system for horizontal tree tubing hanger |
| US9593561B2 (en) * | 2013-09-06 | 2017-03-14 | Saudi Arabian Oil Company | Hanger and penetrator for through tubing ESP deployment with a vertical production tree |
| US10830015B2 (en) | 2017-10-19 | 2020-11-10 | Dril-Quip, Inc. | Tubing hanger alignment device |
| WO2020081911A1 (en) | 2018-10-18 | 2020-04-23 | Dril-Quip, Inc. | Non-orientating tubing hanger and tree |
-
2022
- 2022-11-30 EP EP26150178.7A patent/EP4715163A3/en active Pending
- 2022-11-30 EP EP22835874.3A patent/EP4627180A1/en active Pending
- 2022-11-30 WO PCT/IB2022/000691 patent/WO2024115936A1/en not_active Ceased
Also Published As
| Publication number | Publication date |
|---|---|
| EP4715163A3 (en) | 2026-06-10 |
| WO2024115936A1 (en) | 2024-06-06 |
| EP4715163A2 (en) | 2026-03-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US12234702B2 (en) | Tubing hanger alignment device | |
| US12320222B2 (en) | Subsea equipment alignment device | |
| US11180968B2 (en) | Tubing hanger alignment device | |
| US12006780B2 (en) | Systems, devices and methods for orienting a production outlet of a subsea production tree | |
| US11719064B2 (en) | Completing wells | |
| US11454078B2 (en) | Non-orientating tubing hanger and tree | |
| WO2024115936A1 (en) | Method for installing a subsea tubing hanger and orientate a subsea tree on a subsea wellhead | |
| SG10202104567PA (en) | Tubing hanger alignment device | |
| US20140076575A1 (en) | System and Method for Producing Through a Multi Bore Tubing Hanger to a Subsea Manifold Without BOP Modifications | |
| US11982148B2 (en) | Wellhead apparatus, assembly and method for supporting downhole tubing | |
| WO2025198476A1 (en) | Pipe part for connecting to a subsea foundation | |
| BR112022003825B1 (en) | WELLHEAD APPARATUS AND ASSEMBLY FOR SUPPORTING DOWNWELL PIPING |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20250630 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| DAV | Request for validation of the european patent (deleted) | ||
| DAX | Request for extension of the european patent (deleted) | ||
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20260401 |
|
| P01 | Opt-out of the competence of the unified patent court (upc) registered |
Free format text: CASE NUMBER: UPC_APP_0017343_4627180/2026 Effective date: 20260603 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |