- Publication number
- EP4605299A1 EP4605299A1 EP23794263.6A EP23794263A EP4605299A1 EP 4605299 A1 EP4605299 A1 EP 4605299A1 EP 23794263 A EP23794263 A EP 23794263A EP 4605299 A1 EP4605299 A1 EP 4605299A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- wind turbine
- support structure
- offshore wind
- floating
- floating offshore
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B75/00—Building or assembling floating offshore structures, e.g. semi-submersible platforms, SPAR platforms or wind turbine platforms
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B77/00—Transporting or installing offshore structures on site using buoyancy forces, e.g. using semi-submersible barges, ballasting the structure or transporting of oil-and-gas platforms
- B63B77/10—Transporting or installing offshore structures on site using buoyancy forces, e.g. using semi-submersible barges, ballasting the structure or transporting of oil-and-gas platforms specially adapted for electric power plants, e.g. wind turbines or tidal turbine generators
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63C—LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
- B63C3/00—Launching or hauling-out by landborne slipways; Slipways
- B63C3/04—Launching or hauling-out by landborne slipways; Slipways by sideways movement of vessel
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63C—LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
- B63C3/00—Launching or hauling-out by landborne slipways; Slipways
- B63C3/08—Tracks on slipways
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63C—LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
- B63C3/00—Launching or hauling-out by landborne slipways; Slipways
- B63C3/12—Launching or hauling-out by landborne slipways; Slipways using cradles
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/10—Assembly of wind motors; Arrangements for erecting wind motors
- F03D13/126—Offshore
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/10—Assembly of wind motors; Arrangements for erecting wind motors
- F03D13/135—Pre-assembling, i.e. partially or completely assembling the wind motor before transport to the installation site
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/10—Assembly of wind motors; Arrangements for erecting wind motors
- F03D13/139—Assembling or erecting wind motors by using lifting means
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- F03D13/25—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors specially adapted for offshore installation
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- F03D13/25—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors specially adapted for offshore installation
- F03D13/256—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors specially adapted for offshore installation on a floating support, i.e. floating wind motors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/40—Arrangements or methods specially adapted for transporting wind motor components
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B2035/4433—Floating structures carrying electric power plants
- B63B2035/446—Floating structures carrying electric power plants for converting wind energy into electric energy
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2240/00—Components
- F05B2240/90—Mounting on supporting structures or systems
- F05B2240/93—Mounting on supporting structures or systems on a structure floating on a liquid surface
- F05B2240/932—Mounting on supporting structures or systems on a structure floating on a liquid surface which is a catamaran-like structure
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2240/00—Components
- F05B2240/90—Mounting on supporting structures or systems
- F05B2240/95—Mounting on supporting structures or systems offshore
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/727—Offshore wind turbines
Definitions
- a floating offshore wind turbine construction comprises a wind turbine in combination with a floating support structure.
- the floating support structure may be a semisubmersible or tension leg support structure, or it may be a spar support structure using a separate keel. Irrespective of the type of floating support structure the floating offshore wind turbine construction is intended for floating in a water body at a water surface.
- the wind turbine is supported on a semisubmersible floating support structure that comprises a tower support carrying the tower of the wind turbine.
- the support structure comprises at least one buoyancy member, but typically a plurality of buoyancy members, providing buoyancy to the support structure when in water.
- the buoyancy members are arranged at lateral distances relatively to a central axis of the tower, typically vertical axis.
- each buoyancy member comprises one or more buoyancy columns fixed to a node of the support structure.
- Such buoyancy columns may typically be made of steel or reinforced concrete.
- the offshore location is in sea water but can also be a lake or other offshore body of water.
- it is exemplified in the following for sea water without delineating from the general principle of use in other offshore waters, such as lake water.
- the invention is based on the use of an installation site comprising a combination of one or more of the following elements: i) one or more onshore cranes, ii) one or more onshore stations for assembly, repair and maintenance, and disassembly, iii) an onshore transport system, and iv) a slipway.
- the onshore crane may be a local crane available in the relevant port. It may also be a ring crane, e.g. a Mammoet PTC 200-DS or similar, or one or more crawler cranes, e.g. Liebherr LH 11350 or similar.
- the crane or cranes may be fitted with boom extension to allow for turbine nacelle and blade installation at hub height. Combinations of the above and other types of cranes are also possible.
- the onshore station or stations for assembly, repair and maintenance, and disassembly may be specific locations suitable for crane work and for other relevant completion works.
- An assembly station may be established adjacent to a fixed crane, facilitating standardized operations in assembly, repair and maintenance, and disassembly.
- One or more assembly stations may also be established at one or more locations suitable for crane works using moveable cranes, such as crawler cranes.
- One or more stations may be established for completion of the floating offshore wind turbine, including the floating support structure.
- completion may comprise internal completion of the wind turbine after assembly, e.g. connection of cabling and final tensioning of bolts, mounting of accessories such as navigation lights, energization and pre-commissioning, and even trial operation within specific operating conditions that leave sufficient margins on the stability of the structure while standing upright onshore.
- One or more stations may be established for inspection, maintenance or repair of the floating support structure or the wind turbine using smaller cranes that may not be capable of lifting main parts of the structure such as the entire rotor, the nacelle, the tower or similar, but are capable of lifting relevant main components, such as blades, gearboxes, generators, etc.
- One or more stations may be established for the dry storage of completed floating offshore wind turbines awaiting launch, or for floating offshore wind turbines having been recovered and awaiting inspection, maintenance or repair, or for floating offshore wind turbines awaiting disassembly at the end of useful life.
- An onshore transportation system may be established based on skidding.
- the skidding tracks may be permanently installed, or they may be removable. Movements of components of the floating support structure and of the completed floating support structure, also with the wind turbine mounted, may take place through sliding of the components or structures on the skidding tracks, or it may take places using wheel-based trolleys or other friction-reducing equipment.
- Alternative transportation systems may be established based on SPMTs (Self-Propelled Modular Transporters), rollers or other systems that are not based on tracks but rely on the rolling or sliding on top of large flat or inclined surfaces.
- a particular advantage may be established with an arrangement of skidding tracks suitable for a given floating support structure type.
- a triangular semisubmersible floating support structure may advantageously be transported using two skidding tracks, where one tracks supports two of the tree legs at the vertices of the triangular structure or using three skidding tracks where each track supports one of the three legs at the vertices of the triangular structure.
- a slipway may be constructed that forms an inclined plane connecting one or more largely flat and horizontal areas used for assembly, completion, inspection, maintenance or repair, or disassembly of floating offshore wind turbines with the sea or with any other relevant body of water.
- the slipway may be made of concrete or steel, and it may be fitted with skids to facilitate the launch process.
- a further particular advantage is established with a slipway arrangement comprising three parallel tracks, where the middle track is offset away from the quayside relative to the two lateral tracks, and where each of three legs at vertices of a triangular structure is supported by a corresponding track at launch.
- Such offset will cause the floating offshore wind turbine to have an inclination during launch down the slipway that is less than the inclination of each of the tracks. This will improve stability of the floating offshore wind turbine during launch.
- a further particular advantage is established with an offset of the middle track that is equal to the distance from the line connecting the centre of the two legs that are moving on the lateral tracks to the centre of the third leg that is moving on the middle track.
- the floating offshore wind turbine will remain vertical during launch down the slipway. This will further improve the stability of the floating offshore wind turbine during launch.
- the improved installation and launch method for floating offshore wind turbines of 12-15 MW rating and above according to the invention has a number of steps.
- An advantageous assembly arrangement at the installation site can be arranged by the assembly from prefabricated modules at an assembly station.
- the turbine assembly station may be the same station as that where a floating support structure assembled at the installation site is assembly from prefabricated modules, or it may be a different assembly station.
- the wind turbine is installed on the floating support structure using one or more cranes.
- a particular advantage may be achieved by ballasting the floating support structure prior to the installation of the wind turbine. Such pre-ballasting will improve the onshore stability of the floating offshore wind turbine construction comprising the floating support structure and the wind turbine, and it will save ballasting work after the launch of the floating offshore wind turbine.
- the floating offshore wind turbine construction comprising the floating support structure and the wind turbine is completed.
- completion may comprise internal completion of the wind turbine after assembly, e.g. connection of cabling and final tensioning of bolts, mounting of accessories such as navigation lights, energization and pre-commissioning, and even trial operation within specific operating conditions that leave sufficient margins on the stability of the structure while standing upright onshore.
- the completion may be carried out at the turbine assembly station, or it may be carried out at one or more different stations.
- a particular advantage may be achieved by ballasting the floating support structure prior to any trial operation of the wind turbine if such ballasting has not been carried out prior to the installation of the wind turbine. Such pre-ballasting will improve the onshore stability of the floating offshore wind turbine comprising the floating support structure and the wind turbine, and it will save ballasting work after the launch of the floating offshore wind turbine.
- the floating offshore wind turbine construction is transported to the slipway.
- the floating offshore wind turbine construction may be temporarily stored at an onshore storage station.
- a particular advantage can be established by providing the floating offshore wind turbine construction with pivoted supports that permit the transfer from the horizontal plane to the inclined plane of the slipway without causing edge loads on the underside of the floating support structure.
- a particular advantage can be established by providing the floating offshore wind turbine construction with additional ballast prior to launch using the slipway, thereby ensuring stability also on the inclined plane of the slipway.
- the floating offshore wind turbine construction may be moored in the port for final completion, for awaiting the availability of installation vessels or similar, or it may be towed directly from the slipway to the offshore installation site.
- the improved method for the recovery of floating offshore wind turbine constructions of 12-15 MW rating and above according to the invention has a number of steps.
- the floating offshore wind turbine construction is towed to the slipway.
- it is transferred onto supports facilitating the use of the transportation system of the installation site.
- the supports may be pivoted to permit the transfer from the inclined plane of the slipway to the horizontal plane of the installation site.
- the tower support 8 is exemplified as a cylindrical support column with a central axis 15 that is also a central axis of the tower 7. However, the tower support 8 could have other shapes. As illustrated in FIG. 2, the tower support 8 extends to a position above the water surface 4, which is characteristic for semisubmersible floating support structures.
- the tower support 8 is located midway on the base of the triangle. In other embodiments, the tower support 8 is in the centre of a triangle, for example an equilateral triangle.
- FIG. 3 illustrates and alternative structure, where the tower support is arranged centrally between buoyancy members, each of which comprises a pair of buoyancy columns.
- the pairs of buoyancy columns are arranged at the comers of an equilateral triangle.
- FIG. 4 illustrates a further example, where the tower is arranged in the centre of the triangle and the support structure is not a tetrahedron, but where the tower support is connected to the buoyancy members by horizontal bottom bars, which optionally serves as tanks for sea water as permanent ballast.
- FIG. 5 A is a perspective illustration of an installation site 100.
- the installation site 100 has a number of stations, an assembly station 200, a completion station 300, a storage section 400, and a launch station 500.
- a floating offshore wind turbine construction 600 has been launched and is in the process of being towed to the installation site.
- a ring crane 201 is placed at the assembly station 200. It is connected with skid tracks 202 to two floating support structure assembly stations 203 and 204. Floating support structures 3 are in partial stages of assembly using smaller cranes not shown. A wind turbine 2 is being mounted by the ring crane 201 on a floating support structure 3.
- the ring crane 201 may advantageously be located adjacent to the quayside so as to be available for unloading of incoming goods from ships and barges.
- a floating offshore wind turbine construction 1 is located at the completion station 300.
- the floating offshore wind turbine construction 1 has been transported to the completion station 300 using skidding on skid tracks 302.
- a medium-voltage cable is connected to the floating offshore wind turbine construction 1, enabling not only mechanical completion (final tightening of bolts, mounting of cables, mounting of the last equipment, etc.) but also electrical completion (checking of all electrical connections) and trial operation.
- a number of floating support structures 3 and a number of floating offshore wind turbines constructions 1 are located in the storage station 400. They have been transported to the storage station 400 on skidding tracks 405.
- a floating offshore wind turbine construction 1 is located at the launch station 500 comprising a horizontal or near horizontal platform 16 and a slipway 23.
- a second floating offshore wind turbine construction 1 is in the process of being launched down the slipway 503.
- FIG 6 and FIG. 7 show a situation where a wind turbine installation 1 is positioned on a platform 16 at the end of a slipway 23, shown as a ramp, that has been built with offset of the tracks 17A, 17B, 18.
- the support structure 3 would be pushed on trolleys 21 to the slipway 23 or lifted by a crane to this position.
- the slipway 23 comprises a first track 17A, a second track 17B and third track 18 extending in parallel to each other from the platform 16 and into the water below the water surface 4.
- the first track 17A and the second track 17B are arranged symmetrically on opposite sides of the third track 18, which is a central track.
- the first track 17A and the second track 17B are horizontally offset from the third track 18 by a distance equal to the altitude A of the triangle, which is illustrated in more detail in FIG. 7.
- floating offshore wind turbine construction Imoves along the three tracks 17 A, 7B, 18 down into the water until the support structure 3 including the wind turbine 2 floats off the tracks 17A, 7B, 18 by the lift of buoyancy members 9 A, 9B, 9C, which are shown in more detail in FIG. 1.
- the tracks 17 A, 7B, 18 extends into the water to a water depth DI below the surface 4, which is sufficiently deep under water for maintaining the orientation of the support structure 3, until the wind turbine installation floats off the tracks 17 A, 7B, 18 due to its buoyancy members 9 A, 9B, 9C.
- the support structure 3 when starting floating, the support structure 3 extends a depth D2 underneath the water surface 4, which is less than the depth DI to which the tracks 17A, 7B, 18 extends under water at their ends. This is illustrated in more detail in FIG. 7, which shows the situation where the wind turbine installation 1 is about to float and not any more supported by the tracks 17 A, 7B, 18.
- each leg 13 of the support structure 3 is carried by a wedge-shaped trolley 21, of which there are provided one for each track 17 A, 7B, 18 and typically with rollers on its underside.
- the trolleys have brakes in order to control the speed of the launch. This allows use of relatively steep slipways/ramps 23, which is useful for narrow waters at the end of the slipway/ramp 23, such as in a harbour, river, or canal.
- the tracks at least one, but advantageously at least two of the tracks 17 A, 17B, 18 is provided with rails for better guidance of the trolleys during launch.
- Typical dimension ranges for the system outlined above for turbines in the 12-15 MW range are as follows:
- the installation site 100 may have a length of around 300 m or more in a direction parallel to the quayside and a width of around 500 m or more in a direction perpendicular to the quayside.
- the wind turbine 2 may have a rotor diameter of 220 m or more and a distance from the tower bottom flange to the rotor centre of 115 m or more.
- the floating support structure 3 may have a length of 100 m and a width of 100 m.
- the slipway 503 may have a width of around 120 m or more and an inclination of 3-10 degrees.
- the tacks 17A, 17B, 18 may have a width of 15 m or more and an inclination of 3-
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Sustainable Energy (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Ocean & Marine Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Transportation (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Wind Motors (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DKPA202200941A DK181557B1 (en) | 2022-10-18 | 2022-10-18 | Method of launching, recovering, inspecting, maintaining, repairing or decommissioning a floating offshore wind turbine construction |
| PCT/DK2023/050246 WO2024083295A1 (en) | 2022-10-18 | 2023-10-17 | Method of launching, recovering, or inspecting a floating offshore wind turbine construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP4605299A1 true EP4605299A1 (en) | 2025-08-27 |
Family
ID=88558332
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP23794263.6A Pending EP4605299A1 (en) | 2022-10-18 | 2023-10-17 | Method of launching, recovering, or inspecting a floating offshore wind turbine construction |
Country Status (5)
| Country | Link |
|---|---|
| EP (1) | EP4605299A1 (en) |
| JP (1) | JP2026512610A (en) |
| KR (1) | KR20250091200A (en) |
| DK (1) | DK181557B1 (en) |
| WO (1) | WO2024083295A1 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2026068415A1 (en) * | 2024-09-24 | 2026-04-02 | Aker Solutions As | Construction of floating wind turbine foundations |
| EP4725824A1 (en) * | 2024-10-11 | 2026-04-15 | DEME Offshore BE NV | Arrangement for loading monopiles onto a vessel deck |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8169099B2 (en) * | 2008-08-18 | 2012-05-01 | Samuel Roznitsky | Deep offshore floating wind turbine and method of deep offshore floating wind turbine assembly, transportation, installation and operation |
| CA2669002C (en) | 2008-08-28 | 2012-10-23 | Mitsubishi Heavy Industries, Ltd. | Construction method and construction apparatus for offshore wind turbine generator |
| EP3102822B1 (en) * | 2014-02-06 | 2023-05-24 | University of Maine System Board of Trustees | Method of assembling a floating wind turbine platform |
| EP3262296B1 (en) * | 2015-02-24 | 2019-12-18 | University of Maine System Board of Trustees | Method of construction, assembly, and launch of a floating wind turbine platform |
| DK3342699T3 (en) * | 2016-12-27 | 2020-06-15 | Nautilus Floating Solutions Sl | Floating offshore platform |
| EP4168300A1 (en) * | 2020-06-19 | 2023-04-26 | Ocean Ventus AS | Floating support structure with a stable vertical floating position for connection to a horizontally positioned tower of a wind turbine |
| US12234802B2 (en) | 2021-04-01 | 2025-02-25 | Exmar Offshore Company | Floating offshore wind turbine assembly unit |
-
2022
- 2022-10-18 DK DKPA202200941A patent/DK181557B1/en active IP Right Grant
-
2023
- 2023-10-17 WO PCT/DK2023/050246 patent/WO2024083295A1/en not_active Ceased
- 2023-10-17 JP JP2025521446A patent/JP2026512610A/en active Pending
- 2023-10-17 KR KR1020257011457A patent/KR20250091200A/en active Pending
- 2023-10-17 EP EP23794263.6A patent/EP4605299A1/en active Pending
Also Published As
| Publication number | Publication date |
|---|---|
| KR20250091200A (en) | 2025-06-20 |
| JP2026512610A (en) | 2026-04-20 |
| DK181557B1 (en) | 2024-05-14 |
| WO2024083295A1 (en) | 2024-04-25 |
| DK202200941A1 (en) | 2024-05-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN113581395B (en) | Semi-submersible floating wind turbine with T-shaped buoy | |
| KR20100016369A (en) | A system and method for the deployment of a hydroelectric turbine | |
| US11867148B2 (en) | Delivery of a high volume of floating systems for wind turbines | |
| WO2024083295A1 (en) | Method of launching, recovering, or inspecting a floating offshore wind turbine construction | |
| US10240862B2 (en) | LNG production plant and corresponding method of construction | |
| US20250368299A1 (en) | Floating foundation for an offshore wind turbine and method of construction | |
| US6347909B1 (en) | Method to transport and install a deck | |
| KR20240013167A (en) | Floating fabrication device and method of constructing a floating structure | |
| KR102756000B1 (en) | System and method for installation of floating offshore wind power generation structures | |
| US20250019037A1 (en) | Floating Foundation For An Offshore Wind Turbine | |
| EP4389579A1 (en) | Offshore floating intervention vessel, intended to temporarily support an offshore wind turbine platform, related assembly and intervention method | |
| JP2024175430A (en) | Manufacturing method of floating structure | |
| NO348291B1 (en) | Load out method and system for offshore floating wind turbine | |
| JP7692456B2 (en) | Construction method for floating offshore wind power generation facilities | |
| US20120082530A1 (en) | System and method for submerging a hydraulic turbine engine | |
| US12584461B2 (en) | Floating offshore wind turbine apparatus and installation method | |
| US20250091698A1 (en) | Method of assembling floating offshore wind vessels using a mobile offshore assembly facility | |
| JP2025011444A (en) | Construction method for floating offshore wind power generation facilities | |
| US20240270356A1 (en) | Installation System and Method For An Offshore Wind Turbine | |
| JP2025166523A (en) | Construction method for floating offshore wind power generation facilities | |
| JP2025166366A (en) | Construction method for floating offshore wind power generation facilities | |
| WO2026009031A1 (en) | Relocatable quays to deploy and recover floating units | |
| Cholley et al. | Heavy Production Platform for Offshore LNG Development |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20250414 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| DAV | Request for validation of the european patent (deleted) | ||
| DAX | Request for extension of the european patent (deleted) | ||
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
| 17Q | First examination report despatched |
Effective date: 20260708 |