EP4592002A1 - Can manufacturing method and device - Google Patents

Can manufacturing method and device

Info

Publication number
EP4592002A1
EP4592002A1 EP23867819.7A EP23867819A EP4592002A1 EP 4592002 A1 EP4592002 A1 EP 4592002A1 EP 23867819 A EP23867819 A EP 23867819A EP 4592002 A1 EP4592002 A1 EP 4592002A1
Authority
EP
European Patent Office
Prior art keywords
air
shot
pressure
punch
timing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
EP23867819.7A
Other languages
German (de)
French (fr)
Inventor
Hanjiro Hokamura
Takayuki TOCHIGI
Hiromitsu Hunatsuki
Kouji Wakisaka
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyo Seikan Co Ltd
Original Assignee
Toyo Seikan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyo Seikan Co Ltd filed Critical Toyo Seikan Co Ltd
Publication of EP4592002A1 publication Critical patent/EP4592002A1/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D51/00Making hollow objects
    • B21D51/16Making hollow objects characterised by the use of the objects
    • B21D51/26Making hollow objects characterised by the use of the objects cans or tins; Closing same in a permanent manner
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D51/00Making hollow objects
    • B21D51/16Making hollow objects characterised by the use of the objects
    • B21D51/26Making hollow objects characterised by the use of the objects cans or tins; Closing same in a permanent manner
    • B21D51/2669Transforming the shape of formed can bodies; Forming can bodies from flattened tubular blanks; Flattening can bodies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D22/00Shaping without cutting, by stamping, spinning, or deep-drawing
    • B21D22/20Deep-drawing
    • B21D22/28Deep-drawing of cylindrical articles using consecutive dies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D45/00Ejecting or stripping-off devices arranged in machines or tools dealt with in this subclass
    • B21D45/06Stripping-off devices
    • B21D45/065Stripping-off devices for deep-drawn cans, e.g. using stripping fingers

Definitions

  • the present invention relates to a method and device for manufacturing metal cans by drawing and/or drawing-and-ironing using a press machine.
  • a metal can is manufactured by drawing using a press machine
  • the metal can is drawn and/or drawn and ironed by a punch and then the punch is pulled out from the can
  • the processed can and the punch are in close contact with each other and the punch is pulled out at a high speed, and thus a negative pressure is generated in the space between the can bottom portion and the punch tip portion and the punch cannot be pulled out from the can.
  • the can is pressed by a stripper and the punch is pulled out, but the negative pressure generated in the space between the can bottom portion and the punch tip portion is not resolved. Therefore, air is blown out from the tip of the punch to eliminate the negative pressure, thereby performing air assist to smoothly pull out the punch. (See FIG. 1 )
  • the punch may not be normally pulled out.
  • the air blow is weak, the negative pressure generated in the space between the can bottom portion and the punch tip portion cannot be resolved and the can is crushed (see FIG. 4 (a) ), whereas if the air blow is strong, when the punch is pulled out, the can is blown off and collides with the surrounding structure such as the die (see FIG. 4 (b) ).
  • the present invention has been proposed in order to solve the problem that the punch cannot be normally pulled out in some cases, and an object of the present invention is to provide a method and a device for manufacturing a can in which air assist is performed so that the punch can be smoothly pulled out from the processed can by appropriately performing air assist.
  • a can manufacturing method according to the present invention has the following configuration.
  • a can manufacturing method including drawing and/or drawing-and-ironing using a press machine, the method including stripping that includes removing a punch from a can after the drawing and/or the drawing-and-ironing, wherein in the stripping, air is blown out from an air blowing port at a tip end of the punch to perform air assist of assisting extraction of the punch, and in the air assist, a pressure of the air and/or a blowing timing of the air is adjusted for each shot to a pressure and/or a blowing timing according to a condition of the shot.
  • a can manufacturing device according to the present invention has the following configuration.
  • a can manufacturing device for manufacturing cans using drawing and/or drawing-and-ironing including a punch, a stripper, and a controller, wherein the punch includes an air blowing port configured to blow air at a tip end thereof, and the controller performs air blowing control of blowing air from the air blowing port while the stripper is engaged with an end portion of a can and the punch is being removed from the can, and in the air blowing control, a pressure of the air and/or a blowing timing of the air is adjusted for each shot to a pressure and/or a blowing timing according to a condition of the shot.
  • the present invention can provide a method and a device for manufacturing cans in which a punch can be smoothly pulled out from a processed can by appropriately adjusting air pressure and/or air blowing timing in air assist.
  • a can manufactured by drawing and/or drawing-and-ironing using a press machine in the present embodiment is, for example, a can made of aluminum or steel mainly used for a beverage can which is so-called DI can or a resin-coated can, and is formed into a can by drawing-and-ironing an intermediate product formed into a cup shape using a body maker as a press machine.
  • FIG. 1 is a diagram illustrating air assist in a stripping step according to the present embodiment.
  • Patent Literatures 1 to 3 It is a known technique described in Patent Literatures 1 to 3 that a body maker performs drawing-and-ironing on an intermediate product formed into a cup shape by a punch 2 and a plurality of dies (the dies are not illustrated) and finally forms the shape of a can bottom portion 11.
  • FIG. 1 (a) illustrates a state in which forming of a can 1 by the punch 2 is completed.
  • a stripping step is performed in which the punch is pulled out from the can after the forming.
  • the punch 2 is pulled out from the can 1, but since an outer surface of the punch 2 and an inner surface of the can 1 are almost in close contact with each other and air 5 is not supplied to a space 4 between a can bottom portion 11 and a punch tip portion 21, when the punch 2 is pulled, the can 1 is moved together with the punch 2. Then, the upper end portion of the can 1 is engaged with a stripper 3.
  • air blowing control is performed in which the pressure and blowing timing of the air are controlled by a controller in the air blowing.
  • a body maker used for forming cans is not always operated at a constant speed, but the operation speed varies depending on various conditions or the like for the cans to be manufactured.
  • control is performed by a controller so that manufacturing is performed at a low operation speed at the start of manufacturing, the operation speed is gradually increased, and when the operation speed reaches a predetermined operation speed, the operation is continued at the predetermined operation speed.
  • the speed at which the punch 2 is pulled out from the can 1 is also low, and at a high operation speed, the speed at which the punch 2 is pulled out from the can 1 is also high. Then, as for the speed at which the space 4 between the can bottom portion 11 and the punch tip portion 21 expands, similarly, the speed at which the space 4 expands is low at a low operation speed, and the speed at which the space 4 expands is high at a high operation speed.
  • the supply rate of the air 5 per unit time is increased by increasing the pressure at which the air 5 is supplied.
  • the relationship between the operation speed of the body maker and the air pressure is defined in advance, and each time a can is molded (each shot), the air pressure is controlled (operation speed) by the controller so that the air pressure is in accordance with the operation speed at the time of the shot.
  • control is performed in accordance with the relationship shown in the graph of FIG. 2 .
  • the operation speed at the start of the operation is 100 spm (shot/minute) and the air pressure at that time is 100 kPa, and thereafter the operation speed is gradually increased to 140 kPa at 200 spm, 170 kPa at 300 spm, and 180 kPa at 400 spm to press the can 1.
  • the pressure of the air can be controlled using, for example, a known electropneumatic regulator.
  • the operation speed, the air pressure, and the combination thereof may be appropriately set to optimum values in consideration of the type and constituent elements of the press machine, the type and size of the can to be manufactured, the manufacturing procedure, and the like, and are not limited to those shown in the graph of FIG. 2 .
  • the relationship between the operation speed and the air pressure is not limited to a broken line as shown in the graph of FIG. 2 , but may be a straight line, a curved line, or a combination thereof.
  • an opening/closing valve (not illustrated), for example, an electromagnetic valve is provided in a supply path of the air 5 to the air blowing port 22 of the punch 2, and the opening/closing valve controls the operation timing (air blowing timing) of the opening/closing valve so that the air 5 is supplied from the air blowing port 22 in accordance with the timing when the punch 2 is pulled out from the can 1.
  • the opening/closing valve is provided outside the punch 2, and there is a predetermined distance from the opening/closing valve to the air blowing port 22. Although the air blown in the previous shot remains between the opening/closing valve and the air blowing port 22, there is a time delay from the operation timing of the opening/closing valve (air blowing timing) until the air 5 is actually blown from the air blowing port 22 and the air 5 is sufficiently supplied to the space 4 between the can bottom portion 11 and the punch tip portion 21. Note that there is a slight time delay also in the operation of the opening/closing valve itself.
  • the operation speed of the body maker changes, and the influence of the time delay from the operation timing of the opening/closing valve (air blowing timing) varies depending on the operation speed of the body maker.
  • the relationship between the operation speed of the body maker and the operation timing of the opening/closing valve (air blowing timing) is defined in advance, and the controller controls the operation timing of the opening/closing valve (air blowing timing) in accordance with the operation speed.
  • the time delay itself from the operation timing of the opening/closing valve changes depending on the pressure of the blown air.
  • the air pressure is high, the time delay tends to decrease, and when the air pressure is low, the time delay tends to increase.
  • the relationship between the air pressure and the operation timing of the opening/closing valve (air blowing timing) is defined in advance, and each time a can is formed (each shot), the controller controls the operation timing of the opening/closing valve (air blowing timing) in accordance with the air pressure at the time of the shot.
  • the operation timing of the opening/closing valve (air blowing timing) is controlled in accordance with the operation speed of the body maker or the pressure of the blown air at the time of the shot.
  • a known electronic cam switch with an automatic advance function is used to control the operation timing (air blowing timing) of the opening/closing valve.
  • a detector that detects a rotation angle (0° to 360°) is installed on a rotation shaft, and a switch signal corresponding to an output of an angle signal corresponding to a predetermined angle (°) from the detector is output.
  • the automatic advance function can set an advance correction angle (°) according to the rotation speed of the rotation shaft, and outputs a switch signal according to an output of an angle signal corresponding to an angle obtained by advancing the set advance correction angle (°) from a predetermined angle (°) according to the rotation speed.
  • the opening/closing control of the opening/closing valve is performed by the switch signal output from the electronic cam switch.
  • the detector is mounted on a rotation shaft for driving the punch 2.
  • the rotation shaft performs one shot in one rotation.
  • the angle of the rotation shaft at which the control for opening the opening/closing valve is performed is 180° at the reference operation speed (0 spm) and air pressure (170 kPa).
  • the operation timing (air blowing timing) of the opening/closing valve due to this influence that is, the delay conversion angle (°) which is the adjustment amount of the rotation shaft is determined corresponding to the rotation speed.
  • the rotation speed and the delay conversion angle are set to the automatic advance function of the electronic cam switch as the speed of the rotation shaft and the advance correction angle.
  • the setting of the speed of the rotation shaft and the advance correction angle in the automatic advance function is also performed at other air pressures, for example, 140 kPa.
  • FIG. 3(a) shows a table of the operation speed (rotation speed of the rotation shaft) and the delay conversion angle (advance correction angle). Note that "Corrected ON angle (°)" in FIG. 3(a) is a numerical value obtained by subtracting the delay conversion angle (advance correction angle) from 180° which is a reference angle for performing control to open the opening/closing valve.
  • FIG. 3(b) is a graph of the table of FIG. 3(a) .
  • the angle of the rotation shaft that performs control to open the opening/closing valve becomes smaller than the reference angle of 180°, that is, the timing is advanced.
  • the operation timing of the opening/closing valve (air blowing timing) is controlled in accordance with the operation speed of the body maker and the pressure of the blown air.
  • the operation speed, the air pressure, the delay conversion angle, and the combination thereof may be appropriately set to optimum values in consideration of the type and constituent elements of the press machine, the type and size of the can to be manufactured, the manufacturing procedure, and the like, and are not limited to those shown in the table and graph of FIG. 3 .
  • the operation speed, the air pressure, the delay conversion angle, and the combination thereof are not limited to the broken line as shown in the graph of FIG. 3 , but may be a straight line, a curved line, or a combination thereof.
  • the air pressure or the air blowing timing is controlled to the optimum value for each shot according to the operation speed of the press machine.
  • composite control operation speed
  • composite control may be performed in which the air pressure and the air blowing timing are controlled to the optimum values.
  • the composite control (operation speed) it is preferable to set the air pressure and the air blowing timing in consideration of the synergistic effect of the air pressure control and the air blowing control, instead of simply performing the control with the set values of the air pressure control (operation speed) and the air blowing timing control (operation speed), separately.
  • sufficient air is supplied to the space 4 by performing air pressure control (leading can) for supplying air having a pressure higher than the air pressure at the time of the shot for forming the second can, for example, in which other processing conditions such as the operation speed are the same.
  • the air pressure at that time is set to 100 kPa as shown in FIG. 2 , but in the shot for forming the leading can, the air pressure is set to a high pressure of 140 kPa.
  • the pressure of the air in the shot for forming the leading can may be appropriately set to an optimum value in consideration of the type and constituent elements of the press machine, the type and size of the can to be manufactured, the manufacturing procedure, the pressure of the air when the can is not the leading can, and the like.
  • sufficient air is supplied to the space 4 by performing air blowing timing control (leading can) for supplying air at an air blowing timing earlier than the air blowing timing at the time of the shot for forming the second can, for example, in which other processing conditions such as the operation speed are the same.
  • the delay conversion angle is 14° when the air pressure at the start of the operation is 100 kPa and the operation speed is 100 spm, in the shot for forming the leading can, the delay conversion angle is set to 16°, which is an early air blowing timing.
  • the air blowing timing in the shot for forming the leading can may be appropriately set to an optimum value in consideration of the type and constituent elements of the press machine, the type and size of the can to be manufactured, the manufacturing procedure, the air blowing timing when the can is not the leading can, and the like.
  • the air pressure or the air blowing timing is controlled to the optimum value for each shot for forming the leading can.
  • composite control (leading can) for controlling the air pressure and the air blowing timing to the optimum values may be performed.
  • the composite control leading can

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Shaping Metal By Deep-Drawing, Or The Like (AREA)

Abstract

To provide a can manufacturing method performing air assist capable of smoothly pulling out a punch from a processed can by appropriately performing air assist. Provided is a can manufacturing method including drawing and/or drawing-and-ironing using a press machine, the method including stripping that includes removing a punch from a can after the drawing and/or the drawing-and-ironing. In the stripping, air is blown out from an air blowing port at a tip end of the punch to perform air assist of assisting extraction of the punch. In the air assist, a pressure of the air and/or a blowing timing of the air is adjusted for each shot to a pressure and/or a blowing timing according to a condition of the shot.

Description

    Technical Field
  • The present invention relates to a method and device for manufacturing metal cans by drawing and/or drawing-and-ironing using a press machine.
  • Background Art
  • Conventionally, in drawing of a metal can using a press machine, there is known a technique of performing air assist in which assist air is supplied to a space between a tip of a punch and a bottom portion of the can in order to reduce a negative pressure generated between the can bottom portion and the punch tip portion when the punch is pulled out from the can after drawing and/or drawing-and-ironing of the metal can. (see Patent Documents 1 to 3)
  • Citation List Patent Literature
    • Patent Document 1: JP 2021-70034 A
    • Patent Document 2: JP H9-271870 A
    • Patent Document 3: JP Translation of PCT International Application 2019-525844 A
    Summary of Invention Technical Problem to Be Solved by Invention
  • In a case where a metal can is manufactured by drawing using a press machine, when the metal can is drawn and/or drawn and ironed by a punch and then the punch is pulled out from the can, the processed can and the punch are in close contact with each other and the punch is pulled out at a high speed, and thus a negative pressure is generated in the space between the can bottom portion and the punch tip portion and the punch cannot be pulled out from the can. Then, the can is pressed by a stripper and the punch is pulled out, but the negative pressure generated in the space between the can bottom portion and the punch tip portion is not resolved. Therefore, air is blown out from the tip of the punch to eliminate the negative pressure, thereby performing air assist to smoothly pull out the punch. (See FIG. 1)
  • However, if the air is not properly blown out, the punch may not be normally pulled out. For example, if the air blow is weak, the negative pressure generated in the space between the can bottom portion and the punch tip portion cannot be resolved and the can is crushed (see FIG. 4 (a)), whereas if the air blow is strong, when the punch is pulled out, the can is blown off and collides with the surrounding structure such as the die (see FIG. 4 (b)).
  • The present invention has been proposed in order to solve the problem that the punch cannot be normally pulled out in some cases, and an object of the present invention is to provide a method and a device for manufacturing a can in which air assist is performed so that the punch can be smoothly pulled out from the processed can by appropriately performing air assist.
  • Solution to Problem
  • In order to solve such problems, a can manufacturing method according to the present invention has the following configuration.
  • A can manufacturing method including drawing and/or drawing-and-ironing using a press machine, the method including stripping that includes removing a punch from a can after the drawing and/or the drawing-and-ironing, wherein in the stripping, air is blown out from an air blowing port at a tip end of the punch to perform air assist of assisting extraction of the punch, and in the air assist, a pressure of the air and/or a blowing timing of the air is adjusted for each shot to a pressure and/or a blowing timing according to a condition of the shot.
  • A can manufacturing device according to the present invention has the following configuration.
  • A can manufacturing device for manufacturing cans using drawing and/or drawing-and-ironing, the device including a punch, a stripper, and a controller, wherein the punch includes an air blowing port configured to blow air at a tip end thereof, and the controller performs air blowing control of blowing air from the air blowing port while the stripper is engaged with an end portion of a can and the punch is being removed from the can, and in the air blowing control, a pressure of the air and/or a blowing timing of the air is adjusted for each shot to a pressure and/or a blowing timing according to a condition of the shot.
  • Advantageous Effects of Invention
  • The present invention can provide a method and a device for manufacturing cans in which a punch can be smoothly pulled out from a processed can by appropriately adjusting air pressure and/or air blowing timing in air assist.
  • Brief Description of Drawings
    • FIG. 1 is a diagram illustrating air assist according to an embodiment of the present invention.
    • FIG. 2 is a diagram illustrating an example of air pressure setting in a press machine according to an embodiment of the present invention.
    • FIG. 3 includes diagrams illustrating an example of setting of air blowing timing in the press machine according to the embodiment of the present invention, in which (a) is a table of timing correction amounts and (b) is a graph thereof.
    • FIG. 4 is a diagram for explaining the problems to be solved by the present invention.
    Description of Embodiments
  • Hereinafter, embodiments of the present invention will be described with reference to the drawings. In the following description, the same reference symbols in different drawings denote elements having the same function, and redundant descriptions with regard to each drawing will be omitted as appropriate.
  • Hereinafter, embodiments of the present invention will be described with reference to the drawings.
  • Embodiments
  • Hereinafter, a can manufactured by drawing and/or drawing-and-ironing using a press machine in the present embodiment is, for example, a can made of aluminum or steel mainly used for a beverage can which is so-called DI can or a resin-coated can, and is formed into a can by drawing-and-ironing an intermediate product formed into a cup shape using a body maker as a press machine.
  • Air Assist
  • FIG. 1 is a diagram illustrating air assist in a stripping step according to the present embodiment.
  • It is a known technique described in Patent Literatures 1 to 3 that a body maker performs drawing-and-ironing on an intermediate product formed into a cup shape by a punch 2 and a plurality of dies (the dies are not illustrated) and finally forms the shape of a can bottom portion 11.
  • FIG. 1 (a) illustrates a state in which forming of a can 1 by the punch 2 is completed.
  • After the forming of the can 1 is completed, a stripping step is performed in which the punch is pulled out from the can after the forming.
  • As illustrated in FIG. 1 (b), after the can 1 is formed, the punch 2 is pulled out from the can 1, but since an outer surface of the punch 2 and an inner surface of the can 1 are almost in close contact with each other and air 5 is not supplied to a space 4 between a can bottom portion 11 and a punch tip portion 21, when the punch 2 is pulled, the can 1 is moved together with the punch 2. Then, the upper end portion of the can 1 is engaged with a stripper 3.
  • As illustrated in FIG. 1(c), when the upper end portion of the can 1 is engaged with the stripper 3, the can 1 is fixed, and thus the punch 2 is pulled out from the can 1. At this time, the air 5 is blown out from an air blowing port 22 provided in the punch tip portion 21, and the air 5 is supplied to the space 4 between the can bottom portion 11 and the punch tip portion 21 to assist the removal of the punch 2. Therefore, negative pressure is not generated between the can bottom portion 11 and the punch tip portion 21, and the punch 2 is pulled out from the can 1 by the action of the stripper 3.
  • Then, as illustrated in FIG. 1 (d), the punch 2 is removed from the can 1, and the blowing of the air 5 is also stopped.
  • Air Blowing Control (Operation Speed)
  • If the blown-out air 5 were not blown out at an appropriate pressure and at an appropriate timing, problems as illustrated in FIGS. 4 (a) and 4 (b) would occur. Thus, in the air assist, air blowing control is performed in which the pressure and blowing timing of the air are controlled by a controller in the air blowing.
  • In general, a body maker used for forming cans is not always operated at a constant speed, but the operation speed varies depending on various conditions or the like for the cans to be manufactured.
  • Even in the case of manufacturing cans of a specific type, control is performed by a controller so that manufacturing is performed at a low operation speed at the start of manufacturing, the operation speed is gradually increased, and when the operation speed reaches a predetermined operation speed, the operation is continued at the predetermined operation speed.
  • Even in the continuous operation state, there is a case where the operation speed of the body maker is appropriately increased or decreased in accordance with the operation state of the downstream step.
  • At a low operation speed, the speed at which the punch 2 is pulled out from the can 1 is also low, and at a high operation speed, the speed at which the punch 2 is pulled out from the can 1 is also high. Then, as for the speed at which the space 4 between the can bottom portion 11 and the punch tip portion 21 expands, similarly, the speed at which the space 4 expands is low at a low operation speed, and the speed at which the space 4 expands is high at a high operation speed.
  • Air Pressure Control (Operation Speed)
  • When the speed at which the space 4 expands is different, it is necessary to change the blowing rate of the air 5 blown out from the air blowing port 22 of the punch 2. That is, when the speed at which the space 4 expands increases, it is necessary to increase the supply rate of the air 5 per unit time.
  • The supply rate of the air 5 per unit time is increased by increasing the pressure at which the air 5 is supplied.
  • As described above, when the operation speed of the body maker is increased, the pressure for supplying the air 5 is increased.
  • Therefore, the relationship between the operation speed of the body maker and the air pressure is defined in advance, and each time a can is molded (each shot), the air pressure is controlled (operation speed) by the controller so that the air pressure is in accordance with the operation speed at the time of the shot.
  • For example, control is performed in accordance with the relationship shown in the graph of FIG. 2. The operation speed at the start of the operation is 100 spm (shot/minute) and the air pressure at that time is 100 kPa, and thereafter the operation speed is gradually increased to 140 kPa at 200 spm, 170 kPa at 300 spm, and 180 kPa at 400 spm to press the can 1.
  • The pressure of the air can be controlled using, for example, a known electropneumatic regulator.
  • Note that the operation speed, the air pressure, and the combination thereof may be appropriately set to optimum values in consideration of the type and constituent elements of the press machine, the type and size of the can to be manufactured, the manufacturing procedure, and the like, and are not limited to those shown in the graph of FIG. 2. Note that the relationship between the operation speed and the air pressure is not limited to a broken line as shown in the graph of FIG. 2, but may be a straight line, a curved line, or a combination thereof.
  • Air Blowing Timing Control (Operation Speed)
  • Since the air 5 is not always supplied but is supplied when the punch 2 is pulled out from the can 1, an opening/closing valve (not illustrated), for example, an electromagnetic valve is provided in a supply path of the air 5 to the air blowing port 22 of the punch 2, and the opening/closing valve controls the operation timing (air blowing timing) of the opening/closing valve so that the air 5 is supplied from the air blowing port 22 in accordance with the timing when the punch 2 is pulled out from the can 1.
  • The opening/closing valve is provided outside the punch 2, and there is a predetermined distance from the opening/closing valve to the air blowing port 22. Although the air blown in the previous shot remains between the opening/closing valve and the air blowing port 22, there is a time delay from the operation timing of the opening/closing valve (air blowing timing) until the air 5 is actually blown from the air blowing port 22 and the air 5 is sufficiently supplied to the space 4 between the can bottom portion 11 and the punch tip portion 21. Note that there is a slight time delay also in the operation of the opening/closing valve itself.
  • As described above, the operation speed of the body maker changes, and the influence of the time delay from the operation timing of the opening/closing valve (air blowing timing) varies depending on the operation speed of the body maker.
  • Since the time delay of the air supply does not change even when the operation speed of the body maker changes, it is necessary to set the operation timing of the opening/closing valve (air blowing timing) earlier when the operation speed increases.
  • Therefore, the relationship between the operation speed of the body maker and the operation timing of the opening/closing valve (air blowing timing) is defined in advance, and the controller controls the operation timing of the opening/closing valve (air blowing timing) in accordance with the operation speed.
  • The time delay itself from the operation timing of the opening/closing valve (air blowing timing) changes depending on the pressure of the blown air. When the air pressure is high, the time delay tends to decrease, and when the air pressure is low, the time delay tends to increase.
  • Therefore, the relationship between the air pressure and the operation timing of the opening/closing valve (air blowing timing) is defined in advance, and each time a can is formed (each shot), the controller controls the operation timing of the opening/closing valve (air blowing timing) in accordance with the air pressure at the time of the shot.
  • As described above, for each shot, the operation timing of the opening/closing valve (air blowing timing) is controlled in accordance with the operation speed of the body maker or the pressure of the blown air at the time of the shot.
  • When the operation timing of the opening/closing valve (air blowing timing) is controlled for each shot in accordance with the operation speed of the body maker and the pressure of the blown air at the time of the shot, it can be controlled to a more appropriate timing.
  • Control Example of Air Blowing Timing Control (Operation Speed)
  • For example, a known electronic cam switch with an automatic advance function is used to control the operation timing (air blowing timing) of the opening/closing valve. In the electronic cam switch, a detector that detects a rotation angle (0° to 360°) is installed on a rotation shaft, and a switch signal corresponding to an output of an angle signal corresponding to a predetermined angle (°) from the detector is output. The automatic advance function can set an advance correction angle (°) according to the rotation speed of the rotation shaft, and outputs a switch signal according to an output of an angle signal corresponding to an angle obtained by advancing the set advance correction angle (°) from a predetermined angle (°) according to the rotation speed.
  • The opening/closing control of the opening/closing valve is performed by the switch signal output from the electronic cam switch. The detector is mounted on a rotation shaft for driving the punch 2. The rotation shaft performs one shot in one rotation.
  • For example, it is assumed that the angle of the rotation shaft at which the control for opening the opening/closing valve is performed (the operation timing of the opening/closing valve (the air blowing timing)) is 180° at the reference operation speed (0 spm) and air pressure (170 kPa). When the operation speed (rotation speed of the rotation shaft) becomes faster, the influence of the time delay becomes larger. The operation timing (air blowing timing) of the opening/closing valve due to this influence, that is, the delay conversion angle (°) which is the adjustment amount of the rotation shaft is determined corresponding to the rotation speed. The rotation speed and the delay conversion angle are set to the automatic advance function of the electronic cam switch as the speed of the rotation shaft and the advance correction angle.
  • The setting of the speed of the rotation shaft and the advance correction angle in the automatic advance function is also performed at other air pressures, for example, 140 kPa.
  • FIG. 3(a) shows a table of the operation speed (rotation speed of the rotation shaft) and the delay conversion angle (advance correction angle). Note that "Corrected ON angle (°)" in FIG. 3(a) is a numerical value obtained by subtracting the delay conversion angle (advance correction angle) from 180° which is a reference angle for performing control to open the opening/closing valve. FIG. 3(b) is a graph of the table of FIG. 3(a).
  • As illustrated in FIGS. 3(a) and 3(b), since the delay conversion angle increases and the corrected ON angle decreases as the operation speed increases, it can be seen that the angle of the rotation shaft that performs control to open the opening/closing valve (the operation timing of the opening/closing valve (air blowing timing)) becomes smaller than the reference angle of 180°, that is, the timing is advanced.
  • It can also be seen that the delay conversion angle increases as the air pressure decreases.
  • Thus, the operation timing of the opening/closing valve (air blowing timing) is controlled in accordance with the operation speed of the body maker and the pressure of the blown air.
  • Note that the operation speed, the air pressure, the delay conversion angle, and the combination thereof may be appropriately set to optimum values in consideration of the type and constituent elements of the press machine, the type and size of the can to be manufactured, the manufacturing procedure, and the like, and are not limited to those shown in the table and graph of FIG. 3. The operation speed, the air pressure, the delay conversion angle, and the combination thereof are not limited to the broken line as shown in the graph of FIG. 3, but may be a straight line, a curved line, or a combination thereof.
  • Composite Control (Operation Speed)
  • As described above, the air pressure or the air blowing timing is controlled to the optimum value for each shot according to the operation speed of the press machine. However, composite control (operation speed) may be performed in which the air pressure and the air blowing timing are controlled to the optimum values.
  • In the composite control (operation speed), it is preferable to set the air pressure and the air blowing timing in consideration of the synergistic effect of the air pressure control and the air blowing control, instead of simply performing the control with the set values of the air pressure control (operation speed) and the air blowing timing control (operation speed), separately.
  • Air Blowing Control (Leading Can)
  • In the shot when the body maker starts the operation and forms the first can (leading can) after the start of the operation, since air with a sufficiently high pressure does not exist in an air supply path 23 leading to the air blowing port 22, sufficient air is not supplied to the space 4 between the can bottom portion 11 and the punch tip portion 21.
  • Then, in the shot for forming the leading can, even when forming is performed under the same conditions as in the shot for forming another can, for example, the second can, a problem as illustrated in FIG. 4 (a) occurs.
  • Air Pressure Control (Leading Can)
  • In the shot when forming the leading can, sufficient air is supplied to the space 4 by performing air pressure control (leading can) for supplying air having a pressure higher than the air pressure at the time of the shot for forming the second can, for example, in which other processing conditions such as the operation speed are the same.
  • For example, when the operation speed at the start of operation is 100 spm, the air pressure at that time is set to 100 kPa as shown in FIG. 2, but in the shot for forming the leading can, the air pressure is set to a high pressure of 140 kPa.
  • Note that the pressure of the air in the shot for forming the leading can may be appropriately set to an optimum value in consideration of the type and constituent elements of the press machine, the type and size of the can to be manufactured, the manufacturing procedure, the pressure of the air when the can is not the leading can, and the like.
  • Air Blowing Timing Control (Leading Can)
  • In the shot for forming the leading can, sufficient air is supplied to the space 4 by performing air blowing timing control (leading can) for supplying air at an air blowing timing earlier than the air blowing timing at the time of the shot for forming the second can, for example, in which other processing conditions such as the operation speed are the same.
  • For example, assuming that the delay conversion angle is 14° when the air pressure at the start of the operation is 100 kPa and the operation speed is 100 spm, in the shot for forming the leading can, the delay conversion angle is set to 16°, which is an early air blowing timing.
  • Note that the air blowing timing in the shot for forming the leading can may be appropriately set to an optimum value in consideration of the type and constituent elements of the press machine, the type and size of the can to be manufactured, the manufacturing procedure, the air blowing timing when the can is not the leading can, and the like.
  • Composite Control (Leading Can)
  • As described above, the air pressure or the air blowing timing is controlled to the optimum value for each shot for forming the leading can. However, composite control (leading can) for controlling the air pressure and the air blowing timing to the optimum values may be performed.
  • In the composite control (leading can), it is preferable to set the air pressure and the air blowing timing in consideration of the synergistic effect of the air pressure control and the air blowing control, instead of simply performing control with the set values of the air pressure control (leading can) and the air blowing timing control (leading can), separately.
  • Although the embodiments according to the present invention have been described in detail with reference to the drawings, the specific configurations are not limited to these embodiments, and design changes and the like without departing from the gist of the present invention are also included in the present invention.
  • The above-described embodiments can be combined with each other by applying techniques to each other as long as there is no particular contradiction or problem in the purpose, configuration, and the like.
  • Reference Symbols List
  • 1
    Can
    11
    Can bottom portion
    2
    Punch
    21
    Punch tip portion
    22
    Air blowing port
    23
    Air supply path
    3
    Stripper
    4
    Space
    5
    Air

Claims (10)

  1. A can manufacturing method including drawing and/or drawing-and-ironing using a press machine, the method comprising:
    stripping that includes removing a punch from a can after the drawing and/or the drawing-and-ironing, wherein
    in the stripping, air is blown out from an air blowing port at a tip end of the punch to perform air assist of assisting extraction of the punch, and
    in the air assist, a pressure of the air and/or a blowing timing of the air is adjusted for each shot to a pressure and/or a blowing timing according to a condition of the shot.
  2. The can manufacturing method according to claim 1, wherein
    the pressure of the air is adjusted to a pressure corresponding to an operation speed during the shot.
  3. The can manufacturing method according to claim 1, wherein
    when the shot is a shot for a first can after a start of an operation, the pressure of the air is adjusted to be higher than a pressure during a shot where other conditions of the shot are the same, and/or the blowing timing of the air is adjusted to be earlier than a blowing timing during a shot where the other conditions of the shot are the same.
  4. The can manufacturing method according to claim 1, wherein
    the blowing timing of the air is adjusted to a timing corresponding to an operation speed and/or the pressure of the air during the shot.
  5. The can manufacturing method according to any one of claims 1 to 4, wherein
    the press machine is a body maker.
  6. A can manufacturing device for manufacturing cans using drawing and/or drawing-and-ironing, the device comprising:
    a punch; a stripper; and a controller, wherein
    the punch includes an air blowing port configured to blow air at a tip end thereof, and
    the controller performs air blowing control of blowing air from the air blowing port while the stripper is engaged with an end portion of a can and the punch is being removed from the can, and
    in the air blowing control, a pressure of the air and/or a blowing timing of the air is adjusted for each shot to a pressure and/or a blowing timing according to a condition of the shot.
  7. The can manufacturing device according to claim 6, wherein
    the controller adjusts the pressure of the air to a pressure corresponding to an operation speed during the shot.
  8. The can manufacturing device according to claim 6, wherein
    when the shot is a shot for a first can after a start of an operation, the controller adjusts the pressure of the air to be higher than a pressure during a shot with the same other conditions of the shot, and/or adjusts the blowing timing of the air to be earlier than a blowing timing during a shot where other conditions of the shot are the same.
  9. The can manufacturing device according to claim 6, wherein
    the controller adjusts the blowing timing of the air to a timing corresponding to an operation speed and/or the pressure of the air during the shot.
  10. The can manufacturing device according to any one of claims 6 to 9, wherein
    the manufacturing device is a body maker.
EP23867819.7A 2022-09-22 2023-06-05 Can manufacturing method and device Pending EP4592002A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2022151107A JP7388512B1 (en) 2022-09-22 2022-09-22 Can manufacturing method and device
PCT/JP2023/020782 WO2024062689A1 (en) 2022-09-22 2023-06-05 Can manufacturing method and device

Publications (1)

Publication Number Publication Date
EP4592002A1 true EP4592002A1 (en) 2025-07-30

Family

ID=88917866

Family Applications (1)

Application Number Title Priority Date Filing Date
EP23867819.7A Pending EP4592002A1 (en) 2022-09-22 2023-06-05 Can manufacturing method and device

Country Status (6)

Country Link
US (1) US20250162016A1 (en)
EP (1) EP4592002A1 (en)
JP (1) JP7388512B1 (en)
CN (1) CN119947844A (en)
TW (1) TW202412964A (en)
WO (1) WO2024062689A1 (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5129323Y2 (en) * 1971-01-28 1976-07-23
JPH09271870A (en) 1996-04-09 1997-10-21 Sky Alum Co Ltd Device and method for extracting can body in DI press machine
JP2001150043A (en) * 1999-11-29 2001-06-05 Asahi-Seiki Mfg Co Ltd Drawing method for bottomed cylinder
WO2005014198A1 (en) * 2003-08-08 2005-02-17 Toyo Seikan Kaisha, Ltd. Bulge can, method of manufacturing bulge can, and apparatus of manufacturing bulge can
JP6032750B2 (en) * 2013-10-18 2016-11-30 旭精機工業株式会社 Punch and press molding machine
JP7321056B2 (en) 2019-10-29 2023-08-04 アルテミラ製缶株式会社 can forming equipment

Also Published As

Publication number Publication date
TW202412964A (en) 2024-04-01
US20250162016A1 (en) 2025-05-22
WO2024062689A1 (en) 2024-03-28
JP2024045994A (en) 2024-04-03
CN119947844A (en) 2025-05-06
JP7388512B1 (en) 2023-11-29

Similar Documents

Publication Publication Date Title
US5460026A (en) Method of and apparatus for the cutting of an opening in a hollow body
US4561280A (en) Shell making method and apparatus
EP0661119B1 (en) Method and apparatus for performing multiple necking operations on a container body
JP2005528221A (en) Linear drive metal forming equipment
JPS6366624B2 (en)
EP4592002A1 (en) Can manufacturing method and device
KR102462242B1 (en) Press machine and press forming method
US11691373B2 (en) Paper lid production method
EP1594674B1 (en) Apparatus for molding a plastic closure with gas-assisted ejection
US20060185413A1 (en) Hydroforming machine and a method of hydroforming
US3423985A (en) Stripper and pre-draw ring for wall-ironing can bodies
US4164860A (en) Internal gaseous fluid stripper for can bodymakers and the like
JP5760619B2 (en) Press apparatus and press molding method
US4599884A (en) Apparatus for transferring relatively flat objects
US4224819A (en) Internal gaseous fluid stripper for can bodymakers and the like
TWI721757B (en) Tank processing method and tank processing device
JP7355932B2 (en) Mold for manufacturing closures on a compression molding machine
JP2001150043A (en) Drawing method for bottomed cylinder
JP2013237087A (en) Metal sheet press working method
JP5005248B2 (en) Easy open can lid rivet forming method
CN100420949C (en) Method for detecting forging abnormality of forged product forming machine
CN223506165U (en) SOT beverage lid two-dimensional code pull ring 90 forming die
CN111941767B (en) Elastic self-adaptive wear-free straight top block
JPH09271870A (en) Device and method for extracting can body in DI press machine
JP2000042646A (en) Control method of hydraulic bulging of metal tube

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20250421

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)