EP4557349A1 - Vacuum exhaust system and cleaning method - Google Patents
Vacuum exhaust system and cleaning method Download PDFInfo
- Publication number
- EP4557349A1 EP4557349A1 EP23839577.6A EP23839577A EP4557349A1 EP 4557349 A1 EP4557349 A1 EP 4557349A1 EP 23839577 A EP23839577 A EP 23839577A EP 4557349 A1 EP4557349 A1 EP 4557349A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- gas
- exhaust pipe
- cleaning
- temperature
- exhaust
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- H—ELECTRICITY
- H10—SEMICONDUCTOR DEVICES; ELECTRIC SOLID-STATE DEVICES NOT OTHERWISE PROVIDED FOR
- H10P—GENERIC PROCESSES OR APPARATUS FOR THE MANUFACTURE OR TREATMENT OF DEVICES COVERED BY CLASS H10
- H10P72/00—Handling or holding of wafers, substrates or devices during manufacture or treatment thereof
- H10P72/04—Apparatus for manufacture or treatment
- H10P72/0402—Apparatus for fluid treatment
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C16/00—Chemical coating by decomposition of gaseous compounds, without leaving reaction products of surface material in the coating, i.e. chemical vapour deposition [CVD] processes
- C23C16/44—Chemical coating by decomposition of gaseous compounds, without leaving reaction products of surface material in the coating, i.e. chemical vapour deposition [CVD] processes characterised by the method of coating
- C23C16/4412—Details relating to the exhausts, e.g. pumps, filters, scrubbers, particle traps
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B08—CLEANING
- B08B—CLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
- B08B9/00—Cleaning hollow articles by methods or apparatus specially adapted thereto
- B08B9/02—Cleaning pipes or tubes or systems of pipes or tubes
- B08B9/027—Cleaning the internal surfaces; Removal of blockages
- B08B9/032—Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing
- B08B9/0321—Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing using pressurised, pulsating or purging fluid
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C16/00—Chemical coating by decomposition of gaseous compounds, without leaving reaction products of surface material in the coating, i.e. chemical vapour deposition [CVD] processes
- C23C16/44—Chemical coating by decomposition of gaseous compounds, without leaving reaction products of surface material in the coating, i.e. chemical vapour deposition [CVD] processes characterised by the method of coating
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C16/00—Chemical coating by decomposition of gaseous compounds, without leaving reaction products of surface material in the coating, i.e. chemical vapour deposition [CVD] processes
- C23C16/44—Chemical coating by decomposition of gaseous compounds, without leaving reaction products of surface material in the coating, i.e. chemical vapour deposition [CVD] processes characterised by the method of coating
- C23C16/4401—Means for minimising impurities, e.g. dust, moisture or residual gas, in the reaction chamber
- C23C16/4405—Cleaning of reactor or parts inside the reactor by using reactive gases
-
- H—ELECTRICITY
- H10—SEMICONDUCTOR DEVICES; ELECTRIC SOLID-STATE DEVICES NOT OTHERWISE PROVIDED FOR
- H10P—GENERIC PROCESSES OR APPARATUS FOR THE MANUFACTURE OR TREATMENT OF DEVICES COVERED BY CLASS H10
- H10P14/00—Formation of materials, e.g. in the shape of layers or pillars
- H10P14/60—Formation of materials, e.g. in the shape of layers or pillars of insulating materials
-
- H—ELECTRICITY
- H10—SEMICONDUCTOR DEVICES; ELECTRIC SOLID-STATE DEVICES NOT OTHERWISE PROVIDED FOR
- H10P—GENERIC PROCESSES OR APPARATUS FOR THE MANUFACTURE OR TREATMENT OF DEVICES COVERED BY CLASS H10
- H10P50/00—Etching of wafers, substrates or parts of devices
- H10P50/20—Dry etching; Plasma etching; Reactive-ion etching
- H10P50/24—Dry etching; Plasma etching; Reactive-ion etching of semiconductor materials
- H10P50/242—Dry etching; Plasma etching; Reactive-ion etching of semiconductor materials of Group IV materials
-
- H—ELECTRICITY
- H10—SEMICONDUCTOR DEVICES; ELECTRIC SOLID-STATE DEVICES NOT OTHERWISE PROVIDED FOR
- H10P—GENERIC PROCESSES OR APPARATUS FOR THE MANUFACTURE OR TREATMENT OF DEVICES COVERED BY CLASS H10
- H10P72/00—Handling or holding of wafers, substrates or devices during manufacture or treatment thereof
- H10P72/04—Apparatus for manufacture or treatment
- H10P72/0431—Apparatus for thermal treatment
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B08—CLEANING
- B08B—CLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
- B08B2209/00—Details of machines or methods for cleaning hollow articles
- B08B2209/02—Details of apparatuses or methods for cleaning pipes or tubes
- B08B2209/027—Details of apparatuses or methods for cleaning pipes or tubes for cleaning the internal surfaces
- B08B2209/032—Details of apparatuses or methods for cleaning pipes or tubes for cleaning the internal surfaces by the mechanical action of a moving fluid
Definitions
- the present invention relates to a vacuum exhaust system in a semiconductor manufacturing device and a cleaning method therein.
- a CVD Chemical Vapor Deposition
- a semiconductor, an insulator, a metal film, or the like is deposited on a semiconductor wafer to implement deposition using a chemical gas phase reaction, or a dry etching treatment
- various gases such as a silane (SiH4) gas
- SiH4 gas various gases, such as a silane (SiH4) gas.
- the spent gas (exhaust gas) exhausted from the process chamber is sucked by a dry pump, or the like, and is further introduced into an abatement device via a gas exhaust pipe.
- a gas abatement treatment is performed at the abatement device.
- the pipe is cleaned using a gas.
- the gas to be used may include a ClF gas, for example, ClF3 (chlorine trifluoride), as disclosed in Japanese Patent Application Publication No. H02-77579 and Japanese Patent No. 2776700 .
- the pipe is provided with a heat insulating material, and hence cooling with heat radiation has taken a long time.
- the invention disclosed in Japanese Patent Application Publication No. H02-77579 relates to a cleaning (washing) method for performing removal using a ClF3 gas in order to remove a reaction product deposited in a reaction vessel in a deposited film forming device for forming a deposited film.
- the invention disclosed in Japanese Patent No. 2776700 relates to a cleaning method of cleaning a compound containing a resulting ammonium silicofluoride as a main component, the method being characterized in that the catalytic reaction between the compound and a ClF3 gas or a F2 gas is effected.
- the invention disclosed in Japanese Patent No. 3047248 relates to a cleaning method characterized in that, with the inside of a treatment vessel being kept at a treatment temperature of 450°C or more, a cleaning gas containing diluted ClF3 is supplied into the treatment vessel, thereby removing a polysilicon film deposited in the treatment vessel.
- the exhaust pipe (particularly between the dry pump and the abatement device) of the abovementioned treatment vessel is required to be improved in conductance in terms of exhaust efficiency, and has to be increased in diameter.
- a gasket made of a metal adapted thereto is difficult to develop or manufacture, and hence has not been supplied to the market considerably as far as known.
- the vacuum exhaust system according to aspect 1 or 2 characterized in that the exhaust pipe is configured using a metal material having a high corrosion resistance against the cleaning gas.
- FIG. 1 is a block view showing a schematic overall configuration of an exhaust gas treatment device in a semiconductor manufacturing treatment process of a vacuum exhaust system in a semiconductor manufacturing device in accordance with an embodiment of the present invention
- FIG. 2 is a schematic side cross sectional view schematically showing an internal structure of a dry pump in accordance with the present embodiment.
- FIG. 3 is a view for illustrating introduction of a cleaning gas of the vacuum exhaust system in a semiconductor manufacturing device in accordance with the present embodiment.
- FIGS 1 to 3 preferred embodiments of the present invention will be described in detail.
- an exhaust pipe 18 from a dry pump 100 to an abatement device 19 is provided with a heater 400 (heating means) for heating. Then, the temperature of the exhaust pipe 18 is set at a temperature exceeding 180°C, for example, 300°C.
- the pipe and the gasket of a sealing member are also made of a metal.
- a ClF3 gas is introduced from a process chamber.
- the ClF3 gas is activated at a temperature exceeding 180°C, so that the cleaning efficiency is remarkably increased.
- a gasket made of a metal is used for the exhaust pipe 18. For this reason, even when the ClF3 gas is activated, a problem is less likely to be caused in terms of the sealing performance.
- the temperature of the exhaust pipe 18 is set at a temperature exceeding 180°C, for example, 300°C from before cleaning, and the exhaust pipe 18 is continued to be heated to that temperature and is kept also at the time of cleaning.
- FIG. 1 is a block view showing a schematic overall configuration of an exhaust gas treatment device in a vacuum exhaust system in a semiconductor manufacturing device in accordance with an embodiment of the present invention.
- the exhaust gas treatment device is controlled according to the procedure previously determined by a program in a control device 10.
- a process gas for a process treatment and a cleaning gas (e.g., a gas including a ClF3 gas or a NF gas (nitrogen trifluoride)) for a cleaning treatment are respectively supplied through a gas supply pipe 13.
- a cleaning gas e.g., a gas including a ClF3 gas or a NF gas (nitrogen trifluoride)
- a dry pump 100 is connected with the process chamber 11 via a gas exhaust pipe 14.
- the process chamber 11 is configured so as to be reduced in pressure to high vacuum by driving of the dry pump 100.
- a process gas such as a silane (SiH4) gas and a cleaning gas such as ClF3 (chlorine trifluoride), NF3(nitrogen trifluoride), or HCl(hydrogen chloride) processed in the inside of the process chamber 11 (the process gases and the cleaning gases will be hereinafter generically referred to as "spent gas G1") pass through the gas exhaust pipe 14 to be introduced into the downstream dry pump 100.
- a process gas such as a silane (SiH4) gas and a cleaning gas such as ClF3 (chlorine trifluoride), NF3(nitrogen trifluoride), or HCl(hydrogen chloride) processed in the inside of the process chamber 11 (the process gases and the cleaning gases will be hereinafter generically referred to as "spent gas G1"
- the spent gas G1 pressurized to around the atmospheric pressure in the dry pump 100 is exhausted through the gas outlet port 117b into the exhaust pipe 18, and is fed from the exhaust pipe 18 to the abatement device 19, and is detoxified at the abatement device 19, and then, is exhausted into the atmosphere.
- one end side of the exhaust pipe 18 is connected with the gas outlet port 117b of the dry pump 100, and the other end side thereof is connected with the gas introduction port 19a of the abatement device 19.
- an inert gas e.g., Hot N2
- a MFC mass flow controller
- FIG. 2 is a schematic side cross sectional view schematically showing the internal structure of the dry pump 100 in accordance with the present embodiment.
- the dry pump 100 shown in FIG. 2 includes a pump casing 123 having a plurality of (6 in the present embodiment) pump chambers 122a, 122b, 122c, 122d, 122e, and 122f, rotors 124a, 124b, 124c, 124d, 124e, and 124f provided in the pump chambers 122a to 122f, respectively, a pair of rotating shafts 125a and 125b to which the rotors 124a to 124f are respectively integrally fixedly installed, and for rotating the rotors 124a to 124f integrally, respectively, a pair of gears 126a and 126b for synchronously rotating the pair of rotating shafts 125a and 125b, a motor 127 as a rotation driving mechanism for rotating the rotating shafts 125a and 125b via the pair of gears 126a and 126b, and bearings 128a and 128b for holding the rotating shafts 125a and 125b, respectively, at
- the rotation of the rotating shafts 125a and 125b rotates the rotors 124a to 124f integrally fixedly installed to the rotating shaft 125a, and the rotors 124a to 124f integrally fixedly installed to the rotating shaft 125b in reverse to each other in the pump chambers 122a to 122f, respectively.
- the rotors 124a to 124f mounted to the rotating shafts 125a and 125b, respectively in the present embodiment are cocoon type root rotors, and synchronously rotate with a phase difference of 90° while keeping a minute gap therebetween in a non-contact manner with each other.
- the spent gas G1 is sucked from the gas introduction port 117a communicating with the to-be-evacuated space to the first-stage pump chamber 122a. Subsequently, the spent gas G1 is sucked sequentially from the first-stage pump chamber 122a to the second-stage pump chamber 122b, the third-stage pump chamber 122c, the fourth-stage pump chamber 122d, and the fifth-stage pump chamber 122e, and is finally exhausted from the dry pump 100 via the exhaust pipe 18 (see FIG. 1 ) communicating with the gas outlet port 117b of the sixth-stage pump chamber 122f, so that the to-be-evacuated space is rendered in a vacuum state.
- the spent gas G1 is exhausted while being compressed in respective pump chambers 122a, 122b, 122c, 122d, 122e, and 122f. For this reason, the temperature of the spent gas G1 is increased, and the temperature of the pump casing 123 is also increased. Incidentally, of the pump chambers 122a, 122b, 122c, 122d, 122e, and 122f, on the outlet side of the sixth-stage pump chamber 122f at which the difference in pressure of the spent gas G1 between the inlet side and the outlet side is large, the temperature of the spent gas G1 is highest.
- the temperature of the spent gas G1 herein is set at, for example, a temperature as relatively high as about 150 to 200°C.
- the spent gas G1 exhausted from the sixth-stage pump chamber 122f is fed through the exhaust pipe 18 to the abatement device 19 positioned several meters ahead. Then, at the abatement device 19, a prescribed treatment is performed.
- FIG. 3 is a view for illustrating the introduction of a cleaning gas of a vacuum exhaust system in a semiconductor manufacturing device in accordance with the present embodiment.
- the exhaust pipe 18 for connecting the dry pump 100 and the abatement device 19 is provided with a heater 400, which enables heating of the exhaust pipe 18.
- the pipe and the gasket of a sealing member are also made of a metal, and the sealing performance can be sufficiently held, for example, even when a ClF3 gas is activated at high temperatures.
- the introduced cleaning gas is sucked from the process chamber 11 to the dry pump 100, and then, is subjected to a prescribed treatment at the abatement device 19, thereby to be detoxicated.
- the abatement device 19 is also connected with an emergency exhaust device 500 of an installation factory via a bypass line 300.
- the sealing member is configured using a metal material having a high corrosion resistance against a ClF gas or a NF gas (particularly, a ClF3 gas having a high corrosiveness) included in the cleaning gas to be introduced.
- the material is nickel, titanium, SUS316, SUS316L, or the like.
- the exhaust pipe 18 is also desirably configured using a metal material having a higher corrosion resistance against a ClF gas or a NF gas included in the cleaning gas to be introduced than that of a general stainless steel material (e.g., SUS304).
- a metal material having a higher corrosion resistance against a ClF gas or a NF gas included in the cleaning gas to be introduced than that of a general stainless steel material (e.g., SUS304).
- the materials are SUS316, SUS316L, inconel, and the like.
- the target temperature is a temperature exceeding 180°C, for example, 300°C.
- the ClF3 gas has a property of being stable up to 180°C, and being activated at a temperature exceeding 180°C.
- the activated ClF3 gas is improved in ability of removing the product, so that the cleaning efficiency is enhanced.
- the exhaust pipe 18 uses a gasket made of a metal (not made of a resin). For this reason, even when the ClF3 gas is activated, a problem is less likely to be caused in sealing performance.
- the ClF3 gas activated at a temperature exceeding 180°C can be used. For this reason, it is possible to save the usage of the ClF3 gas while ensuring the safety.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Drying Of Semiconductors (AREA)
- Chemical Vapour Deposition (AREA)
- Compressors, Vaccum Pumps And Other Relevant Systems (AREA)
- Treating Waste Gases (AREA)
Abstract
A vacuum exhaust system is provided which can reduce consumption of a ClF gas for use in cleaning, and can shorten a cleaning time. An exhaust pipe from a dry pump to an abatement device is provided with a heater, thereby to be heated, so that the temperature of the exhaust pipe is set at a temperature exceeding 180°C. For the exhaust pipe, the pipe and a gasket of a sealing member are also made of a metal. Then, a ClF3 gas for cleaning is introduced. The ClF3 gas is activated at a temperature exceeding 180°C, and cleaning efficiency is remarkably enhanced. On the other hand, the gasket made of a metal is used. For this reason, even when the ClF3 gas is activated, a problem in sealing performance is less likely to be caused. For this reason, it is not necessary to wait until the temperature of the exhaust pipe becomes 180°C or less, which enables shortening of the cleaning time.
FIG. 1
10
CONTROL DEVICE
19
ABATEMENT DEVICE
100
DRY PUMP
FIG. 3
11
PROCESS CHAMBER
19
ABATEMENT DEVICE
100
DRY PUMP
FIG. 1
10
CONTROL DEVICE
19
ABATEMENT DEVICE
100
DRY PUMP
FIG. 3
11
PROCESS CHAMBER
19
ABATEMENT DEVICE
100
DRY PUMP
Description
- The present invention relates to a vacuum exhaust system in a semiconductor manufacturing device and a cleaning method therein.
- Generally, in a semiconductor manufacturing treatment process, a CVD (Chemical Vapor Deposition) in which a semiconductor, an insulator, a metal film, or the like is deposited on a semiconductor wafer to implement deposition using a chemical gas phase reaction, or a dry etching treatment is performed. In a process chamber, for example, various gases, such as a silane (SiH4) gas, are used. Then, the spent gas (exhaust gas) exhausted from the process chamber is sucked by a dry pump, or the like, and is further introduced into an abatement device via a gas exhaust pipe. A gas abatement treatment is performed at the abatement device.
- In such a semiconductor manufacturing treatment process, when the spent gas is cooled, the gas is solidified as a film or a powder to be deposited in the insides of the exhaust pipe other than the process chamber, the dry pump, and the abatement device, which is then deposited to cause pipe blocking. For this reason, maintenance thereof has been often required.
- Particularly, to the pipe on the exhaust side of the dry pump, an exhaust gas flows while being pressurized to around the atmospheric pressure. For this reason, the reaction product (which will be hereinafter referred to as a product) resulting from the gas components included in the exhaust gas was deposited considerably in the pipe.
- Thus, in order to prevent the deposition of the product, and to remove the deposited product, the pipe is cleaned using a gas. Examples of the gas to be used may include a ClF gas, for example, ClF3 (chlorine trifluoride), as disclosed in
andJapanese Patent Application Publication No. H02-77579 .Japanese Patent No. 2776700 - Incidentally, for the exhaust pipe of a conventional dry pump, a gasket of an elastomer (a fixing sealing member for allowing a structure to hold airtightness) has been used. For this reason, it has been essential that cleaning gas is passed after a temperature of a pipe becomes 180°C or less. This is because a ClF gas is considerably activated at 180°C or more, which may damage the gasket of an elastomer. Particularly, the ClF3 gas has a high toxicity, hence prevention of damage of the sealing material is very important in terms of ensuring safety.
- It is known that, although the ClF3 gas is stable in a glass container up to 180°C so long as the gas is pure, the gas is decomposed in a free radical mechanism when the temperature becomes equal to, or higher than that.
- For this reason, cleaning has to be awaited until the temperature of the pipe, which has become high during the treatment, becomes 180°C or less. This has required an extra time for the treatment. Particularly, the pipe is provided with a heat insulating material, and hence cooling with heat radiation has taken a long time.
- Further, when the temperature of the pipe becomes 180°C or less, activity of the ClF gas is reduced, resulting in reduction of reactivity with the product. For this reason, a larger amount of gas has to be used.
- The invention disclosed in
relates to a cleaning (washing) method for performing removal using a ClF3 gas in order to remove a reaction product deposited in a reaction vessel in a deposited film forming device for forming a deposited film.Japanese Patent Application Publication No. H02-77579 - The invention disclosed in
relates to a cleaning method of cleaning a compound containing a resulting ammonium silicofluoride as a main component, the method being characterized in that the catalytic reaction between the compound and a ClF3 gas or a F2 gas is effected.Japanese Patent No. 2776700 - The invention disclosed in
relates to a cleaning method characterized in that, with the inside of a treatment vessel being kept at a treatment temperature of 450°C or more, a cleaning gas containing diluted ClF3 is supplied into the treatment vessel, thereby removing a polysilicon film deposited in the treatment vessel. Further, in the column of (Technical Problem), there is following description: "it is reported that particularly, use of ClF3 enables cleaning even when a plasma state is not achieved; however, ClF3 has a high reactivity, and hence is not considered to be used at 400°C or more, and cleaning is generally performed at 400°C or less; therefore, in the step of performing deposition at 400°C or more, particularly, at 600°C or more, the temperature of the inside of the device has to be decreased to 400°C or less for performing ClF3 cleaning, and this results in a long-term cleaning".Japanese Patent No. 3047248 - Incidentally, the exhaust pipe (particularly between the dry pump and the abatement device) of the abovementioned treatment vessel is required to be improved in conductance in terms of exhaust efficiency, and has to be increased in diameter. A gasket made of a metal adapted thereto is difficult to develop or manufacture, and hence has not been supplied to the market considerably as far as known.
- Further, this tendency was remarkable in a metal gasket adaptable to a flange not in a flange shape as that of a ConFlat flange but of a general ISO standard or KF standard (NW standard), and repeatedly usable.
- In recent years, for the abovementioned metal gasket (made of a metal), one usable for the pipe of a flange of a general ISO standard, or KF standard (NW standard) has been developed. For this reason, by using such a metal gasket, it has become possible to keep sufficient sealing characteristics even when the temperature of the exhaust pipe having the abovementioned flange exceeds 180°C. Accordingly, a ClF gas, for example, ClF3 can be activated to be used, and consumption thereof can be decreased, and a cleaning time can be shortened.
- Under such circumstances, it is an object of the present invention to provide a vacuum exhaust system and a cleaning method capable of reducing consumption of a ClF gas or shortening a cleaning time by raising the temperature of the exhaust pipe to a temperature higher than 180°C.
- With the invention according to aspect 1, there is provided a vacuum exhaust system characterized by being connected with a semiconductor manufacturing device, and including an exhaust pipe for exhausting a gas to an abatement device via a vacuum pump, and characterized in that a sealing member for use in the exhaust pipe is made of a metal, a heating means for heating the exhaust pipe is provided at a site of the exhaust pipe extending from the vacuum pump to the abatement device, and when a cleaning gas including a ClF gas or a NF gas is introduced, the exhaust pipe is heated to a temperature exceeding 180°C by the heating means.
- With the invention according to aspect 2, there is provided the vacuum exhaust system according to aspect 1, characterized in that the sealing member is configured using a metal material having a high corrosion resistance against the cleaning gas.
- With the invention according to aspect 3, there is provided the vacuum exhaust system according to aspect 1 or 2, characterized in that the exhaust pipe is configured using a metal material having a high corrosion resistance against the cleaning gas.
- With the invention according to aspect 4, there is provided a cleaning method for, in a vacuum exhaust system connected with a semiconductor manufacturing device, and including an exhaust pipe for exhausting a gas to an abatement device via a vacuum pump, removing a product deposited on the exhaust pipe by a cleaning gas including a ClF gas or a NF gas, the method including, when the cleaning gas is introduced, heating a site of the exhaust pipe extending from the vacuum pump to the abatement device to a temperature exceeding 180°C.
- With the vacuum exhaust system in accordance with the present invention, the exhaust pipe and the sealing member for use in the exhaust pipe are made of a metal, and a ClF gas or a NF gas can be used at high temperatures. For this reason, the consumption thereof can be reduced, and the cleaning time can be shortened.
- With the cleaning method in accordance with the present invention, the cooling time of the exhaust pipe is unnecessary, which can shorten the cleaning time.
-
FIG. 1 is a block view showing a schematic overall configuration of an exhaust gas treatment device in a semiconductor manufacturing treatment process of a vacuum exhaust system in a semiconductor manufacturing device in accordance with an embodiment of the present invention; -
FIG. 2 is a schematic side cross sectional view schematically showing an internal structure of a dry pump in accordance with the present embodiment; and -
FIG. 3 is a view for illustrating introduction of a cleaning gas of the vacuum exhaust system in a semiconductor manufacturing device in accordance with the present embodiment. - Below, referring to
FIGS 1 to 3 , preferred embodiments of the present invention will be described in detail. - In
FIG. 3 , anexhaust pipe 18 from adry pump 100 to anabatement device 19 is provided with a heater 400 (heating means) for heating. Then, the temperature of theexhaust pipe 18 is set at a temperature exceeding 180°C, for example, 300°C. For theexhaust pipe 18, the pipe and the gasket of a sealing member are also made of a metal. - Then, in order to perform cleaning for removing the product, a ClF3 gas is introduced from a process chamber. The ClF3 gas is activated at a temperature exceeding 180°C, so that the cleaning efficiency is remarkably increased. On the other hand, for the
exhaust pipe 18, a gasket made of a metal is used. For this reason, even when the ClF3 gas is activated, a problem is less likely to be caused in terms of the sealing performance. - For this reason, it is not necessary to wait until the temperature of the
exhaust pipe 18 becomes 180°C or less, which can shorten the time required for cleaning. Further, the activated ClF3 gas can be used. For this reason, the usage can be saved while ensuring the safety. - Incidentally, in the present embodiment, the following is also included: the temperature of the
exhaust pipe 18 is set at a temperature exceeding 180°C, for example, 300°C from before cleaning, and theexhaust pipe 18 is continued to be heated to that temperature and is kept also at the time of cleaning. -
FIG. 1 is a block view showing a schematic overall configuration of an exhaust gas treatment device in a vacuum exhaust system in a semiconductor manufacturing device in accordance with an embodiment of the present invention. - Referring to
FIG. 1 , a description will be given to the outline of the overall configuration in the exhaust gas treatment device. - The exhaust gas treatment device is controlled according to the procedure previously determined by a program in a
control device 10. In the inside of aprocess chamber 11, asemiconductor wafer 12 is accommodated, and a process gas for a process treatment, and a cleaning gas (e.g., a gas including a ClF3 gas or a NF gas (nitrogen trifluoride)) for a cleaning treatment are respectively supplied through agas supply pipe 13. - Then, a
dry pump 100 is connected with theprocess chamber 11 via agas exhaust pipe 14. Theprocess chamber 11 is configured so as to be reduced in pressure to high vacuum by driving of thedry pump 100. - Namely, for example, a process gas such as a silane (SiH4) gas and a cleaning gas such as ClF3 (chlorine trifluoride), NF3(nitrogen trifluoride), or HCl(hydrogen chloride) processed in the inside of the process chamber 11 (the process gases and the cleaning gases will be hereinafter generically referred to as "spent gas G1") pass through the
gas exhaust pipe 14 to be introduced into the downstreamdry pump 100. - With the
dry pump 100, the spent gas G1 from theprocess chamber 11 is sucked and taken into the inside of thedry pump 100 through agas introduction port 117a, and the spent gas G1 is gradually pressurized, for example, in six steps in the inside. - Further, the spent gas G1 pressurized to around the atmospheric pressure in the
dry pump 100 is exhausted through thegas outlet port 117b into theexhaust pipe 18, and is fed from theexhaust pipe 18 to theabatement device 19, and is detoxified at theabatement device 19, and then, is exhausted into the atmosphere. - Therefore, one end side of the
exhaust pipe 18 is connected with thegas outlet port 117b of thedry pump 100, and the other end side thereof is connected with thegas introduction port 19a of theabatement device 19. - Incidentally, an inert gas (e.g., Hot N2) is introduced through an
introduction pipe 17, and the flow thereof is appropriately controlled by a MFC (mass flow controller) 200. -
FIG. 2 is a schematic side cross sectional view schematically showing the internal structure of thedry pump 100 in accordance with the present embodiment. - The
dry pump 100 shown inFIG. 2 includes apump casing 123 having a plurality of (6 in the present embodiment) pump chambers 122a, 122b, 122c, 122d, 122e, and 122f, 124a, 124b, 124c, 124d, 124e, and 124f provided in the pump chambers 122a to 122f, respectively, a pair ofrotors 125a and 125b to which therotating shafts rotors 124a to 124f are respectively integrally fixedly installed, and for rotating therotors 124a to 124f integrally, respectively, a pair of 126a and 126b for synchronously rotating the pair ofgears 125a and 125b, arotating shafts motor 127 as a rotation driving mechanism for rotating the 125a and 125b via the pair ofrotating shafts 126a and 126b, andgears 128a and 128b for holding thebearings 125a and 125b, respectively, at therotating shafts pump casing 123. - Then, a description will be given to the action of the exhaust gas treatment device thus configured.
- First, when the
dry pump 100 is operated by control of thecontrol device 10, themotor 127 is also driven, so that therotating shaft 125a is rotated by themotor 127. At this step, therotating shaft 125b arranged in parallel with therotating shaft 125a is configured so as to be synchronously rotated by engagement of the 126a and 126b, so that thegears rotating shaft 125b is rotated in the opposite direction to that of therotating shaft 125a. - Further, the rotation of the
125a and 125b rotates therotating shafts rotors 124a to 124f integrally fixedly installed to therotating shaft 125a, and therotors 124a to 124f integrally fixedly installed to therotating shaft 125b in reverse to each other in the pump chambers 122a to 122f, respectively. Incidentally, although not shown, therotors 124a to 124f mounted to the 125a and 125b, respectively in the present embodiment are cocoon type root rotors, and synchronously rotate with a phase difference of 90° while keeping a minute gap therebetween in a non-contact manner with each other.rotating shafts - As a result of this, the spent gas G1 is sucked from the
gas introduction port 117a communicating with the to-be-evacuated space to the first-stage pump chamber 122a. Subsequently, the spent gas G1 is sucked sequentially from the first-stage pump chamber 122a to the second-stage pump chamber 122b, the third-stage pump chamber 122c, the fourth-stage pump chamber 122d, and the fifth-stage pump chamber 122e, and is finally exhausted from thedry pump 100 via the exhaust pipe 18 (seeFIG. 1 ) communicating with thegas outlet port 117b of the sixth-stage pump chamber 122f, so that the to-be-evacuated space is rendered in a vacuum state. - At this step, the spent gas G1 is exhausted while being compressed in respective pump chambers 122a, 122b, 122c, 122d, 122e, and 122f. For this reason, the temperature of the spent gas G1 is increased, and the temperature of the
pump casing 123 is also increased. Incidentally, of the pump chambers 122a, 122b, 122c, 122d, 122e, and 122f, on the outlet side of the sixth-stage pump chamber 122f at which the difference in pressure of the spent gas G1 between the inlet side and the outlet side is large, the temperature of the spent gas G1 is highest. The temperature of the spent gas G1 herein is set at, for example, a temperature as relatively high as about 150 to 200°C. - Further, the spent gas G1 exhausted from the sixth-stage pump chamber 122f is fed through the
exhaust pipe 18 to theabatement device 19 positioned several meters ahead. Then, at theabatement device 19, a prescribed treatment is performed. -
FIG. 3 is a view for illustrating the introduction of a cleaning gas of a vacuum exhaust system in a semiconductor manufacturing device in accordance with the present embodiment. - The
exhaust pipe 18 for connecting thedry pump 100 and theabatement device 19 is provided with aheater 400, which enables heating of theexhaust pipe 18. For theexhaust pipe 18, the pipe and the gasket of a sealing member are also made of a metal, and the sealing performance can be sufficiently held, for example, even when a ClF3 gas is activated at high temperatures. - As shown with the exhaust gas treatment device in the vacuum exhaust system of
FIG. 1 , the introduced cleaning gas is sucked from theprocess chamber 11 to thedry pump 100, and then, is subjected to a prescribed treatment at theabatement device 19, thereby to be detoxicated. Incidentally, theabatement device 19 is also connected with anemergency exhaust device 500 of an installation factory via abypass line 300. - Herein, the sealing member is configured using a metal material having a high corrosion resistance against a ClF gas or a NF gas (particularly, a ClF3 gas having a high corrosiveness) included in the cleaning gas to be introduced. Specifically, the material is nickel, titanium, SUS316, SUS316L, or the like.
- Further, the
exhaust pipe 18 is also desirably configured using a metal material having a higher corrosion resistance against a ClF gas or a NF gas included in the cleaning gas to be introduced than that of a general stainless steel material (e.g., SUS304). Specifically, the materials are SUS316, SUS316L, inconel, and the like. - Then, when cleaning is performed, the
exhaust pipe 18 for connecting thedry pump 100 and theabatement device 19 is heated by theheater 400. The target temperature is a temperature exceeding 180°C, for example, 300°C. - The ClF3 gas has a property of being stable up to 180°C, and being activated at a temperature exceeding 180°C. The activated ClF3 gas is improved in ability of removing the product, so that the cleaning efficiency is enhanced.
- On the other hand, the
exhaust pipe 18 uses a gasket made of a metal (not made of a resin). For this reason, even when the ClF3 gas is activated, a problem is less likely to be caused in sealing performance. - For this reason, cleaning is not required to be awaited until the temperature of the
exhaust pipe 18 becomes 180°C or less. Immediately after completion of the semiconductor manufacturing step, cleaning can be started, and the time required for the cleaning can be shortened. Further, the control on the time for the temperature also becomes unnecessary. - Further, the ClF3 gas activated at a temperature exceeding 180°C can be used. For this reason, it is possible to save the usage of the ClF3 gas while ensuring the safety.
-
- 10 Control device
- 11 Process chamber
- 12 Semiconductor wafer
- 13 Gas supply pipe
- 14 Gas exhaust pipe
- 17 Introduction pipe
- 18 Exhaust pipe
- 19 Abatement device
- 19a Gas introduction port
- 100 Dry pump
- 117a Gas introduction port
- 117b Gas outlet port
- 122a to 122f Pump chamber
- 123 Pump casing
- 124a to 124f Rotor
- 125a, 125b Rotating shaft
- 126a, 126b Gear
- 127 Motor (Rotation driving mechanism)
- 128a, 128b Bearing
- 200 MFC
- 300 Bypass line
- 400 Heater
- 500 Emergency exhaust device
- G1 Spent gas
Claims (4)
- A vacuum exhaust system connected with a semiconductor manufacturing device, and comprising an exhaust pipe for exhausting a gas to an abatement device via a vacuum pump, whereina sealing member for use in the exhaust pipe is made of a metal,a heating means for heating the exhaust pipe is provided at a site of the exhaust pipe extending from the vacuum pump to the abatement device, andwhen a cleaning gas including a ClF gas or a NF gas is introduced, the exhaust pipe is heated to a temperature exceeding 180°C by the heating means.
- The vacuum exhaust system according to claim 1,
wherein the sealing member is configured using a metal material having a high corrosion resistance against the cleaning gas. - The vacuum exhaust system according to claim 1 or 2,
wherein the exhaust pipe is configured using a metal material having a high corrosion resistance against the cleaning gas. - A cleaning method for, in a vacuum exhaust system connected with a semiconductor manufacturing device, and including an exhaust pipe for exhausting a gas to an abatement device via a vacuum pump, removing a product deposited on the exhaust pipe by a cleaning gas including a ClF gas or a NF gas,
the method comprising, when the cleaning gas is introduced, heating a site of the exhaust pipe extending from the vacuum pump to the abatement device to a temperature exceeding 180°C.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022114110A JP7527327B2 (en) | 2022-07-15 | 2022-07-15 | Vacuum pumping system and cleaning method |
| PCT/JP2023/025249 WO2024014405A1 (en) | 2022-07-15 | 2023-07-07 | Vacuum exhaust system and cleaning method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP4557349A1 true EP4557349A1 (en) | 2025-05-21 |
Family
ID=84889482
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP23839577.6A Pending EP4557349A1 (en) | 2022-07-15 | 2023-07-07 | Vacuum exhaust system and cleaning method |
Country Status (9)
| Country | Link |
|---|---|
| US (1) | US20260062800A1 (en) |
| EP (1) | EP4557349A1 (en) |
| JP (1) | JP7527327B2 (en) |
| KR (1) | KR20250037529A (en) |
| CN (1) | CN119547190A (en) |
| GB (1) | GB202217635D0 (en) |
| IL (1) | IL317564A (en) |
| TW (1) | TW202408671A (en) |
| WO (1) | WO2024014405A1 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2025154277A (en) * | 2024-03-29 | 2025-10-10 | エドワーズ株式会社 | Vacuum Pumping System |
Family Cites Families (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0277579A (en) | 1988-06-06 | 1990-03-16 | Canon Inc | Cleaning method for deposited film forming equipment |
| JP3047248B2 (en) | 1990-10-19 | 2000-05-29 | 東京エレクトロン株式会社 | Cleaning method |
| JP2776700B2 (en) | 1992-09-02 | 1998-07-16 | セントラル硝子株式会社 | Cleaning method of ammonium silicofluoride |
| JP2909364B2 (en) * | 1993-09-20 | 1999-06-23 | 東京エレクトロン株式会社 | Processing apparatus and cleaning method thereof |
| JPH1055992A (en) * | 1996-08-08 | 1998-02-24 | Hitachi Ltd | Cleaning method and semiconductor manufacturing method |
| JP3047248U (en) | 1997-09-18 | 1998-04-10 | 東和産業株式会社 | Shelf sheet |
| JP2002008991A (en) * | 2000-06-21 | 2002-01-11 | Tokyo Electron Ltd | Cleaning method |
| JP2002256436A (en) | 2001-03-06 | 2002-09-11 | Canon Inc | Apparatus and method for forming deposited film by plasma CVD |
| JP2009088308A (en) * | 2007-10-01 | 2009-04-23 | Hitachi Kokusai Electric Inc | Substrate processing equipment |
| JP6422907B2 (en) | 2016-03-14 | 2018-11-14 | 株式会社東芝 | Semiconductor manufacturing equipment |
-
2022
- 2022-07-15 JP JP2022114110A patent/JP7527327B2/en active Active
- 2022-11-25 GB GBGB2217635.8A patent/GB202217635D0/en not_active Ceased
-
2023
- 2023-07-04 TW TW112124874A patent/TW202408671A/en unknown
- 2023-07-07 EP EP23839577.6A patent/EP4557349A1/en active Pending
- 2023-07-07 IL IL317564A patent/IL317564A/en unknown
- 2023-07-07 US US18/878,480 patent/US20260062800A1/en active Pending
- 2023-07-07 CN CN202380053772.9A patent/CN119547190A/en active Pending
- 2023-07-07 WO PCT/JP2023/025249 patent/WO2024014405A1/en not_active Ceased
- 2023-07-07 KR KR1020257004727A patent/KR20250037529A/en active Pending
Also Published As
| Publication number | Publication date |
|---|---|
| US20260062800A1 (en) | 2026-03-05 |
| WO2024014405A1 (en) | 2024-01-18 |
| GB202217635D0 (en) | 2023-01-11 |
| JP2024011837A (en) | 2024-01-25 |
| TW202408671A (en) | 2024-03-01 |
| CN119547190A (en) | 2025-02-28 |
| JP7527327B2 (en) | 2024-08-02 |
| KR20250037529A (en) | 2025-03-17 |
| IL317564A (en) | 2025-02-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP4669605B2 (en) | Cleaning method for semiconductor manufacturing equipment | |
| JP3774668B2 (en) | Cleaning pretreatment method for silicon nitride film forming apparatus | |
| US7156923B2 (en) | Silicon nitride film forming method, silicon nitride film forming system and silicon nitride film forming system precleaning method | |
| JP6418838B2 (en) | Dry pump and exhaust gas treatment method | |
| JP4430918B2 (en) | Thin film forming apparatus cleaning method and thin film forming method | |
| US5797195A (en) | Nitrogen trifluoride thermal cleaning apparatus and process | |
| EP4557349A1 (en) | Vacuum exhaust system and cleaning method | |
| US5714011A (en) | Diluted nitrogen trifluoride thermal cleaning process | |
| KR20190002318A (en) | Facility system for exhaust system | |
| JP7561093B2 (en) | Exhaust piping, exhaust device, and product adhesion prevention method | |
| JP7849202B2 (en) | Cleaning method for vacuum exhaust systems and vacuum pumps | |
| JP3729578B2 (en) | Semiconductor manufacturing method | |
| JP2009088308A (en) | Substrate processing equipment | |
| KR102189446B1 (en) | Hybrid scrubber having a plurality of scrubber chambers and a heating chamber and method for operating the hybrid scrubber | |
| JPH09157830A (en) | Method for nitriding metallic material with gas and device therefor | |
| JP7699125B2 (en) | Method for recovering platinum group metals, method for producing platinum group metal-containing film, and film forming apparatus | |
| KR102114042B1 (en) | Hybrid scrubber having heating chamber and dry scrubber chamber and method for operating the hybrid scrubber | |
| JP4205107B2 (en) | Method and apparatus for forming silicon nitride film | |
| WO2026064075A1 (en) | Minimizing corrosion in pre-plasma abatement systems | |
| US20070074743A1 (en) | H2 conditioning of chamber following cleaning cycle |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20250116 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| DAV | Request for validation of the european patent (deleted) | ||
| DAX | Request for extension of the european patent (deleted) |