EP4442914A1 - Control system, loading machine, and control method - Google Patents

Control system, loading machine, and control method Download PDF

Info

Publication number
EP4442914A1
EP4442914A1 EP23760089.5A EP23760089A EP4442914A1 EP 4442914 A1 EP4442914 A1 EP 4442914A1 EP 23760089 A EP23760089 A EP 23760089A EP 4442914 A1 EP4442914 A1 EP 4442914A1
Authority
EP
European Patent Office
Prior art keywords
bucket
angle
excavated
weight
repose
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
EP23760089.5A
Other languages
German (de)
French (fr)
Other versions
EP4442914A4 (en
Inventor
Takahisa Oasa
Shozo KIKUCHI
Ryota Kudo
Yoshitaka Onodera
Takehiro Komatsu
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Original Assignee
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd filed Critical Komatsu Ltd
Publication of EP4442914A1 publication Critical patent/EP4442914A1/en
Publication of EP4442914A4 publication Critical patent/EP4442914A4/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2025Particular purposes of control systems not otherwise provided for
    • E02F9/2029Controlling the position of implements in function of its load, e.g. modifying the attitude of implements in accordance to vehicle speed
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • E02F9/264Sensors and their calibration for indicating the position of the work tool
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • E02F9/264Sensors and their calibration for indicating the position of the work tool
    • E02F9/265Sensors and their calibration for indicating the position of the work tool with follow-up actions (e.g. control signals sent to actuate the work tool)
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/08Superstructures; Supports for superstructures
    • E02F9/0841Articulated frame, i.e. having at least one pivot point between two travelling gear units

Definitions

  • the technology disclosed in the present specification relates to a control system, a loading machine, and a control method.
  • Patent Literature 1 In the technical field related to a loading machine provided with working equipment, a loading machine capable of performing an efficient excavation operation as disclosed in Patent Literature 1 is known.
  • Patent Literature 1 JP 2019-203381 A
  • the loading machine excavates an object to be excavated with the working equipment, and then loads the excavated object onto a haul vehicle.
  • the loading machine desirably adjusts the weight of the excavated object so as to provide an optimum weight for the haul vehicle.
  • An object of the technology disclosed in the present specification is to optimize loading work by a loading machine.
  • a control system for controlling a loading machine including working equipment having a bucket comprises: a controller, wherein the controller calculates traction force of the loading machine during excavation work of excavating an object to be excavated with the bucket, acquires a bucket angle representing an angle of the bucket with respect to a horizontal plane during the excavation work, and calculates a weight of an excavated object, which is the object to be excavated, held by the bucket based on the traction force, the bucket angle, and bucket data indicating a shape and a dimension of the bucket.
  • the loading work by the loading machine is optimized.
  • a local coordinate system is set in a loading machine 1, and a positional relationship between units will be described with reference to the local coordinate system.
  • a first axis extending in the left-right direction (vehicle width direction) of the loading machine 1 is defined as an X axis
  • a second axis extending in the front-rear direction of the loading machine 1 is defined as a Y axis
  • a third axis extending in the up-down direction of the loading machine 1 is defined as a Z axis.
  • the X axis and the Y axis are orthogonal to each other.
  • the Y axis and the Z axis are orthogonal to each other.
  • the Z axis and the X axis are orthogonal to each other.
  • the +X direction corresponds to the right direction, and the -X direction corresponds to the left direction.
  • the +Y direction corresponds to the front direction, and the -Y direction corresponds to the rear direction.
  • the +Z direction corresponds to the upward direction, and the -Z direction corresponds to the downward direction.
  • FIG. 1 is a side view illustrating the loading machine 1 according to the embodiment.
  • the loading machine 1 is, for example, a wheel loader.
  • the loading machine 1 is appropriately referred to as a wheel loader 1.
  • the wheel loader 1 includes a vehicle body 2, a cab 4, wheels 5, and working equipment 6.
  • the vehicle body 2 supports the working equipment 6.
  • the cab 4 is supported by the vehicle body 2.
  • the cab 4 is disposed in an upper part of the vehicle body 2.
  • the wheels 5 support the vehicle body 2.
  • the wheels 5 include a front wheel 5F and a rear wheel 5R.
  • the front wheel 5F is rotatable about a rotation axis CXf.
  • the rear wheel 5R is rotatable about a rotation axis CXr.
  • the rotation axis CXf of the front wheel 5F and the rotation axis CXr of the rear wheel 5R are parallel to each other.
  • the X axis is parallel to the rotation axis CXf of the front wheel 5F.
  • the working equipment 6 performs predetermined work.
  • the working equipment 6 is supported by the vehicle body 2.
  • the working equipment 6 is connected to the vehicle body 2.
  • the working equipment 6 includes a boom 12, a bucket 13, a bell crank 14, a bucket link 15, a lift cylinder 18, and a bucket cylinder 19.
  • a proximal end portion of the boom 12 is pivotably connected to the vehicle body 2.
  • the boom 12 pivots about a pivot AXa with respect to the vehicle body 2.
  • a bracket 16 is fixed to a middle portion of the boom 12.
  • a proximal end portion of the bucket 13 is pivotably connected to a distal end portion of the boom 12.
  • the bucket 13 pivots about a pivot AXb with respect to the boom 12.
  • the bucket 13 is arranged ahead of the front wheel 5F.
  • a bracket 17 is fixed to a part of the bucket 13.
  • a middle portion of the bell crank 14 is pivotably connected to the bracket 16.
  • the bell crank 14 pivots about a pivot AXc with respect to the bracket 16.
  • a lower end portion of the bell crank 14 is pivotably connected to a proximal end portion of the bucket link 15.
  • a distal end portion of the bucket link 15 is pivotably connected to the bracket 17.
  • the bucket link 15 pivots about a pivot AXd with respect to the bracket 17.
  • the bell crank 14 is connected to the bucket 13 via the bucket link 15.
  • the lift cylinder 18 operates the boom 12.
  • a proximal end portion of the lift cylinder 18 is connected to the vehicle body 2.
  • a distal end portion of the lift cylinder 18 is connected to the boom 12.
  • the boom 12 pivots about a pivot AXe with respect to the lift cylinder 18.
  • the bucket cylinder 19 operates the bucket 13.
  • a proximal end portion of the bucket cylinder 19 is connected to the vehicle body 2.
  • a distal end portion of the bucket cylinder 19 is connected to an upper end portion of the bell crank 14.
  • the bell crank 14 pivots about a pivot AXf with respect to the bucket cylinder 19.
  • FIG. 2 is a configuration diagram illustrating the loading machine 1 according to the embodiment.
  • the loading machine 1 includes a power source 3, a power take off (PTO) 8, a power transmission device 9, a hydraulic pump 20, a control valve 21, and a controller 50.
  • PTO power take off
  • the power source 3 produces driving force for operating the wheel loader 1.
  • the power source 3 is, for example, a diesel engine.
  • the power take off 8 distributes the driving force from the power source 3 to the power transmission device 9 and the hydraulic pump 20.
  • the driving force of the power source 3 is transmitted to the power transmission device 9 and the hydraulic pump 20 via the power take off 8.
  • the power transmission device 9 includes an input shaft to which the driving force is input from the power source 3 and an output shaft that changes the speed of the driving force, which is input to the input shaft, and outputs the resultant.
  • the input shaft of the power transmission device 9 is connected to the power take off 8.
  • the output shaft of the power transmission device 9 is connected to each of the front wheel 5F and the rear wheel 5R.
  • the driving force of the power source 3 is transmitted to each of the front wheel 5F and the rear wheel 5R via the power transmission device 9.
  • the power transmission device 9 may include an axle device or a differential device.
  • the hydraulic pump 20 discharges hydraulic oil.
  • the hydraulic pump 20 is a variable displacement hydraulic pump.
  • the hydraulic pump 20 is driven based on the driving force of the power source 3.
  • the hydraulic oil discharged from the hydraulic pump 20 is supplied to the lift cylinder 18 and the bucket cylinder 19 via the control valve 21.
  • the control valve 21 controls the flow rate and direction of the hydraulic oil supplied to each of the lift cylinder 18 and the bucket cylinder 19.
  • the working equipment 6 is operated with the hydraulic oil supplied from the hydraulic pump 20 via the control valve 21.
  • the controller 50 controls the wheel loader 1.
  • the controller 50 includes a computer system.
  • FIG. 3 is a perspective view illustrating the bucket 13 according to the embodiment.
  • FIG. 4 is a side view schematically illustrating the bucket 13 according to the embodiment.
  • the bucket 13 is a working member that excavates an object to be excavated.
  • the bucket 13 holds an excavated object 300.
  • the excavated object 300 is an object that is excavated and held by the bucket 13.
  • the bucket 13 includes a bottom plate portion 131, a back plate portion 132, a top plate portion 133, a right plate portion 134, and a left plate portion 135.
  • a tip portion of the bottom plate portion 131 is a blade edge portion 13A.
  • a blade edge or a blade is attached to the blade edge portion 13A.
  • a tip portion of the top plate portion 133 is a spill guard end portion 13B.
  • a tip portion of the right plate portion 134 is a right end portion 13C.
  • a tip portion of the left plate portion 135 is a left end portion 13D.
  • the blade edge portion 13A extends in the left-right direction.
  • the spill guard end portion 13B extends in the left-right direction.
  • the right end portion 13C extends in the up-down direction or the front-rear direction.
  • the left end portion 13D extends in the up-down direction or the front-rear direction.
  • the blade edge portion 13A and the spill guard end portion 13B face each other.
  • the right end portion 13C and the left end portion 13D face each other.
  • the blade edge portion 13A and the spill guard end portion 13B are parallel to each other.
  • the right end portion 13C and the left end portion 13D are parallel to each other.
  • An opening portion 136 of the bucket 13 is defined between the blade edge portion 13A, the spill guard end portion 13B, the right end portion 13C, and the left end portion 13D.
  • the opening portion 136 is defined by the blade edge portion 13A, the spill guard end portion 13B, the right end portion 13C, and the left end portion 13D.
  • a dimension of the opening portion 136 in the up-down direction or the front-rear direction that is, a dimension of a straight line connecting the blade edge portion 13A and the spill guard end portion 13B on the YZ plane is defined as a bucket length L.
  • the dimension of the opening portion 136 in the left-right direction is defined as a bucket width B.
  • a cross-sectional area of the bucket 13 parallel to the YZ plane is defined as a bucket cross-sectional area Abk.
  • An angle formed by the inner surface of the bottom plate portion 131 and a straight line connecting the blade edge portion 13A and the spill guard end portion 13B on the YZ plane is defined as a blade edge side opening angle ⁇ 3.
  • An angle formed by a plane parallel to the inner surface of the bottom plate portion 131 and the inner surface of the top plate portion 133 on the YZ plane is defined as an upper opening angle ⁇ sp.
  • the operation of raising the boom 12 refers to the operation of pivoting the boom 12 about the pivot AXa so that the distal end portion of the boom 12 is separated from the ground 200.
  • the lift cylinder 18 extends, and the boom 12 is thereby raised.
  • the operation of lowering the boom 12 refers to the operation of pivoting the boom 12 about the pivot AXa so that the distal end portion of the boom 12 approaches the ground 200.
  • the lift cylinder 18 contracts, and the boom 12 is thereby lowered.
  • the tilting operation of the bucket 13 refers to the operation of pivoting the bucket 13 about the pivot AXb so that the blade edge portion 13A of the bucket 13 is separated from the ground 200.
  • the bell crank 14 pivots such that the upper end portion of the bell crank 14 moves forward and the lower end portion of the bell crank 14 moves backward.
  • the bucket 13 is pulled backward by the bucket link 15 and performs the tilting operation.
  • an object to be excavated is scooped by the bucket 13, and the excavated object 300 is held by the bucket 13.
  • the dumping operation of the bucket 13 refers to the operation of pivoting the bucket 13 about the pivot AXb so that the blade edge portion 13A of the bucket 13 approaches the ground 200.
  • the bell crank 14 pivots such that the upper end portion of the bell crank 14 moves backward and the lower end portion of the bell crank 14 moves forward.
  • the bucket 13 is pushed forward by the bucket link 15 and performs the dumping operation.
  • the excavated object 300 held by the bucket 13 is discharged from the bucket 13.
  • FIG. 6 is a diagram for explanation of the wheel loader 1 according to the embodiment.
  • the wheel loader 1 performs predetermined work on a work target at a work site.
  • the work target includes an object to be excavated and a loading target.
  • the predetermined work includes excavation work and loading work.
  • the object to be excavated is, for example, natural ground, a rock pile, coal, feed, or a wall surface.
  • the natural ground is a pile of earth and sand placed on the ground 200.
  • the rock pile is a pile of rock or stone placed on the ground 200.
  • the object to be excavated is natural ground 210.
  • the excavated object 300 is the natural ground 210 that is excavated and held by the bucket 13.
  • the loading target is, for example, a haul vehicle, a predetermined area of a work site, a hopper, a belt conveyor, or a crusher.
  • the loading target is a dump body 230 of a haul vehicle 220 capable of traveling on the ground 200.
  • the haul vehicle 220 is, for example, a dump truck.
  • the wheel loader 1 performs excavation work of excavating the natural ground 210 with the bucket 13.
  • the wheel loader 1 excavates the natural ground 210 with the bucket 13 while advancing toward the natural ground 210.
  • the wheel loader 1 performs loading work of loading the excavated object 300 held by the bucket 13 in the excavation work onto the dump body 230.
  • the loading work is a concept including discharging work of discharging the excavated object 300.
  • the wheel loader 1 advances toward the natural ground 210 in a state where the excavated object 300 is not held by the bucket 13.
  • the wheel loader 1 performs the excavation work by tilting the bucket 13 inserted into the natural ground 210.
  • the natural ground 210 is excavated by the bucket 13, and the excavated object 300 is held by the bucket 13.
  • the wheel loader 1 moves backward so as to be separated from the natural ground 210 in a state where the excavated object 300 is held by the bucket 13.
  • the wheel loader 1 advances while swinging toward the haul vehicle 220 in a state where the excavated object 300 is held by the bucket 13.
  • the wheel loader 1 performs the operation of raising the boom 12 such that the bucket 13 is disposed above the dump body 230.
  • the wheel loader 1 performs the loading work by causing the bucket 13 to perform the dumping operation.
  • the excavated object 300 held by the bucket 13 is discharged from the bucket 13 and loaded onto the dump body 230.
  • the wheel loader 1 moves backward while swinging so as to be separated from the haul vehicle 220 in a state where the excavated object 300 is not held by the bucket 13.
  • the wheel loader 1 repeats the operation described above until the dump body 230 of the haul vehicle 220 is filled with the excavated object 300 or until the natural ground 210 is completely excavated.
  • FIG. 7 is a functional block diagram illustrating a control system 40 of the wheel loader 1 according to the embodiment.
  • FIG. 8 is a block diagram illustrating the controller 50 of the wheel loader 1 according to the embodiment.
  • the wheel loader 1 includes the control system 40.
  • the control system 40 includes a control valve 21, an operational device 22, an operator command device 23, an inclination sensor 31, a boom angle sensor 32, a bucket angle sensor 33, a weight sensor 34, an engine speed sensor 35, a pump pressure sensor 37, a pump displacement sensor 38, and a controller 50.
  • the operational device 22 is disposed inside the cab 4.
  • the operational device 22 is operated by an operator.
  • the operational device 22 generates an operation signal for operating each of the power source 3, the power transmission device 9, and the working equipment 6.
  • the controller 50 controls the power source 3 and the power transmission device 9 based on the operation signal generated by the operational device 22.
  • the controller 50 controls the control valve 21 based on the operation signal generated by the operational device 22.
  • the operator command device 23 is disposed inside the cab 4.
  • the operator command device 23 includes, for example, a switch button.
  • the operator command device 23 is operated by the operator.
  • the operator command device 23 generates a command signal for calculating an angle of repose ⁇ r to be described later.
  • the controller 50 calculates the angle of repose ⁇ r based on the operation signal generated by the operator command device 23.
  • the inclination sensor 31 detects the inclination of the vehicle body 2. More specifically, the inclination sensor 31 detects a vehicle body inclination angle ⁇ a representing the angle of inclination of the vehicle body 2 with respect to the horizontal plane.
  • the inclination sensor 31 is disposed in at least a part of the vehicle body 2.
  • the inclination sensor 31 is, for example, an inertial measurement unit (IMU). Detection data on the vehicle body inclination angle ⁇ a detected by the inclination sensor 31 is transmitted to the controller 50.
  • IMU inertial measurement unit
  • the boom angle sensor 32 detects an angle of the boom 12. More specifically, the boom angle sensor 32 detects a boom angle ⁇ b representing the angle of the boom 12 with respect to the vehicle body 2 in the local coordinate system.
  • the boom angle sensor 32 is, for example, an angle sensor disposed at a connection portion between the vehicle body 2 and the boom 12.
  • the boom angle ⁇ b is an angle formed by a line connecting the pivot AXa and the pivot AXb and a line connecting the rotation axis CXf and the rotation axis CXr. Detection data on the boom angle ⁇ b detected by the boom angle sensor 32 is transmitted to the controller 50.
  • the boom angle sensor 32 may be a stroke sensor that detects a stroke of the lift cylinder 18.
  • the bucket angle sensor 33 detects an angle of the bucket 13. More specifically, the bucket angle sensor 33 detects a bell crank angle ⁇ c representing the angle of the bell crank 14 with respect to the boom 12 in the local coordinate system.
  • the bucket angle sensor 33 is, for example, an angle sensor disposed at a connection portion between the boom 12 and the bell crank 14.
  • the bell crank angle ⁇ c is an angle formed by a line connecting the pivot AXc and the pivot AXf and a line connecting the pivot AXa and the pivot AXb.
  • the angle of the bucket 13 with respect to the boom 12 in the local coordinate system corresponds to the bell crank angle ⁇ c on a one-to-one basis.
  • the angle of the bucket 13 with respect to boom 12 in the local coordinate system is detected by detecting the bell crank angle ⁇ c. Detection data on the bell crank angle ⁇ c detected by the bucket angle sensor 33 is transmitted to the controller 50.
  • the bucket angle sensor 33 may be a stroke sensor that detects a stroke of the bucket cylinder 19.
  • the weight sensor 34 detects a weight Wa of the excavated object 300, which is an object to be excavated, held by the bucket 13.
  • the weight sensor 34 is, for example, a pressure sensor that detects the pressure of the hydraulic oil in the lift cylinder 18 or a pressure sensor that detects the pressure of the hydraulic oil in the bucket cylinder 19.
  • a load applied to the working equipment 6 changes between a state where the excavated object 300 is held by the bucket 13 and a state where the excavated object 300 is not held by the bucket 13.
  • the weight sensor 34 detects a change in load applied to the working equipment 6 to thereby detect the weight Wa of the excavated object 300 held by the bucket 13. Detection data on the weight Wa of the excavated object 300 detected by the weight sensor 34 is transmitted to the controller 50.
  • the weight sensor 34 may be a load meter disposed in at least a part of the working equipment 6.
  • the weight sensor 34 may directly detect the weight Wa of the excavated object 300.
  • the engine speed sensor 35 detects the engine speed of the power source 3.
  • the pump pressure sensor 37 detects a discharge pressure representing the pressure of the hydraulic oil discharged from the hydraulic pump 20.
  • the pump displacement sensor 38 detects the displacement of the hydraulic pump 20 based on an angle of a swash plate of the hydraulic pump 20.
  • the controller 50 includes a computer system.
  • the controller 50 outputs a control command for controlling the wheel loader 1.
  • the controller 50 includes a processor 51, a main memory 52, a storage 53, and an interface 54.
  • the processor 51 executes a computer program to calculate the operation of the working equipment 6. Examples of the processor 51 include a central processing unit (CPU) and a micro processing unit (MPU).
  • the main memory 52 is, for example, a nonvolatile memory or a volatile memory.
  • the nonvolatile memory is, for example, a read only memory (ROM).
  • the volatile memory is, for example, a random access memory (RAM).
  • the storage 53 is a non-transitory tangible storage medium.
  • the storage 53 is, for example, a magnetic disk, a magneto-optical disk, or a semiconductor memory.
  • the storage 53 may be an internal medium directly connected to a bus of the controller 50 or an external medium connected to the controller 50 via the interface 54 or a communication line.
  • the storage 53 stores a computer program for controlling the working equipment 6.
  • the controller 50 includes a characteristic storage unit 61, a bucket data storage unit 62, a detection data acquisition unit 71, a bucket angle calculation unit 72, a traction force calculation unit 73, a weight calculation unit 81, a near-side load angle determination unit 82, a repose angle calculation unit 91, and a working equipment control unit 100.
  • the controller 50 communicates with each of the control valve 21, the operational device 22, the operator command device 23, the inclination sensor 31, the boom angle sensor 32, the bucket angle sensor 33, the weight sensor 34, the engine speed sensor 35, the pump pressure sensor 37, and the pump displacement sensor 38.
  • the characteristic storage unit 61 stores characteristic data on an object to be excavated.
  • the characteristic data on an object to be excavated includes a natural ground angle ⁇ g representing an angle formed by the ground 200 and the surface of the natural ground 210, an angle of repose ⁇ r of earth and sand constituting the natural ground 210, a density ⁇ of the natural ground 210, and an earth pressure coefficient K of the natural ground 210.
  • the characteristic storage unit 61 also stores correlation data indicating a relationship between the natural ground angle ⁇ g and the angle of repose ⁇ r.
  • the bucket data storage unit 62 stores bucket data indicating the shape or dimensions of the bucket 13.
  • the bucket data includes the bucket length L, the bucket width B, the blade edge side opening angle ⁇ 3, the upper opening angle ⁇ sp, and the bucket cross-sectional area Abk.
  • the bucket data is known data derived from specification data or design data.
  • the detection data acquisition unit 71 acquires detection data from each of the inclination sensor 31, the boom angle sensor 32, the bucket angle sensor 33, the weight sensor 34, the engine speed sensor 35, the pump pressure sensor 37, and the pump displacement sensor 38.
  • the detection data acquisition unit 71 acquires the vehicle body inclination angle ⁇ a from the inclination sensor 31.
  • the detection data acquisition unit 71 acquires the boom angle ⁇ b from the boom angle sensor 32.
  • the detection data acquisition unit 71 acquires the bell crank angle ⁇ c from the bucket angle sensor 33.
  • the detection data acquisition unit 71 acquires the weight Wa of the excavated object 300 from the weight sensor 34.
  • the detection data acquisition unit 71 acquires the engine speed of the power source 3 from the engine speed sensor 35.
  • the detection data acquisition unit 71 acquires the discharge pressure of the hydraulic pump 20 from the pump pressure sensor 37.
  • the detection data acquisition unit 71 acquires the displacement of the hydraulic pump 20 from the pump displacement sensor 38.
  • the bucket angle calculation unit 72 calculates a bucket angle ⁇ bk representing the angle of the bucket 13 with respect to the horizontal plane.
  • the bucket angle calculation unit 72 calculates the bucket angle ⁇ bk based on the detection data on an angle of the vehicle body 2 and the detection data on an angle of the working equipment 6.
  • the detection data on an angle of the working equipment 6 includes detection data on the boom angle ⁇ b representing the angle of the boom 12 in the local coordinate system detected by the boom angle sensor 32 and detection data on the bell crank angle ⁇ c representing the angle of the bell crank 14 in the local coordinate system detected by the bucket angle sensor 33.
  • the bucket angle calculation unit 72 can calculate the bucket angle ⁇ bk based on the detection data on the vehicle body inclination angle ⁇ a, the detection data on the boom angle ⁇ b, and the detection data on the bell crank angle ⁇ c.
  • the traction force calculation unit 73 calculates traction force F of the wheel loader 1 based on the detection data acquired by the detection data acquisition unit 71.
  • the traction force calculation unit 73 calculates the traction force F during the excavation work of excavating the natural ground 210 with the bucket 13.
  • the traction force calculation unit 73 calculates the traction force F in the following procedure.
  • the traction force calculation unit 73 uses detection data of the engine speed sensor 35 to calculate output torque of the power source 3.
  • the traction force calculation unit 73 calculates load torque of the hydraulic pump 20 based on detection data of the pump pressure sensor 37 and detection data of the pump displacement sensor 38.
  • the traction force calculation unit 73 calculates the traction force F by multiplying traveling torque that is obtained by subtracting the load torque from the output torque by the axle ratio and the torque efficiency of the power transmission device 9 and dividing the resultant by the effective diameter of the wheel.
  • the traction force calculation unit 73 calculates the traction force F in the following procedure.
  • the traction force calculation unit 73 calculates the traveling torque by multiplying a value that is obtained by squaring the engine speed of the power source 3 divided by 1000 rpm by the primary torque coefficient and the torque ratio of the torque converter.
  • the primary torque coefficient and the torque ratio are characteristic values determined based on the input/output rotation ratio of the torque converter.
  • the traction force calculation unit 73 calculates the traction force F by multiplying the traveling torque by the axle ratio and the torque efficiency of the power transmission device 9 and dividing the resultant by the effective diameter of the wheel 5.
  • the weight calculation unit 81 calculates the weight Wa of the excavated object 300, which is an object to be excavated, held by the bucket 13. In a case where the inside of the bucket 13 is filled with the excavated object 300, the weight calculation unit 81 calculates the weight Wa based on a first calculation method. In a case where a part of the inside of the bucket 13 is filled with the excavated object 300 and a void 340 is formed in a part of the inside of the bucket 13, the weight calculation unit 81 calculates the weight Wa based on a second calculation method.
  • FIG. 9 is a diagram for explanation of a state of the excavated object 300 held by the bucket 13 according to the embodiment.
  • FIG. 9 illustrates a state where the inside of the bucket 13 is filled with the excavated object 300, and a part of the excavated object 300 is placed outside beyond the opening portion 136 of the bucket 13.
  • the excavated object 300 placed outside beyond the opening portion 136 of the bucket 13 is appropriately referred to as an exposed part 330 of the excavated object 300.
  • the surface of the excavated object 300 includes a first surface 310 and a second surface 320.
  • the second surface 320 is present ahead of the first surface 310.
  • the first surface 310 slopes upwardly toward the front.
  • the second surface 320 slopes downwardly toward the front.
  • the rear end of the first surface 310 is connected to the spill guard end portion 13B.
  • the front end of the second surface 320 is connected to the blade edge portion 13A.
  • the rear end of the second surface 320 is connected to the front end of the first surface 310.
  • a triangle is substantially formed by the first surface 310, the second surface 320, and the right end portion 13C (left end portion 13D).
  • the angle of the first surface 310 with respect to the horizontal plane is appropriately referred to as a near-side load angle ⁇ 1
  • the angle of the second surface 320 with respect to the horizontal plane is appropriately referred to as a blade edge side load angle ⁇ 2.
  • the near-side load angle ⁇ 1 changes based on the bucket angle ⁇ bk at the time of excavation.
  • the near-side load angle ⁇ 1 increases.
  • the near-side load angle ⁇ 1 decreases.
  • the blade edge side load angle ⁇ 2 represents the angle of repose ⁇ r (stop repose angle) of the excavated object 300. Even if the bucket angle ⁇ bk at the time of excavation changes, the blade edge side load angle ⁇ 2 does not substantially change because the blade edge side load angle ⁇ 2 is formed when the bucket 13 is removed after the excavation.
  • the blade edge side load angle ⁇ 2 is uniquely determined based on the property of the excavated object 300 (natural ground 210). In a case where the property of the excavated object 300 is constant, the blade edge side load angle ⁇ 2 does not substantially change even if the bucket angle ⁇ bk at the time of excavation changes.
  • the weight calculation unit 81 calculates the weight Wa of the excavated object 300 based on the first calculation method.
  • the weight calculation unit 81 calculates the weight Wa of the excavated object 300 held by the bucket 13 based on the near-side load angle ⁇ 1, the blade edge side load angle ⁇ 2, the bucket angle ⁇ bk, the density ⁇ of the excavated object 300, and the bucket data.
  • FIG. 10 is a schematic diagram for explanation of a method of calculating the weight Wa of the excavated object 300 based on the first calculation method according to the embodiment.
  • an exposed part cross-sectional area A1 representing a cross-sectional area of the exposed part 330 orthogonal to the pivot AXb is calculated based on the following formula (1).
  • a 1 L 2 ⁇ sin ⁇ 1 + ⁇ 3 ⁇ ⁇ bk ⁇ sin ⁇ 2 ⁇ ⁇ 3 + ⁇ bk 2 ⁇ sin ⁇ 1 + ⁇ 2
  • the bucket cross-sectional area Abk representing the cross-sectional area of the bucket 13 orthogonal to the pivot AXb is stored in the bucket data storage unit 62.
  • a load cross-sectional area Aa representing the cross-sectional area of the excavated object 300 orthogonal to the pivot AXb is calculated based on the following formula (2) .
  • Aa Abk + A 1
  • the volume Va of the excavated object 300 is calculated based on the following formula (3).
  • Va Aa ⁇ B
  • the density ⁇ of the excavated object 300 is stored in the characteristic storage unit 61.
  • FIG. 11 is a diagram for explanation of a state of the excavated object 300 held by the bucket 13 according to the embodiment.
  • FIG. 11 illustrates a state where a part of the inside of the bucket 13 is filled with the excavated object 300 and the void 340 is formed in a part of the inside of the bucket 13.
  • the weight calculation unit 81 calculates the weight Wa of the excavated object 300 based on the second calculation method.
  • the weight calculation unit 81 calculates the weight Wa of the excavated object 300 held by the bucket 13 based on the traction force F, the bucket angle ⁇ bk, the density ⁇ of the excavated object 300, and the bucket data.
  • FIG. 12 is a diagram illustrating a relationship between the traction force F and earth pressure P according to the embodiment.
  • the amount that the bucket 13 is inserted into the natural ground 210 is determined based on the traction force F.
  • the bucket 13 receives the earth pressure P representing excavation resistance from the natural ground 210.
  • a load height H a relationship of the following formula (5) called Coulomb's earth pressure theory is established between the earth pressure P and the load height H.
  • K represents an earth pressure coefficient.
  • P 1 2 ⁇ H 2 K K : EARTH PRESSURE COEFFICIENT
  • a state where the wheel loader 1 cannot move forward and stops when the bucket 13 is inserted into the natural ground 210 is a state where the traction force F and the earth pressure P are balanced.
  • the traction force F is calculated by the traction force calculation unit 73.
  • the density ⁇ and the earth pressure coefficient K are stored in the characteristic storage unit 61. Therefore, the weight calculation unit 81 can calculate the load height H based on the traction force F, the density ⁇ , and the earth pressure coefficient K.
  • a boundary between the inner surface of the bucket 13 and an upper end of the excavated object 300 is defined as a load contact 13E, and a distance between the load contact 13E and the blade edge portion 13A in the horizontal direction (front-rear direction) is defined as a load depth x.
  • the load depth x can be calculated based on the load height H, the bucket angle ⁇ bk, and the bucket data.
  • the weight calculation unit 81 calculates the weight Wa of the excavated object 300 based on the load height H calculated based on the traction force F and the earth pressure coefficient K, the bucket angle ⁇ bk, and the bucket data.
  • FIG. 13 is a schematic diagram for explanation of a method of calculating the weight Wa of the excavated object 300 based on the second calculation method according to the embodiment.
  • a void cross-sectional area A2 and a load shape portion cross-sectional area A3 are defined.
  • the void cross-sectional area A2 represents a cross-sectional area of the void space orthogonal to the pivot AXb.
  • the load shape portion cross-sectional area A3 represents a cross-sectional area of the load shape space orthogonal to the pivot AXb.
  • the void cross-sectional area A2 is calculated based on the following formula (8). As shown in the formula (8), the weight calculation unit 81 calculates the void cross-sectional area A2 based on the load height H, the bucket angle ⁇ bk, and the bucket data.
  • a 2 abs L 2 ⁇ sin ⁇ sp + ⁇ 3 ⁇ sin atan H x ⁇ ⁇ 3 + ⁇ bk 2 ⁇ sin ⁇ sp + ⁇ bk + atan H x
  • the load shape portion cross-sectional area A3 is calculated based on the following formula (9). As shown in the formula (9), the weight calculation unit 81 calculates the load shape portion cross-sectional area A3 based on the load height H, the near-side load angle ⁇ 1, and the blade edge side load angle ⁇ 2.
  • a 3 H 2 + x 2 ⁇ sin ⁇ 1 + atan H x ⁇ sin ⁇ 2 ⁇ atan H x 2 ⁇ sin ⁇ 1 + ⁇ 2
  • the load cross-sectional area Aa is calculated based on the following formula (10).
  • Aa Abk ⁇ A 2 + A 3
  • the load cross-sectional area Aa is calculated, so that the weight calculation unit 81 can calculate the weight Wa based on the formulas (3) and (4).
  • the near-side load angle determination unit 82 determines the near-side load angle ⁇ 1 to be a predetermined angle.
  • the predetermined angle includes at least one of the natural ground angle ⁇ g, a sum of the natural ground angle ⁇ g and a bucket angle increase amount ⁇ bk, and the angle of repose ⁇ r.
  • FIG. 14 is a diagram for explanation of the angle of repose ⁇ r and the natural ground angle ⁇ g according to the embodiment.
  • the angle of repose ⁇ r is an angle of the slope of the earth and sand with respect to the horizontal plane for a case where the shape of the earth and sand is kept stable without collapsing when the earth and sand are piled up.
  • the angle of repose ⁇ r is a physical property value uniquely determined based on the property of the earth and sand.
  • the natural ground angle ⁇ g is an angle formed by the ground 200 and the surface of the natural ground 210 constituted by earth and sand placed on the ground 200. Although the natural ground angle ⁇ g is substantially equal to the angle of repose ⁇ r, the natural ground angle ⁇ g sometimes changes based on the conditions for forming the natural ground 210.
  • the conditions for forming the natural ground 210 include a drop height and the volume of earth and sand when the earth and sand are dropped on the ground 200 to form the natural ground 210.
  • the angle of repose ⁇ r is the angle of inclination of the surface of the earth and sand formed by gently dropping the earth and sand on the horizontal plane
  • the natural ground angle ⁇ g is the angle of inclination of the surface of the natural ground 210 that may change based on the impact received by the earth and sand or the volume of the natural ground 210 when the earth and sand are dropped on the horizontal plane.
  • FIG. 15 is a diagram illustrating a relationship between the natural ground angle ⁇ g and the angle of repose ⁇ r according to the embodiment.
  • the horizontal axis represents the angle of repose ⁇ r
  • the vertical axis represents the natural ground angle ⁇ g.
  • the angle of repose ⁇ r of the earth and sand is substantially equal to the natural ground angle ⁇ g of the natural ground 210 formed by the earth and sand.
  • the correlation data indicating the relationship between the natural ground angle ⁇ g and the angle of repose ⁇ r as illustrated in FIG. 15 is stored in the characteristic storage unit 61.
  • the near-side load angle determination unit 82 can calculate the natural ground angle ⁇ g based on, for example, the angle of repose ⁇ r and the correlation data.
  • the natural ground angle ⁇ g may be actually measured and stored in the characteristic storage unit 61.
  • the repose angle calculation unit 91 calculates the angle of repose ⁇ r of the earth and sand based on the excavated object 300 held by the bucket 13.
  • the angle of repose ⁇ r calculated by the repose angle calculation unit 91 is stored in the characteristic storage unit 61.
  • the angle of repose ⁇ r is a physical property value of earth and sand determined based on the property of the earth and sand. For example, when the property of the earth and sand changes due to weather or the like, the angle of repose ⁇ r may change. For example, the angle of repose ⁇ r may be different between good weather and rainy weather.
  • the repose angle calculation unit 91 calculates the angle of repose ⁇ r and stores the same in the characteristic storage unit 61.
  • the repose angle calculation unit 91 calculates the angle of repose ⁇ r based on the bucket data stored in the bucket data storage unit 62, the bucket angle ⁇ bk calculated by the bucket angle calculation unit 72, the weight Wa of the excavated object 300 detected by the weight sensor 34, and the density ⁇ of the excavated object 300 stored in the characteristic storage unit 61.
  • FIG. 16 is a diagram for explanation of the angle of repose ⁇ r of the excavated object 300 held by the bucket 13 according to the embodiment.
  • FIG. 16 when the bucket 13 is dumped to incline the opening portion 136 of the bucket 13 forward from a state where the bucket 13 is filled with the excavated object 300, a part of the excavated object 300 is discharged from the bucket 13 due to the action of gravity.
  • a slope with the blade edge portion 13A as the base point is formed on the surface of the excavated object 300.
  • the angle of repose ⁇ r is an angle, with respect to the horizontal plane, of a slope in which the surface of the excavated object 300 stays without sliding down with the blade edge portion 13A as the base point.
  • the angle of repose ⁇ r is an angle, with respect to the horizontal plane, of a slope that is exposed to the opening portion 136 of the bucket 13 and formed by the surface of the excavated object 300 with the blade edge portion 13A as the base point.
  • a method of calculating the angle of repose ⁇ r will be described in detail. After the bucket 13 is filled with the excavated object 300, a part of the excavated object 300 held by the bucket 13 is discharged as illustrated in FIG. 16 . A part of the excavated object 300 held by the bucket 13 is discharged, which results in the state where the slope of the surface of the excavated object 300 stays without sliding down is maintained, in other words, the state where the slope of the surface of the excavated object 300 held by the bucket 13 on the YZ plane is maintained at the angle of repose ⁇ r.
  • An unfilled part cross-sectional area A4 of an unfilled part 350 of the bucket 13 in this state is calculated based on the following formula (11) using the bucket length L stored in the bucket data storage unit 62, the blade edge side opening angle ⁇ 3, and the upper opening angle ⁇ sp for a case where the bucket 13 is horizontal (hereinafter, it is referred to as "when the bucket is horizontal").
  • a 4 abs L 2 ⁇ sin ⁇ sp + ⁇ 3 ⁇ sin ⁇ r ⁇ ⁇ 3 + ⁇ bk 2 ⁇ sin ⁇ sp + ⁇ bk + ⁇ r
  • the load cross-sectional area Aa in this state is calculated based on the following formula (12) using the bucket cross-sectional area Abk stored in the bucket data storage unit 62 and the unfilled part cross-sectional area A4 of the unfilled part 350 of the bucket 13.
  • Aa Abk ⁇ A 4
  • the volume Va of the excavated object 300 is calculated based on the formula (3), and the weight Wa of the excavated object 300 is calculated based on the formula (4) .
  • the repose angle calculation unit 91 calculates the angle of repose ⁇ r based on the formula (13).
  • Abk ⁇ abs L 2 ⁇ sin ⁇ sp + ⁇ 3 ⁇ sin ⁇ r ⁇ ⁇ 3 + ⁇ bk 2 ⁇ sin ⁇ sp + ⁇ bk + ⁇ r ⁇ B ⁇ ⁇ Wa
  • the working equipment control unit 100 controls the posture of the working equipment 6 so that the weight Wa calculated by the weight calculation unit 81 becomes a target weight Wr.
  • the posture of the working equipment 6 includes the bucket angle ⁇ bk representing the angle of the bucket 13 with respect to the horizontal plane.
  • the working equipment control unit 100 controls at least one of the lift cylinder 18 and the bucket cylinder 19 to adjust the bucket angle ⁇ bk.
  • the bucket angle ⁇ bk is adjusted, so that the near-side load angle ⁇ 1 is adjusted.
  • the near-side load angle ⁇ 1 is adjusted, so that the weight Wa of the excavated object 300 is adjusted.
  • the working equipment control unit 100 controls the bucket angle ⁇ bk representing the posture of the bucket 13 so that the weight Wa calculated by the weight calculation unit 81 becomes the target weight Wr.
  • the working equipment control unit 100 removes the bucket 13 from the natural ground 210 while maintaining the near-side load angle ⁇ 1 and the bucket angle ⁇ bk for a case where the weight Wa reaches the target weight Wr. As a result, the difference between the weight Wa of the excavated object 300 held by the bucket 13 and the target weight Wr is reduced.
  • FIG. 17 is a flowchart illustrating a method of calculating the angle of repose ⁇ r according to the embodiment.
  • the operator excavates the natural ground 210 with the bucket 13 and holds the excavated object 300 (Step SA1). More specifically, for example, as illustrated in FIG. 9 , after excavating the natural ground 210 such that the inside of the bucket 13 is filled with the excavated object 300, the operator causes the bucket 13 to perform tilting operation so that the excavated object 300 is held in the bucket 13.
  • Step SA2 the operator discharges a part of the excavated object 300 from the bucket 13 (Step SA2). More specifically, the operator causes the bucket 13 to perform dumping operation to such an extent that the excavated object 300 is not completely discharged from the bucket 13, from a state where the bucket 13 is filled with the excavated object 300. For example, the operator causes the bucket 13 to perform the dumping operation between the position for tilting operation in Step SA1 and an angle at which the bucket angle ⁇ bk is larger than 0 degrees.
  • the surface of the excavated object 300 held by the bucket 13 maintains a slope of the surface stays at a predetermined position without sliding down with the blade edge portion 13A as the base point.
  • the angle of the surface of the excavated object 300 of the bucket 13 is maintained at the angle of repose ⁇ r.
  • Step SA3 the operator transmits a command to start the processing of calculating the angle of repose ⁇ r to the controller 50 (Step SA3). More specifically, in response to the operator operating the operator command device 23, the operator command device 23 outputs, to the controller 50, an operation command signal to start the processing of calculating the angle of repose ⁇ r.
  • the detection data acquisition unit 71 acquires the vehicle body inclination angle ⁇ a, the boom angle ⁇ b, the bell crank angle ⁇ c, and the weight Wa of the excavated object 300 in a state where the surface of the excavated object 300 held by the bucket 13 on the YZ plane is maintained at the angle of repose ⁇ r (Step SA4).
  • the bucket angle calculation unit 72 calculates the bucket angle ⁇ bk based on the vehicle body inclination angle ⁇ a, the boom angle ⁇ b, and the bell crank angle ⁇ c acquired by the detection data acquisition unit 71 (Step SA5) .
  • the repose angle calculation unit 91 calculates the angle of repose ⁇ r based on the detection data on the angle of the vehicle body 2, the bucket data stored in the bucket data storage unit 62, the weight Wa of the excavated object 300 acquired in Step SA4, and the bucket angle ⁇ bk calculated in Step SA5 (Step SA6).
  • the characteristic storage unit 61 stores the angle of repose ⁇ r calculated by the repose angle calculation unit 91 (Step SA7).
  • FIG. 18 is a flowchart illustrating an excavation method according to the embodiment.
  • Step SC1 When excavation work is started and at least a part of the bucket 13 is inserted into the natural ground 210, the working equipment control unit 100 causes the bucket 13 to perform tilting operation (Step SC1). When the bucket 13 tilts, the bucket angle ⁇ bk changes.
  • the traction force calculation unit 73 calculates the traction force F during the excavation work (Step SC2).
  • the weight calculation unit 81 acquires the density ⁇ from the characteristic storage unit 61 (Step SC3) .
  • the weight calculation unit 81 acquires the earth pressure coefficient K from the characteristic storage unit 61 (Step SC4).
  • the weight calculation unit 81 calculates the load height H based on the formula (7) (Step SC5).
  • the near-side load angle determination unit 82 determines whether the load height H is higher than the height of the spill guard end portion 13B (Step SC6).
  • Step SC6 If it is determined in Step SC6 that the load height H is higher than the height of the spill guard end portion 13B (Step SC6: Yes), then the near-side load angle determination unit 82 acquires the angle of repose ⁇ r from the characteristic storage unit 61 (Step SC7).
  • the near-side load angle determination unit 82 stores the bucket angle ⁇ bk ( ⁇ bka) at the time of Step SC6.
  • the near-side load angle determination unit 82 acquires a bucket angle ⁇ bk ( ⁇ bkb) calculated by the bucket angle calculation unit 72 during the excavation work.
  • the near-side load angle determination unit 82 counts the bucket angle increase amount ⁇ bk representing a difference between the bucket angle ⁇ bkb and the bucket angle ⁇ bka (Step SC8).
  • the near-side load angle determination unit 82 acquires the natural ground angle ⁇ g from the characteristic storage unit 61 (Step SC9).
  • the near-side load angle determination unit 82 determines whether the sum of the natural ground angle ⁇ g and the bucket angle increase amount ⁇ bk is smaller than the angle of repose ⁇ r (Step SC10).
  • Step SC10 If it is determined in Step SC10 that the sum of the natural ground angle ⁇ g and the bucket angle increase amount ⁇ bk is smaller than the angle of repose ⁇ r (Step SC10: Yes), then the near-side load angle determination unit 82 determines, as the near-side load angle ⁇ 1, the sum of the natural ground angle ⁇ g and the bucket angle increase amount ⁇ bk (Step SC11).
  • Step SC10 If it is determined in Step SC10 that the sum of the natural ground angle ⁇ g and the bucket angle increase amount ⁇ bk is equal to or larger than the angle of repose ⁇ r (Step SC10: No), then the near-side load angle determination unit 82 determines, as the near-side load angle ⁇ 1, the angle of repose ⁇ r (Step SC12).
  • Step SC6 If it is determined in Step SC6 that the load height H is equal to or smaller than the height of the spill guard end portion 13B (Step SC6: No), then the near-side load angle determination unit 82 acquires the natural ground angle ⁇ g from the characteristic storage unit 61, and then determines, as the near-side load angle ⁇ 1, the natural ground angle ⁇ g (Step SC13).
  • the weight calculation unit 81 acquires the bucket angle ⁇ bk calculated by the bucket angle calculation unit 72 during the excavation work (Step SC14).
  • the weight calculation unit 81 acquires, as the bucket data, the bucket length L, the upper opening angle ⁇ sp, and the blade edge side opening angle ⁇ 3 from the bucket data storage unit 62 (Step SC15).
  • the weight calculation unit 81 calculates the load depth x based on the load height H calculated in Step SC5, the bucket angle ⁇ bk acquired in Step SC14, and the bucket data acquired in Step SC15 (Step SC16).
  • the weight calculation unit 81 calculates the void cross-sectional area A2 based on the formula (8) (Step SC17) .
  • the weight calculation unit 81 acquires the angle of repose ⁇ r from the characteristic storage unit 61.
  • the weight calculation unit 81 determines, as the blade edge side load angle ⁇ 2, the angle of repose ⁇ r.
  • the weight calculation unit 81 acquires the near-side load angle ⁇ 1 determined by the near-side load angle determination unit 82 based on the processing from Step SC6 to Step SC13 (Step SC18).
  • the weight calculation unit 81 calculates the load shape portion cross-sectional area A3 based on the formula (9) (Step SC19).
  • the weight calculation unit 81 calculates the load cross-sectional area Aa based on the formula (10) (Step SC20).
  • the weight calculation unit 81 acquires, as the bucket data, the bucket width B from the bucket data storage unit 62 (Step SC21).
  • the weight calculation unit 81 acquires the density ⁇ from the characteristic storage unit 61 (Step SC22) .
  • the weight calculation unit 81 calculates the weight Wa based on the load cross-sectional area Aa calculated in Step SC20, the bucket width B acquired in Step SC21, and the density ⁇ acquired in Step SC22. That is, after calculating the load cross-sectional area Aa in Step SC20, the weight calculation unit 81 calculates the weight Wa based on the formulas (3) and (4) (Step SC23).
  • the working equipment control unit 100 determines whether the difference between the weight Wa calculated in Step SC23 and the target weight Wr is equal to or less than a predetermined threshold (Step SC24).
  • Step SC24 If it is determined in Step SC24 that the difference between the weight Wa and the target weight Wr is equal to or less than the threshold, that is, if it is determined that the weight Wa and the target weight Wr match or approximate to each other (Step SC24: Yes), then the working equipment control unit 100 removes the bucket 13 from the natural ground 210 while the bucket angle ⁇ bk for a case where it is determined that the difference between the weight Wa and the target weight Wr is equal to or less than the threshold is maintained (Step SC25). After the bucket 13 is removed from the natural ground 210, the operator loads the excavated object 300 held by the bucket 13 onto the dump body 230.
  • Step SC24 If it is determined in Step SC24 that the difference between the weight Wa and the target weight Wr is not equal to or less than the threshold, that is, if it is determined that the weight Wa and the target weight Wr are different (Step SC24: No), then the working equipment control unit 100 continues the tilting operation of the bucket 13 (Step SC1).
  • the weight calculation unit 81 can calculate the weight Wa of the excavated object 300 held by the bucket 13 based on the traction force F, the bucket angle ⁇ bk, and the bucket data.
  • the weight calculation unit 81 can grasp, during the excavation work, the weight Wa of the excavated object 300 held by the bucket 13 after the excavation work.
  • the working equipment control unit 100 can control the working equipment 6 during the excavation work so as to reduce the difference between the weight Wa and the target weight Wr.
  • the weight Wa of the excavated object 300 with respect to the haul vehicle 220 is automatically adjusted, and the excavated object 300 with the target loading capacity is loaded onto the haul vehicle 220. Therefore, the loading work by the wheel loader 1 is optimized.
  • the weight Wa of the excavated object 300 is measured by the weight sensor 34 provided in the wheel loader 1.
  • the weight Wa of the excavated object 300 may be detected by a weight sensor provided in the haul vehicle 220.
  • a load applied to the haul vehicle 220 changes.
  • the weight sensor provided in the haul vehicle 220 detects a first load applied to the haul vehicle 220 before the excavated object 300 is loaded onto the dump body 230 and a second load applied to the haul vehicle 220 after the excavated object 300 is loaded onto the dump body 230.
  • Detection data of the weight sensor provided in the haul vehicle 220 is transmitted to the controller 50 of the wheel loader 1.
  • the weight Wa of the excavated object 300 held by the bucket 13 corresponds to a difference between the first load and the second load.
  • the angle of repose ⁇ r is calculated based on the excavated object 300 held by the bucket 13.
  • the angle of repose ⁇ r may be calculated based on the excavated object 300 not held by the bucket 13.
  • the angle of repose ⁇ r may be calculated in an experimental facility or an evaluation facility.
  • the processing of calculating the angle of repose ⁇ r may be omitted. It is only required that, before the excavation work, the angle of repose ⁇ r is stored in the characteristic storage unit 61.
  • the loading machine 1 is described as being operated by an operator, but the present invention is not limited thereto.
  • the loading machine 1 may be operated by a remote system.
  • a device having the function of the controller 50 and a remote operation device is provided at the remote control location.
  • the loading machine 1 is a wheel loader.
  • the loading machine 1 may be an excavator having front-loading working equipment.
  • the loading machine 1 may be an excavator having backhoe working equipment in which an opening portion of a bucket faces backward during the excavation work.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Operation Control Of Excavators (AREA)

Abstract

A control system for controlling a loading machine including working equipment having a bucket includes a controller. The controller calculates traction force of the loading machine during excavation work of excavating an object to be excavated with the bucket. The controller acquires a bucket angle representing an angle of the bucket with respect to the horizontal plane during the excavation work. The controller calculates a weight of an excavated object, which is the object to be excavated, held by the bucket based on the traction force, the bucket angle, and bucket data indicating a shape and a dimension of the bucket.

Description

    Field
  • The technology disclosed in the present specification relates to a control system, a loading machine, and a control method.
  • Background
  • In the technical field related to a loading machine provided with working equipment, a loading machine capable of performing an efficient excavation operation as disclosed in Patent Literature 1 is known.
  • Citation List Patent Literature
  • Patent Literature 1: JP 2019-203381 A
  • Summary Technical Problem
  • According to a specific work cycle, the loading machine excavates an object to be excavated with the working equipment, and then loads the excavated object onto a haul vehicle. When loading the excavated object onto the haul vehicle, the loading machine desirably adjusts the weight of the excavated object so as to provide an optimum weight for the haul vehicle.
  • An object of the technology disclosed in the present specification is to optimize loading work by a loading machine.
  • Solution to Problem
  • According to an aspect of the present invention, a control system for controlling a loading machine including working equipment having a bucket, the control system comprises: a controller, wherein the controller calculates traction force of the loading machine during excavation work of excavating an object to be excavated with the bucket, acquires a bucket angle representing an angle of the bucket with respect to a horizontal plane during the excavation work, and calculates a weight of an excavated object, which is the object to be excavated, held by the bucket based on the traction force, the bucket angle, and bucket data indicating a shape and a dimension of the bucket.
  • Advantageous Effects of Invention
  • According to the technology disclosed in the present specification, the loading work by the loading machine is optimized.
  • Brief Description of Drawings
    • FIG. 1 is a side view illustrating a loading machine according to an embodiment.
    • FIG. 2 is a configuration diagram illustrating the loading machine according to the embodiment.
    • FIG. 3 is a perspective view illustrating a bucket according to the embodiment.
    • FIG. 4 is a side view schematically illustrating the bucket according to the embodiment.
    • FIG. 5 is a diagram for explanation of an operation of working equipment according to the embodiment.
    • FIG. 6 is a diagram for explanation of the loading machine according to the embodiment.
    • FIG. 7 is a functional block diagram illustrating a control system of the loading machine according to the embodiment.
    • FIG. 8 is a block diagram illustrating a control device of the loading machine according to the embodiment.
    • FIG. 9 is a diagram for explanation of a state of an excavated object held by the bucket according to the embodiment.
    • FIG. 10 is a schematic diagram for explanation of a method of calculating the weight of an excavated object based on a first calculation method according to the embodiment.
    • FIG. 11 is a diagram for explanation of a state of an excavated object held by the bucket according to the embodiment.
    • FIG. 12 is a diagram illustrating a relationship between traction force and earth pressure according to the embodiment.
    • FIG. 13 is a schematic diagram for explanation of a method of calculating the weight of an excavated object based on a second calculation method according to the embodiment.
    • FIG. 14 is a diagram for explanation of an angle of repose and a natural ground angle according to the embodiment.
    • FIG. 15 is a diagram illustrating a relationship between a natural ground angle and an angle of repose according to the embodiment.
    • FIG. 16 is a diagram for explanation of an angle of repose of an excavated object held by the bucket according to the embodiment.
    • FIG. 17 is a flowchart illustrating a method of calculating an angle of repose according to the embodiment.
    • FIG. 18 is a flowchart illustrating an excavation method according to the embodiment.
    Description of Embodiments
  • Hereinafter, embodiments according to the present disclosure will be described with reference to the drawings, but the present disclosure is not limited to the embodiments. Components of the embodiments described below can be appropriately combined. Further, some components are not used in some cases.
  • In the embodiments, a local coordinate system is set in a loading machine 1, and a positional relationship between units will be described with reference to the local coordinate system. In the local coordinate system, a first axis extending in the left-right direction (vehicle width direction) of the loading machine 1 is defined as an X axis, a second axis extending in the front-rear direction of the loading machine 1 is defined as a Y axis, and a third axis extending in the up-down direction of the loading machine 1 is defined as a Z axis. The X axis and the Y axis are orthogonal to each other. The Y axis and the Z axis are orthogonal to each other. The Z axis and the X axis are orthogonal to each other. The +X direction corresponds to the right direction, and the -X direction corresponds to the left direction. The +Y direction corresponds to the front direction, and the -Y direction corresponds to the rear direction. The +Z direction corresponds to the upward direction, and the -Z direction corresponds to the downward direction.
  • [Loading Machine]
  • FIG. 1 is a side view illustrating the loading machine 1 according to the embodiment. In the embodiment, the loading machine 1 is, for example, a wheel loader. In the following description, the loading machine 1 is appropriately referred to as a wheel loader 1.
  • As illustrated in FIG. 1, the wheel loader 1 includes a vehicle body 2, a cab 4, wheels 5, and working equipment 6.
  • The vehicle body 2 supports the working equipment 6. The cab 4 is supported by the vehicle body 2. In the embodiment, the cab 4 is disposed in an upper part of the vehicle body 2. The wheels 5 support the vehicle body 2. The wheels 5 include a front wheel 5F and a rear wheel 5R.
  • The front wheel 5F is rotatable about a rotation axis CXf. The rear wheel 5R is rotatable about a rotation axis CXr. When the wheel loader 1 travels straight, the rotation axis CXf of the front wheel 5F and the rotation axis CXr of the rear wheel 5R are parallel to each other. In the embodiment, the X axis is parallel to the rotation axis CXf of the front wheel 5F.
  • The working equipment 6 performs predetermined work. The working equipment 6 is supported by the vehicle body 2. The working equipment 6 is connected to the vehicle body 2. The working equipment 6 includes a boom 12, a bucket 13, a bell crank 14, a bucket link 15, a lift cylinder 18, and a bucket cylinder 19.
  • A proximal end portion of the boom 12 is pivotably connected to the vehicle body 2. The boom 12 pivots about a pivot AXa with respect to the vehicle body 2. A bracket 16 is fixed to a middle portion of the boom 12.
  • A proximal end portion of the bucket 13 is pivotably connected to a distal end portion of the boom 12. The bucket 13 pivots about a pivot AXb with respect to the boom 12. The bucket 13 is arranged ahead of the front wheel 5F. A bracket 17 is fixed to a part of the bucket 13.
  • A middle portion of the bell crank 14 is pivotably connected to the bracket 16. The bell crank 14 pivots about a pivot AXc with respect to the bracket 16. A lower end portion of the bell crank 14 is pivotably connected to a proximal end portion of the bucket link 15.
  • A distal end portion of the bucket link 15 is pivotably connected to the bracket 17. The bucket link 15 pivots about a pivot AXd with respect to the bracket 17. The bell crank 14 is connected to the bucket 13 via the bucket link 15.
  • The lift cylinder 18 operates the boom 12. A proximal end portion of the lift cylinder 18 is connected to the vehicle body 2. A distal end portion of the lift cylinder 18 is connected to the boom 12. The boom 12 pivots about a pivot AXe with respect to the lift cylinder 18.
  • The bucket cylinder 19 operates the bucket 13. A proximal end portion of the bucket cylinder 19 is connected to the vehicle body 2. A distal end portion of the bucket cylinder 19 is connected to an upper end portion of the bell crank 14. The bell crank 14 pivots about a pivot AXf with respect to the bucket cylinder 19.
  • FIG. 2 is a configuration diagram illustrating the loading machine 1 according to the embodiment. The loading machine 1 includes a power source 3, a power take off (PTO) 8, a power transmission device 9, a hydraulic pump 20, a control valve 21, and a controller 50.
  • The power source 3 produces driving force for operating the wheel loader 1. The power source 3 is, for example, a diesel engine.
  • The power take off 8 distributes the driving force from the power source 3 to the power transmission device 9 and the hydraulic pump 20. The driving force of the power source 3 is transmitted to the power transmission device 9 and the hydraulic pump 20 via the power take off 8.
  • The power transmission device 9 includes an input shaft to which the driving force is input from the power source 3 and an output shaft that changes the speed of the driving force, which is input to the input shaft, and outputs the resultant. The input shaft of the power transmission device 9 is connected to the power take off 8. The output shaft of the power transmission device 9 is connected to each of the front wheel 5F and the rear wheel 5R. The driving force of the power source 3 is transmitted to each of the front wheel 5F and the rear wheel 5R via the power transmission device 9. The power transmission device 9 may include an axle device or a differential device.
  • The hydraulic pump 20 discharges hydraulic oil. The hydraulic pump 20 is a variable displacement hydraulic pump. The hydraulic pump 20 is driven based on the driving force of the power source 3. The hydraulic oil discharged from the hydraulic pump 20 is supplied to the lift cylinder 18 and the bucket cylinder 19 via the control valve 21.
  • The control valve 21 controls the flow rate and direction of the hydraulic oil supplied to each of the lift cylinder 18 and the bucket cylinder 19. The working equipment 6 is operated with the hydraulic oil supplied from the hydraulic pump 20 via the control valve 21.
  • The controller 50 controls the wheel loader 1. The controller 50 includes a computer system.
  • [Bucket]
  • FIG. 3 is a perspective view illustrating the bucket 13 according to the embodiment. FIG. 4 is a side view schematically illustrating the bucket 13 according to the embodiment. The bucket 13 is a working member that excavates an object to be excavated. The bucket 13 holds an excavated object 300. The excavated object 300 is an object that is excavated and held by the bucket 13.
  • The bucket 13 includes a bottom plate portion 131, a back plate portion 132, a top plate portion 133, a right plate portion 134, and a left plate portion 135. A tip portion of the bottom plate portion 131 is a blade edge portion 13A. A blade edge or a blade is attached to the blade edge portion 13A. A tip portion of the top plate portion 133 is a spill guard end portion 13B. A tip portion of the right plate portion 134 is a right end portion 13C. A tip portion of the left plate portion 135 is a left end portion 13D. The blade edge portion 13A extends in the left-right direction. The spill guard end portion 13B extends in the left-right direction. The right end portion 13C extends in the up-down direction or the front-rear direction. The left end portion 13D extends in the up-down direction or the front-rear direction. The blade edge portion 13A and the spill guard end portion 13B face each other. The right end portion 13C and the left end portion 13D face each other. The blade edge portion 13A and the spill guard end portion 13B are parallel to each other. The right end portion 13C and the left end portion 13D are parallel to each other.
  • An opening portion 136 of the bucket 13 is defined between the blade edge portion 13A, the spill guard end portion 13B, the right end portion 13C, and the left end portion 13D. The opening portion 136 is defined by the blade edge portion 13A, the spill guard end portion 13B, the right end portion 13C, and the left end portion 13D.
  • In the embodiment, a dimension of the opening portion 136 in the up-down direction or the front-rear direction, that is, a dimension of a straight line connecting the blade edge portion 13A and the spill guard end portion 13B on the YZ plane is defined as a bucket length L. The dimension of the opening portion 136 in the left-right direction is defined as a bucket width B. A cross-sectional area of the bucket 13 parallel to the YZ plane is defined as a bucket cross-sectional area Abk. An angle formed by the inner surface of the bottom plate portion 131 and a straight line connecting the blade edge portion 13A and the spill guard end portion 13B on the YZ plane is defined as a blade edge side opening angle Θ3. An angle formed by a plane parallel to the inner surface of the bottom plate portion 131 and the inner surface of the top plate portion 133 on the YZ plane is defined as an upper opening angle θsp.
  • [Operation of Working Equipment]
  • FIG. 5 is a diagram for explanation of an operation of the working equipment 6 according to the embodiment. In the embodiment, the working equipment 6 is front-loading working equipment in which the opening portion 136 of the bucket 13 faces forward during excavation work.
  • The operation of raising the boom 12 refers to the operation of pivoting the boom 12 about the pivot AXa so that the distal end portion of the boom 12 is separated from the ground 200. The lift cylinder 18 extends, and the boom 12 is thereby raised.
  • The operation of lowering the boom 12 refers to the operation of pivoting the boom 12 about the pivot AXa so that the distal end portion of the boom 12 approaches the ground 200. The lift cylinder 18 contracts, and the boom 12 is thereby lowered.
  • The tilting operation of the bucket 13 refers to the operation of pivoting the bucket 13 about the pivot AXb so that the blade edge portion 13A of the bucket 13 is separated from the ground 200. When the bucket cylinder 19 extends, the bell crank 14 pivots such that the upper end portion of the bell crank 14 moves forward and the lower end portion of the bell crank 14 moves backward. When the lower end portion of the bell crank 14 moves backward, the bucket 13 is pulled backward by the bucket link 15 and performs the tilting operation. When the bucket 13 performs the tilting operation, an object to be excavated is scooped by the bucket 13, and the excavated object 300 is held by the bucket 13.
  • The dumping operation of the bucket 13 refers to the operation of pivoting the bucket 13 about the pivot AXb so that the blade edge portion 13A of the bucket 13 approaches the ground 200. When the bucket cylinder 19 contracts, the bell crank 14 pivots such that the upper end portion of the bell crank 14 moves backward and the lower end portion of the bell crank 14 moves forward. When the lower end of the bell crank 14 moves forward, the bucket 13 is pushed forward by the bucket link 15 and performs the dumping operation. When the bucket 13 performs the dumping operation, the excavated object 300 held by the bucket 13 is discharged from the bucket 13.
  • [Operation of Loading Machine]
  • FIG. 6 is a diagram for explanation of the wheel loader 1 according to the embodiment. The wheel loader 1 performs predetermined work on a work target at a work site. The work target includes an object to be excavated and a loading target. The predetermined work includes excavation work and loading work.
  • The object to be excavated is, for example, natural ground, a rock pile, coal, feed, or a wall surface. The natural ground is a pile of earth and sand placed on the ground 200. The rock pile is a pile of rock or stone placed on the ground 200. In the embodiment, the object to be excavated is natural ground 210. The excavated object 300 is the natural ground 210 that is excavated and held by the bucket 13.
  • The loading target is, for example, a haul vehicle, a predetermined area of a work site, a hopper, a belt conveyor, or a crusher. In the embodiment, the loading target is a dump body 230 of a haul vehicle 220 capable of traveling on the ground 200. The haul vehicle 220 is, for example, a dump truck.
  • The wheel loader 1 performs excavation work of excavating the natural ground 210 with the bucket 13. The wheel loader 1 excavates the natural ground 210 with the bucket 13 while advancing toward the natural ground 210. The wheel loader 1 performs loading work of loading the excavated object 300 held by the bucket 13 in the excavation work onto the dump body 230. The loading work is a concept including discharging work of discharging the excavated object 300.
  • In the excavation work, as indicated by an arrow M1 in FIG. 6, the wheel loader 1 advances toward the natural ground 210 in a state where the excavated object 300 is not held by the bucket 13. The wheel loader 1 performs the excavation work by tilting the bucket 13 inserted into the natural ground 210. When the bucket 13 performs the tilting operation, the natural ground 210 is excavated by the bucket 13, and the excavated object 300 is held by the bucket 13.
  • Next, as indicated by an arrow M2 in FIG. 6, the wheel loader 1 moves backward so as to be separated from the natural ground 210 in a state where the excavated object 300 is held by the bucket 13.
  • Next, loading work is performed. In the loading work, as indicated by an arrow M3 in FIG. 6, the wheel loader 1 advances while swinging toward the haul vehicle 220 in a state where the excavated object 300 is held by the bucket 13. In a state where the wheel loader 1 advances toward the haul vehicle 220, the wheel loader 1 performs the operation of raising the boom 12 such that the bucket 13 is disposed above the dump body 230. After the boom 12 is raised and the bucket 13 is disposed above the dump body 230, the wheel loader 1 performs the loading work by causing the bucket 13 to perform the dumping operation. When the bucket 13 performs the dumping operation, the excavated object 300 held by the bucket 13 is discharged from the bucket 13 and loaded onto the dump body 230.
  • After the excavated object 300 is loaded onto the dump body 230, as indicated by an arrow M4 in FIG. 6, the wheel loader 1 moves backward while swinging so as to be separated from the haul vehicle 220 in a state where the excavated object 300 is not held by the bucket 13.
  • The wheel loader 1 repeats the operation described above until the dump body 230 of the haul vehicle 220 is filled with the excavated object 300 or until the natural ground 210 is completely excavated.
  • [Control System]
  • FIG. 7 is a functional block diagram illustrating a control system 40 of the wheel loader 1 according to the embodiment. FIG. 8 is a block diagram illustrating the controller 50 of the wheel loader 1 according to the embodiment.
  • The wheel loader 1 includes the control system 40. The control system 40 includes a control valve 21, an operational device 22, an operator command device 23, an inclination sensor 31, a boom angle sensor 32, a bucket angle sensor 33, a weight sensor 34, an engine speed sensor 35, a pump pressure sensor 37, a pump displacement sensor 38, and a controller 50.
  • The operational device 22 is disposed inside the cab 4. The operational device 22 is operated by an operator. The operational device 22 generates an operation signal for operating each of the power source 3, the power transmission device 9, and the working equipment 6. The controller 50 controls the power source 3 and the power transmission device 9 based on the operation signal generated by the operational device 22. The controller 50 controls the control valve 21 based on the operation signal generated by the operational device 22.
  • The operator command device 23 is disposed inside the cab 4. The operator command device 23 includes, for example, a switch button. The operator command device 23 is operated by the operator. The operator command device 23 generates a command signal for calculating an angle of repose θr to be described later. The controller 50 calculates the angle of repose θr based on the operation signal generated by the operator command device 23.
  • The inclination sensor 31 detects the inclination of the vehicle body 2. More specifically, the inclination sensor 31 detects a vehicle body inclination angle θa representing the angle of inclination of the vehicle body 2 with respect to the horizontal plane. The inclination sensor 31 is disposed in at least a part of the vehicle body 2. The inclination sensor 31 is, for example, an inertial measurement unit (IMU). Detection data on the vehicle body inclination angle θa detected by the inclination sensor 31 is transmitted to the controller 50.
  • The boom angle sensor 32 detects an angle of the boom 12. More specifically, the boom angle sensor 32 detects a boom angle θb representing the angle of the boom 12 with respect to the vehicle body 2 in the local coordinate system. The boom angle sensor 32 is, for example, an angle sensor disposed at a connection portion between the vehicle body 2 and the boom 12. In the embodiment, the boom angle θb is an angle formed by a line connecting the pivot AXa and the pivot AXb and a line connecting the rotation axis CXf and the rotation axis CXr. Detection data on the boom angle θb detected by the boom angle sensor 32 is transmitted to the controller 50. The boom angle sensor 32 may be a stroke sensor that detects a stroke of the lift cylinder 18.
  • The bucket angle sensor 33 detects an angle of the bucket 13. More specifically, the bucket angle sensor 33 detects a bell crank angle θc representing the angle of the bell crank 14 with respect to the boom 12 in the local coordinate system. The bucket angle sensor 33 is, for example, an angle sensor disposed at a connection portion between the boom 12 and the bell crank 14. In the embodiment, the bell crank angle θc is an angle formed by a line connecting the pivot AXc and the pivot AXf and a line connecting the pivot AXa and the pivot AXb. The angle of the bucket 13 with respect to the boom 12 in the local coordinate system corresponds to the bell crank angle θc on a one-to-one basis. The angle of the bucket 13 with respect to boom 12 in the local coordinate system is detected by detecting the bell crank angle θc. Detection data on the bell crank angle θc detected by the bucket angle sensor 33 is transmitted to the controller 50. The bucket angle sensor 33 may be a stroke sensor that detects a stroke of the bucket cylinder 19.
  • The weight sensor 34 detects a weight Wa of the excavated object 300, which is an object to be excavated, held by the bucket 13. The weight sensor 34 is, for example, a pressure sensor that detects the pressure of the hydraulic oil in the lift cylinder 18 or a pressure sensor that detects the pressure of the hydraulic oil in the bucket cylinder 19. A load applied to the working equipment 6 changes between a state where the excavated object 300 is held by the bucket 13 and a state where the excavated object 300 is not held by the bucket 13. The weight sensor 34 detects a change in load applied to the working equipment 6 to thereby detect the weight Wa of the excavated object 300 held by the bucket 13. Detection data on the weight Wa of the excavated object 300 detected by the weight sensor 34 is transmitted to the controller 50. The weight sensor 34 may be a load meter disposed in at least a part of the working equipment 6. The weight sensor 34 may directly detect the weight Wa of the excavated object 300.
  • The engine speed sensor 35 detects the engine speed of the power source 3.
  • The pump pressure sensor 37 detects a discharge pressure representing the pressure of the hydraulic oil discharged from the hydraulic pump 20.
  • The pump displacement sensor 38 detects the displacement of the hydraulic pump 20 based on an angle of a swash plate of the hydraulic pump 20.
  • The controller 50 includes a computer system. The controller 50 outputs a control command for controlling the wheel loader 1.
  • As illustrated in FIG. 8, the controller 50 includes a processor 51, a main memory 52, a storage 53, and an interface 54. The processor 51 executes a computer program to calculate the operation of the working equipment 6. Examples of the processor 51 include a central processing unit (CPU) and a micro processing unit (MPU). The main memory 52 is, for example, a nonvolatile memory or a volatile memory. The nonvolatile memory is, for example, a read only memory (ROM). The volatile memory is, for example, a random access memory (RAM). The storage 53 is a non-transitory tangible storage medium. The storage 53 is, for example, a magnetic disk, a magneto-optical disk, or a semiconductor memory. The storage 53 may be an internal medium directly connected to a bus of the controller 50 or an external medium connected to the controller 50 via the interface 54 or a communication line. The storage 53 stores a computer program for controlling the working equipment 6.
  • As illustrated in FIG. 7, the controller 50 includes a characteristic storage unit 61, a bucket data storage unit 62, a detection data acquisition unit 71, a bucket angle calculation unit 72, a traction force calculation unit 73, a weight calculation unit 81, a near-side load angle determination unit 82, a repose angle calculation unit 91, and a working equipment control unit 100. The controller 50 communicates with each of the control valve 21, the operational device 22, the operator command device 23, the inclination sensor 31, the boom angle sensor 32, the bucket angle sensor 33, the weight sensor 34, the engine speed sensor 35, the pump pressure sensor 37, and the pump displacement sensor 38.
  • <Characteristic Storage Unit>
  • The characteristic storage unit 61 stores characteristic data on an object to be excavated. The characteristic data on an object to be excavated includes a natural ground angle θg representing an angle formed by the ground 200 and the surface of the natural ground 210, an angle of repose θr of earth and sand constituting the natural ground 210, a density ρ of the natural ground 210, and an earth pressure coefficient K of the natural ground 210. The characteristic storage unit 61 also stores correlation data indicating a relationship between the natural ground angle θg and the angle of repose θr.
  • <Bucket Data Storage Unit>
  • The bucket data storage unit 62 stores bucket data indicating the shape or dimensions of the bucket 13. The bucket data includes the bucket length L, the bucket width B, the blade edge side opening angle θ3, the upper opening angle θsp, and the bucket cross-sectional area Abk. The bucket data is known data derived from specification data or design data.
  • <Detection Data Acquisition Unit>
  • The detection data acquisition unit 71 acquires detection data from each of the inclination sensor 31, the boom angle sensor 32, the bucket angle sensor 33, the weight sensor 34, the engine speed sensor 35, the pump pressure sensor 37, and the pump displacement sensor 38. The detection data acquisition unit 71 acquires the vehicle body inclination angle θa from the inclination sensor 31. The detection data acquisition unit 71 acquires the boom angle θb from the boom angle sensor 32. The detection data acquisition unit 71 acquires the bell crank angle θc from the bucket angle sensor 33. The detection data acquisition unit 71 acquires the weight Wa of the excavated object 300 from the weight sensor 34. The detection data acquisition unit 71 acquires the engine speed of the power source 3 from the engine speed sensor 35. The detection data acquisition unit 71 acquires the discharge pressure of the hydraulic pump 20 from the pump pressure sensor 37. The detection data acquisition unit 71 acquires the displacement of the hydraulic pump 20 from the pump displacement sensor 38.
  • <Bucket Angle Calculation Unit>
  • The bucket angle calculation unit 72 calculates a bucket angle θbk representing the angle of the bucket 13 with respect to the horizontal plane.
  • The bucket angle calculation unit 72 calculates the bucket angle θbk based on the detection data on an angle of the vehicle body 2 and the detection data on an angle of the working equipment 6. The detection data on an angle of the working equipment 6 includes detection data on the boom angle θb representing the angle of the boom 12 in the local coordinate system detected by the boom angle sensor 32 and detection data on the bell crank angle θc representing the angle of the bell crank 14 in the local coordinate system detected by the bucket angle sensor 33. The bucket angle calculation unit 72 can calculate the bucket angle θbk based on the detection data on the vehicle body inclination angle θa, the detection data on the boom angle θb, and the detection data on the bell crank angle θc.
  • <Traction Force Calculation Unit>
  • The traction force calculation unit 73 calculates traction force F of the wheel loader 1 based on the detection data acquired by the detection data acquisition unit 71. The traction force calculation unit 73 calculates the traction force F during the excavation work of excavating the natural ground 210 with the bucket 13.
  • For example, in a case where the power transmission device 9 has a continuously variable transmission, the traction force calculation unit 73 calculates the traction force F in the following procedure. The traction force calculation unit 73 uses detection data of the engine speed sensor 35 to calculate output torque of the power source 3. In addition, the traction force calculation unit 73 calculates load torque of the hydraulic pump 20 based on detection data of the pump pressure sensor 37 and detection data of the pump displacement sensor 38. The traction force calculation unit 73 calculates the traction force F by multiplying traveling torque that is obtained by subtracting the load torque from the output torque by the axle ratio and the torque efficiency of the power transmission device 9 and dividing the resultant by the effective diameter of the wheel.
  • For example, in a case where the power transmission device 9 includes a torque converter, the traction force calculation unit 73 calculates the traction force F in the following procedure. The traction force calculation unit 73 calculates the traveling torque by multiplying a value that is obtained by squaring the engine speed of the power source 3 divided by 1000 rpm by the primary torque coefficient and the torque ratio of the torque converter. The primary torque coefficient and the torque ratio are characteristic values determined based on the input/output rotation ratio of the torque converter. The traction force calculation unit 73 calculates the traction force F by multiplying the traveling torque by the axle ratio and the torque efficiency of the power transmission device 9 and dividing the resultant by the effective diameter of the wheel 5.
  • <Weight Calculation Unit>
  • The weight calculation unit 81 calculates the weight Wa of the excavated object 300, which is an object to be excavated, held by the bucket 13. In a case where the inside of the bucket 13 is filled with the excavated object 300, the weight calculation unit 81 calculates the weight Wa based on a first calculation method. In a case where a part of the inside of the bucket 13 is filled with the excavated object 300 and a void 340 is formed in a part of the inside of the bucket 13, the weight calculation unit 81 calculates the weight Wa based on a second calculation method.
  • FIG. 9 is a diagram for explanation of a state of the excavated object 300 held by the bucket 13 according to the embodiment. FIG. 9 illustrates a state where the inside of the bucket 13 is filled with the excavated object 300, and a part of the excavated object 300 is placed outside beyond the opening portion 136 of the bucket 13. In the following description, the excavated object 300 placed outside beyond the opening portion 136 of the bucket 13 is appropriately referred to as an exposed part 330 of the excavated object 300.
  • The surface of the excavated object 300 includes a first surface 310 and a second surface 320. The second surface 320 is present ahead of the first surface 310. The first surface 310 slopes upwardly toward the front. The second surface 320 slopes downwardly toward the front. The rear end of the first surface 310 is connected to the spill guard end portion 13B. The front end of the second surface 320 is connected to the blade edge portion 13A. The rear end of the second surface 320 is connected to the front end of the first surface 310. In a cross section orthogonal to the pivot AXb, a triangle is substantially formed by the first surface 310, the second surface 320, and the right end portion 13C (left end portion 13D).
  • In the embodiment, the angle of the first surface 310 with respect to the horizontal plane is appropriately referred to as a near-side load angle Θ1, and the angle of the second surface 320 with respect to the horizontal plane is appropriately referred to as a blade edge side load angle θ2.
  • The near-side load angle θ1 changes based on the bucket angle θbk at the time of excavation. When the bucket angle θbk increases, the near-side load angle θ1 increases. When the bucket angle θbk decreases, the near-side load angle θ1 decreases.
  • The blade edge side load angle θ2 represents the angle of repose θr (stop repose angle) of the excavated object 300. Even if the bucket angle θbk at the time of excavation changes, the blade edge side load angle θ2 does not substantially change because the blade edge side load angle θ2 is formed when the bucket 13 is removed after the excavation. The blade edge side load angle θ2 is uniquely determined based on the property of the excavated object 300 (natural ground 210). In a case where the property of the excavated object 300 is constant, the blade edge side load angle θ2 does not substantially change even if the bucket angle θbk at the time of excavation changes.
  • In a case where the state of the excavated object 300 is the state illustrated in FIG. 9, the weight calculation unit 81 calculates the weight Wa of the excavated object 300 based on the first calculation method. The weight calculation unit 81 calculates the weight Wa of the excavated object 300 held by the bucket 13 based on the near-side load angle Θ1, the blade edge side load angle θ2, the bucket angle θbk, the density ρ of the excavated object 300, and the bucket data.
  • FIG. 10 is a schematic diagram for explanation of a method of calculating the weight Wa of the excavated object 300 based on the first calculation method according to the embodiment.
  • As illustrated in FIG. 10, an exposed part cross-sectional area A1 representing a cross-sectional area of the exposed part 330 orthogonal to the pivot AXb is calculated based on the following formula (1). A 1 = L 2 × sin θ 1 + θ 3 θ bk × sin θ 2 θ 3 + θ bk 2 × sin θ 1 + θ 2
    Figure imgb0001
  • The bucket cross-sectional area Abk representing the cross-sectional area of the bucket 13 orthogonal to the pivot AXb is stored in the bucket data storage unit 62. A load cross-sectional area Aa representing the cross-sectional area of the excavated object 300 orthogonal to the pivot AXb is calculated based on the following formula (2) . Aa = Abk + A 1
    Figure imgb0002
  • The volume Va of the excavated object 300 is calculated based on the following formula (3). Va = Aa × B
    Figure imgb0003
  • The density ρ of the excavated object 300 is stored in the characteristic storage unit 61. The weight Wa of the excavated object 300 in the state illustrated in FIG. 9 is calculated based on the following formula (4). Wa = Va × ρ
    Figure imgb0004
  • FIG. 11 is a diagram for explanation of a state of the excavated object 300 held by the bucket 13 according to the embodiment. FIG. 11 illustrates a state where a part of the inside of the bucket 13 is filled with the excavated object 300 and the void 340 is formed in a part of the inside of the bucket 13.
  • In a case where the state of the excavated object 300 is the state illustrated in FIG. 11, the weight calculation unit 81 calculates the weight Wa of the excavated object 300 based on the second calculation method. The weight calculation unit 81 calculates the weight Wa of the excavated object 300 held by the bucket 13 based on the traction force F, the bucket angle θbk, the density ρ of the excavated object 300, and the bucket data.
  • FIG. 12 is a diagram illustrating a relationship between the traction force F and earth pressure P according to the embodiment. The amount that the bucket 13 is inserted into the natural ground 210 is determined based on the traction force F. In addition, the bucket 13 receives the earth pressure P representing excavation resistance from the natural ground 210. In a case where the height of the object to be excavated with the blade edge portion 13A as the base point inside the bucket 13 during the excavation work is defined as a load height H, a relationship of the following formula (5) called Coulomb's earth pressure theory is established between the earth pressure P and the load height H. In the formula (5), K represents an earth pressure coefficient. P = 1 2 ρH 2 K K : EARTH PRESSURE COEFFICIENT
    Figure imgb0005
  • A state where the wheel loader 1 cannot move forward and stops when the bucket 13 is inserted into the natural ground 210 is a state where the traction force F and the earth pressure P are balanced. In a case where the traction force F and the earth pressure P are balanced, the following formula (6) is established. F = 1 2 ρH 2 K
    Figure imgb0006
  • The weight calculation unit 81 calculates the load height H based on the traction force F. As shown in the following formula (7), the load height H is calculated based on the traction force F, the density ρ, and the earth pressure coefficient K. H = 2 F ρK
    Figure imgb0007
  • The traction force F is calculated by the traction force calculation unit 73. The density ρ and the earth pressure coefficient K are stored in the characteristic storage unit 61. Therefore, the weight calculation unit 81 can calculate the load height H based on the traction force F, the density ρ, and the earth pressure coefficient K.
  • In the following description, a boundary between the inner surface of the bucket 13 and an upper end of the excavated object 300 is defined as a load contact 13E, and a distance between the load contact 13E and the blade edge portion 13A in the horizontal direction (front-rear direction) is defined as a load depth x. The load depth x can be calculated based on the load height H, the bucket angle θbk, and the bucket data.
  • The weight calculation unit 81 calculates the weight Wa of the excavated object 300 based on the load height H calculated based on the traction force F and the earth pressure coefficient K, the bucket angle θbk, and the bucket data.
  • FIG. 13 is a schematic diagram for explanation of a method of calculating the weight Wa of the excavated object 300 based on the second calculation method according to the embodiment.
  • As illustrated in FIG. 13, a void cross-sectional area A2 and a load shape portion cross-sectional area A3 are defined. In a case where a void space is set as a space between a first plane connecting the load contact 13E and the blade edge portion 13A and orthogonal to the YZ plane and a second plane defined by the opening portion 136, the void cross-sectional area A2 represents a cross-sectional area of the void space orthogonal to the pivot AXb. In a case where the excavated object 300 present between the first plane and the second plane is set as a load shape space, the load shape portion cross-sectional area A3 represents a cross-sectional area of the load shape space orthogonal to the pivot AXb.
  • The void cross-sectional area A2 is calculated based on the following formula (8). As shown in the formula (8), the weight calculation unit 81 calculates the void cross-sectional area A2 based on the load height H, the bucket angle θbk, and the bucket data. A 2 = abs L 2 × sin θ sp + θ 3 × sin atan H x θ 3 + θ bk 2 × sin θ sp + θ bk + atan H x
    Figure imgb0008
  • The load shape portion cross-sectional area A3 is calculated based on the following formula (9). As shown in the formula (9), the weight calculation unit 81 calculates the load shape portion cross-sectional area A3 based on the load height H, the near-side load angle Θ1, and the blade edge side load angle Θ2. A 3 = H 2 + x 2 × sin θ 1 + atan H x × sin θ 2 atan H x 2 × sin θ 1 + θ 2
    Figure imgb0009
  • The load cross-sectional area Aa is calculated based on the following formula (10). Aa = Abk A 2 + A 3
    Figure imgb0010
  • The load cross-sectional area Aa is calculated, so that the weight calculation unit 81 can calculate the weight Wa based on the formulas (3) and (4).
  • <Near-side Load Angle Determination Unit>
  • The near-side load angle determination unit 82 determines the near-side load angle θ1 to be a predetermined angle. The predetermined angle includes at least one of the natural ground angle θg, a sum of the natural ground angle θg and a bucket angle increase amount Δθbk, and the angle of repose θr.
  • FIG. 14 is a diagram for explanation of the angle of repose θr and the natural ground angle θg according to the embodiment.
  • The angle of repose θr is an angle of the slope of the earth and sand with respect to the horizontal plane for a case where the shape of the earth and sand is kept stable without collapsing when the earth and sand are piled up. The angle of repose θr is a physical property value uniquely determined based on the property of the earth and sand. When the bucket 13 inserted into the natural ground 210 is removed from the natural ground 210, the blade edge side load angle θ2 is equal to the angle of repose θr.
  • The natural ground angle θg is an angle formed by the ground 200 and the surface of the natural ground 210 constituted by earth and sand placed on the ground 200. Although the natural ground angle θg is substantially equal to the angle of repose θr, the natural ground angle θg sometimes changes based on the conditions for forming the natural ground 210. The conditions for forming the natural ground 210 include a drop height and the volume of earth and sand when the earth and sand are dropped on the ground 200 to form the natural ground 210.
  • That is, the angle of repose θr is the angle of inclination of the surface of the earth and sand formed by gently dropping the earth and sand on the horizontal plane, whereas the natural ground angle θg is the angle of inclination of the surface of the natural ground 210 that may change based on the impact received by the earth and sand or the volume of the natural ground 210 when the earth and sand are dropped on the horizontal plane.
  • FIG. 15 is a diagram illustrating a relationship between the natural ground angle θg and the angle of repose θr according to the embodiment. In FIG. 15, the horizontal axis represents the angle of repose θr, and the vertical axis represents the natural ground angle θg. For example, in the case of earth and sand having a small angle of repose θr, the angle of repose θr of the earth and sand is substantially equal to the natural ground angle θg of the natural ground 210 formed by the earth and sand. On the other hand, in the case of earth and sand having a large angle of repose θr, there is a high possibility that the natural ground angle θg of the natural ground 210 formed by the earth and sand becomes smaller than the angle of repose θr of the earth and sand.
  • The correlation data indicating the relationship between the natural ground angle θg and the angle of repose θr as illustrated in FIG. 15 is stored in the characteristic storage unit 61. The near-side load angle determination unit 82 can calculate the natural ground angle θg based on, for example, the angle of repose θr and the correlation data.
  • Note that the natural ground angle θg may be actually measured and stored in the characteristic storage unit 61.
  • <Repose Angle Calculation Unit>
  • The repose angle calculation unit 91 calculates the angle of repose θr of the earth and sand based on the excavated object 300 held by the bucket 13. The angle of repose θr calculated by the repose angle calculation unit 91 is stored in the characteristic storage unit 61.
  • The angle of repose θr is a physical property value of earth and sand determined based on the property of the earth and sand. For example, when the property of the earth and sand changes due to weather or the like, the angle of repose θr may change. For example, the angle of repose θr may be different between good weather and rainy weather. The repose angle calculation unit 91 calculates the angle of repose θr and stores the same in the characteristic storage unit 61.
  • The repose angle calculation unit 91 calculates the angle of repose θr based on the bucket data stored in the bucket data storage unit 62, the bucket angle θbk calculated by the bucket angle calculation unit 72, the weight Wa of the excavated object 300 detected by the weight sensor 34, and the density ρ of the excavated object 300 stored in the characteristic storage unit 61.
  • FIG. 16 is a diagram for explanation of the angle of repose θr of the excavated object 300 held by the bucket 13 according to the embodiment. As illustrated in FIG. 16, when the bucket 13 is dumped to incline the opening portion 136 of the bucket 13 forward from a state where the bucket 13 is filled with the excavated object 300, a part of the excavated object 300 is discharged from the bucket 13 due to the action of gravity. When a part of the excavated object 300 is discharged from the bucket 13, as illustrated in FIG. 16, a slope with the blade edge portion 13A as the base point is formed on the surface of the excavated object 300. The angle of repose θr is an angle, with respect to the horizontal plane, of a slope in which the surface of the excavated object 300 stays without sliding down with the blade edge portion 13A as the base point. The angle of repose θr is an angle, with respect to the horizontal plane, of a slope that is exposed to the opening portion 136 of the bucket 13 and formed by the surface of the excavated object 300 with the blade edge portion 13A as the base point.
  • A method of calculating the angle of repose θr will be described in detail. After the bucket 13 is filled with the excavated object 300, a part of the excavated object 300 held by the bucket 13 is discharged as illustrated in FIG. 16. A part of the excavated object 300 held by the bucket 13 is discharged, which results in the state where the slope of the surface of the excavated object 300 stays without sliding down is maintained, in other words, the state where the slope of the surface of the excavated object 300 held by the bucket 13 on the YZ plane is maintained at the angle of repose θr. An unfilled part cross-sectional area A4 of an unfilled part 350 of the bucket 13 in this state is calculated based on the following formula (11) using the bucket length L stored in the bucket data storage unit 62, the blade edge side opening angle θ3, and the upper opening angle θsp for a case where the bucket 13 is horizontal (hereinafter, it is referred to as "when the bucket is horizontal"). A 4 = abs L 2 × sin θ sp + θ 3 × sin θ r θ 3 + θ bk 2 × sin θ sp + θ bk + θ r
    Figure imgb0011
  • The load cross-sectional area Aa in this state is calculated based on the following formula (12) using the bucket cross-sectional area Abk stored in the bucket data storage unit 62 and the unfilled part cross-sectional area A4 of the unfilled part 350 of the bucket 13. Aa = Abk A 4
    Figure imgb0012
  • The volume Va of the excavated object 300 is calculated based on the formula (3), and the weight Wa of the excavated object 300 is calculated based on the formula (4) .
  • In addition, the following formula (13) is established based on the formulas (11), (3), (4), and (12). The repose angle calculation unit 91 calculates the angle of repose θr based on the formula (13). Abk abs L 2 × sin θ sp + θ 3 × sin θ r θ 3 + θ bk 2 × sin θ sp + θ bk + θ r × B × ρ = Wa
    Figure imgb0013
  • <Working Equipment Control Unit>
  • The working equipment control unit 100 controls the posture of the working equipment 6 so that the weight Wa calculated by the weight calculation unit 81 becomes a target weight Wr. The posture of the working equipment 6 includes the bucket angle θbk representing the angle of the bucket 13 with respect to the horizontal plane. When the bucket angle θbk changes, the near-side load angle θ1 changes. During the excavation work, the working equipment control unit 100 controls at least one of the lift cylinder 18 and the bucket cylinder 19 to adjust the bucket angle θbk. The bucket angle θbk is adjusted, so that the near-side load angle θ1 is adjusted. The near-side load angle θ1 is adjusted, so that the weight Wa of the excavated object 300 is adjusted. The working equipment control unit 100 controls the bucket angle θbk representing the posture of the bucket 13 so that the weight Wa calculated by the weight calculation unit 81 becomes the target weight Wr.
  • The working equipment control unit 100 removes the bucket 13 from the natural ground 210 while maintaining the near-side load angle θ1 and the bucket angle θbk for a case where the weight Wa reaches the target weight Wr. As a result, the difference between the weight Wa of the excavated object 300 held by the bucket 13 and the target weight Wr is reduced.
  • [Method for Calculating Angle of Repose]
  • FIG. 17 is a flowchart illustrating a method of calculating the angle of repose θr according to the embodiment. Before work of excavating the natural ground 210 for the first time, an operator causes the controller 50 to start processing of calculating the angle of repose θr.
  • The operator excavates the natural ground 210 with the bucket 13 and holds the excavated object 300 (Step SA1). More specifically, for example, as illustrated in FIG. 9, after excavating the natural ground 210 such that the inside of the bucket 13 is filled with the excavated object 300, the operator causes the bucket 13 to perform tilting operation so that the excavated object 300 is held in the bucket 13.
  • Next, the operator discharges a part of the excavated object 300 from the bucket 13 (Step SA2). More specifically, the operator causes the bucket 13 to perform dumping operation to such an extent that the excavated object 300 is not completely discharged from the bucket 13, from a state where the bucket 13 is filled with the excavated object 300. For example, the operator causes the bucket 13 to perform the dumping operation between the position for tilting operation in Step SA1 and an angle at which the bucket angle θbk is larger than 0 degrees. When a part of the excavated object 300 is discharged from the bucket 13, as illustrated in FIG. 16, the surface of the excavated object 300 held by the bucket 13 maintains a slope of the surface stays at a predetermined position without sliding down with the blade edge portion 13A as the base point. The angle of the surface of the excavated object 300 of the bucket 13 is maintained at the angle of repose θr.
  • Next, in the state of Step SA2, the operator transmits a command to start the processing of calculating the angle of repose θr to the controller 50 (Step SA3). More specifically, in response to the operator operating the operator command device 23, the operator command device 23 outputs, to the controller 50, an operation command signal to start the processing of calculating the angle of repose θr.
  • The detection data acquisition unit 71 acquires the vehicle body inclination angle θa, the boom angle θb, the bell crank angle θc, and the weight Wa of the excavated object 300 in a state where the surface of the excavated object 300 held by the bucket 13 on the YZ plane is maintained at the angle of repose θr (Step SA4).
  • The bucket angle calculation unit 72 calculates the bucket angle θbk based on the vehicle body inclination angle θa, the boom angle θb, and the bell crank angle θc acquired by the detection data acquisition unit 71 (Step SA5) .
  • The repose angle calculation unit 91 calculates the angle of repose θr based on the detection data on the angle of the vehicle body 2, the bucket data stored in the bucket data storage unit 62, the weight Wa of the excavated object 300 acquired in Step SA4, and the bucket angle θbk calculated in Step SA5 (Step SA6).
  • The characteristic storage unit 61 stores the angle of repose θr calculated by the repose angle calculation unit 91 (Step SA7).
  • [Excavation Method]
  • FIG. 18 is a flowchart illustrating an excavation method according to the embodiment.
  • When excavation work is started and at least a part of the bucket 13 is inserted into the natural ground 210, the working equipment control unit 100 causes the bucket 13 to perform tilting operation (Step SC1). When the bucket 13 tilts, the bucket angle θbk changes.
  • The traction force calculation unit 73 calculates the traction force F during the excavation work (Step SC2).
  • The weight calculation unit 81 acquires the density ρ from the characteristic storage unit 61 (Step SC3) .
  • The weight calculation unit 81 acquires the earth pressure coefficient K from the characteristic storage unit 61 (Step SC4).
  • The weight calculation unit 81 calculates the load height H based on the formula (7) (Step SC5).
  • The near-side load angle determination unit 82 determines whether the load height H is higher than the height of the spill guard end portion 13B (Step SC6).
  • If it is determined in Step SC6 that the load height H is higher than the height of the spill guard end portion 13B (Step SC6: Yes), then the near-side load angle determination unit 82 acquires the angle of repose θr from the characteristic storage unit 61 (Step SC7).
  • The near-side load angle determination unit 82 stores the bucket angle θbk (θbka) at the time of Step SC6. The near-side load angle determination unit 82 acquires a bucket angle θbk (θbkb) calculated by the bucket angle calculation unit 72 during the excavation work. The near-side load angle determination unit 82 counts the bucket angle increase amount Δθbk representing a difference between the bucket angle θbkb and the bucket angle θbka (Step SC8).
  • The near-side load angle determination unit 82 acquires the natural ground angle θg from the characteristic storage unit 61 (Step SC9).
  • The near-side load angle determination unit 82 determines whether the sum of the natural ground angle θg and the bucket angle increase amount Δθbk is smaller than the angle of repose θr (Step SC10).
  • If it is determined in Step SC10 that the sum of the natural ground angle θg and the bucket angle increase amount Δθbk is smaller than the angle of repose θr (Step SC10: Yes), then the near-side load angle determination unit 82 determines, as the near-side load angle Θ1, the sum of the natural ground angle θg and the bucket angle increase amount Δθbk (Step SC11).
  • If it is determined in Step SC10 that the sum of the natural ground angle θg and the bucket angle increase amount Δθbk is equal to or larger than the angle of repose θr (Step SC10: No), then the near-side load angle determination unit 82 determines, as the near-side load angle θ1, the angle of repose θr (Step SC12).
  • If it is determined in Step SC6 that the load height H is equal to or smaller than the height of the spill guard end portion 13B (Step SC6: No), then the near-side load angle determination unit 82 acquires the natural ground angle θg from the characteristic storage unit 61, and then determines, as the near-side load angle θ1, the natural ground angle θg (Step SC13).
  • The weight calculation unit 81 acquires the bucket angle θbk calculated by the bucket angle calculation unit 72 during the excavation work (Step SC14).
  • The weight calculation unit 81 acquires, as the bucket data, the bucket length L, the upper opening angle θsp, and the blade edge side opening angle θ3 from the bucket data storage unit 62 (Step SC15).
  • The weight calculation unit 81 calculates the load depth x based on the load height H calculated in Step SC5, the bucket angle θbk acquired in Step SC14, and the bucket data acquired in Step SC15 (Step SC16).
  • The weight calculation unit 81 calculates the void cross-sectional area A2 based on the formula (8) (Step SC17) .
  • The weight calculation unit 81 acquires the angle of repose θr from the characteristic storage unit 61. The weight calculation unit 81 determines, as the blade edge side load angle θ2, the angle of repose θr. In addition, the weight calculation unit 81 acquires the near-side load angle θ1 determined by the near-side load angle determination unit 82 based on the processing from Step SC6 to Step SC13 (Step SC18).
  • The weight calculation unit 81 calculates the load shape portion cross-sectional area A3 based on the formula (9) (Step SC19).
  • The weight calculation unit 81 calculates the load cross-sectional area Aa based on the formula (10) (Step SC20).
  • The weight calculation unit 81 acquires, as the bucket data, the bucket width B from the bucket data storage unit 62 (Step SC21).
  • The weight calculation unit 81 acquires the density ρ from the characteristic storage unit 61 (Step SC22) .
  • The weight calculation unit 81 calculates the weight Wa based on the load cross-sectional area Aa calculated in Step SC20, the bucket width B acquired in Step SC21, and the density ρ acquired in Step SC22. That is, after calculating the load cross-sectional area Aa in Step SC20, the weight calculation unit 81 calculates the weight Wa based on the formulas (3) and (4) (Step SC23).
  • The working equipment control unit 100 determines whether the difference between the weight Wa calculated in Step SC23 and the target weight Wr is equal to or less than a predetermined threshold (Step SC24).
  • If it is determined in Step SC24 that the difference between the weight Wa and the target weight Wr is equal to or less than the threshold, that is, if it is determined that the weight Wa and the target weight Wr match or approximate to each other (Step SC24: Yes), then the working equipment control unit 100 removes the bucket 13 from the natural ground 210 while the bucket angle θbk for a case where it is determined that the difference between the weight Wa and the target weight Wr is equal to or less than the threshold is maintained (Step SC25). After the bucket 13 is removed from the natural ground 210, the operator loads the excavated object 300 held by the bucket 13 onto the dump body 230.
  • If it is determined in Step SC24 that the difference between the weight Wa and the target weight Wr is not equal to or less than the threshold, that is, if it is determined that the weight Wa and the target weight Wr are different (Step SC24: No), then the working equipment control unit 100 continues the tilting operation of the bucket 13 (Step SC1).
  • [Effects]
  • As described above, in the embodiment, the weight calculation unit 81 can calculate the weight Wa of the excavated object 300 held by the bucket 13 based on the traction force F, the bucket angle θbk, and the bucket data. The weight calculation unit 81 can grasp, during the excavation work, the weight Wa of the excavated object 300 held by the bucket 13 after the excavation work. By grasping the weight Wa of the excavated object 300 during the excavation work, the working equipment control unit 100 can control the working equipment 6 during the excavation work so as to reduce the difference between the weight Wa and the target weight Wr. As a result, the weight Wa of the excavated object 300 with respect to the haul vehicle 220 is automatically adjusted, and the excavated object 300 with the target loading capacity is loaded onto the haul vehicle 220. Therefore, the loading work by the wheel loader 1 is optimized.
  • [Other Embodiments]
  • In the embodiment described above, the weight Wa of the excavated object 300 is measured by the weight sensor 34 provided in the wheel loader 1. The weight Wa of the excavated object 300 may be detected by a weight sensor provided in the haul vehicle 220. When the excavated object 300 is loaded onto the dump body 230 by the bucket 13, a load applied to the haul vehicle 220 changes. The weight sensor provided in the haul vehicle 220 detects a first load applied to the haul vehicle 220 before the excavated object 300 is loaded onto the dump body 230 and a second load applied to the haul vehicle 220 after the excavated object 300 is loaded onto the dump body 230. Detection data of the weight sensor provided in the haul vehicle 220 is transmitted to the controller 50 of the wheel loader 1. The weight Wa of the excavated object 300 held by the bucket 13 corresponds to a difference between the first load and the second load.
  • In the embodiment described above, the angle of repose θr is calculated based on the excavated object 300 held by the bucket 13. The angle of repose θr may be calculated based on the excavated object 300 not held by the bucket 13. For example, the angle of repose θr may be calculated in an experimental facility or an evaluation facility. In addition, in a case where the angle of repose θr is known, the processing of calculating the angle of repose θr may be omitted. It is only required that, before the excavation work, the angle of repose θr is stored in the characteristic storage unit 61.
  • In the embodiment described above, the loading machine 1 is described as being operated by an operator, but the present invention is not limited thereto. The loading machine 1 may be operated by a remote system. In this case, for example, a device having the function of the controller 50 and a remote operation device is provided at the remote control location.
  • In the embodiment described above, the loading machine 1 is a wheel loader. The loading machine 1 may be an excavator having front-loading working equipment. The loading machine 1 may be an excavator having backhoe working equipment in which an opening portion of a bucket faces backward during the excavation work.
  • Reference Signs List
    • 1 WHEEL LOADER (LOADING MACHINE)
    • 2 VEHICLE BODY
    • 3 POWER SOURCE
    • 4 CAB
    • 5 WHEEL
    • 5F FRONT WHEEL
    • 5R REAR WHEEL
    • 6 WORKING EQUIPMENT
    • 8 POWER TAKE OFF
    • 9 POWER TRANSMISSION DEVICE
    • 12 BOOM
    • 13 BUCKET
    • 13A BLADE EDGE PORTION
    • 13B SPILL GUARD END PORTION
    • 13C RIGHT END PORTION
    • 13D LEFT END PORTION
    • 13E LOAD CONTACT
    • 14 BELL CRANK
    • 15 BUCKET LINK
    • 16 BRACKET
    • 17 BRACKET
    • 18 LIFT CYLINDER
    • 19 BUCKET CYLINDER
    • 20 HYDRAULIC PUMP
    • 21 CONTROL VALVE
    • 22 OPERATIONAL DEVICE
    • 23 OPERATOR COMMAND DEVICE
    • 31 INCLINATION SENSOR
    • 32 BOOM ANGLE SENSOR
    • 33 BUCKET ANGLE SENSOR
    • 34 WEIGHT SENSOR
    • 35 ENGINE SPEED SENSOR
    • 37 PUMP PRESSURE SENSOR
    • 38 PUMP DISPLACEMENT SENSOR
    • 40 CONTROL SYSTEM
    • 50 CONTROLLER
    • 51 PROCESSOR
    • 52 MAIN MEMORY
    • 53 STORAGE
    • 54 INTERFACE
    • 61 CHARACTERISTIC STORAGE UNIT
    • 62 BUCKET DATA STORAGE UNIT
    • 71 DETECTION DATA ACQUISITION UNIT
    • 72 BUCKET ANGLE CALCULATION UNIT
    • 73 TRACTION FORCE CALCULATION UNIT
    • 81 WEIGHT CALCULATION UNIT
    • 82 NEAR-SIDE LOAD ANGLE DETERMINATION UNIT
    • 91 REPOSE ANGLE CALCULATION UNIT
    • 100 WORKING EQUIPMENT CONTROL UNIT
    • 131 BOTTOM PLATE PORTION
    • 132 BACK PLATE PORTION
    • 133 TOP PLATE PORTION
    • 134 RIGHT PLATE PORTION
    • 135 LEFT PLATE PORTION
    • 136 OPENING PORTION
    • 200 GROUND
    • 210 NATURAL GROUND (OBJECT TO BE EXCAVATED)
    • 220 HAUL VEHICLE
    • 230 DUMP BODY (LOADING TARGET)
    • 300 EXCAVATED OBJECT
    • 310 FIRST SURFACE
    • 320 SECOND SURFACE
    • 330 EXPOSED PART
    • 340 VOID
    • 350 UNFILLED PART
    • A1 EXPOSED PART CROSS-SECTIONAL AREA
    • A2 VOID CROSS-SECTIONAL AREA
    • A3 LOAD SHAPE PORTION CROSS-SECTIONAL AREA
    • A4 UNFILLED PART CROSS-SECTIONAL AREA
    • Aa LOAD CROSS-SECTIONAL AREA
    • Abk BUCKET CROSS-SECTIONAL AREA
    • AXa PIVOT
    • AXb PIVOT
    • AXc PIVOT
    • AXd PIVOT
    • AXe PIVOT
    • AXf PIVOT
    • B BUCKET WIDTH
    • CXf ROTATION AXIS
    • CXr ROTATION AXIS
    • F TRACTION FORCE
    • H LOAD HEIGHT
    • K EARTH PRESSURE COEFFICIENT
    • L BUCKET LENGTH
    • M1 ARROW
    • M2 ARROW
    • M3 ARROW
    • M4 ARROW
    • P EARTH PRESSURE
    • Va VOLUME
    • Wa WEIGHT
    • Wr TARGET WEIGHT
    • x LOAD DEPTH
    • θ1 NEAR-SIDE LOAD ANGLE
    • θ2 BLADE EDGE SIDE LOAD ANGLE
    • θ3 BLADE EDGE SIDE OPENING ANGLE
    • θa VEHICLE BODY INCLINATION ANGLE
    • θb BOOM ANGLE
    • θbk BUCKET ANGLE
    • θc BELL CRANK ANGLE
    • θg NATURAL GROUND ANGLE
    • θr ANGLE OF REPOSE
    • θsp UPPER OPENING ANGLE
    • ρ DENSITY
    • Δθbk BUCKET ANGLE INCREASE AMOUNT

Claims (9)

  1. A control system for controlling a loading machine including working equipment having a bucket, the control system comprising:
    a controller, wherein
    the controller
    calculates traction force of the loading machine during excavation work of excavating an object to be excavated with the bucket,
    acquires a bucket angle representing an angle of the bucket with respect to a horizontal plane during the excavation work, and
    calculates a weight of an excavated object, which is the object to be excavated, held by the bucket based on the traction force, the bucket angle, and bucket data indicating a shape and a dimension of the bucket.
  2. The control system according to claim 1, wherein
    the controller
    calculates a load height representing a height of the object to be excavated inside the bucket based on the traction force, and
    calculates a weight of the excavated object based on the load height.
  3. The control system according to claim 2, wherein
    the controller
    stores an earth pressure coefficient of the object to be excavated, and
    calculates the load height based on the traction force and the earth pressure coefficient.
  4. The control system according to any one of claims 1 to 3, wherein
    the loading machine excavates the object to be excavated with the bucket while moving forward,
    a surface of the excavated object includes a first surface that slopes upwardly toward a front, and a second surface that is connected to a front end of the first surface and slopes downwardly toward the front, and
    the controller
    calculates a weight of the excavated object based on a near-side load angle representing an angle of the first surface with respect to a horizontal plane and a blade edge side load angle representing an angle of the second surface with respect to the horizontal plane.
  5. The control system according to claim 4, wherein
    the controller
    stores an angle of repose of the object to be excavated, and
    the blade edge side load angle includes the angle of repose.
  6. The control system according to claim 5, wherein
    the controller
    calculates the angle of repose based on the excavated object held by the bucket, and
    stores the angle of repose calculated.
  7. The control system according to any one of claims 1 to 6, wherein
    the controller
    controls a posture of the working equipment such that the weight calculated becomes a target weight.
  8. A loading machine comprising:
    the control system according to any one of claims 1 to 7.
  9. A control method for controlling a loading machine including working equipment having a bucket, the control method comprising:
    calculating traction force of the loading machine during excavation work of excavating an object to be excavated with the bucket;
    calculating a bucket angle representing an angle of the bucket with respect to a horizontal plane during the excavation work; and
    calculating a weight of an excavated object, which is the object to be excavated, held by the bucket based on the traction force, the bucket angle, and bucket data indicating a shape and a dimension of the bucket.
EP23760089.5A 2022-02-28 2023-02-24 CONTROL SYSTEM, LOADER AND CONTROL METHOD Pending EP4442914A4 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2022030476A JP2023126037A (en) 2022-02-28 2022-02-28 Control system, loading machine, and control method
PCT/JP2023/006681 WO2023163090A1 (en) 2022-02-28 2023-02-24 Control system, loading machine, and control method

Publications (2)

Publication Number Publication Date
EP4442914A1 true EP4442914A1 (en) 2024-10-09
EP4442914A4 EP4442914A4 (en) 2025-11-12

Family

ID=87766069

Family Applications (1)

Application Number Title Priority Date Filing Date
EP23760089.5A Pending EP4442914A4 (en) 2022-02-28 2023-02-24 CONTROL SYSTEM, LOADER AND CONTROL METHOD

Country Status (5)

Country Link
US (1) US20250333930A1 (en)
EP (1) EP4442914A4 (en)
JP (1) JP2023126037A (en)
CN (1) CN118510968A (en)
WO (1) WO2023163090A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20260017466A (en) * 2023-09-26 2026-02-05 히다찌 겐끼 가부시키가이샤 work machine
JP2025127282A (en) * 2024-02-20 2025-09-01 株式会社小松製作所 Work machine, system including work machine, and method for controlling work machine

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6522441B2 (en) * 2015-06-29 2019-05-29 日立建機株式会社 Work support system for work machine
JP6915007B2 (en) 2015-08-24 2021-08-04 株式会社小松製作所 Wheel loader
EP4446501A3 (en) * 2017-03-22 2025-02-19 Sumitomo Heavy Industries, LTD. Shovel, and management device and support device for shovels
JP7091167B2 (en) * 2018-06-29 2022-06-27 株式会社小松製作所 Work machines and systems including work machines
JP7059309B2 (en) * 2020-01-15 2022-04-25 住友重機械工業株式会社 Excavator and excavator weight calculator

Also Published As

Publication number Publication date
CN118510968A (en) 2024-08-16
JP2023126037A (en) 2023-09-07
EP4442914A4 (en) 2025-11-12
WO2023163090A1 (en) 2023-08-31
US20250333930A1 (en) 2025-10-30

Similar Documents

Publication Publication Date Title
JP7461265B2 (en) Loading machine control system, loading machine, and loading machine control method
EP3733981B1 (en) Control device of working machine and control method of working machine
US20250333930A1 (en) Control system, loading machine, and control method
CN112601865B (en) Loading and unloading vehicles
EP3677882A1 (en) Work vehicle, system including work vehicle, and load weight calculation method for work vehicle
CN114174599A (en) Working vehicle
JP2020002694A (en) Work machine, and system including the same
WO2019181325A1 (en) Work machine, and system including work machine
JP7822200B2 (en) Control system, loading machine, and control method
US20250327273A1 (en) Control system, loading machine, and control method
US11753802B2 (en) Work machine and system including work machine
JP2022066469A (en) Shovel
JP7450526B2 (en) work vehicle
CN112639223B (en) Wheel loader
JP2011179180A (en) Construction vehicle having work machine
EP4379145A1 (en) Wheel loader
JP2025518692A (en) System for mitigating unintended movement of work machines
JP7830111B2 (en) Method for calculating the angle of repose of excavated material held in a bucket, system for calculating the angle of repose of excavated material held in a bucket, and loading machine
JP2026042380A (en) Systems, work machines, and methods
JP2025127282A (en) Work machine, system including work machine, and method for controlling work machine
JP2025127281A (en) Work machine, system including work machine, and method for controlling work machine
JP2026046089A (en) Working machinery

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20240701

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20251013

RIC1 Information provided on ipc code assigned before grant

Ipc: E02F 9/20 20060101AFI20251007BHEP