EP4437226A1 - An arrangement for extracting heat and a method thereof - Google Patents

An arrangement for extracting heat and a method thereof

Info

Publication number
EP4437226A1
EP4437226A1 EP22817644.2A EP22817644A EP4437226A1 EP 4437226 A1 EP4437226 A1 EP 4437226A1 EP 22817644 A EP22817644 A EP 22817644A EP 4437226 A1 EP4437226 A1 EP 4437226A1
Authority
EP
European Patent Office
Prior art keywords
extension module
heat
air
scavenge
scavenge air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP22817644.2A
Other languages
German (de)
French (fr)
Inventor
Torben MØRCH SØRENSEN
Henrik Rasmussen
Lars SKYTTE JORGENSEN
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alfa Laval Corporate AB
Original Assignee
Alfa Laval Corporate AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alfa Laval Corporate AB filed Critical Alfa Laval Corporate AB
Publication of EP4437226A1 publication Critical patent/EP4437226A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02BINTERNAL-COMBUSTION PISTON ENGINES; COMBUSTION ENGINES IN GENERAL
    • F02B29/00Engines characterised by provision for charging or scavenging not provided for in groups F02B25/00, F02B27/00 or F02B33/00 - F02B39/00; Details thereof
    • F02B29/04Cooling of air intake supply
    • F02B29/0406Layout of the intake air cooling or coolant circuit
    • F02B29/0412Multiple heat exchangers arranged in parallel or in series
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02BINTERNAL-COMBUSTION PISTON ENGINES; COMBUSTION ENGINES IN GENERAL
    • F02B29/00Engines characterised by provision for charging or scavenging not provided for in groups F02B25/00, F02B27/00 or F02B33/00 - F02B39/00; Details thereof
    • F02B29/04Cooling of air intake supply
    • F02B29/0406Layout of the intake air cooling or coolant circuit
    • F02B29/0437Liquid cooled heat exchangers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02BINTERNAL-COMBUSTION PISTON ENGINES; COMBUSTION ENGINES IN GENERAL
    • F02B37/00Engines characterised by provision of pumps driven at least for part of the time by exhaust
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02MSUPPLYING COMBUSTION ENGINES IN GENERAL WITH COMBUSTIBLE MIXTURES OR CONSTITUENTS THEREOF
    • F02M21/00Apparatus for supplying engines with non-liquid fuels, e.g. gaseous fuels stored in liquid form
    • F02M21/02Apparatus for supplying engines with non-liquid fuels, e.g. gaseous fuels stored in liquid form for gaseous fuels
    • F02M21/06Apparatus for de-liquefying, e.g. by heating
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/10Internal combustion engine [ICE] based vehicles
    • Y02T10/12Improving ICE efficiencies

Definitions

  • the invention relates to an arrangement for extracting heat.
  • the invention also relates to a method for extracting heat.
  • Marine engines powered by oil or gas are well known in the art.
  • Oil and gas fired boilers for marine steam production are also well known in the art.
  • the choice of fuel for the boiler operation is made in relation to the fuels selected for the marine engine operation.
  • the marine engine is powered by oil, the boiler is often powered by oil as well.
  • the marine engine and the boiler may be powered by different fuels.
  • One drawback with most of the marine engines of today is marine air pollution, especially in the form of carbon dioxide (CO2) being emitted from the marine engines when providing propulsion power. It is generally agreed that the CO2 emissions, as well as other greenhouse gas emissions, have to be decreased in view of environmental aspects.
  • CO2 carbon dioxide
  • exhaust gas recirculation typically involves installing a so-called scavenging air cooler.
  • the scavenging air cooler has the function of cooling the exhaust gas originating from the engine, by extracting heat from the exhaust gas before the exhaust gas going back to the engine as charge air and thereby recirculating the exhaust gas.
  • a drawback with this solution is that the heat being extracted from the exhaust gas by the scavenging air cooler is typically dumped into seawater and thereby the heat or energy is wasted.
  • document KR101358115 B1 discloses a waste heat recovering system including a working fluid system and a circulation water system.
  • the circulation water system is interconnected with the cooling water system of the engine.
  • An evaporator may be installed between the circulating water system and working fluid system which is arranged to exchange heat between circulating water and working fluid.
  • the working fluid may be supplied from the evaporator, to a scavenging air cooler.
  • the concept disclosed in KR101358115 B1 is a complex design involving several systems interconnected to each other at several points. This makes it cumbersome to build and it is complicated to control.
  • the prior art does not disclose an arrangement which make efficiently use of the extracted heat and which adequately addresses the set of design criteria of making it possible to reduce the heat being wasted, e.g. into seawater, and especially, the prior art does not disclose how to provide an overall robust arrangement which may be used in a convenient manner over time when it comes to meeting said set of design criteria.
  • an arrangement for extracting heat comprising: a scavenging air cooler being configured to receive scavenge air from a turbo charger and to extract heat from the scavenge air by a first cooling medium, wherein the first cooling medium is seawater, and thereby cooling the scavenge air, a first extension module being arranged after the scavenging air cooler and being configured to receive the cooled scavenge air from the scavenging air cooler and extract further heat from the cooled scavenge air and to vaporize liquified fuel into gaseous fuel by the extracted heat, wherein the gaseous fuel is supplied to an engine via a gaseous fuel outlet, and a connection between the first extension module and the engine configured to supply the further cooled scavenge air from the first extension module to the engine as charge air.
  • the engine is a marine engine powered by a gaseous fuel.
  • the fuel is ammonia or liquified natural gas (LNG).
  • the fuel may be any fuel that is stored as a liquid with the need of evaporation. This is advantageous as it uses a more environmentally friendly fuel, namely ammonia or LNG, for powering the engine compared to e.g. fossil oil-based fuels typically used today.
  • the ammonia fuel and the LNG-fuel are stored as liquified fuel since the liquified ammonia and LNG takes less space compared to gaseous ammonia and gaseous natural gas (NG) and thereby less storage space is needed.
  • the liquified fuel has to be transformed into gaseous fuel before being supplied to the engine.
  • This transformation from liquified fuel to gaseous fuel is provided or at least aided by the first extension module of the present disclosure.
  • the first extension module By introducing the first extension module after the scavenging air cooler, an arrangement which utilize the heat being extracted from the scavenge air for specific purposes instead of wasting it like today is achieved.
  • the extracted heat is used for vaporizing the liquified fuel before being supplied to the engine.
  • the arrangement may run in an exhaust gas recirculation (EGR) mode or in a non-exhaust gas recirculation (EGR) mode.
  • EGR exhaust gas recirculation
  • EGR exhaust gas recirculation
  • EGR exhaust gas recirculation
  • EGR exhaust gas recirculation
  • EGR non-exhaust gas recirculation
  • the turbo charger is arranged to discharge the exhaust gas and to receive fresh air.
  • the fresh air is supplied to the scavenging air cooler as scavenge air.
  • a portion of the exhaust gas may be mixed with the scavenge air.
  • the portion of exhaust gas may be mixed with the scavenge air before the scavenge air being received by the scavenge air cooler.
  • the portion of exhaust gas may be mixed with the scavenge air after the scavenge air cooler.
  • the portion of the exhaust gas may be mixed with the scavenge air after the arrangement.
  • the scavenge air may be clean scavenge air or a mixture of clean scavenge air and exhaust gas.
  • scavenge air may be referred to as charge air.
  • charge air charge air
  • charge air charge air
  • the scavenging air cooler is arranged for cooling the scavenge air such that the scavenge air may be used in an efficient way when being supplied to the first extension unit for vaporizing the liquified fuel.
  • the scavenging air cooler extract heat from the scavenge air by using the scavenge air as a first medium and the first cooling medium as a second medium.
  • the first cooling medium may be seawater, wherein the scavenging air cooler may be constantly cooled by the seawater.
  • the scavenging air cooler is inherently easy to control, is inherently robust in its design, and is inherently flexible in the sense that it is capable of extracting anything from small quantities of heat to large quantities of heat, since its basic component is a heat exchanger typically exchanging heat from the scavenge air to sea water.
  • the first extension module may be designed to be efficient within an operational span determined by the conceivable need of heat to vaporize the fuel for different engine loads. Thereby, the first extension module need not be designed to be able to handle all conceivable energy levels of the scavenge air.
  • the scavenge air cooler will in a sense act as a buffer protecting the first extension module. This makes it possible to reduce the operational span and thereby it is possible to reach a high efficiency of the first extension module. This in turn makes it possible to allow other modules to extract more heat from the scavenge air before it is provided to the first extension module.
  • the counter-intuitive positioning of the first extension module, which actively uses the heat in the scavenge air, after the scavenging air cooler, which actually simply removes heat in the scavenge air actually makes it possible to make more efficient use of the heat in the scavenge air.
  • the arrangement provides an efficient use of heat being extracted from the scavenge air.
  • the arrangement is further advantageous in that the cooled scavenge air, which has been cooled by both the scavenging air cooler and the first extension unit, being supplied to the engine as charge air.
  • the scavenge air comprises the mixture of clean scavenge air and exhaust gas, the exhaust gas of the scavenge air being recirculated to the engine but having a lower temperature than when being discharged from the engine.
  • the recirculated exhaust gas may, but preferably will, lead to a lower internal combustion temperature that leads to reduction in NOx particle emission.
  • the arrangement is yet further advantageous in that the scavenging air cooler and the first extension module is capable of cooling the scavenge air to a cooler temperature than a conventional scavenging air cooler.
  • the cooler charge air will comprise more oxygen which will lead to a more efficient combustion compared to when the conventional scavenging air cooler is used.
  • the term “after” may, but does not necessarily need to, mean that the first extension module is physically located after the scavenging air cooler. After is primarily intended to refer to a position as seen along the flow path of the scavenge air.
  • the first extension module is located after the scavenging air cooler as seen along the flow path of the scavenge air since the scavenge air supplied to the first extension module is scavenge air which has already passed the scavenging air cooler. If the first extension module is a module being physically separate from the scavenging air cooler, the first extension module may e.g. be located side by side with the scavenging air cooler or may even be located closer to the engine than the scavenging air cooler.
  • the first extension module may comprise a first heat exchanger configured to exchange heat from the scavenge air from the scavenging air cooler to the liquified fuel by using the scavenge air as a first medium and the liquified fuel as a second medium of the first heat exchanger.
  • the first heat exchanger may be a direct heat exchanger in which the given fuel is connected directly to the first heat exchanger. This provides a compact design in which the first heat exchanger is capable of extracting heat from the scavenge air in a controlled and efficient way. In this part of the arrangement, there is less heat to extract from the scavenge air compared to other parts, being arranged before the first extension module, of the arrangement.
  • the first heat exchanger is capable of making efficient use of the scavenge air by vaporizing the liquified fuel and by supplying the cooled gas as charge air to the engine using the scavenge air. There is no, or limited amount of, scavenge air which is wasted from the first heat exchanger.
  • the first heat exchanger is further advantageous in that it may replace a boiler, e.g. an oil-fired boiler, which may be comprised in conventional arrangement for vaporizing liquified fuel.
  • a boiler e.g. an oil-fired boiler
  • the amount of emission e.g. CO2 emissions, may be reduced.
  • the first heat exchanger is connected to a fuel tank from which the liquified fuel is supplied to the first heat exchanger.
  • the first heat exchanger is a plate heat exchanger, a shell heat exchanger, or a tube heat exchanger.
  • the first extension module may comprise a first and a second heat exchanger being interconnected in a heat exchange circuit and jointly exchanging heat from the scavenge air from the scavenging air cooler to the liquified fuel by using the scavenge air as a first medium of the first heat exchanger and by using the liquified fuel as a second medium of the second heat exchanger, and by using a common heat exchange medium as a second medium in the first heat exchanger and as a first medium in the second heat exchanger.
  • the first and second heat exchanger may form an indirect heat exchanger in which the first and second heat exchangers e.g. may be located side by side or the first heat exchanger may even be located closer to the scavenging air cooler and the second heat exchanger may even be located closer to the engine.
  • the first and second heat exchanger may be connected by a closed loop forming the heat exchanger circuit in which the common heat exchange medium may flow.
  • the common heat exchange medium is hot water, glycol, or a thermal fluid.
  • the common heat exchange medium that may be used may be based on which medium that gives the best heat transfer and performance in a given situation.
  • the second heat exchanger may be connected to the fuel tank from which the liquified fuel is supplied to the second heat exchanger.
  • the first heat exchanger may be capable of supplying the cooled scavenge air as charge air to the engine.
  • the second heat exchanger may be capable of vaporizing the liquified fuel by the extracted heat.
  • the first heat exchanger is a plate heat exchanger, shell heat exchanger or a tube heat exchanger.
  • the first heat exchanger may be an exhaust gas boiler.
  • the second heat exchanger is a plate heat exchanger, shell heat exchanger or a tube heat exchanger.
  • the first extension module may be integrated in the scavenging air cooler.
  • the first extension module may be integrated in a bottom part of the scavenging air cooler.
  • the first extension module may be integrated in a top part of the scavenging air cooler.
  • Integrated may refer to a case where the first extension module is integrated by the scavenging air cooler being formed of a set of heat exchanger plates and the first extension module being formed of a set of heat exchanger modules forming a common stack of heat exchanger plates.
  • the common stack may e.g. be brazed together or be clamped together by a set of endplates.
  • Integrated may also refer to a case where the first extension module is a self-contained module fixedly attached to the scavenging air cooler. In any case, this provides for a compact design.
  • the first extension module By integrating the first extension module in the bottom part of the scavenging air cooler provides for that the first extension module being arranged after the scavenging air cooler as seen along the flow of the scavenge air.
  • the bottom part of the scavenging air cooler may be referred to as an outlet of the scavenging air cooler. If the first extension module is integrated in the scavenging air cooler, the first extension module and the scavenging air cooler may be designed and produced as one unit.
  • the first extension module may be separated from and arranged in series with and connected to the scavenging air cooler via a first exhaust gas supply line being configured to receive the cooled scavenge air from the scavenging air cooler and to supply the cooled scavenge air to the first extension module.
  • This provides for a flexible design which e.g. may be used to provide a compact and efficient design of the first extension module.
  • This e.g. facilities a design where the first extension module comprises a first heat exchanger configured to exchange heat from the scavenge air from the scavenging air cooler to the liquified fuel by using the scavenge air as a first medium and the liquified fuel as a second medium of the first heat exchanger.
  • the first extension module may be connected directly to the scavenging air cooler.
  • the first extension module may be connected with a flexible hose or by a tubing to the scavenging air cooler.
  • the first extension module may be connected with scavenge air funnel to the scavenging air cooler.
  • the separation allows the connection between the first extension module and the scavenging air cooler to be based on ship building practice, which in turn facilitates maintenance. It should be noted that other kinds of connections between the first extension module and the scavenging air cooler may be possible as well, as long as the connection is capable of allowing the scavenge air to flow from the scavenging air cooler to the first extension module.
  • the first extension module is separated from the scavenging air cooler, the first extension module and the scavenging air cooler may be designed and produced as separated units.
  • the arrangement may further comprise a second extension module being arranged before the scavenging air cooler and being configured to extract heat from the scavenge air and supply the cooled scavenge air to the scavenging air cooler.
  • the second extension module may be capable of extracting as much heat as possible from the scavenge air.
  • the second extension module is capable of extracting larger quantities of heat compared to the first extension module. This is further advantageous in that the less heat the scavenging air cooler has to extract, the less heat may need to be dumped into e.g. the seawater.
  • the second extension module is advantageous in that the extracted energy is utilized for beneficial purposes even further.
  • the second extension module to the arrangement provides for that the scavenge air may be cooled more than the arrangement without the second extension module without having to dump to much heat into the sea. This is advantageous in that the charge air will comprise more oxygen which will lead to a more efficient combustion compared to when the second extension module is excluded.
  • the term “before” may, but does not necessarily need to, mean that the second extension module is physically located before the scavenging air cooler. Before is primarily intended to refer to a position as seen along the flow path of the scavenge air.
  • the second extension module is located before the scavenging air cooler as seen along the flow path of the scavenge air since the scavenge air supplied to the second extension module is scavenge air which has not passed the scavenging air cooler yet. If the second extension module is a module being physically separate from the scavenging air cooler, the second extension module may e.g. be located side by side with the scavenging air cooler or may even be located further from the engine than the scavenging air cooler.
  • the first extension module and the second extension module may be arranged in connection. If that is the case, both the first and second extension modules are arranged before the scavenging air cooler.
  • the second extension module may be connected to a heat-to-power conversion arrangement configured to convert heat extracted from the scavenge air by the second extension module into power.
  • the heat-to-power conversion arrangement may be any kind of arrangement configured to transfer heat into power. Preferably, it is a system comprising a medium circulating in a circuit comprising an evaporator, condenser, and a compressor with the evaporator extracting heat from the scavenge air.
  • the heat-to-power conversion arrangement is an Organic Rankine Cycle (ORC). This is advantageous in that the heat extracted by the second extension module may be used as power, e.g. electrical energy. It is desirous to transfer as much heat energy as possible and thereby to produce as much electrical energy as possible.
  • the second extension module may be running continuously with the engine.
  • the second extension module may be closed or shut off, if the power is not needed. In which way the second extension module is running depends on the ship design and the operational profile of the ship.
  • the second extension module makes efficient use of the scavenge air, namely by producing electrical energy by using the heat-to-power conversion arrangement.
  • the second extension module may comprise a third heat exchanger.
  • the third heat exchanger may be configured to extract heat from the scavenge air originating from the engine. If the heat exchanger is connected to the heat-to-power conversion arrangement, the scavenge air may be used as a first medium and the medium circulating in the circuit as a second medium of the third heat exchanger.
  • the medium circulating in the circuit is hot water, glycol, or thermal fluid.
  • the third heat exchanger is a plate heat exchanger, shell heat exchanger or a tube heat exchanger.
  • the second extension module may be integrated in, preferably in a top part of, the scavenging air cooler.
  • Integrated may refer to a case where the second extension module is integrated by the scavenging air cooler being formed of a set of heat exchanger plates and the first extension module being formed of a set of heat exchanger plates forming a common stack of heat exchanger plates.
  • the common stack may e.g. be brazed together or be clamped together by a set of endplates.
  • Integrated may also refer to a case where the second extension module is a self-contained module fixedly attached to the scavenging air cooler. In any case, this provides for a compact design.
  • the second extension module By integrating the second extension module in the top part of the scavenging air cooler provides for that the second extension module being arranged before the scavenging air cooler as seen along the flow of the scavenge air.
  • the top part of the scavenging air cooler may be referred to as an inlet of the scavenging air cooler.
  • the second extension module is integrated in the scavenging air cooler, the second extension module and the scavenging air cooler may be designed and produced as one unit.
  • the second extension module may be separated from and arranged in series with and connected to the scavenging air cooler via a second scavenge air supply line being configured to supply the cooled scavenge air from the second extension module to the scavenging air cooler.
  • This provides for a flexible design which e.g. may be used to provide a compact and efficient design of the second extension module.
  • This e.g. facilities a design where the second extension module comprises a third heat exchanger configured to exchange heat from the scavenge air originating from the engine to a third cooling medium by using the scavenge air as a first medium and the third cooling medium as a second medium of the third heat exchanger.
  • the second extension module may be connected directly to the scavenging air cooler.
  • the second extension module may be connected with a flexible hose or tubing to the scavenging air cooler.
  • the second extension module may be connected with a scavenge air funnel to the scavenging air cooler.
  • connection between the second extension module and the scavenging air cooler may be based on ship building practice. It should be noted that other connections between the first extension module and the scavenging air cooler may be possible as well. If the second extension module is separated from the scavenging air cooler, the second extension module and the scavenging air cooler may be designed and produced as different units.
  • the above-mentioned object has also been achieved in accordance with a method for extracting heat, the method comprising: supplying the scavenge air from a turbo charger to a scavenging air cooler, extracting heat from the scavenge air in the scavenging air cooler by a first cooling medium, wherein the first cooling medium is seawater, and thereby cooling the scavenge air, supplying the cooled scavenge air from the scavenging air cooler to a first extension module, extracting heat from the cooled scavenge air in the first extension module by a second cooling medium, vaporizing liquified fuel into gaseous fuel by the extracted heat in the first extension module, supplying the gaseous fuel from the first extension module to an engine via a gaseous fuel outlet, and supplying the further cooled scavenge air from the first extension module to the engine as charge air.
  • the arrangement is preferably placed onboard a ship.
  • the method is preferably performed onboard a ship.
  • neither the arrangement, nor the method is limited to be used onboard a ship. This may e.g. be the case, apart from ships, in other marine applications. It may e.g. be platforms, such as platforms of the kind used for drilling for oil or gas.
  • the arrangement and method may also be useful for land-based applications.
  • the arrangement and method may e.g. be used for logging or mining applications.
  • first, second and third such as e.g. used when referring to a first cooling medium, a second cooling medium, and a third cooling medium, are intended to act as labels allowing the reader to make a distinction between them.
  • the different cooling media referred to form part of different cooling circuits.
  • the first, second, and/or third cooling mediums may, but need not, be of the same kind. It may also be noted that although different embodiments may involve different number of cooling medium circuits, the same cooling medium is provided with the same label throughout the description although some embodiments do not include all the intervening labels.
  • Figure 1 discloses an engine process comprising an arrangement for extracting heat.
  • Figure 2 discloses a first embodiment of the arrangement disclosed in Fig. 1 for extracting heat.
  • Figure 3 discloses a second embodiment of the arrangement disclosed in Fig. 1 for extracting heat.
  • Figure 4 discloses a third embodiment of the arrangement disclosed in Fig. 1 for extracting heat.
  • Figure 5 discloses a fourth embodiment of the arrangement disclosed in Fig. 1 for extracting heat.
  • Figure 6 discloses a flow chart illustrating a method for extracting heat.
  • the engine process 100 comprises an engine 102, an exhaust gas receiver 104, and a turbo charger 106.
  • the engine process 100 further comprises an arrangement 200 for extracting heat from scavenge air.
  • the arrangement 200 is discussed in further detail in connection with Figs 2-5. It should be noted that engine process may be designed in various way.
  • the engine 102 is connected to the exhaust gas receiver 104 by a first supply line 112.
  • the exhaust gas receiver 104 may be referred to as forming part of engine 102.
  • the exhaust gas receiver 104 is connected to the turbo charger 106 by a second supply line 114.
  • the turbo charger 106 is connected to the arrangement 200 by a third supply line 116.
  • the first supply line 112 may be connected to the third supply line 116 by a fourth supply line 118, also referred to as an exhaust gas recirculation EGR supply line.
  • the engine process 100 may comprise more than one EGR supply line.
  • the turbo charger 106 is arranged to receive exhaust gas from the exhaust gas receiver 104 via the second supply line 114.
  • the turbo charger 106 is arranged to be driven by exhaust gas received from the exhaust gas receiver 104.
  • the turbo charger 106 may have an air inlet 126a and an exhaust gas outlet 126b.
  • the turbo charger 106 may be arranged to receive fresh air via the air inlet 126a.
  • the turbo charger 106 may be arranged to discharge exhaust gas from the turbo charger 106 via the exhaust gas outlet 126b.
  • the fresh air may be referred to as scavenge air.
  • the scavenge air may comprise clean scavenge air (i.e. , fresh air) or may be a mixture of clean scavenge air and a portion of exhaust gas.
  • the exhaust gas may be mixed with the fresh scavenge air before the scavenge air is supplied the arrangement 200 via the fourth supply line 118 (or any other EGR supply line).
  • the exhaust gas may be mixed with the scavenge air after the arrangement 200.
  • the scavenge air may be clean scavenge air or a mixture of clean scavenge air and exhaust gas.
  • the exhaust gas may be introduced to the clean scavenge air via supply lines arranged to introduce the exhaust gas to the clean scavenge air before or after the scavenge air is supplied to the arrangement 200.
  • the arrangement 200 is connected to a scavenging air receiver 110 by a fifth supply line 120.
  • the scavenging air receiver 110 may also be referred to as forming part of the engine 102. Throughout the figures 2-5, the scavenging air receiver 210 is not illustrated but should be understood to be a part of the engine 102 and positioned as shown in figure 1 . The scavenging air receiver 110 may act as a storage place from which the engine 102 may receive air when needed.
  • the EGR supply line 118 forms an exhaust gas recirculation EGR of the engine process 100.
  • the purpose of the exhaust gas recirculation EGR of the engine process 100 is to reduce nitrogen oxides, also known as NOx.
  • the engine process 100 may be configured to run in an exhaust gas recirculation EGR mode in which the exhaust gas is supplied to the arrangement 200 via the EGR supply line 118.
  • the purpose of running the engine process 100 in the EGR mode is to recirculate a portion, approximately 30-50%, of exhaust gas in the engine process 100.
  • By recirculating the exhaust gas the peak combustion temperature in the engine 102 may be reduced. Reducing the peak combustion temperature in the engine 102 is advantageous in that the formation of NOx particles may be reduced.
  • the engine process 100 may be configured to run in a non-exhaust gas recirculation mode in which no exhaust gas is mixed with the scavenge air.
  • the arrangement 200 is configured to extract heat from the scavenge air.
  • the scavenge air being supplied to the arrangement 200 has a temperature of 200-450°C.
  • the scavenge air temperature may vary from arrangement to arrangement and/or from engine process to engine process.
  • the first cooling medium outlet 212b is arranged to discharge the first cooling medium from the scavenging air cooler 210 when heat has been exchanged between the first and second cooling medium.
  • the scavenging air cooler 210 may be continuously cooled by the first cooling medium.
  • the first cooling medium is seawater.
  • the first cooling medium inlet 212a is configured to supply seawater to the scavenging air cooler 210 and the first cooling medium outlet 212b is configured to discharge the seawater which has been heated by extracting heat from the scavenge air by.
  • seawater By using seawater as a cooling medium for the scavenging air cooler 210 is well- known in the art according to normal ship building practise.
  • the arrangement 200 further comprises a first extension module 220.
  • the first extension module 220 is arranged after, as seen along the flow of the scavenge air, the scavenging air cooler 210.
  • the first extension module 220 is configured to receive the cooled scavenge air from the scavenging air cooler 210.
  • the first extension module 220 is configured to extract further heat from the cooled scavenge air by a second cooling medium and thereby cooling the scavenge air even further.
  • the first extension module 220 may be configured to supply the further cooled scavenge air to the engine 102 as charge air via a connection 225 between the first extension module 220 and the engine 102 via the scavenging air receiver 110.
  • the charge air being supplied to the engine 102 has a temperature of less than 40°C.
  • the suitable temperature of the charge air may vary depending on type of engine 102.
  • the first extension module 220 may comprise a liquified fuel inlet 221a configured to connect the first extension module 220 and a storage tank 224.
  • the storage tank 224 may be arranged to store liquified fuel which may be used as fuel for the engine 102.
  • the liquified fuel may be supplied to the first extension module 220 via the liquified fuel inlet 221a.
  • the first extension module 220 is configured to vaporize the liquified fuel into gaseous fuel by the extracted heat from the scavenge air.
  • the first extension module 220 may further comprise a gaseous fuel outlet 221b configured to connect the first extension module 220 and the engine 102.
  • the first extension module 220 is configured to supply the gaseous fuel to the engine 102 via the gaseous fuel outlet 221 b. This is advantageous in that the engine 102 should typically be powered by the gaseous fuel. However, the fuel is stored as liquified fuel as the liquified fuel typically takes less space, and thus need less storage space, compared to the gaseous fuel.
  • the engine 102 is in Figs. 2-5 indicated as two small boxes.
  • the first extension module 220 typically comprises two outlets being connected to the engine 102; the connection 225 configured to supply the charge air to the engine 102 and the gaseous fuel outlet 221 b configured to supply the gaseous fuel to the engine 102.
  • the connection 225 is typically connected to the scavenging air receiver 110 of the engine 102.
  • the connection 221 b is typically connected to a fuel supply system of the engine 102.
  • the first extension module 220 may comprise a first heat exchanger 222.
  • the first heat exchanger 222 may be configured to receive the cooled scavenge air from the scavenging air cooler 210.
  • the first heat exchanger 222 may be configured to exchange heat from the cooled scavenge air to the liquified fuel by using the cooled scavenge air as a first medium and the liquified fuel as a second medium of the first heat exchanger 222. Thereby, the first heat exchanger 222 is configured to extract heat from the cooled scavenge air and thus cool the scavenge air even further.
  • the first heat exchanger 222 comprises the liquified fuel inlet 221a and the gaseous fuel outlet 221b as discussed above.
  • the first heat exchanger 222 is configured to supply the further cooled scavenge air to the engine 102 as charge air via the connection 225 between the first heat exchanger 222 and the engine 102.
  • the first heat exchanger 222 is configured to supply the gaseous fuel to the engine 102 via the gaseous fuel outlet 221 b.
  • the first heat exchanger 222 may be a plate heat exchanger, a shell heat exchanger, or a tube heat exchanger.
  • the first extension module 220 may comprise a boiler configured to produce steam by scavenge air which is used for vaporizing the liquified fuel.
  • the first extension module 220 may comprise a first heat exchanger 222a and a second heat exchanger 222b.
  • the first and second heat exchanger 222a, 222b may be interconnected in a heat exchange circuit and jointly exchanging heat from the scavenge air from the scavenging air cooler 210 to the liquified fuel.
  • the scavenge air may be used as a first medium of the first heat exchanger 222a and the liquified fuel may be used as a second medium of the second heat exchanger 222b.
  • the second cooling medium may be a common heat exchange medium interconnecting the two heat exchangers 222a, 222b.
  • the common heat exchange medium may be used as a second medium in the first heat exchanger 222a and as a first medium in the second heat exchanger 222b.
  • the first heat exchanger 222a may be configured to exchange heat from the scavenge air from the scavenging air cooler 210 to the common heat exchange medium by using the scavenge air as the first medium and the common heat exchange medium as the second medium of the first heat exchanger 222a.
  • the second heat exchanger 222b may be configured to exchange heat from the common heat exchange medium from the first heat exchanger 222a to the liquified fuel by using the common heat exchange medium as the first medium and the liquified fuel as the second medium of the second heat exchanger 222b.
  • the second heat exchanger 222b comprises the liquified fuel inlet 221a and the gaseous fuel outlet 221 b as discussed above.
  • the first heat exchanger 222a is configured to supply the further cooled scavenge air to the engine 102 as charge air via the connection 225 between the first heat exchanger 222a and the engine 102.
  • the first heat exchanger 222a may comprise a heat exchanger inlet 226a and a heat exchanger outlet 226b which both are configured to interconnect the first and the second heat exchanger 222a, 222b.
  • the heat exchanger inlet 226a is configured to supply a common heat exchange medium from the second heat exchanger 222b to the first heat exchanger 222a.
  • the heat exchanger outlet 226b is configured to supply common heat exchange medium from the first heat exchanger 222a to the second heat exchanger 222b.
  • the common heat exchange medium supplied from the first heat exchanger 222a to the second heat exchanger 222b may have an increased temperature compared to the common heat exchange medium being supplied the other way. This is due to that the common heat exchanger medium has removed heat from the scavenge air in the first heat exchanger 222a.
  • the first and second heat exchangers 222, 222a, 222b is made of stainless steel, or the like, which is capable of taking fuels of certain characteristics such that LNG or ammonia which may be harsh on materials.
  • the purpose of the arrangement 200 is to extract as much energy as possible from the scavenge air and to utilize the extracted energy for specific purposes.
  • the purpose of the scavenging air cooler 210 is to cool the scavenge air to such an extent that the first extension module 220 is on one hand able to further cool the scavenge air to provide the charge air at a desired temperature and on the other hand use the heat in the scavenge air to evaporate the fuel.
  • the scavenging air cooler 210 and the first extension module 220 is designed depending on the amount of energy that should be extracted from the scavenge air.
  • the first extension module 220 has a dimensioning cooling capacity based on the desired evaporation of the fuel. This may also be referred to as a heat removal capacity of the first extension module 220.
  • the SAC is dimensioned and controlled to extract any heat form the scavenge air exceeding this heat removal capacity.
  • the arrangement may further comprise a second extension module 230.
  • the second extension module 230 may be arranged before, as seen along the flow of the scavenge air, the scavenging air cooler 210.
  • the second extension module 230 may be configured to extract heat from the scavenge air originating from the engine by a third cooling medium and thereby cooling the scavenge air.
  • the second extension module 230 may be configured to supply the cooled scavenge air to the scavenging air cooler 210.
  • first extension module 220 and the second extension module 230 may be connected. If that is the case, the first and second extension modules 220, 230 are arranged before, as seen along the flow of the scavenge air, the scavenging air cooler 210.
  • the second extension module 230 may comprise a third heat exchanger 232.
  • the third heat exchanger 232 may be configured to receive the scavenge air originating from the engine 102.
  • the second heat exchanger 232 may be configured to exchange heat from the scavenge air to the third cooling medium by using the scavenge air as a first medium and the third cooling medium as a second medium of the third heat exchanger 232.
  • the second heat exchanger 232 is configured to extract heat from the scavenge air and thus cool the scavenge air.
  • the third cooling medium is hot water, glycol, steam, or thermal fluid.
  • the second extension module 230 may be connected to a heat-to- power conversion arrangement 234.
  • the heat-to-power conversion arrangement 234 is configured to convert heat extracted from the scavenge air by the second extension module 230 into power.
  • the second extension module 230 and the heat-to-power conversion arrangement 234 may be connected as a circuit in which the third cooling medium is circulating.
  • the second extension module 230 may comprise a second extension module inlet 236a and a second extension module outlet 236b which both are configured to connect the second extension module 230 and the heat-to-power conversion arrangement 234.
  • the second extension module inlet 236a is configured to supply the third cooling medium from the heat-to-power conversion arrangement 234 to the second extension module 230.
  • the second extension module outlet 236b is configured to supply the third cooling medium from the second extension module 230 to the heat-to-power conversion arrangement 234.
  • the third cooling medium supplied from the second extension module 230 to the heat-to-power conversion arrangement 234 may have an increased temperature compared to the third cooling medium being supplied the other way. This is due to that the third cooling medium has removed heat from the scavenge air in the second extension module 230 and due to the third cooling medium having lost heat to the heat- to-power conversion arrangement 234.
  • the heat-to-power conversion arrangement 234 is an Organic Rankine Cycle ORC.
  • the arrangement may comprise a further heat exchanger being arranged between the second extension module 230 and the heat-to-power conversion arrangement 234.
  • This design is possible if the second extension module 230 is an economizer that produces steam. The steam produced by the economizer is thereafter received by the further heat exchanger which in turn is operating in relation to the heat-to-power conversion arrangement 234 as discussed above.
  • the second extension module 230 may be configured to run in a cleaning mode.
  • the cleaning mode is capable of removing particles which may be stuck on the second extension module 230 as a consequence of running the engine process 100 in the EGR mode.
  • the particles may be present in the scavenge air and may be stuck in the second extension module 230.
  • the particles are stuck in the upper part of the second extension module 230.
  • the particles may be stuck in other parts of the second extension module 230 as well, but typically in some part of the second extension module 230.
  • the cleaning mode may be performed with pressurized water, pressurized steam, or pressurized air being supplied through nozzles and thereby more or less blowing away the particles.
  • the cleaning mode may run continuously together with the engine 102.
  • the cleaning mode may run in sequences in predetermined periods. By running the cleaning mode in sequences, the power consumption to the cleaning mode may be reduced compared to continuously running the cleaning mode.
  • the water used for blowing the particles away has to be captured by a water capture 230a and directed away from the second extension module 230, to avoid water going into the engine 102.
  • the water may be captured and directed by using guide vanes and/or channels and/or by a build-in demister.
  • the biggest water droplets in the second extension module 230 should be captured in the water capture 230a, wherein the smaller water droplets may be evaporated by the scavenging air cooler 210 or the first extension module 220 such that water free charge air is supplied to the engine 102.
  • the cleaning mode may run with the heat and power arrangement 234.
  • the cleaning mode may run as a stand-alone function.
  • the second extension module 230 may comprise a replaceable top layer 230b.
  • the replaceable top layer 230b may be designed such that it easily may be taken in and out.
  • the replaceable top layer 230b may be replaced with a clean top layer.
  • the replaceable top layer 230a may be cleaned manually before being put back.
  • the replaceable top layer may be designed in an optimal size to catch most particles.
  • the replaceable top layer 230b may be integrated in, preferably in a top part of, the second extension module 230.
  • the replaceable top layer 230b may be separated from and arranged in series with and connected to the second extension module 230.
  • the replaceable top layer when referring to the replaceable top layer, it means that it is not needed to replace top entire heat exchanger, if the second extension module 230 comprises the third heat exchanger 232, but only a top section where the particles are stuck. Thus, it may be a plug and play cartridge.
  • the second extension module 230 is configured to extract as much energy as possible from the scavenge air to the heat-to-power conversion arrangement 234. However, it is preferred that there is still left heat sufficient to evaporate the fuel in the first extension module 220.
  • the scavenging air cooler 210 and the first extension module 220 may have a smaller size, being able to extract less energy from the scavenge air, compared to the design in which the second extension module 230 is excluded, as discussed above.
  • the first extension module 220 is integrated in the scavenging air cooler 210.
  • the second extension module 230 is integrated in the scavenging air cooler 210.
  • Integrated may refer to a case where the first and/or second extension module is integrated by the scavenging air cooler such that the first and/or second extension module and the scavenging air cooler is formed as one unit.
  • the first extension module 220 is separated from the scavenging air cooler 210.
  • the first extension module 220 is arranged in series with the scavenging air cooler 210.
  • the first extension module 220 is connected to the scavenging air cooler 210.
  • the first extension module 220 may be connected to the scavenging air cooler 210 via a first scavenge air supply line 211 .
  • the first scavenge air supply line 211 may be configured to receive the cooled scavenge air from the scavenging air cooler 210 and to supply the cooled scavenge air to the first extension module 220.
  • the second extension module 230 is separated from the scavenging air cooler 210.
  • the second extension module 230 is arranged in series with the scavenging air cooler 210.
  • the second extension module 230 is connected to the scavenging air cooler 210.
  • the second extension module 230 may be connected to the scavenging air cooler 210 via a second scavenge air supply line 231 .
  • the second scavenge air supply line 211 may be configured to supply the cooled scavenge air to the scavenging air cooler 210 from the second extension module 220.
  • FIG. 6 a flow chart illustrating a method 600 for extracting heat is illustrated by way of example.
  • a first step S602 of the method 600 may be to supply scavenge air from a turbo charger 106 to the scavenging air cooler 210.
  • heat may be extracted from the scavenge air in the scavenging air cooler 210 by a first cooling medium and thereby cooling the scavenge air.
  • the first cooling medium is seawater which continuously cools the scavenging air cooler 210.
  • the cooled scavenge air may be supplied from the scavenging air cooler 210 to the first extension module 220.
  • heat may be extracted from the cooled scavenge air in the first extension module 220 by a second cooling medium.
  • the second cooling medium may be the fuel in case there is one heat exchanger directly transferring heat from the scavenge air to the fuel or may be a separate medium interconnecting two heat exchangers.
  • the liquified fuel may be vaporized into gaseous fuel by the extracted heat in the first extension module 220.
  • the gaseous fuel may be supplied from the first extension module 220 to the engine 102 via the gaseous fuel outlet 221 b.
  • the further cooled scavenge air may be supplied from the first extension module 220 to the engine 102 as charge air.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Exhaust-Gas Circulating Devices (AREA)

Abstract

An arrangement (200) for extracting heat, and a related method (600), in which a scavenging air cooler (210) being configured to receive scavenge air from a turbo charger (106) and to extract heat from the scavenge air by a first cooling medium and thereby cooling the scavenge air, a first extension module (220) being arranged after the scavenging air cooler (210) and being configured to receive the cooled scavenge air from the scavenging air cooler (210) and extract further heat from the cooled scavenge air and to vaporize liquified fuel into gaseous fuel by the extracted heat, wherein the gaseous fuel is supplied to the engine (102), and a connection (225) between the first extension module (220) and the engine (102) configured to supply the further cooled scavenge air from the first extension module (220) to an engine (102) as charge air.

Description

AN ARRANGEMENT FOR EXTRACTING HEAT AND A METHOD THEREOF
Field of the invention
The invention relates to an arrangement for extracting heat.
The invention also relates to a method for extracting heat.
Background art
Marine engines powered by oil or gas are well known in the art. Oil and gas fired boilers for marine steam production are also well known in the art. Usually, the choice of fuel for the boiler operation is made in relation to the fuels selected for the marine engine operation. Thus, if the marine engine is powered by oil, the boiler is often powered by oil as well. However, the marine engine and the boiler may be powered by different fuels. One drawback with most of the marine engines of today is marine air pollution, especially in the form of carbon dioxide (CO2) being emitted from the marine engines when providing propulsion power. It is generally agreed that the CO2 emissions, as well as other greenhouse gas emissions, have to be decreased in view of environmental aspects. As a solution, it is today well known to reduce emissions by introducing exhaust gas recirculation on ships having combustion engines as power source for the propulsion. The provision of exhaust gas recirculation typically involves installing a so-called scavenging air cooler. The scavenging air cooler has the function of cooling the exhaust gas originating from the engine, by extracting heat from the exhaust gas before the exhaust gas going back to the engine as charge air and thereby recirculating the exhaust gas.
A drawback with this solution is that the heat being extracted from the exhaust gas by the scavenging air cooler is typically dumped into seawater and thereby the heat or energy is wasted.
In an attempt to address some parts of this issue, document KR101358115 B1 discloses a waste heat recovering system including a working fluid system and a circulation water system. The circulation water system is interconnected with the cooling water system of the engine. An evaporator may be installed between the circulating water system and working fluid system which is arranged to exchange heat between circulating water and working fluid. The working fluid may be supplied from the evaporator, to a scavenging air cooler. However, the concept disclosed in KR101358115 B1 is a complex design involving several systems interconnected to each other at several points. This makes it cumbersome to build and it is complicated to control.
However, as will be explained below, the prior art does not disclose an arrangement which make efficiently use of the extracted heat and which adequately addresses the set of design criteria of making it possible to reduce the heat being wasted, e.g. into seawater, and especially, the prior art does not disclose how to provide an overall robust arrangement which may be used in a convenient manner over time when it comes to meeting said set of design criteria.
Summary of the disclosure
It is an object of the disclosure to provide an arrangement which make efficiently use of the extracted heat and which adequately addresses the set of design criteria of making it possible to reduce the heat being wasted, e.g. into seawater. It is also an object to provide an arrangement which is robust.
This object has been achieved by an arrangement for extracting heat, the arrangement comprising: a scavenging air cooler being configured to receive scavenge air from a turbo charger and to extract heat from the scavenge air by a first cooling medium, wherein the first cooling medium is seawater, and thereby cooling the scavenge air, a first extension module being arranged after the scavenging air cooler and being configured to receive the cooled scavenge air from the scavenging air cooler and extract further heat from the cooled scavenge air and to vaporize liquified fuel into gaseous fuel by the extracted heat, wherein the gaseous fuel is supplied to an engine via a gaseous fuel outlet, and a connection between the first extension module and the engine configured to supply the further cooled scavenge air from the first extension module to the engine as charge air.
Preferably, the engine is a marine engine powered by a gaseous fuel. Preferably, the fuel is ammonia or liquified natural gas (LNG). However, the fuel may be any fuel that is stored as a liquid with the need of evaporation. This is advantageous as it uses a more environmentally friendly fuel, namely ammonia or LNG, for powering the engine compared to e.g. fossil oil-based fuels typically used today. Preferably, the ammonia fuel and the LNG-fuel are stored as liquified fuel since the liquified ammonia and LNG takes less space compared to gaseous ammonia and gaseous natural gas (NG) and thereby less storage space is needed. As the engine is designed to be powered by gaseous fuel, the liquified fuel has to be transformed into gaseous fuel before being supplied to the engine. This transformation from liquified fuel to gaseous fuel is provided or at least aided by the first extension module of the present disclosure. By introducing the first extension module after the scavenging air cooler, an arrangement which utilize the heat being extracted from the scavenge air for specific purposes instead of wasting it like today is achieved. Thus, the extracted heat is used for vaporizing the liquified fuel before being supplied to the engine.
The arrangement may run in an exhaust gas recirculation (EGR) mode or in a non-exhaust gas recirculation (EGR) mode. In both the EGR mode and the non-EGR mode, exhaust gas which originates from the engine, is used to drive the turbo charger. The turbo charger is arranged to discharge the exhaust gas and to receive fresh air. The fresh air is supplied to the scavenging air cooler as scavenge air. When the arrangement operates in the EGR mode, a portion of the exhaust gas may be mixed with the scavenge air. The portion of exhaust gas may be mixed with the scavenge air before the scavenge air being received by the scavenge air cooler. The portion of exhaust gas may be mixed with the scavenge air after the scavenge air cooler. The portion of the exhaust gas may be mixed with the scavenge air after the arrangement. Thus, in this context, the scavenge air may be clean scavenge air or a mixture of clean scavenge air and exhaust gas. It should further be noted that scavenge air may be referred to as charge air. Thus, it should be understood by the skilled person that charge air and scavenge air may be referred to the same type of air. Although the term scavenge air is used herein, the term charge air is equally applicable.
The scavenging air cooler is arranged for cooling the scavenge air such that the scavenge air may be used in an efficient way when being supplied to the first extension unit for vaporizing the liquified fuel. Preferably, the scavenging air cooler extract heat from the scavenge air by using the scavenge air as a first medium and the first cooling medium as a second medium. Typically, the first cooling medium may be seawater, wherein the scavenging air cooler may be constantly cooled by the seawater.
Introducing the first extension module after the scavenging air cooler facilitates design and control of the first extension module. The scavenging air cooler is inherently easy to control, is inherently robust in its design, and is inherently flexible in the sense that it is capable of extracting anything from small quantities of heat to large quantities of heat, since its basic component is a heat exchanger typically exchanging heat from the scavenge air to sea water. Thereby, the first extension module may be designed to be efficient within an operational span determined by the conceivable need of heat to vaporize the fuel for different engine loads. Thereby, the first extension module need not be designed to be able to handle all conceivable energy levels of the scavenge air. The scavenge air cooler will in a sense act as a buffer protecting the first extension module. This makes it possible to reduce the operational span and thereby it is possible to reach a high efficiency of the first extension module. This in turn makes it possible to allow other modules to extract more heat from the scavenge air before it is provided to the first extension module. Thus, the counter-intuitive positioning of the first extension module, which actively uses the heat in the scavenge air, after the scavenging air cooler, which actually simply removes heat in the scavenge air, actually makes it possible to make more efficient use of the heat in the scavenge air. Thus, the arrangement provides an efficient use of heat being extracted from the scavenge air.
The arrangement is further advantageous in that the cooled scavenge air, which has been cooled by both the scavenging air cooler and the first extension unit, being supplied to the engine as charge air. If the scavenge air comprises the mixture of clean scavenge air and exhaust gas, the exhaust gas of the scavenge air being recirculated to the engine but having a lower temperature than when being discharged from the engine. In addition, the recirculated exhaust gas may, but preferably will, lead to a lower internal combustion temperature that leads to reduction in NOx particle emission.
The arrangement is yet further advantageous in that the scavenging air cooler and the first extension module is capable of cooling the scavenge air to a cooler temperature than a conventional scavenging air cooler. This is advantageous in that the cooler charge air will comprise more oxygen which will lead to a more efficient combustion compared to when the conventional scavenging air cooler is used.
It may in this context be noted that the term “after” may, but does not necessarily need to, mean that the first extension module is physically located after the scavenging air cooler. After is primarily intended to refer to a position as seen along the flow path of the scavenge air. The first extension module is located after the scavenging air cooler as seen along the flow path of the scavenge air since the scavenge air supplied to the first extension module is scavenge air which has already passed the scavenging air cooler. If the first extension module is a module being physically separate from the scavenging air cooler, the first extension module may e.g. be located side by side with the scavenging air cooler or may even be located closer to the engine than the scavenging air cooler.
The first extension module may comprise a first heat exchanger configured to exchange heat from the scavenge air from the scavenging air cooler to the liquified fuel by using the scavenge air as a first medium and the liquified fuel as a second medium of the first heat exchanger. The first heat exchanger may be a direct heat exchanger in which the given fuel is connected directly to the first heat exchanger. This provides a compact design in which the first heat exchanger is capable of extracting heat from the scavenge air in a controlled and efficient way. In this part of the arrangement, there is less heat to extract from the scavenge air compared to other parts, being arranged before the first extension module, of the arrangement. The first heat exchanger is capable of making efficient use of the scavenge air by vaporizing the liquified fuel and by supplying the cooled gas as charge air to the engine using the scavenge air. There is no, or limited amount of, scavenge air which is wasted from the first heat exchanger.
The first heat exchanger is further advantageous in that it may replace a boiler, e.g. an oil-fired boiler, which may be comprised in conventional arrangement for vaporizing liquified fuel. By being able to replace the boiler, the amount of emission, e.g. CO2 emissions, may be reduced.
Preferably, the first heat exchanger is connected to a fuel tank from which the liquified fuel is supplied to the first heat exchanger. Preferably, the first heat exchanger is a plate heat exchanger, a shell heat exchanger, or a tube heat exchanger.
The first extension module may comprise a first and a second heat exchanger being interconnected in a heat exchange circuit and jointly exchanging heat from the scavenge air from the scavenging air cooler to the liquified fuel by using the scavenge air as a first medium of the first heat exchanger and by using the liquified fuel as a second medium of the second heat exchanger, and by using a common heat exchange medium as a second medium in the first heat exchanger and as a first medium in the second heat exchanger.
The first and second heat exchanger may form an indirect heat exchanger in which the first and second heat exchangers e.g. may be located side by side or the first heat exchanger may even be located closer to the scavenging air cooler and the second heat exchanger may even be located closer to the engine. This provides a flexible design. This further provides a better control and regulation of the extracted heat. The first and second heat exchanger may be connected by a closed loop forming the heat exchanger circuit in which the common heat exchange medium may flow. Preferably, the common heat exchange medium is hot water, glycol, or a thermal fluid. The common heat exchange medium that may be used may be based on which medium that gives the best heat transfer and performance in a given situation.
Preferably, the second heat exchanger may be connected to the fuel tank from which the liquified fuel is supplied to the second heat exchanger. The first heat exchanger may be capable of supplying the cooled scavenge air as charge air to the engine. The second heat exchanger may be capable of vaporizing the liquified fuel by the extracted heat.
Preferably, the first heat exchanger is a plate heat exchanger, shell heat exchanger or a tube heat exchanger. The first heat exchanger may be an exhaust gas boiler. Preferably, the second heat exchanger is a plate heat exchanger, shell heat exchanger or a tube heat exchanger.
The first extension module may be integrated in the scavenging air cooler.
The first extension module may be integrated in a bottom part of the scavenging air cooler. The first extension module may be integrated in a top part of the scavenging air cooler. Integrated may refer to a case where the first extension module is integrated by the scavenging air cooler being formed of a set of heat exchanger plates and the first extension module being formed of a set of heat exchanger modules forming a common stack of heat exchanger plates. The common stack may e.g. be brazed together or be clamped together by a set of endplates. Integrated may also refer to a case where the first extension module is a self-contained module fixedly attached to the scavenging air cooler. In any case, this provides for a compact design.
By integrating the first extension module in the bottom part of the scavenging air cooler provides for that the first extension module being arranged after the scavenging air cooler as seen along the flow of the scavenge air. The bottom part of the scavenging air cooler may be referred to as an outlet of the scavenging air cooler. If the first extension module is integrated in the scavenging air cooler, the first extension module and the scavenging air cooler may be designed and produced as one unit.
The first extension module may be separated from and arranged in series with and connected to the scavenging air cooler via a first exhaust gas supply line being configured to receive the cooled scavenge air from the scavenging air cooler and to supply the cooled scavenge air to the first extension module.
This provides for a flexible design which e.g. may be used to provide a compact and efficient design of the first extension module. This e.g. facilities a design where the first extension module comprises a first heat exchanger configured to exchange heat from the scavenge air from the scavenging air cooler to the liquified fuel by using the scavenge air as a first medium and the liquified fuel as a second medium of the first heat exchanger.
The first extension module may be connected directly to the scavenging air cooler. The first extension module may be connected with a flexible hose or by a tubing to the scavenging air cooler. The first extension module may be connected with scavenge air funnel to the scavenging air cooler. The separation allows the connection between the first extension module and the scavenging air cooler to be based on ship building practice, which in turn facilitates maintenance. It should be noted that other kinds of connections between the first extension module and the scavenging air cooler may be possible as well, as long as the connection is capable of allowing the scavenge air to flow from the scavenging air cooler to the first extension module.
If the first extension module is separated from the scavenging air cooler, the first extension module and the scavenging air cooler may be designed and produced as separated units.
The arrangement may further comprise a second extension module being arranged before the scavenging air cooler and being configured to extract heat from the scavenge air and supply the cooled scavenge air to the scavenging air cooler. This provides for an efficient and flexible design in which the scavenge air is cooled before being supplied to the scavenging air cooler. The second extension module may be capable of extracting as much heat as possible from the scavenge air. Preferably, the second extension module is capable of extracting larger quantities of heat compared to the first extension module. This is further advantageous in that the less heat the scavenging air cooler has to extract, the less heat may need to be dumped into e.g. the seawater. Thus, the second extension module is advantageous in that the extracted energy is utilized for beneficial purposes even further.
Introducing the second extension module to the arrangement provides for that the scavenge air may be cooled more than the arrangement without the second extension module without having to dump to much heat into the sea. This is advantageous in that the charge air will comprise more oxygen which will lead to a more efficient combustion compared to when the second extension module is excluded.
It may in this context be noted that the term “before” may, but does not necessarily need to, mean that the second extension module is physically located before the scavenging air cooler. Before is primarily intended to refer to a position as seen along the flow path of the scavenge air. The second extension module is located before the scavenging air cooler as seen along the flow path of the scavenge air since the scavenge air supplied to the second extension module is scavenge air which has not passed the scavenging air cooler yet. If the second extension module is a module being physically separate from the scavenging air cooler, the second extension module may e.g. be located side by side with the scavenging air cooler or may even be located further from the engine than the scavenging air cooler.
The first extension module and the second extension module may be arranged in connection. If that is the case, both the first and second extension modules are arranged before the scavenging air cooler.
The second extension module may be connected to a heat-to-power conversion arrangement configured to convert heat extracted from the scavenge air by the second extension module into power. The heat-to-power conversion arrangement may be any kind of arrangement configured to transfer heat into power. Preferably, it is a system comprising a medium circulating in a circuit comprising an evaporator, condenser, and a compressor with the evaporator extracting heat from the scavenge air. Most preferably the heat-to-power conversion arrangement is an Organic Rankine Cycle (ORC). This is advantageous in that the heat extracted by the second extension module may be used as power, e.g. electrical energy. It is desirous to transfer as much heat energy as possible and thereby to produce as much electrical energy as possible. The second extension module may be running continuously with the engine. The second extension module may be closed or shut off, if the power is not needed. In which way the second extension module is running depends on the ship design and the operational profile of the ship. Thus, by connecting the second extension module to the heat-to-power conversion arrangement, the second extension module makes efficient use of the scavenge air, namely by producing electrical energy by using the heat-to-power conversion arrangement.
The second extension module may comprise a third heat exchanger. The third heat exchanger may be configured to extract heat from the scavenge air originating from the engine. If the heat exchanger is connected to the heat-to-power conversion arrangement, the scavenge air may be used as a first medium and the medium circulating in the circuit as a second medium of the third heat exchanger. Preferably, the medium circulating in the circuit is hot water, glycol, or thermal fluid. Preferably, the third heat exchanger is a plate heat exchanger, shell heat exchanger or a tube heat exchanger.
The second extension module may be integrated in, preferably in a top part of, the scavenging air cooler.
Integrated may refer to a case where the second extension module is integrated by the scavenging air cooler being formed of a set of heat exchanger plates and the first extension module being formed of a set of heat exchanger plates forming a common stack of heat exchanger plates. The common stack may e.g. be brazed together or be clamped together by a set of endplates. Integrated may also refer to a case where the second extension module is a self-contained module fixedly attached to the scavenging air cooler. In any case, this provides for a compact design.
By integrating the second extension module in the top part of the scavenging air cooler provides for that the second extension module being arranged before the scavenging air cooler as seen along the flow of the scavenge air. The top part of the scavenging air cooler may be referred to as an inlet of the scavenging air cooler.
If the second extension module is integrated in the scavenging air cooler, the second extension module and the scavenging air cooler may be designed and produced as one unit.
The second extension module may be separated from and arranged in series with and connected to the scavenging air cooler via a second scavenge air supply line being configured to supply the cooled scavenge air from the second extension module to the scavenging air cooler.
This provides for a flexible design which e.g. may be used to provide a compact and efficient design of the second extension module. This e.g. facilities a design where the second extension module comprises a third heat exchanger configured to exchange heat from the scavenge air originating from the engine to a third cooling medium by using the scavenge air as a first medium and the third cooling medium as a second medium of the third heat exchanger. The second extension module may be connected directly to the scavenging air cooler. The second extension module may be connected with a flexible hose or tubing to the scavenging air cooler. The second extension module may be connected with a scavenge air funnel to the scavenging air cooler. The connection between the second extension module and the scavenging air cooler may be based on ship building practice. It should be noted that other connections between the first extension module and the scavenging air cooler may be possible as well. If the second extension module is separated from the scavenging air cooler, the second extension module and the scavenging air cooler may be designed and produced as different units.
The above-mentioned object has also been achieved in accordance with a method for extracting heat, the method comprising: supplying the scavenge air from a turbo charger to a scavenging air cooler, extracting heat from the scavenge air in the scavenging air cooler by a first cooling medium, wherein the first cooling medium is seawater, and thereby cooling the scavenge air, supplying the cooled scavenge air from the scavenging air cooler to a first extension module, extracting heat from the cooled scavenge air in the first extension module by a second cooling medium, vaporizing liquified fuel into gaseous fuel by the extracted heat in the first extension module, supplying the gaseous fuel from the first extension module to an engine via a gaseous fuel outlet, and supplying the further cooled scavenge air from the first extension module to the engine as charge air.
The further different preferred embodiments mentioned above in relation to the arrangement are equally applicable to the method.
The arrangement is preferably placed onboard a ship. The method is preferably performed onboard a ship. However, it may be noted that neither the arrangement, nor the method, is limited to be used onboard a ship. This may e.g. be the case, apart from ships, in other marine applications. It may e.g. be platforms, such as platforms of the kind used for drilling for oil or gas. The arrangement and method may also be useful for land-based applications. The arrangement and method may e.g. be used for logging or mining applications.
Generally, all terms used in the claims are to be interpreted according to their ordinary meaning in the technical field, unless explicitly defined otherwise herein. All references to "a/an/the [element, device, component, means, step, etc.]" are to be interpreted openly as referring to at least one instance of said element, device, component, means, step, etc., unless explicitly stated otherwise. The steps of any method disclosed herein do not have to be performed in the exact order disclosed, unless explicitly stated.
It may in this context be noted that first, second and third, such as e.g. used when referring to a first cooling medium, a second cooling medium, and a third cooling medium, are intended to act as labels allowing the reader to make a distinction between them. The different cooling media referred to form part of different cooling circuits. The first, second, and/or third cooling mediums may, but need not, be of the same kind. It may also be noted that although different embodiments may involve different number of cooling medium circuits, the same cooling medium is provided with the same label throughout the description although some embodiments do not include all the intervening labels.
Brief Description of the Drawings
The above, as well as additional objects, features and advantages of the present disclosure, will be better understood through the following illustrative and non-limiting detailed description of preferred embodiments of the present disclosure, with reference to the appended drawings, where the same reference numerals will be used for similar elements, wherein:
Figure 1 discloses an engine process comprising an arrangement for extracting heat.
Figure 2 discloses a first embodiment of the arrangement disclosed in Fig. 1 for extracting heat.
Figure 3 discloses a second embodiment of the arrangement disclosed in Fig. 1 for extracting heat.
Figure 4 discloses a third embodiment of the arrangement disclosed in Fig. 1 for extracting heat.
Figure 5 discloses a fourth embodiment of the arrangement disclosed in Fig. 1 for extracting heat. Figure 6 discloses a flow chart illustrating a method for extracting heat.
Description of Embodiments
The present disclosure will now be described more fully hereinafter with reference to the accompanying drawings, in which currently preferred embodiments of the disclosure are shown. This disclosure may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein; rather, these embodiments are provided for thoroughness and completeness, and fully convey the scope of the disclosure to the skilled person. It should also be noted that, although not illustrated, the arrangement may comprise additional valves, control signal transmitters, flow meters, circulation pumps and other similar components according to relevant rules and legislations and normal ship building practice. The provision of such additional components is routine matter for a person skilled in the art and the inclusion of all such components would render the schematic drawings unclear.
With reference to figure 1 , there is disclosed an engine process 100 according to the present disclosure. The engine process 100 comprises an engine 102, an exhaust gas receiver 104, and a turbo charger 106. The engine process 100 further comprises an arrangement 200 for extracting heat from scavenge air. The arrangement 200 is discussed in further detail in connection with Figs 2-5. It should be noted that engine process may be designed in various way.
The engine 102 is connected to the exhaust gas receiver 104 by a first supply line 112. The exhaust gas receiver 104 may be referred to as forming part of engine 102. The exhaust gas receiver 104 is connected to the turbo charger 106 by a second supply line 114. The turbo charger 106 is connected to the arrangement 200 by a third supply line 116. The first supply line 112 may be connected to the third supply line 116 by a fourth supply line 118, also referred to as an exhaust gas recirculation EGR supply line. Although not illustrated, the engine process 100 may comprise more than one EGR supply line. The turbo charger 106 is arranged to receive exhaust gas from the exhaust gas receiver 104 via the second supply line 114. The turbo charger 106 is arranged to be driven by exhaust gas received from the exhaust gas receiver 104. The turbo charger 106 may have an air inlet 126a and an exhaust gas outlet 126b. The turbo charger 106 may be arranged to receive fresh air via the air inlet 126a. The turbo charger 106 may be arranged to discharge exhaust gas from the turbo charger 106 via the exhaust gas outlet 126b. The fresh air may be referred to as scavenge air. The scavenge air may comprise clean scavenge air (i.e. , fresh air) or may be a mixture of clean scavenge air and a portion of exhaust gas. The exhaust gas may be mixed with the fresh scavenge air before the scavenge air is supplied the arrangement 200 via the fourth supply line 118 (or any other EGR supply line). The exhaust gas may be mixed with the scavenge air after the arrangement 200. Thus, the scavenge air may be clean scavenge air or a mixture of clean scavenge air and exhaust gas. Although not illustrated, the exhaust gas may be introduced to the clean scavenge air via supply lines arranged to introduce the exhaust gas to the clean scavenge air before or after the scavenge air is supplied to the arrangement 200. The arrangement 200 is connected to a scavenging air receiver 110 by a fifth supply line 120. The scavenging air receiver 110 may also be referred to as forming part of the engine 102. Throughout the figures 2-5, the scavenging air receiver 210 is not illustrated but should be understood to be a part of the engine 102 and positioned as shown in figure 1 . The scavenging air receiver 110 may act as a storage place from which the engine 102 may receive air when needed.
The EGR supply line 118 forms an exhaust gas recirculation EGR of the engine process 100. The purpose of the exhaust gas recirculation EGR of the engine process 100 is to reduce nitrogen oxides, also known as NOx. The engine process 100 may be configured to run in an exhaust gas recirculation EGR mode in which the exhaust gas is supplied to the arrangement 200 via the EGR supply line 118. The purpose of running the engine process 100 in the EGR mode is to recirculate a portion, approximately 30-50%, of exhaust gas in the engine process 100. By recirculating the exhaust gas the peak combustion temperature in the engine 102 may be reduced. Reducing the peak combustion temperature in the engine 102 is advantageous in that the formation of NOx particles may be reduced. The engine process 100 may be configured to run in a non-exhaust gas recirculation mode in which no exhaust gas is mixed with the scavenge air.
With reference to Figs 2-5, the arrangement 200 introduced in connection with Fig. 1 is illustrated and discussed in further detail. The arrangement 200 is configured to extract heat from the scavenge air. Typically, the scavenge air being supplied to the arrangement 200 has a temperature of 200-450°C. The scavenge air temperature may vary from arrangement to arrangement and/or from engine process to engine process.
The arrangement 200 comprises a scavenging air cooler 210. The scavenging air cooler 210 is configured to extract heat from the scavenge air by a first cooling medium and thereby cooling the scavenge air. The scavenge air may be used as a first medium and the first cooling medium may be used as a second medium of the scavenging air cooler 210. The scavenging air cooler 210 may comprise a first cooling medium inlet 212a and a first cooling medium outlet 212b. The first cooling medium inlet 212a is arranged to supply the first cooling medium to the scavenging air cooler 210. The first cooling medium outlet 212b is arranged to discharge the first cooling medium from the scavenging air cooler 210 when heat has been exchanged between the first and second cooling medium. The scavenging air cooler 210 may be continuously cooled by the first cooling medium. Preferably, the first cooling medium is seawater. In that case, the first cooling medium inlet 212a is configured to supply seawater to the scavenging air cooler 210 and the first cooling medium outlet 212b is configured to discharge the seawater which has been heated by extracting heat from the scavenge air by. By using seawater as a cooling medium for the scavenging air cooler 210 is well- known in the art according to normal ship building practise.
The arrangement 200 further comprises a first extension module 220. The first extension module 220 is arranged after, as seen along the flow of the scavenge air, the scavenging air cooler 210. The first extension module 220 is configured to receive the cooled scavenge air from the scavenging air cooler 210. The first extension module 220 is configured to extract further heat from the cooled scavenge air by a second cooling medium and thereby cooling the scavenge air even further. The first extension module 220 may be configured to supply the further cooled scavenge air to the engine 102 as charge air via a connection 225 between the first extension module 220 and the engine 102 via the scavenging air receiver 110. Preferably, the charge air being supplied to the engine 102 has a temperature of less than 40°C. However, the suitable temperature of the charge air may vary depending on type of engine 102.
The first extension module 220 may comprise a liquified fuel inlet 221a configured to connect the first extension module 220 and a storage tank 224. The storage tank 224 may be arranged to store liquified fuel which may be used as fuel for the engine 102. The liquified fuel may be supplied to the first extension module 220 via the liquified fuel inlet 221a. The first extension module 220 is configured to vaporize the liquified fuel into gaseous fuel by the extracted heat from the scavenge air. The first extension module 220 may further comprise a gaseous fuel outlet 221b configured to connect the first extension module 220 and the engine 102. The first extension module 220 is configured to supply the gaseous fuel to the engine 102 via the gaseous fuel outlet 221 b. This is advantageous in that the engine 102 should typically be powered by the gaseous fuel. However, the fuel is stored as liquified fuel as the liquified fuel typically takes less space, and thus need less storage space, compared to the gaseous fuel.
It may in this context be noted that the engine 102 is in Figs. 2-5 indicated as two small boxes. The first extension module 220 typically comprises two outlets being connected to the engine 102; the connection 225 configured to supply the charge air to the engine 102 and the gaseous fuel outlet 221 b configured to supply the gaseous fuel to the engine 102. The connection 225 is typically connected to the scavenging air receiver 110 of the engine 102. The connection 221 b is typically connected to a fuel supply system of the engine 102. The first extension module 220 may comprise a first heat exchanger 222. The first heat exchanger 222 may be configured to receive the cooled scavenge air from the scavenging air cooler 210. The first heat exchanger 222 may be configured to exchange heat from the cooled scavenge air to the liquified fuel by using the cooled scavenge air as a first medium and the liquified fuel as a second medium of the first heat exchanger 222. Thereby, the first heat exchanger 222 is configured to extract heat from the cooled scavenge air and thus cool the scavenge air even further. Preferably, the first heat exchanger 222 comprises the liquified fuel inlet 221a and the gaseous fuel outlet 221b as discussed above. Preferably, the first heat exchanger 222 is configured to supply the further cooled scavenge air to the engine 102 as charge air via the connection 225 between the first heat exchanger 222 and the engine 102. Preferably, the first heat exchanger 222 is configured to supply the gaseous fuel to the engine 102 via the gaseous fuel outlet 221 b. The first heat exchanger 222 may be a plate heat exchanger, a shell heat exchanger, or a tube heat exchanger. Alternatively, the first extension module 220 may comprise a boiler configured to produce steam by scavenge air which is used for vaporizing the liquified fuel.
With reference to Fig. 4, the first extension module 220 may comprise a first heat exchanger 222a and a second heat exchanger 222b. The first and second heat exchanger 222a, 222b may be interconnected in a heat exchange circuit and jointly exchanging heat from the scavenge air from the scavenging air cooler 210 to the liquified fuel. The scavenge air may be used as a first medium of the first heat exchanger 222a and the liquified fuel may be used as a second medium of the second heat exchanger 222b. The second cooling medium may be a common heat exchange medium interconnecting the two heat exchangers 222a, 222b. The common heat exchange medium may be used as a second medium in the first heat exchanger 222a and as a first medium in the second heat exchanger 222b.
Thus, the first heat exchanger 222a may be configured to exchange heat from the scavenge air from the scavenging air cooler 210 to the common heat exchange medium by using the scavenge air as the first medium and the common heat exchange medium as the second medium of the first heat exchanger 222a. The second heat exchanger 222b may be configured to exchange heat from the common heat exchange medium from the first heat exchanger 222a to the liquified fuel by using the common heat exchange medium as the first medium and the liquified fuel as the second medium of the second heat exchanger 222b. Preferably, the second heat exchanger 222b comprises the liquified fuel inlet 221a and the gaseous fuel outlet 221 b as discussed above. Preferably, the first heat exchanger 222a is configured to supply the further cooled scavenge air to the engine 102 as charge air via the connection 225 between the first heat exchanger 222a and the engine 102.
The first heat exchanger 222a may comprise a heat exchanger inlet 226a and a heat exchanger outlet 226b which both are configured to interconnect the first and the second heat exchanger 222a, 222b. The heat exchanger inlet 226a is configured to supply a common heat exchange medium from the second heat exchanger 222b to the first heat exchanger 222a. The heat exchanger outlet 226b is configured to supply common heat exchange medium from the first heat exchanger 222a to the second heat exchanger 222b. The common heat exchange medium supplied from the first heat exchanger 222a to the second heat exchanger 222b may have an increased temperature compared to the common heat exchange medium being supplied the other way. This is due to that the common heat exchanger medium has removed heat from the scavenge air in the first heat exchanger 222a.
Preferably, the first and second heat exchangers 222, 222a, 222b is made of stainless steel, or the like, which is capable of taking fuels of certain characteristics such that LNG or ammonia which may be harsh on materials.
As said above, the purpose of the arrangement 200 is to extract as much energy as possible from the scavenge air and to utilize the extracted energy for specific purposes. The purpose of the scavenging air cooler 210 is to cool the scavenge air to such an extent that the first extension module 220 is on one hand able to further cool the scavenge air to provide the charge air at a desired temperature and on the other hand use the heat in the scavenge air to evaporate the fuel. Preferably, the scavenging air cooler 210 and the first extension module 220 is designed depending on the amount of energy that should be extracted from the scavenge air. The first extension module 220 has a dimensioning cooling capacity based on the desired evaporation of the fuel. This may also be referred to as a heat removal capacity of the first extension module 220. The SAC is dimensioned and controlled to extract any heat form the scavenge air exceeding this heat removal capacity.
With reference to Fig. 3, but as also illustrated in Figs 4 and 5, the arrangement may further comprise a second extension module 230. The second extension module 230 may be arranged before, as seen along the flow of the scavenge air, the scavenging air cooler 210. The second extension module 230 may be configured to extract heat from the scavenge air originating from the engine by a third cooling medium and thereby cooling the scavenge air. The second extension module 230 may be configured to supply the cooled scavenge air to the scavenging air cooler 210.
Although not illustrated, the first extension module 220 and the second extension module 230 may be connected. If that is the case, the first and second extension modules 220, 230 are arranged before, as seen along the flow of the scavenge air, the scavenging air cooler 210.
Referring back to Fig. 4, the second extension module 230 may comprise a third heat exchanger 232. The third heat exchanger 232 may be configured to receive the scavenge air originating from the engine 102. The second heat exchanger 232 may be configured to exchange heat from the scavenge air to the third cooling medium by using the scavenge air as a first medium and the third cooling medium as a second medium of the third heat exchanger 232. Thereby, the second heat exchanger 232 is configured to extract heat from the scavenge air and thus cool the scavenge air. Preferably, the third cooling medium is hot water, glycol, steam, or thermal fluid.
The second extension module 230 may be connected to a heat-to- power conversion arrangement 234. The heat-to-power conversion arrangement 234 is configured to convert heat extracted from the scavenge air by the second extension module 230 into power. The second extension module 230 and the heat-to-power conversion arrangement 234 may be connected as a circuit in which the third cooling medium is circulating. The second extension module 230 may comprise a second extension module inlet 236a and a second extension module outlet 236b which both are configured to connect the second extension module 230 and the heat-to-power conversion arrangement 234. The second extension module inlet 236a is configured to supply the third cooling medium from the heat-to-power conversion arrangement 234 to the second extension module 230. The second extension module outlet 236b is configured to supply the third cooling medium from the second extension module 230 to the heat-to-power conversion arrangement 234. The third cooling medium supplied from the second extension module 230 to the heat-to-power conversion arrangement 234 may have an increased temperature compared to the third cooling medium being supplied the other way. This is due to that the third cooling medium has removed heat from the scavenge air in the second extension module 230 and due to the third cooling medium having lost heat to the heat- to-power conversion arrangement 234. Preferably, the heat-to-power conversion arrangement 234 is an Organic Rankine Cycle ORC.
Although not illustrated, the arrangement may comprise a further heat exchanger being arranged between the second extension module 230 and the heat-to-power conversion arrangement 234. This design is possible if the second extension module 230 is an economizer that produces steam. The steam produced by the economizer is thereafter received by the further heat exchanger which in turn is operating in relation to the heat-to-power conversion arrangement 234 as discussed above.
Referring back to Fig. 3, when the engine process 100 is configured to run in the EGR mode, the second extension module 230 may be configured to run in a cleaning mode. The cleaning mode is capable of removing particles which may be stuck on the second extension module 230 as a consequence of running the engine process 100 in the EGR mode. The particles may be present in the scavenge air and may be stuck in the second extension module 230. Typically, the particles are stuck in the upper part of the second extension module 230. However, the particles may be stuck in other parts of the second extension module 230 as well, but typically in some part of the second extension module 230. The cleaning mode may be performed with pressurized water, pressurized steam, or pressurized air being supplied through nozzles and thereby more or less blowing away the particles. The cleaning mode may run continuously together with the engine 102. The cleaning mode may run in sequences in predetermined periods. By running the cleaning mode in sequences, the power consumption to the cleaning mode may be reduced compared to continuously running the cleaning mode.
The water used for blowing the particles away has to be captured by a water capture 230a and directed away from the second extension module 230, to avoid water going into the engine 102. The water may be captured and directed by using guide vanes and/or channels and/or by a build-in demister. Herein, the biggest water droplets in the second extension module 230 should be captured in the water capture 230a, wherein the smaller water droplets may be evaporated by the scavenging air cooler 210 or the first extension module 220 such that water free charge air is supplied to the engine 102.
The cleaning mode may run with the heat and power arrangement 234. The cleaning mode may run as a stand-alone function.
Alternatively, the second extension module 230 may comprise a replaceable top layer 230b. This may provide a quick solution of removing particles when particle clogging scenario may occur. The replaceable top layer 230b may be designed such that it easily may be taken in and out. The replaceable top layer 230b may be replaced with a clean top layer. The replaceable top layer 230a may be cleaned manually before being put back. The replaceable top layer may be designed in an optimal size to catch most particles. The replaceable top layer 230b may be integrated in, preferably in a top part of, the second extension module 230. The replaceable top layer 230b may be separated from and arranged in series with and connected to the second extension module 230. It should be noted that, when referring to the replaceable top layer, it means that it is not needed to replace top entire heat exchanger, if the second extension module 230 comprises the third heat exchanger 232, but only a top section where the particles are stuck. Thus, it may be a plug and play cartridge.
When the arrangement 200 comprises the first and the second extension module 220, 230 as well as the scavenging air cooler 210, the second extension module 230 is configured to extract as much energy as possible from the scavenge air to the heat-to-power conversion arrangement 234. However, it is preferred that there is still left heat sufficient to evaporate the fuel in the first extension module 220. Preferably, with this design, the scavenging air cooler 210 and the first extension module 220 may have a smaller size, being able to extract less energy from the scavenge air, compared to the design in which the second extension module 230 is excluded, as discussed above.
With reference to figure 5, a compact embodiment of the arrangement 200 is illustrated in further detail. In Fig. 5, the first extension module 220 is integrated in the scavenging air cooler 210. Alternatively, or in combination, the second extension module 230 is integrated in the scavenging air cooler 210. Integrated may refer to a case where the first and/or second extension module is integrated by the scavenging air cooler such that the first and/or second extension module and the scavenging air cooler is formed as one unit.
Referring back to Figs 2-4, a flexible embodiment of the arrangement 200 is illustrated in further detail. In Figs 2-4, the first extension module 220 is separated from the scavenging air cooler 210. The first extension module 220 is arranged in series with the scavenging air cooler 210. The first extension module 220 is connected to the scavenging air cooler 210. The first extension module 220 may be connected to the scavenging air cooler 210 via a first scavenge air supply line 211 . The first scavenge air supply line 211 may be configured to receive the cooled scavenge air from the scavenging air cooler 210 and to supply the cooled scavenge air to the first extension module 220. Moreover, in Figs 2-4, the second extension module 230 is separated from the scavenging air cooler 210. The second extension module 230 is arranged in series with the scavenging air cooler 210. The second extension module 230 is connected to the scavenging air cooler 210. The second extension module 230 may be connected to the scavenging air cooler 210 via a second scavenge air supply line 231 . The second scavenge air supply line 211 may be configured to supply the cooled scavenge air to the scavenging air cooler 210 from the second extension module 220.
With reference to Fig. 6, a flow chart illustrating a method 600 for extracting heat is illustrated by way of example.
Generally, a first step S602 of the method 600 may be to supply scavenge air from a turbo charger 106 to the scavenging air cooler 210. In a second step S604, heat may be extracted from the scavenge air in the scavenging air cooler 210 by a first cooling medium and thereby cooling the scavenge air. Preferably, the first cooling medium is seawater which continuously cools the scavenging air cooler 210.
Thereafter, in a third step S606, the cooled scavenge air may be supplied from the scavenging air cooler 210 to the first extension module 220. In a fourth step S608, heat may be extracted from the cooled scavenge air in the first extension module 220 by a second cooling medium. The second cooling medium may be the fuel in case there is one heat exchanger directly transferring heat from the scavenge air to the fuel or may be a separate medium interconnecting two heat exchangers. In a fifth step S610, the liquified fuel may be vaporized into gaseous fuel by the extracted heat in the first extension module 220. Thereafter, in a sixth step S612, the gaseous fuel may be supplied from the first extension module 220 to the engine 102 via the gaseous fuel outlet 221 b. In a seventh step S614, the further cooled scavenge air may be supplied from the first extension module 220 to the engine 102 as charge air.
It is contemplated that there are numerous modifications of the embodiments described herein, which are still within the scope of the invention as defined by the appended claims. Additionally, variations to the disclosed embodiments can be understood and effected by the skilled person in practicing the claimed invention, from a study of the drawings, the disclosure, and the appended claims. In the claims, the word "comprising" does not exclude other elements or steps, and the indefinite article "a" or "an" does not exclude a plurality. The mere fact that certain measures are recited in mutually different dependent claims does not indicate that a combination of these measured cannot be used to advantage.

Claims

26 CLAIMS
1 . An arrangement (200) for extracting heat, the arrangement (200) comprising: a scavenging air cooler (210) being configured to receive scavenge air from a turbo charger (106) and to extract heat from the scavenge air by a first cooling medium, wherein the first cooling medium is seawater, and thereby cooling the scavenge air, a first extension module (220) being arranged after the scavenging air cooler (210) and being configured to receive the cooled scavenge air from the scavenging air cooler (210) and extract further heat from the cooled scavenge air and to vaporize liquified fuel into gaseous fuel by the extracted heat, wherein the gaseous fuel is supplied to an engine (102) via a gaseous fuel outlet (221 b), and a connection (225) between the first extension module (220) and the engine (102) configured to supply the further cooled scavenge air from the first extension module (220) to the engine (102) as charge air.
2. The arrangement (200) according to claim 1 , wherein the first extension module (220) comprises a first heat exchanger (222) configured to exchange heat from the scavenge air from the scavenging air cooler (210) to the liquified fuel by using the scavenge air as a first medium and the liquified fuel as a second medium of the first heat exchanger (222).
3. The arrangement (200) according to claim 1 , wherein the first extension module (220) comprises a first and a second heat exchanger (222a 222b) being interconnected in a heat exchange circuit and jointly exchanging heat from the scavenge air from the scavenging air cooler (210) to the liquified fuel by using the scavenge air as a first medium of the first heat exchanger (222a) and by using the liquified fuel as a second medium of the second heat exchanger (222b), and by using a common heat exchange medium as a second medium in the first heat exchanger (222a) and as a first medium in the second heat exchanger (222b).
4. The arrangement (200) according to claim 1 or 2, wherein the first extension module (220) is integrated in the scavenging air cooler (210).
5. The arrangement (200) according to any one of the preceding claims wherein the first extension module (220) is separated from and arranged in series with and connected to the scavenging air cooler (210) via a first scavenge air supply line (211 ) being configured to receive the cooled scavenge air from the scavenging air cooler (210) and to supply the cooled scavenge air to the first extension module (220).
6. The arrangement (200) according to claim 1 , wherein the arrangement (200) further comprises a second extension module (230) being arranged before the scavenging air cooler (210) and being configured to receive the scavenge air, to extract heat from the scavenge air and supply the cooled scavenge air to the scavenging air cooler (210).
7. The arrangement (200) according to claim 6, wherein the second extension module (230) is connected to a heat-to-power conversion arrangement (234) configured to convert heat extracted from the scavenge air by the second extension module (230) into power.
8. The arrangement (200) according to any one of the preceding claims, wherein the second extension module (230) is integrated in the scavenging air cooler (210).
9. The arrangement (200) according to any one of claims 1 to 7, wherein the second extension module (230) is separated from and arranged in series with and connected to the scavenging air cooler (210) via a second scavenge air supply line (231 ) being configured to receive the cooled scavenge air from the second extension module (230) and supply the cooled scavenge air to the scavenging air cooler (210).
10. A method (600) for extracting heat, the method comprising: supplying scavenge air from a turbo charger (106) to a scavenging air cooler (210), extracting heat from the scavenge air in the scavenging air cooler (210) by a first cooling medium, wherein the first cooling medium is seawater, and thereby cooling the scavenge air, supplying the cooled scavenge air from the scavenging air cooler (210) to a first extension module (220), extracting heat from the cooled scavenge air in the first extension module (220) by a second cooling medium, vaporizing liquified fuel into gaseous fuel by the extracted heat in the first extension module (220), supplying the gaseous fuel from the first extension module (220) to an engine (102) via a gaseous fuel outlet (221 b), and supplying the further cooled scavenge air from the first extension module (220) to the engine (102) as charge air.
EP22817644.2A 2021-11-25 2022-11-11 An arrangement for extracting heat and a method thereof Withdrawn EP4437226A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EP21210344.4A EP4187079A1 (en) 2021-11-25 2021-11-25 An arrangement for extracting heat from exhaust gas originating from an engine and a method thereof
PCT/EP2022/081671 WO2023094185A1 (en) 2021-11-25 2022-11-11 An arrangement for extracting heat and a method thereof

Publications (1)

Publication Number Publication Date
EP4437226A1 true EP4437226A1 (en) 2024-10-02

Family

ID=78789781

Family Applications (2)

Application Number Title Priority Date Filing Date
EP21210344.4A Withdrawn EP4187079A1 (en) 2021-11-25 2021-11-25 An arrangement for extracting heat from exhaust gas originating from an engine and a method thereof
EP22817644.2A Withdrawn EP4437226A1 (en) 2021-11-25 2022-11-11 An arrangement for extracting heat and a method thereof

Family Applications Before (1)

Application Number Title Priority Date Filing Date
EP21210344.4A Withdrawn EP4187079A1 (en) 2021-11-25 2021-11-25 An arrangement for extracting heat from exhaust gas originating from an engine and a method thereof

Country Status (5)

Country Link
EP (2) EP4187079A1 (en)
JP (1) JP2024540652A (en)
KR (1) KR20240105475A (en)
CN (1) CN118302602A (en)
WO (1) WO2023094185A1 (en)

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5390646A (en) * 1993-12-29 1995-02-21 Consolidated Natural Gas Service Company, Inc. Second stage intercooling with phase change heat transfer fluid
JP3788153B2 (en) * 1999-12-21 2006-06-21 三菱ふそうトラック・バス株式会社 Liquefied gas engine
JP2006177213A (en) * 2004-12-21 2006-07-06 Osaka Gas Co Ltd Gas engine system
WO2007115579A2 (en) * 2006-04-12 2007-10-18 Man Diesel A/S A large turbocharged diesel engine with energy recovery arrangment
DE102008032253B4 (en) * 2008-07-09 2013-05-29 Man Truck & Bus Ag Self-igniting internal combustion engine with ether fumigation of combustion air for vehicles and method for ether fumigation of combustion air in a self-igniting internal combustion engine for vehicles
KR100966893B1 (en) * 2008-08-04 2010-06-30 한국기계연구원 Engine system using latent heat of evaporation of fuel
US20120042656A1 (en) * 2010-08-20 2012-02-23 Icr Turbine Engine Corporation Gas turbine engine with exhaust rankine cycle
KR101358115B1 (en) 2011-05-25 2014-02-11 삼성중공업 주식회사 Waste heat recycling system for ship
EP2781719A1 (en) * 2013-03-20 2014-09-24 Caterpillar Motoren GmbH & Co. KG Operating internal combustion engines on pyrolysis products
EP2796689B1 (en) * 2013-04-25 2016-09-14 Caterpillar Motoren GmbH & Co. KG Liquid fuel ignited gas engine with emergency operation
US10054085B2 (en) * 2015-02-18 2018-08-21 Progress Rail Locomotive Inc. Power system having fuel-based cooling
KR102391286B1 (en) * 2017-09-15 2022-04-27 삼성중공업(주) Combined cycle gas power plant

Also Published As

Publication number Publication date
KR20240105475A (en) 2024-07-05
JP2024540652A (en) 2024-10-31
EP4187079A1 (en) 2023-05-31
WO2023094185A1 (en) 2023-06-01
CN118302602A (en) 2024-07-05

Similar Documents

Publication Publication Date Title
KR20120103669A (en) Waste heat recovery power generation device and ship with same
US20190170025A1 (en) Renewable Energy Process and Method Using a Carbon Dioxide Cycle to Produce Work
KR101614605B1 (en) Supercritical Carbon Dioxide Power Generation System and Ship having the same
CN113818940B (en) A system and method for generating electricity using waste heat from ship desulfurization pre-cooling water
EP4187079A1 (en) An arrangement for extracting heat from exhaust gas originating from an engine and a method thereof
KR102035891B1 (en) Supercritical Carbon Dioxide Power Generation System and Ship having the same
KR20160017741A (en) Supercritical Carbon Dioxide Power Generation System and Ship having the same
KR20160073349A (en) Supercritical Carbon Dioxide Power Generation System and Ship having the same
CN105508055B (en) The system and method for distributed busbar protection cooling circulating water
KR101928138B1 (en) Ship installed Supercritical Carbon Dioxide Power Generation System
KR20160017740A (en) Supercritical Carbon Dioxide Power Generation System and Ship having the same
KR101970120B1 (en) Generating apparatus
KR101839643B1 (en) Supercritical Carbon Dioxide Power Generation System having Steam Supplying Function and Ship having the same
CN213631043U (en) Jet compression type refrigerating system for fishing boat
KR20160088847A (en) Supercritical Carbon Dioxide Power Generation System and Ship having the same
KR20180102912A (en) SOx SCRUBBER WASH WATER SUPPLY APPARATUS USING COOLING SEA WATER SYSTEM
KR102117381B1 (en) Energy saving apparatus of a ship using waste heat
KR20160073356A (en) Supercritical Carbon Dioxide Power Generation System
CN112303946A (en) Jet compression type refrigerating system for fishing boat
KR20160073352A (en) Supercritical Carbon Dioxide Power Generation System
KR101519542B1 (en) Energy saving apparatus for a ship using waste heat of organic cooling medium
KR101300714B1 (en) Energy saving system of ship by using waste heat and recirculating exhaust gas
KR101575511B1 (en) Supercritical Carbon Dioxide Power Generation System and Ship having the same
KR20160017735A (en) Supercritical Carbon Dioxide Power Generation System and Ship having the same
KR20160073354A (en) Supercritical Carbon Dioxide Power Generation System and Ship having the same

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20240524

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20250103