EP4416371A1 - Methods and tools for determining bleed-off pressure after well securement jobs - Google Patents
Methods and tools for determining bleed-off pressure after well securement jobsInfo
- Publication number
- EP4416371A1 EP4416371A1 EP22818137.6A EP22818137A EP4416371A1 EP 4416371 A1 EP4416371 A1 EP 4416371A1 EP 22818137 A EP22818137 A EP 22818137A EP 4416371 A1 EP4416371 A1 EP 4416371A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- pressure
- wellhead
- wellbore
- gauge
- pressure gauge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B23/00—Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells
- E21B23/06—Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells for setting packers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B23/00—Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells
- E21B23/14—Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells for displacing a cable or a cable-operated tool, e.g. for logging or perforating operations in deviated wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
- E21B33/134—Bridging plugs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
- E21B34/08—Valve arrangements for boreholes or wells in wells responsive to flow or pressure of the fluid obtained
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
- E21B47/07—Temperature
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/26—Storing data down-hole, e.g. in a memory or on a record carrier
Definitions
- TTBP tubing bridge plugs
- cement cement
- An important factor involved in installing a TTBP is its differential pressure rating, reflecting its ability to withstand an excess of reservoir pressure after installation.
- differential pressure is defined as the difference between reservoir pressure and pressure in the wellbore right above the plug after installation.
- the differential pressure rating of a TTBP corresponds to the maximum differential pressure it can withstand, and a safety factor is also usually considered when installing the plug.
- SIWHP shut- in wellhead pressure
- a rough estimation at best is available for attempting to determine actual differential pressure in the wellbore.
- the rough estimation can be based on the measured SIWHP as well as the presence and location of hydrostatic head due to fluid in the wellbore.
- any errors in such estimation may have serious consequences. For instance, while bleeding off pressure at the wellhead to check on plug integrity, the actual differential pressure may be high enough to cause the TTBP to dislodge or loosen, to literally move in one direction or another physically.
- TTBP plugs typically cannot be milled out or retrieved by tools sent down on a slickline or coil tubing. Permanent securement of the reservoir may then be difficult, and serious well integrity issues may then result.
- embodiments disclosed herein relate to a method including: installing a through tubing bridge plug in a wellbore; deploying a slickline unit into the wellbore, wherein the slickline unit includes a pressure gauge; measuring bottomhole pressure with the pressure gauge; and setting a wellhead pressure based on the measured bottomhole pressure.
- inventions disclosed herein relate to a system for setting a wellhead pressure after a through tubing bridge plug is installed in a wellbore.
- the system includes a slickline unit that includes a static bottomhole pressure gauge, and the static bottomhole pressure gauge includes internal memory that stores a measured bottomhole pressure.
- the system further includes a pressure setting unit that sets a wellhead pressure based on the measured bottomhole pressure stored in the internal memory of the static bottomhole pressure gauge.
- embodiments disclosed herein relate to a method including: installing a through tubing bridge plug in a wellbore; capping the through tubing bridge plug with cement; deploying a slickline unit into the wellbore, wherein the slickline unit includes a pressure gauge; measuring bottomhole pressure with the pressure gauge; storing, at a first data storage location, data that includes the measured bottomhole pressure; transferring the stored data from the first data storage location to a second data storage location; obtaining the data from the second data storage location to use in setting the wellhead pressure; and setting a wellhead pressure based on the measured bottomhole pressure.
- FIG. 1 schematically illustrates, in a cross-sectional elevational view, a conventional wellbore and well control system by way of general background and in accordance with one or more embodiments.
- FIG. 2 illustrates, in elevational view, a wellhead, and related components, employed for the wellbore and well control system of FIG. 1, by way of general background and in accordance with one or more embodiments.
- FIG. 3 schematically illustrates, in a cross-sectional elevational view, a production wellbore in accordance with one or more embodiments.
- FIG. 4 provides essentially the same view as FIG. 3, but with a tubing bridge plug installed, in accordance with one or more embodiments.
- FIG. 5 provides essentially the same view as FIG. 4, but with a slickline unit deployed, in accordance with one or more embodiments.
- FIG. 6 schematically illustrates, in a close-up elevational view, the slickline tool of FIG. 5, in accordance with one or more embodiments.
- FIG. 7 schematically illustrates, in elevational view, a slickline unit in accordance with one or more embodiments.
- FIG. 8 shows a flowchart of a method in accordance with one or more embodiments.
- FIG. 9 schematically illustrates a computing device and related components, in accordance with one or more embodiments.
- ordinal numbers e.g., first, second, third, etc.
- an element i.e., any noun in the application.
- the use of ordinal numbers is not to imply or create any particular ordering of the elements nor to limit any element to being only a single element unless expressly disclosed, such as using the terms "before”, “after”, “single”, and other such terminology. Rather, the use of ordinal numbers is to distinguish between the elements.
- a first element is distinct from a second element, and the first element may encompass more than one element and succeed (or precede) the second element in an ordering of elements.
- reference numerals may be advanced by a multiple of 100 in indicating a similar or analogous component or element among FIGs. 1-9.
- valves at a wellhead and sub-surface safety valves are typically tested manually by an operator at the wellsite.
- Such testing normally involves installation of a pressure gauge above the crown valve to measure shut-in wellhead pressure (SIWHP), and wellhead integrity and SSSV tests are normally conducted manually.
- SIWHP shut-in wellhead pressure
- FIGs. 1 and 2 illustrate a general environment in which one or more embodiments may be employed.
- FIG. 1 schematically illustrates, in a cross-sectional elevational view, a wellbore and a well control system in accordance with one or more embodiments.
- the well system 106 includes a wellbore 120, a well sub-surface system 122, a well surface system 124, and a well control system (“control system”) 126.
- the control system 126 may control various operations of the well system 106, such as well production operations, well completion operations, well maintenance operations, and reservoir monitoring, assessment and development operations.
- the control system 126 includes a computer system that is the same as, or is in communication with, computer system 885 described below in FIG. 9.
- the wellbore 120 includes a bored hole that extends from the surface 108 into a target zone of the formation 104, such as the reservoir 102.
- An upper end of the wellbore 120, terminating at or near the surface 108, may be referred to as the “up-hole” end of the wellbore 120, and a lower end of the wellbore, terminating in the formation 104, may be referred to as the “down-hole” end of the wellbore 120.
- the wellbore 120 facilitates the circulation of drilling fluids during drilling operations, the flow of hydrocarbon production (“production”) 121 (e.g., oil and gas) from the reservoir 102 to the surface 108 during production operations, the injection of substances (e.g., water) into the formation 104 or the reservoir 102 during injection operations, or the communication of monitoring devices (e.g., logging tools) into the formation 104 or the reservoir 102 during monitoring operations (e.g., during in situ logging operations).
- production hydrocarbon production
- substances e.g., water
- monitoring devices e.g., logging tools
- such monitoring devices may include a bottomhole pressure gauge included with a slickline tool (e.g., as indicated at 358 and 356, respectively, in FIG. 5.)
- the control system 126 collects and records wellhead data 140 for the well system 106.
- the wellhead data 140 may include, for example, a record of measurements of wellhead pressure P W h) (e.g., including flowing wellhead pressure), wellhead temperature (T W h) (e.g., including flowing wellhead temperature), wellhead production rate (Q w h) over some or all of the life of the well 106, and water cut data.
- Such measurements may be recorded in real-time, to be available for review or use within seconds, minutes, or hours of the condition being sensed (e.g., within one hour).
- Such real-time data can help an operator of the well 106 to assess a relatively current state of the well system 106, and make real-time decisions regarding development of the well system 106 and the reservoir 102, such as on-demand adjustments in regulation of production flow from the well.
- the well sub-surface system 122 includes a casing installed in the wellbore 120.
- the wellbore 120 may have a cased portion and an uncased (or “open-hole”) portion.
- the cased portion may include a portion of the wellbore having casing (e.g., casing pipe and casing cement; see, e.g., 342 in FIGs. 3-5) disposed therein.
- the uncased portion may include a portion of the wellbore not having casing disposed therein.
- the casing defines a central passage that provides a conduit for the transport of tools and substances through the wellbore 120.
- the central passage may provide a conduit for lowering logging tools into the wellbore 120, a conduit for the flow of production 121 (e.g., oil and gas) from the reservoir 102 to the surface 108, or a conduit for the flow of injection substances (e.g., water) from the surface 108 into the formation 104.
- the well sub-surface system 122 can include production tubing installed in the wellbore 120.
- the production tubing may provide a conduit for the transport of tools and substances through the wellbore 120.
- the production tubing may, for example, be disposed inside casing. In such an embodiment, the production tubing may provide a conduit for some or all of the production 121 (e.g., oil and gas) passing through the wellbore 120 and the casing.
- the well surface system 124 includes a wellhead 130.
- the wellhead 130 may include a rigid structure installed at the “up-hole” end of the wellbore 120, at or near where the wellbore 120 terminates at the Earth’s surface 108.
- the wellhead 130 may include structures (called “wellhead casing hanger” for casing and “tubing hanger” for production tubing) for supporting (or “hanging”) casing and production tubing extending into the wellbore 120.
- Production 121 may flow through the wellhead 130, after exiting the wellbore 120 and the well sub-surface system 122, including, for example, the casing and the production tubing.
- the well surface system 124 may include flow regulating devices that are operable to control the flow of substances into and out of the wellbore 120.
- the well surface system 124 may include one or more production valves 132 that are operable to control the flow of production 121.
- a production valve 132 may be fully opened to enable unrestricted flow of production 121 from the wellbore 120
- the production valve 132 may be partially opened to partially restrict (or “throttle”) the flow of production 121 from the wellbore 120
- production valve 132 may be fully closed to fully restrict (or “block”) the flow of production 121 from the wellbore 120, and through the well surface system 124.
- the wellhead 130 includes a choke assembly.
- the choke assembly may include hardware with functionality for opening and closing the fluid flow through pipes in the well system 106.
- the choke assembly may include a pipe manifold that may lower the pressure of fluid traversing the wellhead.
- the choke assembly may include set of high pressure valves and at least two chokes. These chokes may be fixed or adjustable or a mix of both. Redundancy may be provided so that if one choke has to be taken out of service, the flow can be directed through another choke.
- pressure valves and chokes are communicatively coupled to the well control system 126. Accordingly, a well control system 126 may obtain wellhead data regarding the choke assembly as well as transmit one or more commands to components within the choke assembly in order to adjust one or more choke assembly parameters.
- the well surface system 124 includes a surface sensing system 134.
- the surface sensing system 134 may include sensors for sensing characteristics of substances, including production 121, passing through or otherwise located in the well surface system 124.
- the characteristics may include, for example, pressure, temperature and flow rate of production 121 flowing through the wellhead 130, or other conduits of the well surface system 124, after exiting the wellbore 120.
- the surface sensing system 134 includes a surface pressure sensor 136 operable to sense the pressure of production 121 flowing through the well surface system 124, after it exits the wellbore 120.
- the surface pressure sensor 136 may include, for example, a wellhead pressure sensor that senses a pressure of production 121 flowing through or otherwise located in the wellhead 130.
- the surface sensing system 134 includes a surface temperature sensor 138 operable to sense the temperature of production 121 flowing through the well surface system 124, after it exits the wellbore 120.
- the surface temperature sensor 138 may include, for example, a wellhead temperature sensor that senses a temperature of production 121 flowing through or otherwise located in the wellhead 130, referred to as “wellhead temperature” (T W h).
- the surface sensing system 134 includes a flow rate sensor 139 operable to sense the flow rate of production 121 flowing through the well surface system 124, after it exits the wellbore 120.
- the flow rate sensor 139 may include hardware that senses a flow rate of production 121 (Q W h) passing through the wellhead 130.
- FIG. 2 illustrates, in elevational view, a wellhead, and related components, employed for the wellbore and well control system of FIG. 1, in accordance with one or more embodiments.
- one or more of the modules and/or elements shown in FIG. 2 may be omitted, repeated, and/or substituted. Accordingly, embodiments of the invention should not be considered limited to the specific arrangements of modules and/or elements shown in FIG. 2.
- FIG. 2 illustrates details of the wellhead 130 and the flowline for the production 121 depicted in FIG. 1 above.
- the wellhead 130 includes a well cap 200, a crown valve 201, a wing valve 202, a surface safety valve 203, a master valve 204, a subsurface safety valve 205, an upstream pressure transmitter 206, a downstream pressure transmitter 207, a choke valve 208, and a plot limit valve 209.
- the crown valve 201, wing valve 202, surface safety valve 203, master valve 204, choke valve 208, and plot limit valve 209 are referred to as valves at the wellhead.
- a pressure gauge 210 and/or temperature gauge (not shown) is permanently installed between the crown valve 201 and the well cap 200.
- the pressure gauge 210 and/or temperature gauge correspond to the pressure sensor 136 and temperature sensor 138, respectively, depicted in FIG. 1 above.
- the well cap 200 provides access to wellbore for interventions with wireline, coil tubing, slickline etc.; thus, this can provide access to a slickline with a tool 356 and pressure gauge 358 as discussed and illustrated herein with respect to FIG. 5.
- the crown valve 201 is the uppermost valve on wellhead. Typically, the crown valve 201 is closed until there is a need to access the well as described above.
- the wing valve 202 is for production flow control. In the case of needing to enter a well, this valve would be closed and the master valve would be open.
- the surface safety valve 203 is typically a hydraulic failsafe close valve located at surface.
- the surface safety valve 203 used in the event of an issue in the wellbore/surface equipment and for testing.
- the master valve 204 is the main valve controlling flow from the wellbore.
- the subsurface safety valve 205 is another safety device located below the surface, e.g., several hundred plus feet below the surface.
- the subsurface safety valve 205 makes up part of the production tubing and provides an arrangement for safety closure in the case of uncontrolled release of hydrocarbons, such as a kick. Also, the subsurface safety valve 205 may be used as a barrier when testing or needed to perform maintenance on the wellhead.
- the choke valve 208 is used for flow restriction in the event of bleeding down pressure during testing, loss of pressure in the wellbore, temperature management, etc.
- the choke valve 208 may be used for pressure-bleed off as described herein in connection with the illustrative working examples of FIGs. 3-9.
- the upstream pressure transmitter 206 is a pressure/temperature gauge located upstream of choke valve 208 and provides pressure data prior to reaching the choke valve 208.
- the downstream pressure transmitter 207 is a pressure/temperature gauge downstream of choke valve 208 and provides pressure data after passing the choke valve 208.
- the plot limit valve 209 is a valve for testing, maintenance and isolation purposes, e.g., if the upstream pressure transmitter 206, downstream pressure transmitter 207, or choke valve 208 were being replaced.
- the pressure gauge 210 located above the crown valve 201 is for testing each component of the wellhead.
- SIWHP shut-in wellhead pressure
- This wellhead pressure gauge 210 may be employed in connection with the illustrative working examples of FIGs. 3-9.
- the initial manifold pressure refers to the initial pressure downstream of wellhead and is a base line pressure for testing purposes.
- the hydraulic valves and associated gauges are connected as depicted in FIG. 2.
- a pressure gauge 210 can be permanently installed between the well cap 200 and the crown valve 201.
- the subsurface safety valve, master valve, wellhead valve, crown valve, and plot limit valve are closed to record the initial manifold pressure using the downstream pressure transmitter.
- the subsurface safety valve, master valve, wing valve, and crown valve are opened with the plot limit valve closed to record the initial shut-in wellhead pressure (SIWHP) using the permanently installed pressure gauge between the well cap and the crown valve.
- SIWHP shut-in wellhead pressure
- the pressure gauge readings of the permanently installed pressure gauge, the upstream pressure transmitter, and the downstream pressure transmitter are compared with each other to validate gauge accuracy. All pressure gauge readings are observed for 10 minutes to record pressure changes, if any.
- DPT SIWHP
- UPT SIWHP
- PG SIWHP
- the crown valve is opened to bleed the pressure to a flare pit.
- PLV and WV are open.
- MV is closed and CV bleeds the trapped pressure between CV and MV into the flare pit.
- TTBP through tubing bridge plug
- one or more pressure gauges may be added to a slickline tool, to provide a manner of calculating bottomhole pressure above the TTBP.
- the one or more pressure gauges may be embodied, e.g., by one or more static bottomhole pressure (SBHP) gauges.
- FIG. 3 schematically illustrates, in a cross-sectional elevational view, a production wellbore in accordance with one or more embodiments.
- a well has been drilled and completed for oil production, with a casing 342 cemented into place and a casing shoe 344 set across formation rock 304 at a predetermined depth.
- Production tubing 346 for recovering hydrocarbons from the formation rock 304 (or other subsurface regions), is then installed and nested coaxially within the casing 342.
- a packer 348 may be included to seal the annular chamber between the casing 342 and production tubing 346.
- a wellhead 330 in communication with a well control system 326; these may function and be configured analogously to the wellhead 130 and well control system 126, respectively, that are described and illustrated with respect to FIGs. 1-2
- FIG. 4 provides essentially the same view as FIG. 3, but with a TTBP plug installed, in accordance with one or more embodiments.
- the well is secured with a TTBP 350 that is then capped with cement 352. It may be secured for any of a variety of reasons, such as for stopping the flow of hydrocarbons to the surface at least temporarily (e.g., until a rig arrives for workover of the well). For instance, there may be an issue with securely sealing the annular chamber between the casing 342 and production tubing 346, and a workover may be ordered to replace or fix one or more wellhead components (such as those shown in FIG. 2), thus warranting full securement of the well.
- FIG. 5 provides essentially the same view as FIG. 4, but with a slickline unit deployed, in accordance with one or more embodiments.
- slickline 354 in the form of a non-electric cable, as known
- a slickline unit 356 which includes one or more tools; such tools may include, by way of example, a gauge cutter or a lead impression block (LIB), and/or also a tubing end locator (TEL).
- the slickline unit 356 can be employed to confirm that the TTBP 350 has been successfully set at its desired predetermined depth and that the cement cap 352 has been properly set.
- a LIB (which typically includes a softer material such as soft lead at its end face) can confirm whether cement cap 352 indeed is present above the TTBP 350, e.g., if there is no cement present then an impression will be made at the end face of the LIB that is consistent with the top of the TTBP 350.
- a TEL can be used, as known, to detect the end of production tubing 346 while a gauge cutter can be used to scrape and remove scale or debris (e.g., from an inner surface of production tubing 346), etc., as generally known.
- a pressure gauge (or SBHP gauge) 358 may also be included with the slickline unit 356 to measure downhole pressure right above the TTBP 250.
- the gauge 358 can be placed directly above a terminal component 359 of the slickline unit 356, or may be placed in any other manner deemed suitable, with a general objective of measuring pressure close to the TTBP 250.
- the terminal component 359 may be a gauge cutter or LIB.
- the slickline tool 356 (with gauge 358) may be deployed downhole at a suitable time interval after cement has been poured for the cap 352 (e.g., 48 hours later) to permit sufficient time for the cement to fully set.
- any bottomhole pressure readings via gauge 358 will help in preemptively identifying the limits of pressure bleed-off at the wellhead 330, and will then facilitate maintaining well conditions within differential pressure limits of the TTBP 350, without adding any cost or time to existing operational procedures (including, additional wasted time/effort that may be devoted to retrieving a failed TTBP).
- FIG. 6 schematically illustrates, in a close-up elevational view, the slickline unit of FIG.
- the slickline unit 356 includes terminal component 359 and, disposed axially adjacent thereto, pressure gauge 358.
- the terminal component 359 may be embodied by a lead impression block or gauge cutter disposed at a lower free end of slickline unit 356.
- pressure gauge 358 includes therewithin internal memory 360. Bottomhole pressure measurements thus can be stored at least temporarily in internal memory 360, for later use in setting wellhead pressure based on such measurements.
- Indicated at 361, axially above pressure gauge 358, is a crossover component which physically provides a transition to one or more other components or tools of slickline unit 356.
- a single pressure gauge 358 there may be two or more pressure gauges for measuring bottomhole pressure, e.g., one or more secondary pressure gauges could serve as a backup for a main pressure gauge in the event of its failure, and/or the readings from two or more pressure gauges may be averaged or otherwise mathematically combined in order to yield an even more precise calculation of bottomhole pressure.
- the gauge 358 may measure pressure above the plug 350 (and with the cement cap 352 securely in place) at 3386 psi, thus the extant differential pressure across the plug 350 would be 142 psi and well below the effective differential pressure rating. As such, the available SIWHP to bleed off for an in-flow test would be calculated at 658 psi (i.e., 800-142).
- the SIWHP measured by gauge 358 is initially 1180 psi (as an illustrative example)
- the minimum pressure that would need to be maintained at the wellhead 330 during an inflow test is 522 psi (i.e., 1180-658).
- the SIWHP cannot be bled below 522 psi as that would result in breaching the effective differential pressure limit of the plug 350.
- FIG. 7 schematically illustrates, in elevational view, a slickline unit 456 in accordance with one or more embodiments. Shown are several additional components that may be included in a slickline unit 456, and the unit 456 itself may essentially be considered to be interchangeable with the unit 356 described and illustrated herein with respect to FIGs. 5-6. Further, it should be understood that the unit 456 shown in FIG. 7 is provided merely by way of illustrative and non-restrictive example, and thus can also be considered to be interchangeable with slickline units including a different mix of components.
- slickline unit 456 may be disposed at a lower free end of a slickline 454, and at its own lower free end may include a terminal component 459 (e.g., a gauge cutter or LIB as discussed previously). Proceeding in a generally upward direction with respect to the figure, a pressure gauge (or two or more pressure gauges) 458 may be disposed immediately axially adjacent to the terminal component 459, essentially as discussed previously.
- a crossover component 460 provides a physical transition to a TEL 462, the function of which is discussed elsewhere herein.
- a mechanical jar 464 may be disposed axially adjacent to the TEL 462; as known, the jar 464 may be configured to deliver an impact load, in a predetermined direction, to another downhole component.
- some standard structural components may be provided such as a straight bar (or weight bar) 465, knuckle joint 466 and rope socket / fish neck component 468, in that order.
- the slickline 454 itself may connect into the rope socket / fish neck component 468.
- FIG. 8 shows a flowchart of a method, as a general overview of steps which may be carried out in accordance with one or more embodiments described or contemplated herein.
- a TTBP is installed in a wellbore (770), and the TTBP is capped with cement (772); this can correspond to the TTBP 350 and cement cap 352, respectively, described and illustrated with respect to FIGs. 4 and 5.
- a slickline unit is deployed into the wellbore, wherein the slickline unit includes a pressure gauge (774); thus, the slickline unit may correspond to the combination of tool 356 and pressure gauge 358 as described and illustrated herein with respect to FIGs. 5-6.
- Bottomhole pressure is measured with the pressure gauge (776), e.g., such as pressure gauge 358 described and illustrated with respect to FIGs. 5-6.
- a first data storage location data is stored that includes the measured bottomhole pressure (778).
- the first data storage location may correspond to memory 360 described and illustrated with respect to FIG. 6.
- the stored data is transferred from the first data storage location to a second data storage location (780).
- the data from the second data storage location is obtained to use in setting the wellhead pressure (782), and the wellhead pressure is set based on the bottomhole pressure (784).
- the second data storage location may correspond to computer memory, and/or an associated database, at a surface location such as the well control system indicated 326 described and illustrated with respect to FIGs. 3-5 or the computing device 885 (and memory 892) described and illustrated with respect to FIG. 9.
- the data from the second data storage location is used for manually setting the wellhead pressure based on the bottomhole pressure (e.g., via bleed-off a choke valve such as that indicated at 208 in FIG. 2).
- such setting of the wellhead pressure can be performed automatically, as governed by the data at the second storage location.
- the slickline unit is deployed (774) to position the pressure gauge at a predetermined distance above the tubing bridge plug.
- setting the wellhead pressure (782) may include determining wellhead pressure available for bleed-off Further, determining wellhead pressure available for bleed-off can be based on the measured bottomhole pressure and a differential pressure limit of the plug. Illustrative and non-restrictive examples of these steps may be appreciated from FIGs. 3-7 and their related discussion herein.
- FIG. 9 schematically illustrates a computing device and related components, in accordance with one or more embodiments.
- FIG. 9 generally depicts a block diagram of a computer system 885 used to provide computational functionalities associated with described algorithms, methods, functions, processes, flows, and procedures as described in this disclosure, according to one or more embodiments.
- computer 885 may interface with a well control system 326 such as that described and illustrated with respect to FIGs 3-5, either directly (e.g., via hard-wired connection) or over an internal or external network 899.
- a dedicated database for storing bottomhole pressure measurement data may be housed in computer 885 (e.g., in memory 892), or may be housed or stored elsewhere in a manner to be controlled or communicated with by computer 885.
- the computer 885 illustrated in FIG. 9 may correspond directly to the well control system 326 described and illustrated with respect to FIGs. 3-5.
- the illustrated computer 885 is intended to encompass any computing device such as a server, desktop computer, laptop/notebook computer, wireless data port, smart phone, personal data assistant (PDA), tablet computing device, one or more processors within these devices, or any other suitable processing device, including both physical or virtual instances (or both) of the computing device.
- the computer 885 may include a computer that includes an input device, such as a keypad, keyboard, touch screen, or other device that can accept user information, and an output device that conveys information associated with the operation of the computer 885, including digital data, visual, or audio information (or a combination of information), or a GUI.
- the computer 885 can serve in a role as a client, network component, a server, a database or other persistency, or any other component (or a combination of roles) of a computer system for performing the subject matter described in the instant disclosure.
- the illustrated computer 885 is communicably coupled with a network 899.
- one or more components of the computer 885 may be configured to operate within environments, including cloud-computing-based, local, global, or other environment (or a combination of environments).
- the computer 885 is an electronic computing device operable to receive, transmit, process, store, or manage data and information associated with the described subject matter. According to some implementations, the computer 885 may also include or be communicably coupled with an application server, e-mail server, web server, caching server, streaming data server, business intelligence (BI) server, or other server (or a combination of servers).
- an application server e-mail server, web server, caching server, streaming data server, business intelligence (BI) server, or other server (or a combination of servers).
- BI business intelligence
- the computer 885 can receive requests over network 899 from a client application (for example, executing on another computer 885) and responding to the received requests by processing the said requests in an appropriate software application.
- requests may also be sent to the computer 885 from internal users (for example, from a command console or by other appropriate access method), external or third-parties, other automated applications, as well as any other appropriate entities, individuals, systems, or computers.
- Each of the components of the computer 885 can communicate using a system bus 887.
- any or all of the components of the computer 885 may interface with each other or the interface 889 (or a combination of both) over the system bus 887 using an application programming interface (API) 895 or a service layer 897 (or a combination of the API 895 and service layer 897.
- the API 895 may include specifications for routines, data structures, and object classes.
- the API 895 may be either computer-language independent or dependent and refer to a complete interface, a single function, or even a set of APIs.
- the service layer 897 provides software services to the computer 885 or other components (whether or not illustrated) that are communicably coupled to the computer 885.
- the functionality of the computer 885 may be accessible for all service consumers using this service layer.
- Software services, such as those provided by the service layer 897 provide reusable, defined business functionalities through a defined interface.
- the interface may be software written in JAVA, C++, or other suitable language providing data in extensible markup language (XML) format or another suitable format.
- XML extensible markup language
- alternative implementations may illustrate the API 895 or the service layer 897 as stand-alone components in relation to other components of the computer 885 or other components (whether or not illustrated) that are communicably coupled to the computer 885.
- any or all parts of the API 895 or the service layer 897 may be implemented as child or sub-modules of another software module, enterprise application, or hardware module without departing from the scope of this disclosure.
- the computer 885 includes an interface 889. Although illustrated as a single interface 889 in FIG. 9, two or more interfaces 889 may be used according to particular needs, desires, or particular implementations of the computer 885.
- the interface 889 is used by the computer 885 for communicating with other systems in a distributed environment that are connected to the network 899.
- the interface 889 includes logic encoded in software or hardware (or a combination of software and hardware) and operable to communicate with the network 899. More specifically, the interface 889 may include software supporting one or more communication protocols associated with communications such that the network 899 or interface's hardware is operable to communicate physical signals within and outside of the illustrated computer 885.
- the computer 885 includes at least one computer processor 891. Although illustrated as a single computer processor 891 in FIG. 9, two or more processors may be used according to particular needs, desires, or particular implementations of the computer 885. Generally, the computer processor 891 executes instructions and manipulates data to perform the operations of the computer 885 and any algorithms, methods, functions, processes, flows, and procedures as described in the instant disclosure. [0067]
- the computer 885 also includes a memory 892 that holds data for the computer 885 or other components (or a combination of both) that can be connected to the network 899.
- memory 892 can be a database storing data consistent with this disclosure. Although illustrated as a single memory 892 in FIG. 9, two or more memories may be used according to particular needs, desires, or particular implementations of the computer 885 and the described functionality. While memory 892 is illustrated as an integral component of the computer 885, in alternative implementations, memory 892 can be external to the computer 885.
- the application 893 is an algorithmic software engine providing functionality according to particular needs, desires, or particular implementations of the computer 885, particularly with respect to functionality described in this disclosure.
- application 893 can serve as one or more components, modules, applications, etc.
- the application 893 may be implemented as multiple applications 893 on the computer 885.
- the application 893 can be external to the computer 885.
- computers 885 there may be any number of computers 885 associated with, or external to, a computer system containing computer 885, wherein each computer 885 communicates over network 899.
- client the term “client,” “user,” and other appropriate terminology may be used interchangeably as appropriate without departing from the scope of this disclosure.
- this disclosure contemplates that many users may use one computer 885, or that one user may use multiple computers 885.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US17/499,439 US20230110038A1 (en) | 2021-10-12 | 2021-10-12 | Methods and tools for determining bleed-off pressure after well securement jobs |
| PCT/US2022/046452 WO2023064396A1 (en) | 2021-10-12 | 2022-10-12 | Methods and tools for determining bleed-off pressure after well securement jobs |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP4416371A1 true EP4416371A1 (en) | 2024-08-21 |
Family
ID=84389205
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP22818137.6A Pending EP4416371A1 (en) | 2021-10-12 | 2022-10-12 | Methods and tools for determining bleed-off pressure after well securement jobs |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US20230110038A1 (en) |
| EP (1) | EP4416371A1 (en) |
| WO (1) | WO2023064396A1 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119981862B (en) * | 2025-03-03 | 2025-09-16 | 北京化工大学 | Wellbore blockage location detection method |
Family Cites Families (16)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6318463B1 (en) * | 1999-09-24 | 2001-11-20 | Halliburton Energy Services, Inc. | Slickline fluid indentification tool and method of use |
| AU2003904183A0 (en) * | 2003-08-08 | 2003-08-21 | Woodside Energy Limited | Method for completion or work-over of a sub-sea well using a horizontal christmas tree |
| EP2065556A1 (en) * | 2007-11-30 | 2009-06-03 | Services Pétroliers Schlumberger | Retrievable downhole testing tool |
| GB0905633D0 (en) * | 2009-04-01 | 2009-05-13 | Managed Pressure Operations Ll | Apparatus for and method of drilling a subterranean borehole |
| US8443891B2 (en) * | 2009-12-18 | 2013-05-21 | Petro-Hunt, L.L.C. | Methods of fracturing a well using Venturi section |
| US20160003026A1 (en) * | 2010-12-16 | 2016-01-07 | Bp Corporation North America, Inc. | Method of determining reservoir pressure |
| WO2012083068A2 (en) * | 2010-12-16 | 2012-06-21 | Bp Corporation North America Inc. | Method of determining reservoir pressure |
| US9080407B2 (en) * | 2011-05-09 | 2015-07-14 | Halliburton Energy Services, Inc. | Pressure and flow control in drilling operations |
| US9249646B2 (en) * | 2011-11-16 | 2016-02-02 | Weatherford Technology Holdings, Llc | Managed pressure cementing |
| US9810058B2 (en) * | 2013-10-02 | 2017-11-07 | Bergen Technology Center As | Petroleum well downhole logging tool with high speed data bus |
| US10100631B2 (en) * | 2013-12-10 | 2018-10-16 | Schlumberger Technology Corporation | Method of testing a barrier in a wellbore |
| US20160273347A1 (en) * | 2015-03-11 | 2016-09-22 | Saudi Arabian Oil Company | Method for conducting well testing operations with nitrogen lifting, production logging, and buildup testing on single coiled tubing run |
| US9745832B2 (en) * | 2015-08-13 | 2017-08-29 | Good Son Technologies LLC | Tool for creating impressions of downhole objects |
| US10526866B2 (en) * | 2015-11-19 | 2020-01-07 | Conocophillips Company | Casing expansion for well plugging |
| AU2015419250A1 (en) * | 2015-12-31 | 2018-03-29 | Halliburton Energy Services, Inc. | Control system for managed pressure well bore operations |
| US11261727B2 (en) * | 2020-02-11 | 2022-03-01 | Saudi Arabian Oil Company | Reservoir logging and pressure measurement for multi-reservoir wells |
-
2021
- 2021-10-12 US US17/499,439 patent/US20230110038A1/en not_active Abandoned
-
2022
- 2022-10-12 WO PCT/US2022/046452 patent/WO2023064396A1/en not_active Ceased
- 2022-10-12 EP EP22818137.6A patent/EP4416371A1/en active Pending
Also Published As
| Publication number | Publication date |
|---|---|
| US20230110038A1 (en) | 2023-04-13 |
| WO2023064396A1 (en) | 2023-04-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20130111985A1 (en) | Method for efficient pressure and inflow testing of a fluid containment system through real time leak detection with quantification of pvt effects | |
| CN101586462A (en) | Method of suspending, completing and working over a well | |
| US11692434B2 (en) | Remote wellhead integrity and sub-surface safety valve test | |
| US11125076B1 (en) | Accelerometer based casing collar locator | |
| US12410691B2 (en) | Apparatus and method for milling openings in an uncemented blank pipe | |
| US20230127022A1 (en) | Intelligent Well Control System and Method for Surface Blow-Out Preventer Equipment Stack | |
| NO20161520A1 (en) | Subsea system and method for high pressure high temperature wells | |
| US20190368298A1 (en) | Subsea system and method for high pressure high temperature wells | |
| EP4416371A1 (en) | Methods and tools for determining bleed-off pressure after well securement jobs | |
| US10890046B2 (en) | Managed pressure reverse cementing | |
| US11248432B2 (en) | Method and apparatus for suspending a well | |
| US12163422B2 (en) | Method to test exploration well's hydrocarbon potential while drilling | |
| US12188328B2 (en) | Wellbore back pressure valve with pressure gauge | |
| US12049965B2 (en) | Sub-surface safety valve (SSSV) advisory system-autonomous SSSV troubleshooting device | |
| Ho et al. | Drilling Deepwater Carbonates Using Managed Pressure Drilling on a Dynamically Positioned Drillship | |
| US12392238B2 (en) | Well testing method using tubing hanger deployed heat tracer flow metering system | |
| US12442275B2 (en) | Wireline retrievable annular pressure bleeder | |
| US11828146B2 (en) | Nonmetallic downhole check valve to improve power water injector well safety and reliability | |
| US12258840B1 (en) | Sub-surface safety valve with energy harvesting system and wireless activation | |
| Timms et al. | Downhole Deployment Valve–Case History | |
| US12264555B2 (en) | Autonomous tubing casing annulus relief system | |
| US12286863B2 (en) | Annulus access systems and methods | |
| US11753927B2 (en) | Collapse pressure in-situ tester | |
| US12078062B2 (en) | Automated inflow negative test process | |
| US20250129712A1 (en) | Hydraulic leak detection novel algorithm and method for offshore oil & gas platforms |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20240507 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| P01 | Opt-out of the competence of the unified patent court (upc) registered |
Free format text: CASE NUMBER: APP_49518/2024 Effective date: 20240902 |
|
| DAV | Request for validation of the european patent (deleted) | ||
| DAX | Request for extension of the european patent (deleted) | ||
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20250926 |